0,6 * H
0,3*B
H/10
MIN 0,3
0,1H-0,2H
(MIN)
(H-D)
Distribusi Tekanan Tanah
Aktif
T ha1 3.333 kn/m2
T ha2 5.216 kn/m2 Tabel Momen Tekanan Aktif
T ha3 11.333 kn/m2 No. Tinggi (m) Tekanan Gaya
T ha4 17.735 kn/m2 1 2 3.333 6.667
T ha5 15.066 kn/m2 2 1.5 5.216 7.824
T ha6 -32.790 kn/m2 3 2 11.333 11.333
Gaya Aktif 4 1.5 17.735 26.603
Pa1 6.667 kn/m2 5 1.5 15.066 11.299
Pa2 7.824 kn/m2 6 1.5 -32.790 -49.184
Pa3 11.333 kn/m2 ∑Ma 14.542
Pa4 26.603 kn/m2 Z 2.462046
Pa5 11.299 kn/m2
Pa6 -49.184 kn/m2
Pasif Tabel Momen Tekanan Aktif
T hp1 51.679 kn/m2 No. Tinggi (m) Tekanan Gaya
T hp2 62.860 kn/m2 1 1.4 51.679 36.175
Gaya Pasif 2 1.4 62.860 88.004
Pp1 36.175 kn/m2 ∑Mp 124.179
Pp2 88.004 kn/m2 Z 0.632027
Analisis Terhadap Stabilitas Gaya-Gaya Ekternal
Luas Area Segmen A
1 1.181 m2
n Tekanan Aktif 2 0.236 m2 No.
Lengan Momen 3 0.735 m2 1
2.500 16.667 4 1.750 m2 2
0.750 5.868 5 1.313 m2 3
2.167 24.556 Berat Persatuan Panjang 4
0.750 19.952 1 28.350 kN/m2 5
0.500 5.650 2 5.670 kN/m2 ⅀MR
0.750 -36.888 3 17.640 kN/m2
35.804 4 29.750 kN/m2
m 5 25.272 kN/m2
beban q 6 8.750 kN/m2
⅀V 106.682 kN/m2
n Tekanan Aktif
Lengan Momen Stabiitas Guling/Overtuning
0.467 16.882 Pah 14.542 kN/m2
0.700 61.603 ⅀Mo 35.804 kN/m2
78.485 ⅀MR 143.946
m Fs Ovt 4.020 ≥ 2
LANJUT BRE!!!
Menghitung q
q = γ2.D
= 26.957 kN/m2
Faktor Kedalaman
Fqd =
= 1.208
Fcd =
= 1.267
Fγd = 1.000
Faktor Bentuk
Fcs = 1.000
Fqs = 1.000
Fγs = 1.000
Faktor Inklinasi
Cot Ф = 3.019566
Fqi =
= 0.993
Fγi =
= 0.990
Fci =
= 0.991
Kontrol
qmaks < qu
56.073 < 488.887
MANTAP
qu/qmaks > 3
8.719 > 3.000
MANTAP
qmin > 0
45.529 > 0
MANTAP
Luas Berat Persatuan Panjang Lengan Momen
1.181 28.350 1.0375 29.41313
0.236 5.670 0.8 4.536
0.735 17.64 1.05 18.522
1.750 29.75 1.6625 49.45938
1.313 25.2721875 1.6625 42.01501
143.9455
kN/m2
kN/m2
kN/m2
h (Metode Hansen)
Hansen
φ= Nc Nq Nγ
18 13.100 5.260 2.080
19 13.930 5.800 2.480
qs.q.Nq+Fγd.Fγi.Fγs.0,5.B'.γ2.Nγ
MANTAP
KONTROL DAYA DUKUNG TANAH TE
pat data sondir pada kedalaman tapak dinding penahan tanah yaitu
Parameter Tanah Dimensi Proposional Semi kantilever
Tanah timbunan (Tanah Peniraman) Dimensi
Ɣ 17 kN/m3 H 3.5 m
Ø 30 ° H1 2.2 m
c 0 H2 1.3 m
H3 1.2 m
Tanah asli (Data DB2.1) B 2.100 m
ƴm 1.848 t/m3 Toe 0.700 m
18.48 kn/m3 D 0.350 m
Ø 11.31 ° atas 0.400 m
c 0.176 kg/cm2 bawah 0.525 m
17.26 Kn/m2 Toe 0.700 m
Heel 0.875 m
Tanah asli (Data DB2.2) kemiringan
ƴm 1.989 t/m3 1:48 = 0.021
19.890 kn/m3 0,5-0,68 = 3.150
Ø 18.159 ° 0.13 = 3.150
c 0.317 kg/cm2 1.25 = 31.500
31.087 Kn/m2 0.040
OKE!!!
Tanah Asli Rata-rata (Data DB2.1 & DB2.2) Koefisien Tekanan Tanah
ƴd 1.848 t/m3 Tanah Timbunan
18.480 kn/m3 ka1 tan² (45-Ø/2)
Ø 11.310 ° 0.333
c 0.176 kg/cm2
17.260 Kn/m2 Tanah Asli
ka2 tan² (45-Ø/2)
Data Eksisting DPT 0.672
Beton Bertulang KP 1.488
Fc 30 Mpa
Fy 420 Mpa
q 10 kN/m2
Gamma Beton 24 kN/m2
Berdasarkan SNI-2847-2013 untuk berat jenis beton bertulang adalah 24 kN/m2 .
Semi kantilever
0,6 * H
0,3*B
H/10
MIN 0,3
0,1H-0,2H
(MIN)
(H-D)
Distribusi Tekanan Tanah
Aktif
T ha1 3.333 kn/m2
T ha2 6.721 kn/m2 Tabel Momen Tekanan Aktif
T ha3 12.467 kn/m2 No. Tinggi (m) Tekanan Gaya
T ha4 25.136 kn/m2 1 2.2 3.333 7.333
T ha5 16.146 kn/m2 2 1.3 6.721 8.737
T ha6 -28.300 kn/m2 3 2.2 12.467 13.713
Gaya Aktif 4 1.3 25.136 32.676
Pa1 7.333 kn/m2 5 1.3 16.146 10.495
Pa2 8.737 kn/m2 6 1.3 -28.300 -36.789
Pa3 13.713 kn/m2 ∑Ma 36.165
Pa4 32.676 kn/m2 Z 1.466513
Pa5 10.495 kn/m2
Pa6 -36.789 kn/m2
Pasif Tabel Momen Tekanan Aktif
T hp1 32.996 kn/m2 No. Tinggi (m) Tekanan Gaya
T hp2 42.108 kn/m2 1 1.2 32.996 19.798
Gaya Pasif 2 1.2 42.108 50.529
Pp1 19.798 kn/m2 ∑Mp 70.327
Pp2 50.529 kn/m2 Z 0.543698
Analisis Terhadap Stabilitas Gaya-Gaya Ekternal
Luas Area Segmen A
1 1.260 m2
n Tekanan Aktif 2 0.197 m2 No.
Lengan Momen 3 0.735 m2 1
2.400 17.600 4 1.925 m2 2
0.650 5.679 5 1.138 m2 3
2.033 27.884 Berat Persatuan Panjang 4
0.650 21.240 1 30.240 kN/m2 5
0.433 4.548 2 4.725 kN/m2 ⅀MR
0.650 -23.913 3 17.640 kN/m2
53.037 4 32.725 kN/m2
m 5 21.021 kN/m2
beban q 6 8.750 kN/m2
⅀V 106.351 kN/m2
n Tekanan Aktif
Lengan Momen Stabiitas Guling/Overtuning
0.400 7.919 Pah 36.165 kN/m2
0.600 30.318 ⅀Mo 53.037 kN/m2
38.237 ⅀MR 142.572
m Fs Ovt 2.688 ≥ 2
LANJUT SIST!!!
Menghitung q
q = γ2.D
= 22.176 kN/m2
Faktor Kedalaman
Fqd =
= 1.148
Fcd =
= 1.229
Fγd = 1.000
Faktor Bentuk
Fcs = 1.000
Fqs = 1.000
Fγs = 1.000
Faktor Inklinasi
Cot Ф = 4.999969
Fqi =
= 0.993
Fγi =
= 0.99
Fci =
= 0.99
Kontrol
qmaks < qu
80.757 < 227.833
HEHE
qmin > 0
20.529 > 0
HEHE
qu/qmaks > 3
2.821 > 3.000
BDMD
Luas Berat Persatuan Panjang Lengan Momen
1.260 30.240 1.025 30.996
0.197 4.725 0.783333 3.70125
0.735 17.64 1.05 18.522
1.925 32.725 1.6625 54.40531
1.138 21.021 1.6625 34.94741
142.572
kN/m2
kN/m2
kN/m2
h (Metode Hansen)
Hansen
φ= Nc Nq Nγ
11 8.800 2.710 0.500
12 9.280 2.970 0.630
qs.q.Nq+Fγd.Fγi.Fγs.0,5.B'.γ2.Nγ
Yeyey
Parameter Tanah Dimensi Proposional Semi kantilever
Tanah timbunan (Tanah Peniraman) Dimensi
Ɣ 17 kN/m3 H 4m
Ø 30 ° H1 2.5 m
c 0 H2 1.5 m
H3 1.4 m
Tanah asli (Data DB3.1) B 2.4000 m
ƴm 2.013 t/m3 Toe 0.8000 m
20.13 kn/m3 D 0.4000 m
Ø 12.134 ° atas 0.3750 m
c 0.206 kg/cm2 bawah 0.7200 m
20.6 Kn/m2 Toe 0.8000 m
Heel 0.8800 m
Tanah asli (Data DB3.2) kemiringan
ƴm 1.838 t/m3 1:48 = 0.021
18.380 kn/m3 0,5-0,68 = 3.600
Ø 24.513 ° 0.35 = 3.600
c 0.248 kg/cm2 3.45 = 36.000
24.800 Kn/m2 0.096
OKE!!!
Tanah Asli Rata-rata (Data DB3.1 & DB3.2) Koefisien Tekanan Tanah
ƴm 1.926 t/m3 Tanah Timbunan
19.255 kn/m3 ka1 tan² (45-Ø/2)
Ø 18.324 ° 0.333
c 0.227 kg/cm2
22.700 Kn/m2 Tanah Asli
ka2 tan² (45-Ø/2)
Data Eksisting DPT 0.522
Beton Bertulang KP 1.917
Fc 30 Mpa
Fy 400 Mpa
q 7.5 kN/m2
Gamma Beton 24 kN/m2
Berdasarkan SNI-2847-2020 untuk berat jenis beton bertulang adalah 24 kN/m2 .
Semi kantilever
0,6 * H
0,3*B
H/10
MIN 0,3
0,1H-0,2H 0,18*H
(MIN)
(H-D)
Distribusi Tekanan Tanah
Aktif
T ha1 2.5000 kn/m2
T ha2 3.912 kn/m2 Tabel Momen Tekanan Aktif
T ha3 14.167 kn/m2 No. Tinggi (m) Tekanan
T ha4 22.169 kn/m2 1 2.5 2.500
T ha5 15.066 kn/m2 2 1.5 3.912
T ha6 -32.790 kn/m2 3 2.5 14.167
Gaya Aktif 4 1.5 22.169
Pa1 6.250 kn/m2 5 1.5 15.066
Pa2 5.868 kn/m2 6 1.5 -32.790
Pa3 17.708 kn/m2 ∑Ma
Pa4 33.254 kn/m2 Z
Pa5 11.299 kn/m2
Pa6 -49.184 kn/m2
Pasif Tabel Momen Tekanan Aktif
T hp1 51.679 kn/m2 No. Tinggi (m) Tekanan
T hp2 62.860 kn/m2 1 1.4 51.679
Gaya Pasif 2 1.4 62.860
Pp1 36.175 kn/m2 ∑Mp
Pp2 88.004 kn/m2 Z
Analisis Terhadap Stabilitas Gaya-Gaya Ekternal
Luas Area Segmen A
1 1.350 m2
el Momen Tekanan Aktif 2 0.621 m2
Gaya Lengan Momen 3 0.960 m2
6.250 2.750 17.188 4 2.200 m2
5.868 0.750 4.401 5 1.320 m2
17.708 2.333 41.319 Berat Persatuan Panjang
33.254 0.750 24.940 1 32.400 kN/m2
11.299 0.500 5.650 2 14.904 kN/m2
-49.184 0.750 -36.888 3 23.040 kN/m2
25.195 56.610 4 37.400 kN/m2
2.246831 m 5 25.417 kN/m2
beban q 6 6.600 kN/m2
⅀V 133.161 kN/m2
el Momen Tekanan Aktif
Gaya Lengan Momen Stabiitas Guling/Overtuning
36.175 0.467 16.882 Pah 25.195 kN/m2
88.004 0.700 61.603 ⅀Mo 56.610 kN/m2
124.179 78.485 ⅀MR 209.293
0.632027 m Fs Ovt 3.697 ≥ 2
LANJUT SIST!!!
Menghitung q
q= γ2.D
= 26.957 kN/m2
Faktor Kedalaman
Fqd =
= 1.1816
Fcd =
= 1.233
Fγd = 1.000
Faktor Bentuk
Fcs = 1.000
Fqs = 1.000
Fγs = 1.000
Faktor Inklinasi
Cot Ф = 3.019565688282
Fqi =
= 0.993
Fγi =
= 0.990
Fci =
= 0.992
Kontrol
qmaks < qu
62.890 < 465.505
MANTAP
qu/qmaks > 3
7.402 > 3.000
MANTAP
qmin > 0
48.077 > 0
MANTAP
25.195 kN/m2
124.179 kN/m2
133.161 kN/m2
0.053394
Hansen
φ= Nc Nq Nγ
18 13.100 5.260 2.000
19 13.930 5.800 2.400
q.Nq+Fγd.Fγi.Fγs.0,5.B'.γ2.Nγ
MANTAP
Diasumsikan bahw
sumbu x :
sumbu y :
qmax =
=
Kontrol
qa >
3.166667 >
Dik :
N-NSPT =
qmax =
=
Sehingga,
qa <
6.75 <
KONTROL DAYA DUKUN
Dik :
N-NSPT =
qmax =
=
Sehingga,
qa <
2.375 <
KONTROL DAYA DUKUNG TANAH TERHADAP DATA SONDIR (CPT-01)
maka didapat data sondir pada kedalaman tapak dinding penahan tanah yaitu : 5,2m
9.5 kg/cm2 (nilai conus pada kedalaman rencana)
95 ton/m2
62.890 kN/m2
6.413 t/m2
Kontrol
qmax
6.413 BDMD
Kedalaman Rencana Dinding adalah 5,2 m. Dilihat dari data bor- log (DB.RW 03)
untuk kedalaman tersebut nilai N-SPT = 14 (Terlampir)
PENULISAN DI BUKU KAYAK GAMBAR DI SAMPING
54 5 24 25 27 52
62.890 kN/m2 5.2 22.6 24.6 29 53.6
6.413 t/m2 6 17 23 37 60
qmax
6.413 t/m2 yeyey
KONTROL DAYA DUKUNG TANAH TERHADAP DATA BOR (DB.SP 02)
Kedalaman Rencana Dinding adalah 2.0 m. Dilihat dari data bor- log (DB.RW 02)
untuk kedalaman tersebut nilai N-SPT =0 (Terlampir)
PENULISAN DI BUKU KAYAK GAMBAR DI SAMPING
19
62.890 kN/m2
6.413 t/m2
qmax
6.413 t/m2 BDMD
Dimensi Proposional Semi kantilever
Dimensi
H 4m H'
H1 2.5 m H1 3.600
H2 1.5 m
H3 1.4 m
B 2.4 m 0,6 * H
Toe 0.8 m 0,3*B
D 0.4 m H/10 H2
atas 0.4 m MIN 0,3
bawah 0.72 m 0,1H-0,2H 0,18*H
Toe 0.8 m
Heel 0.88 m B1
kemiringan
1:48 = 0.021 (MIN)
0,5-0,68 = 3.600 (H-D)
0.32 = 3.600
3.2 = 36.000
0.089
OKE!!! B1 0.88 m
fc' 30 B2 0.4 m
fy 400 B3 0.16 m
B4 0.8 m
⅀V 20.736 kN
⅀MR 6.58944 kN.m 2.7
e B/2-(∑M - ∑Mo/∑V)
0.42316 m >
OKE!!!
TINJAU TERHADAP DESAK
L 1m
Tanah Asli
ka2 tan² (45-Ø/2)
0.522
KP 1.917
qmaks = qToe =
qmin = qHeel =
X3 =
X1 =
X2 =
q1 =
q2 =
Wheel =
Wtoe =
h2 =
h3 =
h4 =
Tinjau Poto
Gaya Lintang
D=
Momen
M=
w=
tan² (45-Ø/2)
0.4
0.32 0.32
tabel gaya dan momen tanah aktif tabel gaya dan momen taha
no gaya (kN) lengan (m) momen (kN.m) no
1 6.250 2.350 14.688 1
2 4.303 0.550 2.367 2
3 17.708 1.933 34.236 ⅀V
4 24.386 0.550 13.412
5 6.077 0.367 2.228 e
6 -36.069 0.550 -19.838
⅀Pa 22.656 ⅀Mo 47.093
qmaks - q min
14.812 kN/m2
(B1/B).X3
5.431 kN/m2
(B1+B2/B).X3
9.875 kN/m2
qmin + x1
53.509 kN/m2
qmin + x2
57.952 kN/m2
(H1*γ1)+((H2-D)*γ2)+(D*γbeton)
73.2805 kN/m2
((H3-D)*γ2)+(D*γbeton)
28.855 kN/m2
Momen Momen
h3.B1.1/2B1 + 1/2 . B1 . (h4-h3)(2/3.B1) M=
-9.058 Knm 9.058 berlawanan arah
1/6 * b *h^2 w=
0.14666667
B/2-(∑M - ∑Mo/∑V)
6.
7.
q
Tinjau Potongan D-D'
Gaya Lintang
1/2 (h1+h2) B3
25.253 kN/m arah ke atas
Momen
h2.B3.1/2B3 + 1/2 . B1 . (h1-h2)(2/3.B3)
10.364 Knm searah
1/6 * b *h^2
0.133333
σ1 H2/B.qmax
17.1072 kN/m2
σ2 heel/B.qmax
13.68576 kN/m2
q 7.5 kN/m2
q1 H1.y1 + H2.y2
63.6035 kN/m2
q2 a.ybeton
9.6 kN/m2
q3 H3.y2
19.185 kN/m2
h1 qmax-q2-q3
8.5398 kN/m2
h2 σ1-q2-q3
-11.6778 kN/m2
h3 σ2-q1-q2-q
-67.01774 kN/m2
h4 qmin-q1-q2-q
-80.7035 kN/m2
W 1/6.b.h^2
0.4 m3
γ1 = 17.5 kN/m3
= 1.785 t/m3
γsat = 18 kN/m3 Berat Isi Tanah Jenuh (Kondisi Terendam)
= 1.835 t/m3
Lapisan Tanah 2 (Tanah Asli) (DB1.1) DATA TUGAS (Retaining Wall)
C2 = 0.317 kg/cm2
= 31.087 kN/m2
= 3.17 t/m2
Ф2 = 18.159 o
γ2 = 1.989 t/m3
= 19.505 kN/m3
TEKANAN TOTAL
Pa = Pa1 + Pa2
= 12.164 kN
PH = PH1 + PH2
= 12.164 kN
∑V = W1
= 11.040 kN
∑MV = M1
= 2.208 kN
Eksentrisitas
e = (B/2)-(∑M - ∑Mo/∑V)
= 0.478 < 0.525
Mengalami Desak
Tinjauan Desak
w = 1/6 . B2^2 . h
= 0.0400
σdesak = (∑V/B.h)+(∑M/w)
= 138.558 kN/m2
σizin = 0,45.fc'
= 18 MPa
= 18000 kN/m2
Kontrol = σdesak < σizin
138.558 < 18000
OKE
Tinjauan Tarik
w= 0.0400
σtarik = (∑V/B.h)-(∑M/w)
= -55.7581 kN/m2
σizin = 0,5 . Fc'^0,5
= 3.162 MPa
= 3162.278 kN/m2
Kontrol = σtarik < σizin
-55.758 < 3162.278
OKE
Tinjauan Geser
σgeser = (2/3).(Pa/B.h)
= 13.516 kN/m2
σizin = 1/11 . fc'^0.5
= 0.575 MPa
= 574.960 kN/m2
Kontrol = σgeser < σizin
13.516 < 574.960
OKE
AKIBAT TANAH
Pa2 = 1/2 . H1^2 . γ1 . Ka
= 22.195 kN
PH2 = Pa2 Cos a
= 22.195
TEKANAN TOTAL
Pa = Pa1 + Pa2
= 24.793 kN
PH = PH1 + PH2
= 24.793 kN
∑V = W1
= 24.000 kN
∑MV = M1
= 4.800 kNm
Eksentrisitas
e = (B/2)-(∑M - ∑Mo/∑V)
= 0.478 < 0.525
Mengalami Desak
Tinjauan Desak
w= 0.040
σdesak = (∑V/B2.h)+(∑M/w)
= -1077.798 kN/m2
σizin = 0,45.fc'
= 18 MPa
= 18000 kN/m2
Kontrol = σdesak < σizin
-1077.798 < 18000
OKE
Tinjauan Tarik
w= 0.0400
σtarik = (∑V/B2.h)-(∑M/w)
= 1157.798 kN/m2
σizin = 0,5.fc'^0,5
= 3.162 MPa
= 3162.278 kN/m2
Kontrol = σtarik < σizin
1157.798 < 3162.278
OKE
Tinjauan Geser
σgeser = (2/3).(PH/B2.h)
= 27.548 kN/m2
σizin = 1/11 . fc'^0.5
= 0.575 MPa
= 574.960 kN/m2
Kontrol = σgeser < σizin
27.548 < 574.960
OKE
Stabilitas Internal Dinding Penahan Tanah Pada Pot. D-D' & E-E'
KONTROL TERHADAP PATAH KAKI TAPAK (TOE) DAN UJUNG KAKI TAPAK (HEEL)
X3 = qmaks - qmin
= 161.511 kN/m2
X1 = B1/B . X3
= 117.929 kN/m2
X2 = (B1 + B2)/B . X3
= 138.438 kN/m2
q1 = qmin + X1
= 125.838 kN/m2
q2 = qmin + x2
= 146.348 kN/m2
Wheel = (H - H2)γ1 + H2 γ1
= 72.6 kN/m2
wToe = D γ2 + H2 γbeton
= 24.229 kN/m2
TINJAUAN DESAK
σdesak = M/W
= -168.849 kN/m2
Kontrol = σdesak < σizin
= -168.849 < 18000
OKE
TINJAUAN DESAK
σdesak = M/W
= 6.014
Kontrol = σdesak < σizin
= 6.014 < 18000
OKE
TINJAUAN TARIK
σtarik = 2 . DE'/(3 . B2 . h)
= 5.768
Kontrol = σdesak < σizin
= 5.768 < 3162.278
OKE
= 0.050 N/mm2
𝟏/𝐌∙(𝟏−√(𝟏−(𝟐∙𝐌∙𝐑_𝐧)/𝐟_𝐲 ))
𝟏/𝐌∙(𝟏−√(𝟏−(𝟐∙𝐌∙𝐑_𝐧)/𝐟_𝐲 ))
ρ=
= 0.0001
(𝟎,𝟖𝟓∙𝐟_𝐜′∙𝛃)/𝐟_𝐲 ∙(𝟔𝟎𝟎/(𝟔𝟎𝟎+𝐟_𝐲 ))
ρb =
= 0.0688
ρmaks. = 𝟎,𝟕𝟓∙𝝆_𝒃
= 0.0516
(𝟏,𝟒)/𝐟_𝐲
ρmin. =
= 0.0033
√(𝐟_𝐜′)/(𝟒𝐟_𝐲 )
ρmin. =
= 6.894 ~ 9 buah
S = Be / n
= 111.111 ~ 120 mm
= 12.353
𝐌_𝐧/(𝐝∙ 〖𝐝 _𝐱 〗 ^𝟐 )
Rn =
= 0.178 N/mm2
𝟏/𝐌∙(𝟏−√(𝟏−(𝟐∙𝐌∙𝐑_𝐧)/𝐟_𝐲 ))
𝟏/𝐌∙(𝟏−√(𝟏−(𝟐∙𝐌∙𝐑_𝐧)/𝐟_𝐲 ))
ρ=
= 0.0004
(𝟎,𝟖𝟓∙𝐟_𝐜′∙𝛃)/𝐟_𝐲 ∙(𝟔𝟎𝟎/(𝟔𝟎𝟎+𝐟_𝐲 ))
ρb =
= 0.0688
ρmaks. = 𝟎,𝟕𝟓∙𝝆_𝒃
= 0.0516
(𝟏,𝟒)/𝐟_𝐲
ρmin. =
= 0.0033
√(𝐟_𝐜′)/(𝟒𝐟_𝐲 )
ρmin. =
= 6.894 ~ 9 buah
S = Be / n
= 111.111 ~ 120 mm
Jadi, Tulangan Horizontal pada Bagian B & C dipakai Tulangan D10 - 100mm
Vu B = σ . L . G'
= 2.009 kN
Vu C = σ . L . G'
= 4.368 kN
Kontrol = ФVc ≥ Vu
290.930 ≥ 6.377
OKE
Vu B = σ . (L^2 - B'^2)
= 12.219 kN
Vu C = σ . (L^2 - B'^2)
= 26.563 kN
DESAIN TERHADAP GESER
GAYA GESER SATU ARAH YANG TERJADI
Vu = Vu B + Vu C
= 38.782 kN ; Gaya Geser Dua Arah Yang Terjadi
Kontrol = ФVc ≥ Vu
2639.313 ≥ 38.782
OKE
DESAIN HEEL
Tebal Dinding (b) = B2
= 0.400 m
= 400 mm
Selimut Beton = Berdasarkan SNI 2019; pasal 20.6.1
= 40 mm
ϕTulangan (D) = 16 mm ; ASUMSI
Lebar Efektif (d) = (Tebal dinding - Selimut) + (Tul./2)
= 368 mm
Lebar Tinjauan (Be) = 1000 mm ; ASUMSI
Mu = 76.472 kNm β
= 76471521.5749504 Nmm
Mn = Mu/Ф
= 84968357.3055005 Nmm
𝐟_𝐲/(𝟎,𝟖𝟓∙𝐟_𝐜′)
M=
= 12.353
𝐌_𝐧/(𝐝∙ 〖𝐝 _𝐱 〗 ^𝟐 )
Rn =
= 0.627 N/mm2
𝟏/𝐌∙(𝟏−√(𝟏−(𝟐∙𝐌∙𝐑_𝐧)/𝐟_𝐲 ))
𝟏/𝐌∙(𝟏−√(𝟏−(𝟐∙𝐌∙𝐑_𝐧)/𝐟_𝐲 ))
ρ=
= 0.0015
(𝟎,𝟖𝟓∙𝐟_𝐜′∙𝛃)/𝐟_𝐲 ∙(𝟔𝟎𝟎/(𝟔𝟎𝟎+𝐟_𝐲 ))
ρb =
= 0.0688
ρmaks. = 𝟎,𝟕𝟓∙𝝆_𝒃
= 0.0516
(𝟏,𝟒)/𝐟_𝐲
ρmin. =
= 0.0033
√(𝐟_𝐜′)/(𝟒𝐟_𝐲 )
ρmin. =
= 6.894 ~ 9 buah
S = Be / n
= 111.111 ~ 120 mm
DESAIN TOE
Tebal Dinding (b) = B2
= 0.400 m
= 400 mm
Selimut Beton = Berdasarkan SNI 2019; pasal 20.6.1
= 40 mm
ϕTulangan (D) = 16 mm ; ASUMSI
Lebar Efektif (d) = (Tebal dinding - Selimut) + (Tul./2)
= 368 mm
Lebar Tinjauan (Be) = 1000 mm ; ASUMSI
Mu = 13.922 kNm β
= 13921950.9743313 Nmm
Mn = Mu/Ф
= 15468834.4159237 Nmm
𝐟_𝐲/(𝟎,𝟖𝟓∙𝐟_𝐜′)
M=
= 12.353
𝐌_𝐧/(𝐝∙ 〖𝐝 _𝐱 〗 ^𝟐 )
Rn =
= 0.114 N/mm2
𝟏/𝐌∙(𝟏−√(𝟏−(𝟐∙𝐌∙𝐑_𝐧)/𝐟_𝐲 ))
ρ=
= 0.0003
(𝟎,𝟖𝟓∙𝐟_𝐜′∙𝛃)/𝐟_𝐲 ∙(𝟔𝟎𝟎/(𝟔𝟎𝟎+𝐟_𝐲 ))
ρb =
= 0.0688
ρmaks. = 𝟎,𝟕𝟓∙𝝆_𝒃
= 0.0516
(𝟏,𝟒)/𝐟_𝐲
ρmin. =
= 0.0033
√(𝐟_𝐜′)/(𝟒𝐟_𝐲 )
ρmin. =
= 6.894 ~ 9 buah
S = Be / n
= 111.111 ~ 120 mm
(Retaining Wall)
'
= 0.850
= 0.850
100mm
hitungkan Untuk Geser Penulangan Satu Arah
= 0.850
= 0.850
Mutu beton f'c 30 MPa
Mutu baja fy 400 MPa
SNI-03-2847-2002
Lapisan tanah 1
C1 0 kg/cm^2
Φ1 30 ˚ ρb 0.033
γ1 17 kN/m3 ρmin 0.00350
C1 0 t/m^2 ρmax 0.024
Lapisan Tanah 2
C2 22.7 Kn/m2 e) Menghitung Mu di sambungan
Φ2 18.3235 ˚ Pa1 6.25
γ2 19.255 kN/m3 Pa2 17.708333333
Pa3 25
γdpt 2.4 t/m^3 Pa4 6
γw 1 t/m^3 sigma Pa 54.958333333
M 109.91666667
Mu 153.88333333
f) Momen nominal
Mn 15.648
g) Perhitungan koefisien ketahanan
Rn 31.573129496
h) m 15.686
digunakan ρ
j) As perlu
As perlu 1232
k) Jarak tulangan
Si 163
digunakan 100
D 16
n 6
Perhitungan luas tulangan p
a) ρ 0.0018
Perhitungan As perlu
Asperlu 2534
b) Jarak tulangan
S 178
digunakan 100
D 12
n 22
Tabel. 1 Dimensi Nominal Tulangan Ulir Table 2 Dimensi Efektif Tulangan Polos
Luas
Diameter Berat Keliling Diameter Berat Keliling
Penampang
(mm) (kg/m) (cm) (cm2) (mm) (kg/m) (cm)
10 0,67 3,14 0,785 6 0,222 1,88
13 1,04 4,08 1,33 8 0,395 2,51
16 1,58 5,02 2,01 10 0,617 3,14
19 2,23 5,96 2,84 12 0,888 3,77
22 2,98 6,91 3,80 16 1.58 5,02
25 3,85 7,85 4,91
32 6,31 10,05 8,04
36 7,99 11,30 10,20
40 9,87 12,56 12,60
Perhitungan tulangan dinding penahan tanah
selimut minimum
mm
ebal efektif
mm
ρmin 0.003
ng Mu di sambungan
t P 20.5556 t
t Pu 28.7778 t
t
t q 16.667 kN/m2
t Mmax 14.083 kN.m
tm
tm
omen nominal
kN.m
n koefisien ketahanan
t/m^2 0.003 kg/mm^2
0.031 N/mm^2
mm^2
rak tulangan
mm
mm
- 100 mm
tungan As perlu
mm^2
rak tulangan
mm
mm
- 100 mm
Efektif Tulangan Polos
Luas
penmpang
(cm2)
0,283
0,503
0,785
1.13
2.01
Mutu beton f'c 30 MPa
Mutu baja fy 400 MPa
SNI-03-2847-2002
Lapisan tanah 1
C1 0 kg/cm^2
Φ1 30 ˚ ρb 0.033
γ1 17 t/m^3 ρmin 0.004
C1 0 t/m^2 ρmax 0.024
Lapisan Tanah 2
C2 6.3 kg/cm^2 e) Momen pada plat dasar
Φ2 7.012 ˚ Pa1 6.25
γ2 15.11 t/m^3 Pa2 17.708333333
Pa3 25
γdpt 2.4 t/m^3 Pa4 6
γw 1 t/m^3 sigma Pa 54.958333333
M 109.91666667
Mu 153.88333333
f) Momen nominal
Mn 11.516
g) Perhitungan koefisien ketahanan
Rn 2.625065845
h) m 15.686
digunakan ρ
j) As perlu
As perlu 4732
k) Jarak tulangan
Si 42
digunakan 40
D 16
n 24
Perhitungan luas tulangan pemba
a) ρ 0.0018
Perhitungan As perlu
Asperlu 5841
b) Jarak tulangan
S 46
digunakan 50
D 12
n 52
Tabel. 1 Dimensi Nominal Tulangan Ulir Table 2 Dimensi Efektif Tulangan Polos
Luas
Diameter Berat Keliling Diameter Berat Keliling
Penampang
(mm) (kg/m) (cm) (cm2) (mm) (kg/m) (cm)
10 0.67 3,14 0,785 6 0,222 1,88
13 1,04 4,08 1,33 8 0,395 2,51
16 1,58 5,02 2,01 10 0,617 3,14
19 2,23 5,96 2,84 12 0,888 3,77
22 2,98 6,91 3,80 16 1,58 5,02
25 3,85 7,85 4,91
32 6,31 10,05 8,04
36 7,99 11,30 10,20
40 9,87 12,56 12,60
erhitungan tulangan pelat dinding penahan tanah
selimut minimum
mm
ebal efektif
mm
0.003423266
omen nominal
tm
n koefisien ketahanan
t/m^2 0.000263 kg/mm^2
0.003 N/mm^2
mm^2
rak tulangan
mm
mm
- 40 mm
tungan As perlu
mm^2
rak tulangan
mm
mm
- 50 mm
Efektif Tulangan Polos
Luas
penmpang
(cm2)
0,283
0,503
0,785
1.13
2.01
Data
PENULANGAN DINDING (STEM)
Dimensi DPT (m)
H 5
Mutu beton f'c 30 MPa H1 3.5
Mutu baja fy 400 MPa H2 1.5
H3 1.3
D. Tulangan Bagi 16 mm H2-D 1
D. Tulangan Pokok 12 mm
B 3
m= 15.686
- Rasio Tulangan
ρ= 1/𝑀∙(1−√(1−(2∙𝑀∙𝑅_𝑛)/𝑓_𝑦 ))
0.00028
digunakan : ρ= 0.0035
m b= 0.5
3.1 Data Perencanaan Turap
Data Parameter Tanah
Tanah timbunan (Tanah Urugan)
Ɣ 17 kN/m3 Ɣw 9.807 kN/m3
Ø 30 °
c 0
Ɣsat 15 kN/m3
Data Konstruksi
Beton Bertulang
Fc 30 Mpa
Fy 420 Mpa
q 10 kN/m2
Gamma Beton 24 kN/m2
Tanah Asli
ka2 tan² (45-Ø/2)
0.837
KP 1.195
Dimensi ProposionalSemi kantilever 3.2
Dimensi Aktif
H 4 m T ha1
H1 2.5 m 0.8333333 T ha2
H (dibawah 4m 1.25 T ha3
B 2.400 m 0,6 * H T ha4
Toe 0.800 m 0,3*B T ha5
D 0.400 m H/10 T ha6
Latas 0.400 m MIN 0,3 T ha7
L bawah 0.720 m 0,1H-0,2H 0,18*H T ha8
Toe 0.800 m T ha9
Heel 0.880 m Gaya Aktif
kemiringan Pa1
1:48 = 0.021 (MIN) Pa2
0,72-0,4 = 3.600 (H-D) Pa3
0.32 = 3.600 Pa4
3.2 = 36.000 Pa5
0.089 Pa6
OKE!!! Pa7
Pa8
Pa9
Pasif
T hp1
T hp2
Gaya Pasif
Pp1
Pp2
Diagram Distribusi Tekanan Tanah
Aktif
3.3333 kn/m2 Tabel Mom
8.371 kn/m2 No Tinggi Tekanan Gaya
14.167 kn/m2 1 6.5 3.3333 21.667
14.167 kn/m2 2 D 8.3714 8.371
35.578 kn/m2 3 2.5 14.1667 17.708
6.924 kn/m2 4 4 14.1667 56.667
17.389 kn/m2 5 D 35.5783 35.578
4.294 D kn/m2 6 4 6.9240 13.848
-16.690 kn/m2 7 D 17.3890 17.389
8 D 4.2944 D 2.147
21.667 kn/m2 9 D -16.6896 -16.690
8.371 D kn/m2
17.708 kn/m2 ∑Ma = 0.716 D3 +
56.667 kn/m2
35.578 D kn/m2
13.848 kn/m2 Tabel Mom
17.389 D kn/m2 No Tinggi Tekanan Gaya
2.147 D2 kn/m2 1 D 6.128 D 3.064
-16.690 D kn/m2 2 D 19.937 19.937
= -0.306
∑Mx = -0.306 X3 +
d ∑Mx/dx = -0.91673 X3 +
9.968 D2
D3 - 1.021 D3 + 22.324 D2 -
109.890 D + 260.720944444444
D3 + 12.356 D2 + 109.890 D +
24.712397 X2 + 109.890
f = 127.5671456321 kNm
9.968 D2
260.721
Pada jangkar 3.4
3.5
Tabel Momen Tekanan Pasif
Gaya Lengan Momen
64.117 1.5248549 97.7695663553088
91.201 2.28728235 208.603030242274
306.372596597583
L
Dimensi Baja Angkur
Berat angkur = 1000 kg/cm2
F = 127.56715 kN
12756.715
Baja angkur dengan jarak setiap 3 meter
A = 38.270144 cm2
Kontol
Mtahanan > Mult
440.663284873355 > 396.596956386
OKE
Mnperlu = 495.7461954825
S = 16.52487318275
Perencanaan Papan
Mutu Beton = 30
Konversi Ke Kuat tekan Silinder (fc') =
ß = 0.762
c' = 0.003
Ɣc = 25
Ec = 23314.16984637
fy = 420
Es = 200000
tpt = 450
bpt = 1000
Φ = 25
ntarik = 16
As = 7857.142857143
ntekan = 16
As = 7857.142857143
Selimut beton = 50
d' = 74.5
Tebal Efektif = 375.5
Spt = 31.73333333333
Perhitungan Analisis
Diasumsikan tulangan tekan belum leleh pada
1. Momen Ultimate
15937.4227691494 c2 +
4. Cek keseimbangan
Ts = 3300000
Cs = 825210.3263306
Cc = 1439275.404979
∑M = 1035.514
5. Momen Nominal
Mnpt = 357556.8873284
Momen Tahanan = 286045.5098627
Momen Rencana = 793.193912772
Dimensi Turap
an Turap Beton Mutu K-500
kNm
kNm
kN/m3
mPA
Mpa
Mpa
mm
mm
mm
batang
mm2
batang
mm2
mm
mm
mm
mm > 25 mm oke
1414285.71428571 c - 351214286 = 0
-93515133.53
90.307914010109 > 74.5
N 3300 kN
N 825.21033 kN
N 1439.2754 kN
< 286.04551
mnding maen
3.6 Dimensi Tiang pancang
Direncanakan Turap Beton Mutu K-500
H1 = 2.5
h dibwah mat = 4 1.552
d = 4.5745647
∑Mf = 0
-4 Rvb + 1897.9287 = 0
-4 Rvb = -1897.929
Rvb = 474.48216 kN/m atas
∑P = 563.8917
∑P = -563.8917 kN/m
∑v = 0
Rva + Rvb + ∑P =
Rva = -474.48216387 + 563.8917
Rva = 89.4095
Rekap
Rvb = 474.482163865 kN/m
∑P = -563.89171271 kN/m
Rva = 89.4095 kN/m
Menghitung jarak z
R = 385.0726 kN/m
Z = 0.63423204722 m
Mmaks = 244.225392957
cm
Perhitungan Analisis
Diasumsikan tulangan tekan belum leleh pada
1. Momen Ultimate
3984.35569229 c2 + 3604480 c
4. Cek keseimbangan
Ts = 4119406 N 4119.4057
Cs = 3205853 N 3205.8531
Cc = 531299.22 N 531.29922
∑M = 382.253
5. Momen Nominal
Mnpt = 160121.57
Rasio Tulangan
- 602463086 = 0 pb
pmin
pmin
78 pmin (yang terkecil)
pmaks
kN karena
kN maka
kN
Asperlu
Astulangan
Jumlah tulangan
= 0.01771818423826
= 0.00249075209963
= 0.00333333333333
= 0.00249075209963
= 0.01328863817869
= 693.176309326373 mm2
= 201.142857142857 mm2
= 3.44618903784418
= 4
= 287.5 mm
adi digunakan tulangan D16-287,5 mm
pmaks = 0.0132886