Rab Pendopo'15 000
Rab Pendopo'15 000
BECK UP DATA
( PERHITUNGAN )
KEGIATAN :
PEKERJAAN :
TAHUN ANGGARAN :
2015
Konsultan Perencana :
N)
SEKOLAH
EGERI 1 KARANGGAYAM
Bantul
REKAPITULASI RENCANA ANGGARAN BIAYA
(RAB)
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
III PEKERJAAN PONDASI
IV PEKERJAAN BETON
V PEKERJAAN BESI
VI PEKERJAAN PASANGAN DINDING
VII PEKERJAAN PLESTERAN
VIII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DIN
IX PEKERJAAN LANGIT-LANGIT (PLAFOND)
X PEKERJAAN PENUTUP ATAP
XI PEKERJAAN KAYU
XII PEKERJAAN KUNCI DAN KACA
XIII PEKERJAAN PENGECATAN
XIV SANITASI DALAM GEDUNG
XV PEKERJAAN LAIN - LAIN
XVI PEKERJAAN SOFTSSCAPE
XVII PEKERJAAN TALUD
JUMLAH
DIBULATKAN
===SATU MILYAR DELAPAN RATUS ENAM PULUH
Terbilang :
SEMBILAN JUTA RUPIAH ===
:MENYETUJUI
KASI TEKHNIK BIDANG BINA TEKHNIK
DINAS PEKERJAAN UMUM
KABUPATEN KEBUMEN
IKHSANUDIN ,S.ST .MT
NIP.19710209 199303 1 002
SUPANGAT ,ST
NIP.196507261992031003
:MENGETAHUI
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN KEBUMEN
PENGEMBANGAN INSFRATRUKTUR
OKUMEN PERENCANAAN TEKHNIK
N INSFRATRUKTUR BIDANG CIPTAKARYA
HARGA
(Rp.)
Rp 22,043,029.20
Rp 56,042,422.35
Rp 80,847,781.99
Rp 539,685,645.74
Rp 305,772,668.35
Rp 163,216,317.01
Rp 147,137,123.70
Rp 73,364,406.40
Rp 73,459,075.50
Rp 43,990,834.60
Rp 100,371,291.12
Rp 22,316,512.75
Rp 55,997,343.09
Rp 27,233,857.10
Rp 50,872,168.88
Rp 12,205,558.40
Rp 94,994,447.95
Rp 1,869,550,484.13
Rp 1,869,000,000.00
YAR DELAPAN RATUS ENAM PULUH
MBILAN JUTA RUPIAH ===
Kebumen, 2015
CV. WULANDARI
TONI SETYAWAN, ST
Ir.TRIMULYONO
NIP.19630322 199603 1 003
RENCANA ANGGARAN BIAY
(RAB)
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN
NO JENIS PEKERJAAN
I PEKERJAAN PERSIAPAN
1 Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter
2 Pengukuran Dan Pemasangan 1 M’ Bouwplank
JUMLAH
II PEKERJAAN TANAH
1 Penggalian 1 M3 Tanah Biasa Sedalam 1 M
2 Pengurugan Kembali 1 M3 Galian Tanah
2 Pemadatan Tanah 1 M3 Tanah ( Per 20 Cm)
3 Pengurugan 1 M3 Dengan Pasir Urug
4 Pengurugan 1 M3 Sirtu Padat
5 Tanah Subur
JUMLAH
JUMLAH
IV PEKERJAAN BETON
1 Beton Mutu F’C = 7,4 Mpa (K 100), Slump (12 ± 2) Cm, W/C = 0,87
PONDASI FOOTPLAT
2 Pemasangan 1 M2 Bekisting Untuk Pondasi
3 Pembesian 10 Kg Dengan Besi Polos Atau Besi Ulir
4 Beton Mutu F’C = 16,9 Mpa (K 200), Slump (12 ± 2) Cm, W/C = 0,87
KOLOM PENGUAT FOOTPLAT 20/20
5 Pemasangan 1 M2 Bekisting Untuk Kolom
6 Pembesian 10 Kg Dengan Besi Polos Atau Besi Ulir
7 Beton Mutu F’C = 16,9 Mpa (K 200), Slump (12 ± 2) Cm, W/C = 0,87
SLOOF 15/20
8 Pemasangan 1 M2 Bekisting Untuk Sloof
9 Pembesian 10 Kg Dengan Besi Polos Atau Besi Ulir
10 Beton Mutu F’C = 16,9 Mpa (K 200), Slump (12 ± 2) Cm, W/C = 0,87
KOLOM 20/20
11 Pemasangan 1 M2 Bekisting Untuk Kolom
12 Pembesian 10 Kg Dengan Besi Polos Atau Besi Ulir
13 Beton Mutu F’C = 16,9 Mpa (K 200), Slump (12 ± 2) Cm, W/C = 0,87
BALOK 15/30
17 Pemasangan 1 M2 Bekisting Untuk Balok
18 Pembesian 10 Kg Dengan Besi Polos Atau Besi Ulir
19 Beton Mutu F’C = 16,9 Mpa (K 200), Slump (12 ± 2) Cm, W/C = 0,87
PLAT ATAP
26 Pemasangan 1 M2 Bekisting Untuk Pondasi
27 Pembesian 10 Kg Dengan Besi Polos Atau Besi Ulir
28 Beton Mutu F’C = 16,9 Mpa (K 200), Slump (12 ± 2) Cm, W/C = 0,87
SHADING
29 Pemasangan 1 M2 Bekisting Untuk Balok
30 Pembesian 10 Kg Dengan Besi Polos Atau Besi Ulir
31 Beton Mutu F’C = 16,9 Mpa (K 200), Slump (12 ± 2) Cm, W/C = 0,87
BALOK LATAI
32 Pemasangan 1 M2 Bekisting Untuk Balok
33 Pembesian 10 Kg Dengan Besi Polos Atau Besi Ulir
34 Beton Mutu F’C = 16,9 Mpa (K 200), Slump (12 ± 2) Cm, W/C = 0,87
KONSOL HIAS
35 Pemasangan 1 M2 Bekisting Untuk Balok
36 Pembesian 10 Kg Dengan Besi Polos Atau Besi Ulir
37 Beton Mutu F’C = 16,9 Mpa (K 200), Slump (12 ± 2) Cm, W/C = 0,87
JUMLAH
V PEKERJAAN BESI
1 Pemasangan 1 Kg Besi Profil
2 Pengerjaan 100 Kg Pekerjaan Perakitan
3 Talang ½ Lingkaran D-15 Cm, Seng Plat Bjls 30 Lebar 45 Cm
4 Rangka Atap Baja Ringan (Usuk+Reng)
Beton Mutu F’C = 16,9 Mpa (K 200), Slump (12 ± 2) Cm, W/C = 0,87
JUMLAH
JUMLAH
JUMLAH
JUMLAH
XI PEKERJAAN KAYU
1 Masangan 1 M3 Kusen Pintu Dan Kusen Jendela, Kayu Kelas I
2 Daun Pintu Panel, Kayu Kelas I Atau Ii
3 Pintu Dan Jendela Kaca, Kayu Kelas I Atau Ii
4 Pintu Dan Jendela Jalusi Kayu Kelas I Atau Ii
5 Kuran (3 X 30) Cm, Kayu Kelas I Atau Kelas Ii
6 Pasang Roster 30x30
7 Pasang Roster 20x20
JUMLAH
XII PEKERJAAN KUNCI DAN KACA
1 Pemasangan 1 Buah Kunci Tanam Antik
2 Pemasangan 1 Buah Engsel Pintu
3 Pemasangan 1 Buah Engsel Jendela Kupu-Kupu
4 Pemasangan 1 Buah Kait Angin
5 Pemasangan 1 Buah Kunci Slot
6 Pemasangan 1 M2 Kaca Tebal 5 Mm
JUMLAH
JUMLAH
JUMLAH
XVI PEKERJAAN SOFTSSCAPE
1 Menanam Palm ekor tupai t. 3m
2 Menanam Dadap Merah
3 Menanam Kantil Kuning
4 Menanam Semak Perdu
5 Menanam Rumput Gajah Mini
JUMLAH
JUMLAH TOTAL
A ANGGARAN BIAYA
(RAB)
Rp 22,043,029.20
Rp 56,042,422.35
Rp 80,847,781.99
Rp 539,685,645.74
Rp 305,772,668.35
Rp 163,216,317.01
Rp 147,137,123.70
Rp 73,459,075.50
Rp 43,990,834.60
Rp 100,371,291.12
A.4.6.2.1. bh 73.00 Rp 171,825.00 Rp 12,543,225.00
A.4.6.2.5. bh 48.00 Rp 28,110.00 Rp 1,349,280.00
A.4.6.2.6. bh 110.00 Rp 21,487.50 Rp 2,363,625.00
A.4.6.2.9. bh 49.00 Rp 27,350.00 Rp 1,340,150.00
A.4.6.2.11. bh 9.00 Rp 81,475.00 Rp 733,275.00
A.4.6.2.17. m² 25.31 Rp 157,525.00 Rp 3,986,957.75
Rp 22,316,512.75
Rp 55,997,343.09
Rp 27,233,857.10
Rp 50,872,168.88
Rp 12,205,558.40
Rp 94,994,447.95
Rp 1,869,550,484.13
PERHITUNGAN KUANTITAS PEKERJAA
NO
URAIAN PEKERJAAN / SKET GAMBAR PERHITUNGAN
I. PEKERJAAN PERSIAPAN
1 Pagar proyek, seng gelombang = 34.00 x 1.00
a. Galian Pondasi
= 0.80 x 0.60 x 245.4
0.8
m
m 0.6
m 0.5
m
m 0.25
2 Galian sedalam 1 m
- Galian Footplat P1, jumlah 49 bh = 1.00 x 2.05 x 49.00
3 Urugan pasir
4 Urugan Sirtu
= 0.12 x 431.30 x 1.00
6 Pemadatan Tanah
= 1134.87 + 51.76
7 Tanah Subur
= 518.00 x 0.10 x 1.00
0,20
1,10
NO
URAIAN PEKERJAAN / SKET GAMBAR PERHITUNGAN
Pas bata merah 1/2 bata 1 : 4 = total pas bata merah 1 : 4 - pas. Bata me
= 1,309.74 - 95.88 - 115.84
V. PEKERJAAN PLESTERAN
1 Plesteran dinding 1 : 4 , 15 mm = 1,098.02 x 2 = 2196.04
VI PEKERJAAN BETON
1 Beton tumbuk 1 : 3 : 5 = 0.50 x 0.10 x 132.00
b. Sloof 15/20
a. Begisting = 0.2 x 2 x 104.3
b. Pembesian
-Besi 4 Ø 12 = 4.00 x 0.887 x 104.30
-Begel Ø 8-15 = 696.33 x 0.393 x 0.90
b. Gording C 200.75.20.3,2
Gording = 49.00 x 9.27
c. Plat tebal 8 mm
= 0.08 x 64.93
= 15.00 x 2.00
Pasang mur baud HTB 12 mm
= 9.00 x 2.00
= 9.00 x 20.00
NO
URAIAN PEKERJAAN / SKET GAMBAR PERHITUNGAN
VII PEKERJAAN PENUTUP ATAP
1 Pasangan rangka atap baja ringan = 15.75 x 4.05 x 2.00
= 23.00 x 5.15 x 2.00
= 2.75 x 4.05 x 2.00
= 10.00 x 5.15 x 2.00
= 6.75 x 2.70 x 2.00
= 11.00 x 2.80 x 2.00
= 1.75 x 2.70 x 2.00
= 6.00 x 2.80 x 2.00
= 5.25 x 3.75 x 2.00
= 3.25 x 3.75 x 2.00
= 2.50 x 3.42 x 2.00
= 3.00 x 3.50 x 2.00
KUDA-KUDA A
7.54 x 26.20
D + 70.70.7 = 4.60
14.76 x 4.60
7.51 218.00
7,055.86
2 Pasangan atap genteng palentong kecil = 732.72 m2
NO
URAIAN PEKERJAAN / SKET GAMBAR PERHITUNGAN
IX PEKERJAAN SANITASI
1 Kloset Jongkok Porselen = 1.00 bh
2 Kloset duduk/monoblok = 4.00 bh
3 Wastafel = 4.00 bh
4 Bath up ex Toto = 1.00 bh
5 Floor drain = 4.00 bh
6 Exhaust fan = 4.00 bh
7 Pipa PVC AW Diameter 3/4" = 4.00 x 40 = 160
8 Pipa PVC AW Diameter 3" = 4.00 x 20 = 80
9 Knee = 2.00 x 20 = 40
10 Kran Diameter 3/4" = 4.00 bh
11 Bak Mandi 0.3 m3 = 4.00 bh
12 Bak Cuci Piring = 1.00 bh
13 Septictank + Sumur = 2.00 bh
14 Gorong - gorong 20 Cm = 38.00 x 1 = 38.00
NO
URAIAN PEKERJAAN / SKET GAMBAR PERHITUNGAN
XV PEKERJAAN SOFTSCAPE
1 Menanam Palm ekor tupai t. 3m = 10.00 bh
2 Menanam Cemara Lilin = 4.00 bh
3 Menanam Kantil Kuning = 9.00 bh
4 Menanam Semak Perdu = 9.40 x 0.80 = 7.52
= 10.70 x 0.80 = 8.56
= 17.20 x 0.80 = 13.76
29.84
B Pekerjaan Tanah
1. Galian tanah untuk konstruksi ( Buruh= 1.25 x 0.80 x 237.08
= 1.20 x 0.75 x 263.27
C Pekerjaan pondasi
1. Pasangan batu kosong = 1.25 x 0.20 x 237.08
E Pekerjaan pagar
1. Sloof 15/20
- Begisting = 0.20 x 2 x 237.08
2. Kolom 20/20
-Begisting = 0.52 x 4 x 68.00
4. Plesteran
a. Pilar = 3.00 x 2.75 x 64.00
= 0.21 x 4.00 x 64.00
a. Pagar = 7.50 x 2.4 x 62.00
NO
URAIAN PEKERJAAN / SKET GAMBAR PERHITUNGAN
5. Profil
a. Pilar = 3.24 x 0.97 x 64.00
= 3.48 x 0.8 x 64.00
= 3.56 x 0.14 x 64.00
= 4.00 x 0.1 x 64.00
6. Pengecatan
a. Pilar = 3.00 x 2.75 x 64.00
= 0.20 x 4.00 x 64.00
= 0.28 x 4.00 x 64.00
= 0.02 x 4.00 x 64.00
7. Roster 25 x 35 = 896.00 bh
XVIIPEKERJAAN RENOVASI
A Bongkaran dinding
= 0.15 x 3.50 x 21.50
B Pekerjaan Tanah
1. Galian tanah untuk konstruksi ( Buruh= 1.10 x 0.80 x 18.50
C Pekerjaan pondasi
1. Pasangan batu kosong = 0.80 x 0.20 x 18.50
D Pasangan Bata
1. Pasangan Bata merah 1/2 bata, 1 : 4
= 18.50 x tinggi
= 18.50 x 3.5 = 64.75
E Plesteran
1. Plesteran dinding 1 : 4 , 15 mm = 64.75 x 2 = 129.5
F Sloof 15/20
- Begisting = 0.20 x 2 x 18.50
G Kolom 15/15
-Begisting = 0.70 x 4 x 11.00
I Langit - Langit
1. Pasang rangka langit - langit ( 1.00 x1.00 ) m kayu kamper
= 6.50 x 12 = 78
J Sanitasi
1. Memasang 1 buah kloset duduk/monoblok
= 3.00 bh
2. Memasang 1 buah bak mandi batu bata volume 0,30 m3
= 3.00 bh
cm 5
NO
URAIAN PEKERJAAN / SKET GAMBAR PERHITUNGAN
K Pengecatan
1. Pengecatan Tembok Baru = 129.50 x 1.00 = 129.50
= 7.40 x 1.00 = 7.40
136.90
L Pasang Keramik
= 1.60 x 18.50 = 29.6
M Pekerjaan Lain-lain
1. Instalasi lampu
= 3.00 bh
2. Instalasi stop kontak
= 2.00 bh
3. Lampu down light SL 18 W
= 3.00 bh
TITAS PEKERJAAN
= 34.00 m1 34.00 m1
1.00 unit
= 140.00 m1 140.00 m1
= 9.00 m3 9.00 m3
= 34.00 m2 34.00 m2
1.00 ls
= 117.79 m3 226.83 m3
= 3.31 m3
= 33.35 m3
= 72.38 m3
= 12.35 m3
84.73 m3
100.45 m3
= 100.45 m3
m3 147.48 m3
m3
17.98 m3
= 0.33 m3
= 7.36 m3
= 6.58 m3
13.94 m3
= 3.71 m3
= 51.76 m3 51.76 m3
= 1072.71 m3 1,134.87 m3
= 62.16 m3
1134.87 m3
= 1186.63 m3 1,186.63 m3
= 51.80 m3 51.80 m3
= 6.60 m3 6.60 m3
= 39.26 m3 52.42 m3
= 13.16 m3
52.42 m3
= 62.58 m3 103.47 m3
= 33.37 m3
= 7.53 m3
103.47 m3
m2 165.64 m2
m2
m2
m2
m2
1,098.02 m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2 95.88 m2
m2
m2
m2 260.75 m2
m2 2,196.04 m2
m2 191.76 m2
m2 53.98 m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
= 6.60 m2 6.60 m3
6.60 m2
4.90 m3
= 4.90 m2
4.90 m2 11.50 m3
= 78.40 m2 78.40 m2
= 12.42 kg
= 9.76 kg
= 12.42 kg
= 9.76 kg
44.35 kg
2,173.15 kg 2,173.15 kg
= 19.11 m3 19.11 m3
= 127.04 m2 127.04 m2
= 1,690.27 kg
= 749.25 kg
2,439.52 kg 2,439.52 kg
= 9.53 m3 9.53 m3
= 41.72 m2 41.72 m2
= 370.06 kg
= 246.29 kg
616.35 kg 616.35 kg
= 3.13 m3 3.13 m3
= 31.29 m2 31.29 m2
= 370.06 kg
= 246.29 kg
616.35 kg 616.35 kg
= 2.35 m3 2.35 m3
219.19
x 9.00 = 199.26
x 18.00 = 19.93
219.19
908.46
x 2.00 = 908.46
908.46
131.48
= 64.93 kg
x 27.00 = 131.48
131.48
54.00
x 18.00 / ### = 54.00
54.00
216.00
x 2.00 = 36.00
x 1.00 = 180.00
= 127.58 m2 732.72 m2
= 236.90 m2
= 22.28 m2
= 103.00 m2
= 36.45 m2
= 61.60 m2
= 9.45 m2
= 33.60 m2
= 39.38 m2
= 24.38 m2
= 17.12 m2
= 21.00 m2
732.72 m2
+ 3.40 16.80
247.97 Kg
11.80
128.03 Kg
+ 3.30 7.30
11.90
7.00
26.20 M
197.55 Kg
4.60
67.90 Kg
67.90 641.44 Kg
7,055.86 Kg
+ 15.00 66.00
14.00
+ 24.00 84.00
54.00
218.00
1,637.18 Kg
+ 1,637.18 8,693.04 Kg
732.72 m2
625.68 m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
452.68 m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
173.00 m2
m2
m2
m2
m2
m2
652.50 m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
1.00 bh
4.00 bh
4.00 bh
1.00 bh
4.00 bh
4.00 bh
m' 160.00 m'
m' 80.00 m'
m' 40.00 m'
4.00 bh
4.00 bh
1.00 bh
2.00 bh
m1 38.00 m1
m1 12.00 m'
416.33 m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
59.40 m2
= 12.00 m2
= 12.90 m2
= 10.50 m2
= 9.00 m2
= 15.00 m2
59.40 m2
35.70 m2
= 7.35 m2
= 7.95 m2
= 6.35 m2
= 5.35 m2
= 8.70 m2
35.70 m2
3.96 m2
= 0.80 m2
= 0.86 m2
= 0.70 m2
= 0.60 m2
= 1.00 m2
3.96 m2
m2 2,494.39 m2
m2
m2
m3
- 115.84 = ### m2
m2
m2
295.67 m2
52.00 bh
13.00 bh
37.00 bh
8.00 bh
3.00 bh
2.00 bh
2.00 bh
36.00 m1
m1
938.70 m1
m1
= 38.36 m3 38.36 m3
10.00 bh
4.00 bh
9.00 bh
m2 29.84 m2
m2
m2
m2
m2 272.48 m2
m2
m2
m2
m2
m2
= 98.73 m3 98.73 m3
= 237.08 m3 474.02 m3
= 236.94 m3
474.02 m3
= 29.64 m3 29.64 m3
= 31.59 m3
61.23 m3
= 118.51 m3 118.51 m3
= 59.27 m3 59.27 m3
= 85.35 m3 227.51 m3
= 110.57 m3
= 31.59 m3
227.51 m3
= 112.00 m3 112.00 m3
= 95.36 m3 95.36 m3
64.00 m2
= 64.00 m2
64.00 m2
= 76.80 m2 76.80 m2
= 8.69 kg
= 6.83 kg
= 8.69 kg
= 6.83 kg
31.03 kg
1,985.93 kg 1,985.93 kg
= 13.44 m3 13.44 m3
= 64.00 m2 64.00 m2
= 567.68 kg 567.68 kg
= 3.20 m3 3.20 m3
= 94.83 m2 94.83 m2
= 1,261.74 kg 1,261.74 kg
= 7.11 m3 7.11 m3
= 141.44 m2 141.44 m2
= 1,254.57 kg 1,254.57 kg
= 7.07 m3 7.07 m3
= 396.00 m2 396.00 m2
= 511.50 m2 511.50 m2
= 528.00 m2 580.80 m2
= 52.80 m2
580.80
= 1,116.00 m2 1,116.00 m2
= 201.14 m2 436.81 m2
= 178.18 m2
= 31.90 m2
= 25.60 m2
436.81 m2
= 102.30 m2 223.20 m2
= 97.65 m2
= 23.25 m2
223.20 m2
= 528.00 m2 654.17 m2
= 49.92 m2
= 71.27 m2
= 4.98 m2
654.17 m2
= 1,116.00 m2 1,413.60 m2
= 186.00 m2
= 111.60 m2
1,413.60 m2
896.00 bh
= 11.29 m3 11.29 m3
= 16.28 m3 16.28 m3
16.28 m3
= 1.48 m3 1.48 m3
1.48 m3
= 4.07 m3 4.07 m3
= 2.96 m3 2.96 m3
= 5.00 m3 5.00 m3
5.00 m3
64.75 m2
m2
m2 3.70 m2
m2 129.50 m2
m2 7.40 m2
= 7.40 m2 7.40 m2
= 98.46 kg 98.46 kg
= 0.56 m3 0.56 m3
= 30.80 m2 30.80 m2
= 95.48 kg 95.48 kg
= 0.87 m3 0.87 m3
= 7.40 m2 7.40 m2
= 98.46 kg 98.46 kg
= 0.56 m3 0.56 m3
m2 78.00 m2
m2 78.00 m2
37.00 m'
m'
3.00 bh
3.00 bh
m2 209.16 m2
m2
m2
m2
- 10.18 = 126.72 m2
m2
m2
37.39 m2
m2 29.60 m2
3.00 bh
2.00 bh
3.00 bh
BACK UP STRUKTUR
KOLOM
Kolom 20x20
tinggi : 5m panjang total = 320
jml kol : 64 bh
VOL BETON dimensi pjng total
0.04 x 320 = 12.8 m3
VOL BESI jml besi tggi kol jml kolom
8D12 : 8 bh x 5m x 64 bh = 2560 m
Kolom 20x20
tinggi : 3.5 m panjang total = 14
jml kol : 4 bh
VOL BETON dimensi pjng total
0.04 x 14 = 0.56 m3
VOL BESI jml besi tggi kol jml kolom
8D12 : 8 bh x 3.5 m x 4 bh = 112 m
Kolom praktis
tinggi : 5m panjang total = 60
jml kol : 12 bh
VOL BETON dimensi pjng total
0.0225 x 60 = 1.35 m3
BALOK
Balok 15/30
koef :
6D12 : 6 bh x 4.00 m = 24.00 0.887 kg =
RING BALOK
Ring Balok 15/20
koef :
6D12 : 6 bh x 12.00 m = 72.00 0.887 kg =
koef :
6D12 : 6 bh x 7.00 m = 42.00 0.887 kg =
koef :
6D12 : 6 bh x 2.00 m = 12.00 0.887 kg =
PLAT ATAP
vol penulangan
PLAT ATAP
vol penulangan
PLAT ATAP
vol penulangan
SHADING
jumlah : 70.4 bh luas total : 45.76 m2
ukuran : 0.65 m
vol beton : 0.1 m1 x 45.76 m2 = 4.58 m3
vol penulangan
koef :
Ø 10 - 10 : 704 bh x 0.75 m = 528 0.620 kg =
Ø 10 - 10 : 8 bh x 70.40 m = 563.2 0.620 kg =
BALOK LATAY
jumlah : 1 bh luas total : 70.40 m2
ukuran : 70.4 m
vol beton : 0.02 m1 x 70.4 m2 = 1.58 m3
koef :
Ø 8 : 4 bh x 70.4 m = 281.6 0.393 kg =
koef :
4D10 : 4 bh x 1.30 m = 5.20 0.62 kg =
koef :
6D10 : 6 bh x 0.70 m = 4.20 0.62 kg =
koef :
4D8 : 4 bh x 0.70 m = 2.80 0.393 kg =
koef : 0.393 kg
: 754.91 kg
dlm kg (20x20) : 3025.63 kg
128.00 m2
koef : 0.887 kg
: 99.344 kg
koef : 0.393 kg
: 33.37 kg
dlm kg (20x20) : 132.71 kg
5.6 m2
koef : 0.620 kg
: 148.8 kg
koef : 0.393 kg
: 82.81 kg
dlm kg (20x20) : 231.61 kg
18 m2
koef : 0.620 kg
: 267.84 kg
koef : 0.393 kg
: 148.83 kg
dlm kg (20x20) : 416.67 kg
32.4 m2
koef : 0.620 kg
: 243.04 kg
koef : 0.393 kg
: 135.07 kg
dlm kg (20x20) : 378.11 kg
29.4 m2
koef : 0.887 kg
: 851.8748 kg
koef : 0.393 kg
: 283.43 kg
dlm kg (20x20) : 1135.31 kg
58.8245 m2
koef : 0.393 kg
: 41.92 kg
: 41.92 kg
21.29 kg
21.29 kg
85.15 kg 127.07 kg
9.6 m2
koef : 0.393 kg
: 56.95 kg
: 56.95 kg
63.86 kg
63.86 kg
127.73 kg 184.67 kg
9.6 m2
koef : 0.393 kg
: 66.38 kg
: 66.38 kg
37.25 kg
37.25 kg
149.02 kg 215.39 kg
11.2 m2
koef : 0.393 kg
: 38.08 kg
: 38.08 kg
10.64 kg
10.64 kg
85.15 kg 123.23 kg
6.4 m2
koef : 0.393 kg
: 32.19 kg
: 32.19 kg
23.95 kg
23.95 kg
71.85 kg 104.03 kg
5.4 m2
koef : 0.393 kg
: 194.89 kg
: 194.89 kg
146.36 kg
146.36 kg
439.07 kg 633.95 kg
33 m2
koef : 0.393 kg
: 118.25 kg
: 118.25 kg
66.53 kg
66.53 kg
266.10 kg 384.35 kg
20 m2
koef : 0.393 kg
: 66.38 kg
: 66.38 kg
74.51 kg
74.51 kg
149.02 kg 215.39 kg
11.2 m2
koef : 0.393 kg
: 53.41 kg
: 53.41 kg
23.95 kg
23.95 kg
119.75 kg 173.15 kg
9 m2
koef : 0.393 kg
: 120.61 kg
: 120.61 kg
15.97 kg
15.97 kg
271.42 kg 392.03 kg
20.4 m2
koef : 0.393 kg
: 19.22 kg
: 19.22 kg
21.29 kg
21.29 kg
42.58 kg 61.79 kg
3.2 m2
koef : 0.393 kg
: 64.02 kg
: 64.02 kg
23.95 kg
23.95 kg
143.69 kg 207.71 kg
10.8 m2
koef : 0.393 kg
: 33.37 kg
: 33.37 kg
10.64 kg
10.64 kg
74.51 kg 107.87 kg
5.6 m2
koef : 0.393 kg
: 10.96 kg
: 10.96 kg
7.98 kg
7.98 kg
23.95 kg 34.91 kg
1.8 m2
m2
99.20 kg
94.86 kg
99.20 kg
54.25 kg
94.86 kg
54.56 kg
13.18 kg
4.22 kg
514.32 kg
514.32 kg
30.00 m2
m2
59.89 kg
60.08 kg
59.89 kg
32.55 kg
60.08 kg
33.48 kg
7.38 kg
4.74 kg
318.09 kg
318.09 kg
17.88 m2
m2
43.65 kg
41.85 kg
43.65 kg
23.87 kg
41.85 kg
23.81 kg
5.80 kg
4.22 kg
228.69 kg
228.69 kg
12.90 m2
m2
327.36 kg
349.18 kg
676.54
kg
676.54 kg
35.20 m2
m2
koef : 0.22 kg
: 60.01 kg
: 60.01 kg
110.67 kg
110.67 kg
110.67 kg 170.68 kg
10.56 m2
koef : 0.393 kg
: 112.40 kg
: 112.40 kg
3.22 kg
3.22 kg
177.32 kg 289.72 kg
28.6 m2
koef : 0.393 kg
: 80.70 kg
: 80.70 kg
2.60 kg
2.60 kg
143.22 kg 223.92 kg
26.95 m2
koef : 0.22 kg
: 23.72 kg
: 23.72 kg
1.10 kg
1.10 kg
84.73 kg 108.45 kg
10.78 m2
koef : 0.22 kg
: 13.55 kg
: 13.55 kg
0.47 kg
0.47 kg
36.31 kg 49.87 kg
5.775 m2
KONSULTAN
KONSULTAN
KONSULTAN
Pejabat
Kepala Dinas Pembuat
Menyetujui
Menyetujui
PERENCANA
Menyetujui
PERENCANA
Menyetujui
PERENCANA
Menyetujui
Menyetujui
Menyetujui
,Menyetujui
Komitmen
Kesehatan Menyetujui
MenyetujuiKepala
Kepala
Kepala
Kepala
Kebumen,
Kepala
Kepala
Kepala
Kepala Dinas
KebumenDinas
Dinas
Dinas
Dinas BACK UP PERHITUNGAN
KONSULTAN
KONSULTAN
KONSULTAN
KONSULTAN
KONSULTAN
KONSULTAN
Kasi
KONSULTAN
KONSULTAN
CV.
CV.
CV. Kab.
Program
ABADI
ABADI
ABADI
A/N.
A/N.
A/N
A/N.
A/N. Kasi
PERENCANA
Kebumen
PERENCANA
A/N.
PERENCANA
A/N. Kepala
PERENCANA
Kepala
PERENCANA
PERENCANA
A/N.
A/N Program
PERENCANA
Bidang
Kepala
A/N.
PERENCANA
.
Kepala
DESAIN
Kepala
Kepala
DESAIN
Kepala
DESAIN
Kepala
Kepala
Kepala
A/N.
Kepala
Dinas
A/N Dinas
Bina
Dinas
Dinas
Dinas
DinasBidang
Kepala
Dinas
Dinas
Dinas
. Kimprasda
Dinas
Kepala
Kimprasda
Teknik
Dinas Bina
Dinas Teknik
Dinas
KimprsadaKepala
Kepala
Kesehatan
Kimprasda
Kesehatan
………………
Kesehatan
Kesehatan
Dinas
Dinas
DinasKepala
Kesehatan
Maret
KEGIATAN : PEMBANGUNAN RUMAH DINAS BUPATI
Selaku
DinasCV.
CV.
CV.CV.
CV.
CV. ABADI
Kimprasda
CV.
ABADI ABADI
ABADI
ABADI
ABADI
ABADI Dinas
Pengguna DESAINKimprasda
DESAINKabupaten
Anggaran
DinasKimprasda
DESAIN
DESAIN
Kimprasda
Kimprasda
DESAIN
Kabupaten
DESAIN
Kimprasda
Kimprasda
Kabupaten
Kimprasada
DESAIN
Kimprasda
Kimprasda
Kimprasda Kabupaten
Kabupaten Kebumen
Kabupaten
Kebumen
Kebumen Kebumen
Kebumen
Kebumen
Kab.upaten
KabupatenKab.
Kabupaten
Kesehatan2005
Dinas
Dinas
Kabupaten
Kesehatan
Kabupaten
……..
Kesehatan Dinas
2005
PEKERJAAN : PEMBANGUNAN RUMAH DINAS BUPATI KEBUMEN
Tahun T.A.
Kabupaten
Kabupaten
Kabupaten2005
Kabupaten
Kabupaten
Anggaran
Kabupaten Tahun
Kabupaten Kebumen
Kebumen
Kepala Anggaran
Kebumen
Kebumen
Kepala
Kebumen
2006
Kebumen
Kebumen
Bidang 2006
Bidang Cipta
Cipta Kebumen
Kesehatan
Kesehata
Kabupaten
Kabupaten
Kebumen
Kabupaten
Kabupaten
Kebumen
Karya
Kebumen
Kebumen
Karya
PT/CVKesehat
LOKASI : KEBUMEN
Selaku Pejabat Pembuat KomitmenKabupaten Selaku
Panitia
TAHUN Kepala
Kepala
Kepala
Kepala
Kepala
Kepala
Kepala
Bidang
Bidang
Bidang
Bidang
Bidang
Bidang
Bidang
Cipta
Cipta
Cipta
Cipta
Cipta
Cipta
Cipta
Karya
Karya
Karya
Karya
:Karya
Karya
Karya ………………
2008 Kebumen
Selaku
Kebumen
Kebumen
Selaku
Selaku
Selakun an
Pengguna
Pengadaa
Kebumen
Pengguna
Pengguna
……………..
Pengguna
Pengguna
Selaku
Selaku
Selaku
Anggaran
n Barang/
Ir.
Ir. MARSONO.MT
dr. SUPRAPTI MARSONO.MT
HARTINI. M Kes Kabupate
Selaku
Pengguna
Anggaran
AnggaranKabupat
Pengguna
Pengguna
Anggaran
Anggaran
T.A. Jasa
2005
L. Penampang
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
Ir.Ir.MARSONO.MT
MARSONO.MT Pengguna n.en
LUAS KACA
Ir.Ir.
Ir.MARSONO.MT
Ir.Ir.
MARSONO.MT
MARSONO.MT
TEAM
TEAM
MARSONO.MT
MARSONO.MT
140LEADER
LEADER
079Ir. SUHARTOMO,Ir. PING MT ANGGORO Anggaran
Tahun
Anggaran
Anggaran
Tahun
Tahun
Tahun
MELAMIN
NIP 112 Kegiatan
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
TEAM
TEAM Ir.LEADER
LEADER Anggaran
Kebumen
Kebume
MATI
TEAM
TEAM
TEAM
TEAM
TEAM
Ir.
Ir.
Ir.
LEADER
PING
LEADER
Ir.
PING
LEADER
PING
LEADER
PING
Ir.
LEADER
Ir.
PING
Ir.PING
PING
SUHARTOMO,
ANGGORO
ANGGORO
ANGGORO
ANGGORO
Ir. ANGGORO
ANGGORO
NIP.
Ir. ANGGORO
Ir.500
SUHARTOMO,
TRI PING
NIP.
071ANGGORO
MULYONO MT
500
MT082Anggaran
942 Anggaran
Tahun.Angg
020
Anggaran
Anggaran
Tahun
Tahun
Tahun
PERHITUNGAN
N
KODE
SKETIr. NIP.
NIP.
NIP.
TRI
NIP.
GAMBARNIP.
NIP.
MULYONO
NIP.
500
NIP.
500
500
500
500500
082
082
500
082
082
500
NIP.082
NIP.082
020
NIP.
020
082
020
020
071
500 020
020
020
500
071
103942082 020
942
975 Tahun
Selaku
Anggaran
aran.
Anggaran
2005
2005
2005
2005 n
2005
Anggaran
NIP. 500 103 975 Anggaran
Pengguna
dr.2005
2005 Selaku
SUPRAPTI
2005
å Anggaran
Nama 2005
Penggu
HARTINI.
Dinas
Jelas M @ å @ å @ å @ å @ å @ å @ å @ å
Kesehatan
Kes å
bh Tahun
Jabatan na m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
P1 2 dr.NIP 140
Kab.
Anggaran
SUPRAPTI
dr.
dr.
dr. 079
Anggar 0.01 7.64 0.11 2.94 5.88 4.00 8 - - - - - - 3.44 6.8864 13.59 27.1872
Kebumen
112an
2005
SUPRAPTI
SUPRAPTI
HARTINI.
SUPRAPTI
Luas Penampang dr.
dr. M
kusen(6/12) 0.01
Ketua
3
0.06 HARTINI.
HARTINI.
SUPRAPTI
HARTINI.
SUPRAPTI
x 0.12 = dr.
Kes
dr. Tahun
MMM 0.01
3 14
SUPRAPTI
PanjangHARTINI.
HARTINI.
NIP
SUPRAPTI
Kes
Kusen Kes
Kes
140Anggar
079
MM 7.64
15
2.1 NIP
NIP HARTINI.
xHARTINI.
NIP140
Kes
140
Kesan079
140
112
2 2005
079
079
= M 4.2
6
1.72 NIP
xNIP
M
112
140
112
Kes
140
112dr.
Kes
079
079 3.44
3 10
2 =
NIPSUPRAP
NIP
112
140
112 140
NIP 079
23
079
Luas daun pintu
112 TI112 2.94
HARTINI. dr.
1.47 x 2 = 2.94
23
MSUPRA
Kes
NIP 140 PTI
23
NIP 140
Luas perlubangan 3.44
079 112
23
daun pintu
10 6 10 3 44 3 10 10 3 44 3 10 6 10 2.94 x 2.00 = 11.76
172
L. Penampang
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
P2 1 0.01 7.24 0.05 2.52 2.52 3.00 3 - - - - - - 2.97 2.97 11.82 11.82
Luas Penampang (6/12) 0.01
0.06 x 0.12 = 0.01
15 3 14 3
Panjang Kusen 7.24
2.1 x 2 = 4.2
3 10 6
23 1.52 x 2 = 3.04
1.68 x 1 = 1.68
23
1.00 x 3 = 3.00
216
23
0.04 x 3 = 0.12
23
kusen
10 3
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
P3 7 0.01 5.32 0.27 1.68 11.76 3.00 21 - - - - - - 2.11 14.7504 8.00 55.9776
Luas Penampang (6/12) 0.01
3 10 6 15 3 14 3
0.06 x 0.12 = 0.01
Panjang Kusen 5.32
2.1 x 2 = 4.2
1.12 x 1 = 1.12
23
23
1.00 x 3 = 3.00
23
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
P4 5 0.01 5.22 0.19 1.47 7.35 0.00 0 - - - - - - 1.99 9.936 7.13 35.664
Luas Penampang (6/12) 0.01
0.06 x 0.12 = 0.01
Panjang Kusen 5.22
2.1 x 2 = 4.2
1.02 x 1 = 1.02
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
PJ1 2 0.01 13.44 0.19 2.94 5.88 5.00 10 0.00 0 1.01 2.0152 1.04 2.088 5.70 11.4048 17.00 34.0016
Luas Penampang (6/12) 0.01
0.06 x 0.12 = 0.01
3
14
Panjang Kusen 13.44
3
15
2.1 x 4 = 8.4
6
8
2.84 x 1 = 2.84
0.5 x 2 = 1
0.6 x 2 = 1.2
KACA BENING KACA BENING
5 mm 5 mm
1.47 x 2 = 2.94
216
0.20 x 2 = 0.39
39
6
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
PJ2 1 0.01 20.06 0.14 1.68 1.68 5.00 5 0.00 0 2.02 2.0152 2.09 2.088 6.83 6.8256 15.56 15.5648
Luas Penampang (6/12) 0.01
3
0.06 x 0.12 = 0.01
14
3
Panjang Kusen 20.06
47
2.1 x 6 = 12.6
6
3 10
3.36 x 1 = 3.36
0.5 x 4 = 2
23
2.1 x 1 = 2.1
23
23
1.68 x 1 = 1.68
23
23
0.31 x 4 = 1.24
23
10 6 8 34 8 6 8 34 8 6 8 34 8 6 8 34 8 6 10 3 54 3 10 6
0.20 x 4 = 0.78
326
35
kaca 150
mm 5 Jumlah Roster 5.00
1.00 x 5 = 5.00
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
J1 2 0.01 19.82 0.29 - - 5.00 10 1.43 2.85 1.51 3.0228 1.57 3.132 5.57 11.1456 10.63 21.2616
Luas Penampang (6/12) 0.01
0.06 x 0.12 = 0.01
3 14 3
Panjang Kusen 19.82
47
2.1 x 6 = 12.6
8 6
2.78 x 1 = 2.78
2.22 x 2 = 4.44
14 3
0.31 x 3 = 0.93
6 8
0.20 x 3 = 0.59
6
10 6 8 34 8 6 36 6 8 34 8 6 36 6 8 34 8 6 10
278
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
J2 1 0.01 17.10 0.12 - - 4.00 4 0.00 0 2.02 2.0152 2.09 2.088 5.57 5.5728 8.13 8.1344
Luas Penampang (6/12) 0.01
3 14 3
0.06 x 0.12 = 0.01
Panjang Kusen 17.10
47
2.1 x 5 = 10.50
8 6
2.4 x 1 = 2.40
2 x 1 = 2.00
2.2 x 1 = 2.20
143
0.31 x 4 = 1.24
Luas panil jendela 0.78
6 8
0.20 x 4 = 0.78
39
10 6 8 34 8 6 8 34 8 6 8 34 8 6 8 34 8 6
240
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
J3 10 0.01 13.12 0.94 - - 4.00 40 0.71 7.13 1.01 10.076 1.04 10.44 3.46 34.56 6.59 65.896
Luas Penampang (6/12) 0.01
0.06 x 0.12 = 0.01
3 14 3
Panjang Kusen 13.12
2.1 x 4 = 8.40
47
1.8 x 1 = 1.80
1.36 x 1 = 1.36
8 6
1.56 x 1 = 1.56
0.20 x 2 = 0.39
216
10 6 8 34 8 6 36 6 8 34 8 6
170
Luas perlubangan 3.46
1.6 x 2.16 = 3.46
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
J4 1 0.01 11.01 0.08 - - 3.00 3 0.00 0 1.01 1.0076 1.04 1.044 2.55 2.5488 4.66 4.6576
Luas Penampang (6/12) 0.01
0.06 x 0.12 = 0.01
3 14 3
Panjang Kusen 11.01
47 2.1 x 3 = 6.30
1.79 x 1 = 1.79
1.36 x 1 = 1.36
8 6
1.56 x 1 = 1.56
0.20 x 2 = 0.39
216
10 6 8 34 8 6 8 34 8 6 10 1.00 x 3 = 3.00
138
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
J5 6 0.01 4.62 0.20 - - 0.00 0 0.00 0 0.31 1.8528 0.52 3.132 1.06 6.3612 1.73 10.3584
Luas Penampang (6/12) 0.01
0.06 x 0.12 = 0.01
8 6
Panjang Kusen 4.62
1.59 x 2 = 3.18
0.72 x 2 = 1.44
KACA BENING
3 mm Kaca bening 5 mm 0.52
171
143
daun jendela/slimar
10 6 8 34 8 6 10 0.31 x 2.00 = 0.62
82
L. Penampang
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
J6 4 0.01 3.52 0.10 0.00 0 0.00 0 0.00 0 0.22 0.8832 0.32 1.296 0.72 2.8768 1.29 5.1456
Luas Penampang (6/12) 0.01
0.06 x 0.12 = 0.01
8 6
Panjang Kusen 3.52
1.04 x 2 = 2.08
0.72 x 2 = 1.44
L. Penampang
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
P3 2 0.01 5.32 0.1 1.68 3.36 3.00 6 - - - - - - 2.11 4.2144 8.00 15.9936
Luas Penampang (6/12) 0.01
3 10 6 15 3 14 3
23
1.00 x 3 = 3.00
23
Luas perlubangan 2.11
23
0.92 x 2.16 = 1.99
0.04 x 3 = 0.12
23
10 3
10 6 10 3 54 3 10 6 10 Luas melamin 8.00
112
kusen
0.24 x 5.32 = 1.28
daun pintu
1.68 x 2.00 = 6.72
L. Penampang
PERLUBANGA
JALUSI KAYU
LUAS DAUN
LUAS DAUN
LUAS KACA
MELAMIN
JENDELA
ROSTER
JUMLAH
KUSEN
JUMLAH
PINTU
LUAS
LUAS
MATI
PERHITUNGAN
N
KODE
SKET GAMBAR
å @ å @ å @ å @ å @ å @ å @ å @ å
å
bh m2 m' m3 m2 m2 bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
P4 3 0.01 5.22 0.11 1.47 4.41 0.00 0 - - - - - - 1.99 5.9616 7.13 21.3984
Luas Penampang (6/12) 0.01
0.06 x 0.12 = 0.01
Panjang Kusen 5.22
2.1 x 2 = 4.2
1.02 x 1 = 1.02
å
bh
12
å
2
SLOT
bh
2
pintu
0
jendela GRENDEL
4
bh
0
@
m2
ENGSEL
JENDELA
å
0
bh
0
@
m2
KAIT ANGIN
å
0
bh
6
@
m2
ENGSEL
PINTU
6
bh
å
2
SLOT
bh
2
pintu
0
jendela GRENDEL
å
2
bh
0
@
m2
ENGSEL
JENDELA
å
0
bh
0
@
m2
KAIT ANGIN
å
0
bh
@
m2
3.00
ENGSEL
PINTU
0
bh
å
SLOT
bh
1.00
1
pintu
jendela GRENDEL
0.00
å
7
bh
0
@
m2
ENGSEL
JENDELA
å
0
bh
0
@
m2
KAIT ANGIN
å
0
bh
@
m2
3.00
ENGSEL
PINTU
å
bh
15
å
SLOT
bh
1.00
1
pintu
jendela GRENDEL
0.00
å
5
bh
0
@
m2
ENGSEL
JENDELA
å
0
bh
0
@
m2
KAIT ANGIN
å
0
bh
6
@
m2
ENGSEL
PINTU
å
bh
12
2
å
SLOT
bh
2
pintu
2
jendela GRENDEL
å
8
bh
4
@
m2
ENGSEL
JENDELA
å
8
bh
2
@
m2
KAIT ANGIN
å
4
bh
3
@
bh
ENGSEL
PINTU
3
bh
1
å
SLOT
bh
2
pintu
4
jendela GRENDEL
6
å
bh
8
@
bh
ENGSEL
JENDELA
å
8
bh
4
@
bh
KAIT ANGIN
å
4
bh
0
@
bh
ENGSEL
PINTU
0
bh
0
å
SLOT
bh
0
pintu
3
jendela GRENDEL
å
6
bh
6
@
bh
ENGSEL
JENDELA
å
bh
12
3
@
bh
KAIT ANGIN
å
6
bh
0
@
bh
ENGSEL
PINTU
0
bh
0
å
SLOT
bh
0
pintu
3
jendela GRENDEL
å
3
bh
6
@
bh
ENGSEL
JENDELA
å
6
bh
3
@
bh
KAIT ANGIN
å
3
bh
0
@
bh
ENGSEL
PINTU
0
bh
0
å
SLOT
bh
0
pintu
2
jendela GRENDEL
å
bh
20
4
@
bh
ENGSEL
JENDELA
å
bh
40
2
@
bh
KAIT ANGIN
å
bh
20
0
@
bh
ENGSEL
PINTU
0
bh
0
å
SLOT
bh
0
pintu
2
jendela GRENDEL
å
2
bh
4
@
bh
ENGSEL
JENDELA
å
4
bh
2
@
bh
KAIT ANGIN
å
2
bh
0
@
bh
ENGSEL
PINTU
0
bh
0
å
SLOT
bh
0
pintu
1
jendela GRENDEL
å
6
bh
4
@
bh
ENGSEL
JENDELA
å
bh
24
1
@
bh
KAIT ANGIN
å
6
bh
0
@
bh
ENGSEL
PINTU
0
bh
48.00
0
å
9
SLOT
bh
0
pintu
1
jendela GRENDEL
å
4
bh
73
2
@
bh
ENGSEL
JENDELA
å
8
bh
110
1
@
bh
KAIT ANGIN
å
4
bh
49
@
m2
3.00
ENGSEL
PINTU
0
bh
å
SLOT
bh
1.00
1
pintu
jendela GRENDEL
0.00
å
2
bh
0
@
m2
ENGSEL
JENDELA
0
bh
0
@
m2
KAIT ANGIN
0
bh
@
m2
3.00
ENGSEL
PINTU
9
bh
9.00
å
2
SLOT
bh
1.00
1
pintu
jendela GRENDEL
0.00
å
5
3
bh
0
@
m2
ENGSEL
JENDELA
å
0
0
bh
0
@
m2
KAIT ANGIN
å
0
0
bh
DAFTAR ANALISA SNI
KEGIATAN DINAS KIMPRASDA KABUPATEN KEBUMEN
TAHUN ANGGARAN 2008
UNTUK PEKERJAAN DIBORONGKAN
Tenaga
Pekerja 0.150 oh 25,000.00
Tukang kayu 0.250 oh 34,000.00
Kepala tukang 0.025 oh 37,500.00
Mandor 0.075 oh 33,000.00
IX.PEKERJAAN LANGIT-LANGIT
SNI 03-2639-2002-24 1 M2 LANGIT-LANGIT GYPSUM BOARD, TEBAL 9 MM
Bahan
Gypsum Board (120x240x9) mm 0.364 lbr 53,100.00
Paku Sekrup 0.110 kg 23,000.00
Tenaga
Pekerja 0.100 oh 25,000.00
Tukang kayu 0.050 oh 34,000.00
Kepala tukang 0.005 oh 37,500.00
Mandor 0.005 oh 33,000.00
SNI 03-2639-2002-24a 1 M2 LANGIT-LANGIT KALSIBOARD
Bahan
Plafon Kalsiboard 1,2 x 2,4 m 0.364 lbr 51,800.00
Paku Sekrup 0.110 kg 23,000.00
Tenaga
Pekerja 0.100 oh 25,000.00
Tukang kayu 0.050 oh 34,000.00
Kepala tukang 0.005 oh 37,500.00
Mandor 0.005 oh 33,000.00
X. PEKERJAAN SANITASI
SNI - 1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
Bahan
Kloset duduk/monoblok 1.000 bh 1,733,400.00
Perlengkapan 6% harga kloset 1,733,400.00
Tenaga
Pekerja 3.300 oh 25,000.00
Tukang batu 1.100 oh 34,000.00
Kepala tukang 0.001 oh 37,500.00
Mandor 0.160 oh 33,000.00
SNI - 2 MEMASANG 1 BUAH KLOSET JONGKOK, PORSELIN
Bahan
Kloset jongkok porselin 1.000 bh 152,950.00
Semen portland 6.000 kg 908.00
Pasir pasang 0.010 m3 76,400.00
Tenaga
Pekerja 1.000 oh 25,000.00
Tukang batu 1.500 oh 34,000.00
Kepala tukang 1.500 oh 37,500.00
Mandor 0.160 oh 33,000.00
SNI - 5 MEMASANG 1 BUAH WASTAFEL
Bahan
Wastafel 1.000 bh 1,210,000.00
Perlengkapan 12% harga wastafel 1,210,000.00
Semen abu-abu 6.000 kg 908.00
Pasir pasang 0.010 m3 76,400.00
Tenaga
Pekerja 1.200 oh 25,000.00
Tukang batu 1.450 oh 34,000.00
Kepala tukang 0.150 oh 37,500.00
Mandor 0.100 oh 33,000.00
SNI - 8 MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,30 M3
Bahan
Batu bata 0.400 m3 350.00
Semen Portland 120.000 kg 908.00
Pasir pasang 0.300 m3 76,400.00
Porselen ( 11x11) cm 360.000 bh -
Semen nat 6.000 kg -
Tenaga
Pekerja 6.000 oh 25,000.00
Tukang batu 3.000 oh 34,000.00
Kepala tukang 0.300 oh 37,500.00
Mandor 0.300 oh 33,000.00
SNI - 26 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3/4"
Bahan
Pipa PVC 1.200 m' 4,700.00
Perlengkapan 35% harga pipa
Tenaga
Pekerja 0.036 oh 25,000.00
Tukang batu 0.060 oh 34,000.00
Kepala tukang 0.006 oh 37,500.00
Mandor 0.0018 oh 33,000.00
SNI - 31 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3"
Bahan
Pipa PVC 1.200 m' 21,500.00
Perlengkapan 35% harga pipa 7,525.00
Tenaga
Pekerja 0.081 oh 25,000.00
Tukang batu 0.135 oh 34,000.00
Kepala tukang 0.0135 oh 37,500.00
Mandor 0.0041 oh 33,000.00
SNI - 33 MEMASANG 1 BH BAK CUCI PIRING STAINLES STEEL
Bahan
Bak cuci stainles steel 1.000 bh 300,000.00
Water drain + asesories 1.000 set 50,000.00
Tenaga
Pekerja 0.030 oh 25,000.00
Tukang batu 0.300 oh 34,000.00
Kepala tukang 0.0300 oh 37,500.00
Mandor 0.0015 oh 33,000.00
SNI - 35 MEMASANG 1 BUAH KRAN DIAMETER 3/4"
Bahan
Kran air 1.000 bh 23,000.00
Seal tape 0.025 bh 2,500.00
Tenaga
Pekerja 0.010 oh 25,000.00
Tukang batu 0.100 oh 34,000.00
Kepala tukang 0.010 oh 37,500.00
Mandor 0.005 oh 33,000.00
SNI - 37 MEMASANG 1 BUAH FLOOR DRAIN
Bahan
Floor drain 1.000 bh 16,500.00
Tenaga
Pekerja 0.010 oh 25,000.00
Tukang batu 0.100 oh 34,000.00
Kepala tukang 0.010 oh 37,500.00
Mandor 0.005 oh 33,000.00
Tenaga
Tukang taman 0.150 oh 34,000.00
Pekerja 0.000 oh 25,000.00
Kepala Tukang 0.000 oh 37,500.00
Mandor 0.010 oh 33,000.00
Tenaga
Tukang taman 0.330 oh 34,000.00
Pekerja 0.000 oh 25,000.00
Kepala Tukang 0.000 oh 37,500.00
Mandor 0.010 oh 33,000.00
Tenaga
Tukang taman 0.400 oh 34,000.00
Pekerja - oh 25,000.00
Kepala Tukang - oh 37,500.00
Mandor 0.020 oh 33,000.00
Tenaga
Tukang taman 0.400 oh 34,000.00
Pekerja - oh 25,000.00
Kepala Tukang - oh 37,500.00
Mandor 0.020 oh 33,000.00
Tenaga
Pekerja 0.320 oh 25,000.00
Tukang batu 0.150 oh 34,000.00
Kepala tukang 0.015 oh 37,500.00
Mandor 0.015 oh 33,000.00
Ls 1 M2 PASANG DINDING BATU TEMPEL RAI
Bahan
Batu tempel Rai 1.050 M2 29,000.00
Semen abu-abu 11.750 kg 908.00
Pasir pasang 0.035 m3 76,400.00
Tenaga
Pekerja 0.620 oh 25,000.00
Tukang batu 0.350 oh 34,000.00
Kepala tukang 0.035 oh 37,500.00
Mandor 0.030 oh 33,000.00
Ls 1 M2 PELABURAN DINDING BATU DENGAN VERNIS
Bahan
Vernis 0.150 Ltr 69,900.00
Dempul 0.050 Kg -
Ampelas 0.100 Lbr -
Kuas 0.010 Bh -
Tenaga
Pekerja 0.160 oh 25,000.00
Tukang cat 0.160 oh 34,000.00
Kepala tukang 0.016 oh 37,500.00
Mandor 0.0025 oh 33,000.00
Tenaga
Pekerja 0.081 oh 25,000.00
Tukang batu 0.135 oh 34,000.00
Kepala tukang 0.0135 oh 37,500.00
Mandor 0.0041 oh 33,000.00
Tenaga
Pekerja 0.100 oh 25,000.00
Tukang kayu 0.200 oh 34,000.00
Kepala tukang 0.025 oh 37,500.00
Mandor 0.005 oh 33,000.00
Tenaga
Pekerja 0.100 oh 25,000.00
Tukang kayu 0.200 oh 34,000.00
Kepala tukang 0.025 oh 37,500.00
Mandor 0.005 oh 33,000.00
Tenaga
Pekerja 0.5000 oh 25,000.00
Tukang batu 0.2500 oh 34,000.00
Kepala tukang 0.0250 oh 37,500.00
Mandor 0.0250 oh 33,000.00
Ls 1 M3 URUGAN TANAH
Bahan
Pasir urug 1.200 m3 32,300.00
Tenaga
Pekerja 0.300 oh 25,000.00
Mandor 0.010 oh 33,000.00
Tenaga
Pekerja 0.320 oh 25,000.00
Tukang batu 0.150 oh 34,000.00
Kepala tukang 0.015 oh 37,500.00
Mandor 0.015 oh 33,000.00
157,401.20
139,191.20
12,500.00
2,270.00
30,240.00
382.00
1,194.30
82,562.40
624.00
9,418.50
18,210.00
6,800.00
10,000.00
750.00
660.00
167,764.00
167,764.00
166,675.00
1,089.00
11,320.00
11,320.00
10,000.00
-
-
1,320.00
5,427.00
5,427.00
4,800.00
627.00
14,150.00
14,150.00
12,500.00
1,650.00
79,830.00
72,000.00
72,000.00
7,830.00
7,500.00
330.00
59,875.00
52,800.00
52,800.00
7,075.00
6,250.00
825.00
111,595.00
104,520.00
104,520.00
7,075.00
6,250.00
825.00
369,487.00
306,862.00
119,130.00
148,004.00
39,728.00
62,625.00
37,500.00
20,400.00
2,250.00
2,475.00
183,469.50
147,960.00
129,960.00
18,000.00
35,509.50
19,500.00
13,260.00
1,462.50
1,287.00
67,856.50
45,094.00
42,420.00
2,674.00
22,762.50
12,500.00
8,500.00
937.50
825.00
52,873.96
40,603.96
24,500.00
13,047.96
3,056.00
12,270.00
8,000.00
3,400.00
375.00
495.00
50,497.20
38,227.20
24,500.00
10,442.00
3,285.20
12,270.00
8,000.00
3,400.00
375.00
495.00
105,002.60
80,212.60
49,000.00
24,107.40
7,105.20
24,790.00
16,250.00
6,800.00
750.00
990.00
18,327.94
7,335.44
5,883.84
1,451.60
10,992.50
5,000.00
5,100.00
562.50
330.00
17,242.10
6,249.60
4,721.60
1,528.00
10,992.50
5,000.00
5,100.00
562.50
330.00
4,814.80
606.80
454.00
152.80
4,208.00
1,425.00
1,292.00
1,425.00
66.00
6,861,170.00
5,946,270.00
5,946,270.00
914,900.00
150,000.00
680,000.00
75,000.00
9,900.00
337,253.00 SNI 03-3434-2002-39
1 M2 PASANG RANGKA LANGIT - LAN
216,228.00 Bahan
216,228.00 Kayu kamp 0.012
121,025.00 Paku biasa 0.100
25,000.00
85,000.00 Tenaga
9,375.00 Pekerja 0.150
1,650.00 Tukang ka 0.250
286,019.50 Kepala tu 0.025
189,199.50 Mandor 0.075
189,199.50
96,820.00
20,000.00
68,000.00
7,500.00
1,320.00
414,727.00
325,902.00
324,342.00
1,560.00
88,825.00
12,500.00
68,000.00
7,500.00
825.00
71,202.70
59,982.70
59,462.70
520.00
11,220.00
2,750.00
7,480.00
825.00
165.00
AYU KAMPER 79,102.50
63,440.00
62,400.00
1,040.00
15,662.50
3,750.00
8,500.00
937.50
2,475.00
430,808.50
377,481.00
197,944.00
39,728.00
139,809.00
53,327.50
41,250.00
8,500.00
937.50
2,640.00
s : 5 Kr, TEBAL 5 CM 47,840.20
18,137.20
9,080.00
1,986.40
7,070.80
29,703.00
28,750.00
680.00
75.00
198.00
572,723.50
476,511.00
305,088.00
41,256.00
130,167.00
96,212.50
50,000.00
11,900.00
1,312.50
33,000.00
9,269.15
8,820.00
8,662.50
157.50
449.15
175.00
238.00
26.25
9.90
68,568.00
51,088.00
45,868.00
3,120.00
2,100.00
17,480.00
7,500.00
8,840.00
975.00
165.00
74,301.50
56,821.50
51,601.50
3,120.00
2,100.00
17,480.00
7,500.00
8,840.00
975.00
165.00
74,383.50
54,228.00
45,868.00
4,160.00
4,200.00
-
-
-
20,155.50
7,500.00
11,220.00
1,237.50
198.00
74,883.50
54,228.00
45,868.00
4,160.00
4,200.00
-
-
-
20,655.50
8,000.00
11,220.00
1,237.50
198.00
74,883.50
54,228.00
45,868.00
4,160.00
4,200.00
-
-
-
20,655.50
8,000.00
11,220.00
1,237.50
198.00
53,079.00
46,800.00
46,800.00
6,279.00
3,750.00
2,040.00
225.00
264.00
50,324.80
32,708.80
23,000.00
7,264.00
2,444.80
17,616.00
10,000.00
6,800.00
750.00
66.00
26,410.90
21,858.40
19,328.40
2,530.00
4,552.50
2,500.00
1,700.00
187.50
165.00
25,937.70
21,385.20
18,855.20
2,530.00
4,552.50
2,500.00
1,700.00
187.50
165.00
1,962,621.50
1,837,404.00
1,733,400.00
104,004.00
125,217.50
82,500.00
37,400.00
37.50
5,280.00
296,692.00
159,162.00
152,950.00
5,448.00
764.00
137,530.00
25,000.00
51,000.00
56,250.00
5,280.00
1,449,637.00
1,361,412.00
1,210,000.00
145,200.00
5,448.00
764.00
88,225.00
30,000.00
49,300.00
5,625.00
3,300.00
405,170.00
132,020.00
140.00
108,960.00
22,920.00
-
-
273,150.00
150,000.00
102,000.00
11,250.00
9,900.00
10,509.40
7,285.00
5,640.00
1,645.00
3,224.40
900.00
2,040.00
225.00
59.40
40,581.55
33,325.00
25,800.00
7,525.00
7,256.55
2,025.00
4,590.00
506.25
135.30
417,124.50
405,000.00
300,000.00
105,000.00
12,124.50
750.00
10,200.00
1,125.00
49.50
27,252.50
23,062.50
23,000.00
62.50
4,190.00
250.00
3,400.00
375.00
165.00
20,690.00
16,500.00
16,500.00
4,190.00
250.00
3,400.00
375.00
165.00
111,078.35
95,499.60
13,400.00
345.00
75,475.60
6,279.00
15,578.75
1,000.00
13,600.00
937.50
41.25
114,249.00
90,000.00
90,000.00
24,249.00
1,500.00
20,400.00
2,250.00
99.00
16,262.25
10,200.00
10,200.00
6,062.25
375.00
5,100.00
562.50
24.75
10,941.50
6,900.00
6,900.00
4,041.50
250.00
3,400.00
375.00
16.50
15,462.25
9,400.00
9,400.00
6,062.25
375.00
5,100.00
562.50
24.75
65,583.00
57,500.00
57,500.00
8,083.00
500.00
6,800.00
750.00
33.00
73,602.25
67,540.00
67,540.00
6,062.25
375.00
5,100.00
562.50
24.75
57,079.68
51,283.68
49,450.00
1,498.20
244.48
91.00
5,796.00
2,250.00
3,060.00
337.50
148.50
102,609.34
72,906.84
58,000.00
10,333.04
3,208.80
1,365.00
29,702.50
15,500.00
11,900.00
1,312.50
990.00
110,959.34
81,256.84
66,350.00
10,333.04
3,208.80
1,365.00
29,702.50
15,500.00
11,900.00
1,312.50
990.00
82,262.10
61,184.60
50,000
8,444.40
1,375.20
1,365.00
21,077.50
15,000.00
3,400.00
1,687.50
990.00
8,323.75
5,363.00
710.00
1,292.50
3,360.50
2,960.75
500.00
2,142.00
236.25
82.50
EM 1 LAPIS MELAMIN
58,970.00
11,070.00
11,070.00
47,900.00
10,000.00
23,800.00
7,500.00
6,600.00
32,430.00
27,000.00
27,000.00
5,430.00
5,100.00
-
-
330.00
34,050.00
22,500.00
22,500.00
11,550.00
11,220.00
-
-
330.00
119,260.00
105,000.00
105,000.00
14,260.00
13,600.00
-
-
660.00
89,260.00
75,000.00
75,000.00
14,260.00
13,600.00
-
-
660.00
89,260.00
75,000.00
75,000.00
14,260.00
13,600.00
-
-
660.00
110,379.70
96,222.20
31,200.00
21,474.20
43,548.00
14,157.50
8,000.00
5,100.00
562.50
495.00
73,495.50
43,793.00
30,450.00
10,669.00
2,674.00
29,702.50
15,500.00
11,900.00
1,312.50
990.00
20,607.50
10,485.00
10,485.00
-
-
-
10,122.50
4,000.00
5,440.00
600.00
82.50
60,352.95
53,096.40
38,800.00
11,622.40
2,674.00
7,256.55
2,025.00
4,590.00
506.25
135.30
57,107.75
46,705.25
46,705.25
10,402.50
2,500.00
6,800.00
937.50
165.00
41,539.33
31,136.83
31,136.83
10,402.50
2,500.00
6,800.00
937.50
165.00
22,762.50
-
-
-
22,762.50
12,500.00
8,500.00
937.50
825.00
46,590.00
38,760.00
38,760.00
7,830.00
7,500.00
330.00
2,826.00
1,784.75
1,784.75
1,041.25
1,000.00
41.25
35,953.90
21,796.40
7,500.00
11,622.40
2,674.00
14,157.50
8,000.00
5,100.00
562.50
495.00
30,466.25
29,425.00
29,425.00
1,041.25
1,000.00
41.25
SANG RANGKA LANGIT - LANGIT ( 1,00 Err:509
Err:509
m3 Err:509 Err:509
kg - -
-
oh - -
oh - -
oh - -
oh - -
BACK UP DATA / PERHITUNGAN
Gedung Baru Gedung Lama
Kegiatan : Pengadaan Sarana Peningkatan Mutu Pendidikan SD
Pekerjaan : Pembangunan Perpustakaan SD Negeri 1 Bojongsari
Lokasi : Bojongsari - Alian
Tahun Anggaran : 2012
I PEKERJAAN PERSIAPAN
Pengukuran Dan Pemasangan Bouwplank
Volume = 7 + 8 x 2
= 30 m1
II PEKERJAAN TANAH
Galian Tanah Biasa Sedalam 1 Meter
Pondasi A
Panjang = 8.00 + 8.00 + 7.00 + 7.00 +
2.80 + 3.50
= 36.30 m1
Pondasi B
Panjang = 1.00 + 1.00 + -
= 2.00 m1
Mengurug kembali 1m³ galian dihitung dari 1/3 kali indeks pekerjaan galian
volume = vol. galian x 0.25
= 3.26 x 0.25
= 0.81 m 3
Urugan Pasir
Pondasi A
Panjang = 36.30 m1
lebar = 0.90 m1
tebal = 0.10 m1
luas = pj x lb x tbl
Vol. = 36.30 x 0.90 x 0.10
= 3.17 m3
Pondasi B
Panjang = 2.00 m1
lebar = 0.70
tebal = 0.10
luas = pj x lb x tbl
Vol. = 2.00 x 0.70 x 0.10
= 0.14 m3
lantai
Panjang = 8.00 m1
0.30 + 0.80
Vol. = x 0.80 x 36.30
2
= 15.97 m3
Pondasi B
Panjang = 2.00 m1
lbr atas (a) = 0.30
lbr bawah (b) = 0.60
tinggi = 0.60
a + b
Vol. = x tinggi x panjang
2
0.30 + 0.60
Vol. = x 0.60 x 2.00
2
= 0.54 m3
IV PEKERJAAN DINDING
Dinding Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps
Luas kusen
J1 = 2.04 x 1.38 x 2
= 5.63 m2
J2 = 1.38 x 1.38 x 3
= 5.71 m2
V PEKERJAAN PLESTERAN
Plesteran 1 Pc : 4 Ps, Tebal 15 Mm
dinding = luas pas bata x 2
= 135.01 x 2
= 270.02 m2
vol. = 14.08 x 2 bh
= 28.16 m1
vol. = 10.06 x 3 bh
= 30.18 m1
vol. = 14.45 x 1 bh
= 14.45 m1
vol. = 7.10 x 1 bh
= 7.1 m1
P1 = 2.00 x 0.92 x 1
= 1.84 m2
P1 = 0.31 x 0.82 x 1
= 0.25 m2
● Jendela
J1 = 0.32 x 0.62 x 3 +
0.46 x 0.76 x 2 +
0.62 x 0.92 x 1
= 1.86 m2
Vol = 1.86 x 2 bh
= 3.73 m2
J2 = 0.32 x 0.62 x 2 +
0.46 x 0.76 x 2
= 1.10 m2
Vol = 1.10 x 3 bh
= 3.288 m2
Pasang Rangka Atap ( Reng 2/3 Kaso 5/7 ) Kayu Lokal Keras
gunungan = 2.70 x 4
10.79 m1
Membuat Balok Beton Bertulang (125 Kg Besi+Bekisting )K.175 7/50 plat beton
b. Pj. Plat topi 7/50 = 3.00 + 2.05 + 2.05
= 7.10 m1
IX PEKERJAAN LANGIT-LANGIT
List Langit-Langit Kayu Profil 5 Cm
ruang = 8.00 + 7.00 x 2 =
2.80 + 3.50 x 2 =
selasar = 2 + 2.4 x 2 =
tritisan sampg = 11.40 + 1.00 x 2 x 2 =
tritisan blkg = 9.60 + 1.00 x 2 x 2 =
=
Langit-Langit Kalsiboard (120 X 240 ) Tbl 4 Mm Rangka Kayu Lokal Keras (Ba
ruang = 8.00 x 7.00 = 56.00 m2
selasar = 2.00 x 2.40 = 4.80 m2
tritisan kankir = 11.40 x 1.00 x 2 = 22.80 m2
tritisan blkg = 9.60 x 1.00 x 2 = 19.20 m2
= 102.80 m2
b. Daun
jendela = 0.15 x 6.16 x 10 = 9.36 m2
PJ1 = 1.22 x 2.00 x 1 = 2.44 m2
P1 = 0.92 x 2.00 x 1 = 1.84 m2
13.64 m2
d. List plank
= 0.2 x pj listplank
= 0.2 x 52.38
= 10.48 m2
volume total
= 38.73 + 13.64 + 0.0 + 10.48
= 62.84 m2
Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penu
dengan cat mutu baik Kualitas A
Volume = Vol plesteran + vol. plafon + kolom, konsol, balok ikat - gu
= 270.02 + 102.80 + 15.168 - 18.44
= 369.54 m2
12.00 m1
3.26 m3
10.29 m3
6.81 m3
135.01 m2
m2
m2
+
m2
281.54 m2
0.58 m3
1.38
1.38
0.96
0.40
2.46 m1
8.38 m2
131.45 m2
8.00 m1
2.83 m3
3.8 )x
1.281 m3
1.18 m3
0.30 m3
1.79 m3
0.17 m3
14.50 m1
143.40 m1
30.00 m1
12.60 m1
8.80 m1
49.60 m1
42.40 m1
143.40 m1
9.00 bh
20.00 bh
10.00 psg
2.00 bh
4.23 m2
1.19 m2
10.00 bh
1.70 m2
5.94 m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
7.00 unit
4.00 bh
3.00 bh
2.00 bh
1.00 bh
2.00 bh
I PEKERJAAN PERSIAPAN
1. Pekerjaan pengukuran dan pemasangan bauwplank
Volume = 9 m1
II PEKERJAAN TANAH
1. Galian tanah biasa
Pondasi Gedung
Panjang = 9 + 7 + 9
= 25.00 m1
Vol. = Tinggi + Lebar + Panjang
= 0.85 x 0.80 x 25.00
= 17.00 m3
Pondasi Teras
Panjang = 2 + 9
= 11.00 m1
Vol. = Tinggi + Lebar + Panjang
= 0.85 x 0.80 x 11.00
= 7.48 m3
Selasar
Panjang = 8.85 m1
lebar = 1.85 m1
tebal = 0.15 m1
Vol. = pj x lb x tbl
Vol. = 8.85 x 1.85 x 0.15
= 2.46 m3
IV PEKERJAAN BETON
1.Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12± 2) cm, w/c = 0,87
= 0.05 x 1 x 87.47 =
2.Sloof 15/20
a. Beton = 0.15 x 0.2 x 36.00 =
4.Kolom 15/20
a. Beton = 0.03 x 3.8 x 5.00 =
5.Kolom 20/20
a. Beton = 0.04 x 3.8 x 2.00 =
6.Kolom 11/11 = 3 x 3 =
2.3 x 1 =
Luas kusen
J1 = 2.20 x 1.66 x 5 =
Pj 1 = 0.71 x 1.66 x 1 =
= 1.52 x 2.72 x 1 =
=
Perluabangan
= 23.57 m2
2. Acian
= volume plesteran = 163.66 m2
X PEKERJAAN KAYU
1. Pasang kusen pintu dan jendela, kayu kruing
Panjang kusen
● J1 = 2.19 + 2.19 + 2.19 +
+ 1.66 + 1.66 + 1.66 +
= 15.4 m1
vol. = 15.4 x 5 bh
= 77 m1
Vol. total
= 3.12 m2
f. blk apit = 4 + 4 = 8
vol. 6/10 = 0.06 x 0.12 x 8 =
Kuda - kuda B
a. blk tarik = 3.1 x 1 = 3.1 m
b. blk tekan = 1.45 x 1 = 1.45 m
c. blk mander = 1.6 x 3 = 4.8 m
d. kaki kuda = 3.3 x 1 = 3.3 m
12.65 m
Volume = 1.10 m3
Volume = 3.22
= 3.22 m2
daun jendela P1 =
Kaca Mati = 0.67 x 0.32 x 1.00 x
= 0.21 m2
b. Daun
J1 = 0.22 x 3.12 x 21 =
PJ1 = 0.22 x 3.12 x 1 =
c. List plank
= 0.4 x pj listplank
= 0.4 x 37.5
= 15.00 m2
volume total
= 36.08 + 15.10 + 15.00
= 66.18 m 2
9.00 m1
24.48 m3
6.12 m3
5.29 m3
14.58 m3
13.68 m3
panjang
25.00
panjang
11.00
4.37 m3
4.37 m3
4.37
1.08 m3 1.08 m3
0.3 m3 0.30 m3
0.57 m3 0.57 m3
0.304 m3 0.30 m3
9 11.30 m
2.3
11.3
51.20 m
m 1
m1
m1
m1
m1
78.95 m2
1 = 7.5
18.26 m2
1.18 m2
4.13 m2 +
23.57 m2
163.66 m2
157.904
5.76 +
163.664
163.66 m2
170.79 m2
20.51 m1
0.65 m3
2.19
1.66
0.71
2.72
2.98 m2
2.98
3.12 m2
0.63
bh
1.66 m2
0.50
bh
0.50
bh
0.66 m3
0.21 m3
0.06 m3
0.54 m3
0.12 m3
0.66 m3
1.10 m3
29.15 m1
24.40 m1
20.75 m1
11.52 m1
10.90 m1
12.50 m1
4.90 m1 +
114.12
1.10 m3
170.79 m2
= 19.62 m2
= 47.04 m2
1.00
= 18.40 m2
85.06 m2
= 19.62 m2
= 41.44 m2
1.00
61.06 m2
= 24.67 m2
1.00
37.50 m1
11.5 + 3.00
2.00 bh
6.00 bh
32.00 bh
32.00 Bh
2.00 bh
6.93 m2
5.00 = 4.2075 m2
5.00 = 2.025 m2
0.27 m2
0.42 m2
3.43 m2
5.00 = 3.216 m2
1.00
66.18 m2
jml
38.81 m2
6.48 m2 -
32.32 m2
4.95 m3
1.19 m2 -
3.76 m2
14.41 m2
0.69 m2
15.10 m2
224.29 m2
BACK UP DATA / PERHITUNGAN PEMBESIAN
Gedung Baru Gedung Lama
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN
PEKERJAAN BETON
Konsultan Pengawas
Konsultan
SLOOF 15/20 200 Kg Penyedia Jasa
CV. PIRAMIDA KREASIPengawas Dimensi = 0.15 x 0.2 CV. ABDI KARYA
MANDIRI CV. PIRAMIDA
KREASI MANDIRI 1
Panjang (1 m3) =
0.15 x 0.2 WAHID ANWAR
.ARIF SETIYAWAN, ST Pelaksana
InspectorARIF SETIYAWAN, = 33.33 m1
.ST
Inspector Ø tul. pokok = 12 mm
Ø tul. Begel = 8 mm
isi tul pokok = 4 bh
jrk begel = 0.15 m
Ø 12 = 0.89 kg/m1
Ø 8 = 0.39 kg/m1
berat tulangan Ø 12 mm
= brt x isi x pj
= 0.89 x 4 x 33.33
= 118.37 kg
berat tulangan Ø 8 mm
Pj
isi =
jrk begel
33
=
0.15
= 222.22 bh
Angkur Vertikal
Panjang/angkur = 0.35 m1
Jarak = 0.50 m1
Panjang (1 m3) = 33.33 m1
33.33
isi tul =
0.50
= 67 bh
Back-up data
hal. 196 dari 541
perhitungan besi
Panjang = isi x panjang angkur
= 66.67 x 0.35
= 23.33 m1
Ø tul. Angkur = 6 mm
berat besi = 0.22 kg/m1
Back-up data
hal. 197 dari 541
perhitungan besi
KOLOM 15/20 200
Dimensi = 0.15 x 0.2
1
Panjang (1 m3) =
0.15 x 0.2
Ø tul. pokok = 12 mm
Ø tul. Begel = 6 mm
isi tul pokok = 4 bh
jrk begel = 0.15 m
Ø 12 = 0.89 kg/m1
Ø 6 = 0.22 kg/m1
berat tulangan Ø 12 mm
= brt x isi x pj
= 0.89 x 4 x 33.33
= 118.37 kg
berat tulangan Ø 6 mm
Pj
isi =
jrk begel
33
=
0.15
= 222.22 bh
Angkur horisontal
Panjang/angkur = 0.70 m1
Jarak = 0.50 m1
Panjang (1 m3) = 33.33 m1
33.33
isi tul =
0.50
= 67 bh
Ø tul. Angkur = 6 mm
berat besi = 0.22 kg/m1
Back-up data
hal. 198 dari 541
perhitungan besi
= 147.47 + 10.36
= 157.82 Kg/m3 OKE…!
Back-up data
hal. 199 dari 541
perhitungan besi
KOLOM 20/20 150
Dimensi = 0.2 x 0.2
1
Panjang (1 m3) =
0.20 x 0.2
Ø tul. pokok = 12 mm
Ø tul. Begel = 6 mm
isi tul pokok = 4 bh
jrk begel = 0.15 m
Ø 12 = 0.89 kg/m1
Ø 6 = 0.22 kg/m1
berat tulangan Ø 12 mm
= brt x isi x pj
= 0.89 x 4 x 25.00
= 88.78 kg
berat tulangan Ø 6 mm
Pj
isi =
jrk begel
25
=
0.15
= 166.67 bh
Angkur horisontal
Panjang/angkur = 0.70 m1
Jarak = 0.50 m1
Panjang (1 m3) = 25.00 m1
25.00
isi tul =
0.50
= 50 bh
Ø tul. Angkur = 8 mm
berat besi = 0.39 kg/m1
Back-up data
hal. 200 dari 541
perhitungan besi
= 114.30 + 13.81
= 128.11 Kg/m3 OKE…!
Back-up data
hal. 201 dari 541
perhitungan besi
BALOK 10/30 200
Dimensi = 0.08 x 0.3
1
Panjang (1 m3) =
0.08 x 0.3
= 41.67 m1
Ø tul. pokok = 12 mm
Ø tul. Begel = 6 mm
isi tul pokok = 3 bh
jrk begel = 0.15 m
Ø 12 = 0.89 kg/m1
Ø 6 = 0.22 kg/m1
berat tulangan Ø 12 mm
= brt x isi x pj
= 0.89 x 3 x 41.67
= 110.97 kg
berat tulangan Ø 6 mm
Pj
isi =
jrk begel
42
=
0.15
= 277.78 bh
Back-up data
hal. 202 dari 541
perhitungan besi
4. Membuat plat beton bertulang t = 8 cm
tebal = 0.08 m1
lebar (vertikal) = 0.6 m1
= 20.83 m1 (horisontal)
1
Panjang (1 m3) =
tebal x lebar
1
=
0.08 x 0.6
= 20.83 m1 (horisontal)
Back-up data
hal. 203 dari 541
perhitungan besi
MBESIAN
BERAT SAT.
xxxxxxxxx
xxx
Pelaksana
OKE…!
Back-up data
hal. 204 dari 541
perhitungan besi
Back-up data
hal. 205 dari 541
perhitungan besi
157.82
173.61
Back-up data
hal. 206 dari 541
perhitungan besi
OKE…!
Back-up data
hal. 207 dari 541
perhitungan besi
128.11
140.92
Back-up data
hal. 208 dari 541
perhitungan besi
OKE…!
Back-up data
hal. 209 dari 541
perhitungan besi
151.04 kg
166.15
OKE…!
Back-up data
hal. 210 dari 541
perhitungan besi
103.61 kg
Back-up data
hal. 211 dari 541
perhitungan besi
A.2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN
A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III (Kruwing)
A.4.6.1.16a. Pemasangan 1 m2 rangka atap genteng Plentong, kayu kelas III (Kayu Tahun)
m³
m³
m³
m³
m³
m³
m³
m³
m³
m'
m'
m²
m²
m²
m²
m'
m³
m²
m²
m²
m³
m³
m²
m'
DAFTAR HARGA SATUAN PEKERJAAN
KEGIATAN DINAS PEKERJAAN UMUM KABUPATEN KEBUMEN
TAHUN ANGGARAN 2015
UNTUK PEKERJAAN DIBORONGKAN
NO. KODE
URAIAN PEKERJAAN ANALISA
1 2 3
1 2 3
5 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP A.3.2.1.5.
6 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP A.3.2.1.6.
7 Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP A.3.2.1.7.
8 Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP A.3.2.1.8.
9 Pemasangan 1 m3 batu kosong (anstamping) A.3.2.1.9.
10 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah A.3.2.1.10.
2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.2.
3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.3.
4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.4.
5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.5.
6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.6.
7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.7.
8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.8.
9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.9.
10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.10.
11 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.11.
12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.12.
13 Membuat 1 m3 beton kedap air dengan strorox – 100 A.4.1.1.13.
14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm A.4.1.1.14.
15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm A.4.1.1.15.
16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm A.4.1.1.16.
17 Pembesian 10 kg dengan besi polos atau besi ulir A.4.1.1.17.
18 Pemasangan 10 kg kabel presstressed polos/strands A.4.1.1.18.
19 Pemasangan 10 kg jaring kawat baja (wiremesh) A.4.1.1.19.
20 Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20.
21 Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21.
22 Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22.
23 Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.
24 Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24.
25 Pemasangan 1 m2 bekisting untuk dinding A.4.1.1.25.
26 Pemasangan 1 m2 bekisting untuk tangga A.4.1.1.26.
27 Pemasangan 1 m2 jembatan untuk pengecoran beton A.4.1.1.27.
28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) A.4.1.1.28.
29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) A.4.1.1.29.
29a Membuat 1 m3 sloof beton bertulang (180 kg besi + bekisting) 15/20 A.4.1.1.29a.
30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) A.4.1.1.30.
NO. KODE
URAIAN PEKERJAAN ANALISA
1 2 3
31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) A.4.1.1.31.
31a Membuat 1 m3 balok beton bertulang (175 kg besi + bekisting) 10/30 A.4.1.1.31a.
32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) A.4.1.1.32.
32a Membuat 1 m3 kolom beton bertulang (175 kg besi + bekisting) 15/20 A.4.1.1.32a.
32b Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) 20/20 A.4.1.1.32b.
33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) A.4.1.1.33.
34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) A.4.1.1.34.
35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35.
36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36.
3 Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm A.4.1.2.3.
4 Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm A.4.1.2.4.
1 2 3
5 Pengerjaan 10 cm pengelasan dengan las listrik A.4.2.1.5.
6 Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm A.4.2.1.6.
7 Pemasangan 1 m2 pintu rolling door besi A.4.2.1.7.
8 Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC A.4.2.1.8.
9 Pemasangan 1 m2 sunscreen alluminium A.4.2.1.9.
10 Pemasangan 1 m2 rolling door alluminium A.4.2.1.10.
11 Pemasangan 1 m kusen pintu alluminium A.4.2.1.11.
12 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm A.4.2.1.12.
13 Pemasangan 1 m2 pintu kaca rangka alluminium A.4.2.1.13.
14 Pemasangan 1 m2 venetions blinds dan Vertical blinds A.4.2.1.14.
15 Pemasangan 1 m2 terali besi strip (2 x 3) mm A.4.2.1.15.
16 Pemasangan 1 m2 kawat nyamuk A.4.2.1.16.
17 Pemasangan 1 m2 jendela nako & tralis A.4.2.1.17.
18 Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm A.4.2.1.18.
19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm A.4.2.1.19.
20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi A.4.2.1.20.
21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon A.4.2.1.21.
7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP A. 4.4.1.7.
8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP A. 4.4.1.8.
9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP A.4.4.1.9.
10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5PP A. 4.4.1.10.
11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP A. 4.4.1.11.
12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP A. 4.4.1.12.
13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP A. 4.4.1.13.
14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP A. 4.4.1.14.
15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP A. 4.4.1.15.
16 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP A. 4.4.1.22.
17 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP A. 4.4.1.23.
18 Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP A. 4.4.1.24.
1 2 3
2 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. A.4.4.2.2.
3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. A.4.4.2.3.
4 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm A.4.4.2.4.
5 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm A.4.4.2.5.
6 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. A.4.4.2.6.
7 Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm A.4.4.2.7.
8 Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm A.4.4.2.8.
9 Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm A.4.4.2.9.
10 Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm A.4.4.2.10.
11 Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm A.4.4.2.11.
12 Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm A.4.4.2.12.
13 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm A.4.4.2.13.
14 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm A.4.4.2.14.
15 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. A.4.4.2.15.
16 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm A.4.4.2.16.
17 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm A.4.4.2.17.
18 Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm A.4.4.2.18.
19 Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm A.4.4.2.19.
20 Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm A.4.4.2.20.
21 Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm A.4.4.2.21.
22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm A.4.4.2.22.
23 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP A.4.4.2.23.
24 Pemasangan 1 m2 finishing siar pasangan bata merah A.4.4.2.24.
25 Pemasangan 1 m2 finishing siar pasangan conblock ekspose A.4.4.2.25.
26 Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. A.4.4.2.26.
27 Pemasangan 1 m2 acian. A.4.4.2.27.
VIII A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 40cm x40cm A.4.4.3.1.
2 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 30cm x30 cm A.4.4.3.2.
3 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 20cm x20 cm A.4.4.3.3.
4 Pemasangan 1m2 lantai ubin warna ukuran 40cm x40 cm A.4.4.3.4.
5 Pemasangan 1m2 lantai ubin warna ukuran 30cm x30cm A.4.4.3.5.
6 Pemasangan 1m2 lantai ubin warna ukuran 20cm x20cm A.4.4.3.6.
7 Pemasangan 1m2 lantai ubin teraso ukuran 40cm x40cm A.4.4.3.7.
8 Pemasangan 1m2 lantai ubin teraso ukuran 30cm x30cm A.4.4.3.8.
9 Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm A.4.4.3.9.
10 Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm A.4.4.3.10.
11 Pemasangan 1m2 lantai ubin teralux ukuran 40cm x40cm A.4.4.3.11.
12 Pemasangan 1m2 lantai ubin teralux ukuran 30cm x30cm A.4.4.3.12.
13 Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm A.4.4.3.13.
14 Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm A.4.4.3.14.
15 Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm A.4.4.3.15.
16 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 15cm x 20cm A.4.4.3.16.
NO. KODE
URAIAN PEKERJAAN ANALISA
1 2 3
17 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm A.4.4.3.17.
18 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm A.4.4.3.18.
19 Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm A.4.4.3.19.
20 Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm A.4.4.3.20.
21 Pemasangan 1 m’ plint ubin warna ukuran 10cm x 40cm A.4.4.3.21.
22 Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 30cm A.4.4.3.22.
23 Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 40cm A.4.4.3.23.
24 Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm A.4.4.3.24.
25 Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm A.4.4.3.25.
26 Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm A.4.4.3.26.
27 Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm A.4.4.3.27.
28 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm A.4.4.3.28.
29 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm A.4.4.3.29.
30 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm A.4.4.3.30.
31 Pemasangan 1m2 lantai teraso cor di tempat, tebal 3cm A.4.4.3.31.
32 Pemasangan 1m2 lantai keramik artistik 10cm x 20cm A.4.4.3.32.
33 Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm A.4.4.3.33.
34 Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm A.4.4.3.34.
1 2 3
60 Pemasangan 1 m2 wallpaper lebar 50 cm A.4.4.3.60.
61 Pemasangan 1m2 floor harderner A.4.4.3.61.
62 Pemasangan 1 m’ plint vynil 15cm x 30cm A.4.4.3.62.
63 Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm A.4.4.3.63.
1 2 3
7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II A.4.6.1.7.
8 Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) A.4.6.1.8.
9 Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II A.4.6.1.9.
10 Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II A.4.6.1.10.
11 Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I A.4.6.1.11.
12 Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II A.4.6.1.12.
13 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III (Kruwing) A.4.6.1.13.
14 Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I A.4.6.1.14.
15 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II (Kruwing) A.4.6.1.15.
16 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II A.4.6.1.16.
Pemasangan 1 m2 rangka atap genteng Plentong, kayu kelas III (Kayu Tahun) A.4.6.1.16a.
17 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II A.4.6.1.17.
18 Pemasangan 1 m2 rangka atap sirap, kayu kelas II A.4.6.1.18.
19 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III A.4.6.1.19.
20 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III A.4.6.1.20.
21 Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II A.4.6.1.21.
Pemasangan 1 m’ lisplank GRC ukuran (0,8 x 20) cm A.4.6.1.21a.
22 Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II A.4.6.1.22.
23 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III A.4.6.1.23.
24 Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II A.4.6.1.24.
25 Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II A.4.6.1.25.
26 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I A.4.6.1.26.
27 Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm A.4.6.1.27.
28 Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV A.4.6.1.28.
1 2 3
7 Pemasangan 1 buah kait angin A.4.6.2.9.
8 Pemasangan 1 buah door closer A.4.6.2.10.
9 Pemasangan 1 buah kunci slot A.4.6.2.11.
10 Pemasangan 1 buah Door holder A.4.6.2.12.
11 Pemasangan 1 buah door stop A.4.6.2.13.
14 Pemasangan 1 buah rel pintu sorong A.4.6.2.14.
15 Pemasangan 1 buah kunci lemari A.4.6.2.15.
12 Pemasangan 1 m2 kaca tebal 3 mm A.4.6.2.16.
13 Pemasangan 1 m2 kaca tebal 5 mm A.4.6.2.17.
18 Pemasangan 1 m2 kaca tebal 8 mm A.4.6.2.18.
19 Pemasangan 1 m2 kaca buram tebal 5 mm A.4.6.2.19.
14 Pemasangan 1 m2 kaca cermin tebal 5 mm A.4.6.2.20.
21 Pemasangan 1 m2 kaca cermin tebal 8 mm A.4.6.2.21.
22 Pemasangan 1 m2 kaca wireglassed tebal 5 mm A.4.6.2.22.
23 Pemasangan 1 m2 kaca patri tebal 5 mm A.4.6.2.23.
5 Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) A.4.7.1.5.
1 2 3
3 Pemasangan 1 buah closet jongkok teraso A.5.1.1 3.
4 Pemasangan 1 buah urinoir A.5.1.1 4.
5 Pemasangan 1 buah wastafel A.5.1.1 5.
6 Pemasangan 1 buah bathcuip porselen A.5.1.1 6.
6 Pemasangan 1 buah bak fibreglass vol 1 m3 A.5.1.1 7.
7 Pemasangan 1 buah bak mandi batu bata vol 0,30 m3 A.5.1.1 8.
8 Pemasangan 1 buah bak mandi teraso vol 0,30 m3 A.5.1.1 9.
9 Pemasangan 1 buah bak air fibreglass vol 1 m3 A.5.1.1 10.
10 Pemasangan 1 buah bak beton volume 1 m3 A.5.1.1 11.
11 Pemasangan 1 buah bak cuci piring stainlessteel A.5.1.1 12.
12 Pemasangan 1 buah bak cuci piring teraso A.5.1.1 13.
13 Pemasangan 1 buah floor drain A.5.1.1 14.
14 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm A.5.1.1 15.
15 Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm A.5.1.1 16.
16 Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm A.5.1.1 17.
17 Pemasangan 1 m’ pipa galvanis diameter ½” A.5.1.1 18.
18 Pemasangan 1 buah kran diameter ½” atau 3/4” A.5.1.1 19.
19 Pemasangan 1 m pipa galvanis diameter 3/4” A.5.1.1 20.
20 Pemasangan 1 m’ pipa galvanis diameter 1” A.5.1.1 21.
21 Pemasangan 1 m’ pipa galvanis diameter 1 ½” A.5.1.1 22.
22 Pemasangan 1 m’ pipa galvanis diameter 3” A.5.1.1 23.
23 Pemasangan 1 m’ pipa galvanis diameter 4” A.5.1.1 24.
25 Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” A.5.1.1 25.
24 Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” A.5.1.1 26.
25 Pemasangan 1 m’ pipa PVC tipe AW diameter 1” A.5.1.1 27.
26 Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” A.5.1.1 28.
27 Pemasangan 1 m’ pipa PVC tipe AW diameter 2” A.5.1.1 29.
28 Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” A.5.1.1 30.
29 Pemasangan 1 m’ pipa PVC tipe AW diameter 3” A.5.1.1 31.
30 Pemasangan 1 m’ pipa PVC tipe AW diameter 4” A.5.1.1 32.
33 Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm A.5.1.1 33.
34 Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm A.5.1.1 34.
31 Pemasangan 1 m’ pipa beton diameter 15 – 20 cm A.5.1.1 35.
32 Pemasangan 1 m’ pipa beton diameter 30 – 100 cm A.5.1.1.36.
Kebumen,
KEPALA DINAS PE
KABUPATEN
H. SLAMET MUST
ARGA SATUAN PEKERJAAN
ERJAAN UMUM KABUPATEN KEBUMEN
UN ANGGARAN 2015
EKERJAAN DIBORONGKAN
HARGA SATUAN
SATUAN (Rp.)
4 5
m² 288,552.80
m² 349,347.80
m² 55,663.50
m' 72,608.60
m² 1,134,781.00
m² 1,139,194.40
m² 993,354.00
m² 1,005,843.40
m² 53,750.00
m² 29,970.00
bh 168,870.60
m² 81,395.00
m³ 358,325.00
m³ 35,832.50
m² -
m² -
m³ 39,375.00
m³ 48,375.00
m³ 57,525.00
m³ 52,400.00
m³ 79,500.00
m³ 63,375.00
m² 2,875.00
m³ 17,250.00
m³ 13,100.00
m³ 28,750.00
m³ 94,950.00
m³ 204,985.00
m² 57,825.00
m³ 134,135.00
m³ 105,695.00
m³ 660,045.00
m³ 606,165.00
m³ 568,833.00
m³ 542,577.00
HARGA SATUAN
SATUAN (Rp.)
4 5
m³ 506,613.00
m³ 360,600.00
m³ 468,873.00
m³ 440,853.00
m³ 256,917.00
m³ 2,636,318.00
m³ 651,273.00
m³ 771,018.93
m³ 811,732.50
m³ 843,497.50
m³ 723,923.57
m³ 881,280.36
m³ 916,998.93
m³ 944,264.64
m³ 961,553.21
m³ 991,179.64
m³ 1,000,391.79
m³ 1,064,791.79
m³ 1,076,821.79
m³ 999,635.00
m' 94,635.00
m' 146,230.00
m' 146,830.00
kg 138,695.00
kg 135,245.00
kg 27,179.00
m² 178,156.00
m² 193,878.00
m² 331,157.00
m² 340,590.20
m² 419,157.00
m² 362,635.00
m² 298,838.00
m² 113,632.16
m³ 3,779,255.00
m³ 4,721,508.00
m³ 4,358,508.00
m³ 7,985,590.00
HARGA SATUAN
SATUAN (Rp.)
4 5
m³ 6,118,059.00
m³ 4,902,343.00
m³ 5,651,161.00
m³ 5,862,911.00
m³ 5,560,411.00
m³ 5,349,175.00
m³ 5,650,482.00
m' 65,756.30
m' 89,041.20
m² 10,764,712.40
m² 13,455,901.75
m² 16,136,251.10
m² 20,183,852.63
m² 41,187.50
m² -
m² 32,542.20
bh 4,195.00
bh 6,775.00
bh 5,485.00
bh 26,915.00
bh 27,245.00
bh 24,680.00
bh 129,149.20
bh 117,797.00
bh 160,035.90
bh 35,129.90
bh 35,129.90
bh 35,129.90
m³ 1,225.00
m³ 1,400.00
m³ 31,810.00
m³ 98,044.80
m³ 40,425.00
kg 29,740.00
kg 28,360.00
kg 28,855.00
m² 1,109,950.00
HARGA SATUAN
SATUAN (Rp.)
4 5
cm 18,649.00
m² 191,397.60
m² 581,350.00
m² 456,830.00
m² 161,100.00
m² 506,900.00
m' 106,955.50
m² 526,695.00
m² 570,869.00
m² 49,750.00
m² 342,002.89
m² 74,095.24
m² 299,475.00
m' 196,407.75
m' 64,168.50
m² 865,962.50
m² 997,750.00
m² 216,960.00
m² 202,587.00
m² 193,251.00
m² 187,914.00
m² 185,004.00
m² 173,622.50
m² 104,016.00
m² 97,410.00
m² 93,501.00
m² 91,035.00
m² 89,523.00
m² 86,925.00
m² 86,730.00
m² 76,318.39
m² 76,890.08
m² 113,445.00
m² 113,445.00
m² 213,149.00
m² 52,293.00
HARGA SATUAN
SATUAN (Rp.)
4 5
m² 44,901.00
m² 41,625.00
m² 39,453.00
m² 38,133.00
m² 37,113.00
m² 36,525.00
m² 35,937.00
m² 38,742.00
m² 35,790.00
m² 30,379.50
m² 30,904.50
m² 60,062.00
m² 48,019.00
m² 52,754.00
m² 51,038.00
m² 49,634.00
m² 43,067.50
m² 24,743.00
m² 35,566.00
m² 86,210.00
m² 288,136.47
m² 30,597.00
m² 18,197.00
m² 8,755.00
m² 38,019.00
m² 22,825.00
m² 143,263.00
m² 144,345.00
m² 143,895.00
m² 58,659.00
m² 69,766.00
m² 98,000.00
m² 146,838.00
m² 148,513.00
m² 164,739.00
m² 166,414.00
m² 146,838.00
m² 149,295.00
m² 151,405.00
m² 146,838.00
m² 149,295.00
m² 21,248.00
HARGA SATUAN
SATUAN (Rp.)
4 5
m² 18,200.00
m² 18,116.00
m² 16,121.00
m² 18,325.00
m² 18,241.00
m² 31,503.67
m² 31,520.44
m² 34,700.44
m² 34,680.67
m² 23,664.25
m² 23,737.67
m² 23,369.33
m² 23,739.75
m² 23,737.67
m² 35,472.20
m² 127,479.17
m² 128,716.67
m² 150,235.41
m² 151,390.00
m² 151,826.65
m² 191,697.91
m² 795,769.88
m' 21,650.41
m' 21,719.16
m' 17,414.08
m' 102,325.44
m² 915,997.50
m² 43,167.50
m² 6,263,185.00
m² 207,755.00
m² 207,755.00
m² 196,201.00
m² 192,266.81
m² 188,386.41
m² 279,563.50
m² 279,976.00
m² 165,163.50
m² 162,936.00
m² 1,010,912.10
m² 535,072.50
m² 225,070.00
m² 269,870.00
m² 944,600.00
HARGA SATUAN
SATUAN (Rp.)
4 5
m² 59,742.67
m² 97,590.00
m² 151,124.00
m² 45,780.00
m² 25,113.00
m² 87,105.00
m² 101,835.00
m² 84,440.00
m² 33,569.00
m² 265,723.00
m² 33,175.00
m² 34,813.00
m² 177,850.00
m' 10,499.50
m' 18,007.00
m² 54,750.00
m² 59,785.00
m² 46,535.00
m' 64,524.00
m' 83,774.00
m' 61,774.00
m² 75,395.00
m² 64,095.00
m² 58,158.33
m² 39,175.00
m² 45,925.00
m² 60,121.00
m² 56,973.00
m² 58,132.00
m² 61,865.00
m² 34,775.00
m² 33,235.00
m² 34,665.00
m² 33,290.00
m² 33,235.00
m' 70,960.00
m' 75,374.13
m² 44,170.00
m' 27,820.00
m² 25,560.00
HARGA SATUAN
SATUAN (Rp.)
4 5
m³ 14,012,450.00
m³ 10,882,700.00
m² 403,110.00
m² 220,886.00
m² 582,150.00
m² 403,240.00
m² 766,950.00
m² 446,670.50
m² 478,265.50
m² 666,852.50
m² 554,385.50
m² 271,675.00
m³ 9,940,492.00
m³ 15,398,817.00
m³ 10,636,785.00
m² 124,150.20
m² 60,371.80
m² 124,615.50
m² 109,002.40
m² 56,688.76
m² 86,903.72
m' 104,255.00
m' 39,019.50
m' 105,135.00
m² 130,523.20
m² 352,878.00
m² 337,948.00
m² 243,470.00
m² 34,700.00
m² 61,754.50
bh 171,825.00
bh 141,375.00
bh 102,475.00
bh -
bh 28,110.00
bh 21,487.50
bh 33,737.50
bh -
HARGA SATUAN
SATUAN (Rp.)
4 5
bh 27,350.00
bh 522,725.00
bh 81,475.00
bh 121,225.00
bh 65,775.00
bh -
bh -
m² 141,465.00
m² 157,525.00
m² -
m² 97,986.50
m² 72,650.00
m² -
m² -
m² -
m² 8,275.00
m² 9,050.00
m² 9,425.00
m² 33,250.50
m² 44,102.50
m² 13,322.00
m² 36,044.60
m² 7,970.00
m² -
m² 15,167.00
m² 11,579.00
m² 4,979.00
m² Err:509
m² Err:509
m² 226,727.50
m² 17,334.00
m² 37,407.80
m² 38,944.00
m² 24,671.50
m² 99,106.50
m² 88,510.00
bh 2,618,400.00
bh 279,320.00
HARGA SATUAN
SATUAN (Rp.)
4 5
bh 249,695.00
bh 230,840.00
bh 685,130.00
bh Err:509
bh 698,300.00
bh 1,215,600.00
bh 698,300.00
bh 233,325.00
bh 4,355,292.18
bh 162,225.00
bh 214,975.00
bh 25,075.00
bh 299,955.00
bh 463,610.00
bh 593,694.00
m' 31,096.67
bh 46,230.00
m' 36,780.00
m' 43,884.17
m' 137,542.50
m' 205,841.67
m' 368,359.17
m' -
m' 10,532.50
m' 17,352.50
m' 17,930.00
m' 24,420.63
m' 33,251.25
m' 43,365.00
m' 53,982.50
m' -
m' -
m' 87,939.23
m' 135,132.25
4 5
NIP. 19690922 199703 1 005
HARGA SATUAN MATERIAL DAN UPAH
KABUPATEN KEBUMEN
TAHUN ANGGARAN 2015
1 2 3
Bahan dan Material
1 Abu Batu m3
2 AC Split 2 PK Panasonic Type CS-CU-C 18E K unit
3 Air Liter
4 Akustik 30 cm x 30 cm Lembar
5 Akustik 30 cm x 60 cm Lembar
6 Akustik 60 cm x 120 cm Lembar
7 Alat bantu Set
8 Alluminium strip m’
9 Alumunium Foil m2
10 Amplas Lbr
11 Angkur / dok kg
12 Asbes gelombang ( 1,80 X 1,08 M ) X 6 MM lbr
13 Asbes gelombang ( 1,80X 0,92 m ) X 5 mm lbr
14 Asbes Gelombang ( 2,25 X 0,92 M ) X 5 MM lbr
15 Asbes gelombang ( 3,.X 1,05 m ) X 4 mm lbr
16 Asbes Gelombang ( 3,00X 1,05 m ) X 4 mm lbr
17 Asbes gelombang 80 x 180 cm lembar
18 Asbes gelombang besar 200 x 102cm x 5mm lembar
19 Asbes gelombang besar 250 x 102cm x 5mm lembar
20 Asbes gelombang besar 225 x 102 x 5mm lembar
21 Asbes semen m2
22 Atap polycarbonate m2
23 Bahan teraso cor m3
24 Baja Konstruksi kg
25 Baja strip (0,2 x 2) cm kg
26 Baja Tralis kg
27 Baja Tulangan Beton / Besi Beton kg
28 Bak mandi Sudut fibre buah
29 Bambu Æ 6-8/600 cm Bt
30 Bata merah Buah
31 Bata pelapis dinding Buah
32 Batako 10 x 16,5 x 40 buah
33 Batu bata bh
34 Batu belah 10/15 m3
35 Batu belah 15 cm/20 cm m3
36 Batu belah/batu gunung m3
37 Batu cincin (20 - 25 kg) karung
38 Batu granit kg
No Material dan Upah Satuan
39 Batu Kali m3
40 Batu kerikil m3
41 Batu koral kg
42 Batu paras m2
43 Batu Pecah 0,5-1 cm (crusser ) m3
44 Batu Pecah 10-15 cm m3
45 Batu Pecah 1-2 cm (manual) m3
46 Batu pecah 1-2 cm crusher m3
47 Batu pecah 15-20 cm m3
48 Batu Pecah 2-3 cm (manual) m3
49 Batu pecah 2-3 cm crusher m3
50 Batu Pecah 3-5 cm (manual) m3
51 Batu pecah 3-5 cm crusher m3
52 Batu pecah 5/7 m3
53 Batu Pecah 5-7 cm (manual) m3
54 Batu Pecah 7-10 cm m3
55 Batu tempel candi 10 x 20 m2
56 Batu tempel candi 15 x 30 m2
57 Batu tempel candi 20 x 40 m2
58 Batu tempel granit 10 x 20 m2
59 Batu tempel granit 15 x 30 m2
60 Batu tempel granit 20 x 40 m2
61 Batu tempel hitam m2
62 Batu tempel Karangsambung 10 x 20 m2
63 Batu tempel Karangsambung 15 x 30 m2
64 Batu tempel Karangsambung 20 x 40 m2
65 Batu tempel Palimanan 10 x 20 m2
66 Batu tempel Palimanan 15 x 30 m2
67 Batu tempel Palimanan 20 x 40 m2
68 Batu tempel rai 10 x 20 m2
69 Batu tempel rai 15 x 30 m2
70 Batu tempel rai 20 x 40 m2
71 Batu tempel rai tak beraturan m2
72 Batu teraso kg
73 Baut Baja kg
74 Begel kuda-kuda kg
75 Bendrat kg
76 Bensin / Premium
77 Bensin / Premium (Non Subsidi) Lt
78 Besi baja IWF Kg
79 Besi beton kg
80 Besi beton (polos/ulir) kg
81 Besi beton polos kg
82 Besi Galvanis kg
83 Besi lis kaca (1 x 1) cm m
No Material dan Upah Satuan
Minimal
132,000.00
214,500.00
3.50
5,950.00
14,850.00
47,500.00
140,000.00
8,250.00
13,200.00
2,200.00
17,600.00
33,000.00
33,000.00
82,000.00
77,000.00
90,000.00
33,000.00
73,000.00
105,000.00
93,500.00
16,500.00
171,400.00
80,200.00
22,000.00
34,000.00
34,500.00
11,000.00
165,000.00
13,000.00
675.00
6,600.00
2,750.00
675.00
132,000.00
148,500.00
99,000.00
38,500.00
2,050.00
Minimal
137,500.00
140,000.00
154,000.00
140,000.00
192,500.00
154,000.00
165,000.00
192,500.00
154,000.00
210,000.00
255,000.00
171,500.00
211,300.00
110,000.00
171,500.00
170,000.00
244,600.00
154,000.00
154,000.00
138,000.00
156,000.00
176,500.00
184,800.00
78,000.00
92,500.00
103,500.00
124,000.00
135,000.00
145,300.00
88,200.00
98,500.00
114,000.00
41,500.00
263,700.00
17,600.00
14,850.00
13,750.00
7,300.00
10,450.00
18,100.00
15,000.00
12,100.00
11,000.00
27,500.00
7,800.00
Minimal
21,500.00
19,300.00
7,800.00
49,500.00
55,000.00
66,000.00
77,000.00
13,200.00
18,100.00
32,100.00
5,700.00
38,500.00
38,500.00
27,500.00
110,000.00
198,000.00
16,500.00
22,000.00
44,000.00
60,500.00
22,000.00
22,000.00
31,700.00
20,900.00
302,500.00
110,000.00
110,000.00
23,100.00
550,000.00
22,000.00
44,000.00
52,800.00
55,000.00
16,500.00
18,700.00
22,000.00
98,500.00
98,500.00
18,700.00
55,000.00
71,500.00
322,500.00
807,500.00
9,700.00
22,000.00
Minimal
9,900.00
275,000.00
5,500.00
13,750.00
11,000.00
16,500.00
64,900.00
17,000.00
16,500.00
50,450.00
84,700.00
6,300.00
935,000.00
1,650,000.00
123,700.00
14,000.00
1,900.00
2,750.00
2,200.00
6,600.00
2,200.00
3,800.00
2,750.00
4,900.00
4,900.00
1,650.00
1,850.00
1,000.00
7,500.00
18,700.00
-
317,500.00
55,000.00
66,000.00
77,000.00
165,000.00
220,000.00
5,500.00
7,700.00
8,800.00
3,300.00
26,200.00
60,500.00
16,775.00
3,900.00
Minimal
19,100.00
16,500.00
7,500.00
82,500.00
85,800.00
66,000.00
8,200.00
-
9,500.00
22,700.00
165,000.00
55,000.00
71,500.00
60,900.00
71,000.00
66,000.00
71,500.00
117,700.00
132,300.00
82,500.00
65,000.00
15,200.00
17,500.00
132,000.00
187,000.00
317,500.00
3,300.00
3,300.00
18,150.00
16,500.00
6,352,500.00
18,700.00
14,300.00
22,700.00
20,350.00
60,500.00
25,000.00
31,900.00
16,500.00
22,000.00
16,500.00
16,500.00
88,000.00
2,420,000.00
11,550,000.00
Minimal
11,495,000.00
11,495,000.00
3,811,500.00
11,000,000.00
9,900,000.00
7,700,000.00
6,050,000.00
3,144,400.00
2,750.00
4,400.00
2,200.00
1,700.00
3,300.00
3,850.00
127,000.00
255,000.00
182.14
151,734.00
127,000.00
125,000.00
121,000.00
165,000.00
2,500,000.00
2,000,000.00
165,000.00
99,000.00
72,900.00
231,000.00
111,750.00
16,500.00
148,500.00
125,400.00
5,500.00
100,000.00
60,500.00
60,500.00
60,500.00
72,000.00
63,500.00
87,500.00
77,500.00
28,800.00
39,000.00
31,500.00
7,700.00
Minimal
8,800.00
16,500.00
11,000.00
16,500.00
3,850.00
11,000.00
786,000.00
33,000.00
16,500.00
16,500.00
16,750.00
17,500.00
13,800.00
6,700.00
13,800.00
16,100.00
45,500.00
45,500.00
16,400.00
105,000.00
60,500.00
107,800.00
159,500.00
203,500.00
236,500.00
19,800.00
366,400.00
488,800.00
286,000.00
357,500.00
13,200.00
12,300.00
2,500.00
14,850.00
13,200.00
12,320.00
12,320.00
13,200.00
13,200.00
13,200.00
13,200.00
13,200.00
13,200.00
13,200.00
13,200.00
Minimal
14,500.00
15,700.00
17,000.00
15,500.00
15,500.00
19,800.00
24,200.00
19,800.00
110.00
22,000.00
12,300.00
17,000.00
12,300.00
7,700,000.00
121,000.00
133,000.00
110,000.00
176,000.00
132,000.00
66,000.00
55,000.00
52,800.00
48,300.00
71,500.00
82,500.00
82,500.00
84,700.00
63,200.00
60,500.00
66,000.00
55,000.00
-
66,500.00
-
55,000.00
154,000.00
715,000.00
660,000.00
519,700.00
434,500.00
401,500.00
185,900.00
258,500.00
220,000.00
372,680.00
Minimal
195,657.00
252,890.00
77,000.00
99,000.00
126,500.00
376,900.00
705,800.00
13,200.00
34,800.00
82,500.00
10,900.00
22,000.00
28,600.00
103,000.00
75,600.00
11,000.00
49,500.00
38,750.00
489,500.00
10,300.00
6,000.00
56,000.00
55,000.00
11,000.00
11,000.00
10,900.00
11,500.00
1,500.00
1,300.00
1,300.00
1,700.00
1,300.00
900.00
1,300.00
1,700.00
1,300.00
2,800.00
4,200.00
44,300.00
68,200.00
71,500.00
60,500.00
132,000.00
52,800.00
1,000.00
Minimal
1,500.00
11,000.00
89,900.00
8,400.00
36,100.00
89,300.00
9,600.00
244,200.00
325,700.00
448,000.00
346,500.00
13,200.00
16,500.00
7,200.00
467,700.00
325,700.00
381,150.00
2,300.00
6,600.00
7,700.00
5,500.00
6,600.00
44,500.00
56,000.00
6,800.00
4,000.00
3,500.00
-
-
-
26,500.00
-
2,200.00
7,700.00
77,000.00
1,500.00
103,900.00
2,750.00
2,200.00
27,500.00
24,200.00
27,500.00
26,400.00
47,300.00
48,400.00
Minimal
47,500.00
51,700.00
50,000.00
66,000.00
24,200.00
44,000.00
47,500.00
48,300.00
6,700.00
71,500.00
65,400.00
104,300.00
99,800.00
89,300.00
2,500.00
1,100.00
60,500.00
66,000.00
201,800.00
104,500.00
11,000.00
2,200.00
3,800.00
2,200.00
7,000.00
10,300.00
62,300.00
42,600.00
62,900.00
99,200.00
209,000.00
3,800.00
11,000.00
3,300.00
48,100.00
49,500.00
49,500.00
9,000.00
76,100.00
55,000.00
75,200.00
104,500.00
82,500.00
Minimal
55,000.00
126,500.00
154,000.00
198,000.00
264,000.00
2,700.00
55,000.00
55,000.00
77,000.00
16,500.00
11,000.00
17,800.00
15,100.00
1,800.00
3,700.00
8,500.00
15,100.00
8,500.00
8,500.00
8,500.00
15,100.00
8,500.00
15,100.00
34,000.00
5,948,000.00
5,700.00
77,500.00
79,400.00
173,200.00
383,000.00
1,400,000.00
2,574,000.00
85,000.00
133,000.00
33,000.00
121,000.00
108,800.00
96,700.00
85,700.00
59,300.00
-
-
-
-
Minimal
484,000.00
57,700.00
9,650.00
12,100.00
14,300.00
459,900.00
1,334,900.00
HARGA
NO. JENIS BAHAN SATUAN MINIMUM KET.
(Rp)
1 Pekerja Hr 50,000
2 Pekerja tak terlatih Hr 45,000
3 Mandor Hr 75,000
4 Buruh Semi Terlatih Hr 45,000
5 T u k a n g l i s t r i k / Buruh Terlatih Hr 50,000
6 Tukang kayu Hr 65,000
7 Kepala tukang Hr 70,000
8 Tukang batu Hr 65,000
9 Kep. tk. batu Hr 70,000
10 Tukang besi Hr 65,000
11 Kep. tk. besi Hr 70,000
12 Tukang cat Hr 65,000
13 Kep. tk. cat Hr 70,000
14 Tukang plitur Hr 65,000
15 Tukang jalan Hr 45,000
16 Tukang gali Hr 45,000
17 Tukang masak aspal Hr 45,000
18 Tk. leideng Hr 65,000
19 M a s i n i s / Operator Hr 70,000
20 Pemb. Masinis Hr 45,000
21 Penjaga api Hr 45,000
22 Penjaga malam Hr 45,000
23 Sopir Hr 55,000
24 Pembantu Sopir Hr 50,000
A.2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN
A. 2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.2. Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.3. Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,87
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.6. Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,87
D
E
F
A.4.1.1.24.
D
E
F
No
A.4.1.1.25.
B
No
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 10 %)
Harga Satuan Pekerjaan (D+E)
TENAGA
Pekerja
Uraian
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu kelas III
Paku 5 cm – 12 cm
Minyak bekisting
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam, 8–
10 cm panj4 m
PERALATAN
Jumlah (A+B+C)
Kode
L.01
L.02
L.03
L.04
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu kelas III
Paku 5 cm – 12 cm
L.01
L.02
L.03
L.04
OH
OH
m3
kg
Liter
m3
Lbr
Batang
Uraian Kode
OH
OH
OH
OH
m3
kg
JUMLAH HARGA ALAT
0.00 x D
Satuan Koefisien
OH
OH
0.66
0.33
0.033
0.033
0.04
0.4
0.2
0.015
0.35
6
Harga Satuan
0.00 x D
Satuan Koefisien
0.66
0.33
0.033
0.033
0.03
0.4
(Rp)
50,000.00
65,000.00
70,000.00
75,000.00
JUMLAH TENAGA KERJA
3,144,400.00
13,200.00
17,500.00
3,144,400.00
132,000.00
22,000.00
Harga Satuan
(Rp)
50,000.00
65,000.00
70,000.00
75,000.00
JUMLAH TENAGA KERJA
3,144,400.00
13,200.00
Jumlah
Harga
(Rp)
-
340,590.20
-
340,590.20
33,000.00
21,450.00
2,310.00
2,475.00
59,235.00
125,776.00
5,280.00
3,500.00
47,166.00
46,200.00
132,000.00
359,922.00
Jumlah
Harga
(Rp)
-
419,157.00
-
419,157.00
33,000.00
21,450.00
2,310.00
2,475.00
59,235.00
94,332.00
5,280.00
m²
m²
Minyak bekisting Liter 0.2 17,500.00 3,500.00
Balok kayu kelas II m3 0.02 3,144,400.00 62,888.00
Plywood tebal 9 mm Lbr 0.35 132,000.00 46,200.00
Dolken kayu , 3 22,000.00 66,000.00
8–10 cm, panj4 m Batang
Penjaga jarak 4 6,300.00 25,200.00
bekisting/spacer Buah
JUMLAH HARGA BAHAN 303,400.00
C PERALATAN
A.4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
A.4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
A.4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
A.4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
A. 4.4.1.6. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
A. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
A. 4.4.1.10. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5PP
A. 4.4.1.12. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
A. 4.4.1.13. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah
(Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3 50,000.00 15,000.00
Tukang Batu L.02 OH 0.1 65,000.00 6,500.00
Kepala Tukang L.03 OH 0.01 70,000.00 700.00
Mandor L.04 OH 0.015 75,000.00 1,125.00
JUMLAH TENAGA KERJA 23,325.00
B BAHAN
Bata merah bh 70 675.00 47,250.00
Semen Portlan Kg 4.5 1,500.00 6,750.00
Kapur Padam m3 0.015 187,000.00 2,805.00
Pasir Pasang m3 0.05 132,000.00 6,600.00
JUMLAH HARGA BAHAN 63,405.00
C PERALATAN
A. 4.4.1.14. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
A. 4.4.1.22. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
A. 4.4.1.23. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
A. 4.4.1.24. Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III (Kruwing)
A.4.6.1.16a. Pemasangan 1 m2 rangka atap genteng Plentong, kayu kelas III (Kayu Tahun)
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.07 50,000.00 3,500.00
Tukang cat L.02 OH 0.105 65,000.00 6,825.00
Kepala tukang L.03 OH 0.004 70,000.00 280.00
Mandor L.04 OH 0.003 75,000.00 225.00
JUMLAH TENAGA KERJA 10,830.00
B BAHAN
Cat menie Kg 0.2 16,500.00 3,300.00
Plamuur Kg 0.15 11,000.00 1,650.00
Cat dasar Kg 0.17 52,800.00 8,976.00
Cat penutup Kg 0.35 52,800.00 18,480.00
Kuas Bh 0.01 9,650.00 96.50
Pengencer Kg 0.03 11,000.00 330.00
Ampelas Lbr 0.2 2,200.00 440.00
JUMLAH HARGA BAHAN 33,272.50
C PERALATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
A.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
Harga Satuan Jumlah
(Rp) Harga
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.5 50,000.00 25,000.00
Tukang Besi L.02 OH 0.5 65,000.00 32,500.00
Kepala tukang L.03 OH 0.05 70,000.00 3,500.00
Mandor L.04 OH 0.025 75,000.00 1,875.00
JUMLAH TENAGA KERJA 62,875.00
B BAHAN
Profil Allum"T" m 3.6 8,400.00 30,240.00
Kawat dia 4 mm kg 0.15 22,700.00 3,405.00
Ramset Buah 1.05 9,600.00 10,080.00
Akustik60 x 120 Lembar 1.5 47,500.00 71,250.00
JUMLAH HARGA BAHAN 114,975.00
C PERALATAN
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
PPN 10 0.10 x D
Overhead & Profit (Contoh 10 %) 0.00 x D
dolak 0.25 x 1.40 = 0.35
0.40 x 0.50 = 0.20
0.55
0.55 x 0.02 = 0.01