Anda di halaman 1dari 18

#NAME?

#NAME?

#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME?

#NAME? #NAME?

#NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME?
#NAME?
#NAME?

#NAME? #NAME? #NAME?


#NAME?

DALAM BAHASA INGGRIS

123,675,976.12
ONE HUNDRED TWENTY THREE MILLION SIX HUNDRED SEVENTY FIVE THOUSAND NINE HUND
RUPIAHS TWELVE CENT .

123,675,976.12 123,675,976.12 23,675,976.12


0 100,000,000 20,000,000
0 1 2
ONE HUNDRED TWENTY

TWENTY

ONE HUNDRED TWENTY

ONE HUNDRED TWENTY THREE MILLION SIX HUNDRED SEVENTY FIVE THOUSAND NINE HUNDR
#NAME?

#NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME?
#NAME?
#NAME?

#NAME? #NAME? #NAME?


#NAME?

2
FIVE THOUSAND NINE HUNDRED SEVENTY SIX
ENT .

3,675,976.12 675,976.12 75,976.12


3,000,000 600,000 70,000
3 6 7
THREE
SIX HUNDRED SEVENTY
THREE SEVENTY

THREE SIX HUNDRED SEVENTY


MILLION

FIVE THOUSAND NINE HUNDRED SEVENTY SIX RUPIAHS TWELVE CENT .


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME?
#NAME?
#NAME?

#NAME? #NAME? #NAME?


#NAME?

5,976.12 976.12 76.12


5,000 900 70
5 9 7
FIVE
NINE HUNDRED SEVENTY
FIVE SEVENTY

FIVE NINE HUNDRED SEVENTY


THOUSAND
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?

#NAME? #NAME? #NAME?


#NAME? #NAME?

6.12 0.13 0.03


6 0.10 0.02
6 1 2
TEN TWO
SIX
SIX TEN TWO
TWELVE

SIX TWELVE
RUPIAHS CENT .
RINCIAN ANGGARAN BIAYA
KEGIATAN : LAPANGAN PARKIR KANTOR DINAS KESEHATAN SANGGAU
PEKERJAAN : LAPANGAN PARKIR KANTOR DINAS KESEHATAN SANGGAU
SUB PEKERJAAN : REKAPITULASI PEMBANGUNAN LAPANGAN PARKIR
LOKASI : KABUPATEN SANGGAU
TAHUN ANGGARAN : 2021

TOTAL JUMLAH
NO URAIAN PEKERJAAN HARGA
(Rp)
1 2 3

A. PEKERJAAN PERSIAPAN #NAME?

B. PEKERJAAN TANAH #NAME?

C. PEKERJAAN RABAT BETON 1,029,628,988.05

D. PEKERJAAN LAIN-LAIN #NAME?

JUMLAH TOTAL #NAME?


PPN (10%) #NAME?
JUMLAH TOTAL + PPN #NAME?
DIBULATKAN #NAME?
TERBILANG #NAME?
RINCIAN ANGGARAN BIAYA
NAMA KEGIATAN : PENATAAN HALAMAN DINAS KESEHATAN SANGGAU
PEKERJAAN : PENATAAN HALAMAN DINAS KESEHATAN SANGGAU
LOKASI : KABUPATEN SANGGAU
TAHUN ANGGARAN : 2021

NO URAIAN PEKERJAAN SAT KODE HARGA SATUAN VOLUME JUMLAH TOTAL (Rp.)
ANALISA (Rp.)
1 2 3 4 5 6 7
III. PEKERJAAN RABAT BETON
1 Pembersihan Lahan 4,260.00
2 Sirtu T=5cm m3 A.2.3.1.14 209,550.00 85.20 17,853,660.00
3 Pasir Urug T=5 cm m3 A.2.3.1.11 148,500.00 213.00 31,630,500.00
4 Semen Portland, Pasir Beton, Split Tebal 5 cm M3 A.4.1.1.1 1,180,826.04 213.00 251,515,945.61
5 Beton K-300 T=10cm m3 A.4.1.1.10 1,552,756.25 426.00 661,474,164.53
6 Wiremesh M6-150 kg A.4.1.1.19 38,044.57 1,305.80 49,678,560.29
7 Bekisting Multiplek 9 mm m2 A.4.1.1.24 514,004.64 34.00 17,476,157.62
8 Tutup U-Ditch 60x60x150 bh 83,848.84 20.00 1,676,976.76
Sub Total III 1,029,628,988.05
JUMLAH TOTAL 1,029,628,988.05
A.2.3.1.14 Pengurugan 1 m3 sirtu padat
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 144,000.00 36,000.00
Mandor L.04 OH 0.025 180,000.00 4,500.00
JUMLAH TENAGA KERJA 40,500.00
B BAHAN
Sirtu m3 1.200 125,000.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C) 190,500.00
E Overhead & Provit 10% x D 19,050.00
F Harga Satuan Pekerjaan ( D + E ) 209,550.00
A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 144,000.00 43,200.00
Mandor L.04 OH 0.010 180,000.00 1,800.00
JUMLAH TENAGA KERJA 45,000.00
B BAHAN
Pasir urug 1.200 75,000.00 90,000.00
JUMLAH HARGA BAHAN 90,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C) 135,000.00
E Overhead & Provit 10% x D 13,500.00
F Harga Satuan Pekerjaan ( D + E ) 148,500.00
A.4.1.1.1 Membuat 1m3 beton mutu f'c = 7,4 Mpa ( K 100), slump (12 ± 2) cm ,w/c =0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 144,000.00 237,600.00
Tukang batu L.02 OH 0.275 144,000.00 39,600.00
Kepala tukang L.03 OH 0.028 156,000.00 4,368.00
Mandor L.04 OH 0.083 180,000.00 14,940.00
JUMLAH TENAGA KERJA 296,508.00
B BAHAN
Semen Portland Kg 247.000 2,126.00 525,122.00
Pasir beton Kg 869.000 98.21 85,348.21
Kerikil (maks 30 mm) Kg 999.000 166.67 166,500.00
Air Liter 215.000
JUMLAH HARGA BAHAN 776,970.21
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C) 1,073,478.21
E Overhead & Provit 10% x D 107,347.82
F Harga Satuan Pekerjaan ( D + E ) 1,180,826.04
A.4.1.1.10 Membuat 1m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm ,w/c = 0,52
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 144,000.00 237,600.00
Tukang batu L.02 OH 0.275 144,000.00 39,600.00
Kepala tukang L.03 OH 0.028 156,000.00 4,368.00
Mandor L.04 OH 0.083 180,000.00 14,940.00
JUMLAH TENAGA KERJA 296,508.00
B BAHAN
Semen Portland Kg 413.000 2,126.00 878,038.00
Pasir beton Kg 681.000 98.21 66,883.93
Kerikil (maks 30 mm) Kg 1021.000 166.67 170,166.67
Air Liter 215.000
JUMLAH HARGA BAHAN 1,115,088.60
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C) 1,411,596.60
E Overhead & Provit 10% x D 141,159.66
F Harga Satuan Pekerjaan ( D + E ) 1,552,756.25
A.4.1.1.19 Pemasangan 1 Kg jaring kawat baja (wiremesh)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.025 144,000.00 3,600.00
Tukang besi L.02 OH 0.025 144,000.00 3,600.00
Kepala tukang L.03 OH 0.025 156,000.00 3,900.00
Mandor L.04 OH 0.001 180,000.00 180.00
JUMLAH TENAGA KERJA 11,280.00
B BAHAN
Jaring kawat baja dilas Kg 1.020 20,741.15 21,155.97
Kawat beton Kg 0.050 43000 2,150.00
JUMLAH HARGA BAHAN 23,305.97
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 34,585.97
E Overhead & Provit 10% x D 3,458.60
F Harga Satuan Pekerjaan ( D + E ) 38,044.57
A.4.1.1.24 (K3) Pemasangan 1m2 bekisting untuk lantai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.660 144,000.00 95,040.00
Tukang kayu L.02 OH 0.330 144,000.00 47,520.00
Kepala tukang L.03 OH 0.033 156,000.00 5,148.00
Mandor L.04 OH 0.033 180,000.00 5,940.00
JUMLAH TENAGA KERJA 153,648.00
B BAHAN
Kasau 5/7 m3 0.040 2,235,714.29 89,428.57
Paku 5 - 12 cm Kg 0.400 22,500.00 9,000.00
Minyak bekisting Liter 0.200 -
Kayu Kls. II m3 0.015 3,858,024.69 57,870.37
Papan Bekisting / Mal Kayu Kls. III Lbr 0.350 243,800.00 85,330.00
cerucuk diameter 8-10 cm pjg 4 m Batang 6.000 12,000.00 72,000.00
JUMLAH HARGA BAHAN 313,628.94
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 467,276.94
E Overhead & Provit 10% x D 46,727.69
F Harga Satuan Pekerjaan ( D + E ) 514,004.64
DAFTAR HARGA BAHAN DAN UPAH KERJA

KABUPATEN SANGGAU TAHUN ANGGARAN 2020

A. HARGA BAHAN / MATERIAL BANGUNAN

No. Uraian Satuan Harga satuan ( Rp)

1 2 3 4
I. BAHAN PASIR, BATU & TANAH ( SAND, STONE & SOIL )

1 Pasir Urug M3 75,000.00


2 Pasir Beton M3 137,500.00
5 Kerikil galian - Royalti M3 225,000.00
17 Sirtu ( Tak Ayak) M3 125,000.00
43 cerucuk diameter 8-10 cm pjg 4 m Batang 12,000.00
II. BAHAN SEMEN ( CEMENT )
1 Semen PC 50 Kg / Zak 106,300.00
III. BAHAN KAYU ( TIMBER, WOODS )
5 Kayu Kls. II 0.0324 30.8641975 125,000.00 m3 3,858,024.69
11 Papan Bekisting / Mal Kayu Kls. III 0.267912 3.7325689 243,800.00 m3 910,000.30
14 Kasau 5/7 0.014 71.4285714 31,300.00 m3 2,235,714.29
IX. BAHAN BESI , ALUMINIUM & KAWAT ( IRON, ALUMUNIUM & WIRE )
9 Kawat Ikat Beton Kg 43,000.00
16 Wiremesh Besi Ulir diam. 6 mm 1 Gulung = 2.10 x 54.00 M
2
Gulung 5,625,000.00
X. BAHAN PENGGANTUNG, KUNCI & PEREKAT ( NAILS, KEYS & GLUE )
1 Paku Campuran 1" - 5 " Kg 22,500.00
B. UPAH TUKANG/PEKERJA
1 Pekerja Org / Hari 144,000.00
2 Mandor Org / Hari 180,000.00
3 Kepala Tukang Org / Hari 156,000.00
4 Tukang Kayu Org / Hari 144,000.00
5 Tukang Semen Org / Hari 144,000.00
6 Tukang Batu Org / Hari 144,000.00
7 Tukang Besi Org / Hari 144,000.00
8 Tukang Pipa Org / Hari 144,000.00
9 Tukang Cat Org / Hari 144,000.00