190,925,000
Jabatan
0 0 0
-
matan Banjaranyar
AAN SENDIRI (HPS/OE)
DAFTAR HARGA BAHAN - BAHAN BANGUNAN
PERENCANAAN TA. 2018
CIHAURBEUTI - SINDANGKASIH -
CIKONENG - CIAMIS - SADANANYA - PANUMBANGAN - PANJALU - CIPAKU - KAWALI - SUKADANA - PANAWANGAN - JATINAGARA - RANCAH - BANJARSARI - PAMARICAN
No. URAIAN SATUAN TAMBAKSARI - BANJARANYAR Harga Tertinggi
BAREGBEG - CIJEUNGJING - SUKAMANTRI CISAGA LUMBUNG - RAJADESA - CIDOLOG - LAKBOK - PURWADADI
CIMARAGAS
DEKAT SEDANG JAUH DEKAT SEDANG JAUH DEKAT SEDANG JAUH DEKAT SEDANG JAUH DEKAT SEDANG JAUH DEKAT SEDANG JAUH
A UPAH
1 Pekerja OH 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000
2 Tukang OH 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000
3 Kepala tukang OH 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000
4 Mandor OH 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000
5 Operator Alat Berat OH 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000
6 Mekanik OH 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000 90,000
7 Mekanik pembantu OH 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000
8 Operator kurang terlatih OH 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000
9 Pembantu operator OH 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000
10 Supir Material/Truck OH 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000
11 Supir Personil OH 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000
12 Pembantu supir/Kenek OH 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000 70,000
B BAHAN
1 Batu belah 15-20 cm m3 140,000 151,000 162,000 150,000 165,000 180,000 167,000 173,500 180,000 180,000 186,600 193,200 190,800 195,400 200,000 200,000 208,000 216,000 216,000.00
2 Batu pecah 2-3 cm m3 200,000 224,500 249,000 250,000 260,300 270,600 235,000 255,800 276,600 250,000 269,000 288,000 260,000 278,500 297,000 275,000 294,100 313,200 313,200.00
3 Batu putih 15-20 cm m3 -
4 Portland Cement (PC) 50 kg. zak 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000.00
5 Pasir beton m3 170,000 185,000 200,000 200,000 211,300 222,600 200,000 214,300 228,600 225,000 237,500 250,000 230,000 239,500 249,000 230,500 247,850 265,200 265,200.00
6 Pasir pasang m3 140,000 151,000 162,000 150,000 165,000 180,000 167,000 173,500 180,000 180,000 186,600 193,200 190,800 195,400 200,000 195,000 205,500 216,000 216,000.00
7 Pasir urug/timbun M3 80,000 89,200 98,400 120,000 121,800 123,600 120,000 123,000 126,000 125,000 133,900 142,800 136,800 145,200 153,600 135,000 148,500 162,000 162,000.00
8 Bahan timbunan pilihan (Sirtu) m3 108,000 114,000 120,000 120,000 128,400 136,800 120,000 128,400 136,800 136,800 139,800 142,800 155,000 160,000 165,000 160,000 161,000 162,000 165,000.00
9 Cabluk (timbunan) m3 -
10 Baja tulangan beton kg. 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200.00
11 Kawat beton kg. 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000.00
12 Paku kg. 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000.00
13 Papan 3/20 cm kayu kelas III m3 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000.00
14 Kaso 5/7 cm m3 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000.00
15 Kayu untuk konstruksi ( klas II ) m3 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000.00
16 Bambu btg. 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000.00
17 Pipa PVC dia. 1,5" m' 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000.00
18 Waterstop L = 150 mm' m' 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000.00
19 Injuk kg. 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500.00
20 Bronjong 2 x 1 x 0,5 bh. 260,000 260,000 260,000 260,000 260,000 260,000 260,000 260,000 260,000 260,000 260,000 260,000 260,000 260,000 260,000 260,000 260,000 260,000 260,000.00
21 Solar Non Subsidi ltr. 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100.00
22 Bensin Non Subsidi ltr. 6,550 6,550 6,550 6,550 6,550 6,550 6,550 6,550 6,550 6,550 6,550 6,550 6,550 6,550 6,550 6,550 6,550 6,550 6,550.00
23 Minyak Tanah ltr. 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000.00
24 Pelumas/ Minyak Bekisting ltr. 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000.00
25 Sablon m2 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000.00
26 Cat Kayu/ Besi kg. 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000.00
27 Batu 200 - 450 kg m3 -
28 Batu > 500 kg m3 -
29 Kawat Bronjong kg. 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500 17,500.00
30 Baja konstruksi kg. 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000.00
31 Beton Ready Mixed K.175 m3 730,500 730,500 730,500 751,400 751,400 751,400 751,400 751,400 751,400 800,000 800,000 800,000 835,500 835,500 835,500 860,900 860,900 860,900 860,900.00
32 Gorong2 beton diameter 20 cm m' 52,500 52,500 52,500 52,500 52,500 52,500 52,500 52,500 52,500 52,500 52,500 52,500 52,500 52,500 52,500 52,500 52,500 52,500 52,500.00
33 Gorong2 beton diameter 30 cm m' 72,500 72,500 72,500 72,500 72,500 72,500 72,500 72,500 72,500 72,500 72,500 72,500 72,500 72,500 72,500 72,500 72,500 72,500 72,500.00
34 Gorong2 beton diameter 40 cm m' 93,000 93,000 93,000 93,000 93,000 93,000 93,000 93,000 93,000 93,000 93,000 93,000 93,000 93,000 93,000 93,000 93,000 93,000 93,000.00
35 Gorong2 beton diameter 50 cm m' 103,000 103,000 103,000 103,000 103,000 103,000 103,000 103,000 103,000 103,000 103,000 103,000 103,000 103,000 103,000 103,000 103,000 103,000 103,000.00
36 Gorong2 beton diameter 60 cm m' 113,000 113,000 113,000 113,000 113,000 113,000 113,000 113,000 113,000 113,000 113,000 113,000 113,000 113,000 113,000 113,000 113,000 113,000 113,000.00
37 Gorong2 beton diameter 80 cm m' 123,500 123,500 123,500 123,500 123,500 123,500 123,500 123,500 123,500 123,500 123,500 123,500 123,500 123,500 123,500 123,500 123,500 123,500 123,500.00
38 Gorong2 beton diameter 100 cm m' 148,500 148,500 148,500 148,500 148,500 148,500 148,500 148,500 148,500 148,500 148,500 148,500 148,500 148,500 148,500 148,500 148,500 148,500 148,500.00
39 Pipa PVC dia. 12" AW m' 375,000 375,000 375,000 375,000 375,000 375,000 375,000 375,000 375,000 375,000 375,000 375,000 375,000 375,000 375,000 375,000 375,000 375,000 375,000.00
40 Pipa PVC dia. 10" AW m' 262,500 262,500 262,500 262,500 262,500 262,500 262,500 262,500 262,500 262,500 262,500 262,500 262,500 262,500 262,500 262,500 262,500 262,500 262,500.00
41 Pipa PVC dia. 8" AW m' 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000 175,000.00
Pekerjaan Cut and Fill (Block Plan) Kecamatan Banjaranyar
Kecamatan Banjaranyar
WILAYAH II
PANUMBANGAN - PANJALU - SUKAMANTRI
-
-
-
-
-
DEKAT
-
-
70,000.00 Pekerja OH
80,000.00 Tukang OH
90,000.00 Kepala tukang OH
90,000.00 Mandor OH
90,000.00 Operator Alat Berat OH
90,000.00 Mekanik OH
80,000.00 Mekanik pembantu OH
70,000.00 Operator kurang terlatih OH
80,000.00 Pembantu operator OH
80,000.00 Supir Material/Truck OH
80,000.00 Supir Personil OH
70,000.00 Pembantu supir/Kenek OH
-
-
150,000.00 Batu belah 15-20 cm m3
250,000.00 Batu pecah 2-3 cm m3
- Batu putih 15-20 cm m3
55,000.00 Portland Cement (PC) 50 kg. zak
200,000.00 Pasir beton m3
150,000.00 Pasir pasang m3
120,000.00 Pasir urug/timbun M3
120,000.00 Bahan timbunan pilihan (Sirtu) m3
- Cabluk (timbunan) m3
8,200.00 Baja tulangan beton kg.
15,000.00 Kawat beton kg.
15,000.00 Paku kg.
1,500,000.00 Papan 3/20 cm kayu kelas III m3
1,500,000.00 Kaso 5/7 cm m3
2,500,000.00 Kayu untuk konstruksi ( klas II ) m3
DOKUMEN PERENCANAAN
Pekerjaan :
Lokasi :
Kecamatan Banjaranyar
Sumber Dana :
Harga Jumlah
Kode Satuan Biaya Biaya
No. Uraian Satuan Kuantitas
Analisa Rp.
Rp. Rp.
1 2 3 4 5 6 7 8
I PEKERJAAN PERSIAPAN
1 Papan nama proyek Ls 1.00 -
2 Mobilisasi/demobilisasi peralatan Ls 1.00 -
3 Pembersihan Lokasi setelah Pekerjaan Ls 1.00 -
4 Perencanaan Ls 1.00 -
-
II PEKERJAAN KONSTRUKSI
1 Galian tanah dengan Excavator m3 2.1 4,016.59 - -
2 Timbunan tanah atau urugan tanah kembali m3 T.14a 1,293.82 - -
-
JUMLAH -
PPn 10 % -
JUMLAH FISIK -
DIBULATKAN -
TERBILANG :
SERATUS SEMBILAN PULUH JUTA SEMBILAN RATUS DUA PULUH LIMA RIBU RUPIAH
Menyetujui/Mengetahui: Menyetujui/Mengetahui:
Kepala Dinas Pekerjaan Umum, Kepala Bidang Pengelolaan Sumber Daya Air
Penataan Ruang dan Pertanahan Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan
Kabupaten Ciamis, Kabupaten Ciamis,
Harga
No Uraian Kode Satuan Satuan Keterangan
Analisa
( Rp. )
Harga
No Uraian Satuan Kode Satuan Keterangan
(Rp.)
1 2 3 4 5 6
A UPAH
1 Pekerja OH L.01 - /Jam
2 Tukang OH L.02 - /Jam
3 Kepala tukang OH L.03 - /Jam
4 Mandor OH L.04 - /Jam
5 Operator Alat Berat OH L.05 - /Jam
6 Operator kurang terlatih OH L.06 - /Jam
7 Supir Material/Truck OH L.11 - /Jam
8 Pembantu supir/Kenek OH L.12 - /Jam
B BAHAN
0 Batu belah 15-20 cm m3 M.05 #REF!
0 Batu pecah 2-3 cm m3 M.12 #REF!
0 Pasir beton m3 M.14.a
0 Pasir pasang m3 M.14.b
0 Pasir urug/timbun M3 M.14.d
0 Portland Cement (PC) 50 kg. zak M.15
0 Bahan timbunan pilihan (Sirtu) m3 M.16
0 Tiang Pancang Beton Tulang 30x30 cm m' M.18.c
0 Beton Ready Mixed K.175 m3 M.09.x
0 Bambu btg. M.30.b
0 Kayu Galam dia. 8 - 10 cm m' M.31.b
0 Injuk kg. M.32
0 Kayu untuk konstruksi ( klas II ) m3 M.33.c
0 Papan 3/20 cm kayu kelas III m3 M.35.e
0 Kaso 5/7 cm m3 M.37.a
0 Baja tulangan beton kg. M.55.d
0 Kawat beton kg. M.60
0 Kawat Bronjong kg. M.61
0 Bronjong 2 x 1 x 0,5 bh. M.61.a
0 Kawat Las Listrik kg. M.62
0 Paku kg. M.65.b
0 Pipa PVC dia. 1,5" m' M.107.d
0 Pipa PVC dia. 12" AW m' M.107.o
0 Bensin Non Subsidi ltr. M.112.b
0 Cat Kayu/ Besi kg. M.115.b
0 Cat Meni Kayu/Besi kg. M.115.c
0 Pelumas/ Minyak Bekisting ltr. M.129
0 Minyak Tanah ltr. M.130
0 Sablon m2 M.137.c
0 Solar Non Subsidi ltr. M.140.b
0 Waterstop L = 150 mm' m' M.144.a
C ALAT
0 Alat Pancang + Hammer 2 ton Sewa-hari E.01.d
0 Alat Penyambung tiang pancang bh E.02.a
0 Chainsaw Sewa-hari E.06
0 Crane 5-10 ton Sewa-hari E.07.b
0 Dump Truck Jam E.08.b
0 Excavator (Long Arm) Jam E.11.b
0 Gergaji Besi bh E.12
0 Jack Hammer Sewa-hari E.14
0 Mesin Las Listrik Jam E.22
0 Molen 0,35 m3 Sewa-hari E.28.b
0 Pahat Beton bh E.29
0 Linggis bh E.29
0 Palu/Godam bh E.30
0 Pemadat timbunan (stamper) Sewa-hari E.31
DAFTAR HARGA UPAH DAN BAHAN
A UPAH
B BAHAN
C ALAT
Penawar,
CV./PT _______________
Jabatan
ANALISA HARGA SATUAN
T.02 1 m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/tumbuhan diameter < 15 cm
T.03 Cabut 1 Tunggul pohon tanaman keras diameter > 15 cm dan membuang sisa tunggul kayu dan akar-akarnya
P.01c 1 m3 Pasangan Batu dengan Mortar Tipe N (untuk mutu PP tertentu setara dengan campuran 1 PC : 4 PP)
P.03a 1 m2 Siaran dengan mortar jenis PC-PP tipe M (untuk mutu PP tertentu setara dengan campuran 1 PC : 2 PP)
P.04e 1 m2 Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (untuk mutu PP tertentu setara dengan campuran 1PC : 3 PP)
Catatan : jika pasangan batu kosong ini dipasang untuk kontak langsung dengan tanah, maka pada bahan perlu
ditambahkan koefisien pasir 0,432 m3
B.01 1m3 Beton untuk lantai kerja (bedding); menggunakan campuran beton fc' = 5,6 s.d 7,4 Mpa (K-80 s.d. K-100)
B.03 1m3 Beton mutu, f'c = 9,8 Mpa (K125), slump (12±2) cm, w/c = 0,78
a) Manual
b) Menggunakan molen
B.05 1m3 Beton mutu, f'c = 14,5 Mpa (K175), slump (12±2) cm, w/c = 0,66
a) Manual
b) Menggunakan molen
B.07 1m3 Beton mutu, f'c = 19,3 Mpa (K225), slump (12±2) cm, w/c = 0,58
a) Manual
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.650 - -
2 Tukang batu L.02 OH 0.275 - -
3 Kepala tukang L.03 OH 0.028 - -
4 Mandor L.04 OH 0.165 - -
Jumlah Harga Tenaga Kerja -
B Bahan
1 Portland Cement (PC) 50 kg. M.15 zak 7.420 - -
2 Pasir beton M.14.a m3 0.499 - -
3 Batu pecah 2-3 cm M.12 m3 0.722 - -
4 Air M.02 ltr. 215.000 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan
D Jumlah ( A + B + C ) -
E Ovehead + Profit ( 10% ) -
F Harga Satuan Pekerjaan per - m ( D + E )
3
-
b) Menggunakan molen
B.22 1m2 Bekisting untuk permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa perancah)
Portland
Batu pecah
Batu belah Pasir pasang Pasir beton Cement (PC)
No. Analisa Satuan 2-3 cm
15-20 cm 50 kg.
m3 m3 m3 m3 zak
5 Waktu Siklus
- Waktu muat ( Tm ) jam - - - - -
- Waktu angkut ( Ta ) = ( D ) / ( Va ) jam - - - - -
- Waktu pulang ( Tp ) = ( D ) / ( Vp ) jam - - - - -
- Waktu percepatan ( Tg ) jam - - - - -
- Waktu bongkar ( Tt ) jam - - - - -
- Total Waktu Siklus ( T ) jam - - - - -
Jabatan
DAFTAR BIAYA ANGKUT KE LOKASI PEKERJAAN (PIKUL)
DENGAN JARAK ANGKUT RATA-RATA 0 m'.
Portland
Batu pecah Pasir
Batu belah Pasir beton Cement (PC)
No. Analisa Satuan 2-3 cm pasang
15-20 cm 50 kg.
m3 m3 m3 m3 zak
5 Waktu Siklus
- Waktu muat ( Tm ) jam - - - - -
- Waktu angkut ( Ta ) = ( D ) / ( Va ) jam - - - - -
- Waktu pulang ( Tp ) = ( D ) / ( Vp ) jam - - - - -
- Waktu percepatan ( Tg ) jam - - - - -
- Waktu bongkar ( Tt ) jam - - - - -
- Total Waktu Siklus ( T ) jam - - - - -
Jabatan
DAFTAR BIAYA ANGKUT KE LOKASI PEKERJAAN (MENGGUNAKAN KENDARAAN RODA 2)
DENGAN JARAK ANGKUT RATA-RATA 0 m'.
Portland
Batu pecah Pasir
Batu belah Pasir beton Cement (PC)
No. Analisa Satuan 2-3 cm pasang
15-20 cm 50 kg.
m3 m3 m3 m3 zak
5 Waktu Siklus
- Waktu muat ( Tm ) jam - - - - -
- Waktu angkut ( Ta ) = ( D ) / ( Va ) jam - - - - -
- Waktu pulang ( Tp ) = ( D ) / ( Vp ) jam - - - - -
- Waktu percepatan ( Tg ) jam - - - - -
- Waktu bongkar ( Tt ) jam - - - - -
- Total Waktu Siklus ( T ) jam - - - - -
Jabatan
DAFTAR BIAYA ANGKUT KE LOKASI PEKERJAAN (MENGGUNAKAN KENDARAAN RODA 4)
DENGAN JARAK ANGKUT RATA-RATA 0 m'.
Portland
Batu pecah Pasir
Batu belah Pasir beton Cement (PC)
No. Analisa Satuan 2-3 cm pasang
15-20 cm 50 kg.
m3 m3 m3 m3 zak
5 Waktu Siklus
- Waktu muat ( Tm ) jam - - - - -
- Waktu angkut ( Ta ) = ( D ) / ( Va ) jam - - - - -
- Waktu pulang ( Tp ) = ( D ) / ( Vp ) jam - - - - -
- Waktu percepatan ( Tg ) jam - - - - -
- Waktu bongkar ( Tt ) jam - - - - -
- Total Waktu Siklus ( T ) jam - - - - -
Jabatan
REKAPITULASI VOLUME PEKERJAAN
Mengangkut
Mengangkut
Timbunan Timbunan Pemadatan material atau Pasangan Bongkaran
Galian tanah hasil galian Galian tanah
Galian tanah Galian tanah Galian tanah tanah atau Pemadatan pasir sebagai pasir sebagai hasil galian batu dengan pasangan
NO URAIAN PEKERJAAN biasa berbatu
Galian batu cadas atau
lumpur urugan tanah tanah bahan bahan
dengan jarak dengan
sejauh 1 km mortar jenis batu
tanah keras angkut 100 Excavator
kembali pengisi pengisi dengan PC-PP tipe N (manual)
m'
Dump Truck
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
0 PEKERJAAN KONSTRUKSI - m - - - - - - - - - - - - - -
- m
-
-
- m - - - - - - - - - - - - - -
1 2.83
JENIS PEKERJAAN
- - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - -
Pembuatan
Pembuatan
Pemasangan pintu Pemasangan
pintu intake
Pipa PVC dia.
(b=60;h=50
penguras skotbalk KETERANGAN
12" AW (b=80;h=70 kayu klas II
;f=230)
;f=260)
- - - -
ANALISA HARGA SATUAN PINTU PENGURAS
HARGA
HARGA
No. URAIAN SATUAN VOLUME SATUAN
( Rp )
(Rp.)
A BAHAN
1 Drat Penggerak 1 1/2 inchi Kg 23.10 19,000.00 438,900.00
2 Bronze 2 1/2 up drat dalam Kg 6.00 130,000.00 780,000.00
3 Plat 8 mm Stir Penggerak kg 3.50 11,000.00 38,500.00
4 Siku Atas 80.80.8 Kg 19.40 13,000.00 252,200.00
5 Frame Siku 80.80.8 Kg 100.88 13,000.00 1,311,440.00
6 Siku Bawah 80.80.8 Kg 19.40 13,000.00 252,200.00
7 Penguat daun pintu Siku 80.80.8 Kg 27.94 13,000.00 363,168.00
8 Plat 10 mm up daun pintu Kg 45.89 11,000.00 504,790.00
9 Baut W 3/8 x 18 x 2 inchi Bh 42.00 1,500.00 63,000.00
10 Baut W 3/4 x 10 x 4 inchi . Bh 1.00 8,000.00 8,000.00
11 Kawat las kg 2.00 40,000.00 80,000.00
12 Cat besi kg 2.00 50,000.00 100,000.00
13 Meni Besi kg 1.50 20,000.00 30,000.00
14 Besi beton 12 mm up angker Kg 6.00 10,000.00 60,000.00
15 Besi beton persegi 10 mm Kg 10.00 10,000.00 100,000.00
16 Minyak Cat ltr 2.20 17,500.00 38,500.00
17 Stempet kg 1.00 35,000.00 35,000.00
18 Lager Bh 1.00 60,000.00 60,000.00
B TENAGA
1 Tukang Las OH 7.00 80,000.00 560,000.00
2 Tukang Bubut OH 2.00 80,000.00 160,000.00
3 Pekerja OH 9.00 70,000.00 630,000.00
C PERALATAN
1 Mesin las Hr 7.00 100,000.00 700,000.00
2 Mesin Gerinda Hr 2.00 20,000.00 40,000.00
3 Mesin Bor Hr 3.00 25,000.00 75,000.00
4 Kwas 2 inchi bh 1.00 10,000.00 10,000.00
5 Mesin bubut Hr 2.00 150,000.00 300,000.00
Sub-total 7,190,698.00
Keuntungan 10% 719,069.80
Jumlah Harga 7,909,767.80
Harga Satuan dibulatkan 7,900,000.00
HARGA HARGA
No. URAIAN SATUAN VOLUME SATUAN
(Rp.) ( Rp )
A BAHAN
1 Drat Penggerak 1 1/2 inchi Kg 23.10 19,000.00 438,900.00
2 Bronze 2 1/2 up drat dalam Kg 6.00 130,000.00 780,000.00
3 Plat 7 mm Stir Penggerak kg 3.50 11,000.00 38,500.00
4 Siku Atas 70.70.7 Kg 12.00 13,000.00 156,000.00
5 Frame Siku 70.70.7 Kg 69.00 13,000.00 897,000.00
6 Siku Bawah 70.70.7 Kg 12.00 13,000.00 156,000.00
7 Penguat daun pintu Siku 70.70.7 Kg 11.70 13,000.00 152,100.00
8 Plat 8 mm up daun pintu Kg 19.67 11,000.00 216,370.00
9 Baut W 3/8 x 18 x 2 inchi Bh 42.00 1,500.00 63,000.00
10 Baut W 3/4 x 10 x 4 inchi . Bh 1.00 8,000.00 8,000.00
11 Kawat las kg 2.00 40,000.00 80,000.00
12 Cat besi kg 2.00 50,000.00 100,000.00
13 Meni Besi kg 1.50 20,000.00 30,000.00
14 Besi beton 12 mm up angker Kg 6.00 10,000.00 60,000.00
15 Besi beton persegi 10 mm Kg 10.00 10,000.00 100,000.00
16 Minyak Cat ltr 2.20 17,500.00 38,500.00
17 Stempet kg 1.00 35,000.00 35,000.00
18 Lager Bh 1.00 60,000.00 60,000.00
B TENAGA
1 Tukang Las OH 7.00 80,000.00 560,000.00
2 Tukang Bubut OH 2.00 80,000.00 160,000.00
3 Pekerja OH 9.00 70,000.00 630,000.00
C PERALATAN
1 Mesin las Hr 7.00 100,000.00 700,000.00
2 Mesin Gerinda Hr 2.00 20,000.00 40,000.00
3 Mesin Bor Hr 3.00 25,000.00 75,000.00
4 Kwas 2 inchi bh 1.00 10,000.00 10,000.00
5 Mesin bubut Hr 2.00 150,000.00 300,000.00
Sub-total 6,084,370.00
Keuntungan 10% 608,437.00
Jumlah Harga 6,692,807.00
Harga Satuan dibulatkan 6,690,000.00
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.600 M3
Faktor Bucket Fb 0.70 -
Faktor Efisiensi alat Fa 0.69 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 24.15 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 169.05 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 0.40 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1656 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0166 Jam
ANALISIS BIAYA OPERASI ALAT BERAT PENGGALIAN TANAH
A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP
2. Tenaga Pw 133.0 HP
3. Kapasitas Cp 0.6 M3
4. Umur Ekonomis A 5.0 Tahun
5. Jam Operasi dalam 1 tahun W 2,000.0 Jam
6. Harga Alat B 1,555,092,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 0.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 0.00 Rp./Jam
4. Bahan Bakar Bensin Mb 0.00 Liter
5. Bahan Bakar Solar Ms 0.00 Liter
6. Minyak Pelumas Mp 0.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
ANALISIS BIAYA OPERASI ALAT BERAT PENGGALIAN TANAH
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3-4 M3
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 5.0 Ton
4. Umur Ekonomis A 5.0 Tahun
5. Jam Operasi dalam 1 tahun W 2,000.0 Jam
6. Harga Alat B 360,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 0.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 0.00 Rp./Jam
4. Bahan Bakar Bensin Mb 0.00 Liter
5. Bahan Bakar Solar Ms 0.00 Liter
6. Minyak Pelumas Mp 0.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan