RENCANA PENAMBANGAN 
DI IUP OPERASI PRODUKSI 
(YANG DIAJUKAN)
PT BERKAH CIHERANG ABADI

BANDUNG, 9 Agustus 2019

LOKASI IUP OPERASI PRODUKSI (YANG DIAJUKAN)
Bujur Timur Lintang Selatan Bujur Timur Lintang Selatan
No No
Untuk mencapai lokasi daerah penyelidikan 1
o
107
'
44
"
6.943
o
6
'
37 5.282
"
14
o
107
'
43
"
51.473
o
6
'
37 50.761
"

2 107 44 10.647 6 37 5.282 15 107 43 51.473 6 37 40.454

dari Kota Bandung dapat ditempuh 3


4
107
107
44
44
10.647
12.332
6
6
37
37
16.467
16.467
16
17
107
107
43
43
58.735
58.735
6
6
37
37
40.454
32.995
5 107 44 12.332 6 37 24.157 18 107 44 3.199 6 37 32.995
menggunakan kendaraan roda empat selama 6 107 44 9.592 6 37 24.157 19 107 44 3.199 6 37 27.447
7 107 44 9.592 6 37 27.235 20 107 44 6.050 6 37 27.447

kurang lebih 2 Jam melalui jalan Setiabudi – 8


9
107
107
44
44
7.429
7.429
6
6
37
37
27.235
32.847
21
22
107
107
44
44
6.050
6.943
6
6
37
37
16.908
16.908
10 107 44 4.707 6 37 32.847 23 107 44 6.943 6 37 16.667

Jalan Raya Lembang – Jalan Subang 11


12
107
107
44
44
4.707
1.406
6
6
37
37
36.713
36.713
24
25
107
107
44
44
7.652
7.652
6
6
37
37
16.667
13.629
13 107 44 1.406 6 37 50.761 26 107 44 6.943 6 37 13.629
Lembang – lokasi dengan jarak tempuh
kurang lebih 54 Km dari kota Bandung.
Daerah kegiatan memiliki luas sekitar 24 
Ha, yang terletak di Desa Gunung Tua dan 
Desa Cijambe Kecamatan Cijambe, 
Kabupaten Subang, Provinsi Jawa Barat. 
Secara geografis terletak pada koordinat 
107 ̊ 44’ 1,406” ‐ 107 ̊ 44’ 58,7349” BT dan 
06 ̊ 37’ 5,282” ‐ 06 ̊ 37’ 50,761” LS. 

1
06/08/2019

STATUS DAN KEGUNAAN LAHAN 
Lokasi IUP eksplorasi PT Berkah Ciherang Abadi
yang berlokasi di Desa gunungtua Kecamatan
Cijambe Kabupaten Subang Provinsi Jawa Barat
termasuk kedalam kawasan Pertanian Lahan
Basah. Sebagaimana tercantum dalam pasal 42
Perda no. 3 Tahun 2014 tentang RTRW ayat (2)
Kawasan peruntukan pertambangan mineral dan
batubara sebagaimana dimaksud pada ayat (1)
huruf a tersebar di seluruh kecamatan kecuali
kecamatan subang dan ayat (3) kawasan
peruntukan pertambangan mineral dan batubara
sebagaimana dimaksud pada ayat (2) tidak
meliputi :

a. Kawasan Lindung PT berkah Ciherang Abadi mempunyai


b. Kawasan Peruntukan Perkotaan. lokasi IUP Eksplorasi seluas 24 Ha yang
terletak di Kp. Ciherang Desa Gunungtua
Kecamatan Cijambe Kabupaten Subang.
Saat ini kepemilikan seluruh lahan di
dalam IUP Eksplorasi dimiliki oleh
perusahaan dengan status lahan AJB dan
lahan bersertifikat Hak Milik

2
06/08/2019

PERIZINAN YANG DIMILIKI
1. Surat Keputusan Kepala Dinas Penanaman Modal Dan Pelayanan Terpadu Satu Pintu Pemerintah
Daerah Provinsi Jawa Bawat, Nomor 540/49/29.1.05.0/DPMPTSP/2018, tentang Wilayah Izin
Usaha Pertambangan PT. Berkah Ciherang Abadi.

2. Surat Keputusan Kepala Dinas Penanaman Modal Dan Pelayanan Terpadu Satu Pintu Pemerintah
Daerah Provinsi Jawa Bawat, Nomor 540/58/29.1.06.0/DPMPTSP/2018, tentang Izin Usaha
Pertambangan Eksplorasi PT. Berkah Ciherang Abadi.

3. Surat Keterangan Peruntukan Lahan Dinas Pekerjaan Umum dan Penataan Ruang
No.591/103/ket/Bid.TR

4. Keputusan Kepala Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu No 503/0051 – IL
– DPMPTSP / IV / 2019 Tentang Izin Lingkungan Penambangan Batu Andesit Kepada PT Berkah
Ciherang Abadi

SUMBERDAYA DAN CADANGAN Sumber Daya
No Nama Blok Terukur Luas (Ha)
Volume (m3) Tonase (ton)
1 IUP EKSPLORASI BCA 3.895.708 10.401.540,36 24

Cadangan 2018
Nama 
No Terbukti Luas    (Ha)
Blok
Volume    (m3) Tonase    (ton)
1 Pit 1 238,232.46  636,080.67  2.60
2 Pit 2 71,324.05  190,435.20  0.94
3 Pit 3 196,754.08  525,333.40  1.88
4 Pit 4 730,434.58  1,950,260.34  4.28

3
06/08/2019

KONDISI SEBELUM PENAMBANGAN
GEOMORFOLOGI
Kondisi geomorfologi di daerah IUP Operasi Produksi yang
dimohonkan dan sekitarnya dapat diketahui dengan melakukan
interpretasi peta rupa bumi, analisis morfologi serta pengamatan
dilapangan. Dari hasil kajian diketahui bahwa di sebelah Selatan IUP
eksplorasi PT berkah Ciherang Abadi didominasi oleh satuan
perbukitan, sedangkan daerah Utara IUP didominasi oleh satuan
Dataran.
Daerah  selatan  IUP  dibentuk  oleh  batuan  hasil 
gunungapi  muda  tak  teruraikan  serta  batuan 
aliran  lava  terutama  dari  gunung 
tangkubanparahu. Di sebelah Utara IUP Operasi 
Produksi  yang  dimohonkan  dibentuk  oleh 
anggota batulempung formasi Subang.  

Satuan Perbukitan di Selatan IUP

4
06/08/2019

RENCANA PENAMBANGAN
SISTEM/METODA DAN TATA CARA PENAMBANGAN
Side hill type merupakan bentuk penambangan
untuk batuan atau bahan galian industri yang terletak
dilereng-lereng bukit atau endapannya berbentuk bukit
dikarenakan bentuk endapan yang dapat digali hanya
sebagian lereng bukit, maka front kerja dibuat memanjang
dengan jalan masuk dari salah satu sisinya atau dari
depan.

5
06/08/2019

RENCANA PENAMBANGAN
Geometri FK (Faktor Keamanan)
Tinggi (m) Slope (o) Model 1 Model 2 Model 3
60 4.84 4.11 3.9
5 70 4.80 3.94 3.47
80 4.35 3.74 3.33

Simulasi lereng yang dilakukan untuk lereng tunggal menggunakan


geometri yang berbeda-beda. Hal ini bertujuan untuk mendapatkan geometri
yang paling ekonomis (terjal) namun tetap aman serta menjadi acuan dalam
merencanakan geometri lereng keseluruhan. Adapun geometri lereng tunggul
yang akan disimulasikan sebagai berikut :

- Tinggi lereng tunggal : 5 meter


- Sudut lereng tunggal : 60 o, 70 o, dan 80o

FK (Faktor Keamanan)
Geometri
Statis Dinamis
Lereng
Tinggi  Inter ramp  Model  Model  Model  Model  Model  Model 
Slope (o)
(m) (m) 1 2 3 1 2 3
PIT A 20 58 ‐ 3.24 2.62 2.05 2.49 2.03 1.49
PIT B 17.47 54 ‐ 3.59 2.81 2.27 2.81 2.12 1.7
PIT C 17 54 ‐ 3.87 2.87 2.4 3.05 2.26 1.76
PIT D 43 48 10 2.99 2.46 1.5 2.5 1.87 1.12

6
06/08/2019

7
06/08/2019

RENCANA PENAMBANGAN
RENCANA PRODUKSI
Berdasarkan hasil estimasi yang telah dilakukan pit potensial yang berada di wilayah IUP Operasi Produksi yang
dimohonkan PT Berkah Ciherang Abadi diperoleh total cadangan tertambang sebesar 1.236.745,17 m3 atau 3.302.110 ton
dengan total tanah penutup 65.091,85 m3.

Adapun rencana produksi andesit PT Berkah Ciherang Abadi secara detail dengan losses penambangan dan
pengolahan sebesar 5%. Sehubungan dengan hasil perhitungan cadangan andesit pada wilayah IUP PT Berkah Ciherang
Abadi ini, maka umur tambang yang berada di wilayah IUP PT Berkah Ciherang Abadi selama 11 tahun.

Tahun 1 2 3 4 5 6 7 8 9 10 11
Rencana Produksi (ton) 275.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000 300.000
Mineable 250.025 280.697 308.700 308.264 308.254 308.254 335.891 307.762 308.637 308.064 277.562
Jarak Angkut (m ) 1.200 1.200 1.200 1.200 1.200 1.200 1.000 1.000 600 400 400
Tanah Penutup (bcm ) 15.496 8.025 5.225 4.125 4.015 1.558 8.109 2.246 12.512 3.781 0
Jarak Angkut (m ) 150 150 150 150 150 150 150 150 150 150 0
Produksi Crusher 237.524 266.662 293.265 292.851 292.841 292.841 319.097 292.374 293.205 292.661 263.684

8
06/08/2019

9
06/08/2019

10
06/08/2019

11
06/08/2019

RENCANA PENAMBANGAN
PERALATAN PENAMBANGAN
Pemilihan jenis peralatan utama yang akan digunakan
dalam operasi penambangan batu andesit PT BCA adalah
Breaker, excavator, dump truck dan bulldozer.

A. PERALATAN UTAMA PENAMBANGAN Model Satuan Tahun


(Andesit) 1 2 3 4 5 6 7 8 9 10 11
Breaking PC 200 (unit) 2 2 2 2 2 2 2 2 2 2 2
Excavator PC 200 (unit) 1 1 1 1 1 1 1 1 1 1 1
Hauling Truck Hino 2836 TIP (unit) 2 2 2 2 2 2 2 2 2 1 1
(Tanah Penutup)
Breaking D85 (unit) 1 1 1 1 1 1 1 1 1 1 1
Excavator PC 200 (unit) 1 1 1 1 1 1 1 1 1 1 1
Hauling Truck Hino 2836 TIP (unit) 1 1 1 1 1 1 1 1 1 1 1

B. PERALATAN PENUNJANG
Water Truck (unit) 1 1 1 1 1 1 1 1 1 1 1
Fuel/lube truck (unit) 1 1 1 1 1 1 1 1 1 1 1
Welding (unit) 1 1 1 1 1 1 1 1 1 1 1
Passenger Bus (unit) 1 1 1 1 1 1 1 1 1 1 1
General Manager Vehicle (unit) 1 1 1 1 1 1 1 1 1 1 1
Mine Manager Vehicle (unit) 1 1 1 1 1 1 1 1 1 1 1
Safety Vehicle (unit) 1 1 1 1 1 1 1 1 1 1 1
Computer (unit) 2 2 2 2 2 2 2 2 2 2 2
Telephone Communication Equipment (unit) 2 2 2 2 2 2 2 2 2 2 2
Mine Radio (unit) 5 5 5 5 5 5 5 5 5 5 5
Engineering & Survey Equipment (unit) 2 2 2 2 2 2 2 2 2 2 2

C. PERALATAN PENGOLAHAN/STOCKPILE
Wheel Loader Cat C-970F (unit) 1 1 1 1 1 1 1 1 1 1 1
Hopper (unit) 1 1 1 1 1 1 1 1 1 1 1
Vibrating grizly (unit) 2 2 2 2 2 2 2 2 2 2 2
Jaw Crusher (unit) 1 1 1 1 1 1 1 1 1 1 1
Cone Crusher (unit) 1 1 1 1 1 1 1 1 1 1 1
Belt Conveyor (unit) 3 3 3 3 3 3 3 3 3 3 3

12
06/08/2019

RENCANA PENGOLAHAN

RENCANA REKLAMASI DAN PASCATAMBANG
PROGRAM REKLAMASI
Lahan yang umumnya akan dilakukan kegiatan direklamasi meliputi lahan bekas tambang, jalan tambang dan non
tambang. Tujuan dari kegiatan reklamasi ini yaitu untuk mengambalikan fungsi lahan yang terganggu akibat
kegiatan penambangan yang telah dilakukan

13
06/08/2019

RENCANA REKLAMASI DAN PASCATAMBANG
PROGRAM REKLAMASI
Rencana Luasan Reklamasi Pertahun

14
06/08/2019

Berdasarkan rencana penambangan, rencana reklamasi


dan pascatambang yang akan dilaksanakan oleh PT Berkah
Ciherang Abadi, lubang bekas penambanganakan dimanfaatkan
sebagai kolam penampungan air. Selanjutmya kolam
penampunganair ini akan digunakan sebagai objek pariwisata
dan budidaya ikan air tawar yang diharapkan akan bermanfaat
bagi warga sekitar area bekas penambangan

15
06/08/2019

RENCANA REKLAMASI DAN PASCATAMBANG

RONA LINGKUNGAN AKHIR LAHAN 
PASCATAMBANG
KEADAAN CADANGAN TERSISA Tahun  Sisa Cadangan (Ton) 
0  3.302.109,61 
Rencana penambangan di daerah PT BCA dibuat sampai pada
1  3.052.084,61 
kedalaman 270m dpl. Hal ini dikarenakan topografi terendah dan
2  2.771.387,65 
rencana design secara ekonomis hanya sampai kedalaman tersebut.
3  2.462.687,38 
Aktivitas penambangan sampai akhir berjalan dengan baik. Jumlah
4  2.154.423,38 
cadangan di lokasi IUP PT BCA , yaitu sebesar 3.302.109,60 Ton.
5  1.846.169,38 
Berdasarkan perundang – undangan yang berlaku umur ijin 6  1.537.915,38 
tambang bahan galian batuan maksimal 5 tahun dan dapat 7  1.202.024,27 
diperpanjang 2x5 tahun. Berdasarkan cadangan yang terdapat di 8  894.262,27 
lokasi IUP PT Berkah Ciherang Abadi, maka umur ijin tambang yang 9  585.625,67 
dimintakan adalah 5 tahun dengan opsi perpanjangan 5 tahun dan 1 10  277.561,67 
tahun . 11  0,00 

16
06/08/2019

ANALISIS KELAYAKAN No Jenis Ukuran Batuan Andesit


1
Kegunaan
Boulder Elephant Stone (Batu Penimbunan daerah rawa atau bibir pantai
Gajah) sebagai pembuatan dermaga dan pondasi
PEMASARAN 2 Base Course (lapisan Kedua) Untuk lapisan kedua/ketiga dari suatu areal
yang akan ditimbun, dimana tanah dasar
sudah cukup stabil
3 Batu Belah (20 cm x 30 cm) Untuk pondasi bangunan
4 Sirtu Untuk lapisan kedua, dimana tanah awalnya
masih kurang stabil
5 Split Stone (3 cm x 5 cm) Digunakan untuk dasar badan jalan sebelum
menggunakan material yang lain,
penyangga bantalan kereta api,
penutup/pemberat pipa dasar laut, juga
digunakan untuk campuran beton.
6 Split Stone (2 cm x 3cm) Untuk pengecoran lantai kerja, pengecoran
atau pembetonan horizontal dan AMP
7 Split Stone (1 cm x 2 cm) Untuk pengecoran segala macam kontruksi
mulai dari yang ringan sampai konstruksi
berat seperti jalan tol, gedung bertingkat,
lapang pesawat udara, bantaran kereta api
pelabuhan, dan dermaga, tiang pancang
dan jembatan.
8 Screening Untuk campuran dan pengaspalan jalan
mulai dari jalan ringan sampai dengan jalan
ke I (asphalt mixed plant)
9 Abu Batu (0 – 5) Untuk campuran dalam proses pengaspalan
dan dapat berfungsi sebagai pengganti
pasir, untuk pembuatan gorong-gorong.

Modal kerja pada tahun ke-1 yang dibutuhkan

INVESTASI untuk proyek penambangan batu andesit ini adalah


sebesar Rp. 17.948.427.374 (tujuh belas milyar
MODAL KERJA
sembilan ratus emapt puluh delapan juta emapt ratus
dua puluh tujuh juta tiga ratus tujuh puluh empat rupiah)

Jenis sumber pendanaan untuk investasi rencana


penambangan batu andesit PT Berkah Ciherang Abadi
merupakan Modal sendiri (20 %) dan pinjaman Modal
sebesar 80%.

17
06/08/2019

ANALISIS KELAYAKAN 
Analisis Kepekaan dan Break Event Point

RENCANA KERJA TAHUN KE 1
Perbaikan Sarana Prasarana Tambang yang ada

18
06/08/2019

Bukaan Lahan
Deskripsi
Rencana dan Realisasi Lokasi/Blok/Pit
Tambang Aktif (Ha) Tambang Selesai (Ha)
Blok BCA Pit 1 0,00 0,00
Blok BCA Pit 2 0,00 0,00
Rencana Tahun Ke 1 Blok BCA Pit 3 0,00 0,00
Blok BCA Pit 4 1,97 0,16
Total Total 1,97 0,16

Elevasi
Deskripsi
Rencana dan Realisasi Lokasi/Blok/P it Elevasi Tambang Elevasi Tambang Sesuai FS
(m) (m)
Blok BCA Pit 1 286 286
Blok BCA Pit 2 302 302
RENCANA TAHUN 
Blok BCA Pit 3 312 312
(2019)
Blok BCA Pit 4 338 325
Rata‐rata 309,5 306,25

Rencana Biaya Kegiatan Penambangan Tahun Ke 1


Deskripsi
Rencana &  Lokasi 
No Deskripsi Mineral Getting  Jumlah (Rp)
Realisasi Blok/Pit Land Clearing (Ha) Reconturing (Ha)
(Ton)
Kuantitas 0,69 80.526,00 0,19
Rencana Tahun Lokasi/Pit I
1 Satuan Biaya 1.678.804.124,51 23.116,52 75.921.102,93
Ke 1
Total Biaya 1.158.374.845,91 1.861.480.884,11 14.425.009,56 3.034.280.739,57

NO DESKRIPSI RENCANA TAHUN (2019)

1 2
1 Batuan yang diolah (ton) 250.025,00
2 Produksi (ton) 237.523,75
3 Spesifikasi produk
Base coarse (0%-15%) 35.628,56
Split 3-5 (20%) 47.504,75
Split 2-3 (20%) 47.504,75
Split 1-2 (35%) 83.133,31
Abu (10%) 23.752,38
4 Recovery pengolahan (%) 95,00%

19
06/08/2019

Rencana dan Realisasi Tahun (2019) (IDR)


Uraian Biaya Pengelolaan dan
Tri. I Tri. II Tri. III Tri. IV TOTAL
Pemantauan Lingkungan
Rencana Realisasi Rencana Realisasi Rencana Realisasi Rencana Realisasi Rencana Realisasi
1 2 3 4 5 6 7 8 9 10=(2+4+6+8) 11=(3+5+7+9)
1 Biaya Pengelolaan Lingkungan
1) Pembongkaran fasilitas tambang
Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -
(jika ada)
2) Penataan lahan Rp - Rp - Rp 1.540.231,05 Rp - Rp 1.540.231,05 Rp - Rp 1.540.231,05 Rp - Rp 4.620.693,14 Rp -
3) Penghijauan Rp - Rp - Rp 820.099,12 Rp - Rp 820.099,12 Rp - Rp 820.099,12 Rp - Rp 2.460.297,36 Rp -
4) Pekerjaan sipil seperti pembuatan
dan perawatan dam/kolam Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -
pengendap
5) Pengelolaan Kualitas Air Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -
2 Biaya Pemantauan Lingkungan
Kualitas Air Rp 3.000.000,00 Rp - Rp 3.000.000,00 Rp - Rp 3.000.000,00 Rp - Rp 3.000.000,00 Rp - Rp 12.000.000,00 Rp -
Total Biaya Pengelolaan Dan
Rp 3.000.000,00 Rp - Rp 5.360.330,17 Rp - Rp 5.360.330,17 Rp - Rp 5.360.330,17 Rp - Rp 19.080.990,50 Rp -
Pemantauan Lingkungan

N TAHUN Ke 1
URAIAN
O RENCANA REALISASI PRAKIRAAN REALISASI

PENERIMAAN NEGARA 1 2 3

a PAJAK
Pajak‐pajak daerah Rp 732.529.793  Rp          ‐ Rp 700.000.000 
Jumlah Pajak Rp 732.529.793  Rp          ‐ Rp 700.000.000 
JUMLAH PENERIMAAN NEGARA Rp 732.529.793  Rp          ‐ Rp 700.000.000 

20
06/08/2019

TERIMA KASIH