CHILLER

LAKUKAN BLOWDOWN SETIAP HARI


SECARA TERUS – MENERUS DENGAN
ALIRAN KECIL UNTUK EVAPORATOR
DAN CONDENSER YANG OFF.
DICATAT SETIAP PAGI (PUKUL 07:00
WIB) UNTUK KUBIKASINYA.
COOLING TOWER
LAKUKAN BLOWDOWN PADA SAAT
LIQUID TEMPERATURE MENCAPAI
SUHU 31C. BLOWDOWN DIHENTIKAN
APABILA LIQUID TEMPERATURE 29C
DAN PANTAU NILAI TDS. SAAT
PENGECEKAN TDS DI ATAS 80 PPM,
LAKUKAN BLOWDOWN. RENTANG pH
COOLING TOWER ADALAH 7-8.
SISTEM RO
SISTEM RO MATI PADA
3
POSISI LEVEL 150 M DAN
3
PADA POSISI LEVEL 120 M
SISTEM RO JALAN LAGI.
GROUNDTANK
POSISI LEVEL 120 M3 PDAM HARUS DIBUKA
SAMPAI POSISI LEVEL 150 M3 HARUS
DIMATIKAN.

CATATAN : USAHAKAN PEMBUKAAN PDAM 1 X


SEHARI. APABILA GROUNDTANK DAN MAKE UP
RO TIDAK MENGCOVER, HARUS DIBACKUP
DENGAN AIR PDAM. TIDAK DIIJINKAN
MENGGUNAKAN FILTER SOFTENER / AIR SUMUR
LANGSUNG.
LAKUKAN LOG SHEET
SESUAI JAM YANG SUDAH
TERCANTUM PADA BUKU
LOG SHEET.
LAKUKAN PENGISIAN
KUBIKASI DENGAN
BENAR.