Rab Gudang Tambang
Rab Gudang Tambang
#NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME?
#NAME? #NAME?
#NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME?
#NAME?
#NAME?
123,675,976.12
ONE HUNDRED TWENTY THREE MILLION SIX HUNDRED SEVENTY FIVE THOUSAND NINE HUND
RUPIAHS TWELVE CENT .
TWENTY
ONE HUNDRED TWENTY THREE MILLION SIX HUNDRED SEVENTY FIVE THOUSAND NINE HUNDR
#NAME?
2
FIVE THOUSAND NINE HUNDRED SEVENTY SIX
ENT .
SIX TWELVE
RUPIAHS CENT .
RINCIAN ANGGARAN BIAYA
KEGIATAN : LAPANGAN PARKIR KANTOR DINAS KESEHATAN SANGGAU
PEKERJAAN : LAPANGAN PARKIR KANTOR DINAS KESEHATAN SANGGAU
SUB PEKERJAAN : REKAPITULASI PEMBANGUNAN LAPANGAN PARKIR
LOKASI : KABUPATEN SANGGAU
TAHUN ANGGARAN : 2021
TOTAL JUMLAH
NO URAIAN PEKERJAAN HARGA
(Rp)
1 2 3
NO URAIAN PEKERJAAN SAT KODE HARGA SATUAN VOLUME JUMLAH TOTAL (Rp.)
ANALISA (Rp.)
1 2 3 4 5 6 7
III. PEKERJAAN RABAT BETON
1 Pembersihan Lahan 4,260.00
2 Sirtu T=5cm m3 A.2.3.1.14 209,550.00 85.20 17,853,660.00
3 Pasir Urug T=5 cm m3 A.2.3.1.11 148,500.00 213.00 31,630,500.00
4 Semen Portland, Pasir Beton, Split Tebal 5 cm M3 A.4.1.1.1 1,180,826.04 213.00 251,515,945.61
5 Beton K-300 T=10cm m3 A.4.1.1.10 1,552,756.25 426.00 661,474,164.53
6 Wiremesh M6-150 kg A.4.1.1.19 38,044.57 1,305.80 49,678,560.29
7 Bekisting Multiplek 9 mm m2 A.4.1.1.24 514,004.64 34.00 17,476,157.62
8 Tutup U-Ditch 60x60x150 bh 83,848.84 20.00 1,676,976.76
Sub Total III 1,029,628,988.05
JUMLAH TOTAL 1,029,628,988.05
A.2.3.1.14 Pengurugan 1 m3 sirtu padat
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 144,000.00 36,000.00
Mandor L.04 OH 0.025 180,000.00 4,500.00
JUMLAH TENAGA KERJA 40,500.00
B BAHAN
Sirtu m3 1.200 125,000.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
1 2 3 4
I. BAHAN PASIR, BATU & TANAH ( SAND, STONE & SOIL )