(1 SERVER, 2 CLIENT)
B Pekerjaan Instalasi
Jaringan
1 Konector RJ45 1 Box IDR 90,000 IDR 90,000
2 Kabel UTP 80 Meter IDR 4,000 IDR 320,000
3 AP Totolink 1 Unit IDR 400,000 IDR 400,000
4 AP TP-Link 2 Unit IDR 160,000 IDR 320,000
5 AP OmniTik 1 Unit IDR 1,402,700 IDR 1,402,700
6 AP Tenda 1 Unit IDR 170,000 IDR 170,000
7 Kabel Clip/Klem 2 Pcs IDR 5,000 IDR 10,000
8 Kabel Ties/Ripet 1 Pcs IDR 30,000 IDR 30,000
Jasa 2 Hari IDR 50,000.00
Sub Total IDR 2,742,700
No Uraian Kegiatan Volume Satuan Harga Satuan Harga Total Harga Satuan
Perangkat Perangkat Upah
A Pekerjaan Persiapan
1 Survey Lokasi 3 Hari IDR 20,000
2 Konfigurasi Perangkat 3 Hari IDR 20,000
B Pekerjaan Instalasi
Jaringan
1 Konector RJ45 1 Box
2 Kabel UTP 100 Meter IDR 4,000 IDR 400,000
3 AP LiteBeam M5 1 Unit IDR 800,000 IDR 800,000
4 AP PowerBeam M5 1 Unit IDR 1,400,000 IDR 1,400,000
6 AP Tenda 3 Unit IDR 170,000 IDR 510,000
7 AP SXTsq Lite 1 Unit IDR 800,000 IDR 800,000
8 Kabel Ties/Ripet 1 Pcs IDR 20,000 IDR 20,000
Jasa 3 Hari IDR 50,000.00
Sub Total IDR 3,930,000
Total Biaya IDR 4,200,000
Harga Total
Upah
IDR 20,000
IDR 20,000
IDR 100,000.00
IDR 140,000
2,882,700
Harga Total
Upah
IDR 60,000
IDR 60,000
2600
400 187
510 492
800 715
0
IDR 150,000.00 besi 35 35
IDR 270,000 konsumsi 70 70
obeng 20 20
4,200,000 klem 20 20