PEMERINTAH ACEH

DINAS PENDIDIKAN
Jl. Tgk. H. Mohd. Daud Beureueh No. 22 Kuta Alam
Banda Aceh Kode Pos. 23121 Telp. (0651) 22620, Fax. (0651) 32386
Website : diddik.acehprov.go.id, Email : disdik@acehprov.go.id

DETAIL ENGINEERING DESIGN


( DED )
PEKERJAAN :

PEMBANGUNAN PAGAR SMKN 1


INDRA MAKMU
KAB. ACEH TIMUR
KONSULTAN PERENCANA :

TAHUN ANGGARAN :

2017
PEMERINTAH ACEH
DINAS PENDIDIKAN
Jl. Tgk. H. Mohd. Daud Beureueh No. 22 Kuta Alam
Banda Aceh Kode Pos. 23121 Telp. (0651) 22620, Fax. (0651) 32386
Website : diddik.acehprov.go.id, Email : disdik@acehprov.go.id

DAFTAR LEMBAR GAMBAR

NO NAMA GAMBAR HAL. NO NAMA GAMBAR HAL. NO NAMA GAMBAR HAL.

1 Site Plant 1 17 Denah Pondasi Dan Detail Potongan (Detail - B4) 17 33 Detail Denah Dan Tampak Tipe (Detail - B9) 33

2 Denah Pagar 2 18 Detail Denah Dan Tampak Tipe (Detail - B4) 18 34 Denah Dan Tampak Depan (Detail - B10) 34

3 Denah Pondasi 3 19 Denah Dan Tampak Depan (Detail - B5) 19 35 Denah Pondasi Dan Detail Potongan (Detail - B10) 35

4 Denah Dan Tampak Depan (Detail - A1) 4 20 Denah Pondasi Dan Detail Potongan (Detail - B5) 20 36 Detail Denah Dan Tampak Tipe (Detail - B10) 36

5 Denah Pondasi Dan Detail Potongan (Detail - A1) 5 21 Detail Denah Dan Tampak Tipe (Detail - B5) 21 37 Denah Dan Tampak Depan (Detail - B11) 37

6 Detail Denah Dan Tampak Tipe (Detail - A1) 6 22 Denah Dan Tampak Depan (Detail - B6) 22 38 Denah Pondasi Dan Detail Potongan (Detail - B11) 38

7 Denah Dan Tampak Depan (Detail - B1) 7 23 Denah Pondasi Dan Detail Potongan (Detail - B6) 23 39 Detail Denah Dan Tampak Tipe (Detail - B11) 39

8 Denah Pondasi Dan Detail Potongan (Detail - B1) 8 24 Detail Denah Dan Tampak Tipe (Detail - B6) 24 40 Denah Dan Tampak Depan (Detail - B12) 40

9 Detail Denah Dan Tampak Tipe (Detail - B1) 9 25 Denah Dan Tampak Depan (Detail - B7) 25 41 Denah Pondasi Dan Detail Potongan (Detail - B12) 41

10 Denah Dan Tampak Depan (Detail - B2) 10 26 Denah Pondasi Dan Detail Potongan (Detail - B7) 26 42 Detail Denah Dan Tampak Tipe (Detail - B12) 42

11 Denah Pondasi Dan Detail Potongan (Detail - B2) 11 27 Detail Denah Dan Tampak Tipe (Detail - B7) 27 43 Detail Pintu Pagar 43

12 Detail Denah Dan Tampak Tipe (Detail - B2) 12 28 Denah Dan Tampak Depan (Detail - B8) 28 44 Detail Pagar Hollow Stainless 44

13 Denah Dan Tampak Depan (Detail - B3) 13 29 Denah Pondasi Dan Detail Potongan (Detail - B8) 29 45 Detail Pintu Gerbang dan Denah Pondasi 45

14 Denah Pondasi Dan Detail Potongan (Detail - B3) 14 30 Detail Denah Dan Tampak Tipe (Detail - B8) 30 46 Detail Pondasi Pagar (Potongan dan Detail) 46

15 Detail Denah Dan Tampak Tipe (Detail - B3 15 31 Denah Dan Tampak Depan (Detail - B9) 31 47 Detail Papan Nama 47

16 Denah Dan Tampak Depan (Detail - B4) 16 32 Denah Pondasi Dan Detail Potongan (Detail - B9) 32 48 Denah Papan Nama dan Potongan 48

PEKERJAAN :
PEMBANGUNAN PAGAR SMK NEGERI 1
INDRA MAKMUR
KAB. ACEH TIMUR
KONSULTAN PERENCANA :

TAHUN ANGGARAN :
2017
TAMPAK DEPAN ( DET. A-1)
Skala 1 : 100

Pintu Gerbang Papan Nama

DENAH ( DET. A-1)


Skala 1 : 100

TAMPAK DEPAN ( DET. A-1)


DENAH ( DET. A-1)

1 : 100 04
i ii

DENAH PONDASI ( DET. A-1)


Skala 1 : 100

TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20
20 20
10
10 15 10
25
20 18
Besi Hollow Stainless
20.40.2 mm

85
85
Ø 8 - 15
DIMENSI 25 x 20 20 x 15 18 x 10
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10

Ø 8 - 15 Ring Balok 18 x 10 cm Ø 8 - 15 Ring Balok TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10


6 Ø 10 6 Ø 10 18 x 10 cm SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15

240
240
TABEL PENULANAGAN ( DET A-1 )

130
130
Pasangan Bata 1 : 4

45
Ø 8 - 15
Sloof 25 x 20 cm 25 15 30 15 25
Ø 8 - 15

25
25
Sloof 25 x 20 cm
6 Ø 12 Plester + Acian 6 Ø 12
110
Muka Tanah

30
30
Pondasi Menerus 45

90
Pondasi Menerus Urugan Kembali Bekas
85

60
Galian
15 15

75

135
Ø 8 - 15
30
Ø 12 - 15

Aanstamping 20 80

15
5 10
Pasir Urug
6 Ø12 9 Ø12

30
30 2 Ø12 30 2 Ø12
6 Ø12 9 Ø12 Ø 12 - 15
5 60 5

5
Pasir Urug
80
DENAH PONDASI ( DET. A-1)
90 110 DETAIL PONDASI ( DET. A-1)

POTONGAN . I POTONGAN . II DETAIL PONDASI TAPAK ( DET A-1 ) 1 : 100 05

Skala 1 : 30 Skala 1 : 30
Skala 1 : 25
Keping Pengikat Kolom 20 x 15 cm Kolom 20 x 15 cm
Hollow Stainless Hollow Stainless Hollow Stainless
40.40.2 mm 40.40.2 mm 40.40.2 mmPasangan Batu Bata 1 : 4 40.40.2 mm Pasangan Batu Bata 1 : 4
Kolom 20 x 15 cm Kolom 20 x 15 cm

Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

Sloof 25 x 20 cm Sloof 25 x 20 cm

Pasangan Batu di Plaster + Acian Pasangan Batu di Plaster + Acian

DETAIL TAMPAK TIPE ( A-1 )


Skala 1 : 40

Kolom 20 x 15 cm Kolom 20 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

DETAIL TAMPAK TIPE ( A-1 )


DETAIL DENAH TIPE ( A-1 )

DETAIL DENAH TIPE ( A-1 )


Skala 1 : 40

1 : 40 06
TAMPAK DEPAN ( DET. B-1)
1 : 100

DENAH ( DET. B-1)


1 : 100 TAMPAK DEPAN ( DET. B-1)
DENAH ( DET. B-1)

1 : 100 07
i ii

DENAH PONDASI ( DET. B-1)


1 : 100

TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20 20
15 10
20
15 15
Ring Balok Ring Balok 25

18
18
Ø 8 - 15
18 x 15 cm 18 x 15 cm 20 18
6 Ø 12

Ø 8 - 15 DIMENSI 25 x 20 20 x 15 18 x 15
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10
SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15

197
197

240
240
TABEL PENULANAGAN ( DET B-1 )
Pasangan Bata 1 : 4

Ø 8 - 15
Sloof 25 x 20 cm 30 20 30
Ø 8 - 15

25
25
Sloof 25 x 20 cm
6 Ø 12 Plester + Acian 6 Ø 12

Muka Tanah

30
30
Pondasi Menerus
30 20 30

90
Pondasi Menerus Urugan Kembali Bekas 80

60
Galian 32
Ø 8 - 15

75

135
80 15
Ø 12 - 15

Aanstamping

15
5 10
Pasir Urug
6 Ø12 6 Ø12
30 2 Ø12 32

30
30 2 Ø12
6 Ø12 Ø 12 - 15
6 Ø12
5 60 5

5
Pasir Urug
80 DENAH PONDASI ( DET. B-1)
80
90 DETAIL PONDASI ( DET. B-1)
80

POTONGAN . I POTONGAN . II DETAIL PONDASI TAPAK ( DET B-1 )


Skala 1 : 30 Skala 1 : 30 Skala 1 : 25 1 : 100 08
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm

Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

Kolom 20 x 15 cm

Sloof 25 x 20 cm Sloof 25 x 20 cm Sloof 25 x 20 cm

Pasangan Batu di Plaster + Acian

DETAIL TAMPAK TIPE ( B-1 )


Skala 1 : 40

Kolom 20 x 15 cm Kolom 20 x 15 cm Kolom 20 x 15 cm


Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

DETAIL TAMPAK TIPE ( B-1 )


DETAIL DENAH TIPE ( B-1 ) DETAIL DENAH TIPE ( B-1 )

Skala 1 : 40

1 : 40 09
TAMPAK DEPAN ( DET. B-2)
1 : 100

DENAH ( DET. B-2)


1 : 100
TAMPAK DEPAN ( DET. B-2)
DENAH ( DET. B-2)

1 : 100 10
i ii

DENAH PONDASI ( DET. B-2)


1 : 100

TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20 20
15 10
20
15 15
Ring Balok Ring Balok 25

18
18
Ø 8 - 15
18 x 15 cm 18 x 15 cm 20 18
6 Ø 12

Ø 8 - 15 DIMENSI 25 x 20 20 x 15 18 x 15
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10
SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15

197
197

240
240
TABEL PENULANAGAN ( DET B-2 )
Pasangan Bata 1 : 4

Ø 8 - 15
Sloof 25 x 20 cm 30 20 30
Ø 8 - 15

25
25
Sloof 25 x 20 cm
6 Ø 12 Plester + Acian 6 Ø 12

Muka Tanah

30
30
Pondasi Menerus
30 20 30

90
Pondasi Menerus
80

60
32
Ø 8 - 15

75

135
80 15
Ø 12 - 15

Aanstamping

15
5 10
Pasir Urug
6 Ø12 6 Ø12
30 2 Ø12 32

30
30 2 Ø12
6 Ø12 Ø 12 - 15
6 Ø12
5 60 5

5
Pasir Urug
80
DENAH PONDASI ( DET. B-2)
80
90 DETAIL PONDASI ( DET. B-2)
80

POTONGAN . I POTONGAN . II
11
Skala 1 : 30 Skala 1 : 30
DETAIL PONDASI TAPAK ( DET B-2 ) 1 : 100

Skala 1 : 25
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm

Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

Kolom 20 x 15 cm

Sloof 25 x 20 cm Sloof 25 x 20 cm Sloof 25 x 20 cm

Pasangan Batu di Plaster + Acian

DETAIL TAMPAK TIPE ( B-2 )


Skala 1 : 40

Kolom 20 x 15 cm Kolom 20 x 15 cm Kolom 20 x 15 cm


Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

DETAIL TAMPAK TIPE ( B-2 )


DETAIL DENAH TIPE ( B-2 )
DETAIL DENAH TIPE ( B-2 )
Skala 1 : 40

1 : 40 12
TAMPAK DEPAN ( DET. B-3)
1 : 100

DENAH ( DET. B-3)


1 : 100
TAMPAK DEPAN ( DET. B-3)
DENAH ( DET. B-3)

1 : 100 13
i ii

DENAH PONDASI ( DET. B-3)


1 : 100

TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20 20
15 10
20
15 15
Ring Balok Ring Balok 25

18
18
Ø 8 - 15
18 x 15 cm 18 x 15 cm 20 18
6 Ø 12

Ø 8 - 15 DIMENSI 25 x 20 20 x 15 18 x 15
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10
SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15

197
197

240
240
TABEL PENULANAGAN ( DET B-3 )
Pasangan Bata 1 : 4

Ø 8 - 15
Sloof 25 x 20 cm 30 20 30
Ø 8 - 15

25
25
Sloof 25 x 20 cm
6 Ø 12 Plester + Acian 6 Ø 12

Muka Tanah

30
30
Pondasi Menerus
30 20 30

90
Pondasi Menerus
80

60
32
Ø 8 - 15

75

135
80 15
Ø 12 - 15

Aanstamping

15
5 10
Pasir Urug
6 Ø12 6 Ø12
30 2 Ø12 32

30
30 2 Ø12
6 Ø12 Ø 12 - 15
6 Ø12
5 60 5

5
Pasir Urug
80
DENAH PONDASI ( DET. B-3)
80
90 DETAIL PONDASI ( DET. B-3)
80

POTONGAN . I POTONGAN . II
1 : 100 14
Skala 1 : 30 Skala 1 : 30
DETAIL PONDASI TAPAK ( DET B-3 )
Skala 1 : 25
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm

Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

Kolom 20 x 15 cm

Sloof 25 x 20 cm Sloof 25 x 20 cm Sloof 25 x 20 cm

Pasangan Batu di Plaster + Acian

DETAIL TAMPAK TIPE ( B-3 )


Skala 1 : 40

Kolom 20 x 15 cm Kolom 20 x 15 cm Kolom 20 x 15 cm


Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

DETAIL TAMPAK TIPE ( B-3 )


DETAIL DENAH TIPE ( B-3 )
DETAIL DENAH TIPE ( B-3 )
Skala 1 : 40

1 : 40 15
TAMPAK DEPAN ( DET. B-4)
1 : 100

DENAH ( DET. B-4)


1 : 100
TAMPAK DEPAN ( DET. B-4)
DENAH ( DET. B-4)

1 : 100 16
i ii

DENAH PONDASI ( DET. B-4)


1 : 100

TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20 20
15 10
20
15 15
Ring Balok Ring Balok 25

18
18
Ø 8 - 15
18 x 15 cm 18 x 15 cm 20 18
6 Ø 12

Ø 8 - 15 DIMENSI 25 x 20 20 x 15 18 x 15
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10
SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15

197
197

240
240
TABEL PENULANAGAN ( DET B-4 )
Pasangan Bata 1 : 4

Ø 8 - 15
Sloof 25 x 20 cm 30 20 30
Ø 8 - 15

25
25
Sloof 25 x 20 cm
6 Ø 12 Plester + Acian 6 Ø 12

Muka Tanah

30
30
Pondasi Menerus
30 20 30

90
Pondasi Menerus
80

60
32
Ø 8 - 15

75

135
80 15
Ø 12 - 15

Aanstamping

15
5 10
Pasir Urug
6 Ø12 6 Ø12
30 2 Ø12 32

30
30 2 Ø12
6 Ø12 Ø 12 - 15
6 Ø12
5 60 5

5
Pasir Urug
80
80 DENAH PONDASI ( DET. B-4)
90 80 DETAIL PONDASI ( DET. B-4)

POTONGAN . I POTONGAN . II
Skala 1 : 30 Skala 1 : 30
DETAIL PONDASI TAPAK ( DET B-4 ) 1 : 100 17

Skala 1 : 25
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm

Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

Kolom 20 x 15 cm

Sloof 25 x 20 cm Sloof 25 x 20 cm Sloof 25 x 20 cm

Pasangan Batu di Plaster + Acian

DETAIL TAMPAK TIPE ( B-4 )


Skala 1 : 40

Kolom 20 x 15 cm Kolom 20 x 15 cm Kolom 20 x 15 cm


Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

DETAIL TAMPAK TIPE ( B-4 )


DETAIL DENAH TIPE ( B-4 ) DETAIL DENAH TIPE ( B-4 )

Skala 1 : 40

1 : 40 18
TAMPAK DEPAN ( DET. B-5)
1 : 100

DENAH ( DET. B-5)


1 : 100
TAMPAK DEPAN ( DET. B-5)
DENAH ( DET. B-5)

1 : 100 19
i ii

DENAH PONDASI ( DET. B-5)


1 : 100

TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20 20
15 10
20
15 15
Ring Balok Ring Balok 25

18
18
Ø 8 - 15
18 x 15 cm 18 x 15 cm 20 18
6 Ø 12

Ø 8 - 15 DIMENSI 25 x 20 20 x 15 18 x 15
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10
SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15

197
197

240
240
TABEL PENULANAGAN ( DET B-5 )
Pasangan Bata 1 : 4

Ø 8 - 15
Sloof 25 x 20 cm 30 20 30
Ø 8 - 15

25
25
Sloof 25 x 20 cm
6 Ø 12 Plester + Acian 6 Ø 12

Muka Tanah

30
30
Pondasi Menerus
30 20 30

90
Pondasi Menerus
80

60
32
Ø 8 - 15

75

135
80 15
Ø 12 - 15

Aanstamping

15
5 10
Pasir Urug
6 Ø12 6 Ø12
30 2 Ø12 32

30
30 2 Ø12
6 Ø12 Ø 12 - 15
6 Ø12
5 60 5

5
Pasir Urug
80
DENAH PONDASI ( DET. B-5)
80
90 DETAIL PONDASI ( DET. B-5)
80

POTONGAN . I POTONGAN . II
20
Skala 1 : 30 Skala 1 : 30
DETAIL PONDASI TAPAK ( DET B-5 ) 1 : 100

Skala 1 : 25
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm

Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

Kolom 20 x 15 cm

Sloof 25 x 20 cm Sloof 25 x 20 cm Sloof 25 x 20 cm

Pasangan Batu di Plaster + Acian

DETAIL TAMPAK TIPE ( B-5 )


Skala 1 : 40

Kolom 20 x 15 cm Kolom 20 x 15 cm Kolom 20 x 15 cm


Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

DETAIL TAMPAK TIPE ( B-5 )


DETAIL DENAH TIPE ( B-5 ) DETAIL DENAH TIPE ( B-5 )

Skala 1 : 40

1 : 40 21
TAMPAK DEPAN ( DET. B-6)
1 : 100

DENAH ( DET. B-6)


1 : 100
TAMPAK DEPAN ( DET. B-6)
DENAH ( DET. B-6)

1 : 100 22
i ii

DENAH PONDASI ( DET. B-6)


1 : 100

TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20 20
15 10
20
15 15
Ring Balok Ring Balok 25

18
18
Ø 8 - 15
18 x 15 cm 18 x 15 cm 20 18
6 Ø 12

Ø 8 - 15 DIMENSI 25 x 20 20 x 15 18 x 15
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10
SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15

197
197

240
240
TABEL PENULANAGAN ( DET B-6 )
Pasangan Bata 1 : 4

Ø 8 - 15
Sloof 25 x 20 cm 30 20 30
Ø 8 - 15

25
25
Sloof 25 x 20 cm
6 Ø 12 Plester + Acian 6 Ø 12

Muka Tanah

30
30
Pondasi Menerus
30 20 30

90
Pondasi Menerus
80

60
32
Ø 8 - 15

75

135
80 15
Ø 12 - 15

Aanstamping

15
5 10
Pasir Urug
6 Ø12 6 Ø12
30 2 Ø12 32

30
30 2 Ø12
6 Ø12 Ø 12 - 15
6 Ø12
5 60 5

5
Pasir Urug
80
80 DENAH PONDASI ( DET. B-6)
90 80 DETAIL PONDASI ( DET. B-6)

POTONGAN . I POTONGAN . II
1 : 100
Skala 1 : 30 Skala 1 : 30
DETAIL PONDASI TAPAK ( DET B-6 ) 23

Skala 1 : 25
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm

Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

Kolom 20 x 15 cm

Sloof 25 x 20 cm Sloof 25 x 20 cm Sloof 25 x 20 cm

Pasangan Batu di Plaster + Acian

DETAIL TAMPAK TIPE ( B-6 )


Skala 1 : 40

Kolom 20 x 15 cm Kolom 20 x 15 cm Kolom 20 x 15 cm


Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

DETAIL TAMPAK TIPE ( B-6 )


DETAIL DENAH TIPE ( B-6 ) DETAIL DENAH TIPE ( B-6 )

Skala 1 : 40

1 : 40 24
TAMPAK DEPAN ( DET. B-7)
1 : 100

DENAH ( DET. B-7)


1 : 100

TAMPAK DEPAN ( DET. B-7)


DENAH ( DET. B-7)

1 : 100 25
i ii

DENAH PONDASI ( DET. B-7)


1 : 100

TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20 20
15 10
20
15 15
Ring Balok Ring Balok 25

18
18
Ø 8 - 15
18 x 15 cm 18 x 15 cm 20 18
6 Ø 12

Ø 8 - 15 DIMENSI 25 x 20 20 x 15 18 x 15
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10
SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15

197
197

240
240
TABEL PENULANAGAN ( DET B-7)
Pasangan Bata 1 : 4

Ø 8 - 15
Sloof 25 x 20 cm 30 20 30
Ø 8 - 15

25
25
Sloof 25 x 20 cm
6 Ø 12 Plester + Acian 6 Ø 12

Muka Tanah

30
30
Pondasi Menerus
30 20 30

90
Pondasi Menerus
80

60
32
Ø 8 - 15

75

135
80 15
Ø 12 - 15

Aanstamping

15
5 10
Pasir Urug
6 Ø12 6 Ø12
30 2 Ø12 32

30
30 2 Ø12
6 Ø12 Ø 12 - 15
6 Ø12
5 60 5

5
Pasir Urug
80 DENAH PONDASI ( DET. B-7)
80 DETAIL PONDASI ( DET. B-7)
90 80

POTONGAN . I POTONGAN . II
1 : 100 26
Skala 1 : 30 Skala 1 : 30
DETAIL PONDASI TAPAK ( DET B-7 )
Skala 1 : 25
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm

Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

Kolom 20 x 15 cm

Sloof 25 x 20 cm Sloof 25 x 20 cm Sloof 25 x 20 cm

Pasangan Batu di Plaster + Acian

DETAIL TAMPAK TIPE ( B-7 )


Skala 1 : 40

Kolom 20 x 15 cm Kolom 20 x 15 cm Kolom 20 x 15 cm


Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4

DETAIL TAMPAK TIPE ( B-7 )


DETAIL DENAH TIPE ( B-7 )
DETAIL DENAH TIPE ( B-7 )
Skala 1 : 40

1 : 40 27
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4
Kolom 20 x 15 cm
Sloof 25 x 20 cm Sloof 25 x 20 cm Sloof 25 x 20 cm
Pasangan Batu di Plaster + Acian
DETAIL TAMPAK TIPE ( B-7 )
Skala 1 : 40
Kolom 20 x 15 cm Kolom 20 x 15 cm Kolom 20 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4
DETAIL DENAH TIPE ( B-7 ) DETAIL TAMPAK TIPE ( B-7 )
DETAIL DENAH TIPE ( B-7 )
Skala 1 : 40
1 : 40 27
TAMPAK DEPAN ( DET. B-8)
1 : 100
DENAH ( DET. B-8)
1 : 100
TAMPAK DEPAN ( DET. B-8)
DENAH ( DET. B-8)
1 : 100 28
i ii
DENAH PONDASI ( DET. B-8)
1 : 100
TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20 20
15 10
20
15 15
Ring Balok Ring Balok 25
Ø 8 - 15
18

18

18 x 15 cm 18 x 15 cm 20 18
6 Ø 12
Ø 8 - 15 DIMENSI 25 x 20 20 x 15 18 x 15
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10
SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15
197

197
240

240
TABEL PENULANAGAN ( DET B-8 )
Pasangan Bata 1 : 4
Ø 8 - 15
Sloof 25 x 20 cm 30 20 30
Ø 8 - 15 Sloof 25 x 20 cm
25

25
6 Ø 12 Plester + Acian 6 Ø 12
Muka Tanah Pondasi Menerus
30

30
30 20 30
Pondasi Menerus
90

80
32
60

Ø 8 - 15

Ø 12 - 15
135

75
80 15
Aanstamping
5 10
15

Pasir Urug
6 Ø12 6 Ø12
30 2 Ø12 32

30
30 2 Ø12
6 Ø12 Ø 12 - 15
6 Ø12
5 60 5 Pasir Urug

5
80 DENAH PONDASI ( DET. B-8)
80 DETAIL PONDASI ( DET. B-8)
90 80
POTONGAN . I POTONGAN . II
Skala 1 : 30 Skala 1 : 30
DETAIL PONDASI TAPAK ( DET B-8 ) 1 : 100 29
Skala 1 : 25
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4
Kolom 20 x 15 cm
Sloof 25 x 20 cm Sloof 25 x 20 cm Sloof 25 x 20 cm
Pasangan Batu di Plaster + Acian
DETAIL TAMPAK TIPE ( B-8 )
Skala 1 : 40
Kolom 20 x 15 cm Kolom 20 x 15 cm Kolom 20 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4
DETAIL DENAH TIPE ( B-8 ) DETAIL TAMPAK TIPE ( B-8 )
DETAIL DENAH TIPE ( B-8 )
Skala 1 : 40
1 : 40 30
TAMPAK DEPAN ( DET. B-9)
1 : 100
DENAH ( DET. B-9)
1 : 100
TAMPAK DEPAN ( DET. B-9)
DENAH ( DET. B-9)
1 : 100 31
i ii
DENAH PONDASI ( DET. B-9)
1 : 100
TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20 20
15 10
20
15 15
Ring Balok Ring Balok 25
Ø 8 - 15
18

18

18 x 15 cm 18 x 15 cm 20 18
6 Ø 12
Ø 8 - 15 DIMENSI 25 x 20 20 x 15 18 x 15
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10
SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15
197

197
240

240
Pasangan Bata 1 : 4
Ø 8 - 15
Sloof 25 x 20 cm 30 20 30
Ø 8 - 15 Sloof 25 x 20 cm
25

25
6 Ø 12 Plester + Acian 6 Ø 12
Muka Tanah Pondasi Menerus
30

30
30 20 30
Pondasi Menerus
90

80
32
60

Ø 8 - 15

Ø 12 - 15
135

75
80 15
Aanstamping
5 10
15

Pasir Urug
6 Ø12 6 Ø12
30 2 Ø12 32

30
30 2 Ø12
6 Ø12 Ø 12 - 15
6 Ø12
5 60 5 Pasir Urug

5
80
DENAH PONDASI ( DET. B-9)
80
90 80 DETAIL PONDASI ( DET. B-9)
POTONGAN . I POTONGAN . II
Skala 1 : 30 Skala 1 : 30
DETAIL PONDASI TAPAK ( DET B-9 ) 1 : 100 32
Skala 1 : 25
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4
Kolom 20 x 15 cm
Sloof 25 x 20 cm Sloof 25 x 20 cm Sloof 25 x 20 cm
Pasangan Batu di Plaster + Acian
DETAIL TAMPAK TIPE ( B-9 )
Skala 1 : 40
Kolom 20 x 15 cm Kolom 20 x 15 cm Kolom 20 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4
DETAIL DENAH TIPE ( B-9 ) DETAIL TAMPAK TIPE ( B-9 )
DETAIL DENAH TIPE ( B-9 )
Skala 1 : 40
1 : 40 33
TAMPAK DEPAN ( DET. B-10)
1 : 100
DENAH ( DET. B-10)
1 : 100
TAMPAK DEPAN ( DET. B-10)
DENAH ( DET. B-10)
1 : 100 34
i ii
DENAH PONDASI ( DET. B-10)
1 : 100
TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20 20
15 10
20
15 15
Ring Balok Ring Balok 25
Ø 8 - 15
18

18

18 x 15 cm 18 x 15 cm 20 18
6 Ø 12
Ø 8 - 15 DIMENSI 25 x 20 20 x 15 18 x 15
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10
SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15
197

197
240

240
Pasangan Bata 1 : 4
Ø 8 - 15
Sloof 25 x 20 cm 30 20 30
Ø 8 - 15 Sloof 25 x 20 cm
25

25
6 Ø 12 Plester + Acian 6 Ø 12
Muka Tanah Pondasi Menerus
30

30
30 20 30
Pondasi Menerus
90

80
32
60

Ø 8 - 15

Ø 12 - 15
135

75
80 15
Aanstamping
5 10
15

Pasir Urug
6 Ø12 6 Ø12
30 2 Ø12 32

30
30 2 Ø12
6 Ø12 Ø 12 - 15
6 Ø12
5 60 5 Pasir Urug

5
80
80 DENAH PONDASI ( DET. B-10)
90 80 DETAIL PONDASI ( DET. B-10)
POTONGAN . I POTONGAN . II
Skala 1 : 30 Skala 1 : 30
DETAIL PONDASI TAPAK ( DET B-10 ) 1 : 100 35
Skala 1 : 25
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4
Kolom 20 x 15 cm
Sloof 25 x 20 cm Sloof 25 x 20 cm
Pasangan Batu di Plaster + Acian
DETAIL TAMPAK TIPE ( B-10
)
Skala 1 : 40
Kolom 20 x 15 cm Kolom 20 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4
DETAIL DENAH TIPE ( B- 10 ) DETAIL TAMPAK TIPE ( B-10 )
DETAIL DENAH TIPE ( B- 10 )
Skala 1 : 40
1 : 40 36
i ii
DENAH PONDASI ( DET. B-11)
1 : 100
TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20 20
15 10
20
15 15
Ring Balok Ring Balok 25
Ø 8 - 15
18

18

18 x 15 cm 18 x 15 cm 20 18
6 Ø 12
Ø 8 - 15 DIMENSI 25 x 20 20 x 15 18 x 15
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10
SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15
197

197
240

240
Pasangan Bata 1 : 4
Ø 8 - 15
Sloof 25 x 20 cm 30 20 30
Ø 8 - 15 Sloof 25 x 20 cm
25

25
6 Ø 12 Plester + Acian 6 Ø 12
Muka Tanah Pondasi Menerus
30

30
30 20 30
Pondasi Menerus
90

80
32
60

Ø 8 - 15

Ø 12 - 15
135

75
80 15
Aanstamping
5 10
15

Pasir Urug
6 Ø12 6 Ø12
30 2 Ø12 32

30
30 2 Ø12
6 Ø12 Ø 12 - 15
6 Ø12
5 60 5 Pasir Urug

5
80
80 DENAH PONDASI ( DET. B-11)
90 80 DETAIL PONDASI ( DET. B-11)
POTONGAN . I POTONGAN . II
Skala 1 : 30 Skala 1 : 30
DETAIL PONDASI TAPAK ( DET B- 11 ) 1 : 100 38
Skala 1 : 25
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4
Kolom 20 x 15 cm
Sloof 25 x 20 cm Sloof 25 x 20 cm Sloof 25 x 20 cm
Pasangan Batu di Plaster + Acian
DETAIL TAMPAK TIPE ( B- 11 )
Skala 1 : 40
Kolom 20 x 15 cm Kolom 20 x 15 cm Kolom 20 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4
DETAIL DENAH TIPE ( B- 11 ) DETAIL TAMPAK TIPE ( B- 11 )
DETAIL DENAH TIPE ( B- 11 )
Skala 1 : 40
1 : 40 39
TAMPAK DEPAN ( DET. B-12)
1 : 100
DENAH ( DET. B-12)
1 : 100
TAMPAK DEPAN ( DET. B-12)
DENAH ( DET. B-12)
1 : 100 40
i ii
DENAH PONDASI ( DET. B-12)
1 : 100
TABEL PEMBESIAN
TYPE SLOOF KOLOM RING BALOK
20 20
15 10
20
15 15
Ring Balok Ring Balok 25
Ø 8 - 15
18

18

18 x 15 cm 18 x 15 cm 20 18
6 Ø 12
Ø 8 - 15 DIMENSI 25 x 20 20 x 15 18 x 15
TULANGAN ATAS 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN TENGAH 2 Ø 12 2 Ø 12 2 Ø 10
TULANGAN BAWAH 2 Ø 12 2 Ø 12 2 Ø 10
SENGKANG Ø 8 - 15 Ø 8 - 15 Ø 6 - 15
197

197
240

240
Pasangan Bata 1 : 4
Ø 8 - 15
Sloof 25 x 20 cm 30 20 30
Ø 8 - 15 Sloof 25 x 20 cm
25

25
6 Ø 12 Plester + Acian 6 Ø 12
Muka Tanah Pondasi Menerus
30

30
30 20 30
Pondasi Menerus
90

80
32
60

Ø 8 - 15

Ø 12 - 15
135

75
80 15
Aanstamping
5 10
15

Pasir Urug
6 Ø12 6 Ø12
30 2 Ø12 32

30
30 2 Ø12
6 Ø12 Ø 12 - 15
6 Ø12
5 60 5 Pasir Urug

5
80
80 DENAH PONDASI ( DET. B-12)
90 80 DETAIL PONDASI ( DET. B-12)
POTONGAN . I POTONGAN . II
Skala 1 : 30 Skala 1 : 30
DETAIL PONDASI TAPAK ( DET B- 12 ) 1 : 100 41
Skala 1 : 25
Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm Reng Balok 18 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4
Kolom 20 x 15 cm
Sloof 25 x 20 cm Sloof 25 x 20 cm Sloof 25 x 20 cm
Pasangan Batu di Plaster + Acian
DETAIL TAMPAK TIPE ( B-12 )
Skala 1 : 40
Kolom 20 x 15 cm Kolom 20 x 15 cm Kolom 20 x 15 cm
Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4 Pasangan Batu Bata 1 : 4
DETAIL DENAH TIPE ( B-12 ) DETAIL TAMPAK TIPE ( B-12 )
DETAIL DENAH TIPE ( B-12 )
Skala 1 : 40
1 : 40 42
Hollow Stainless Hollow Stainless
40.40.2 mm 40.30.2 mm
24 158 182 158 24
10 10

10
10

144
59
550
DETAIL PINTU PAGAR STAINLESS
Skala 1 : 30
DETAIL PINTU PAGAR STANELES
1 : 100 43
Hollow Stainless Hollow Stainless Hollow Stainless Keping Pengikat Stainless
40.40.2 mm 40.30.2 mm 40.40.2 mm 40.40.2 mm
330
3 10 3 10 3 10
10
10
4
3
8
3
8
03 47
8
3
8
3
4
10
10
5
50
4 101 3 114 3 101 4
DETAIL PAGAR HOLLOW STAINLESS ( Tipe 1= 6 Unit)
Skala 1 : 20
Hollow Stainless
40.30.2 mm
Hollow Stainless
40.40.2 mm
98
10
10
4
3
8
3
8
30 47
8
3
8
3
4
10
10
DETAIL HOLLOW STAINLESS
DETAIL PAGAR HOLLOW STAINLESS ( Tipe 2 = 2 Unit )
Skala 1 : 20
1 : 100 44
Hollow Stainless Hollow Stainless Hollow Stainless
40.40.2 mm 40.40.2 mm 40.40.2 mm
6 6

6
Roda Pintu Ø 7 cm Rel Plat Siku 5.5.5 mm Roda Pintu Ø 7 cm
TAMPAK DETAIL PINTU GERBANG
Skala 1 : 50
Pintu Gerbang Hollow
Stainless
TAMPAK DETAIL PINTU GERBANG
DENAH PONDASI PINTU PAGAR
DENAH PONDASI PINTU PAGAR
Skala 1 : 40
1 : 100 45
Besi Plat 5 mm
Hollow Stainless
Lobang Gembok 40.40.2 mm
Hollow Stainless Roda Penyangga Ø 5 cm
40.40.2 mm
Hollow Stainless
Hollow Stainless 40.60.2 mm
40.60.2 mm
DETAIL A DETAIL B
Skala 1 : 15 Skala 1 : 15
B
Besi Plat 5 mm
Lobang Gembok
Roda Penyangga Ø 5 cm
A Besi Hollow 40.40.2 mm
Besi Hollow 40.60.2 mm
Besi Plat 5 mm
Roda Pintu Ø 7 cm
Angkur Ø 12 -10
Pasir Alas
Angkur Ø 12-100
Pondasi Betopn Cor 1 : 3 : 5 Pasir Alas
Tanah Urug Pondasi Betopn Cor 1 : 3 : 5
Tanah Urug DETAIL
DETAIL POTONGAN I - I DETAIL POTONGAN II - II 1 : 30 46
Skala 1 : 30 Skala 1 : 30
Tulisan Stainless 10 Cm
Tulisan Stainless 10 Cm
Logo Ukuran Standar ( Akrilik )
Granit Warna Hitam
Tulisan Staneles 06 Cm Granit Warna Hitam
DETAIL PAPAN NAMA
Skala 1 :40
TAMPAK PAPAN NAMA
1 : 100 47
15
DENAH PAPAN NAMA
Skala 1 : 50
33 33
10
Balok 10 x 10 cm Balok 10 x 10 cm
TABEL PEMBESIAN
Pasangan Bata 1 : 4 Pasangan Bata 1 : 4
TYPE K.PRAKTIS SLOOF R.BALOK
243

243
240

240
10 10 10
Dinding Granit 10 10 10
B

Pas Bata 1 : 2 Pas Bata 1 : 2


e
t
o
n
C
o
r

B
e
t
o
n
C
o
r
B
a
l
o
k
1
0
/
1
0
S
l
o
o
f
1
0
/
1
0

DIMENSI 10 x 10 10 x 10 10 x 10
B
a
l
o
k
1
0
/
1
0

25
Sloof 20 x 25 cm Dinding Granit Sloof 20 x 25 cm TULANGAN ATAS 2 Ø 10 2 Ø 10 2 Ø 10

25
TULANGAN TENGAH - - -
53
55

55
TULANGAN BAWAH 2 Ø 10 2 Ø 10 2 Ø 10
Pas Bata 1 :2

30

30
SENGKANG Ø 6 - 15 Ø 6 - 15 Ø 6 - 15
Pondasi Menerus Pondasi Menerus

10
Galian Pondasi Galian Pondasi
30

40

40
Aanstamping Aanstamping

5 10

5 10
Pasir Urug Pasir Urug
30 30
5 60 5 5 60 5
DETAIL PAPAN NAMA
POT I-I POT II-II
Skala 1 : 30 Skala 1 : 30
1 : 100 48