q = qult / 3 0.437
q = 0.29156 kg/cm2
q = 29.1556 KN/m2
2680 kg/m3
0.00268
297.6 m2 0 kg
297.6 m2 0 kg/m3 0 kg
124 m 37.2 m2 5.58 m3 2400 kg/m3 13392 kg
124 m 0.375 m2 46.5 m3 2200 kg/m3 102300 kg
q 198506.40 kg
q 1600.86 kg/m
q 2286.94 kg/m2
kg/m3
1000000
q 1583.30 KN
q 12.77 KN/m
q 18.24 KN/m2
t/m2 1000
10000
0.1
0.125
12400
70
868000
86.8
0.228694 kg/cm2
TABEL URAIAN PEMBEBAN
No Item Lebar Tinggi
1 Ring Balok 0.15 m 0.15 m
2 Kolom 0.2 m 2.4 m
3 Pas. Bata Merah (Camp 1:4) 0.15 m 2.4 m
Semen 0.115 KN
Pasir 0.043 m3
4 Plesteran (Camp 1:4)
Semen 0.0624 Kg
Pasir 0.024 m3
4 Sloof 0.15 m 0.3 m
5 Pondasi Menerus 0.3 + 0.7 m 0.75 m
q = qult / 3
q = 0.6462 kg/cm2
q= 64.62 KN/m2
q = qult / 3
q = 1.14053 kg/cm2
q = 114.053 KN/m2
297.6 m2 18.57024 KN
297.6 m2 14 KN/m3 99.9936 KN
124 m 37.2 m2 5.58 m3 24 KN/m3 133.92 KN
124 m 0.375 m2 46.5 m3 22 KN/m3 1023 KN
q 2317.01 KN
q 18.69 KN/m
q 26.69 KN/m2
q 1583.30 KN
q 12.77 KN/m
q 18.24 KN/m2
2011 2012 2013 2014 2015
a 1 2 3 4 5
b 9 7 4 7 6
c 2 3 12 8 10
d 7 4 14 11
40
35
30
25
20
15
10
5
0
a b c d
0.921421 m
m
0.36
0.864
0.432
Kolom
9.6 0.24 KN/m
c Nc y D Nq
qu 18 29.24 + 19.75 0.75 15.9 +
526.32 235.5188
qu 842.0238 KN/m2
280.6746 KN/m2
0.44 Nov-25
25
y B ny
0.5 19.75 0.7 11.6
80.185