I. PEKERJAAN PENDAHULUAN
Pek.Pemasangan Bowplank 1,00 ls
II. PEK.TANAH
Pek.Galian Tanah Pondasi 14,40 m³
Pek. Urugan Kembali bekas Galian 4,80 m³
Pek. Urugan Pasir Bawah Pondasi 1,44 m³
III. PEK.PONDASI
Pek. Pondasi Tapak Beton 1:2:3 0,88 m³
Pas. Pondasi Batu Kali 1 Pc : 4 Ps 7,92 m³
V. PEKERJAAN DINDING
Pas. Dinding HEBEL 137,29 m²
Pek. Plesteran Dinding 1 : 4 274,58 m²
Pek. Acian Dinding 1 : 4 274,58 m²
300.000 300.000,00
Total I 300.000,00
47.250 680.400,00
137.250 658.800,00
240.900 346.896,00
Total II 1.686.096,00
3.958.000 3.483.040,00
674.450 5.341.644,00
Total III 8.824.684,00
3.861.210 2.780.071,20
3.861.210 17.375.445,00
3.861.210 14.827.046,40
3.958.000 30.634.920,00
3.861.210 2.780.071,20
Total IV 68.397.553,80
110.622 15.187.294,38
46.500 12.767.970,00
23.950 6.576.191,00
Total V 34.531.455,38
3.958.000 25.331.200,00
275.000 3.553.000,00
Total VI 28.884.200,00
3.861.210 12.741.993,00
20.000 660.000,00
Total VII 13.401.993,00
85.200 6.590.220,00
37.350 2.889.022,50
Total VIII 9.479.242,50
240.900 633.567,00
122.520 14.861.676,00
Total IX 15.495.243,00
18.200 4.997.356,00
18.200 1.407.770,00
Total X 6.405.126,00
32.350 938.150,00
66.450 465.150,00
83.450 250.350,00
55.450 166.350,00
150.350 1.052.450,00
Total XI 2.872.450,00
Total 190.278.043,68