No. Jenis Pekerjaan
I Pekerjaan Persiapan
1 Pembersihan Lokasi
2m
3m
3 Uizet
II Pekerjaan Tanah
1 Galian Tanah Pondasi Batu Kali
2 Galian Pondasi Setempat
4 Pekerjaan Plesteran
III Pekerjaan Beton
1 Beton Lantai Kerja
4 Beton Kolom
5 Beton Balok
2 Pembesian Kolom
3 Pembesian Plat Lantai
Analisa Perhitungan Quantity
L = 20*9 180
= 180 m²
L = 3*2
= 6 m² 6
K = 20+20+9+9 58
= 58 m
V = 52.18*0.9
= 46.962 m³
Arah X = 9+9 18
Arah Y = 20+20 40
K = 58
L = 1/2*(0.9+0.7)*1
= 0.8 m²
V = 58*0.8
= 46.4 m³
V Total = 93.362 m³
L = 1.2*1.2 30.888
= 1.44 m²
V (1 titik) = 1.44*1.95 m³
2.808
L2 = 4*11.5
= 46 m²
L Total = 60+46
= 106 m²
V = (106*0.25)*1.1
Koefisien
= 29.15 m³
L = 0.1*0.7 9.297
= 0.07 m²
V = (52.18+58)*0.07
= 7.713 m³
Footplat :
L = 1.2*1.2
= 1.44 m²
V = 0.1*1.44
= 0.144 m³
V 11 titik = 11*0.144
= 1.584 m³
V1 = 91*0.05 6.05
= 4.55 m³
V2 = 15*0.1
= 1.5 m³
V Total = 4.55+1.5
= 6.05 m³
L = 0.1*0.7 7.7126
= 0.07 m²
V = (52.18+58)*0.07
= 7.713 m³
L Trasram = 0.3*110.18
= 33.054 m²
L Pintu 1 = 2*(0.3*1.6)
= 0.96 m²
L Pintu 2 = 3*(0.3*0.8)
= 0.72 m²
L Pintu 3 = 0.3*0.6
= 0.18 m²
L Trasram = 33.054-(0.96+0.72+0.18)
= 31.194 m²
L Dinding 1 = 3.1*83.18
= 257.9 m²
L Dinding 2 = 3.3*79.77
= 263.2 m²
L Pintu = 24.8 m²
L Jendela = 27.3 m²
V = 2*(469+31.194) 1000.39
= 1000.39 m²
V = 1.2*1.2*0.05 0.792
= 0.072 m³
V1 = 0.25*0.25*1.85 6.028
= 0.116 m³
V2 = 1.2*1.2*0.3
= 0.432 m³
V1+V2 = 0.116+0.432
= 0.548 m³
L = 0.15*0.2
= 0.03 m²
V = 0.03*110.18
= 3.305 m³
V = 0.0625*7
= 0.4375 m³
V 11 titik = 0.4375*11
= 4.8125 m³
Kolom 15x15
L = 0.15*0.15
= 0.0225 m²
V = 0.0225*7
= 0.1575 m³
V 17 titik = 0.1575*17
= 2.6775 m³
L = 0.15*0.15
= 0.0225 m²
V = 0.0225*1.5
= 0.03375 m³
V 2 titik = 0.03375*2
= 0.0675 m³
V total = 4.8125+2.6775+0.0675
= 7.5575 m³
Balok 20x30 6.11
P = 71.25 m
L = 0.2*0.3
= 0.06 m²
V = 0.06*71.25
= 4.275 m³
Balok 20x25
P = 36.7 m
L = 0.2*0.25
= 0.05 m²
V = 0.05*36.7
= 1.835 m³
V total = 4.275+1.835
= 6.11 m³
L 1 = 0.95*2.52 0.73704
= 2.394 m²
L 2 = 0.8*1.85
= 1.48 m²
L 3 = 0.9*2.52
= 2.268 m²
L total = 2.394+1.48+2.268
= 6.142 m²
V = 6.142*0.12
= 0.73704 m³
Jumlah Besi 92
Arah X = 1.2/0.15
= 8 Buah
Arah Y = 1.2/0.15
= 8 Buah
Total = 16 Buah
Tulangan Sengkang
Jumlah Sengkang = 1.75/0.15
= 11.6666667 Buah
= 12 Buah
Panjang Sengkang = 0.25+0.25+0.25+0.25+0.025+0.025
= 1.05 m
Panjang Total Besi Sengk = 12*1.05
= 12.6 m
Berat Besi Tulangan Poko = 12.6*61.65*d2
= 12.6*61.65*0.082
= 4.971 kg
Jumlah Besi
Arah X = 1.2/0.15
= 8 Buah
Arah Y = 1.2/0.15
= 8 Buah
Total = 16 Buah
Tulangan Sengkang
Jumlah Sengkang = 1.75/0.15
= 11.667 Buah
= 12 Buah
Panjang Sengkang = 0.25+0.25+0.25+0.25+0.025+0.025
= 1.05 m
Panjang Total Besi Sengk = 12*1.05
= 12.6 m
Tulangan Sengkang
Jumlah Sengkang = 110.18/0.2
= 550.9 buah
= 551 buah
Tulangan Pokok
Berat Besi Tulangan Poko = 5*110.18*61.65*0.122
= 489.067 kg
Jumlah Besi
Tulangan Sengkang Ø8 = 119.571/(12*61.65*0.082)
= 25.2540805
Dibulatkan = 26 Lonjor
Tulangan Sengkang
Jumlah Sengkang kolom 1 = 64.6/0.15
= 430.666667 buah
= 431 buah
Jumlah Sengkang kolom 2 = 37.4/0.15
= 249.333333 buah
= 250 buah
Tulangan Pokok
Berat Besi Tulangan Poko = 4*64.6*61.65*0.132
= 269.223 kg
Berat Besi Tulangan Poko = 8*37.4*61.65*0.132
= 311.732 kg
Jumlah Besi
Tulangan Sengkang Kolom = 43.045/(12*61.65*0.062)
= 16.1624012
Dibulatkan = 17 Lonjor
Tulangan Sengkang Kolom = 83.844/(12*61.65*0.082)
= 17.7083333
Dibulatkan = 18 Lonjor
Tulangan Sengkang
Jumlah Sengkang kolom 1 = 40.2/0.15
= 268 buah
Jumlah Sengkang kolom 2 = 36.85/0.15
= 245.666667 buah
= 246 buah
Jumlah Besi
Tulangan Sengkang Kolom = 26.766/(12*61.65*0.062)
= 10.0500135
Dibulatkan = 11 Lonjor
Tulangan Sengkang Kolom = 82.502/(12*61.65*0.082)
= 17.4248952
Dibulatkan = 18 Lonjor
m²
m²
m³
m³
m³
m³
m³
m³
m³
m³
m²
m²
m²
m³
m³
m³
m³
m³
m³
Lonjor
Lonjor
DAFTAR KUANTITAS PEKERJAAN
F Pekerjaan Beton
1 Beton Lantai Kerja K 100
2 Beton Pondasi Telapak K 225
3 Besi Pondasi Footplat
4 Bekisting Pondasi
5 Sloof
6 Kolom
7 Ring Balok
8 Balok
9 Beton Plat Lantai
Kuantitas Satuan
58 m
6 m²
180 m²
93.362 m³
30.888 m³
42.013 m³
26.255 m³
29.15 m³
15.347 m³
37.4612 m³
7.713 m³
31.194 m²
469 m²
62.388 m²
938 m²
146.25 m
0.792 m³
6.028 m³
1039.75 Kg
15.84 m²
3.305 m³
7.558 m³
2.685 m³
6.11 m³
13.5 m³
DAFTAR HARGA SATUAN BAHAN
KABUPATEN LUMAJANG
TAHUN ANGGARAN 2017
KAPUR
1 Kapur bubuk
2 Gamping
3 Kapur bubuk
4 Kalsium (DSGM)
KAYU
1 Kayu jati Klas A Balok 8/12,6/12 X 4 M'
2 kayu Jati Klas A Papan 2/20 X 4 M'
3 Kayu Kamper balok 8/12, 8/15, 6/12 X 4 M'
4 Kayu Kanper Papan 2/20, 3/30, 3/30 X 4 M'
5 Kayu Kamper Usuk 5/7, 4/6 X 4 M'
6 Kayu Kamper Reng 2/3, 3/5 X 4 M'
7 Kayu Kruing Balok 8/12, 8/15, 6/12 X 4 M'
8 Kayu Kruing Papan 2/20, 3/30, 3/30 X 4 M'
9 Kayu Kruing Usuk 5/7, 4/6 X 4 M'
10 Kayu Kruing reng 2/3, 3/5 X 4 M'
11 Kayu Meranti balok 8/12, 8/15, 6/12 X 4 M'
12 Kayu Meranti papan 2/20, 3/30, 3/30 X 4 M'
13 Kayu Meranti Usuk 5/7, 4/6 X 4 M'
14 Kayu Meranti reng 2/3, 3/5 X 4 M'
15 Kayu Lokal balok 8/12, 8/15, 6/12 X 4 M'
16 Kayu Lokal papan 2/20, 3/30, 3/30 X 4 M'
17 Kayu Lokal Usuk 5/7, 4/6 X 4 M' / Perancah
18 Kayu Lokal reng 2/3, 3/5 X 4 M'
19 Kayu Begisting
20 Dolken kayu Q 8 - 10/400 cm
21 Kayu Jati Kelas B 8/12, 8/15, 6/12 X 4 M'
22 Kayu Jati Kelas B papan 2/20, 3/30, 3/30 X 4 M'
GENTENG
1 Genteng type karang pilang Setara nglayur
2 Genteng bubung type Karang pilang Setara nglayur / ambulu
3 Genteng press Jawa / Lokal
4 Genteng bubung press
5 Genteng Pres Beton
6 Genteng Karang pilang Setara ambulu
7 Genteng Bubung Beton
8 Genteng type karang pilang Setara Madura
9 Genteng type karang pilang lokal
10 Genteng beton flat minimalis
11 Genteng Flat Beton
12 Genteng Bubung Flat Beton
13 Genteng Multiroof
14 Genteng Multiroof tebal 0.7 mm (1 x 80 m)
15 Genteng Nok Multiroof
16 Genteng Nok Multiroof tebal 0.7 mm (1 m')
17 Genteng Zinckalum
GORONG-GORONG
1 Gorong-2 Q 10 Cm
2 Gorong-2 Q 20 Cm
3 Gorong-2 Q 30 Cm
4 Gorong-2 Q 40 Cm
5 Gorong-2 Q 50 Cm
6 Gorong-2 Q 60 Cm
7 Gorong-2 Q 70 Cm
8 Gorong-2 Q 80 Cm
9 Buis beton U 20
10 Buis beton U. 30
11 Buis beton U. 40
12 Buis beton U. 50
13 Paving stone K 175
14 Paving stone K. 225
15 Paving stone K. 400
16 Ducotile 30x30 tebal 3 cm
17 U Gatter 60x12x120 cm
18 U Gatter 50x60x120 cm
19 U Gatter 100x100x120 cm
20 Cover U Gatter 30x12x120 cm
21 Cover U Gatter 50x10x120 cm
22 Cover U Gatter 100x12x120 cm
Box Culvert 80.80.120
Box Culvert 100.100.120
PAKU.
1 Paku reng / papan
2 Paku usuk
3 Paku eternit
4 Baut kail / kait
5 Angker kusyn / paku dook
6 Paku seng / sumbat
7 Baut baja
8 Paku Skrup
9 Paku Rivet / Ring
10 Sekrup fixer
KAWAT
1 Bendrat / Kawat beton
2 Kawat bronjong Q 4 mm
3 Kawat Harmonika
4 Kawat Duri
5 Kawat Las
6 Pagar BRC Uk. 1,2 X 1 M
7 Pagar Pintu BRC Uk. 1,2 X 1.00 M
SENG
1 Seng BJLS 30 ( 80 X 300 Cm ) gelombang
2 Seng BJLS 30 ( 80 X 180 Cm ) gelombang
3 Seng alumunium
4 Seng Talang BJLS 30 Lbr. 60 cm
5 Seng plat datar
6 Pleaster 2,8 mm
TRIPLEK
1 Triplek 2 mm (122 X 244) mm
2 Triplek 3 mm (110 X 210) mm
3 Triplek 3 mm (122 X 244) mm
4 Triplek 4 mm (122 X 244) mm
5 Triplek 4 mm (120 X 240) mm
6 Teaxwood 4 mm (90 X 210) mm
7 Teaxwood 4 mm (110 X 210) mm
8 Teaxwood 4 mm (122 X 244) mm
9 Teaxwood Lapis Alumunium 90 X 210 X 4 mm
10 Plywood 3 mm (0,4 x 0,8)
11 Plywood 4 mm (0,4 x 0,8)
12 Plywood 4 mm (1,22 x 2,44)
13 Plywood 9 mm (1,22 x 2,44)
KACA
1 Kaca bening 3 mm
2 Kaca bening 5 mm
3 Kaca bening 8 mm (tempered)
4 Kaca bening 10 mm (tempered)
5 Kaca bening 12 mm (tempered)
6 Kaca 3 mm Rayben
7 Kaca 5 mm Rayben
8 Kaca 10 mm Rayben
9 Kaca 12 mm Rayben
10 Kaca painting
11 Kaca sun glass 5 mm berwarna
12 Kaca glass blok polos
13 Kaca glass blok motif
14 Kaca Cermin 5 mm
15 Kaca Es / Buram
16 Sealant
LEM.
1 Lem kayu rajawali
2 Lem PVC
POLITURAN
1 Cherlagh
2 Spirtus
3 Kertas gosok air
4 Kertas gosok biasa
5 Alang - Alang / Saput
6 Kuas 4"
LISTRIK
1 Stop kontak merk VIMAR
2 Stop kontak merk BROCO
3 Stop kontak Ganda merk VIMAR
4 Stop kontak Ganda merk BROCO
5 Saklar Engkel VIMAR
6 Saklar Ganda VIMAR
7 Saklar Engkel BROCO
8 Saklar Ganda BROCO
9 Sekering Otomatis
10 Sekering Biasa
11 Box Sekering tanam
12 Box Sekering biasa
13 Lampu TL 20 Watt Lengkap
14 Lampu TL 40 Watt Lengkap
15 Lampu TL tabung 40 Watt
16 Lampu PL Lilin 9 Watt
17 Lampu PL Lilin 11 Watt
18 Lampu PL Lilin 20 Watt
19 Panel MCB
20 Kabel NYA uk. 1x2,5 mm
21 Sambungan PLN 900 Kw
22 Sambungan PLN 1300 Kw
23 Sambungan PLN 2200 Kw
24 Sambungan PLN 3500 Kw
25 Sambungan PLN 4400 Kw
26 Sambungan PLN 6600 Kw
27 Kabel engkel NYA
28 Kabel NYY
29 Kabel Tustet
30 Fiting Tempel merk BROCO
31 Pipa Listrik
32 Fitting Down Light
33 Perlengkapan Lampu Taman (Fitting dan Stom)
34 Lampu pijar 25 Watt
35 Lampu pijar 60 Watt
36 Pompa air 1 PK Setara Merk Sanyo
37 Pompa air 1 PK Setara Merk Panasonic
38 Pompa air 1 PK standart
39 Penyambungan PDAM
40 Pompa Air 1 PK Setara Grundfos JD Basic 3
41 Tiang Listrik Besi Biasa
42 Penangkal petir
43 Isolasi
SANITAIR
1 Kloset jongkok Merk. INA
2 Kloset jongkok Merk. TOTO
3 Kloset jongkok Merk. KIA
4 Kloset duduk Merk TOTO Lengkap
5 Kloset duduk Merk INA Lengkap
6 Floor Drain Logam
7 Floor Drain Biasa
8 Afour Bak mandi logam
9 Afour Bak mandi standart
10 Bath up Merk INA Lengkap
11 Tempat Sabun
12 Kran air Q 1/2 " AVE
13 Kran air Q 1/2 " Merk SAN EI
14 Kran air Q 3/4 " Merk SAN EI
15 Kran air Q 1 1/2 " Standard
16 Kran air Q 1/2 " standart ( Logam Biasa )
17 Kran air Q 3/4 " Logam
18 Stop Kran 3/4 " Merk ONDA
19 Stop Kran 1/2 " merk LUXOR
20 Wastafel lengkap INA
21 Tangki Air Fiberglass 1000 Ltr
22 Tangki Air Fiberglass 2000 Ltr
23 Grease Trap
24 Pipa GI Q 1/2"Medium B panjang 6 m
25 Pipa GI Q 3/4" Medium B panjang 6 m
26 Pipa GI Q 1" Medium B panjang 6 m
27 Pipa GI Q 2" Medium B panjang 6 m
28 Pipa GI Q 3" Medium B panjang 6 m
29 Pipa GI Q 4" Medium B panjang 6 m
30 Pipa PVC SNI AW. Q 1/2" pj = 4 m
31 Pipa PVC SNI AW. Q 3/4" pj = 4 m
32 Pipa PVC SNI AW. Q 1" pj = 4 m
33 Pipa PVC SNI AW. Q 1 1/2" pj = 4 m
34 Pipa PVC SNI AW. Q 2" pj = 4 m
35 Pipa PVC SNI AW. Q 3" pj = 4 m
36 Pipa PVC SNI AW. Q 4" pj = 4 m
37 Pipa Air Limbah SNI D. Q 4" pj = 4 m
38 Pipa Air Limbah SNI D. Q 6" pj = 4 m
39 Pipa Air Limbah SNI D. Q 8" pj = 4 m
40 Pipa Air Limbah SNI D. Q 10" pj = 4 m
41 Pipa PVC SCJ Sewage Kelas A Q 11/4"
42 Pipa PVCSCJ Sewage Kelas A Q 1 1/2"
43 Pipa PVC SCJ Sewage Kelas A Q 2"
44 Pipa PVC SCJ Sewage Kelas A Q 2 1/2"
45 Pipa PVC SCJ Sewage Kelas A Q 3"
46 Pipa PVC SCJ Sewage Kelas A Q 4"
47 Pipa PVC SCJ Sewage Kelas A Q 5"
48 Pipa PVC SCJ Sewage Kelas A Q 6"
49 Pipa PVC SCJ Sewage Kelas A Q 8"
50 Pipa PVC SCJ Sewage Kelas A Q 10:"
51 Pipa PVC SCJ Sewage Kelas A Q 12"
52 Pipa PVC SCJ Sewage Kelas B Q 11/4"
53 Pipa PVC SCJ Sewage Kelas B Q 1 1/2"
54 Pipa PVC SCJ Sewage Kelas B Q 2"
55 Pipa PVC SCJ Sewage Kelas B Q 2 1/2"
56 Pipa PVC SCJ Sewage Kelas B Q 3"
57 Pipa PVC SCJ Sewage Kelas B Q 4"
58 Pipa PVC SCJ Sewage Kelas B Q 5"
59 Pipa PVC SCJ Sewage Kelas B Q 6"
60 Pipa PVC SCJ Sewage Kelas B Q 8"
61 Pipa PVC SCJ Sewage Kelas B Q 10:"
62 Pipa PVC SCJ Sewage Kelas B Q 12"
41 Seal tape
42 Ongkos Flen Las Uk. Q 4 "
43 Ongkos Flen Las Uk. Q 3 "
44 Ongkos Flen Las Uk. Q 2 "
45 Titik Las
46 Pas. Bak Mandi 60 x 60 cm / fiber
47 Pas. Pipa udara GI Q 2"
Knee Q-4 jenis D
Knee Q-6 jenis D
Knee Q-8 jenis D
Knee Q-10 jenis D
ASBES.
1 Asbes gelombang 5mm 250x92 cm
2 Asbes gelombang 5mm 240x92 cm
3 Asbes gelombang 3,5mm 240x80 cm
4 Asbes gelombang 3,5mm 210x92 cm
5 Asbes gelombang 3,5mm 150x80 cm
6 Asbes gelombang 4mm 300x80 cm
7 Asbes gelombang 4mm 240x80 cm
8 Asbes gelombang 4mm 180x80 cm
9 Asbes gelombang 4mm 150x80 cm
10 Bubung Asbes Gel 1,05mm
11 Bubung Asbes Gel. 0,92mm
12 Bubung Asbes Gel. 0,80mm
13 Eternit Merk Gresik
14 Eternit Merk Mico
15 Eternit Merk Biasa
16 Gypsum board uk. 1.20 x 2.40 tebal 9 mm
17 Gypsum board uk. 1.20 x 2.40 tebal 6 mm
18 List gypsum
19 Sceceriner
20 Policarbonat tebal 2 mm
21 Policarbonat tebal 4 mm
22 Calciboard tebal 4 mm (1,2 x 2,4 M)
PENUTUP LANTAI DAN DINDING
1 Wallpaper bahan vynil uk. 50x10 cm (Elegance)
2 Wallpaper bahan vynil uk. 50x10 cm (Prestice)
3 Wallpaper bahan vynil uk. 50 cm x 10 m (Paris)
4 Karpet lebar 1,5 m
5 Karpet (Bail)
SEWA ALAT
1 Pesawat ukur
2 Kereta dorong
3 Molen
4 Pengeringan dengan pompa air
5 Pemadat TIMB (stamper)
6 Jack hammer
7 Vibrator beton
8 Excavator
LAIN - LAIN.
1 Gedek
2 Bambu
3 Tali Ijuk
4 Rumput tabal
5 Rumput taman
6 Aspal Bitumen
7 Aspal Curah
8 Aspal Buton
9 Minyak Tanah
10 Solar
11 Bensin Premium
12 Minyak Pelumas
13 Meteran
14 Palu/bodem
15 Timbris
16 Ganco
17 Kranjang
18 Ember
19 Kotak adukan
20 Cetok
21 Kuas 4"
22 Pisau besar
23 Kasut kayu
24 Tang pemotong kawat
25 Gergaji
26 Tusuk bambu
27 Kunci bengko tulangan
28 Tampar
29 Alat bantu pemasangan stoplog
30 Ijuk
31 Linggis
32 Gunting pemotong baja
DAFTAR HARGA SATUAN BAHAN
KABUPATEN LUMAJANG
TAHUN ANGGARAN 2017
HA
NAMA SATUAN BAHAN SATUAN KODE NORMAL
Rp.
M3 M. 020 A 144,000
0 - 15 / 15 - 20 Cm M3 M. 020 157,600
M3 M. 022 178,750
M3 M. 023 165,375
ecah 2 - 3 Cm M3 M. 024 217,055
ecah 1 - 2 Cm M3 M. 025 217,055
ecah 0,5 - 1 Cm M3 M. 026 217,055
M3 M. 040 93,023
pasir pasang M3 M. 041 165,375
M3 M. 042 155,039
M3 M. 043 165,375
M3 M. 044 68,217
ihan (Sirtu Klas B) M3 M. 050 217,055
Bj M. 188 442
M3 M. 080 C 99,914
Mesin 5-7 cm M3 201,250
Mesin 3-5 cm M3 201,250
Mesin 2-3 cm M3 M. 024 A 201,250
Mesin 1-2 cm M3 M. 025 A 201,250
Mesin 0.5-1 cm M3 M. 026 A 201,250
0
0
Bj - 3,617
M2 - 98,437
Kg - 19,687
Bh - 6,727
0
0
Zak M. 081 6,398
Kg M.081 A 1,181
M3 M. 081 B 492,187
Zak 32,484
0
0
s A Balok 8/12,6/12 X 4 M' M3 - 14,765,625
s A Papan 2/20 X 4 M' M3 - 17,718,750
r balok 8/12, 8/15, 6/12 X 4 M' M3 - 8,859,375
Papan 2/20, 3/30, 3/30 X 4 M' M3 - 10,869,139
r Usuk 5/7, 4/6 X 4 M' M3 - 8,859,375
Reng 2/3, 3/5 X 4 M' M3 - 9,023,436
Balok 8/12, 8/15, 6/12 X 4 M' M3 - 5,167,968
Papan 2/20, 3/30, 3/30 X 4 M' M3 - 7,235,156
Usuk 5/7, 4/6 X 4 M' M3 - 5,032,125
reng 2/3, 3/5 X 4 M' M3 - 4,104,843
ti balok 8/12, 8/15, 6/12 X 4 M' M3 - 5,512,500
ti papan 2/20, 3/30, 3/30 X 4 M' M3 - 5,807,812
ti Usuk 5/7, 4/6 X 4 M' M3 - 4,528,125
ti reng 2/3, 3/5 X 4 M' M3 - 4,921,874
alok 8/12, 8/15, 6/12 X 4 M' M3 - 2,756,250
apan 2/20, 3/30, 3/30 X 4 M' M3 - 2,756,250
Usuk 5/7, 4/6 X 4 M' / Perancah M3 - 2,756,250
eng 2/3, 3/5 X 4 M' M3 - 2,657,812
M3 M. 180 817,031
Q 8 - 10/400 cm btg 21,189
as B 8/12, 8/15, 6/12 X 4 M' M3 14,293,125
as B papan 2/20, 3/30, 3/30 X 4 M' M3 16,741,070
0
0
e karang pilang Setara nglayur Bj - 2,165
ung type Karang pilang Setara nglayur / ambulu Bj - 11,812
ss Jawa / Lokal Bj - 1,033
Bj - 7,875
Bj - 5,167
ang pilang Setara ambulu Bj - 4,134
Bj - 11,886
e karang pilang Setara Madura Bj - 2,165
e karang pilang lokal Bj - 2,165
on flat minimalis Bj 7,383
Bj 5,167
ung Flat Beton Bj 10,336
Lbr 36,176
tiroof tebal 0.7 mm (1 x 80 m) Lbr 106,312
Bj 41,343
Multiroof tebal 0.7 mm (1 m') Bj 59,062
Bj 139,535
0
0
0
M' - 31,008
M' - 69,251
M' - 87,855
M' M. 031 A 98,191
M' M. 031 B 139,535
M' M. 032 167,958
M' 120,930
M' M. 033 168,476
Bh - 34,108
Bh - 47,545
60,982
101,292
M2 - 56,847
M2 M. 186 69,767
M2 - 99,225
30 tebal 3 cm M2 - 188,343
Unit 853,125
Unit 590,625
x100x120 cm Unit 1,701,000
er 30x12x120 cm Unit 409,500
er 50x10x120 cm Unit 292,250
er 100x12x120 cm Unit 712,250
00.100.120 0
0
0
Zak M. 080 75,000
Zak M. 080 A 50,000
g ( Tiga Roda ) Zak 85,641
g ( Tiga Roda ) Zak 45,000
Zak 85,641
Zak 43,500
Zak 0
Zak 42,000
/ Warna 40 kg (Gresik) Zak M. 080 B 135,844
/ Warna 40 kg (Tiga Roda) Zak M. 080 B 115,000
0
0
Kg - 11,812
Kg - 11,812
Kg - 21,189
Stel - 5,167
n / paku dook Kg - 14,470
Kg - 23,772
Kg M. 163 21,189
Bh - 517
Bj - 517
Bh 1,033
0
0
Kg M. 168 14,765
ong Q 4 mm Kg M. 162 12,796
M2 - 31,524
M' - 82,687
Bh 1,378
unit - 407,236
RC Uk. 1,2 X 1.00 M unit - 668,735
0
0
Kg M. 167 12,403
Stell - 17,718
Stell - 17,718
Kg - 13,289
Kg 10,336
Kg - 14,765
kg 2,067
kg 13,289
Bh - 17,054
Bh - 9,302
Bh - 5,684
Bh - 113,695
m' - 101,292
m' - 87,855
Bh - 4,134
M' 21,189
M' 20,154
M' 19,121
M' 17,570
M' 280,104
n Aluminium 3 Cm Warna Gelap M' 87,855
n Aluminium 4 Cm Warna Gelap M' 101,292
n Aluminium 3 Cm Warna Silver M' 83,671
n Aluminium 4 Cm Warna Silver M' 95,484
m2 1,136,953
al 0.75 mm m' 13,781
m' 16,734
/Reng R 32-0,60 m' 7,383
/Reng R 32-0,45 m' 6,890
Truss Screw) 12x14x22 bh 393
Truss Screw) 10x16x20 bh 344
10 panjang 6 cm bh 1,968
m' 33,592
m' 55,814
unit 180,879
m2 104,909
m2 113,695
Door KW 1 ( tebal 1.2 mm ) m2 466,151
Door KW 2 ( tebal 0.9 mm ) m2 407,236
Door KW 2 ( tebal 0.7 mm ) m2 344,531
4 x 4 0,35 mm (rangka baja ringan) btg 34,108
ljr 73,828
ljr 88,593
ljr 108,281
Besi 5x5 cm1,4 mm ljr 114,187
Besi 5x5 cm1,6mm ljr 152,578
lbr 39,375
0
0
0 ( 80 X 300 Cm ) gelombang Lbr - 99,225
0 ( 80 X 180 Cm ) gelombang Lbr - 70,284
Lbr - 28,940
BJLS 30 Lbr. 60 cm M1 - 40,826
Lbr - 68,733
lbr 700,875
0
0
m (122 X 244) mm Lbr - 43,927
m (110 X 210) mm Lbr - 53,746
m (122 X 244) mm Lbr - 55,814
m (122 X 244) mm Lbr - 74,418
m (120 X 240) mm Lbr - 76,486
mm (90 X 210) mm Lbr - 87,855
mm (110 X 210) mm Lbr - 101,292
mm (122 X 244) mm Lbr - 80,620
apis Alumunium 90 X 210 X 4 mm Lbr - 113,695
m (0,4 x 0,8) Lbr - 20,671
m (0,4 x 0,8) Lbr - 28,423
m (1,22 x 2,44) Lbr - 80,620
m (1,22 x 2,44) Lbr - 108,527
0
0
M2 - 67,183
M2 - 88,889
8 mm (tempered) M2 279,070
10 mm (tempered) M2 372,093
12 mm (tempered) M2 496,125
M2 - 74,418
M2 - 100,775
M2 602,061
M2 873,386
M2 - 470,285
ss 5 mm berwarna M2 - 470,285
Bh - 23,772
Bh - 25,839
M2 - 242,894
M2 201,551
Bh - 33,961
0
ANTUNG & KUNCI 0
kuda terbang Setara RRC Bh - 87,855
anchor Setara RRC Bh - 90,956
Bh - 268,734
Bh - 100,775
Bh - 7,383
Bh - 5,906
Stel - 33,592
Stel - 13,436
Bh - 9,843
Daun - 13,436
njaga jarak bekisting Bh - 28,301
kaca (Dorma) Bh 583,980
0
0
ing 20/25 Cm polos M2 - 44,296
ing 20/25 Cm motif M2 - 46,265
ai KM 20/20 Cm warna M2 - 44,789
30 Cm warna polos putih M2 - 32,484
30 Cm warna / gelap M2 - 39,375
30 Cm warna / motif M2 - 46,265
40 warna polos M2 - 38,390
40 Cm warna / motif M2 - 35,930
uk. 6 X 20 Cm Bh - 2,214
uk. 6 X 20 Cm motif Bh - 2,461
u macan polos Bh - 5,906
u macan motif / warna Bh - 98,437
u Uk. 20 x 20 Cm M2 - 51,187
Gln - 187,031
Kg - 67,921
mowilexSetara ) Kg - 68,906
Kg M. 090 93,023
Kg - 24,289
Kg - 22,640
Ltr - 22,739
er A Bintang ) Ltr - 26,086
er A Spesial ) Ltr - 26,086
Ltr M. 182 24,609
Gln - 73,828
Kg - 23,625
Kg - 33,075
Kg - 33,075
Kg 45,168
0
0
Kg - 12,796
Kg - 7,235
0
0
Kg - 17,570
Ltr - 14,470
Lbr - 3,101
Lbr - 2,461
Ikat - 4,921
Bh 20,671
0
0
merk VIMAR Bh - 28,940
merk BROCO Bh - 10,828
Ganda merk VIMAR Bh - 43,411
Ganda merk BROCO Bh - 12,796
Bh - 18,088
Bh - 25,839
Bh - 10,336
Bh - 21,705
Bh - 65,116
Bh - 14,470
Bh - 44,444
Bh - 36,176
Watt Lengkap Bh - 73,385
Watt Lengkap Bh - 106,460
bung 40 Watt Bh - 18,088
Bh - 36,176
Bh - 39,277
Bh - 51,680
Bh - 124,306
. 1x2,5 mm m" - 4,237
Unit 1,892,855
PLN 1300 Kw Unit 3,046,460
PLN 2200 Kw Unit 4,265,986
PLN 3500 Kw Unit 5,509,055
PLN 4400 Kw Unit 6,705,037
PLN 6600 Kw Unit 14,643,727
m' - 2,825
m' - 10,359
m' - 4,134
l merk BROCO Bh - 14,470
Ljr - 10,852
Bh - 41,343
n Lampu Taman (Fitting dan Stom) Bh - 116,795
Bh - 7,235
Bh - 8,268
PK Setara Merk Sanyo Bh - 1,095,609
PK Setara Merk Panasonic Bh - 873,386
Bh - 640,828
Unit - 759,691
PK Setara Grundfos JD Basic 3 Unit - 2,945,742
Bh - 516,796
Unit - 904,394
Bh 14,470
0
0
ok Merk. INA Bh - 157,106
ok Merk. TOTO Bh - 408,269
ok Merk. KIA Bh - 133,333
Merk TOTO Lengkap Bh - 2,313,281
Merk INA Lengkap Bh - 1,927,652
Bh - 29,457
Bh - 11,369
Bh - 63,984
andi standart Bh - 10,852
k INA Lengkap Bh - 2,945,742
Bh - 34,108
Bh - 20,671
2 " Merk SAN EI Bh - 44,296
4 " Merk SAN EI Bh - 54,140
1/2 " Standard Bh - 94,057
2 " standart ( Logam Biasa ) Bh - 47,545
Bh - 81,654
4 " Merk ONDA Bh - 81,654
2 " merk LUXOR Bh - 51,680
Bh - 246,093
berglass 1000 Ltr 1 Unit - 1,173,129
berglass 2000 Ltr 1 Unit - 4,237,734
1 Unit - 6,459,961
"Medium B panjang 6 m Ljr - 132,136
" Medium B panjang 6 m Ljr - 167,372
Medium B panjang 6 m Ljr - 246,654
Medium B panjang 6 m Ljr - 519,736
Medium B panjang 6 m Ljr - 775,200
Medium B panjang 6 m Ljr - 1,100,255
I AW. Q 1/2" pj = 4 m Ljr - 25,839
I AW. Q 3/4" pj = 4 m Ljr - 33,075
I AW. Q 1" pj = 4 m Ljr - 41,343
I AW. Q 1 1/2" pj = 4 m Ljr - 53,156
I AW. Q 2" pj = 4 m Ljr - 94,057
AW. Q 3" pj = 4 m Ljr - 167,343
AW. Q 4" pj = 4 m Ljr - 177,187
ah SNI D. Q 4" pj = 4 m Ljr - 320,414
ah SNI D. Q 6" pj = 4 m Ljr - 604,652
ah SNI D. Q 8" pj = 4 m Ljr - 926,652
ah SNI D. Q 10" pj = 4 m Ljr - 1,457,367
Sewage Kelas A Q 11/4" Ljr 96,124
Sewage Kelas A Q 1 1/2" Ljr 120,930
Sewage Kelas A Q 2" Ljr 155,039
Sewage Kelas A Q 2 1/2" Ljr 186,046
Sewage Kelas A Q 3" Ljr 227,390
Sewage Kelas A Q 4" Ljr 335,917
Sewage Kelas A Q 5" Ljr 434,109
Sewage Kelas A Q 6" Ljr 713,180
Sewage Kelas A Q 8" Ljr 1,085,273
Sewage Kelas A Q 10:" Ljr 1,705,430
Sewage Kelas A Q 12" Ljr 2,739,023
Sewage Kelas B Q 11/4" Ljr 170,542
Sewage Kelas B Q 1 1/2" Ljr 217,055
Sewage Kelas B Q 2" Ljr 279,070
Sewage Kelas B Q 2 1/2" Ljr 320,167
Sewage Kelas B Q 3" Ljr 403,102
Sewage Kelas B Q 4" Ljr 496,125
Sewage Kelas B Q 5" Ljr 568,477
Sewage Kelas B Q 6" Ljr 904,307
Sewage Kelas B Q 8" Ljr 1,395,352
Sewage Kelas B Q 10:" Ljr 2,222,227
Sewage Kelas B Q 12" Ljr 3,462,478
bh 3,617
Las Uk. Q 4 " Bj - 83,720
Las Uk. Q 3 " Bj - 54,780
Las Uk. Q 2 " Bj - 48,579
Titik - 5,167
ndi 60 x 60 cm / fiber Bh - 295,312
m' #VALUE!
0
0
bang 5mm 250x92 cm Lbr - 87,281
bang 5mm 240x92 cm Lbr - 74,418
bang 3,5mm 240x80 cm Lbr - 43,411
bang 3,5mm 210x92 cm Lbr - 56,847
bang 3,5mm 150x80 cm Lbr - 34,108
bang 4mm 300x80 cm Lbr - 58,914
bang 4mm 240x80 cm Lbr - 39,277
bang 4mm 180x80 cm Lbr - 31,008
bang 4mm 150x80 cm Lbr - 26,873
s Gel 1,05mm Lbr - 34,108
s Gel. 0,92mm Lbr - 29,974
s Gel. 0,80mm Lbr - 29,974
Bh - 10,852
Bh - 12,920
Bh - 9,819
rd uk. 1.20 x 2.40 tebal 9 mm Lbr - 78,553
rd uk. 1.20 x 2.40 tebal 6 mm Lbr - 67,183
M' - 14,765
M2 - 2,346,258
tebal 2 mm M2 - 61,031
tebal 4 mm M2 - 67,183
bal 4 mm (1,2 x 2,4 M) M2 - 70,284
0
NTAI DAN DINDING 0
ahan vynil uk. 50x10 cm (Elegance) roll - 227,390
ahan vynil uk. 50x10 cm (Prestice) roll - 268,734
ahan vynil uk. 50 cm x 10 m (Paris) roll - 387,597
M' - 43,411
M2 - 129,199
0
Bh/hr
Bh/hr
Bh/hr
dengan pompa air /hr
MB (stamper) Unit/m3
Bh/hr
Unit/hr
Unit/hr
0
M2 49,612
Ljr 21,189
M' 4,134
M2 20,671
M2 37,209
kg 9,450
kg 9,887
ton 941,308
ltr 18,000
ltr 5,150
ltr 6,450
ltr 29,531
bh 24,609
bh 87,855
bh 0
bh 56,847
bh 13,436
bh 10,336
bh 53,746
bh 20,671
bh 14,765
bh 83,204
bh 8,785
bh 33,592
bh 56,847
ikat 1,033
bh 16,537
M' 6,718
emasangan stoplog bh 47,545
Kg 36,176
bh 67,183
bh 72,352
HARGA SATUAN
SEDANG JAUH KHUSUS KETERANGAN
Rp. Rp. Rp.
300,000 307,500
441,000 452,000
300,000 307,500
300,000 338,250
170,000 174,250
247,000 253,000
220,000 225,500
549,175 549,175
0 0
52,093 54,000 55,000
22,247 20,000 20,000
4,340 5,500 6,000
21,705 22,000 22,000
39,069 41,000 42,000
9,922 6,750 7,000
10,381 5,250 6,500
941,308 437,000 447,000
18,000 9,600 9,600
5,150 5,150 5,150
6,450 6,450 6,450
31,008 36,000 36,000
20,077 22,000 22,000
92,248 23,000 24,000
0 0 0
59,689 58,000 59,000
14,108 11,000 12,000
10,852 13,000 13,500
56,434 22,000 22,000
21,705 18,000 18,500
15,504 18,000 18,000
87,364 10,000 10,000
9,225 7,000 7,000
35,271 35,000 35,000
59,689 63,000 64,000
1,085 2,000 2,500
17,364 18,000 19,000
7,054 18,000 18,000
49,922 23,000 24,000
37,984 29,000 30,000
70,542 55,000 56,000
75,969 27,000 27,000
HARGA SATUAN UPAH
PEMBANGUNAN SARANA PEMUKIMAN
TAHUN ANGGARAN 2017
BAHAN LOKAL
1 Batu bulat sungai
2 Batu belah 10 - 15 / 15 - 20 Cm
3 Batu pecah 5 - 7 Cm
4 Batu pecah 3 - 5 Cm
5 Batu Koral pecah 2 - 3 Cm
6 Batu Koral pecah 1 - 2 Cm
7 Batu Koral pecah 0,5 - 1 Cm
8 Pasir urug / timbunan
9 Pasir beton / pasir pasang
10 Sirtu
11 Grosok
12 Tanah urug
13 Timbunan pilihan (Sirtu Klas B)
14 Batu merah
15 Semen merah
16 Batu Pecah Mesin 5-7 cm
17 Batu Pecah Mesin 3-5 cm
18 Batu Pecah Mesin 2-3 cm
19 Batu Pecah Mesin 1-2 cm
20 Batu Pecah Mesin 0.5-1 cm
KAPUR
1 Kapur bubuk
2 Gamping
3 Kapur bubuk
4 Kalsium (DSGM)
KAYU
1 Kayu jati Klas A Balok 8/12,6/12 X 4 M'
2 kayu Jati Klas A Papan 2/20 X 4 M'
3 Kayu Kamper balok 8/12, 8/15, 6/12 X 4 M'
4 Kayu Kanper Papan 2/20, 3/30, 3/30 X 4 M'
5 Kayu Kamper Usuk 5/7, 4/6 X 4 M'
6 Kayu Kamper Reng 2/3, 3/5 X 4 M'
7 Kayu Kruing Balok 8/12, 8/15, 6/12 X 4 M'
8 Kayu Kruing Papan 2/20, 3/30, 3/30 X 4 M'
9 Kayu Kruing Usuk 5/7, 4/6 X 4 M'
10 Kayu Kruing reng 2/3, 3/5 X 4 M'
11 Kayu Meranti balok 8/12, 8/15, 6/12 X 4 M'
12 Kayu Meranti papan 2/20, 3/30, 3/30 X 4 M'
13 Kayu Meranti Usuk 5/7, 4/6 X 4 M'
14 Kayu Meranti reng 2/3, 3/5 X 4 M'
15 Kayu Lokal balok 8/12, 8/15, 6/12 X 4 M'
16 Kayu Lokal papan 2/20, 3/30, 3/30 X 4 M'
17 Kayu Lokal Usuk 5/7, 4/6 X 4 M' / Perancah
18 Kayu Lokal reng 2/3, 3/5 X 4 M'
19 Kayu Begisting
20 Dolken kayu Q 8 - 10/400 cm
21 Kayu Jati Kelas B 8/12, 8/15, 6/12 X 4 M'
22 Kayu Jati Kelas B papan 2/20, 3/30, 3/30 X 4 M'
GENTENG
1 Genteng type karang pilang Setara nglayur
2 Genteng bubung type Karang pilang Setara nglayur / ambulu
3 Genteng press Jawa / Lokal
4 Genteng bubung press
5 Genteng Pres Beton
6 Genteng Karang pilang Setara ambulu
7 Genteng Bubung Beton
8 Genteng type karang pilang Setara Madura
9 Genteng type karang pilang lokal
10 Genteng beton flat minimalis
11 Genteng Flat Beton
12 Genteng Bubung Flat Beton
13 Genteng Multiroof
14 Genteng Multiroof tebal 0.7 mm (1 x 80 m)
15 Genteng Nok Multiroof
16 Genteng Nok Multiroof tebal 0.7 mm (1 m')
17 Genteng Zinckalum
GORONG-GORONG
1 Gorong-2 Q 10 Cm
2 Gorong-2 Q 20 Cm
3 Gorong-2 Q 30 Cm
4 Gorong-2 Q 40 Cm
5 Gorong-2 Q 50 Cm
6 Gorong-2 Q 60 Cm
7 Gorong-2 Q 70 Cm
8 Gorong-2 Q 80 Cm
9 Buis beton U 20
10 Buis beton U. 30
11 Buis beton U. 40
12 Buis beton U. 50
13 Paving stone K 175
14 Paving stone K. 225
15 Paving stone K. 400
16 Ducotile 30x30 tebal 3 cm
17 U Gatter 60x12x120 cm
18 U Gatter 50x60x120 cm
19 U Gatter 100x100x120 cm
20 Cover U Gatter 30x12x120 cm
21 Cover U Gatter 50x10x120 cm
22 Cover U Gatter 100x12x120 cm
Box Culvert 80.80.120
Box Culvert 100.100.120
PAKU.
1 Paku reng / papan
2 Paku usuk
3 Paku eternit
4 Baut kail / kait
5 Angker kusyn / paku dook
6 Paku seng / sumbat
7 Baut baja
8 Paku Skrup
9 Paku Rivet / Ring
10 Sekrup fixer
KAWAT
1 Bendrat / Kawat beton
2 Kawat bronjong Q 4 mm
3 Kawat Harmonika
4 Kawat Duri
5 Kawat Las
6 Pagar BRC Uk. 1,2 X 1 M
7 Pagar Pintu BRC Uk. 1,2 X 1.00 M
SENG
1 Seng BJLS 30 ( 80 X 300 Cm ) gelombang
2 Seng BJLS 30 ( 80 X 180 Cm ) gelombang
3 Seng alumunium
4 Seng Talang BJLS 30 Lbr. 60 cm
5 Seng plat datar
6 Pleaster 2,8 mm
TRIPLEK
1 Triplek 2 mm (122 X 244) mm
2 Triplek 3 mm (110 X 210) mm
3 Triplek 3 mm (122 X 244) mm
4 Triplek 4 mm (122 X 244) mm
5 Triplek 4 mm (120 X 240) mm
6 Teaxwood 4 mm (90 X 210) mm
7 Teaxwood 4 mm (110 X 210) mm
8 Teaxwood 4 mm (122 X 244) mm
9 Teaxwood Lapis Alumunium 90 X 210 X 4 mm
10 Plywood 3 mm (0,4 x 0,8)
11 Plywood 4 mm (0,4 x 0,8)
12 Plywood 4 mm (1,22 x 2,44)
13 Plywood 9 mm (1,22 x 2,44)
KACA
1 Kaca bening 3 mm
2 Kaca bening 5 mm
3 Kaca bening 8 mm (tempered)
4 Kaca bening 10 mm (tempered)
5 Kaca bening 12 mm (tempered)
6 Kaca 3 mm Rayben
7 Kaca 5 mm Rayben
8 Kaca 10 mm Rayben
9 Kaca 12 mm Rayben
10 Kaca painting
11 Kaca sun glass 5 mm berwarna
12 Kaca glass blok polos
13 Kaca glass blok motif
14 Kaca Cermin 5 mm
15 Kaca Es / Buram
16 Sealant
LEM.
1 Lem kayu rajawali
2 Lem PVC
POLITURAN
1 Cherlagh
2 Spirtus
3 Kertas gosok air
4 Kertas gosok biasa
5 Alang - Alang / Saput
6 Kuas 4"
LISTRIK
1 Stop kontak merk VIMAR
2 Stop kontak merk BROCO
3 Stop kontak Ganda merk VIMAR
4 Stop kontak Ganda merk BROCO
5 Saklar Engkel VIMAR
6 Saklar Ganda VIMAR
7 Saklar Engkel BROCO
8 Saklar Ganda BROCO
9 Sekering Otomatis
10 Sekering Biasa
11 Box Sekering tanam
12 Box Sekering biasa
13 Lampu TL 20 Watt Lengkap
14 Lampu TL 40 Watt Lengkap
15 Lampu TL tabung 40 Watt
16 Lampu PL Lilin 9 Watt
17 Lampu PL Lilin 11 Watt
18 Lampu PL Lilin 20 Watt
19 Panel MCB
20 Kabel NYA uk. 1x2,5 mm
21 Sambungan PLN 900 Kw
22 Sambungan PLN 1300 Kw
23 Sambungan PLN 2200 Kw
24 Sambungan PLN 3500 Kw
25 Sambungan PLN 4400 Kw
26 Sambungan PLN 6600 Kw
27 Kabel engkel NYA
28 Kabel NYY
29 Kabel Tustet
30 Fiting Tempel merk BROCO
31 Pipa Listrik
32 Fitting Down Light
33 Perlengkapan Lampu Taman (Fitting dan Stom)
34 Lampu pijar 25 Watt
35 Lampu pijar 60 Watt
36 Pompa air 1 PK Setara Merk Sanyo
37 Pompa air 1 PK Setara Merk Panasonic
38 Pompa air 1 PK standart
39 Penyambungan PDAM
40 Pompa Air 1 PK Setara Grundfos JD Basic 3
41 Tiang Listrik Besi Biasa
42 Penangkal petir
43 Isolasi
SANITAIR
1 Kloset jongkok Merk. INA
2 Kloset jongkok Merk. TOTO
3 Kloset jongkok Merk. KIA
4 Kloset duduk Merk TOTO Lengkap
5 Kloset duduk Merk INA Lengkap
6 Floor Drain Logam
7 Floor Drain Biasa
8 Afour Bak mandi logam
9 Afour Bak mandi standart
10 Bath up Merk INA Lengkap
11 Tempat Sabun
12 Kran air Q 1/2 " AVE
13 Kran air Q 1/2 " Merk SAN EI
14 Kran air Q 3/4 " Merk SAN EI
15 Kran air Q 1 1/2 " Standard
16 Kran air Q 1/2 " standart ( Logam Biasa )
17 Kran air Q 3/4 " Logam
18 Stop Kran 3/4 " Merk ONDA
19 Stop Kran 1/2 " merk LUXOR
20 Wastafel lengkap INA
21 Tangki Air Fiberglass 1000 Ltr
22 Tangki Air Fiberglass 2000 Ltr
23 Grease Trap
24 Pipa GI Q 1/2"Medium B panjang 6 m
25 Pipa GI Q 3/4" Medium B panjang 6 m
26 Pipa GI Q 1" Medium B panjang 6 m
27 Pipa GI Q 2" Medium B panjang 6 m
28 Pipa GI Q 3" Medium B panjang 6 m
29 Pipa GI Q 4" Medium B panjang 6 m
30 Pipa PVC SNI AW. Q 1/2" pj = 4 m
31 Pipa PVC SNI AW. Q 3/4" pj = 4 m
32 Pipa PVC SNI AW. Q 1" pj = 4 m
33 Pipa PVC SNI AW. Q 1 1/2" pj = 4 m
34 Pipa PVC SNI AW. Q 2" pj = 4 m
35 Pipa PVC SNI AW. Q 3" pj = 4 m
36 Pipa PVC SNI AW. Q 4" pj = 4 m
37 Pipa Air Limbah SNI D. Q 4" pj = 4 m
38 Pipa Air Limbah SNI D. Q 6" pj = 4 m
39 Pipa Air Limbah SNI D. Q 8" pj = 4 m
40 Pipa Air Limbah SNI D. Q 10" pj = 4 m
41 Pipa PVC SCJ Sewage Kelas A Q 11/4"
42 Pipa PVCSCJ Sewage Kelas A Q 1 1/2"
43 Pipa PVC SCJ Sewage Kelas A Q 2"
44 Pipa PVC SCJ Sewage Kelas A Q 2 1/2"
45 Pipa PVC SCJ Sewage Kelas A Q 3"
46 Pipa PVC SCJ Sewage Kelas A Q 4"
47 Pipa PVC SCJ Sewage Kelas A Q 5"
48 Pipa PVC SCJ Sewage Kelas A Q 6"
49 Pipa PVC SCJ Sewage Kelas A Q 8"
50 Pipa PVC SCJ Sewage Kelas A Q 10:"
51 Pipa PVC SCJ Sewage Kelas A Q 12"
52 Pipa PVC SCJ Sewage Kelas B Q 11/4"
53 Pipa PVC SCJ Sewage Kelas B Q 1 1/2"
54 Pipa PVC SCJ Sewage Kelas B Q 2"
55 Pipa PVC SCJ Sewage Kelas B Q 2 1/2"
56 Pipa PVC SCJ Sewage Kelas B Q 3"
57 Pipa PVC SCJ Sewage Kelas B Q 4"
58 Pipa PVC SCJ Sewage Kelas B Q 5"
59 Pipa PVC SCJ Sewage Kelas B Q 6"
60 Pipa PVC SCJ Sewage Kelas B Q 8"
61 Pipa PVC SCJ Sewage Kelas B Q 10:"
62 Pipa PVC SCJ Sewage Kelas B Q 12"
41 Seal tape
42 Ongkos Flen Las Uk. Q 4 "
43 Ongkos Flen Las Uk. Q 3 "
44 Ongkos Flen Las Uk. Q 2 "
45 Titik Las
46 Pas. Bak Mandi 60 x 60 cm / fiber
47 Pas. Pipa udara GI Q 2"
Knee Q-4 jenis D
Knee Q-6 jenis D
Knee Q-8 jenis D
Knee Q-10 jenis D
ASBES.
1 Asbes gelombang 5mm 250x92 cm
2 Asbes gelombang 5mm 240x92 cm
3 Asbes gelombang 3,5mm 240x80 cm
4 Asbes gelombang 3,5mm 210x92 cm
5 Asbes gelombang 3,5mm 150x80 cm
6 Asbes gelombang 4mm 300x80 cm
7 Asbes gelombang 4mm 240x80 cm
8 Asbes gelombang 4mm 180x80 cm
9 Asbes gelombang 4mm 150x80 cm
10 Bubung Asbes Gel 1,05mm
11 Bubung Asbes Gel. 0,92mm
12 Bubung Asbes Gel. 0,80mm
13 Eternit Merk Gresik
14 Eternit Merk Mico
15 Eternit Merk Biasa
16 Gypsum board uk. 1.20 x 2.40 tebal 9 mm
17 Gypsum board uk. 1.20 x 2.40 tebal 6 mm
18 List gypsum
19 Sceceriner
20 Policarbonat tebal 2 mm
21 Policarbonat tebal 4 mm
22 Calciboard tebal 4 mm (1,2 x 2,4 M)
SEWA ALAT
1 Pesawat ukur
2 Kereta dorong
3 Molen
4 Pengeringan dengan pompa air
5 Pemadat TIMB (stamper)
6 Jack hammer
7 Vibrator beton
8 Excavator
LAIN - LAIN.
1 Gedek
2 Bambu
3 Tali Ijuk
4 Rumput tabal
5 Rumput taman
6 Aspal Bitumen
7 Aspal Curah
8 Aspal Buton
9 Minyak Tanah
10 Solar
11 Bensin Premium
12 Minyak Pelumas
13 Meteran
14 Palu/bodem
15 Timbris
16 Ganco
17 Kranjang
18 Ember
19 Kotak adukan
20 Cetok
21 Kuas 4"
22 Pisau besar
23 Kasut kayu
24 Tang pemotong kawat
25 Gergaji
26 Tusuk bambu
27 Kunci bengko tulangan
28 Tampar
29 Alat bantu pemasangan stoplog
30 Ijuk
31 Linggis
32 Gunting pemotong baja
HARGA SATUAN KETERANGAN
SATUAN KODE NORMAL
Rp.
M3 M. 020 A 144,000
M3 M. 020 157,600
M3 M. 022 178,750
M3 M. 023 165,375
M3 M. 024 217,055
M3 M. 025 217,055
M3 M. 026 217,055
M3 M. 040 93,023
M3 M. 041 165,375
M3 M. 042 155,039
M3 M. 043 165,375
M3 M. 044 68,217
M3 M. 050 217,055
Bj M. 188 442
M3 M. 080 C 99,914
M3 201,250
M3 201,250
M3 M. 024 A 201,250
M3 M. 025 A 201,250
M3 M. 026 A 201,250
0
0
Bj - 3,617
M2 - 98,437
Kg - 19,687
Bh - 6,727
0
0
Zak M. 081 6,398
Kg M.081 A 1,181
M3 M. 081 B 492,187
Zak 32,484
0
0
M3 - 14,765,625
M3 - 17,718,750
M3 - 8,859,375
M3 - 10,869,139
M3 - 8,859,375
M3 - 9,023,436
M3 - 5,167,968
M3 - 7,235,156
M3 - 5,032,125
M3 - 4,104,843
M3 - 5,512,500
M3 - 5,807,812
M3 - 4,528,125
M3 - 4,921,874
M3 - 2,756,250
M3 - 2,756,250
M3 - 2,756,250
M3 - 2,657,812
M3 M. 180 817,031
btg 21,189
M3 14,293,125
M3 16,741,070
0
0
Bj - 2,165
Bj - 11,812
Bj - 1,033
Bj - 7,875
Bj - 5,167
Bj - 4,134
Bj - 11,886
Bj - 2,165
Bj - 2,165
Bj 7,383
Bj 5,167
Bj 10,336
Lbr 36,176
Lbr 106,312
Bj 41,343
Bj 59,062
Bj 139,535
0
0
0
M' - 31,008
M' - 69,251
M' - 87,855
M' M. 031 A 98,191
M' M. 031 B 139,535
M' M. 032 167,958
M' 120,930
M' M. 033 168,476
Bh - 34,108
Bh - 47,545
60,982
101,292
M2 - 56,847
M2 M. 186 69,767
M2 - 99,225
M2 - 188,343
Unit 853,125
Unit 590,625
Unit 1,701,000
Unit 409,500
Unit 292,250
Unit 712,250
0
0
0
Zak M. 080 75,000
Zak M. 080 A 50,000
Zak 85,641
Zak 45,000
Zak 85,641
Zak 43,500
Zak 0
Zak 42,000
Zak M. 080 B 135,844
Zak M. 080 B 115,000
0
0
Kg - 11,812
Kg - 11,812
Kg - 21,189
Stel - 5,167
Kg - 14,470
Kg - 23,772
Kg M. 163 21,189
Bh - 517
Bj - 517
Bh 1,033
0
0
Kg M. 168 14,765
Kg M. 162 12,796
M2 - 31,524
M' - 82,687
Bh 1,378
unit - 407,236
unit - 668,735
0
0
Kg M. 167 12,403
Stell - 17,718
Stell - 17,718
Kg - 13,289
Kg 10,336
Kg - 14,765
kg 2,067
kg 13,289
Bh - 17,054
Bh - 9,302
Bh - 5,684
Bh - 113,695
m' - 101,292
m' - 87,855
Bh - 4,134
M' 21,189
M' 20,154
M' 19,121
M' 17,570
M' 280,104
M' 87,855
M' 101,292
M' 83,671
M' 95,484
m2 1,136,953
m' 13,781
m' 16,734
m' 7,383
m' 6,890
bh 393
bh 344
bh 1,968
m' 33,592
m' 55,814
unit 180,879
m2 104,909
m2 113,695
m2 466,151
m2 407,236
m2 344,531
btg 34,108
ljr 73,828
ljr 88,593
ljr 108,281
ljr 114,187
ljr 152,578
lbr 39,375
0
0
Lbr - 99,225
Lbr - 70,284
Lbr - 28,940
M1 - 40,826
Lbr - 68,733
lbr 700,875
0
0
Lbr - 43,927
Lbr - 53,746
Lbr - 55,814
Lbr - 74,418
Lbr - 76,486
Lbr - 87,855
Lbr - 101,292
Lbr - 80,620
Lbr - 113,695
Lbr - 20,671
Lbr - 28,423
Lbr - 80,620
Lbr - 108,527
0
0
M2 - 67,183
M2 - 88,889
M2 279,070
M2 372,093
M2 496,125
M2 - 74,418
M2 - 100,775
M2 602,061
M2 873,386
M2 - 470,285
M2 - 470,285
Bh - 23,772
Bh - 25,839
M2 - 242,894
M2 201,551
Bh - 33,961
0
0
Bh - 87,855
Bh - 90,956
Bh - 268,734
Bh - 100,775
Bh - 7,383
Bh - 5,906
Stel - 33,592
Stel - 13,436
Bh - 9,843
Daun - 13,436
Bh - 28,301
Bh 583,980
0
0
M2 - 44,296
M2 - 46,265
M2 - 44,789
M2 - 32,484
M2 - 39,375
M2 - 46,265
M2 - 38,390
M2 - 35,930
Bh - 2,214
Bh - 2,461
Bh - 5,906
Bh - 98,437
M2 - 51,187
bh - 32,484
M2 - 140,568
M2 - 268,734
M2 - 51,187
M2 127,968
Kg 0
Bh 462,656
0
0
Gln - 90,562
Gln - 142,734
Gln - 295,312
Gln - 172,265
Gln - 187,031
Kg - 67,921
Kg - 68,906
Kg M. 090 93,023
Kg - 24,289
Kg - 22,640
Ltr - 22,739
Ltr - 26,086
Ltr - 26,086
Ltr M. 182 24,609
Gln - 73,828
Kg - 23,625
Kg - 33,075
Kg - 33,075
Kg 45,168
0
0
Kg - 12,796
Kg - 7,235
0
0
Kg - 17,570
Ltr - 14,470
Lbr - 3,101
Lbr - 2,461
Ikat - 4,921
Bh 20,671
0
0
Bh - 28,940
Bh - 10,828
Bh - 43,411
Bh - 12,796
Bh - 18,088
Bh - 25,839
Bh - 10,336
Bh - 21,705
Bh - 65,116
Bh - 14,470
Bh - 44,444
Bh - 36,176
Bh - 73,385
Bh - 106,460
Bh - 18,088
Bh - 36,176
Bh - 39,277
Bh - 51,680
Bh - 124,306
m" - 4,237
Unit 1,892,855
Unit 3,046,460
Unit 4,265,986
Unit 5,509,055
Unit 6,705,037
Unit 14,643,727
m' - 2,825
m' - 10,359
m' - 4,134
Bh - 14,470
Ljr - 10,852
Bh - 41,343
Bh - 116,795
Bh - 7,235
Bh - 8,268
Bh - 1,095,609
Bh - 873,386
Bh - 640,828
Unit - 759,691
Unit - 2,945,742
Bh - 516,796
Unit - 904,394
Bh 14,470
0
0
Bh - 157,106
Bh - 408,269
Bh - 133,333
Bh - 2,313,281
Bh - 1,927,652
Bh - 29,457
Bh - 11,369
Bh - 63,984
Bh - 10,852
Bh - 2,945,742
Bh - 34,108
Bh - 20,671
Bh - 44,296
Bh - 54,140
Bh - 94,057
Bh - 47,545
Bh - 81,654
Bh - 81,654
Bh - 51,680
Bh - 246,093
1 Unit - 1,173,129
1 Unit - 4,237,734
1 Unit - 6,459,961
Ljr - 132,136
Ljr - 167,372
Ljr - 246,654
Ljr - 519,736
Ljr - 775,200
Ljr - 1,100,255
Ljr - 25,839
Ljr - 33,075
Ljr - 41,343
Ljr - 53,156
Ljr - 94,057
Ljr - 167,343
Ljr - 177,187
Ljr - 320,414
Ljr - 604,652
Ljr - 926,652
Ljr - 1,457,367
Ljr 96,124
Ljr 120,930
Ljr 155,039
Ljr 186,046
Ljr 227,390
Ljr 335,917
Ljr 434,109
Ljr 713,180
Ljr 1,085,273
Ljr 1,705,430
Ljr 2,739,023
Ljr 170,542
Ljr 217,055
Ljr 279,070
Ljr 320,167
Ljr 403,102
Ljr 496,125
Ljr 568,477
Ljr 904,307
Ljr 1,395,352
Ljr 2,222,227
Ljr 3,462,478
bh 3,617
Bj - 83,720
Bj - 54,780
Bj - 48,579
Titik - 5,167
Bh - 295,312
m' #VALUE!
0
0
Lbr - 87,281
Lbr - 74,418
Lbr - 43,411
Lbr - 56,847
Lbr - 34,108
Lbr - 58,914
Lbr - 39,277
Lbr - 31,008
Lbr - 26,873
Lbr - 34,108
Lbr - 29,974
Lbr - 29,974
Bh - 10,852
Bh - 12,920
Bh - 9,819
Lbr - 78,553
Lbr - 67,183
M' - 14,765
M2 - 2,346,258
M2 - 61,031
M2 - 67,183
M2 - 70,284
0
0
roll - 227,390
roll - 268,734
roll - 387,597
M' - 43,411
M2 - 129,199
0
Bh/hr
Bh/hr
Bh/hr
/hr
Unit/m3
Bh/hr
Unit/hr
Unit/hr
0
M2 49,612
Ljr 21,189
M' 4,134
M2 20,671
M2 37,209
kg 9,450
kg 9,887
ton 941,308
ltr 18,000
ltr 5,150
ltr 6,450
ltr 29,531
bh 24,609
bh 87,855
bh 0
bh 56,847
bh 13,436
bh 10,336
bh 53,746
bh 20,671
bh 14,765
bh 83,204
bh 8,785
bh 33,592
bh 56,847
ikat 1,033
bh 16,537
M' 6,718
bh 47,545
Kg 36,176
bh 67,183
bh 72,352
DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )
BANGUNAN GEDUNG DAN PERUMAHAN/PERMUKIMAN
KABUPATEN LUMAJANG TAHUN ANGGARAN 2017
I. PEKERJAAN PERSIAPAN
Tenaga
- Tukang kayu 0.1 Oh Rp.
- Pekerja 0.1 Oh Rp.
- Kepala tukang 0.01 Oh Rp.
- Mandor 0.005 Oh Rp.
Tenaga
- Tukang kayu 2.0000 Oh Rp.
- Tukang batu 1.0000 Oh Rp.
- Pekerja 2.0000 Oh Rp.
- Kepala tukang 0.3000 Oh Rp.
- Mandor 0.0500 Oh Rp.
Tenaga
- Pekerja 0.3300 Oh Rp.
- Mandor 0.0100 Oh Rp.
Tenaga
- Pekerja 0.2500 Oh Rp.
- Mandor 0.0250 Oh Rp.
10 1 m3 Urugan pasir
Bahan
- Pasir urug 1.2000 M3 Rp.
Tenaga
- Pekerja 0.3000 Oh Rp.
- Mandor 0.0100 Oh Rp.
11 1 m3 Urugan sirtu
Bahan
- Sirtu 1.2000 M3 Rp.
Tenaga
- Pekerja 0.2500 Oh Rp.
- Mandor 0.0250 Oh Rp.
Tenaga
- Pekerja 1.5000 Oh Rp.
- Tukang batu 0.7500 Oh Rp.
- Kepala Tukang 0.0750 Oh Rp.
- Mandor 0.0750 Oh Rp.
Tenaga
- Pekerja 1.5000 Oh Rp.
- Tukang batu 0.7500 Oh Rp.
- Kepala Tukang 0.0750 Oh Rp.
- Mandor 0.0750 Oh Rp.
Tenaga
- Pekerja 0.7800 Oh Rp.
- Tukang batu 0.3900 Oh Rp.
- Kepala Tukang 0.0390 Oh Rp.
- Mandor 0.0390 Oh Rp.
Tenaga
- Pekerja 0.3000 Oh Rp.
- Tukang batu 0.1000 Oh Rp.
- Kepala Tukang 0.0100 Oh Rp.
- Mandor 0.0150 Oh Rp.
Tenaga
- Pekerja 0.3000 Oh Rp.
- Tukang batu 0.1000 Oh Rp.
- Kepala Tukang 0.0100 Oh Rp.
- Mandor 0.0150 Oh Rp.
Jumlah B ( Overhead & Profit 12.5% )
Tenaga
- Pekerja 0.3000 Oh Rp.
- Tukang batu 0.1000 Oh Rp.
- Kepala Tukang 0.0100 Oh Rp.
- Mandor 0.0150 Oh Rp.
V. PEKERJAAN PLESTERAN
Tenaga
- Pekerja 0.3000 Oh Rp.
- Tukang Batu 0.1500 Oh Rp.
- Kepala Tukang 0.0150 Oh Rp.
- Mandor 0.0150 Oh Rp.
Tenaga
- Pekerja 0.3000 Oh Rp.
- Tukang Batu 0.1500 Oh Rp.
- Kepala Tukang 0.0150 Oh Rp.
- Mandor 0.0150 Oh Rp.
Tenaga
- Pekerja 0.2000 Oh Rp.
- Tukang Batu 0.1500 Oh Rp.
- Kepala Tukang 0.0150 Oh Rp.
- Mandor 0.0100 Oh Rp.
4 1 m' Benangan
Bahan
- Semen PC 40 kg 6.5000 kg Rp.
- Pasir Pasang 0.0210 M3 Rp.
Tenaga
- Tukang Batu 0.4000 Oh Rp.
Tenaga
- Pekerja 0.3000 Oh Rp.
- Tukang Batu 0.1500 Oh Rp.
- Kepala Tukang 0.0150 Oh Rp.
- Mandor 0.0150 Oh Rp.
1 Membuat dan Memasang 1m3 Kusen Pintu dan Jendela kayu jati
Bahan
- Kayu Jati balok Klas A 1.1000 M3 Rp.
- Paku 1.2500 kg Rp.
- Lem Kayu 1.0000 kg Rp.
Tenaga
- Pekerja 7.0000 Oh Rp.
- Tukang Kayu 21.0000 Oh Rp.
- Kepala Tukang 2.1000 Oh Rp.
- Mandor 0.3500 Oh Rp.
2 Membuat dan Memasang 1 M2 Daun Pintu dan Jendela Panel Kayu Jati
Bahan
- Kayu jati papan Klas A 0.0400 M3 Rp.
- Lem Kayu 0.5000 kg Rp.
Tenaga
- Pekerja 1.0000 Oh Rp.
- Tukang Kayu 3.0000 Oh Rp.
- Kepala Tukang 0.3000 Oh Rp.
- Mandor 0.0500 Oh Rp.
3 Membuat dan Memasang 1m2 Pintu dan Jendela kaca kayu jati
Bahan
- Kayu Jati, papan Klas A 0.0240 M3 Rp.
- Lem kayu 0.3000 Kg Rp.
Tenaga
- Pekerja 0.8000 Oh Rp.
- Tukang Kayu 2.4000 Oh Rp.
- Kepala Tukang 0.2400 Oh Rp.
- Mandor 0.0400 Oh Rp.
Tenaga
- Pekerja 2.4000 Oh Rp.
- Tukang Kayu 7.2000 Oh Rp.
- Kepala Tukang 0.7200 Oh Rp.
- Mandor 0.1200 Oh Rp.
Tenaga
- Pekerja 4.0000 Oh Rp.
- Tukang Kayu 12.0000 Oh Rp.
- Kepala Tukang 1.2000 Oh Rp.
- Mandor 0.2000 Oh Rp.
Tenaga
- Pekerja 0.1000 Oh Rp.
- Tukang Kayu 0.1000 Oh Rp.
- Kepala Tukang 0.0100 Oh Rp.
- Mandor 0.0050 Oh Rp.
Tenaga
- Pekerja 0.1500 Oh Rp.
- Tukang Kayu 0.2500 Oh Rp.
- Kepala Tukang 0.0250 Oh Rp.
- Mandor 0.0750 Oh Rp.
Tenaga
- Pekerja 0.1000 Oh Rp.
- Tukang Kayu 0.2000 Oh Rp.
- Kepala Tukang 0.0200 Oh Rp.
- Mandor 0.0050 Oh Rp.
Jumlah B ( Overhead & Profit 12.5% )
Tenaga
- Pekerja 0.0100 Oh Rp.
- Tukang Kayu 0.0200 Oh Rp.
- Kepala Tukang 0.0020 Oh Rp.
- Mandor 0.0010 Oh Rp.
Tenaga
- Pekerja 0.0280 Oh Rp.
- Tukang Kayu 0.0800 Oh Rp.
- Kepala Tukang 0.0080 Oh Rp.
- Mandor 0.0140 Oh Rp.
Tenaga
- Pekerja 0.1500 Oh Rp.
- Tukang Kayu 0.3000 Oh Rp.
- Kepala Tukang 0.0300 Oh Rp.
- Mandor 0.0750 Oh Rp.
Jumlah B ( Overhead & Profit 12.5% )
1 Membuat 1 m3 beton mutu f'c = 19,38 Mpa (K 225), Slump (12 + 2 ) cm, w/c = 0,58
Bahan
- Semen PC 40 kg/zak 371.0000 kg Rp.
- Pasir beton 0.4986 M3 Rp.
- Batu pecah mesin 1-2 cm / 2-3 cm 0.7756 M3 Rp.
- Air 215.000 ltr Rp.
- Sewa molen 0.250 hari Rp.
Tenaga
- Pekerja 1.6500 Oh Rp.
- Tukang Batu 0.2750 Oh Rp.
- Kepala Tukang 0.0280 Oh Rp.
- Mandor 0.0830 Oh Rp.
Tenaga
- Pekerja 0.0070 Oh Rp.
- Tukang Besi 0.0070 Oh Rp.
- Kepala Tukang 0.0007 Oh Rp.
- Mandor 0.0003 Oh Rp.
Tenaga
- Pekerja 0.5200 Oh Rp.
- Tukang Kayu 0.2600 Oh Rp.
- Kepala Tukang 0.0260 Oh Rp.
- Mandor 0.0260 Oh Rp.
Tenaga
- Pekerja 0.6600 Oh Rp.
- Tukang Kayu 0.3300 Oh Rp.
- Kepala Tukang 0.0330 Oh Rp.
- Mandor 0.0330 Oh Rp.
Tenaga
- Pekerja 0.6600 Oh Rp.
- Tukang Kayu 0.3300 Oh Rp.
- Kepala Tukang 0.0330 Oh Rp.
- Mandor 0.0330 Oh Rp.
Tenaga
- Pekerja 0.6600 Oh Rp.
- Tukang Kayu 0.3300 Oh Rp.
- Kepala Tukang 0.0330 Oh Rp.
- Mandor 0.0330 Oh Rp.
Tenaga
- Pekerja 0.6600 Oh Rp.
- Tukang Kayu 0.3300 Oh Rp.
- Kepala Tukang 0.0330 Oh Rp.
- Mandor 0.0330 Oh Rp.
Tenaga
- Pekerja 0.6600 Oh Rp.
- Tukang Kayu 0.3300 Oh Rp.
- Kepala Tukang 0.0330 Oh Rp.
- Mandor 0.0330 Oh Rp.
Tenaga
Pekerja 0.1800 Oh Rp.
Tukang Batu 0.0200 Oh Rp.
Tukang kayu 0.0200 Oh Rp.
Tukang Besi 0.0200 Oh Rp.
Kepala Tukang 0.0060 Oh Rp.
Mandor 0.0090 Oh Rp.
Tenaga
Pekerja 0.2970 Oh Rp.
Tukang Batu 0.0330 Oh Rp.
Tukang kayu 0.0330 Oh Rp.
Tukang Besi 0.0330 Oh Rp.
Kepala Tukang 0.0100 Oh Rp.
Mandor 0.0150 Oh Rp.
12 1 M3 Sloof Beton K.225 uk. 20x30 cm, tul 6 Q 16mm, begel Q 8-15 cm
Beton Mutu K.225 1.0000 m3 Rp.
Besi Beton 192.8120 kg Rp.
Bekisting untuk sloof 5.1200 m2 Rp.
Membongkar Bekisting 1.0000 m3 Rp.
13 1 M3 kolom Beton K.225 uk. 30x30 cm, tul 12 Q 16mm, begel Q 8-15 cm
Beton Mutu K.225 1.0000 m3 Rp.
Besi Beton 169.2100 kg Rp.
Bekisting untuk kolom 6.1800 m2 Rp.
Membongkar Bekisting 1.0000 m3 Rp.
14 1 M3 Ring Balok K.225, uk. 12x20 cm, tul 4 Q 12 mm, begel Q 6-20 cm
Beton Mutu K.225 1.0000 m3 Rp.
Besi Beton 168.7350 kg Rp.
Bekisting untuk balok 5.0500 m2 Rp.
Membongkar Bekisting 1.0000 m3 Rp.
15 1 M3 Balok Beton K.225, uk. 15x25 cm, tul 6 Q 12 mm, begel Q 8-15 cm
Beton Mutu K.225 1.0000 m3 Rp.
Besi Beton 184.3260 kg Rp.
Bekisting untuk balok 5.0800 m2 Rp.
Membongkar Bekisting 1.0000 m3 Rp.
Tenaga
- Pekerja 0.1500 Oh Rp.
- Tukang Kayu 0.0750 Oh Rp.
- Kepala Tukang 0.0080 Oh Rp.
- Mandor 0.0080 Oh Rp.
Tenaga
- Pekerja 0.1500 Oh Rp.
- Tukang Kayu 0.0750 Oh Rp.
- Kepala Tukang 0.0080 Oh Rp.
- Mandor 0.0080 Oh Rp.
Tenaga
- Pekerja 0.1500 Oh Rp.
- Tukang Kayu 0.0750 Oh Rp.
- Kepala Tukang 0.0080 Oh Rp.
- Mandor 0.0080 Oh Rp.
4 1 M' Pasang bubung genteng type karang pilang ex. Ambulu / Nglayur
Bahan
- Genteng bubung Type Karang pilang 5.0000 Bh Rp.
- Semen PC 40 kg/zak 8.0000 kg Rp.
- Pasir pasang 0.0320 M3 Rp.
Tenaga
- Pekerja 0.4000 Oh Rp.
- Tukang Kayu 0.2000 Oh Rp.
- Kepala Tukang 0.0200 Oh Rp.
- Mandor 0.0020 Oh Rp.
Tenaga
- Pekerja 0.4000 Oh Rp.
- Tukang Kayu 0.2000 Oh Rp.
- Kepala Tukang 0.0200 Oh Rp.
- Mandor 0.0020 Oh Rp.
Tenaga
- Pekerja 0.1400 Oh Rp.
- Tukang Kayu 0.0670 Oh Rp.
- Kepala Tukang 0.0070 Oh Rp.
- Mandor 0.0070 Oh Rp.
Tenaga
- Pekerja 0.1400 Oh Rp.
- Tukang Kayu 0.0670 Oh Rp.
- Kepala Tukang 0.0070 Oh Rp.
- Mandor 0.0070 Oh Rp.
Tenaga
- Pekerja 0.0840 Oh Rp.
- Tukang kayu 0.1250 Oh Rp.
- Kepala Tukang 0.0130 Oh Rp.
- Mandor 0.0040 Oh Rp.
Tenaga
- Pekerja 0.1500 Oh Rp.
- Tukang Kayu 0.0750 Oh Rp.
- Kepala Tukang 0.0080 Oh Rp.
- Mandor 0.0080 Oh Rp.
Tenaga
- Pekerja 0.2000 Oh Rp.
- Tukang Kayu 0.1000 Oh Rp.
- Kepala Tukang 0.0100 Oh Rp.
- Mandor 0.0100 Oh Rp.
Tenaga
- Pekerja 0.4000 Oh Rp.
- Tukang Kayu 0.2000 Oh Rp.
- Kepala Tukang 0.0200 Oh Rp.
- Mandor 0.0200 Oh Rp.