RINCIAN ESTIMASI BIAYA TENDER

HPS 1.500.000.000,00

NO URAIAN BIAYA BUAT/PROSES BIAYA SEWA KETERANGAN

SEWA SKA
1. AHLI TEKNIK JALAN (MADYA) 3.000.000,00 SEWA / DI LUAR HADIR
2. AHLI MANAJEMEN PROYEK (MADYA) 3.000.000,00 SEWA / DI LUAR HADIR
3. AHLI K3 KONSTRUKSI (MADYA) 3.000.000,00 SEWA / DI LUAR HADIR
SEWA / BIKIN SKT
1. SKT QUANTITY SURVEYOR (KELAS 1) 1.500.000,00 BUAT/PROSES
2. OPERATOR MOUNTED CRANE (KELAS 1) 1.500.000,00 BUAT/PROSES

DUKUNGAN ALAT
1. STAMPER
2. CONC. VIBRATOR
500.000,00 1 PERUSAHAAN
3. DUMPTRUCK
4. THEODOLIT
5. TRUCK MOUNTED CRANE 500.000,00 1 PERUSAHAAN

BIAYA REK KORAN 6.500.000,00

DUK PAVING 500.000,00 WORKSHOP


SURAT DUKUNGAN/
PERUSAHAAN MEMILIKI ISO 1.000.000,00
PERJANJIAN

SEWA BENDERA 30.000.000,00 ESTIMASI 2% DARI HPS

BIAYA UPLOAD FULL 7.000.000,00

TOTAL 49.000.000,00 9.000.000,00


BIAYA TOTAL 58.000.000,00
REKAP SEBELUM KEBUTUHAN TENDER

SKA SEMUA SEWA = 4.500.000,00 ( DP 50%)


SKT HARUS PROSES = 3.000.000,00 (FULL)
DUKUNGAN ALAT (2 PERUSAHAAN) = 1.000.000,00 (FULL)
BIAYA REKENING KORAN = 6.500.000,00 (FULL)
DUKUNGAN BAHAN + (SERTIFIKAT ISO) = 1.500.000,00 (FULL)
SEWA BENDERA = 5.000.000,00 DP minimal 5 JT
BIAYA PENAWARAN + UPLOAD = 1.000.000,00 Biaya Matrai dulu

BIAYA WAJIB SEBELUM TENDER = 22.500.000,00


TOTAL BIAYA FULL = 58.000.000,00

CATATAN:
1. SEWA SKA di bayar Lunas pada tahap Pembuktian Kualifikasi
2. Sewa Bendera di bayar lunas pada Tahap Pengambilan DP proyek
3. Biaya Upload di bayar Lunas sebelum tahap Pembuktian Kualifikasi