Anda di halaman 1dari 15

TABEL URAIAN PEMBEBAN

No Item Lebar Tinggi


1 Ring Balok 0.15 m 0.15 m
2 Kolom 0.2 m 2.4 m
3 Pas. Bata Merah (Camp 1:4) 0.15 m 2.4 m
Semen 0.115 KN
Pasir 0.043 m3
4 Plesteran (Camp 1:4)
Semen 0.0624 Kg
Pasir 0.024 m3
4 Sloof 0.15 m 0.3 m
5 Pondasi Menerus 0.3 + 0.7 m 0.75 m

Dik : Lebar Bawah B = 70 cm


Kedalaman Df = 75 cm
Berat jenis tanah y = 0.00025 Kg/cm3
Nilai Kohesi c = 0.1 Kg/m2
Susut Geser Ø = 20 °
Faktor daya dukung Nc = 11.8
tanah Nq = 3.9
Ny = 1.7

qult = c*2/3N'c + y*Df*N'q + 0,5*y*B*N'y


qult = 0.78667 + 0.073125 + 0.015
qult = 0.87467

q = qult / 3 0.437
q = 0.29156 kg/cm2
q = 29.1556 KN/m2

2680 kg/m3
0.00268

TABEL URAIAN PEMBEBAN


No Item Lebar Tinggi
1 Ring Balok 0.15 m 0.15 m
2 Kolom 0.2 m 2.4 m
3 Panel Beton 0.05 m 2.4 m
4 Sloof 0.15 m 0.3 m
5 Pondasi Menerus 0.3 + 0.7 m 0.75 m
TABEL URAIAN PEMBEBANAN
Panjang Luasan Volume Berat Jenis Beban
124 m 18.6 m2 2.79 m3 2400 kg/m3 6696 kg
0.2 m 0.48 m2 0.096 m3 2400 kg/m3 230.4 kg
124 m 297.6 m2 44.64 m3 1700 kg/m3 75888 kg
297.6 m2 0 kg
297.6 m2 0 kg/m3 0 kg

297.6 m2 0 kg
297.6 m2 0 kg/m3 0 kg
124 m 37.2 m2 5.58 m3 2400 kg/m3 13392 kg
124 m 0.375 m2 46.5 m3 2200 kg/m3 102300 kg

q 198506.40 kg
q 1600.86 kg/m
q 2286.94 kg/m2

kg/m3

1000000

TABEL URAIAN PEMBEBANAN


Panjang Luasan Volume Berat Jenis Beban
124 m 18.6 m2 2.79 m3 24 KN/m3 66.96 KN
0.2 m 0.48 m2 0.096 m3 24 KN/m3 2.304 KN
124 m 297.6 m2 14.88 m3 24 KN/m3 357.12 KN
124 m 37.2 m2 5.58 m3 24 KN/m3 133.92 KN
124 m 0.375 m2 46.5 m3 22 KN/m3 1023 KN

q 1583.30 KN
q 12.77 KN/m
q 18.24 KN/m2
t/m2 1000
10000

0.1
0.125

12400
70
868000

86.8
0.228694 kg/cm2
TABEL URAIAN PEMBEBAN
No Item Lebar Tinggi
1 Ring Balok 0.15 m 0.15 m
2 Kolom 0.2 m 2.4 m
3 Pas. Bata Merah (Camp 1:4) 0.15 m 2.4 m
Semen 0.115 KN
Pasir 0.043 m3
4 Plesteran (Camp 1:4)
Semen 0.0624 Kg
Pasir 0.024 m3
4 Sloof 0.15 m 0.3 m
5 Pondasi Menerus 0.3 + 0.7 m 0.75 m

Dik : Lebar Bawah B = 70 cm


Kedalaman Df = 75 cm
Berat jenis tanah y = 0.00025 Kg/cm3
Nilai Kohesi c = 0.183 Kg/cm2
Susut Geser Ø = 25 °
Faktor daya dukung Nc = 14.8 17.7
tanah Nq = 5.6 7.4
Ny = 3.2 5

qult = c*2/3N'c + y*Df*N'q + 0,5*y*B*N'y


qult = 1.8056 + 0.105 + 0.028
qult = 1.9386

q = qult / 3
q = 0.6462 kg/cm2
q= 64.62 KN/m2

qult = c*Nc + y*Df*Nq + 0,5*y*B*Ny


qult = 3.2391 + 0.13875 + 0.044
qult = 3.4216

q = qult / 3
q = 1.14053 kg/cm2
q = 114.053 KN/m2

TABEL URAIAN PEMBEBAN


No Item Lebar Tinggi
1 Ring Balok 0.15 m 0.15 m
2 Kolom 0.2 m 2.4 m
3 Panel Beton 0.05 m 2.4 m
4 Sloof 0.15 m 0.3 m
5 Pondasi Menerus 0.3 + 0.7 m 0.75 m
TABEL URAIAN PEMBEBANAN
Panjang Luasan Volume Berat Jenis Beban
124 m 18.6 m2 2.79 m3 24 KN/m3 66.96 KN
0.2 m 0.48 m2 0.096 m3 24 KN/m3 2.304 KN
124 m 297.6 m2 44.64 m3 17 KN/m3 758.88 KN
297.6 m2 34.224 KN
297.6 m2 14 KN/m3 179.1552 KN

297.6 m2 18.57024 KN
297.6 m2 14 KN/m3 99.9936 KN
124 m 37.2 m2 5.58 m3 24 KN/m3 133.92 KN
124 m 0.375 m2 46.5 m3 22 KN/m3 1023 KN

q 2317.01 KN
q 18.69 KN/m
q 26.69 KN/m2

TABEL URAIAN PEMBEBANAN


Panjang Luasan Volume Berat Jenis Beban
124 m 18.6 m2 2.79 m3 24 KN/m3 66.96 KN
0.2 m 0.48 m2 0.096 m3 24 KN/m3 2.304 KN
124 m 297.6 m2 14.88 m3 24 KN/m3 357.12 KN
124 m 37.2 m2 5.58 m3 24 KN/m3 133.92 KN
124 m 0.375 m2 46.5 m3 22 KN/m3 1023 KN

q 1583.30 KN
q 12.77 KN/m
q 18.24 KN/m2
2011 2012 2013 2014 2015
a 1 2 3 4 5
b 9 7 4 7 6
c 2 3 12 8 10
d 7 4 14 11
40
35
30
25
20
15
10
5
0
a b c d

2011 2012 2013 2014 2015


KOLOM 0.2 0.2 2.4 2400 230.4
SLOOF 0.15 0.3 124 2400 13392
BALOK 0.15 0.15 124 2400 6696
DINDING 2.4 0.15 124 1700 75888
PONDASI 0.3 0.7 0.75 124 2200 0
N 96206.4 KG
P 775.8581 KG/M
1108.369
3103.432
4433.475

0.921421 m
m

0.36
0.864
0.432

Kolom
9.6 0.24 KN/m

c Nc y D Nq
qu 18 29.24 + 19.75 0.75 15.9 +
526.32 235.5188
qu 842.0238 KN/m2
280.6746 KN/m2

0.44 Nov-25
25
y B ny
0.5 19.75 0.7 11.6
80.185

Anda mungkin juga menyukai