HARGA SATUAN
NO. U R A I A N SATUAN
(Rp.)
1. Kayu Klas II M3
2,000,000.00
2. Kayu Kls. III M3
1,850,000.00
3. Kayu Terentang M3
1,850,000.00
4. Balok Kayu Borneo M3
1,850,000.00
5. Dolken Kayu Galam Ø 8 - 10/4 m Btg
25,000.00
6. Kayu Kamper, Papan M3
2,000,000.00
7. Batu Belah / Batu Gunung M3
120,000.00
8. Batu Bata Bh
600.00
9. Koral Beton M3
85,000.00
10. Pasir Pasang M3
100,000.00
11. Pasir Beton M3
100,000.00
12. Pasir Urug M3
80,000.00
13. Tanah Urug M3
40,000.00
14. Semen Kg
1,250.00
15. Semen Warna Kg
3,500.00
16. Keramik 40 x 40 Dos
9,600.00
17. Keramik 30 x 30 Dos
4,050.00
18. Besi Beton Kg
9,000.00
19. Kawat Beton Kg
17,000.00
20. Besi Strip Kg
12,500.00
21. Minyak Bekisting Lt
17,500.00
Genteng Metal
22. Lbr
35,000.00
23. Nok Genteng Metal Bh
15,000.00
24. Seng Gelombang Lbr
40,000.00
25. Seng Plat Lbr
60,000.00
26. Tripleks 4 mm Lbr
42,500.00
27. Plywood Tebal 9 mm Lbr
75,000.00
28. Kaca 5 mm M2
60,000.00
29. Kayu Profil M'
4,500.00
30. Paku Biasa 2" - 5" Kg
17,000.00
31. Paku Biasa 1/2' - 1 " Kg
17,000.00
32. Paku Tripleks Kg
22,500.00
33. Paku Seng Kg
22,500.00
34. Kunci Tanam Biasa Bh
70,000.00
35. Engsel Pintu Bh
17,500.00
36. Engsel Jendela Bh
12,500.00
37. Grendel Bh
7,500.00
38. Kait Angin Bh
8,000.00
39. Cat Meni Kg
32,500.00
40. Plamir Kg
10,000.00
41. Cat Dinding Dasar Kg
9,000.00
42. Cat Dinding Penutup Kg
12,500.00
Cat Kayu Dasar
43. Kg
21,000.00
44. Cat Kayu Penutup Kg
32,500.00
45. Cat Atap Seng Kg
32,500.00
46. Kawat NYYM 3 x 2.5 mm M'
5,500.00
47. Pipa Instalasi 1/2" Ujg
12,000.00
48. Klem PVC 1/2" Lot
2,500.00
49. T.Dos PVC Bh
1,500.00
50. Bok PVC Bh
1,500.00
51. Isolatip Bh
8,000.00
52. Stop Kontak 200 VA ex Broco Bh
22,500.00
53. Lampu SL 18 Watt Bh
45,000.00
54. Saklar Tunggal Bh
15,000.00
55. Saklar Ganda Bh
25,000.00
56. Meja Serbaguna Bh
750,000.00
57. Meja Kursi Bh
600,000.00
58. Meja Demonstrasi Bh
800,000.00
59. Kursi Siswa Bh
300,000.00
60. Kursi Bunder Tinggi Bh
450,000.00
61. Kursi Kerja Bh
400,000.00
62. Lemari Kaca Geser Bh
1,750,000.00
63. Lemari Alat Peraga Bh
1,350,000.00
64. Lemari Kertas Kerja Bh
1,000,000.00
65. Lemari Gantung P3K Bh
950,000.00
66. Lemari Asam Bh
900,000.00
67. Papan Tulis Gantung Bh
200,000.00
Kotak Sampah
68. Bh
75,000.00
HARGA
NO. U R A I A N SATUAN
(Rp.)
1 Pekerja O/H
50,000.00
2 Tukang O/H
60,000.00
Kepala
3 O/H
Tukang 75,000.00
4 Mandor O/H
55,000.00
HARGA
NO. U R A I A N SATUAN
(Rp.)
1 Beton Mollen Hari
250,000.00
2 Dump Truck Hari
450,000.00
3 Stamper Hari
100,000.00