Anda di halaman 1dari 1

RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUMAH TYPE 7 x 5 METODE RUMAH RISBA (RUMAH INSTAN BAJA)
POKMAS :
ALAMAT :

Volume Harga Satuan Harga Pekerjaan Harga Total Rencana pendanaan


No Uraian Pekerjaan Kode Analisa Hrg Sat Hrg Sat
Pekerjaan
Tipe 36 Sat Bahan Upah Bahan Upah Stimulan Swadaya

1. PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi 3.96 m3 A.2.3.1.1 63,000.00 249,480.00 249,480.00 249,480.00 -
2 Pek. Urugan Tanah Kembali 0.99 m3 A.2.3.1.9 46,000.00 45,540.00 45,540.00 45,540.00 -
3 Pek. Tanah Urug Peninggian Lantai 6.67 m3 A.2.3.1.14 85,714.29 23,000.00 571,628.57 153,387.00 725,015.57 725,015.57 -
4 Pek. Pasir Urug di Bawah Pondasi 0.66 m3 A.2.3.1.11 105,000.00 25,200.00 69,300.00 16,632.00 85,932.00 85,932.00 -
5 Pek. Pasir Urug dibawah Lantai 1.26 m3 A.2.3.1.11 105,000.00 25,200.00 132,418.13 31,780.35 164,198.48 164,198.48 -
Sub Total I 1,270,166.05 1,270,166.05 -
2. PEKERJAAN PONDASI
1 Pek. Pondasi Batu Pecah Camp. 1 : 5 4.83 m3 A.3.2.1.3 410,251.43 210,000.00 1,979,975.96 1,013,512.50 2,993,488.46 2,993,488.46 -
2 Pek. Rabat Beton Lantai 1.67 m3 A.A.4.1.1.4 843,173.18 128,286.00 1,405,780.48 213,884.83 1,619,665.32 1,619,665.32 -
Sub Total II 4,613,153.77 4,613,153.77 -
3. PEKERJAAN BESI STURUKTUR CNP
1 Pek. Sloof CNP 100.55.33.1,8 36.00 m3 A.4.6.1.21.d 61,512.00 12,735.00 2,214,432.00 458,460.00 2,672,892.00 2,672,892.00 -
2 Pek. Kolom CNP 100.55.33.1,8 54.00 m3 A.4.6.1.21.d 61,512.00 12,735.00 3,321,648.00 687,690.00 4,009,338.00 4,009,338.00 -
3 Pek. Balok CNP 100.55.33.1,8 72.00 m3 A.4.6.1.21.d 61,512.00 12,735.00 4,428,864.00 916,920.00 5,345,784.00 5,345,784.00 -
4 Pek. Besi Siku 40 18.00 m Ls 25,833.33 - 465,000.00 - 465,000.00 465,000.00 -
5 Pek. Besi Siku 70 6.00 m Ls 108,333.33 - 650,000.00 - 650,000.00 650,000.00 -
Sub Total III 13,143,014.00 13,143,014.00 -
4. PEKERJAAN PASANGAN
1 Pek. Pasangan Dinding Bata Camp. 1 : 5 25.08 m2 A. 4.4.1.10 68,827.90 36,000.0 1,726,203.73 902,880.00 2,629,083.73 2,629,083.73 -
2 Pek. Pasangan Dinding Kalsiboard + Rangka Dindidng 152.76 m2 A.4.5.1.7.a 45,710.00 14,000.0 6,982,659.60 2,138,640.00 9,121,299.60 9,121,299.60 -
3 Pek. Penutup Gunungan Kalsiboard t = 6 mm 10.80 m2 A.4.5.1.7.a 45,710.00 14,000.0 493,668.00 151,200.00 644,868.00 644,868.00
Sub Total V 12,395,251.33 12,395,251.33 -
6. PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pek. Kusen Pintu 4.00 buah Ls 270,000.00 - 1,080,000.00 - 1,080,000.00 1,080,000.00 -
2 Pel. Kusen Jendela 4.00 buah Ls 250,000.00 - 1,000,000.00 - 1,000,000.00 1,000,000.00 -
3 Pek. Daun Pintu + Accessories 4.00 buah Ls 750,000.00 - 3,000,000.00 - 3,000,000.00 3,000,000.00 -
3 Pek. Daun Jendela + Accessories 4.00 buah Ls 350,000.00 - 1,400,000.00 - 1,400,000.00 1,400,000.00 -
Sub Total VI 6,480,000.00 6,480,000.00 -
7. PEKERJAAN INSTALASI LISTRIK
1 Pek. Instalasi Listrik 4.00 buah Ls 200,000.00 - 800,000.00 - 800,000.00 800,000.00
800,000.00 800,000.00
8. PEKERJAAN RANGKA ATAPBAJA RINGAN & PENUTUP ATAP
1 Pek. Rangka Atap Baja Ringan C75.75 68.68 m3 A.4.2.1.23 45,000.00 50,700.00 3,090,659.34 3,482,142.86 6,572,802.20 6,572,802.20 -
2 Pek. Penutup Atap Spandek t = 0,3 68.68 m3 A.4.5.2.39 52,100.00 16,800.00 3,578,296.70 1,153,846.15 4,732,142.86 4,732,142.86 -
Sub Total VII 11,304,945.05 11,304,945.05 -
Total Harga 50,006,530.21 50,006,530.21 -
Harga Total Pekerjaan Rumah Tahan Gempa TYPE 7 x 5 (RISBA) 50,000,000.00 50,000,000.00 -

………………,…………...…………..2020
Dibuat Oleh Diperiksa Oleh Mengetahui
Penerima Manfaat Senior Fasilitator Ketua Pokmas

(……………………………………...) (………………………………...) (………………...………………)

Anda mungkin juga menyukai