TUGAS PERENCANAAN TRANSPORTASI LAUT (TPT)

Kelompok : Tiga (3)

Dosen Pebimbing:

Studi Kasus : Muatan CPO , Chemical Tanker, ITB, SPOB


Volume (ton/tahun) Kedalaman Maksimum Utillity
NO Pelabuhan Asal/Tujuan
Muat Bongkar LWS BOR
1 Buru Asal 103,067,600 -7 60%
2 Surabaya Tujuan 103,067,600 -9 60%

2,147,241.67
Macam Alternatif Rute
Rute
1 Buru Surabaya

PTP1

Jarak pelayaran Buru - Surabaya (Nm)


Buru Surabaya
Buru 291 386
Surabaya 1130
Jarak pelayaran Buru - Surabaya (Nm)
Buru Surabaya 1Nm = 1.852 Km
Buru 538.932 1761.252
Surabaya 2092.76 714.872

Dumai
Surabaya
**

Maksimum Utillity IT + WT + AT Konsumsi CPO


Jenis alat Bongkar Muat Maks. Sarat
SOR/YOR Jam/Call Ton/hari
70% Pump 6 5.9 282377
70% Pump 4 7.9 282377

Dumai Surabaya
951
951 1130
Konsumsi Batubara
Ton/hari
#VALUE!
0
0 Volume (ton/tahun)
NO Pelabuhan Asal/Tujuan
#REF! Muat Bongkar
1 Dumai Asal 2,000
2 Medan Tujuan 1,000
3 Jakarta Tujuan 500
4 Surabaya Tujuan 500

20.83
Kedalaman Maksimum Utillity IT + WT + AT Konsumsi CPO
Jenis alat Bongkar Muat Maks. Sarat
LWS BOR SOR/YOR Jam/Call Ton/hari
-7 60% 70% Pump 6 5.9 5
-9 60% 70% Pump 4 7.9 3
-11 60% 70% Pump 6 9.9 1
-10 60% 70% Pump 4 8.9 1
BURU
Jasa Tunda
No Jenis Jasa Tarif (Rp) Keterngan
1 Kapal s/d 3500 GT
a. Tarif Tetap Rp 144,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
2 Kapal 3501 GT s/d 8000 GT
a. Tarif Tetap Rp 360,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
3 Kapal 8001 GT s/d 14000 GT
a. Tarif Tetap Rp 570,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
4 Kapal 14001 GT s/d 18000 GT
a. Tarif Tetap Rp 750,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
5 Kapal 18001 GT s/d 26000 GT
a. Tarif Tetap Rp 1,200,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
6 Kapal 26001 GT s/d 40000 GT
a. Tarif Tetap Rp 1,200,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
7 Kapal 40001 GT s/d 75000 GT
a. Tarif Tetap Rp 1,200,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
8 Kapal 75000 GT keatas
a. Tarif Tetap Rp 1,560,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam

Labuh dan tambat


Tarif
No
Jenis Jasa (Rupiah) Keterangan
I. JASA LABUH
a. Kapal Niaga Rp60 Per GT/Kunjungan
b. Kapal Bukan Niaga Rp30 Per GT/Kunjungan

II. JASA TAMBAT


a. Dermaga (Beton, Besi dan Kay Rp49 Per GT/Etmal
b. Breasting Dolphin dan Pelamp Rp25 Per GT/Etmal
c. Pinggiran Rp16 Per GT/Etmal

Pemanduan
No Jenis Jasa Tarif (Rp) Keterangan
I. Angkutan laut dalam negeri
a. Tarif Tetap Rp 117,150 Per Kapal Per Gerakan
b. Tarif Variabel Rp 53 Per GT kapal Per gerakan
SURABAYA
Jasa Tunda
No Jenis Jasa Tarif (Rp) Keterngan
1 Kapal s/d 3500 GT
a. Tarif Tetap Rp 320,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
2 Kapal 3501 GT s/d 8000 GT
a. Tarif Tetap Rp 600,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
3 Kapal 8001 GT s/d 14000 GT
a. Tarif Tetap Rp 900,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
4 Kapal 14001 GT s/d 18000 GT
a. Tarif Tetap Rp 1,300,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
5 Kapal 18001 GT s/d 26000 GT
a. Tarif Tetap Rp 1,900,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
6 Kapal 26001 GT s/d 40000 GT
a. Tarif Tetap Rp 2,200,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
7 Kapal 40001 GT s/d 75000 GT
a. Tarif Tetap Rp 2,500,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
8 Kapal 75000 GT keatas
a. Tarif Tetap Rp 3,000,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam

Labuh dan tambat


Tarif
No
Jenis Jasa (Rupiah) Keterangan
I. JASA LABUH
a. Kapal Niaga Rp95 Per GT/Kunjungan
b. Kapal Bukan Niaga Rp25 Per GT/Kunjungan

II. JASA TAMBAT


a. Dermaga (Beton, Besi dan Kayu) Rp95 Per GT/Etmal
b. Breasting Dolphin dan Pelampung Rp48 Per GT/Etmal
c. Pinggiran Rp34 Per GT/Etmal

Pemanduan
No Jenis Jasa Tarif (Rp) Keterangan
I. Angkutan laut dalam negeri
a. Tarif Tetap Rp 150,000 Per Kapal Per Gerakan
b. Tarif Variabel Rp 30 Per GT kapal Per gerakan
TIME CHARTER HIRE
$30,000.00

$25,000.00
f(x) = 0.063383763837638 x + 5526.49710068529
R² = 0.756039244604595
$20,000.00
TCH ($)

$15,000.00

$10,000.00

$5,000.00

$-
- 50,000 100,000 150,000 200,000 250,000 300,000 350,000
DWT (ton)

Column C Linear (Column C)

DATA TIME CHARTER HIRE


SIZE DWT (Ton) TIME CHARTER HIRE (US $)
HANDY 40,000 $ 11,750.00
MR IMO3 45,000 $ 1,270.00
LR1 80,000 $ 13,000.00
LR2 120,000 $ 16,000.00
AFRA 160,000 $ 15,500.00
SUEZ 250,000 $ 18,500.00
VLCC 320,000 $ 27,000.00
Hasil regresi
Hasil regresi 0.00634 x +

1 USD = Rp 13,285

Harga CPO per ton $ 762.00 https://www.market.bisnis.com


5526.5

https://www.mataf.net/id/currency/converter-USD-IDR

s://www.market.bisnis.com
No Nama Kapal DWT (Ton) LPP (m) B (m) H (m) T (m) L/B
1 BAKTI SATU 1087 39.62 14.64 3.04 2.40 2.71
2 BEAUTIFUL 9 1493 54.86 15.24 3.05 2.30 3.60
3 BEE SIN LIFTER 1824 52.67 18.29 3.05 2.34 2.88
4 BAYSWEATER 128 2233 52.57 18.29 3.60 2.90 2.87
5 ATTILA 23 2525 61.45 18.20 3.60 2.80 3.38
6 HIUCHI 2  2950 89.03 17.00 5.00 3.00 5.24
7 BESTVIC 3468 67.30 19.50 4.20 3.30 3.45
8 BINA 88A 3964 70.23 21.34 4.80 3.90 3.29
9 BAHARI 4694 73.20 21.34 4.80 3.90 3.43
10 BINA MARINE 4776 70.22 21.34 4.80 3.90 3.29
11 PERTAMA ABADI 2801 5149 81.93 21.95 5.38 3.79 3.73
12 JIAN YANG CHENG YUN 5155 100.80 22.00 6.00 4.30 4.58
13 HUA LI 6277 84.27 29.38 5.49 4.10 2.87
14 TOLL SPB 3210 7675 98.00 24.00 7.00 4.60 4.08
15 TOLL SPB 3212 7675 98.00 24.00 7.00 4.50 4.08
16 Kimtrans 7675 97.00 24.00 7.00 4.50 4.04
17 MV. ROYAL STAR 8000 91.74 24.00 7.50 5.00 3.82
18 WU LIU XIAN FENG 8776 99.50 26.00 7.38 5.45 3.83
19 CASPIAN EXPLORER 8843 100.00 30.00 8.00 5.50 3.33
20 LINAU 78  8991 96.56 26.82 6.10 4.81 3.60
21 ZHI XIAN 2 9301 109.30 26.00 7.38 5.40 4.20
22 GTO 397 9590 87.84 30.48 6.10 4.85 2.88
23 SCANBARGE 9926 91.55 27.51 6.13 4.87 3.33
24 LARIS 10000 102.16 30.00 7.50 5.00 3.41
25 MV Bashundhara-4 10187 100.20 26.00 8.10 5.50 3.85
26 LAJU 12000 107.65 28.00 8.50 5.65 3.84
27 MV. JAYA AMARA 12000 120.00 27.50 8.00 5.50 4.36
28 YUE SHEN ZHOU 5 12388 131.40 32.00 8.00 5.40 4.11
29 YUAN JING 12626 134.50 32.20 8.00 5.20 4.18
30 XING YUN HAI 15405 124.00 35.00 8.70 6.00 3.54
batas bawah 1087 39.62 14.64 3.04 2.30 2.71
batas atas 15405 134.50 35.00 8.70 6.00 5.24

L/B B/T L/T B/H L/H


Minimal 2.71 4.73 16.51 3.20 12.23
Maksimal 5.24 7.82 29.68 6.00 17.99

Perbandingan ukuran kapal :


2.71 <=Lo/B0<= 5.24
4.73 <=Bo/To<= 7.82
16.51 <=Lo/To<= 29.68
3.20 <=Bo/Ho<= 6.00
12.23 <=Lo/Ho<= 17.99
B /T L/T B/H L/H L/16 GT Vs (Knot) Tahun
6.10 16.51 4.82 13.03 2.48 426 8.0
6.63 23.85 5.00 17.99 3.43 636 8.0
7.82 22.51 6.00 17.27 3.29 815 8.0
6.31 18.13 5.08 14.60 3.29 921 9.0
6.50 21.95 5.06 17.07 3.84 1067 10.0
5.67 29.68 3.40 17.81 5.56 2636 11.0
5.91 20.39 4.64 16.02 4.21 1446 10.0
5.47 18.01 4.45 14.63 4.39 1897 10.0
5.47 18.77 4.45 15.25 4.58 1897 11.0
5.47 18.01 4.45 14.63 4.39 1882 10.0
5.79 21.62 4.08 15.23 5.12 2235 10.0 2002
5.12 23.44 3.67 16.80 6.30 3583 10.5 1980
7.17 20.55 5.35 15.35 5.27 3735 8.0 1999
5.22 21.30 3.43 14.00 6.13 3695 16.2 2006
5.33 21.78 3.43 14.00 6.13 3708 4.8 2007
5.33 21.56 3.43 13.86 6.06 3708 14.5 2005
4.80 18.35 3.20 12.23 5.73 4181 7.0 2005
4.77 18.26 3.52 13.48 6.22 5201 13.0 2009
5.45 18.18 3.75 12.50 6.25 5380 5.9 2012
5.58 20.09 4.40 15.84 6.04 3898 10.0 2007
4.81 20.24 3.52 14.81 6.83 5986 10.0 2010
6.29 18.13 5.00 14.40 5.49 4462 - 2011
5.65 18.79 4.49 14.93 5.72 4030 - 1977
6.00 20.43 4.00 13.62 6.39 6159 10.0 2010
4.73 18.22 3.21 12.37 6.26 6559 5.9 2007
4.96 19.05 3.29 12.66 6.73 7081 10.0 2010
5.00 21.82 3.44 15.00 7.50 9843 10.2 2011
5.93 24.33 4.00 16.43 8.21 9611 12.5 2011
6.19 25.87 4.03 16.81 8.41 10177 11.5 2009
5.83 20.67 4.02 14.25 7.75 8632 7.5 2003
4.73 16.51 3.20 12.23 2.48
7.82 29.68 6.00 17.99 8.41
Class
NK CLASS
NK CLASS
NK CLASS
NK CLASS
NK CLASS
NK CLASS
NK CLASS
NK CLASS
NK CLASS
NK CLASS
SIBU
CHINA CLASSIFICATION SOCIETY
CHINA CLASSIFICATION SOCIETY
Biro Klasifikasi Indonesia (BKI)
Biro Klasifikasi Indonesia (BKI)
Biro Klasifikasi Indonesia (BKI)
American Bureau of Shipping (ABS)
CHINA CLASSIFICATION SOCIETY
American Bureau of Shipping (ABS)
NKK
CHINA CLASSIFICATION SOCIETY
DNV GL
DNV GL
Biro Klasifikasi Indonesia (BKI)
American Bureau of Shipping (ABS)
Biro Klasifikasi Indonesia (BKI)
Korean Ship Register (KSR)
CHINA CLASSIFICATION SOCIETY
CHINA CLASSIFICATION SOCIETY
CHINA CLASSIFICATION SOCIETY
No Nama Kapal DWT (ton) LPP (m) B (m) H (m) T (m)
1 As Glory 15 5000.0 81.4 21.2 5.4 4.3
2 MCL PERMAI 4028.0 73.2 19.5 4.9 3.8
3 YON 338 1182.3 51.0 13.4 3.7 2.6
4 VDA XII 2971.0 64.0 16.6 4.1 4.0
5 PCC PROVIDER 5451.0 76.2 22.6 5.8 3.8
6 TAN CANG 02 8772.0 86.3 27.4 6.1 4.8
7 TNC 24006 2022.0 60.7 10.7 3.7 3.4
8 B NO.233 3130.0 72.1 19.5 5.2 3.9
9 BERNIE BRIERE 5395.3 73.5 19.7 5.2 4.4
10 ENTERPRISE 4700.0 84.6 17.7 5.7 4.1
11 VDA III 2260.0 63.7 15.0 3.8 3.1
12 AL KHAFJI 1 1050.0 46.1 15.0 3.9 2.4
13 WPL 2015 1871.0 62.4 16.0 3.8 3.4
14 GLOBAL SEATTLE 1601.0 55.6 14.0 4.0 2.9
15 INMACULADA 5415.4 87.8 16.5 5.8 4.4
16 DOUNLESKIN 40 4100.0 83.5 19.5 5.4 4.2
17 COLUMBIA 9757.2 97.5 27.4 6.1 4.9
18 DAVID FANNING 5395.2 73.5 19.7 5.2 4.3
19 EASTERN NOVA 10558.0 97.0 30.6 6.6 5.0
20 EASTERN ROSE 5799.0 76.2 24.4 5.2 4.1
batas bawah 1050 46.10 10.67 3.66 2.44
batas atas 10558 97.54 30.60 6.60 5.00

L/B B/T L/T B/H L/H


Minimal 3.07 3.18 16.00 2.84 11.97
Maksimal 5.69 6.15 20.43 4.71 16.99

Perbandingan ukuran kapal :


3.07 <=Lo/B0<= 5.69
3.18 <=Bo/To<= 6.15
16.00 <=Lo/To<= 20.43
2.84 <=Bo/Ho<= 4.71
11.97 <=Lo/Ho<= 16.99
L/B B /T L/T B/H L/H L/16 Vs (Knot) Tahun GT
3.85 4.92 18.93 3.92 15.07 5.09 10.00 1984 2880
3.75 5.17 19.39 4.00 15.00 4.57 11.00 1980 1662
3.80 5.15 19.61 3.66 13.93 3.19 10.00 1982 710
3.86 4.14 16.00 4.04 15.61 4.00 13.50 1992 1407
3.38 5.94 20.06 3.90 13.16 4.76 12.00 1983 2443
3.14 5.78 18.16 4.50 14.15 5.39 13.50 2009 3709
5.69 3.18 18.10 2.92 16.59 3.79 11.50 1979 593
3.69 4.99 18.44 3.75 13.87 4.51 12.90 2015 2210
3.74 4.47 16.69 3.79 14.18 4.59 10.20 1979 2724
4.78 4.27 20.43 3.12 14.91 5.29 12.20 1979 2358
4.25 4.79 20.36 4.00 16.99 3.98 12.00 1978 1113
3.07 6.15 18.89 3.90 11.97 2.88 11.66 2004 671
3.90 4.72 18.41 4.21 16.42 3.90 11.50 1999 1010
3.97 4.88 19.34 3.51 13.90 3.48 15.00 1997 1004
5.33 3.74 19.96 2.84 15.16 5.49 14.00 1992 2391
4.28 4.64 19.88 3.61 15.46 5.22 12.50 1992 2509
3.56 5.56 19.76 4.50 16.00 6.10 12.50 1974 4286
3.74 4.57 17.08 3.80 14.18 4.59 11.00 2004 2724
3.17 6.12 19.40 4.64 14.70 6.06 14.80 2013 4625
3.13 5.98 18.68 4.71 14.71 4.76 14.80 1980 2434
3.07 3.18 16.00 2.84 11.97 2.88
5.69 6.15 20.43 4.71 16.99 6.10
Class
BV
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
Duami - Medan : Chemical Tanker

No Pelabuhan Asal/Tujuan

1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan

DATA PENDUKUNG Chemical Tanker


Jumlah hari = 365
Hari Kerja = 330
Kecepatan Dinas = 11
Kecepatan Ballast = 12
Harga HFO = Rp 8,724
Harga MDO = Rp 9,000
Kecepatan Loading = 200
Kecepatan Unloading = 200
Kurs = Rp 13,000
Umur 25

DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 85.47
B = 10.95
H = 5.74
T = 4.54
GT = 1743
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yang diangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 85.47
B = 10.95
H = 5.74
T = 4.54
VS = 11
= 5.6584
Freeboard = 1.20

PERBANDINGAN UKURAN UTAMA :


L/B = 7.808
B/T = 2.413
L/T = 18.837
L/16 = 5.342
B/H = 1.906
L/B 7.81 3,5 < L/B < 10
B/T 2.41 1,8 < B/T < 5
L/T 18.84 10 < L/T < 30
H>L/16 5.34 H > L/16
B/H 1.91 1,47>B/H>2,38
PERHITUNGAN FROU
LWL = 104%LPP
= 88.89

Fn = Vs / √( g. L )
= 0.192

PERHITUNGAN KOEFISIEN UKURAN UTAMA :


Koefisien Blok (Watson & Gilfillan) :
CB = – 4.22 + 27.8 √Fn – 39.1 Fn + 46.6 Fn3
= 0.78
Koefisien Luas Midship (Series '60) :
CM = 0.977 + 0.085 (CB – 0.60)
= 0.99
Koefisien Prismatik :
Cx = Cm
Cр = Cb/Cx
= 0.79
Koefisien Bidang Garis Air ;
CWP = Cb/(0.471+(0.551*Cb))
= 0.87
Longitudinal Center of Bouyancy :
a. LCB (%) = -13,5 + 19,4 ⋅ Cp
= 1.84
b. LCB dari M = LCB % / 100 . LPP
= 1.57
c. LCB dari AP = 0.5 · LPP + LCBM
= 44.31

Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 85.47
LWL = 88.89
B = 10.95
H = 5.74
T = 4.54
Vs = 5.66

Perhitungan Viscous Resistance

Cfo (Friction Coefficient - ITTC 1957)


𝜇/𝑟
v= = 1.188 x 10-6 m2/s (for salt water)
(kinematic viscosity)

(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)

=
423,283,253.9
Cfo =〖 (log⁡〖𝑅𝑛 − 2) 〗〗 ^2
0.075/

= 0.00171

• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =

= 0.244
〖𝐿𝑤𝑙〗 ^3/𝛻 202.70
=
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =

= 1.210

• Wetted Surface Area


Amid= Cm . B . T
ABT = 1.000 ---> tidak menggunakan
(luas Bulb di depan FP)

𝐿(2𝑇+𝐵) 〖𝐶 _𝑀 〗 ^0.5 (0.4530+0.4425 𝐶_𝐵−0.2862 𝐶_𝑀−0.003467 𝐵/𝑇+0.3696 𝐶_𝑊𝑃 )


+2.38 𝐴_𝐵𝑇/𝐶_𝐵 S=

= 1472.245 m2

• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆

= 49.918 kN

Perhitungan Resistance of Appendages

• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)

= 13.574
Lkeel = 0.6.Cb.Lwl Hkeel =
= 41.860 =
Sapp = Srudder + Sbilge Keel

= 65.109
• Stot = S + Sapp
= 1537.354
Harga (1 + k2) ---> PNA Vol II hlm. 92
Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome

+ k2〖𝑆
(1(∑▒ _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )

= 1.400

• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=

= 1.218
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =

= 52.473 kN

Perhitungan Wave Making Resistance

• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =

= 30.4549
B/L = 0.123
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.123
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1
= 1.118

• Harga C2 ---> PNA Vol II hlm. 92


A BT γ B
e 1.89
C2 = BT  γ B  i 
---> menggunakan Bulb
=1
• Harga C3 ---> PNA Vol II hlm. 93
C3 = 1 - 0.8 AT (B.T.CM) ---> AT = 0 ( luas transom saat kecepatan
= 1.000 saat V=0 transom tidak tercelup air)
0.56∙√(ABT )

• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3

= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.172〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =

= -1.785

• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= -0.00028

• Harga λ
L/B = 8.120
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.900

• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ⁡〖〖𝐹𝑛〗 ^(−2)) 〗

= 0.00041562

• CA (Correlation Allowance)
Tf/Lwl = 0.0510
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000544
• w (Gaya Berat)
w= ∆.g
= 34845.091 kN

• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =

= 14.4824357205291 kN

Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 80.68 kN
= 80676.58 N

• Rtotal + 15% (margin)


= 92.778 kN
Kedalaman
Volume (Ton/Thn)

Muat Bongkar LWS


103,067,600 -7
103,067,600 -9
Err:509 Err:509
Err:509 Err:509

nker Jarak (Nm)


hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost

ROUNDTRIP
ton > Seatime
ton Dumai - Medan =
m Medan - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Medan =
103,067,600
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi sebenarnya =
m/S

UKURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025

Principle of Naval Architecture Vol. II hal. 58

√Fn – 39.1 Fn + 46.6 Fn3


(Parametric Ship Design hal. 11-11)

5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)

(Parametric Ship Design hal. 11-10)

(Parametric Ship Design hal. 11-16)

(Parametric Ship Design hal. 11-19)


% Lpp

m dari M

m dari AP

Lwl . B . T .Cb
3465.36 m3
Lwl . B .T . Cb .ρ
3552.00 ton

KOEFISIEN UKURAN UTAMA :


m CB =
m CM =
m CP =
m CWP =
m Fn =
m/s Cstern =
Lcb =

m2/s (for salt water)

Practical Ship Design hlm .168

Practical Ship Design hlm .157

Pinciple of Naval Architecture Vol II hlm. 91


Pinciple of Naval Architecture Vol II hlm. 91

10% Amidship

3696 𝐶_𝑊𝑃 )

Pinciple of Naval Architecture Vol II hlm. 90

faktor tipe kapal (umum)


faktor tipe kemudi (umum)
faktor tipe profil kemudi (NACA)
faktor letak baling-baling
---> BKI Vol II hlm 14-2

0.18/(Cb-0.2) SBilge Keel = 4.Lkeel.HKeel


0.308 = 51.534
Value of 1+k2
--> (1+k2)=
1.3 to 1.5 1.4
2.8
1.5 to 2.0
3.0
2.0
1.4
2.8
2.0
2.7

_𝑖 〗 )/(∑▒𝑆_𝑖 )

Pinciple of Naval Architecture Vol II hlm. 90

〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3

〗 ^(−1.3757)
luas transom saat kecepatan 0,
dak tercelup air)

Principle of Naval Architecture Vol II hlm. 92

---> untuk Cp < 0.8

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

---> untuk Tf/Lwl >0.04


/𝑊 𝑊
Konsumsi
Maksimum Utility IT+WT+AT Batubara

BOR SOR/YOR Jam/call ton/hari


60% 70% 6 282,377
60% 70% 4 282,377
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Dumai Medan Jakarta Surabaya


- Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509
Err:509 Err:509 - 386
Err:509 Err:509 386 -
min max
= 7.81 3.5 10
= 2.41 1.8 5
= 18.84 10 30
= 1.91 1.47 2.38
= Rp -

OUNDTRIP Load Factor Kapal 90%


Utilitas Alat 67%
Err:509 jam Kecepatan Alat 200 ton/hour
Err:509 jam
Err:509 jam
Err:509 hari
Err:509
6 jam Err:509
0.25 hari
4 jam
0.17 hari

Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
164 kali

ciple of Naval Architecture Vol. I hal. 19


ciple of Naval Architecture Vol. I hal. 19
ciple of Naval Architecture Vol. I hal. 19
Vol. II Tahun 2006
ciple of Naval Architecture Vol. I hal. 19

m/s²
≤ Fn ≤ 0,3
ton/m3

ametric Ship Design hal. 11-11)

ametric Ship Design hal. 11-12)

ametric Ship Design hal. 11-10)

ametric Ship Design hal. 11-16)

ametric Ship Design hal. 11-19)


0.78
0.99
0.79
0.87
0.191613253228383
0
1.57 m
PERHITUNGAN PROPULSI & DAYA M
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0

Perhitungan Awal :
1+k
CF
CA

CV
Principle of Naval Architecture Vo

Principle of Naval Architecture Vo

t
Principle of Naval Architecture Vo

Va

Principle of Naval Architecture Vo


Chapter 11 Parametric Design - M.

Effective Horse Power (EHP) :


PE

Chapter 11 Parametric Design - M.

Thrust Horse Power (THP) :


PT

Chapter 11 Parametric Design - M.

Propulsive Coefficient Calculation :


ηH

Chapter 11 Parametric Design - M.

ηO

ηr
ηD

Delivered Horse Power (DHP) :


PD

Chapter 11 Parametric Design - M.

Shaft Horse Power (SHP) :


ηS

PS

Chapter 11 Parametric Design - M.

Brake Horse Power Calculation (BHP) :


ηR

PB0

Chapter 11 Parametric Design - M.


Koreksi MCR
PB
BHP

Chapter 11 Parametric Design - M.


MAIN ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

AUXILARY ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL
Perhitungan Harga Kapal
Input Data
WST = 727.079 Ton
WE&O = 158.342 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja

= $ 799,786.52
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 174,176.22
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509

Harga = Biaya + Keuntungan + Inflasi + Pajak


= Err:509
= Err:509
= Err:509 /tahun

BIAYA OPERASIONAL

Gaji Crew = Err:509 /tahun


Jumlah Crew = 17 Orang
Gaji Per Crew/Bulan = Rp 10,000,000.00
Repair & Maintenance = 3% dari harga kapal
= Err:509 /tahun
Asuransi Kapal = 1,5% dari harga kapal
= Err:509 /tahun
Supplies Crew = Rp 50,000.00 /orang/hari
= Err:509 /tahun
Dokumen & Administrasi = Rp 5,000,000.00 /trip
= Err:509

Total = Err:509 /tahun


AN PROPULSI & DAYA MESIN :

= 88.89 m P/D

= 10.95 m D
= 5.74 m z
= 4.54 m nrpm

= 0.19161325322838 nrps

= 3465.36 m3 Cb
= 3552.00 ton Vs

= 0.4 RT

= 1.22
= 0.0017
= 0.00054

= (1+ k) CF + CA
= 0.0026
ciple of Naval Architecture Vol. II hal. 162

= 0.3 Cb + 10 Cv Cb - 0.1
= 0.16
ciple of Naval Architecture Vol. II hal. 163

= 0.1 ; thrust deduction friction


ciple of Naval Architecture Vol. II hal. 163

= V (1 - w) ; Speed of Advantages
= 4.78
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27

Power (EHP) :
= RT.Vs
= 524.98 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27

wer (THP) :
= PE∙(1−w)/(1−t)
= 492.28 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29

ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.07
pter 11 Parametric Design - M.G. Parson ; page 11-29

= Open Water Test Propeller Efficiency


= (J/(2∙n))∙(KT/KQ)
= 0.6

= Rotative Efficiency
= 0.985

= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591

Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 888.28 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 906.41 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer Calculation (BHP) :


= Reduction Gear Efficiency
= 0.98
= Brake Horse Power (BHP0)
= PS/ηR
= 924.91 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
= 15% ∙ PB0
= 115% ∙ PB0 = BHP
= 1063.65 Kw
= BHP ∙ 1.3596 HP
= 1446.13 HP
pter 11 Parametric Design - M.G. Parson ; page 11-30
Merek Tipe Daya (kW) SFOC (g/kW/hr)

CUMMINS NTA855-M400 298 103


CATERPILLAR 3208 325 235
CUMMINS KTTA 19-M3 447 184
YUCHAI YC6C670L 492 195
YUCHAI YC6C700L 515 195
YUCHAI YC6C730L 536 195
YUCHAI YC6C865L 636 195
YUCHAI YC6C925L 680 195
YUCHAI YC6C960L 706 195
YUCHAI YC6CL1035L 760 195
MAN B&W 6L23/30A-E 800 188
MAN B&W 6L23/30A 960 189
CATERPILLAR 6M20C 1020 191
CATERPILLAR 6M20C 1080 190
CATERPILLAR 6M20C 1140 192
CATERPILLAR 6M20C 1200 189
MAN B&W 8L23/30A 1280 191
MAN B&W 6L21/31 1290 190
CATERPILLAR 8M20C 1360 192
CATERPILLAR 8M20C 1440 189
MAN B&W 6L28/32A 1470 191
MAN B&W 5L27/38 1500 190
MAN B&W 7L21/31 1505 192
CATERPILLAR 8M20C 1520 188
CATERPILLAR 9M20C 1530 185
CATERPILLAR 8M20C 1600 185
MAN B&W 5L27/38 1600 187
CATERPILLAR 9M20C 1620 185
CATERPILLAR 9M20C 1710 185
MAN B&W 7L28/32A 1715 189
MAN B&W 8L21/31 1720 195
CATERPILLAR 9M20C 1800 195
MAN B&W 9L21/31 1935 195
MAN B&W 8L28/32A 1960 195
MAN B&W 6L27/38 1980 194
CATERPILLAR 6M25C 2000 194
MAN B&W 9L28/32A 2205 194
MAN B&W 7L27/38 2310 194
CATERPILLAR 8M25C 2320 194
CATERPILLAR 8M25C 2400 196
CATERPILLAR 9M25C 2610 196
MAN B&W 8L27/38 2640 196
CATERPILLAR 8M25C 2666 194
CATERPILLAR 9M25C 2700 194
MAN B&W 9L27/38 2970 194
CATERPILLAR 9M25C 3000 194
MAN B&W 3000 189
MAN B&W 3500 195
MAN B&W 4000 195
MAN B&W 4500 195
MAN B&W 5000 195
MAN B&W 5500 194
MAN B&W 6000 194
MAN B&W 6500 194
MAN B&W 7000 194
MAN B&W 7500 189
MAN B&W 8000 192
MAN B&W 8500 194

LARY ENGINE

Merek Tipe Daya (kW) SFOC (g/kW/hr)

CATERPILLAR C9 217 212.1


CATERPILLAR C9 253 228.8
CATERPILLAR C9 253 209
CATERPILLAR C9 288 206.6
CATERPILLAR C9 311 229.5
CATERPILLAR C9 361 211.7
CATERPILLAR C18 404 210
CATERPILLAR C18 499 217
CATERPILLAR C18 514 209
CATERPILLAR C15 536 218.8
CATERPILLAR C15 540 218.8
CATERPILLAR C18 587 208
CATERPILLAR C18 624 215
CATERPILLAR C18 660 209
CATERPILLAR C32 791 203.8
CATERPILLAR C32 916 210.8
CATERPILLAR C32 923 203
CATERPILLAR C32 1047 210.4
CATERPILLAR C32 1172 207
CATERPILLAR C32 1333 207.2
CATERPILLAR C33 1500 209
CATERPILLAR C34 1700 206.6
CATERPILLAR C35 2153 218.8
CATERPILLAR C36 2337 218.8
CATERPILLAR C37 2745 210
CATERPILLAR C38 3000 209
CATERPILLAR C39 3254 208
CATERPILLAR C40 3559 209
CATERPILLAR C41 3749 217
CATERPILLAR C42 4000 215
BIAYA PERJALANAN

Biaya bahan bakar :


1 > Main Engine

2 > Aux. Engine

Total

Biaya pelabuhan

Pelabuhan Dumai
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal =
Tarif Tetap =
Tarif Variabel =

total

Pelabuhan Medan
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal <=
Tarif Tetap =
Tarif Variabel =

total

BIAYA BONGKAR MUAT


Tarif Bongkar muat = Rp 30,000

>> Muat = Rp -
>> Bongkar = Rp -
Total = Rp -
= 1.00
= 2.84
= 4.00
= 110
= 1.83
= 0.78
= 5.66 m/s
= 92.78 KN
(propeller B-series = 0.5 - 0.6 )

; Ship Resistance and Propultion


Modul 7 hal. 2

(parametric design hal 11-27)

; untuk mesin di after


Mesin yang SFOC yang Fuel Oil Consumption
SLOC (g/kW/hr)
memungkinkan memungkinkan (ton)

1 1 103 Err:509
1 1 235 Err:509
1 1 184 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1 1 188 Err:509
1.0 1 189 Err:509
0.6 1 191 Err:509
0.6 1 190 Err:509

0.6 1 192 Err:509

0.7 1 189 Err:509


1.0 1 191 Err:509
0.8 1 190 Err:509
0.7 1 192 Err:509
0.7 1 189 Err:509
1.0 1 191 Err:509
1.0 1 190 Err:509
0.8 1 192 Err:509
0.7 1 188 Err:509
0.7 1 185 Err:509
0.7 1 185 Err:509
1.0 1 187 Err:509
0.8 1 185 Err:509
0.8 1 185 Err:509
1.0 1 189 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1.0 1 195 Err:509
1.0 1 194 Err:509
0.8 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
0.8 1 194 Err:509
0.8 1 196 Err:509
0.9 1 196 Err:509
1.0 1 196 Err:509
0.9 1 194 Err:509
0.9 1 194 Err:509
1.0 1 194 Err:509
0.9 1 194 Err:509
0.9 1 189 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.1 1 189 Err:509
1.1 1 192 Err:509
1.1 1 194 Err:509

Mesin yang SFOC yang Fuel Oil Consumption


SLOC (g/kW/hr)
memungkinkan memungkinkan (ton)

1.1 0 0 Err:509
1.1 0 0 Err:509
1.0 0 0 Err:509
1.0 1 206.6 Err:509
1.1 1 229.5 Err:509
1.1 1 211.7 Err:509
1.1 1 210 Err:509
1.1 1 217 Err:509
1.0 1 209 Err:509
1.1 1 218.8 Err:509
1.1 1 218.8 Err:509
1.0 1 208 Err:509
1.1 1 215 Err:509
1.0 1 209 Err:509
1.0 1 203.8 Err:509
1.1 1 210.8 Err:509
1.0 1 203 Err:509
1.1 1 210.4 Err:509
1.0 1 207 Err:509
1.0 1 207.2 Err:509
1.0 1 209 Err:509
1.0 1 206.6 Err:509
1.1 1 218.8 Err:509
1.1 1 218.8 Err:509
1.1 1 210 Err:509
1.0 1 209 Err:509
1.0 1 208 Err:509
1.0 1 209 Err:509
1.1 1 217 Err:509
1.1 1 215 Err:509
Chemical Tanker
= Err:509
= Err:509
= Err:509
Err:509
= Err:509

tarif
Rp 60 Per GT/Kunjungan

Rp 49 per GT/Etmal

Rp 117,150 per GT/Kapal/Gerakan


Rp 53 per GT/Kapal/Gerakan
1743 GT
Rp 144,000 per Kapal yang Ditunda/Jam
Rp 2 per GT/Kapal yang Ditunda/Jam

total

tarif
Err:509 Per GT/Kunjungan

Err:509 per GT/Etmal

Err:509 per GT/Kapal/Gerakan


Err:509 per GT/Kapal/Gerakan
1743 GT
Err:509 per Kapal yang Ditunda/Jam
Err:509 per GT/Kapal yang Ditunda/Jam

total

/ton

/tahun
Fuel Oil
Biaya ME
Consumption (liter)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Fuel Oil
Biaya AE
Consumption (liter)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun

total
17,152,578.51

14,122,289.64

19,212,600.00
30,188,538.17

Rp 23,616,000
686,103.14

Rp 104,978,109.46

total
Err:509

Err:509

Err:509
Err:509

Err:509
Err:509

Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :

MCR Mesin ME :
BHP

Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mesin

MCR Mesin AE :
BHP

Mesin :
No. Urut Mesin
Merk
Type

Daya Mesin Yang Digunakan :


Daya

Konsumsi Bahan Bakar :


SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mensin
Berat Mesin
(ton)

1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509

Berat Mesin

(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
Chemical Tanker

Capital Cost Err:509


Operating Cost Err:509
Voyage Cost Err:509
Cargo Handling Cost Rp -
TOTAL COST Err:509

Unit Cost Rp -

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 1063.65 Kw
= 1446.13 HP

Err:509
= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton

= 265.91 Kw
= 361.53 HP

= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =

/ton

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
1595.47
398.87
lti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509

Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam

Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN

Input Data :
D= 2.836

n= 110
Z= 4
AE/AO = 0.40
PD = 888
PB = Err:509

PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=

Gearbox

Wgear =

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Shafting
𝑑s =

l =
=
=
=

M 
  =
 l 
=

M =
=

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Propeller

K =
=
=

Wprop =
=
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176

Electrical Units

Wagg =
P = PB
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176

Other Weight

Wot =
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177

Weight Total =
=

Titik Berat Machinery

hdb =
=
=
BKI Vol II. Bab 24 -3.3

KG =
=

Chapter 11 Parametric Design - M.G. Parson ; page 11-25

LCB =
=
=

LCGM =
=

LCGFP =
=
BERAT BAJA

Input Data :
m L

H
buah B
T

kW (Delivery Power at Propeller) FN


kW (Brake Horse Power) CSO Bulk Carrier

CKG Bulk Carriers

PERHITUNGAN :

Berat Mesin Induk 1. Volume Forecastle (VFC)


ton Panjang Forecastle (ℓFC)
Err:509
Lebar Forecastle (bFC)
Berat Mesin Genset
ton Tinggi Forecastle (tFC)
0.5
Volume Forecastle (VFC)

2. Volume Poop (VPO)


 PB 
( 0.34 ~ 0.4 ) ton Panjang Poop (ℓPO)
 n 
Err:509 ton Lebar Poop (bPO)
hneekluth Vol 2. hal 175
Tinggi Poop (tPO)
Volume Poop (VPO)

Diameter Poros Propeller


1/ 3 Volume Superstructure (VA)
 PD 
11,5*  
 n 
23.1 cm 1. Volume Layer 2 (VDH2)
Panjang Layer 2 (ℓDH2)
Panjang Poros Propeller
2,13 m untuk area di ceruk buritan Lebar Layer 2 (bDH2)
1,8 m untuk area gangway
3.93 m Tinggi Layer 2 (tDH2)
Volume Layer 2 (VDH2)

Berat poros / panjang poros


2/3 2. Volume Layer 3 (VDH3)
 PD 
0.081   Panjang Layer 3 (ℓDH3)
 n 
0.3 ton/m Lebar Layer 3 (bDH3)

Berat Poros Propeller Tinggi Layer 3 (tDH3)


M  Volume Layer 3 (VDH3)
 l
 l 
1.3 Ton
hneekluth Vol 2. hal 175 3. Volume Layer 4 (VDH4)
Panjang Layer 4 (ℓDH4)

Lebar Layer 4 (bDH4)

Koefisien Fixed Propeller


(𝑑s/𝐷)∙(1.85∙𝐴𝐸/𝐴𝑂)−((𝑧−2)/100) Tinggi Layer 4 (tDH4)

0.040 Volume Layer 4 (VDH4)

Berat Propeler
D3 · K 4. Volume Anjungan (VAN)

0.92 t/m3 Panjang Anjungan (ℓAN)

hneekluth Vol 2. hal 175-176 Lebar Anjungan (bAN)

Tinggi Anjungan (tAN)


Volume Anjungan (VAN)
0.001P (15 + 0.; P=Pb

Err:509 Ton Volume Deck House (VDH)

hneekluth Vol 2. hal 176

DA

0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U

Tinggi Double bottom CS

B/15
0.7 m
T
WST
hdb+0.35∙(H−hdb)

2.5 m

on ; page 11-25 CKG

Panjang Ceruk Buritan KG


4% · LPP

3.4 m
LCG(%)

(-0,5 . Lpp ) + LCB +5


-34.3 m LCGM

-LCGm + ( 0,5.Lpp) LCGFP


77.1 m
Input Data :
= 85.47 m

= 5.74 m
= 10.95 m
= 4.54 m

= 0.19
= 0.0752

0.52 – 0.54

Volume Superstructure (VA)


ecastle (VFC)
ecastle (ℓFC) = 10,5% · LPP
= 8.97 m
= selebar kapal
= 10.95 m
= 2.5 m
ecastle (VFC) = 0.5 · ℓFC · bFC · tFC
= 122.81 m3

= 17,2% · LPP
= 14.70 m
= selebar kapal
= 10.95 m
= 2.5 m
= ℓPO · bPO · tPO
= 402.34 m3
tructure (VA) = VFC + VPO
= 525.14 m3
Volume Deck House (VDH)

= 16,1 % · L
= 13.8 m
= B-4
= 6.95 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 238.99 m3

er 3 (VDH3)
= 11,5 % · L
= 9.83 m
= B-4
= 6.95 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 170.71 m3

er 4 (VDH4)
= 8,5 % · L
= 7 m
= B-4
= 6.95 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4

= 126.18 m3

ungan (VAN)

= 7%·L
= 6.0 m
= B- 8
= 2.95 m
= 2.5 m
= ℓAN · bAN · tAN
44.08 m3

House (VDH) = VDH2 + VDH3 + VDH4 + VAN


= 579.95 m3

Berat Baja (WST)


= Tinggi Kapal Setelah Dikoreksi dengan Superstucture dan Deck House
= H+(VA+VDH)/(LPP∙B)
= 6.92 m

= 0.0752 t/m3

= Berat Kapal
= 3552.00 ton

= log⁡〖∆ /100 〗
= 1.55

CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11
Total Berat Baja
= LPP · B · DA · CS
= 727.08 ton

Titik Berat Baja


= Koefisien KG Baja
= 0.54
= DA * CKG
= 3.74 m

= -0,15 + LCB(%)
= 1.688 %L
= LCG(%) · LPP
= 1.442 m
= 0.5 · LPP - LCGM
= 41.29 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN

Grup III (Accommodation)


The specific volumetric and unit area weights are:
For small and medium sized cargo ships :
For large cargo ships, large Bulk Carriers, etc :
Therefore, for oat, it is used :

• POOP
Lpoop = 14.70
Bpoop = 10.95
Apoop = 160.93
Wpoop = 32.19

• DECKHOUSE
Layer II
LDH II = 13.76
BDH II = 6.95
ADH II = 95.60
WDH II = 19.12

Layer IV
LDH IV = 7.27
BDH IV = 6.95
ADH IV = 50.47
WDH IV = 10.09

W Group III = 78.58

Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C

= 79.76

Equipment and Outfitting Total Weight


= 158.34

Outfit Weight Center Estimation


DA = 6.92
KGE&O = 1.02 -1.08DA

= 7.27
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 39.586
Lcb = 4.274
LCGM dr FP = 79.619
LCGM = -36.882
Lkm = 10.000

Layer II
LDH II = 13.761
WDH II = 6.947
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide

= -35.344

Layer III

LDH III = 9.830


WDH III = 6.947
LCGII = -33.378

Layer IV
LDH IV = 7.265
WDH IV = 6.947
LCGIII = -32.096

Wheelhouse
LWH = 5.983
WWH = 2.947
LCGIV = -31.455

2. LCG2 (37,5% WE&O at LCGDH)


WE&O DH = 59.378
LCGM DH = -33.339

3. LCG3 (37,5% WE&O at midship)

WE&O Midship = 59.378


midship = 0

LCGE&O (LCG di belakang midship)


= -21.723
LCGE&O (dari FP)
= 64.460
Parametric design chapter 11, hal. 11-25
BERAT CONSUMABLE & CREW

Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =

• FORECASTLE Jumlah Crew


m L = 8.97 m Cst
forecasle =
m B forecastle = 10.95 m Cdk =
m2 A forecastle = 98.24 m2 Ceng
=
ton W forecastle = 19.65 ton cadet =
Jumlah Crew (Zc) =

=
Layer III =
m LDH III = 9.83 m Modul TMK bab Consumable and Crew
m BDH III = 6.95 m CC&E =
m2 ADH III = 68.28 m2 WC&E =
ton WDH III = 13.66 ton =
=
Wheel House Parametric design chapter 11, hal. 11-25
m LWH = 5.98 m

m BWH = 2.95 m Main Engine


m 2 AWH = 17.63 m 2
Fuel Oil
ton WWH = 3.53 ton SFR
=
MCR =
ton Margin
=
WFO
=

(0.18 ton / m2 < C < 0.26 ton / m2 =


[ton/m ] 2
=
(L*B*D)2/3 * C
[ton]

Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA

m Auxilary Engine
Fuel Oil
SFR =
m MCR =
m Margin =
WFO
m =
m asumsi Lmesin = 4m
=
=
m

ton

[0,5*L+(Lkm+Lcb)+0,5*Ideck] Lubricating Oil


m SFR =
MCR
=
Margin =
m WLO'
=
ton =
m

Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24

m
WFWtotal =

m WFW =
ton =
m

Provision & Store


CPR
=
ton =
m WPR
=
=

ton
m

m
UMABLE & CREW

VS = 5.66 m/s
85.47 m = 11.00 nm/jam
S
10.95 m = Err:509 nm
5.74 m
4.54 m

1.2 ; Coef. Steward (1.2 ~ 1.33)


11.5 ; Coef. Deck (11.5 ~ 14.5)
8.5 ; Coef. Engine (8.5 ~ 11 untuk diesel)
2 ; Umumnya 2 orang
C st∙Cdk∙((Lpp∙B∙H∙35)/10^5 )^(1/6) + Ceng ∙ (BHP/ 〖 10 〗 ^5)
^(1/3)+cadet

17.3 orang
17 orang
Consumable and Crew
0.17 ton/orang ; Asumsi rata-rata berat manusia
Berat Crew Total
Zc · Cc&e

2.89 ton
gn chapter 11, hal. 11-25

Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

Err:509 ton/kW h
265.912 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter
8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)
Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

0.17 ton/orang . hari


gn chapter 11, hal. 11-24

0.49 ton

WFW total + 4% · WFW total


; terdapat penambahan koreksi 4%

0.511 ton

10 kg/orang h; Koef. Provision & Store


0.000416666666667 ton/ orang jam
CP∙S/Vs ∙Zc
; Berat Provision & Store

Err:509 ton
1. LWT
Steel Weight
WST = 727.08 ton

Equipment & Outfitting Weight


WE&O = 158.34 ton

Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton

GROSS TONAGE
Input Data
H = 5.74 m
T = 4.54 m
VPO = 402.34 m3
VFC = 122.81 m3
VDH = 579.95 m3
∆ = 3551.997 ton
Zc = 17 orang
N1 = 0 orang
N2 = 0 orang

Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)

= 5210.47 m3
VH = VPO + VFC + VDH
= 1105.10 m3
V = VU + V H
= 6315.57 m3
K1 = 0.2+0.02∙log_10⁡V
= 0.28
GT = V ∙ K1

= 1743.15 m3
Duami - Medan : SPOB

No Pelabuhan Asal/Tujuan

1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan

DATA PENDUKUNG SPOB


Jumlah hari = 365
Hari Kerja = 330
Kecepatan Dinas = 8
Kecepatan Ballast = 10
Harga HFO = Rp 8,724
Harga MDO = Rp 9,000
Kecepatan Loading = 200
Kecepatan Unloading = 200
Kurs = Rp 13,000
Umur 25

DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 85.310
B = 11.026
H = 5.445
T = 4.075
GT = 1773
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 85.31
B = 11.03
H = 5.44
T = 4.07
VS = 8
= 4.1152

Freeboard = 1.37

PERBANDINGAN UKURAN UTAMA :


L/B = 7.737
B/T = 2.706
L/T = 20.936
L/16 = 5.332
B/H = 2.025
L/B 7.74 3,5 < L/B < 10
B/T 2.71 1,8 < B/T < 5
L/T 20.94 10 < L/T < 30
H>L/16 5.33 H > L/16
B/H 2.03 1,47>B/H>2,38
PERHITUNGAN FROUD
LWL = 104%LPP
= 88.72

Fn = Vs / √( g. L )
= 0.139

PERHITUNGAN KOEFISIEN UKURAN UTAMA :


Koefisien Blok (Watson & Gilfillan) :
CB = – 4.22 + 27.8 √Fn – 39.1 Fn + 46.6 Fn3
= 0.84
Koefisien Luas Midship (Series '60) :
CM = 0.977 + 0.085 (CB – 0.60)
= 1.00
Koefisien Prismatik :
Cx = Cm
Cр = Cb/Cx
= 0.84
Koefisien Bidang Garis Air ;
CWP = Cb/(0.471+(0.551*Cb))
= 0.90
Longitudinal Center of Bouyancy :
a. LCB (%) = -13,5 + 19,4 ⋅ Cp
= 2.75
b. LCB dari M = LCB % / 100 . LPP
= 2.35
c. LCB dari AP = 0.5 · LPP + LCBM
= 45.00

Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 85.31
LWL = 88.72
B = 11.03
H = 5.44
T = 4.07
Vs = 4.12

Perhitungan Viscous Resistance

Cfo (Friction Coefficient - ITTC 1957)


𝜇/𝑟
v= = 1.188 x 10-6 m2/s (for salt water)
(kinematic viscosity)

(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)

=
307,251,950.6
Cfo =〖 (log⁡〖𝑅𝑛 − 2) 〗〗 ^2
0.075/

= 0.00178

• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =

= 0.212
〖𝐿𝑤𝑙〗 ^3/𝛻 209.76
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =

= 1.253

• Wetted Surface Area


Amid= Cm . B . T
ABT = 1.000 ---> tidak menggunakan
(luas Bulb di depan FP)

𝐿(2𝑇+𝐵) 〖𝐶 _𝑀 〗 ^0.5 (0.4530+0.4425 𝐶_𝐵−0.2862 𝐶_𝑀−0.003467 𝐵/𝑇+0.3696 𝐶_𝑊𝑃 )


+2.38 𝐴_𝐵𝑇/𝐶_𝐵 S=

= 1462.265 m2

• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆

= 28.345 kN

Perhitungan Resistance of Appendages

• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)

= 12.166
Lkeel = 0.6.Cb.Lwl Hkeel =
= 44.464 =
Sapp = Srudder + Sbilge Keel

= 62.561
• Stot = S + Sapp
= 1524.826
Harga (1 + k2) ---> PNA Vol II hlm. 92

Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome

+ k2〖𝑆
(1(∑▒ _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )

= 1.400

• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=

= 1.259
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =

= 29.700 kN

Perhitungan Wave Making Resistance

• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =

= 41.5312
B/L = 0.124
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.124
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1

= 1.358

• Harga C2 ---> PNA Vol II hlm. 92


A BT γ B
e 1.89
C2 = BT  γ B  i 
---> menggunakan Bulb
=1
• Harga C3 ---> PNA Vol II hlm. 93
C3 = 1 - 0.8 AT (B.T.CM) ---> AT = 0 ( luas transom saat kecepatan
= 1.000 saat V=0 transom tidak tercelup air)
0.56∙√(ABT )

• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3

= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.143〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =

= -1.728

• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= 0.00000

• Harga λ
L/B = 8.047
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.970

• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ⁡〖〖𝐹𝑛〗 ^(−2)) 〗

= 0.00005188

• CA (Correlation Allowance)
Tf/Lwl = 0.0459
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000544
• w (Gaya Berat)
w= ∆.g
= 33478.574 kN

• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =

= 1.73688223750268 kN

Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 38.64 kN
= 38640.07 N

• Rtotal + 15% (margin)


= 44.436 kN
Kedalaman
Volume (Ton/Thn)

Muat Bongkar LWS


103,067,600 -7
103,067,600 -9
Err:509 Err:509
Err:509 Err:509

Jarak (Nm)
hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost

ROUNDTRIP
ton > Seatime
ton Dumai - Medan =
m Medan - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Medan =
Err:509
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi sebenarnya =
m/S

KURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025

Principle of Naval Architecture Vol. II hal. 58

√Fn – 39.1 Fn + 46.6 Fn3


(Parametric Ship Design hal. 11-11)

5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)

(Parametric Ship Design hal. 11-10)

(Parametric Ship Design hal. 11-16)


(Parametric Ship Design hal. 11-19)
% Lpp

m dari M

m dari AP

Lwl . B . T .Cb
3329.46 m3
Lwl . B .T . Cb .ρ
3412.70 ton

KOEFISIEN UKURAN UTAMA :


m CB =
m CM =
m CP =
m CWP =
m Fn =
m/s Cstern =
Lcb =

m2/s (for salt water)

Practical Ship Design hlm .168

Practical Ship Design hlm .157

Pinciple of Naval Architecture Vol II hlm. 91


Pinciple of Naval Architecture Vol II hlm. 91

10% Amidship

3696 𝐶_𝑊𝑃 )

Pinciple of Naval Architecture Vol II hlm. 90

faktor tipe kapal (umum)


faktor tipe kemudi (umum)
faktor tipe profil kemudi (NACA)
faktor letak baling-baling
---> BKI Vol II hlm 14-2

0.18/(Cb-0.2) SBilge Keel = 4.Lkeel.HKeel


0.283 = 50.395
Value of 1+k2
--> (1+k2)=
1.3 to 1.5 1.4
2.8
1.5 to 2.0
3.0
2.0
1.4
2.8
2.0
2.7

_𝑖 〗 )/(∑▒𝑆_𝑖 )

Pinciple of Naval Architecture Vol II hlm. 90

〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3

〗 ^(−1.3757)
〗 ^(−1.3757)

luas transom saat kecepatan 0,


dak tercelup air)

Principle of Naval Architecture Vol II hlm. 92

---> untuk Cp < 0.8

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

---> untuk Tf/Lwl >0.04


/𝑊 𝑊
Konsumsi
Maksimum Utility IT+WT+AT Batubara

BOR SOR/YOR Jam/call ton/hari


60% 70% 6 282,377
60% 70% 4 282,377
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Dumai Medan Jakarta Surabaya


- Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509
Err:509 Err:509 - 386
Err:509 Err:509 386 -
min max
= 7.74 3.5 10
= 2.71 1.8 5
= 20.94 10 30
= 2.03 1.47 2.38
= Rp -

ROUNDTRIP Load Factor Kapal 90%


Utilitas Alat 67%
Err:509 jam Kecepatan Alat 300 ton/hour
Err:509 jam
Err:509 jam
Err:509 hari

6 jam
0.25 hari
4 jam
0.17 hari

Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
0 kali

ciple of Naval Architecture Vol. I hal. 19


ciple of Naval Architecture Vol. I hal. 19
ciple of Naval Architecture Vol. I hal. 19
Vol. II Tahun 2006
ciple of Naval Architecture Vol. I hal. 19

m/s²
≤ Fn ≤ 0,3
ton/m3

ametric Ship Design hal. 11-11)

ametric Ship Design hal. 11-12)

ametric Ship Design hal. 11-10)

ametric Ship Design hal. 11-16)


ametric Ship Design hal. 11-19)

0.84
1.00
0.84
0.90
0.139488921494948
0
2.35 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0

Perhitungan Awal :
1+k
CF
CA

CV
Principle of Naval Architecture Vol.

Principle of Naval Architecture Vol.

t
Principle of Naval Architecture Vol.

Va

Principle of Naval Architecture Vol.


Chapter 11 Parametric Design - M.G

Effective Horse Power (EHP) :


PE

Chapter 11 Parametric Design - M.G

Thrust Horse Power (THP) :


PT

Chapter 11 Parametric Design - M.G

Propulsive Coefficient Calculation :


ηH

Chapter 11 Parametric Design - M.G

ηO
ηr

ηD

Delivered Horse Power (DHP) :


PD

Chapter 11 Parametric Design - M.G

Shaft Horse Power (SHP) :


ηS

PS

Chapter 11 Parametric Design - M.G

Brake Horse Power Calculation (BHP) :


ηR

PB0

Chapter 11 Parametric Design - M.G


Koreksi MCR
PB
BHP

Chapter 11 Parametric Design - M.G


MAIN ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

AUXILARY ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL
Perhitungan Harga Kapal
Input Data
WST = 700.031 Ton
WE&O = 156.499 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja

= $ 770,033.81
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 172,149.07
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509

Harga = Biaya + Keuntungan + Inflasi + Pajak


= Err:509
= Err:509
= Err:509 /tahun

BIAYA OPERASIONAL

Gaji Crew = Err:509 /tahun


Jumlah Crew = 17 Orang
Gaji Per Crew/Bulan = Rp 10,000,000.00
Repair & Maintenance = 3% dari harga kapal
= Err:509 /tahun
Asuransi Kapal = 1,5% dari harga kapal
= Err:509 /tahun
Supplies Crew = Rp 50,000.00 /orang/hari
= Err:509 /tahun
Dokumen & Administrasi = Rp 5,000,000.00 /trip
= Err:509

Total = Err:509 /tahun


AN PROPULSI & DAYA MESIN :

= 88.72 m P/D

= 11.03 m D
= 5.44 m z
= 4.07 m nrpm

= 0.13948892149495 nrps

= 3329.46 m3 Cb
= 3412.70 ton Vs

= 0.4 RT

= 1.26
= 0.0018
= 0.00054

= (1+ k) CF + CA
= 0.0028
ciple of Naval Architecture Vol. II hal. 162

= 0.3 Cb + 10 Cv Cb - 0.1
= 0.17
ciple of Naval Architecture Vol. II hal. 163

= 0.1 ; thrust deduction friction


ciple of Naval Architecture Vol. II hal. 163

= V (1 - w) ; Speed of Advantages
= 3.40
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27

Power (EHP) :
= RT.Vs
= 182.86 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27

wer (THP) :
= PE∙(1−w)/(1−t)
= 167.85 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29

ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.09
pter 11 Parametric Design - M.G. Parson ; page 11-29

= Open Water Test Propeller Efficiency


= (J/(2∙n))∙(KT/KQ)
= 0.6
= Rotative Efficiency
= 0.985

= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591

Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 309.41 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 315.73 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer Calculation (BHP) :


= Reduction Gear Efficiency
= 0.98
= Brake Horse Power (BHP0)
= PS/ηR
= 322.17 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
= 15% ∙ PB0
= 115% ∙ PB0 = BHP
= 370.50 Kw
= BHP ∙ 1.3596 HP
= 503.73 HP
pter 11 Parametric Design - M.G. Parson ; page 11-30
Merek Tipe Daya (kW) SFOC (g/kW/hr)

CUMMINS NTA855-M400 298 103


CATERPILLAR 3208 325 235
CUMMINS KTTA 19-M3 447 184
YUCHAI YC6C670L 492 195
YUCHAI YC6C700L 515 195
YUCHAI YC6C730L 536 195
YUCHAI YC6C865L 636 195
YUCHAI YC6C925L 680 195
YUCHAI YC6C960L 706 195
YUCHAI YC6CL1035L 760 195
MAN B&W 6L23/30A-E 800 188
MAN B&W 6L23/30A 960 189
CATERPILLAR 6M20C 1020 191
CATERPILLAR 6M20C 1080 190
CATERPILLAR 6M20C 1140 192
CATERPILLAR 6M20C 1200 189
MAN B&W 8L23/30A 1280 191
MAN B&W 6L21/31 1290 190
CATERPILLAR 8M20C 1360 192
CATERPILLAR 8M20C 1440 189
MAN B&W 6L28/32A 1470 191
MAN B&W 5L27/38 1500 190
MAN B&W 7L21/31 1505 192
CATERPILLAR 8M20C 1520 188
CATERPILLAR 9M20C 1530 185
CATERPILLAR 8M20C 1600 185
MAN B&W 5L27/38 1600 187
CATERPILLAR 9M20C 1620 185
CATERPILLAR 9M20C 1710 185
MAN B&W 7L28/32A 1715 189
MAN B&W 8L21/31 1720 195
CATERPILLAR 9M20C 1800 195
MAN B&W 9L21/31 1935 195
MAN B&W 8L28/32A 1960 195
MAN B&W 6L27/38 1980 194
CATERPILLAR 6M25C 2000 194
MAN B&W 9L28/32A 2205 194
MAN B&W 7L27/38 2310 194
CATERPILLAR 8M25C 2320 194
CATERPILLAR 8M25C 2400 196
CATERPILLAR 9M25C 2610 196
MAN B&W 8L27/38 2640 196
CATERPILLAR 8M25C 2666 194
CATERPILLAR 9M25C 2700 194
MAN B&W 9L27/38 2970 194
CATERPILLAR 9M25C 3000 194
MAN B&W 3000 189
MAN B&W 3500 195
MAN B&W 4000 195
MAN B&W 4500 195
MAN B&W 5000 195
MAN B&W 5500 194
MAN B&W 6000 194
MAN B&W 6500 194
MAN B&W 7000 194
MAN B&W 7500 189
MAN B&W 8000 192
MAN B&W 8500 194

LARY ENGINE

Merek Tipe Daya (kW) SFOC (g/kW/hr)

CATERPILLAR C9 217 212.1


CATERPILLAR C9 253 228.8
CATERPILLAR C9 253 209
CATERPILLAR C9 288 206.6
CATERPILLAR C9 311 229.5
CATERPILLAR C9 361 211.7
CATERPILLAR C18 404 210
CATERPILLAR C18 499 217
CATERPILLAR C18 514 209
CATERPILLAR C15 536 218.8
CATERPILLAR C15 540 218.8
CATERPILLAR C18 587 208
CATERPILLAR C18 624 215
CATERPILLAR C18 660 209
CATERPILLAR C32 791 203.8
CATERPILLAR C32 916 210.8
CATERPILLAR C32 923 203
CATERPILLAR C32 1047 210.4
CATERPILLAR C32 1172 207
CATERPILLAR C32 1333 207.2
CATERPILLAR C33 1500 209
CATERPILLAR C34 1700 206.6
CATERPILLAR C35 2153 218.8
CATERPILLAR C36 2337 218.8
CATERPILLAR C37 2745 210
CATERPILLAR C38 3000 209
CATERPILLAR C39 3254 208
CATERPILLAR C40 3559 209
CATERPILLAR C41 3749 217
CATERPILLAR C42 4000 215
BIAYA PERJALANAN :

Biaya bahan bakar:


1 > Main Engine

2 > Aux. Engine

Total

BIAYA PELABUHAN :

Pelabuhan Dumai
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal =
Tarif Tetap =
Tarif Variabel =

total

Pelabuhan Medan
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal <=
Tarif Tetap =
Tarif Variabel =

total

BIAYA BONGKAR MUAT:


Tarif Bongkar muat = Rp 30,000

>> Muat = Rp -
>> Bongkar = Rp -
Total = Rp -
= 1.00
= 2.55
= 4.00
= 110
= 1.83
= 0.84
= 4.12 m/s
= 44.44 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2

(parametric design hal 11-27)

; untuk mesin di after


Mesin yang SFOC yang
SLOC (g/kW/hr) Fuel Oil Consumption (ton)
memungkinkan memungkinkan

1 0 0 Err:509
1 0 0 Err:509
1 1 184 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1 1 188 Err:509
1.0 1 189 Err:509
0.6 1 191 Err:509
0.6 1 190 Err:509

0.6 1 192 Err:509

0.7 1 189 Err:509


1.0 1 191 Err:509
0.8 1 190 Err:509
0.7 1 192 Err:509
0.7 1 189 Err:509
1.0 1 191 Err:509
1.0 1 190 Err:509
0.8 1 192 Err:509
0.7 1 188 Err:509
0.7 1 185 Err:509
0.7 1 185 Err:509
1.0 1 187 Err:509
0.8 1 185 Err:509
0.8 1 185 Err:509
1.0 1 189 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1.0 1 195 Err:509
1.0 1 194 Err:509
0.8 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
0.8 1 194 Err:509
0.8 1 196 Err:509
0.9 1 196 Err:509
1.0 1 196 Err:509
0.9 1 194 Err:509
0.9 1 194 Err:509
1.0 1 194 Err:509
0.9 1 194 Err:509
0.9 1 189 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.1 1 189 Err:509
1.1 1 192 Err:509
1.1 1 194 Err:509

Mesin yang SFOC yang


SLOC (g/kW/hr) Fuel Oil Consumption (ton)
memungkinkan memungkinkan

1.1 1 212.1 Err:509


1.1 1 228.8 Err:509
1.0 1 209 Err:509
1.0 1 206.6 Err:509
1.1 1 229.5 Err:509
1.1 1 211.7 Err:509
1.1 1 210 Err:509
1.1 1 217 Err:509
1.0 1 209 Err:509
1.1 1 218.8 Err:509
1.1 1 218.8 Err:509
1.0 1 208 Err:509
1.1 1 215 Err:509
1.0 1 209 Err:509
1.0 1 203.8 Err:509
1.1 1 210.8 Err:509
1.0 1 203 Err:509
1.1 1 210.4 Err:509
1.0 1 207 Err:509
1.0 1 207.2 Err:509
1.0 1 209 Err:509
1.0 1 206.6 Err:509
1.1 1 218.8 Err:509
1.1 1 218.8 Err:509
1.1 1 210 Err:509
1.0 1 209 Err:509
1.0 1 208 Err:509
1.0 1 209 Err:509
1.1 1 217 Err:509
1.1 1 215 Err:509
SPOB
= Err:509
= Err:509
= Err:509
Err:509
= Err:509

tarif
Rp 60 Per GT/Kunjungan

Rp 49 per GT/Etmal

Rp 117,150 per GT/Kapal/Gerakan


Rp 53 per GT/Kapal/Gerakan
1773 GT
Rp 144,000 per Kapal yang Ditunda/Jam
Rp 2 per GT/Kapal yang Ditunda/Jam

total

tarif
Err:509 Per GT/Kunjungan

Err:509 per GT/Etmal

Err:509 per GT/Kapal/Gerakan


Err:509 per GT/Kapal/Gerakan
1773 GT
Err:509 per Kapal yang Ditunda/Jam
Err:509 per GT/Kapal yang Ditunda/Jam

total

/ton

/tahun
Fuel Oil
Biaya ME
Consumption (liter)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Fuel Oil
Biaya AE
Consumption (liter)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun

total
-

-
-

Rp -
-

Rp -

total
Err:509

Err:509

Err:509
Err:509

Err:509
Err:509

Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :

MCR Mesin ME :
BHP

Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mesin

MCR Mesin AE :
BHP

Mesin :
No. Urut Mesin
Merk
Type

Daya Mesin Yang Digunakan :


Daya

Konsumsi Bahan Bakar :


SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mensin
Berat Mesin
(ton)

1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509

Berat Mesin

(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
SPOB

Capital Cost Err:509


Operating Cost Err:509
Voyage Cost Err:509
Cargo Handling Cost Rp -
TOTAL COST Err:509

Unit Cost Rp -

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 370.50 Kw
= 503.73 HP

Err:509
= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton

= 92.62 Kw
= 125.93 HP

= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =

/ton

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
555.75
138.94
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509

Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam

Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN

Input Data :
D= 2.547

n= 110
Z= 4
AE/AO = 0.40
PD = 309
PB = Err:509

PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=

Gearbox

Wgear =

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Shafting
𝑑s =

l =
=
=
=

M 
  =
 l 
=

M =
=

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Propeller

K =
=
=

Wprop =
=
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176

Electrical Units

Wagg =
P = PB
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176

Other Weight

Wot =
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177

Weight Total =
=

Titik Berat Machinery

hdb =
=
=
BKI Vol II. Bab 24 -3.3

KG =
=

Chapter 11 Parametric Design - M.G. Parson ; page 11-25

LCB =
=
=

LCGM =
=

LCGFP =
=
BERAT BAJA

Input Data :
m L

H
buah B
T

kW (Delivery Power at Propeller) FN


kW (Brake Horse Power) CSO Bulk Carrier

CKG Bulk Carriers

PERHITUNGAN :

Berat Mesin Induk 1. Volume Forecastle (VFC)


ton Panjang Forecastle (ℓFC)
Err:509
Lebar Forecastle (bFC)
Berat Mesin Genset
0.5 ton Tinggi Forecastle (tFC)
Volume Forecastle (VFC)

2. Volume Poop (VPO)


 PB 
( 0.34 ~ 0.4 ) ton Panjang Poop (ℓPO)
 n 
Err:509 ton Lebar Poop (bPO)
hneekluth Vol 2. hal 175
Tinggi Poop (tPO)
Volume Poop (VPO)

Diameter Poros Propeller


1/ 3 Volume Superstructure (VA)
 PD 
11,5*  
 n 
16.2 cm 1. Volume Layer 2 (VDH2)
Panjang Layer 2 (ℓDH2)
Panjang Poros Propeller
2,13 m untuk area di ceruk buritan Lebar Layer 2 (bDH2)
1,8 m untuk area gangway
3.93 m Tinggi Layer 2 (tDH2)
Volume Layer 2 (VDH2)

Berat poros / panjang poros


2/3 2. Volume Layer 3 (VDH3)
 PD 
0.081   Panjang Layer 3 (ℓDH3)
 n
0.2 ton/m Lebar Layer 3 (bDH3)

Berat Poros Propeller Tinggi Layer 3 (tDH3)


M  Volume Layer 3 (VDH3)
 l
 l 
0.6 Ton
hneekluth Vol 2. hal 175 3. Volume Layer 4 (VDH4)
Panjang Layer 4 (ℓDH4)

Lebar Layer 4 (bDH4)

Koefisien Fixed Propeller


(𝑑s/𝐷)∙(1.85∙𝐴𝐸/𝐴𝑂)−((𝑧−2)/100) Tinggi Layer 4 (tDH4)

0.027 Volume Layer 4 (VDH4)

Berat Propeler
D3 · K 4. Volume Anjungan (VAN)

0.45 t/m3 Panjang Anjungan (ℓAN)

hneekluth Vol 2. hal 175-176 Lebar Anjungan (bAN)

Tinggi Anjungan (tAN)


Volume Anjungan (VAN)
0.001P (15 + 0.; P=Pb

Err:509 Ton Volume Deck House (VDH)

hneekluth Vol 2. hal 176

DA

0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U

Tinggi Double bottom CS


B/15
0.7 m
T
WST
hdb+0.35∙(H−hdb)

2.4 m

on ; page 11-25 CKG

Panjang Ceruk Buritan KG


4% · LPP

3.4 m
LCG(%)

(-0,5 . Lpp ) + LCB +5


-34.2 m LCGM

-LCGm + ( 0,5.Lpp) LCGFP


76.9 m
Input Data :
= 85.31 m
= 5.44 m
= 11.03 m
= 4.07 m
= 0.14
= 0.0752

0.52 – 0.54

Volume Superstructure (VA)


ecastle (VFC)
ecastle (ℓFC) = 10,5% · LPP
= 8.96 m
= selebar kapal
= 11.03 m
= 2.5 m
ecastle (VFC) = 0.5 · ℓFC · bFC · tFC
= 123.46 m3

= 17,2% · LPP
= 14.67 m
= selebar kapal
= 11.03 m
= 2.5 m
= ℓPO · bPO · tPO
= 404.47 m3
tructure (VA) = VFC + VPO
= 527.93 m3
Volume Deck House (VDH)

= 16,1 % · L
= 13.7 m
= B-4
= 7.03 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 241.26 m3

er 3 (VDH3)
= 11,5 % · L
= 9.81 m
= B-4
= 7.03 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 172.33 m3
er 4 (VDH4)
= 8,5 % · L
= 7 m
= B-4
= 7.03 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4

= 127.37 m3

ungan (VAN)

= 7%·L
= 6.0 m
= B- 8
= 3.03 m
= 2.5 m
= ℓAN · bAN · tAN
45.18 m3

House (VDH) = VDH2 + VDH3 + VDH4 + VAN


= 586.13 m3

Berat Baja (WST)


= Tinggi Kapal Setelah Dikoreksi dengan Superstucture dan Deck House
= H+(VA+VDH)/(LPP∙B)
= 6.63 m

= 0.0752 t/m3

= Berat Kapal
= 3412.70 ton

= log⁡〖∆ /100 〗
= 1.53

CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11

Total Berat Baja


= LPP · B · DA · CS
= 700.03 ton

Titik Berat Baja


= Koefisien KG Baja
= 0.54
= DA * CKG
= 3.58 m

= -0,15 + LCB(%)
= 2.603 %L
= LCG(%) · LPP
= 2.221 m
= 0.5 · LPP - LCGM
= 40.43 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN

Grup III (Accommodation)


The specific volumetric and unit area weights are:
For small and medium sized cargo ships :
For large cargo ships, large Bulk Carriers, etc :
Therefore, for oat, it is used :

• POOP
Lpoop = 14.67
Bpoop = 11.03
Apoop = 161.79
Wpoop = 32.36
• DECKHOUSE
Layer II
LDH II = 13.73
BDH II = 7.03
ADH II = 96.50
WDH II = 19.30

Layer IV
LDH IV = 7.25
BDH IV = 7.03
ADH IV = 50.95
WDH IV = 10.19

W Group III = 79.25

Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C

= 77.25

Equipment and Outfitting Total Weight


= 156.50

Outfit Weight Center Estimation


DA = 6.63
KGE&O = 1.02 -1.08DA

= 6.96
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 39.125
Lcb = 4.266
LCGM dr FP = 79.457
LCGM = -36.802
Lkm = 10.000
Layer II

LDH II = 13.735
WDH II = 7.026
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide

= -35.257

Layer III

LDH III = 9.811


WDH III = 7.026
LCGII = -33.295

Layer IV
LDH IV = 7.251
WDH IV = 7.026
LCGIII = -32.015

Wheelhouse
LWH = 5.972
WWH = 3.026
LCGIV = -31.375

2. LCG2 (37,5% WE&O at LCGDH)


WE&O DH = 58.687
LCGM DH = -33.253

3. LCG3 (37,5% WE&O at midship)

WE&O Midship = 58.687


midship = 0

LCGE&O (LCG di belakang midship)


= -21.670
LCGE&O (dari FP)
= 64.325
Parametric design chapter 11, hal. 11-25
BERAT CONSUMABLE & CREW

Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =

• FORECASTLE Jumlah Crew


m L = 8.96 m Cst
forecasle =
m B forecastle = 11.03 m Cdk =
m2 A forecastle = 98.77 m2 Ceng
=
ton W forecastle = 19.75 ton cadet =
Jumlah Crew (Zc) =
=
Layer III =
m LDH III = 9.81 m Modul TMK bab Consumable and Crew
m BDH III = 7.03 m CC&E =
m2 ADH III = 68.93 m2 WC&E =
ton WDH III = 13.79 ton =
=
Wheel House Parametric design chapter 11, hal. 11-25
m LWH = 5.97 m

m BWH = 3.03 m Main Engine


m 2 AWH = 18.07 m 2
Fuel Oil
ton WWH = 3.61 ton SFR
=
MCR =
ton Margin
=
WFO
=

(0.18 ton / m2 < C < 0.26 ton / m2 =


[ton/m ] 2
=
(L*B*D) 2/3
*C
[ton]

Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA

m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m

ton

[0,5*L+(Lkm+Lcb)+0,5*Ideck] Lubricating Oil


m SFR =
MCR
=
Margin =
m WLO'
=
ton =
m

Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24

m
WFWtotal =

m WFW =
ton =
m

Provision & Store


CPR
=
ton =
m WPR
=
=

ton
m

m
UMABLE & CREW

VS = 4.12 m/s
85.31 m = 8.00 nm/jam
S
11.03 m = Err:509 nm
5.44 m
4.07 m

1.2 ; Coef. Steward (1.2 ~ 1.33)


11.5 ; Coef. Deck (11.5 ~ 14.5)
8.5 ; Coef. Engine (8.5 ~ 11 untuk diesel)
2 ; Umumnya 2 orang
C st∙Cdk∙((Lpp∙B∙H∙35)/10^5 )^(1/6) + Ceng ∙ (BHP/ 〖 10 〗 ^5)
^(1/3)+cadet
17.2 orang
17 orang
Consumable and Crew

0.17 ton/orang ; Asumsi rata-rata berat manusia


Berat Crew Total
Zc · Cc&e

2.89 ton
gn chapter 11, hal. 11-25

Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

Err:509 ton/kW h
92.624 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

0.17 ton/orang . hari


gn chapter 11, hal. 11-24

0.49 ton

WFW total + 4% · WFW total


; terdapat penambahan koreksi 4%

0.511 ton

10 kg/orang h; Koef. Provision & Store


0.000416666666667 ton/ orang jam
CP∙S/Vs ∙Zc
; Berat Provision & Store

Err:509 ton
1. LWT
Steel Weight
WST = 700.03 ton

Equipment & Outfitting Weight


WE&O = 156.50 ton

Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton

GROSS TONAGE
Input Data
H = 5.44 m
T = 4.07 m
VPO = 404.47 m3
VFC = 123.46 m3
VDH = 586.13 m3
∆ = 3412.699 ton
Zc = 17 orang
N1 = 0 orang
N2 = 0 orang

Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)

= 5307.67 m3
VH = VPO + VFC + VDH
= 1114.06 m3
V = VU + V H
= 6421.74 m3
K1 = 0.2+0.02∙log_10⁡V
= 0.28
GT = V ∙ K1

= 1773.38 m3
Duami - Medan : ITB

No Pelabuhan Asal/Tujuan

1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan

DATA PENDUKUNG ITB


Jumlah hari = 365
Hari Kerja = 330
Kecepatan Dinas = 5
Kecepatan Ballast = 7
Harga HFO = Rp 8,724
Harga MDO = Rp 9,000
Kecepatan Loading = 200
Kecepatan Unloading = 200
Kurs = Rp 13,000
Umur 25

DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 75.426
B = 12.605
H = 6.304
T = 4.766
GT = 1671
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 75.43
B = 12.61
H = 6.30
T = 4.77
VS = 5
= 2.572

Freeboard = 1.54

PERBANDINGAN UKURAN UTAMA :


L/B = 5.984
B/T = 2.645
L/T = 15.825
L/16 = 4.714
B/H = 2.000
L/B 5.98 3,5 < L/B < 10
B/T 2.64 1,8 < B/T < 5
L/T 15.82 10 < L/T < 30
H>L/16 4.71 H > L/16
B/H 2.00 1,47>B/H>2,38
PERHITUNGAN FROU
LWL = 104%LPP
= 78.44

Fn = Vs / √( g. L )
= 0.093

PERHITUNGAN KOEFISIEN UKURAN UTAMA :


Koefisien Blok (Watson & Gilfillan) :
CB = – 4.22 + 27.8 √Fn – 39.1 Fn + 46.6 Fn3
= 0.66
Koefisien Luas Midship (Series '60) :
CM = 0.977 + 0.085 (CB – 0.60)
= 0.98
Koefisien Prismatik :
Cx = Cm
Cр = Cb/Cx
= 0.67
Koefisien Bidang Garis Air ;
CWP = Cb/(0.471+(0.551*Cb))
= 0.79
Longitudinal Center of Bouyancy :
a. LCB (%) = -13,5 + 19,4 ⋅ Cp
= -0.52
b. LCB dari M = LCB % / 100 . LPP
= -0.39
c. LCB dari AP = 0.5 · LPP + LCBM
= 37.32

Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 75.43
LWL = 78.44
B = 12.61
H = 6.30
T = 4.77
Vs = 2.57

Perhitungan Viscous Resistance

Cfo (Friction Coefficient - ITTC 1957)


𝜇/𝑟
v= = 1.188 x 10-6 m2/s (for salt water)
(kinematic viscosity)

(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)

=
169,782,828.7
Cfo =〖 (log⁡〖𝑅𝑛 − 2) 〗〗 ^2
0.075/

= 0.00193

• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =

= 0.322
〖𝐿𝑤𝑙〗 ^3/𝛻 155.92
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =

= 1.198

• Wetted Surface Area


Amid= Cm . B . T
ABT = 1.000 ---> tidak menggunakan
(luas Bulb di depan FP)

𝐿(2𝑇+𝐵) 〖𝐶 _𝑀 〗 ^0.5 (0.4530+0.4425 𝐶_𝐵−0.2862 𝐶_𝑀−0.003467 𝐵/𝑇+0.3696 𝐶_𝑊𝑃 )


+2.38 𝐴_𝐵𝑇/𝐶_𝐵 S=

= 1284.238 m2

• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆

= 10.083 kN

Perhitungan Resistance of Appendages

• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)

= 12.583
Lkeel = 0.6.Cb.Lwl Hkeel =
= 30.916 =
Sapp = Srudder + Sbilge Keel

= 61.305
• Stot = S + Sapp
= 1345.543
Harga (1 + k2) ---> PNA Vol II hlm. 92

Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome

+ k2〖𝑆
(1(∑▒ _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )

= 1.400

• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=

= 1.208
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =

= 10.646 kN

Perhitungan Wave Making Resistance

• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =

= 17.7289
B/L = 0.161
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.161
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1

= 2.125

• Harga C2 ---> PNA Vol II hlm. 92


A BT γ B
e 1.89
C2 = BT  γ B  i 
---> menggunakan Bulb
=1
• Harga C3 ---> PNA Vol II hlm. 93
C3 = 1 - 0.8 AT (B.T.CM) ---> AT = 0 ( luas transom saat kecepatan
= 1.000 saat V=0 transom tidak tercelup air)
0.56∙√(ABT )

• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3

= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.290〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =

= -2.155

• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= 0.00000

• Harga λ
L/B = 6.223
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.781

• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ⁡〖〖𝐹𝑛〗 ^(−2)) 〗

= 0.00000002

• CA (Correlation Allowance)
Tf/Lwl = 0.0608
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000568
• w (Gaya Berat)
w= ∆.g
= 31127.927 kN

• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =

= 0.000729657889838 kN

Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 13.24 kN
= 13236.00 N

• Rtotal + 15% (margin)


= 15.221 kN
Kedalaman
Volume (Ton/Thn)

Muat Bongkar LWS


103,067,600 -7
103,067,600 -9
Err:509 Err:509
Err:509 Err:509

Jarak (Nm)
hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost

ROUNDTRIP
ton > Seatime
ton Dumai - Medan =
m Medan - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Medan =
Err:509
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi sebenarnya =
m/S

UKURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025

Principle of Naval Architecture Vol. II hal. 58

√Fn – 39.1 Fn + 46.6 Fn3


(Parametric Ship Design hal. 11-11)

5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)

(Parametric Ship Design hal. 11-10)

(Parametric Ship Design hal. 11-16)


(Parametric Ship Design hal. 11-19)
% Lpp

m dari M

m dari AP

Lwl . B . T .Cb
3095.69 m3
Lwl . B .T . Cb .ρ
3173.08 ton

KOEFISIEN UKURAN UTAMA :


m CB =
m CM =
m CP =
m CWP =
m Fn =
m/s Cstern =
Lcb =

m2/s (for salt water)

Practical Ship Design hlm .168

Practical Ship Design hlm .157

Pinciple of Naval Architecture Vol II hlm. 91


Pinciple of Naval Architecture Vol II hlm. 91

10% Amidship

3696 𝐶_𝑊𝑃 )

Pinciple of Naval Architecture Vol II hlm. 90

faktor tipe kapal (umum)


faktor tipe kemudi (umum)
faktor tipe profil kemudi (NACA)
faktor letak baling-baling
---> BKI Vol II hlm 14-2

0.18/(Cb-0.2) SBilge Keel = 4.Lkeel.HKeel


0.394 = 48.722
Value of 1+k2
--> (1+k2)=
1.3 to 1.5 1.4
2.8
1.5 to 2.0
3.0
2.0
1.4
2.8
2.0
2.7

_𝑖 〗 )/(∑▒𝑆_𝑖 )

Pinciple of Naval Architecture Vol II hlm. 90

〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3

〗 ^(−1.3757)
〗 ^(−1.3757)

luas transom saat kecepatan 0,


dak tercelup air)

Principle of Naval Architecture Vol II hlm. 92

---> untuk Cp < 0.8

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

---> untuk Tf/Lwl >0.04


/𝑊 𝑊
Konsumsi
Maksimum Utility IT+WT+AT Batubara

BOR SOR/YOR Jam/call ton/hari


60% 70% 6 282,377
60% 70% 4 282,377
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Dumai Medan Jakarta Surabaya


- Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509
Err:509 Err:509 - 386
Err:509 Err:509 386 -
min max
= 5.98 3.5 10
= 2.64 1.8 5
= 15.82 10 30
= 2.00 1.47 2.38
= Rp -

ROUNDTRIP Load Factor Kapal 90%


Utilitas Alat 67%
Err:509 jam Kecepatan Alat 200 ton/hour
Err:509 jam
Err:509 jam
Err:509 hari

6 jam
0.25 hari
4 jam
0.17 hari

Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
0 kali

ciple of Naval Architecture Vol. I hal. 19


ciple of Naval Architecture Vol. I hal. 19
ciple of Naval Architecture Vol. I hal. 19
Vol. II Tahun 2006
ciple of Naval Architecture Vol. I hal. 19

m/s²
≤ Fn ≤ 0,3
ton/m3

ametric Ship Design hal. 11-11)

ametric Ship Design hal. 11-12)

ametric Ship Design hal. 11-10)

ametric Ship Design hal. 11-16)


ametric Ship Design hal. 11-19)

0.66
0.98
0.67
0.79
0.092717173635863
0
-0.39 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0

Perhitungan Awal :
1+k
CF
CA

CV
Principle of Naval Architecture Vol.

Principle of Naval Architecture Vol.

t
Principle of Naval Architecture Vol.

Va

Principle of Naval Architecture Vol.


Chapter 11 Parametric Design - M.G

Effective Horse Power (EHP) :


PE

Chapter 11 Parametric Design - M.G

Thrust Horse Power (THP) :


PT

Chapter 11 Parametric Design - M.G

Propulsive Coefficient Calculation :


ηH

Chapter 11 Parametric Design - M.G

ηO
ηr

ηD

Delivered Horse Power (DHP) :


PD

Chapter 11 Parametric Design - M.G

Shaft Horse Power (SHP) :


ηS

PS

Chapter 11 Parametric Design - M.G

Brake Horse Power Calculation (BHP) :


ηR

PB0

Chapter 11 Parametric Design - M.G


Koreksi MCR
PB
BHP

Chapter 11 Parametric Design - M.G


MAIN ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

AUXILARY ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL
Perhitungan Harga Kapal
Input Data
WST = 805.738 Ton
WE&O = 170.213 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja

= $ 886,311.69
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 187,234.84
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509

Harga = Biaya + Keuntungan + Inflasi + Pajak


= Err:509
= Err:509
= Err:509 /tahun

BIAYA OPERASIONAL

Gaji Crew = Err:509 /tahun


Jumlah Crew = 8 Orang
Gaji Per Crew/Bulan = Rp 10,000,000.00
Repair & Maintenance = 3% dari harga kapal
= Err:509 /tahun
Asuransi Kapal = 1,5% dari harga kapal
= Err:509 /tahun
Supplies Crew = Rp 50,000.00 /orang/hari
= Err:509 /tahun
Dokumen & Administrasi = Rp 5,000,000.00 /trip
= Err:509

Total = Err:509 /tahun


AN PROPULSI & DAYA MESIN :

= 78.44 m P/D

= 12.61 m D
= 6.30 m z
= 4.77 m nrpm

= 0.09271717363586 nrps

= 3095.69 m3 Cb
= 3173.08 ton Vs

= 0.4 RT

= 1.21
= 0.0019
= 0.00057

= (1+ k) CF + CA
= 0.0029
ciple of Naval Architecture Vol. II hal. 162

= 0.3 Cb + 10 Cv Cb - 0.1
= 0.12
ciple of Naval Architecture Vol. II hal. 163

= 0.1 ; thrust deduction friction


ciple of Naval Architecture Vol. II hal. 163

= V (1 - w) ; Speed of Advantages
= 2.27
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27

Power (EHP) :
= RT.Vs
= 39.15 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27

wer (THP) :
= PE∙(1−w)/(1−t)
= 38.45 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29

ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.02
pter 11 Parametric Design - M.G. Parson ; page 11-29

= Open Water Test Propeller Efficiency


= (J/(2∙n))∙(KT/KQ)
= 0.6
= Rotative Efficiency
= 0.985

= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591

Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 66.24 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 67.59 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer Calculation (BHP) :


= Reduction Gear Efficiency
= 0.98
= Brake Horse Power (BHP0)
= PS/ηR
= 68.97 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
= 15% ∙ PB0
= 115% ∙ PB0 = BHP
= 79.32 Kw
= BHP ∙ 1.3596 HP
= 107.84 HP
pter 11 Parametric Design - M.G. Parson ; page 11-30
Merek Tipe Daya (kW) SFOC (g/kW/hr)

CUMMINS NTA855-M400 298 103


CATERPILLAR 3208 325 235
CUMMINS KTTA 19-M3 447 184
YUCHAI YC6C670L 492 195
YUCHAI YC6C700L 515 195
YUCHAI YC6C730L 536 195
YUCHAI YC6C865L 636 195
YUCHAI YC6C925L 680 195
YUCHAI YC6C960L 706 195
YUCHAI YC6CL1035L 760 195
MAN B&W 6L23/30A-E 800 188
MAN B&W 6L23/30A 960 189
CATERPILLAR 6M20C 1020 191
CATERPILLAR 6M20C 1080 190
CATERPILLAR 6M20C 1140 192
CATERPILLAR 6M20C 1200 189
MAN B&W 8L23/30A 1280 191
MAN B&W 6L21/31 1290 190
CATERPILLAR 8M20C 1360 192
CATERPILLAR 8M20C 1440 189
MAN B&W 6L28/32A 1470 191
MAN B&W 5L27/38 1500 190
MAN B&W 7L21/31 1505 192
CATERPILLAR 8M20C 1520 188
CATERPILLAR 9M20C 1530 185
CATERPILLAR 8M20C 1600 185
MAN B&W 5L27/38 1600 187
CATERPILLAR 9M20C 1620 185
CATERPILLAR 9M20C 1710 185
MAN B&W 7L28/32A 1715 189
MAN B&W 8L21/31 1720 195
CATERPILLAR 9M20C 1800 195
MAN B&W 9L21/31 1935 195
MAN B&W 8L28/32A 1960 195
MAN B&W 6L27/38 1980 194
CATERPILLAR 6M25C 2000 194
MAN B&W 9L28/32A 2205 194
MAN B&W 7L27/38 2310 194
CATERPILLAR 8M25C 2320 194
CATERPILLAR 8M25C 2400 196
CATERPILLAR 9M25C 2610 196
MAN B&W 8L27/38 2640 196
CATERPILLAR 8M25C 2666 194
CATERPILLAR 9M25C 2700 194
MAN B&W 9L27/38 2970 194
CATERPILLAR 9M25C 3000 194
MAN B&W 3000 189
MAN B&W 3500 195
MAN B&W 4000 195
MAN B&W 4500 195
MAN B&W 5000 195
MAN B&W 5500 194
MAN B&W 6000 194
MAN B&W 6500 194
MAN B&W 7000 194
MAN B&W 7500 189
MAN B&W 8000 192
MAN B&W 8500 194

LARY ENGINE

Merek Tipe Daya (kW) SFOC (g/kW/hr)

CATERPILLAR C9 217 212.1


CATERPILLAR C9 253 228.8
CATERPILLAR C9 253 209
CATERPILLAR C9 288 206.6
CATERPILLAR C9 311 229.5
CATERPILLAR C9 361 211.7
CATERPILLAR C18 404 210
CATERPILLAR C18 499 217
CATERPILLAR C18 514 209
CATERPILLAR C15 536 218.8
CATERPILLAR C15 540 218.8
CATERPILLAR C18 587 208
CATERPILLAR C18 624 215
CATERPILLAR C18 660 209
CATERPILLAR C32 791 203.8
CATERPILLAR C32 916 210.8
CATERPILLAR C32 923 203
CATERPILLAR C32 1047 210.4
CATERPILLAR C32 1172 207
CATERPILLAR C32 1333 207.2
CATERPILLAR C33 1500 209
CATERPILLAR C34 1700 206.6
CATERPILLAR C35 2153 218.8
CATERPILLAR C36 2337 218.8
CATERPILLAR C37 2745 210
CATERPILLAR C38 3000 209
CATERPILLAR C39 3254 208
CATERPILLAR C40 3559 209
CATERPILLAR C41 3749 217
CATERPILLAR C42 4000 215
BIAYA PERJALANAN :

Biaya bahan bakar :


1 > Main Engine

2 > Aux. Engine

Total

BIAYA PERLABUAHAN :

Pelabuhan Dumai
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal =
Tarif Tetap =
Tarif Variabel =

total

Pelabuhan Medan
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal <=
Tarif Tetap =
Tarif Variabel =

total

BIAYA BONGKAR MUAT


Tarif Bongkar muat = Rp 30,000

>> Muat = Rp -
>> Bongkar = Rp -
Total = Rp -
= 1.00
= 2.98
= 4.00
= 110
= 1.83
= 0.66
= 2.57 m/s
= 15.22 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2

(parametric design hal 11-27)

; untuk mesin di after


Mesin yang SFOC yang
SLOC (g/kW/hr) Fuel Oil Consumption (ton)
memungkinkan memungkinkan

1 1 103 Err:509
1 1 235 Err:509
1 1 184 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1 1 188 Err:509
1.0 1 189 Err:509
0.6 1 191 Err:509
0.6 1 190 Err:509

0.6 1 192 Err:509

0.7 1 189 Err:509


1.0 1 191 Err:509
0.8 1 190 Err:509
0.7 1 192 Err:509
0.7 1 189 Err:509
1.0 1 191 Err:509
1.0 1 190 Err:509
0.8 1 192 Err:509
0.7 1 188 Err:509
0.7 1 185 Err:509
0.7 1 185 Err:509
1.0 1 187 Err:509
0.8 1 185 Err:509
0.8 1 185 Err:509
1.0 1 189 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1.0 1 195 Err:509
1.0 1 194 Err:509
0.8 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
0.8 1 194 Err:509
0.8 1 196 Err:509
0.9 1 196 Err:509
1.0 1 196 Err:509
0.9 1 194 Err:509
0.9 1 194 Err:509
1.0 1 194 Err:509
0.9 1 194 Err:509
0.9 1 189 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.1 1 189 Err:509
1.1 1 192 Err:509
1.1 1 194 Err:509

Mesin yang SFOC yang


SLOC (g/kW/hr) Fuel Oil Consumption (ton)
memungkinkan memungkinkan

1.1 1 212.1 Err:509


1.1 1 228.8 Err:509
1.0 1 209 Err:509
1.0 1 206.6 Err:509
1.1 1 229.5 Err:509
1.1 1 211.7 Err:509
1.1 1 210 Err:509
1.1 1 217 Err:509
1.0 1 209 Err:509
1.1 1 218.8 Err:509
1.1 1 218.8 Err:509
1.0 1 208 Err:509
1.1 1 215 Err:509
1.0 1 209 Err:509
1.0 1 203.8 Err:509
1.1 1 210.8 Err:509
1.0 1 203 Err:509
1.1 1 210.4 Err:509
1.0 1 207 Err:509
1.0 1 207.2 Err:509
1.0 1 209 Err:509
1.0 1 206.6 Err:509
1.1 1 218.8 Err:509
1.1 1 218.8 Err:509
1.1 1 210 Err:509
1.0 1 209 Err:509
1.0 1 208 Err:509
1.0 1 209 Err:509
1.1 1 217 Err:509
1.1 1 215 Err:509
ITB
= Err:509
= Err:509
= Err:509
Err:509
= Err:509

tarif
Rp 60 Per GT/Kunjungan

Rp 49 per GT/Etmal

Rp 117,150 per GT/Kapal/Gerakan


Rp 53 per GT/Kapal/Gerakan
1671 GT
Rp 144,000 per Kapal yang Ditunda/Jam
Rp 2 per GT/Kapal yang Ditunda/Jam

otal

tarif
Err:509 Per GT/Kunjungan

Err:509 per GT/Etmal

Err:509 per GT/Kapal/Gerakan


Err:509 per GT/Kapal/Gerakan
1671 GT
Err:509 per Kapal yang Ditunda/Jam
Err:509 per GT/Kapal yang Ditunda/Jam

otal

/ton

/tahun
Fuel Oil
Biaya ME
Consumption (liter)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Fuel Oil
Biaya AE
Consumption (liter)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun

total
-

-
-

Rp -
-

Rp -

total
Err:509

Err:509

Err:509
Err:509

Err:509
Err:509

Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :

MCR Mesin ME :
BHP

Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mesin

MCR Mesin AE :
BHP

Mesin :
No. Urut Mesin
Merk
Type

Daya Mesin Yang Digunakan :


Daya

Konsumsi Bahan Bakar :


SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mensin
Berat Mesin
(ton)

1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509

Berat Mesin

(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
ITB

Capital Cost Err:509


Operating Cost Err:509
Voyage Cost Err:509
Cargo Handling Cost Rp -
TOTAL COST Err:509

Unit Cost Rp -

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 79.32 Kw
= 107.84 HP

Err:509
= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton

= 19.83 Kw
= 26.96 HP

= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =

/ton

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
118.98
29.75
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509

Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam

Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN

Input Data :
D= 2.979

n= 110
Z= 4
AE/AO = 0.40
PD = 66
PB = Err:509

PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=

Gearbox

Wgear =

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Shafting
𝑑s =

l =
=
=
=

M 
  =
 l 
=

M =
=

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Propeller

K =
=
=

Wprop =
=
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176

Electrical Units

Wagg =
P = PB
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176

Other Weight

Wot =
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177

Weight Total =
=

Titik Berat Machinery

hdb =
=
=
BKI Vol II. Bab 24 -3.3

KG =
=

Chapter 11 Parametric Design - M.G. Parson ; page 11-25

LCB =
=
=

LCGM =
=

LCGFP =
=
BERAT BAJA

Input Data :
m L

H
buah B
T

kW (Delivery Power at Propeller) FN


kW (Brake Horse Power) CSO Bulk Carrier

CKG Bulk Carriers

PERHITUNGAN :

Berat Mesin Induk 1. Volume Forecastle (VFC)


ton Panjang Forecastle (ℓFC)
Err:509
Lebar Forecastle (bFC)
Berat Mesin Genset
0.5 ton Tinggi Forecastle (tFC)
Volume Forecastle (VFC)

2. Volume Poop (VPO)


 PB 
( 0.34 ~ 0.4 ) ton Panjang Poop (ℓPO)
 n 
Err:509 ton Lebar Poop (bPO)
hneekluth Vol 2. hal 175
Tinggi Poop (tPO)
Volume Poop (VPO)

Diameter Poros Propeller


1/ 3 Volume Superstructure (VA)
 PD 
11,5*  
 n 
9.7 cm 1. Volume Layer 2 (VDH2)
Panjang Layer 2 (ℓDH2)
Panjang Poros Propeller
2,13 m untuk area di ceruk buritan Lebar Layer 2 (bDH2)
1,8 m untuk area gangway
3.93 m Tinggi Layer 2 (tDH2)
Volume Layer 2 (VDH2)

Berat poros / panjang poros


2/3 2. Volume Layer 3 (VDH3)
 PD 
0.081   Panjang Layer 3 (ℓDH3)
 n
0.1 ton/m Lebar Layer 3 (bDH3)

Berat Poros Propeller Tinggi Layer 3 (tDH3)


M  Volume Layer 3 (VDH3)
 l
 l 
0.2 Ton
hneekluth Vol 2. hal 175 3. Volume Layer 4 (VDH4)
Panjang Layer 4 (ℓDH4)

Lebar Layer 4 (bDH4)

Koefisien Fixed Propeller


(𝑑s/𝐷)∙(1.85∙𝐴𝐸/𝐴𝑂)−((𝑧−2)/100) Tinggi Layer 4 (tDH4)

0.004 Volume Layer 4 (VDH4)

Berat Propeler
D3 · K 4. Volume Anjungan (VAN)

0.11 t/m3 Panjang Anjungan (ℓAN)

hneekluth Vol 2. hal 175-176 Lebar Anjungan (bAN)

Tinggi Anjungan (tAN)


Volume Anjungan (VAN)
0.001P (15 + 0.; P=Pb

Err:509 Ton Volume Deck House (VDH)

hneekluth Vol 2. hal 176

DA

0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U

Tinggi Double bottom CS


B/15
0.8 m
T
WST
hdb+0.35∙(H−hdb)

2.8 m

on ; page 11-25 CKG

Panjang Ceruk Buritan KG


4% · LPP

3.0 m
LCG(%)

(-0,5 . Lpp ) + LCB +5


-29.7 m LCGM

-LCGm + ( 0,5.Lpp) LCGFP


67.4 m
Input Data :
= 75.43 m
= 6.30 m
= 12.61 m
= 4.77 m
= 0.09
= 0.0752

0.52 – 0.54

Volume Superstructure (VA)


ecastle (VFC)
ecastle (ℓFC) = 10,5% · LPP
= 7.92 m
= selebar kapal
= 12.61 m
= 2.5 m
ecastle (VFC) = 0.5 · ℓFC · bFC · tFC
= 124.79 m3

= 17,2% · LPP
= 12.97 m
= selebar kapal
= 12.61 m
= 2.5 m
= ℓPO · bPO · tPO
= 408.82 m3
tructure (VA) = VFC + VPO
= 533.60 m3
Volume Deck House (VDH)

= 16,1 % · L
= 12.1 m
= B-4
= 8.61 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 261.24 m3

er 3 (VDH3)
= 11,5 % · L
= 8.67 m
= B-4
= 8.61 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 186.60 m3
er 4 (VDH4)
= 8,5 % · L
= 6 m
= B-4
= 8.61 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4

= 137.92 m3

ungan (VAN)

= 7%·L
= 5.3 m
= B- 8
= 4.61 m
= 2.5 m
= ℓAN · bAN · tAN
60.78 m3

House (VDH) = VDH2 + VDH3 + VDH4 + VAN


= 646.54 m3

Berat Baja (WST)


= Tinggi Kapal Setelah Dikoreksi dengan Superstucture dan Deck House
= H+(VA+VDH)/(LPP∙B)
= 7.54 m

= 0.0752 t/m3

= Berat Kapal
= 3173.08 ton

= log⁡〖∆ /100 〗
= 1.50

CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11

Total Berat Baja


= LPP · B · DA · CS
= 805.74 ton

Titik Berat Baja


= Koefisien KG Baja
= 0.54
= DA * CKG
= 4.07 m

= -0,15 + LCB(%)
= -0.671 %L
= LCG(%) · LPP
= -0.506 m
= 0.5 · LPP - LCGM
= 38.22 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN

Grup III (Accommodation)


The specific volumetric and unit area weights are:
For small and medium sized cargo ships :
For large cargo ships, large Bulk Carriers, etc :
Therefore, for oat, it is used :

• POOP
Lpoop = 12.97
Bpoop = 12.61
Apoop = 163.53
Wpoop = 32.71
• DECKHOUSE
Layer II
LDH II = 12.14
BDH II = 8.61
ADH II = 104.50
WDH II = 20.90

Layer IV
LDH IV = 6.41
BDH IV = 8.61
ADH IV = 55.17
WDH IV = 11.03

W Group III = 84.43

Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C

= 85.78

Equipment and Outfitting Total Weight


= 170.21

Outfit Weight Center Estimation


DA = 7.54
KGE&O = 1.02 -1.08DA

= 7.92
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 42.553
Lcb = 3.771
LCGM dr FP = 69.671
LCGM = -31.959
Lkm = 10.000
Layer II

LDH II = 12.144
WDH II = 8.605
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide

= -30.013

Layer III

LDH III = 8.674


WDH III = 8.605
LCGII = -28.279

Layer IV
LDH IV = 6.411
WDH IV = 8.605
LCGIII = -27.147

Wheelhouse
LWH = 5.280
WWH = 4.605
LCGIV = -26.581

2. LCG2 (37,5% WE&O at LCGDH)


WE&O DH = 63.830
LCGM DH = -28.192

3. LCG3 (37,5% WE&O at midship)

WE&O Midship = 63.830


midship = 0

LCGE&O (LCG di belakang midship)


= -18.562
LCGE&O (dari FP)
= 56.275
Parametric design chapter 11, hal. 11-25
BERAT CONSUMABLE & CREW

Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =

• FORECASTLE Jumlah Crew


m L = 7.92 m Cst
forecasle =
m B forecastle = 12.61 m Cdk =
m2 A forecastle = 99.83 m2 Ceng
=
ton W forecastle = 19.97 ton cadet =
Jumlah Crew (Zc) =
=
Layer III =
m LDH III = 8.67 m Modul TMK bab Consumable and Crew
m BDH III = 8.61 m CC&E =
m2 ADH III = 74.64 m2 WC&E =
ton WDH III = 14.93 ton =
=
Wheel House Parametric design chapter 11, hal. 11-25
m LWH = 5.28 m

m BWH = 4.61 m Main Engine


m 2 AWH = 24.31 m 2
Fuel Oil
ton WWH = 4.86 ton SFR
=
MCR =
ton Margin
=
WFO
=

(0.18 ton / m2 < C < 0.26 ton / m2 =


[ton/m ] 2
=
(L*B*D) 2/3
*C
[ton]

Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA

m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m

ton

[0,5*L+(Lkm+Lcb)+0,5*Ideck] Lubricating Oil


m SFR =
MCR
=
Margin =
m WLO'
=
ton =
m

Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24

m
WFWtotal =

m WFW =
ton =
m

Provision & Store


CPR
=
ton =
m WPR
=
=

ton
m

m
UMABLE & CREW

VS = 2.57 m/s
75.43 m = 5.00 nm/jam
S
12.61 m = Err:509 nm
6.30 m
4.77 m

1.2 ; Coef. Steward (1.2 ~ 1.33)


11.5 ; Coef. Deck (11.5 ~ 14.5)
8.5 ; Coef. Engine (8.5 ~ 11 untuk diesel)
2 ; Umumnya 2 orang
C st∙Cdk∙((Lpp∙B∙H∙35)/10^5 )^(1/6) + Ceng ∙ (BHP/ 〖 10 〗 ^5)
^(1/3)+cadet
17.6 orang
18 orang
Consumable and Crew

0.17 ton/orang ; Asumsi rata-rata berat manusia


Berat Crew Total
Zc · Cc&e

3.06 ton
gn chapter 11, hal. 11-25

Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

Err:509 ton/kW h
19.830 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

0.17 ton/orang . hari


gn chapter 11, hal. 11-24

0.52 ton

WFW total + 4% · WFW total


; terdapat penambahan koreksi 4%

0.541 ton

10 kg/orang h; Koef. Provision & Store


0.000416666666667 ton/ orang jam
CP∙S/Vs ∙Zc
; Berat Provision & Store

Err:509 ton
1. LWT
Steel Weight
WST = 805.74 ton

Equipment & Outfitting Weight


WE&O = 170.21 ton

Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton

GROSS TONAGE
Input Data
H = 6.30 m
T = 4.77 m
VPO = 408.82 m3
VFC = 124.79 m3
VDH = 646.54 m3
∆ = 3173.081 ton
Zc = 18 orang
N1 = 0 orang
N2 = 0 orang

Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)

= 4880.67 m3
VH = VPO + VFC + VDH
= 1180.15 m3
V = VU + V H
= 6060.81 m3
K1 = 0.2+0.02∙log_10⁡V
= 0.28
GT = V ∙ K1

= 1670.67 m3
Dumai - Medan
OF Chemical Tanker
Total Biaya Err:509
Total Err:509
Biaya Satuan Rp -

DV
LPP 85.47
B 10.95
H 5.74
T 4.54
Frekuensi 164

T min 1
T max 5.9
Chemical Tanker
Frekuensi kapal sisa Err:509
Roundtrip per tahun Err:509
Payload 0.00
Total Angkut -
Permintaan 103,067,600
Freeboard 1.20
Batasan Freeboard >=
Keterangan Chemical Tanker
L/B 7.8
B/T 2.4
L/T 18.8
B/H 1.9

N Kapal Err:509
SPOB ITB
Err:509 Err:509

Chemical Tanker
Min Maks
85.31 75.43 10 177.0
11.03 12.61 5.6 35.4
5.44 6.30 3.8 14.9
4.07 4.77 1 5.9
0 0 0 1000

SPOB ITB
Err:509 Err:509
Err:509 Err:509
0.00 0.00
ton
ton
1.37 1.54
1 Chemical Tanker
SPOB ITB Min Maks
7.7 6.0 3.5 10
2.7 2.6 1.8 5
20.9 15.8 10 30
2.0 2.0 1.47 2.38

Err:509 Err:509
Biaya Penalti Frekuensi Sisa
Total Penalti =

SPOB ITB
Min Maks Min Maks
17 175.1 16 120.5
3.5 22.4 5.0 19.6
1.1 3.7 1.8 4.2
1 5.9 1 5.9
0 1000 0 1000

SPOB ITB
Min Maks Min Maks
2.7 5.2 3.1 5.7
4.7 7.8 3.2 6.1
16.5 29.7 16.0 20.4
3.2 6.0 2.8 4.7
ya Penalti Frekuensi Sisa
Err:509
Duami - Jakarta : Chemical Tanker

No Pelabuhan Asal/Tujuan

1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan

DATA PENDUKUNG Chemical Tanker


Jumlah hari = 365
Hari Kerja = 330
Kecepatan Dinas = 11
Kecepatan Ballast = 12
Harga HFO = Rp 8,724
Harga MDO = Rp 9,000
Kecepatan Loading = 300
Kecepatan Unloading = 300
Kurs = Rp 13,000
Umur 25

DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 95.17
B = 12.21
H = 6.03
T = 4.94
GT = 2335
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 95.17
B = 12.21
H = 6.03
T = 4.94
VS = 11
= 5.6584

Freeboard = 1.09

PERBANDINGAN UKURAN UTAMA :


L/B = 7.792
B/T = 2.471
L/T = 19.258
L/16 = 5.948
B/H = 2.025
L/B 7.79 3,5 < L/B < 10
B/T 2.47 1,8 < B/T < 5
L/T 19.26 10 < L/T < 30
H>L/16 5.95 H > L/16
B/H 2.02 1,47>B/H>2,38
PERHITUNGAN FROU
LWL = 104%LPP
= 98.98

Fn = Vs / √( g. L )
= 0.182

PERHITUNGAN KOEFISIEN UKURAN UTAMA :


Koefisien Blok (Watson & Gilfillan) :
CB = – 4.22 + 27.8 √Fn – 39.1 Fn + 46.6 Fn3
= 0.81
Koefisien Luas Midship (Series '60) :
CM = 0.977 + 0.085 (CB – 0.60)
= 0.99
Koefisien Prismatik :
Cx = Cm
Cр = Cb/Cx
= 0.81
Koefisien Bidang Garis Air ;
CWP = Cb/(0.471+(0.551*Cb))
= 0.88
Longitudinal Center of Bouyancy :
a. LCB (%) = -13,5 + 19,4 ⋅ Cp
= 2.21
b. LCB dari M = LCB % / 100 . LPP
= 2.11
c. LCB dari AP = 0.5 · LPP + LCBM
= 49.69

Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 95.17
LWL = 98.98
B = 12.21
H = 6.03
T = 4.94
Vs = 5.66

Perhitungan Viscous Resistance

Cfo (Friction Coefficient - ITTC 1957)


𝜇/𝑟
v= = 1.188 x 10-6 m2/s (for salt water)
(kinematic viscosity)

(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)

=
471,322,726.6
Cfo =〖 (log⁡〖𝑅𝑛 − 2) 〗〗 ^2
0.075/

= 0.00168

• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =

= 0.236
〖𝐿𝑤𝑙〗 ^3/𝛻 201.53
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =

= 1.225

• Wetted Surface Area


Amid= Cm . B . T
ABT = 1.000 ---> tidak menggunakan
(luas Bulb di depan FP)

𝐿(2𝑇+𝐵) 〖𝐶 _𝑀 〗 ^0.5 (0.4530+0.4425 𝐶_𝐵−0.2862 𝐶_𝑀−0.003467 𝐵/𝑇+0.3696 𝐶_𝑊𝑃 )


+2.38 𝐴_𝐵𝑇/𝐶_𝐵 S=

= 1838.116 m2

• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆

= 62.218 kN

Perhitungan Resistance of Appendages

• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)

= 16.462
Lkeel = 0.6.Cb.Lwl Hkeel =
= 47.832 =
Sapp = Srudder + Sbilge Keel

= 73.349
• Stot = S + Sapp
= 1911.465
Harga (1 + k2) ---> PNA Vol II hlm. 92

Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome

+ k2 〖
(1(∑▒ 𝑆 _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )

= 1.400

• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=

= 1.232
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =

= 65.056 kN

Perhitungan Wave Making Resistance

• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =

= 35.0056
B/L = 0.123
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.123
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1

= 1.225

• Harga C2 ---> PNA Vol II hlm. 92


A BT γ B
e 1.89
C2 = BT  γ B  i 
---> menggunakan Bulb
=1
• Harga C3 ---> PNA Vol II hlm. 93
C3 = 1 - 0.8 AT (B.T.CM) ---> AT = 0 ( luas transom saat kecepatan
= 1.000 saat V=0 transom tidak tercelup air)
0.56∙√(ABT )

• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3

= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.158〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =

= -1.767

• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= -0.00006

• Harga λ
L/B = 8.104
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.928

• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ⁡〖〖𝐹𝑛〗 ^(−2)) 〗

= 0.00033437

• CA (Correlation Allowance)
Tf/Lwl = 0.0499
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000522
• w (Gaya Berat)
w= ∆.g
= 48385.110 kN

• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =

= 16.1783054023264 kN

Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 97.62 kN
= 97620.01 N

• Rtotal + 15% (margin)


= 112.263 kN
Kedalaman
Volume (Ton/Thn)

Muat Bongkar LWS


103,067,600 -7
103,067,600 -9
Err:509 Err:509
Err:509 Err:509

nker Jarak (Nm)


hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost

ROUNDTRIP
ton > Seatime
ton Dumai - Jakarta =
m Jakarta - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Jakarta =
103,067,600
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi Sebenarnya =
m/S

UKURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025

Principle of Naval Architecture Vol. II hal. 58

√Fn – 39.1 Fn + 46.6 Fn3


(Parametric Ship Design hal. 11-11)

5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)

(Parametric Ship Design hal. 11-10)

(Parametric Ship Design hal. 11-16)


(Parametric Ship Design hal. 11-19)
% Lpp

m dari M

m dari AP

Lwl . B . T .Cb
4811.93 m3
Lwl . B .T . Cb .ρ
4932.22 ton

KOEFISIEN UKURAN UTAMA :


m CB =
m CM =
m CP =
m CWP =
m Fn =
m/s Cstern =
Lcb =

m2/s (for salt water)

Practical Ship Design hlm .168

Practical Ship Design hlm .157

Pinciple of Naval Architecture Vol II hlm. 91


Pinciple of Naval Architecture Vol II hlm. 91

10% Amidship

3696 𝐶_𝑊𝑃 )

Pinciple of Naval Architecture Vol II hlm. 90

faktor tipe kapal (umum)


faktor tipe kemudi (umum)
faktor tipe profil kemudi (NACA)
faktor letak baling-baling
---> BKI Vol II hlm 14-2

0.18/(Cb-0.2) SBilge Keel = 4.Lkeel.HKeel


0.297 = 56.886
Value of 1+k2
--> (1+k2)=
1.3 to 1.5 1.4
2.8
1.5 to 2.0
3.0
2.0
1.4
2.8
2.0
2.7

_𝑖 〗 )/(∑▒𝑆_𝑖 )

Pinciple of Naval Architecture Vol II hlm. 90

〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3

〗 ^(−1.3757)
〗 ^(−1.3757)

luas transom saat kecepatan 0,


dak tercelup air)

Principle of Naval Architecture Vol II hlm. 92

---> untuk Cp < 0.8

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

---> untuk Tf/Lwl >0.04


/𝑊 𝑊
Konsumsi
Maksimum Utility IT+WT+AT Batubara

BOR SOR/YOR Jam/call ton/hari


60% 70% 6 282,377
60% 70% 4 282,377
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Dumai Medan Jakarta Surabaya


- Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509
Err:509 Err:509 - 386
Err:509 Err:509 386 -
min max
= 7.79 3.5 10
= 2.47 1.8 5
= 19.26 10 30
= 2.02 1.47 2.38
= Rp -

ROUNDTRIP Load Factor Kapal 90%


Utilitas Alat 67%
Err:509 jam Kecepatan Alat 300 ton/hour
Err:509 jam
Err:509 jam
Err:509 hari

6 jam
0.25 hari
4 jam
0.17 hari

Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
46 kali

ciple of Naval Architecture Vol. I hal. 19


ciple of Naval Architecture Vol. I hal. 19
ciple of Naval Architecture Vol. I hal. 19
Vol. II Tahun 2006
ciple of Naval Architecture Vol. I hal. 19

m/s²
≤ Fn ≤ 0,3
ton/m3

ametric Ship Design hal. 11-11)

ametric Ship Design hal. 11-12)

ametric Ship Design hal. 11-10)

ametric Ship Design hal. 11-16)


ametric Ship Design hal. 11-19)

0.81
0.99
0.81
0.88
0.181585805684186
0
2.11 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0

Perhitungan Awal :
1+k
CF
CA

CV
Principle of Naval Architecture Vol.

Principle of Naval Architecture Vol.

t
Principle of Naval Architecture Vol.

Va

Principle of Naval Architecture Vol.


Chapter 11 Parametric Design - M.G

Effective Horse Power (EHP) :


PE

Chapter 11 Parametric Design - M.G

Thrust Horse Power (THP) :


PT

Chapter 11 Parametric Design - M.G

Propulsive Coefficient Calculation :


ηH

Chapter 11 Parametric Design - M.G

ηO
ηr

ηD

Delivered Horse Power (DHP) :


PD

Chapter 11 Parametric Design - M.G

Shaft Horse Power (SHP) :


ηS

PS

Chapter 11 Parametric Design - M.G

Brake Horse Power Calculation (BHP) :


ηR

PB0

Chapter 11 Parametric Design - M.G


Koreksi MCR
PB
BHP

Chapter 11 Parametric Design - M.G


MAIN ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

AUXILARY ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL
Perhitungan Harga Kapal
Input Data
WST = 947.020
WE&O = 197.295
WME = Err:509
Harga Baja = $ 1,100.00
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja

= $ 1,041,722.04
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 217,024.58
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509

Harga = Biaya + Keuntungan + Inflasi + Pajak


= Err:509
= Err:509
= Err:509

BIAYA OPERASIONAL

Gaji Crew = Err:509


Jumlah Crew = 18
Gaji Per Crew/Bulan = Rp 10,000,000.00
Repair & Maintenance = 3% dari harga kapal
= Err:509
Asuransi Kapal = 1,5% dari harga kapal
= Err:509
Supplies Crew = Rp 50,000.00
= Err:509
Dokumen & Administrasi = Rp 5,000,000.00
= Err:509

Total = Err:509
AN PROPULSI & DAYA MESIN :

= 98.98 m
= 12.21 m
= 6.03 m
= 4.94 m
= 0.18158580568419
= 4811.93 m3
= 4932.22 ton
= 0.4

= 1.23
= 0.0017
= 0.00052

= (1+ k) CF + CA
= 0.0026
ciple of Naval Architecture Vol. II hal. 162

= 0.3 Cb + 10 Cv Cb - 0.1
= 0.16
ciple of Naval Architecture Vol. II hal. 163

= 0.1 ; thrust deduction friction


ciple of Naval Architecture Vol. II hal. 163

= V (1 - w) ; Speed of Advantages
= 4.74
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27

Power (EHP) :
= RT.Vs
= 635.23 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27

wer (THP) :
= PE∙(1−w)/(1−t)
= 591.09 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29

ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.07
pter 11 Parametric Design - M.G. Parson ; page 11-29

= Open Water Test Propeller Efficiency


= (J/(2∙n))∙(KT/KQ)
= 0.6
= Rotative Efficiency
= 0.985

= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591

Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 1074.84 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 1096.77 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer Calculation (BHP) :


= Reduction Gear Efficiency
= 0.98
= Brake Horse Power (BHP0)
= PS/ηR
= 1119.16 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
= 15% ∙ PB0
= 115% ∙ PB0 = BHP
= 1287.03 Kw
= BHP ∙ 1.3596 HP
= 1749.85 HP
pter 11 Parametric Design - M.G. Parson ; page 11-30
Merek Tipe Daya (kW)

CUMMINS NTA855-M400 298


CATERPILLAR 3208 325
CUMMINS KTTA 19-M3 447
YUCHAI YC6C670L 492
YUCHAI YC6C700L 515
YUCHAI YC6C730L 536
YUCHAI YC6C865L 636
YUCHAI YC6C925L 680
YUCHAI YC6C960L 706
YUCHAI YC6CL1035L 760
MAN B&W 6L23/30A-E 800
MAN B&W 6L23/30A 960
CATERPILLAR 6M20C 1020
CATERPILLAR 6M20C 1080
CATERPILLAR 6M20C 1140
CATERPILLAR 6M20C 1200
MAN B&W 8L23/30A 1280
MAN B&W 6L21/31 1290
CATERPILLAR 8M20C 1360
CATERPILLAR 8M20C 1440
MAN B&W 6L28/32A 1470
MAN B&W 5L27/38 1500
MAN B&W 7L21/31 1505
CATERPILLAR 8M20C 1520
CATERPILLAR 9M20C 1530
CATERPILLAR 8M20C 1600
MAN B&W 5L27/38 1600
CATERPILLAR 9M20C 1620
CATERPILLAR 9M20C 1710
MAN B&W 7L28/32A 1715
MAN B&W 8L21/31 1720
CATERPILLAR 9M20C 1800
MAN B&W 9L21/31 1935
MAN B&W 8L28/32A 1960
MAN B&W 6L27/38 1980
CATERPILLAR 6M25C 2000
MAN B&W 9L28/32A 2205
MAN B&W 7L27/38 2310
CATERPILLAR 8M25C 2320
CATERPILLAR 8M25C 2400
CATERPILLAR 9M25C 2610
MAN B&W 8L27/38 2640
CATERPILLAR 8M25C 2666
CATERPILLAR 9M25C 2700
MAN B&W 9L27/38 2970
CATERPILLAR 9M25C 3000
MAN B&W 3000
MAN B&W 3500
MAN B&W 4000
MAN B&W 4500
MAN B&W 5000
MAN B&W 5500
MAN B&W 6000
MAN B&W 6500
MAN B&W 7000
MAN B&W 7500
MAN B&W 8000
MAN B&W 8500

LARY ENGINE

Merek Tipe Daya (kW)

CATERPILLAR C9 217
CATERPILLAR C9 253
CATERPILLAR C9 253
CATERPILLAR C9 288
CATERPILLAR C9 311
CATERPILLAR C9 361
CATERPILLAR C18 404
CATERPILLAR C18 499
CATERPILLAR C18 514
CATERPILLAR C15 536
CATERPILLAR C15 540
CATERPILLAR C18 587
CATERPILLAR C18 624
CATERPILLAR C18 660
CATERPILLAR C32 791
CATERPILLAR C32 916
CATERPILLAR C32 923
CATERPILLAR C32 1047
CATERPILLAR C32 1172
CATERPILLAR C32 1333
CATERPILLAR C33 1500
CATERPILLAR C34 1700
CATERPILLAR C35 2153
CATERPILLAR C36 2337
CATERPILLAR C37 2745
CATERPILLAR C38 3000
CATERPILLAR C39 3254
CATERPILLAR C40 3559
CATERPILLAR C41 3749
CATERPILLAR C42 4000
BIAYA PERJALANAN

Biaya bahan bakar


Ton 1 > Main Engine
Ton
Ton 2 > Aux. Engine
/ton
Total

BIAYA PELABUHAN

Pelabuhan Dumai
1 Jasa Labuh
2 Jasa Tambat
Dermaga Beton
3 Jasa Pandu
Tarif Tetap
Tarif Variable
4 Jasa Tunda Kapal
Tarif Tetap
Tarif Variabel

Pelabuhan Jakarta
1 Jasa Labuh
2 Jasa Tambat
Dermaga Beton
3 Jasa Pandu
Tarif Tetap
Tarif Variable
4 Jasa Tunda Kapal
Tarif Tetap
/tahun Tarif Variabel

/tahun BIAYA BONGKAR MUAT


Orang Tarif Bongkar muat =

>> Muat =
/tahun >> Bongkar =
Total =
/tahun
/orang/hari
/tahun
/trip

/tahun
P/D = 1.00
D = 3.09
z = 4.00
nrpm = 110
nrps = 1.83
Cb = 0.81
Vs = 5.66 m/s
RT = 112.26 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2

(parametric design hal 11-27)

; untuk mesin di after


SFOC yang
SFOC (g/kW/hr) SLOC (g/kW/hr) Mesin yang memungkinkan
memungkinkan

103 1 0 0
235 1 0 0
184 1 0 0
195 0.8 0 0
195 0.8 0 0
195 0.8 0 0
195 0.8 0 0
195 0.8 0 0
195 0.8 0 0
195 0.8 0 0
188 1 0 0
189 1.0 0 0
191 0.6 0 0
190 0.6 0 0

192 0.6 0 0

189 0.7 0 0
191 1.0 0 0
190 0.8 1 190
192 0.7 1 192
189 0.7 1 189
191 1.0 1 191
190 1.0 1 190
192 0.8 1 192
188 0.7 1 188
185 0.7 1 185
185 0.7 1 185
187 1.0 1 187
185 0.8 1 185
185 0.8 1 185
189 1.0 1 189
195 0.8 1 195
195 0.8 1 195
195 0.8 1 195
195 1.0 1 195
194 1.0 1 194
194 0.8 1 194
194 1.0 1 194
194 1.0 1 194
194 0.8 1 194
196 0.8 1 196
196 0.9 1 196
196 1.0 1 196
194 0.9 1 194
194 0.9 1 194
194 1.0 1 194
194 0.9 1 194
189 0.9 1 189
195 0.8 1 195
195 0.8 1 195
195 0.8 1 195
195 0.8 1 195
194 1.0 1 194
194 1.0 1 194
194 1.0 1 194
194 1.0 1 194
189 1.1 1 189
192 1.1 1 192
194 1.1 1 194

SFOC yang
SFOC (g/kW/hr) SLOC (g/kW/hr) Mesin yang memungkinkan
memungkinkan

212.1 1.1 1 212.1


228.8 1.1 1 228.8
209 1.0 1 209
206.6 1.0 1 206.6
229.5 1.1 1 229.5
211.7 1.1 1 211.7
210 1.1 1 210
217 1.1 1 217
209 1.0 1 209
218.8 1.1 1 218.8
218.8 1.1 1 218.8
208 1.0 1 208
215 1.1 1 215
209 1.0 1 209
203.8 1.0 1 203.8
210.8 1.1 1 210.8
203 1.0 1 203
210.4 1.1 1 210.4
207 1.0 1 207
207.2 1.0 1 207.2
209 1.0 1 209
206.6 1.0 1 206.6
218.8 1.1 1 218.8
218.8 1.1 1 218.8
210 1.1 1 210
209 1.0 1 209
208 1.0 1 208
209 1.0 1 209
217 1.1 1 217
215 1.1 1 215
RJALANAN

Chemical Tanker
= Err:509
= Err:509
= Err:509
Err:509
Total = Err:509

LABUHAN

tarif
= Rp 60 Per GT/Kunjungan

= Rp 49 per GT/Etmal

= Rp 117,150 per GT/Kapal/Gerakan


= Rp 53 per GT/Kapal/Gerakan
= 2335 GT
= Rp 144,000 per Kapal yang Ditunda/Jam
= Rp 2 per GT/Kapal yang Ditunda/Jam

total

tarif
= Err:509 Per GT/Kunjungan

= Err:509 per GT/Etmal

= Err:509 per GT/Kapal/Gerakan


= Err:509 per GT/Kapal/Gerakan
<= 2335 GT
= Err:509 per Kapal yang Ditunda/Jam
= Err:509 per GT/Kapal yang Ditunda/Jam

total

Rp 30,000 /ton

Rp -
Rp -
Rp - /tahun
Fuel Oil
Fuel Oil Consumption (ton) Biaya ME
Consumption (liter)

Err:509 Err:509 Err:509


Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509

Fuel Oil
Fuel Oil Consumption (ton) Biaya AE
Consumption (liter)

Err:509 Err:509 Err:509


Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun

total
6,445,266.09

5,306,602.41

5,388,900.00
11,343,668.31

Rp 6,624,000
257,810.64

Rp 35,366,247.46

total
Err:509

Err:509

Err:509
Err:509

Err:509
Err:509

Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :

MCR Mesin ME :
BHP

Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mesin

MCR Mesin AE :
BHP

Mesin :
No. Urut Mesin
Merk
Type

Daya Mesin Yang Digunakan :


Daya

Konsumsi Bahan Bakar :


SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mensin
Berat Mesin
(ton)

1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509

Berat Mesin

(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
Chemical Tanker

Capital Cost Err:509


Operating Cost Err:509
Voyage Cost Err:509
Cargo Handling Cost Rp -
TOTAL COST Err:509

Unit Cost Rp -

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 1287.03 Kw
= 1749.85 HP

Err:509
= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton

= 321.76 Kw
= 437.46 HP

= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =

/ton

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
1930.54
482.64
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509

Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam

Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN

Input Data :
D= 3.089

n= 110
Z= 4
AE/AO = 0.40
PD = 1075
PB = Err:509

PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=

Gearbox

Wgear =

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Shafting
𝑑s =

l =
=
=
=

M 
  =
 l 
=

M =
=

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Propeller

K =
=
=

Wprop =
=
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176

Electrical Units

Wagg =
P = PB
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176

Other Weight

Wot =
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177

Weight Total =
=

Titik Berat Machinery

hdb =
=
=
BKI Vol II. Bab 24 -3.3

KG =
=

Chapter 11 Parametric Design - M.G. Parson ; page 11-25

LCB =
=
=

LCGM =
=

LCGFP =
=
BERAT BAJA

Input Data :
m L

H
buah B
T

kW (Delivery Power at Propeller) FN


kW (Brake Horse Power) CSO Bulk Carrier

CKG Bulk Carriers

PERHITUNGAN :

Berat Mesin Induk 1. Volume Forecastle (VFC)


ton Panjang Forecastle (ℓFC)
Err:509
Lebar Forecastle (bFC)
Berat Mesin Genset
0.5 ton Tinggi Forecastle (tFC)
Volume Forecastle (VFC)

2. Volume Poop (VPO)


 PB 
( 0.34 ~ 0.4 ) ton Panjang Poop (ℓPO)
 n 
Err:509 ton Lebar Poop (bPO)
hneekluth Vol 2. hal 175
Tinggi Poop (tPO)
Volume Poop (VPO)

Diameter Poros Propeller


1/ 3 Volume Superstructure (VA)
 PD 
11,5*  
 n 
24.6 cm 1. Volume Layer 2 (VDH2)
Panjang Layer 2 (ℓDH2)
Panjang Poros Propeller
2,13 m untuk area di ceruk buritan Lebar Layer 2 (bDH2)
1,8 m untuk area gangway
3.93 m Tinggi Layer 2 (tDH2)
Volume Layer 2 (VDH2)

Berat poros / panjang poros


2/3 2. Volume Layer 3 (VDH3)
 PD 
0.081   Panjang Layer 3 (ℓDH3)
 n
0.4 ton/m Lebar Layer 3 (bDH3)

Berat Poros Propeller Tinggi Layer 3 (tDH3)


M  Volume Layer 3 (VDH3)
 l
 l 
1.5 Ton
hneekluth Vol 2. hal 175 3. Volume Layer 4 (VDH4)
Panjang Layer 4 (ℓDH4)

Lebar Layer 4 (bDH4)

Koefisien Fixed Propeller


(𝑑s/𝐷)∙(1.85∙𝐴𝐸/𝐴𝑂)−((𝑧−2)/100) Tinggi Layer 4 (tDH4)

0.039 Volume Layer 4 (VDH4)

Berat Propeler
D3 · K 4. Volume Anjungan (VAN)

1.15 t/m3 Panjang Anjungan (ℓAN)

hneekluth Vol 2. hal 175-176 Lebar Anjungan (bAN)

Tinggi Anjungan (tAN)


Volume Anjungan (VAN)
0.001P (15 + 0.; P=Pb

Err:509 Ton Volume Deck House (VDH)

hneekluth Vol 2. hal 176

DA

0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U

Tinggi Double bottom CS


B/15
0.8 m
T
WST
hdb+0.35∙(H−hdb)

2.6 m

on ; page 11-25 CKG

Panjang Ceruk Buritan KG


4% · LPP

3.8 m
LCG(%)

(-0,5 . Lpp ) + LCB +5


-38.8 m LCGM

-LCGm + ( 0,5.Lpp) LCGFP


86.4 m
Input Data :
= 95.17 m
= 6.03 m
= 12.21 m
= 4.94 m
= 0.18
= 0.0752

0.52 – 0.54

Volume Superstructure (VA)


ecastle (VFC)
ecastle (ℓFC) = 10,5% · LPP
= 9.99 m
= selebar kapal
= 12.21 m
= 2.5 m
ecastle (VFC) = 0.5 · ℓFC · bFC · tFC
= 152.57 m3

= 17,2% · LPP
= 16.37 m
= selebar kapal
= 12.21 m
= 2.5 m
= ℓPO · bPO · tPO
= 499.86 m3
tructure (VA) = VFC + VPO
= 652.43 m3
Volume Deck House (VDH)

= 16,1 % · L
= 15.3 m
= B-4
= 8.21 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 314.66 m3

er 3 (VDH3)
= 11,5 % · L
= 10.95 m
= B-4
= 8.21 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 224.76 m3
er 4 (VDH4)
= 8,5 % · L
= 8 m
= B-4
= 8.21 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4

= 166.12 m3

ungan (VAN)

= 7%·L
= 6.7 m
= B- 8
= 4.21 m
= 2.5 m
= ℓAN · bAN · tAN
70.19 m3

House (VDH) = VDH2 + VDH3 + VDH4 + VAN


= 775.72 m3

Berat Baja (WST)


= Tinggi Kapal Setelah Dikoreksi dengan Superstucture dan Deck House
= H+(VA+VDH)/(LPP∙B)
= 7.26 m

= 0.0752 t/m3

= Berat Kapal
= 4932.22 ton

= log⁡〖∆ /100 〗
= 1.69

CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11

Total Berat Baja


= LPP · B · DA · CS
= 947.02 ton

Titik Berat Baja


= Koefisien KG Baja
= 0.54
= DA * CKG
= 3.92 m

= -0,15 + LCB(%)
= 2.062 %L
= LCG(%) · LPP
= 1.962 m
= 0.5 · LPP - LCGM
= 45.63 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN

Grup III (Accommodation)


The specific volumetric and unit area weights are:
For small and medium sized cargo ships :
For large cargo ships, large Bulk Carriers, etc :
Therefore, for oat, it is used :

• POOP
Lpoop = 16.37
Bpoop = 12.21
Apoop = 199.94
Wpoop = 39.99
• DECKHOUSE
Layer II
LDH II = 15.32
BDH II = 8.21
ADH II = 125.86
WDH II = 25.17

Layer IV
LDH IV = 8.09
BDH IV = 8.21
ADH IV = 66.45
WDH IV = 13.29

W Group III = 102.05

Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C

= 95.25

Equipment and Outfitting Total Weight


= 197.30

Outfit Weight Center Estimation


DA = 7.26
KGE&O = 1.02 -1.08DA

= 7.62
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 49.324
Lcb = 4.759
LCGM dr FP = 89.223
LCGM = -41.636
Lkm = 10.000
Layer II

LDH II = 15.323
WDH II = 8.214
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide

= -40.490

Layer III

LDH III = 10.945


WDH III = 8.214
LCGII = -38.301

Layer IV
LDH IV = 8.090
WDH IV = 8.214
LCGIII = -36.874

Wheelhouse
LWH = 6.662
WWH = 4.214
LCGIV = -36.160

2. LCG2 (37,5% WE&O at LCGDH)


WE&O DH = 73.986
LCGM DH = -38.205

3. LCG3 (37,5% WE&O at midship)

WE&O Midship = 73.986


midship = 0

LCGE&O (LCG di belakang midship)


= -24.736
LCGE&O (dari FP)
= 72.323
Parametric design chapter 11, hal. 11-25
BERAT CONSUMABLE & CREW

Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =

• FORECASTLE Jumlah Crew


m L = 9.99 m Cst
forecasle =
m B forecastle = 12.21 m Cdk =
m2 A forecastle = 122.06 m2 Ceng
=
ton W forecastle = 24.41 ton cadet =
Jumlah Crew (Zc) =
=
Layer III =
m LDH III = 10.95 m Modul TMK bab Consumable and Crew
m BDH III = 8.21 m CC&E =
m2 ADH III = 89.90 m2 WC&E =
ton WDH III = 17.98 ton =
=
Wheel House Parametric design chapter 11, hal. 11-25
m LWH = 6.66 m

m BWH = 4.21 m Main Engine


m 2 AWH = 28.07 m 2
Fuel Oil
ton WWH = 5.61 ton SFR
=
MCR =
ton Margin
=
WFO
=

(0.18 ton / m2 < C < 0.26 ton / m2 =


[ton/m ] 2
=
(L*B*D) 2/3
*C
[ton]

Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA

m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m

ton

[0,5*L+(Lkm+Lcb)+0,5*Ideck] Lubricating Oil


m SFR =
MCR
=
Margin =
m WLO'
=
ton =
m

Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24

m
WFWtotal =

m WFW =
ton =
m

Provision & Store


CPR
=
ton =
m WPR
=
=

ton
m

m
UMABLE & CREW

VS = 5.66 m/s
95.17 m = 11.00 nm/jam
S
12.21 m = Err:509 nm
6.03 m
4.94 m

1.2 ; Coef. Steward (1.2 ~ 1.33)


11.5 ; Coef. Deck (11.5 ~ 14.5)
8.5 ; Coef. Engine (8.5 ~ 11 untuk diesel)
2 ; Umumnya 2 orang
C st∙Cdk∙((Lpp∙B∙H∙35)/10^5 )^(1/6) + Ceng ∙ (BHP/ 〖 10 〗 ^5)
^(1/3)+cadet
18.0 orang
18 orang
Consumable and Crew

0.17 ton/orang ; Asumsi rata-rata berat manusia


Berat Crew Total
Zc · Cc&e

3.06 ton
gn chapter 11, hal. 11-25

Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

Err:509 ton/kW h
321.757 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

0.17 ton/orang . hari


gn chapter 11, hal. 11-24

0.52 ton

WFW total + 4% · WFW total


; terdapat penambahan koreksi 4%

0.541 ton

10 kg/orang h; Koef. Provision & Store


0.000416666666667 ton/ orang jam
CP∙S/Vs ∙Zc
; Berat Provision & Store

Err:509 ton
1. LWT
Steel Weight
WST = 947.02 ton

Equipment & Outfitting Weight


WE&O = 197.30 ton

Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton

GROSS TONAGE
Input Data
H = 6.03 m
T = 4.94 m
VPO = 499.86 m3
VFC = 152.57 m3
VDH = 775.72 m3
∆ = 4932.223 ton
Zc = 18 orang
N1 = 0 orang
N2 = 0 orang

Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)

= 6957.79 m3
VH = VPO + VFC + VDH
= 1428.15 m3
V = VU + V H
= 8385.94 m3
K1 = 0.2+0.02∙log_10⁡V
= 0.28
GT = V ∙ K1

= 2335.24 m3
Duami - Jakarta : SPOB

No Pelabuhan Asal/Tujuan

1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan

DATA PENDUKUNG SPOB


Jumlah hari = 365
Hari Kerja = 330
Kecepatan Dinas = 8
Kecepatan Ballast = 10
Harga HFO = Rp 8,724
Harga MDO = Rp 9,000
Kecepatan Loading = 300
Kecepatan Unloading = 300
Kurs = Rp 13,000
Umur 25

DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 90.759
B = 13.731
H = 6.340
T = 5.249
GT = 2704
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 90.76
B = 13.73
H = 6.34
T = 5.25
VS = 8
= 4.1152

Freebroad = 1.09

PERBANDINGAN UKURAN UTAMA :


L/B = 6.610
B/T = 2.616
L/T = 17.290
L/16 = 5.672
B/H = 2.166
L/B 6.61 3,5 < L/B < 10
B/T 2.62 1,8 < B/T < 5
L/T 17.29 10 < L/T < 30
H>L/16 5.67 H > L/16
B/H 2.17 1,47>B/H>2,38
PERHITUNGAN FROU
LWL = 104%LPP
= 94.39

Fn = Vs / √( g. L )
= 0.135

PERHITUNGAN KOEFISIEN UKURAN UTAMA :


Koefisien Blok (Watson & Gilfillan) :
CB = – 4.22 + 27.8 √Fn – 39.1 Fn + 46.6 Fn3
= 0.83
Koefisien Luas Midship (Series '60) :
CM = 0.977 + 0.085 (CB – 0.60)
= 1.00
Koefisien Prismatik :
Cx = Cm
Cр = Cb/Cx
= 0.83
Koefisien Bidang Garis Air ;
CWP = Cb/(0.471+(0.551*Cb))
= 0.89
Longitudinal Center of Bouyancy :
a. LCB (%) = -13,5 + 19,4 ⋅ Cp
= 2.67
b. LCB dari M = LCB % / 100 . LPP
= 2.43
c. LCB dari AP = 0.5 · LPP + LCBM
= 47.81

Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 90.76
LWL = 94.39
B = 13.73
H = 6.34
T = 5.25
Vs = 4.12

Perhitungan Viscous Resistance

Cfo (Friction Coefficient - ITTC 1957)


𝜇/𝑟
v= = 1.188 x 10-6 m2/s (for salt water)
(kinematic viscosity)

(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)

=
326,876,060.5
Cfo =〖 (log⁡〖𝑅𝑛 − 2) 〗〗 ^2
0.075/

= 0.00177

• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =

= 0.218
〖𝐿𝑤𝑙〗 ^3/𝛻 148.78
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =

= 1.292

• Wetted Surface Area


Amid= Cm . B . T
ABT = 1.000 ---> tidak menggunakan
(luas Bulb di depan FP)

𝐿(2𝑇+𝐵) 〖𝐶 _𝑀 〗 ^0.5 (0.4530+0.4425 𝐶_𝐵−0.2862 𝐶_𝑀−0.003467 𝐵/𝑇+0.3696 𝐶_𝑊𝑃 )


+2.38 𝐴_𝐵𝑇/𝐶_𝐵 S=

= 1958.916 m2

• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆

= 38.817 kN

Perhitungan Resistance of Appendages

• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)

= 16.674
Lkeel = 0.6.Cb.Lwl Hkeel =
= 47.053 =
Sapp = Srudder + Sbilge Keel

= 70.378
• Stot = S + Sapp
= 2029.294
Harga (1 + k2) ---> PNA Vol II hlm. 92

Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome

+ k2 〖
(1(∑▒ 𝑆 _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )

= 1.400

• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=

= 1.296
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =

= 40.329 kN

Perhitungan Wave Making Resistance

• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =

= 43.4913
B/L = 0.145
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.145
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1

= 2.706

• Harga C2 ---> PNA Vol II hlm. 92


A BT γ B
e 1.89
C2 = BT  γ B  i 
---> menggunakan Bulb
=1
• Harga C3 ---> PNA Vol II hlm. 93
C3 = 1 - 0.8 AT (B.T.CM) ---> AT = 0 ( luas transom saat kecepatan
= 1.000 saat V=0 transom tidak tercelup air)
0.56∙√(ABT )

• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3

= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.145〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =

= -1.920

• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= 0.00000

• Harga λ
L/B = 6.874
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.999

• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ⁡〖〖𝐹𝑛〗 ^(−2)) 〗

= 0.00002418

• CA (Correlation Allowance)
Tf/Lwl = 0.0556
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000532
• w (Gaya Berat)
w= ∆.g
= 56835.221 kN

• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =

= 1.37431671277712 kN

Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 51.07 kN
= 51073.66 N

• Rtotal + 15% (margin)


= 58.735 kN
Kedalaman
Volume (Ton/Thn)

Muat Bongkar LWS


103,067,600 -7
103,067,600 -9
Err:509 Err:509
Err:509 Err:509

Jarak (Nm)
hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost

ROUNDTRIP
ton > Seatime
ton Dumai - Jakarta =
m Jakarta - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Jakarta =
Err:509
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi Sebenarnya =
m/S

UKURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025

Principle of Naval Architecture Vol. II hal. 58

√Fn – 39.1 Fn + 46.6 Fn3


(Parametric Ship Design hal. 11-11)

5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)

(Parametric Ship Design hal. 11-10)

(Parametric Ship Design hal. 11-16)


(Parametric Ship Design hal. 11-19)
% Lpp

m dari M

m dari AP

Lwl . B . T .Cb
5652.29 m3
Lwl . B .T . Cb .ρ
5793.60 ton

KOEFISIEN UKURAN UTAMA :


m CB =
m CM =
m CP =
m CWP =
m Fn =
m/s Cstern =
Lcb =

m2/s (for salt water)

Practical Ship Design hlm .168

Practical Ship Design hlm .157

Pinciple of Naval Architecture Vol II hlm. 91


Pinciple of Naval Architecture Vol II hlm. 91

10% Amidship

3696 𝐶_𝑊𝑃 )

Pinciple of Naval Architecture Vol II hlm. 90

faktor tipe kapal (umum)


faktor tipe kemudi (umum)
faktor tipe profil kemudi (NACA)
faktor letak baling-baling
---> BKI Vol II hlm 14-2

0.18/(Cb-0.2) SBilge Keel = 4.Lkeel.HKeel


0.285 = 53.704
Value of 1+k2
--> (1+k2)=
1.3 to 1.5 1.4
2.8
1.5 to 2.0
3.0
2.0
1.4
2.8
2.0
2.7

_𝑖 〗 )/(∑▒𝑆_𝑖 )

Pinciple of Naval Architecture Vol II hlm. 90

〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3

〗 ^(−1.3757)
〗 ^(−1.3757)

luas transom saat kecepatan 0,


dak tercelup air)

Principle of Naval Architecture Vol II hlm. 92

---> untuk Cp < 0.8

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

---> untuk Tf/Lwl >0.04


/𝑊 𝑊
Konsumsi
Maksimum Utility IT+WT+AT Batubara

BOR SOR/YOR Jam/call ton/hari


60% 70% 6 282,377
60% 70% 4 282,377
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Dumai Medan Jakarta Surabaya


- Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509
Err:509 Err:509 - 386
Err:509 Err:509 386 -
min max
= 6.61 3.5 10
= 2.62 1.8 5
= 17.29 10 30
= 2.17 1.47 2.38
= Rp -

ROUNDTRIP Load Factor Kapal 90%


Utilitas Alat 67%
Err:509 jam Kecepatan Alat 300 ton/hour
Err:509 jam
Err:509 jam
Err:509 hari

6 jam
0.25 hari
4 jam
0.17 hari

Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
123 kali

ciple of Naval Architecture Vol. I hal. 19


ciple of Naval Architecture Vol. I hal. 19
ciple of Naval Architecture Vol. I hal. 19
Vol. II Tahun 2006
ciple of Naval Architecture Vol. I hal. 19

m/s²
≤ Fn ≤ 0,3
ton/m3

ametric Ship Design hal. 11-11)

ametric Ship Design hal. 11-12)

ametric Ship Design hal. 11-10)

ametric Ship Design hal. 11-16)


ametric Ship Design hal. 11-19)

0.83
1.00
0.83
0.89
0.135236985984954
0
2.43 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0

Perhitungan Awal :
1+k
CF
CA

CV
Principle of Naval Architecture Vol.

Principle of Naval Architecture Vol.

t
Principle of Naval Architecture Vol.

Va

Principle of Naval Architecture Vol.


Chapter 11 Parametric Design - M.G

Effective Horse Power (EHP) :


PE

Chapter 11 Parametric Design - M.G

Thrust Horse Power (THP) :


PT

Chapter 11 Parametric Design - M.G

Propulsive Coefficient Calculation :


ηH

Chapter 11 Parametric Design - M.G

ηO
ηr

ηD

Delivered Horse Power (DHP) :


PD

Chapter 11 Parametric Design - M.G

Shaft Horse Power (SHP) :


ηS

PS

Chapter 11 Parametric Design - M.G

Brake Horse Power Calculation (BHP) :


ηR

PB0

Chapter 11 Parametric Design - M.G


Koreksi MCR
PB
BHP

Chapter 11 Parametric Design - M.G


MAIN ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

AUXILARY ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL
Perhitungan Harga Kapal
Input Data
WST = 1065.740 Ton
WE&O = 217.062 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja

= $ 1,172,313.92
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 238,768.28
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509

Harga = Biaya + Keuntungan + Inflasi + Pajak


= Err:509
= Err:509
= Err:509 /tahun

BIAYA OPERASIONAL

Gaji Crew = Err:509 /tahun


Jumlah Crew = 18 Orang
Gaji Per Crew/Bulan = Rp 10,000,000.00
Repair & Maintenance = 3% dari harga kapal
= Err:509 /tahun
Asuransi Kapal = 1,5% dari harga kapal
= Err:509 /tahun
Supplies Crew = Rp 50,000.00 /orang/hari
= Err:509 /tahun
Dokumen & Administrasi = Rp 5,000,000.00 /trip
= Err:509

Total = Err:509 /tahun


AN PROPULSI & DAYA MESIN :

= 94.39 m P/D

= 13.73 m D
= 6.34 m z
= 5.25 m nrpm

= 0.13523698598495 nrps

= 5652.29 m3 Cb
= 5793.60 ton Vs

= 0.4 RT

= 1.30
= 0.0018
= 0.00053

= (1+ k) CF + CA
= 0.0028
ciple of Naval Architecture Vol. II hal. 162

= 0.3 Cb + 10 Cv Cb - 0.1
= 0.17
ciple of Naval Architecture Vol. II hal. 163

= 0.1 ; thrust deduction friction


ciple of Naval Architecture Vol. II hal. 163

= V (1 - w) ; Speed of Advantages
= 3.40
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27

Power (EHP) :
= RT.Vs
= 241.71 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27

wer (THP) :
= PE∙(1−w)/(1−t)
= 222.18 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29

ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.09
pter 11 Parametric Design - M.G. Parson ; page 11-29

= Open Water Test Propeller Efficiency


= (J/(2∙n))∙(KT/KQ)
= 0.6
= Rotative Efficiency
= 0.985

= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591

Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 408.98 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 417.32 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer Calculation (BHP) :


= Reduction Gear Efficiency
= 0.98
= Brake Horse Power (BHP0)
= PS/ηR
= 425.84 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
= 15% ∙ PB0
= 115% ∙ PB0 = BHP
= 489.72 Kw
= BHP ∙ 1.3596 HP
= 665.82 HP
pter 11 Parametric Design - M.G. Parson ; page 11-30
Merek Tipe Daya (kW) SFOC (g/kW/hr)

CUMMINS NTA855-M400 298 103


CATERPILLAR 3208 325 235
CUMMINS KTTA 19-M3 447 184
YUCHAI YC6C670L 492 195
YUCHAI YC6C700L 515 195
YUCHAI YC6C730L 536 195
YUCHAI YC6C865L 636 195
YUCHAI YC6C925L 680 195
YUCHAI YC6C960L 706 195
YUCHAI YC6CL1035L 760 195
MAN B&W 6L23/30A-E 800 188
MAN B&W 6L23/30A 960 189
CATERPILLAR 6M20C 1020 191
CATERPILLAR 6M20C 1080 190
CATERPILLAR 6M20C 1140 192
CATERPILLAR 6M20C 1200 189
MAN B&W 8L23/30A 1280 191
MAN B&W 6L21/31 1290 190
CATERPILLAR 8M20C 1360 192
CATERPILLAR 8M20C 1440 189
MAN B&W 6L28/32A 1470 191
MAN B&W 5L27/38 1500 190
MAN B&W 7L21/31 1505 192
CATERPILLAR 8M20C 1520 188
CATERPILLAR 9M20C 1530 185
CATERPILLAR 8M20C 1600 185
MAN B&W 5L27/38 1600 187
CATERPILLAR 9M20C 1620 185
CATERPILLAR 9M20C 1710 185
MAN B&W 7L28/32A 1715 189
MAN B&W 8L21/31 1720 195
CATERPILLAR 9M20C 1800 195
MAN B&W 9L21/31 1935 195
MAN B&W 8L28/32A 1960 195
MAN B&W 6L27/38 1980 194
CATERPILLAR 6M25C 2000 194
MAN B&W 9L28/32A 2205 194
MAN B&W 7L27/38 2310 194
CATERPILLAR 8M25C 2320 194
CATERPILLAR 8M25C 2400 196
CATERPILLAR 9M25C 2610 196
MAN B&W 8L27/38 2640 196
CATERPILLAR 8M25C 2666 194
CATERPILLAR 9M25C 2700 194
MAN B&W 9L27/38 2970 194
CATERPILLAR 9M25C 3000 194
MAN B&W 3000 189
MAN B&W 3500 195
MAN B&W 4000 195
MAN B&W 4500 195
MAN B&W 5000 195
MAN B&W 5500 194
MAN B&W 6000 194
MAN B&W 6500 194
MAN B&W 7000 194
MAN B&W 7500 189
MAN B&W 8000 192
MAN B&W 8500 194

LARY ENGINE

Merek Tipe Daya (kW) SFOC (g/kW/hr)

CATERPILLAR C9 217 212.1


CATERPILLAR C9 253 228.8
CATERPILLAR C9 253 209
CATERPILLAR C9 288 206.6
CATERPILLAR C9 311 229.5
CATERPILLAR C9 361 211.7
CATERPILLAR C18 404 210
CATERPILLAR C18 499 217
CATERPILLAR C18 514 209
CATERPILLAR C15 536 218.8
CATERPILLAR C15 540 218.8
CATERPILLAR C18 587 208
CATERPILLAR C18 624 215
CATERPILLAR C18 660 209
CATERPILLAR C32 791 203.8
CATERPILLAR C32 916 210.8
CATERPILLAR C32 923 203
CATERPILLAR C32 1047 210.4
CATERPILLAR C32 1172 207
CATERPILLAR C32 1333 207.2
CATERPILLAR C33 1500 209
CATERPILLAR C34 1700 206.6
CATERPILLAR C35 2153 218.8
CATERPILLAR C36 2337 218.8
CATERPILLAR C37 2745 210
CATERPILLAR C38 3000 209
CATERPILLAR C39 3254 208
CATERPILLAR C40 3559 209
CATERPILLAR C41 3749 217
CATERPILLAR C42 4000 215
BIAYA PERJALANAN

Biaya bahan bakar :


1 > Main Engine

2 > Aux. Engine

Total

BIAYA PELABUHAN

Pelabuhan Dumai
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal =
Tarif Tetap =
Tarif Variabel =

total

Pelabuhan Jakarta
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal <=
Tarif Tetap =
Tarif Variabel =

total

BIAYA BONGKAR MUAT


Tarif Bongkar muat = Rp 30,000

>> Muat = Rp -
>> Bongkar = Rp -
Total = Rp -
= 1.00
= 3.28
= 4.00
= 110
= 1.83
= 0.83
= 4.12 m/s
= 58.73 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2

(parametric design hal 11-27)

; untuk mesin di after


Mesin yang SFOC yang
SLOC (g/kW/hr) Fuel Oil Consumption (ton)
memungkinkan memungkinkan

1 0 0 Err:509
1 0 0 Err:509
1 0 0 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1 1 188 Err:509
1.0 1 189 Err:509
0.6 1 191 Err:509
0.6 1 190 Err:509

0.6 1 192 Err:509

0.7 1 189 Err:509


1.0 1 191 Err:509
0.8 1 190 Err:509
0.7 1 192 Err:509
0.7 1 189 Err:509
1.0 1 191 Err:509
1.0 1 190 Err:509
0.8 1 192 Err:509
0.7 1 188 Err:509
0.7 1 185 Err:509
0.7 1 185 Err:509
1.0 1 187 Err:509
0.8 1 185 Err:509
0.8 1 185 Err:509
1.0 1 189 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1.0 1 195 Err:509
1.0 1 194 Err:509
0.8 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
0.8 1 194 Err:509
0.8 1 196 Err:509
0.9 1 196 Err:509
1.0 1 196 Err:509
0.9 1 194 Err:509
0.9 1 194 Err:509
1.0 1 194 Err:509
0.9 1 194 Err:509
0.9 1 189 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.1 1 189 Err:509
1.1 1 192 Err:509
1.1 1 194 Err:509

Mesin yang SFOC yang


SLOC (g/kW/hr) Fuel Oil Consumption (ton)
memungkinkan memungkinkan

1.1 1 212.1 Err:509


1.1 1 228.8 Err:509
1.0 1 209 Err:509
1.0 1 206.6 Err:509
1.1 1 229.5 Err:509
1.1 1 211.7 Err:509
1.1 1 210 Err:509
1.1 1 217 Err:509
1.0 1 209 Err:509
1.1 1 218.8 Err:509
1.1 1 218.8 Err:509
1.0 1 208 Err:509
1.1 1 215 Err:509
1.0 1 209 Err:509
1.0 1 203.8 Err:509
1.1 1 210.8 Err:509
1.0 1 203 Err:509
1.1 1 210.4 Err:509
1.0 1 207 Err:509
1.0 1 207.2 Err:509
1.0 1 209 Err:509
1.0 1 206.6 Err:509
1.1 1 218.8 Err:509
1.1 1 218.8 Err:509
1.1 1 210 Err:509
1.0 1 209 Err:509
1.0 1 208 Err:509
1.0 1 209 Err:509
1.1 1 217 Err:509
1.1 1 215 Err:509
SPOB
= Err:509
= Err:509
= Err:509
Err:509
= Err:509

tarif
Rp 60 Per GT/Kunjungan

Rp 49 per GT/Etmal

Rp 117,150 per GT/Kapal/Gerakan


Rp 53 per GT/Kapal/Gerakan
2704 GT
Rp 144,000 per Kapal yang Ditunda/Jam
Rp 2 per GT/Kapal yang Ditunda/Jam

total

tarif
Err:509 Per GT/Kunjungan

Err:509 per GT/Etmal

Err:509 per GT/Kapal/Gerakan


Err:509 per GT/Kapal/Gerakan
2704 GT
Err:509 per Kapal yang Ditunda/Jam
Err:509 per GT/Kapal yang Ditunda/Jam

total

/ton

/tahun
Fuel Oil
Biaya ME
Consumption (liter)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Fuel Oil
Biaya AE
Consumption (liter)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun

total
19,958,489.20

16,432,489.44

14,409,450.00
35,126,940.99

Rp 17,712,000
798,339.57

Rp 104,437,709.20

total
Err:509

Err:509

Err:509
Err:509

Err:509
Err:509

Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :

MCR Mesin ME :
BHP

Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mesin

MCR Mesin AE :
BHP

Mesin :
No. Urut Mesin
Merk
Type

Daya Mesin Yang Digunakan :


Daya

Konsumsi Bahan Bakar :


SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mensin
Berat Mesin
(ton)

1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509

Berat Mesin

(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
SPOB

Capital Cost Err:509


Operating Cost Err:509
Voyage Cost Err:509
Cargo Handling Cost Rp -
TOTAL COST Err:509

Unit Cost Rp -

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 489.72 Kw
= 665.82 HP

Err:509
= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton

= 122.43 Kw
= 166.45 HP

= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =

/ton

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
734.57
183.64
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509

Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam

Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN

Input Data :
D= 3.281

n= 110
Z= 4
AE/AO = 0.40
PD = 409
PB = Err:509

PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=

Gearbox

Wgear =

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Shafting
𝑑s =

l =
=
=
=

M 
  =
 l 
=

M =
=

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Propeller

K =
=
=

Wprop =
=
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176

Electrical Units

Wagg =
P = PB
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176

Other Weight

Wot =
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177

Weight Total =
=

Titik Berat Machinery

hdb =
=
=
BKI Vol II. Bab 24 -3.3

KG =
=

Chapter 11 Parametric Design - M.G. Parson ; page 11-25

LCB =
=
=

LCGM =
=

LCGFP =
=
BERAT BAJA

Input Data :
m L

H
buah B
T

kW (Delivery Power at Propeller) FN


kW (Brake Horse Power) CSO Bulk Carrier

CKG Bulk Carriers

PERHITUNGAN :

Berat Mesin Induk 1. Volume Forecastle (VFC)


ton Panjang Forecastle (ℓFC)
Err:509
Lebar Forecastle (bFC)
Berat Mesin Genset
0.5 ton Tinggi Forecastle (tFC)
Volume Forecastle (VFC)

2. Volume Poop (VPO)


 PB 
( 0.34 ~ 0.4 ) ton Panjang Poop (ℓPO)
 n 
Err:509 ton Lebar Poop (bPO)
hneekluth Vol 2. hal 175
Tinggi Poop (tPO)
Volume Poop (VPO)

Diameter Poros Propeller


1/ 3 Volume Superstructure (VA)
 PD 
11,5*  
 n 
17.8 cm 1. Volume Layer 2 (VDH2)
Panjang Layer 2 (ℓDH2)
Panjang Poros Propeller
2,13 m untuk area di ceruk buritan Lebar Layer 2 (bDH2)
1,8 m untuk area gangway
3.93 m Tinggi Layer 2 (tDH2)
Volume Layer 2 (VDH2)

Berat poros / panjang poros


2/3 2. Volume Layer 3 (VDH3)
 PD 
0.081   Panjang Layer 3 (ℓDH3)
 n
0.2 ton/m Lebar Layer 3 (bDH3)

Berat Poros Propeller Tinggi Layer 3 (tDH3)


M  Volume Layer 3 (VDH3)
 l
 l 
0.8 Ton
hneekluth Vol 2. hal 175 3. Volume Layer 4 (VDH4)
Panjang Layer 4 (ℓDH4)

Lebar Layer 4 (bDH4)

Koefisien Fixed Propeller


(𝑑s/𝐷)∙(1.85∙𝐴𝐸/𝐴𝑂)−((𝑧−2)/100) Tinggi Layer 4 (tDH4)

0.020 Volume Layer 4 (VDH4)

Berat Propeler
D3 · K 4. Volume Anjungan (VAN)

0.71 t/m3 Panjang Anjungan (ℓAN)

hneekluth Vol 2. hal 175-176 Lebar Anjungan (bAN)

Tinggi Anjungan (tAN)


Volume Anjungan (VAN)
0.001P (15 + 0.; P=Pb

Err:509 Ton Volume Deck House (VDH)

hneekluth Vol 2. hal 176

DA

0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U

Tinggi Double bottom CS


B/15
0.9 m
T
WST
hdb+0.35∙(H−hdb)

2.8 m

on ; page 11-25 CKG

Panjang Ceruk Buritan KG


4% · LPP

3.6 m
LCG(%)

(-0,5 . Lpp ) + LCB +5


-36.7 m LCGM

-LCGm + ( 0,5.Lpp) LCGFP


82.1 m
Input Data :
= 90.76 m
= 6.34 m
= 13.73 m
= 5.25 m
= 0.14
= 0.0752

0.52 – 0.54

Volume Superstructure (VA)


ecastle (VFC)
ecastle (ℓFC) = 10,5% · LPP
= 9.53 m
= selebar kapal
= 13.73 m
= 2.5 m
ecastle (VFC) = 0.5 · ℓFC · bFC · tFC
= 163.57 m3

= 17,2% · LPP
= 15.61 m
= selebar kapal
= 13.73 m
= 2.5 m
= ℓPO · bPO · tPO
= 535.88 m3
tructure (VA) = VFC + VPO
= 699.44 m3
Volume Deck House (VDH)

= 16,1 % · L
= 14.6 m
= B-4
= 9.73 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 355.48 m3

er 3 (VDH3)
= 11,5 % · L
= 10.44 m
= B-4
= 9.73 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 253.92 m3
er 4 (VDH4)
= 8,5 % · L
= 8 m
= B-4
= 9.73 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4

= 187.68 m3

ungan (VAN)

= 7%·L
= 6.4 m
= B- 8
= 5.73 m
= 2.5 m
= ℓAN · bAN · tAN
91.03 m3

House (VDH) = VDH2 + VDH3 + VDH4 + VAN


= 888.11 m3

Berat Baja (WST)


= Tinggi Kapal Setelah Dikoreksi dengan Superstucture dan Deck House
= H+(VA+VDH)/(LPP∙B)
= 7.61 m

= 0.0752 t/m3

= Berat Kapal
= 5793.60 ton

= log⁡〖∆ /100 〗
= 1.76

CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11

Total Berat Baja


= LPP · B · DA · CS
= 1065.74 ton

Titik Berat Baja


= Koefisien KG Baja
= 0.54
= DA * CKG
= 4.11 m

= -0,15 + LCB(%)
= 2.523 %L
= LCG(%) · LPP
= 2.290 m
= 0.5 · LPP - LCGM
= 43.09 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN

Grup III (Accommodation)


The specific volumetric and unit area weights are:
For small and medium sized cargo ships :
For large cargo ships, large Bulk Carriers, etc :
Therefore, for oat, it is used :

• POOP
Lpoop = 15.61
Bpoop = 13.73
Apoop = 214.35
Wpoop = 42.87
• DECKHOUSE
Layer II
LDH II = 14.61
BDH II = 9.73
ADH II = 142.19
WDH II = 28.44

Layer IV
LDH IV = 7.71
BDH IV = 9.73
ADH IV = 75.07
WDH IV = 15.01

W Group III = 113.92

Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C

= 103.14

Equipment and Outfitting Total Weight


= 217.06

Outfit Weight Center Estimation


DA = 7.61
KGE&O = 1.02 -1.08DA

= 7.99
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 54.266
Lcb = 4.538
LCGM dr FP = 84.851
LCGM = -39.472
Lkm = 10.000
Layer II

LDH II = 14.612
WDH II = 9.731
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide

= -38.148

Layer III

LDH III = 10.437


WDH III = 9.731
LCGII = -36.060

Layer IV
LDH IV = 7.714
WDH IV = 9.731
LCGIII = -34.699

Wheelhouse
LWH = 6.353
WWH = 5.731
LCGIV = -34.018

2. LCG2 (37,5% WE&O at LCGDH)


WE&O DH = 81.398
LCGM DH = -35.927

3. LCG3 (37,5% WE&O at midship)

WE&O Midship = 81.398


midship = 0

LCGE&O (LCG di belakang midship)


= -23.341
LCGE&O (dari FP)
= 68.720
Parametric design chapter 11, hal. 11-25
BERAT CONSUMABLE & CREW

Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =

• FORECASTLE Jumlah Crew


m L = 9.53 m Cst
forecasle =
m B forecastle = 13.73 m Cdk =
m2 A forecastle = 130.85 m2 Ceng
=
ton W forecastle = 26.17 ton cadet =
Jumlah Crew (Zc) =
=
Layer III =
m LDH III = 10.44 m Modul TMK bab Consumable and Crew
m BDH III = 9.73 m CC&E =
m2 ADH III = 101.57 m2 WC&E =
ton WDH III = 20.31 ton =
=
Wheel House Parametric design chapter 11, hal. 11-25
m LWH = 6.35 m

m BWH = 5.73 m Main Engine


m 2 AWH = 36.41 m 2
Fuel Oil
ton WWH = 7.28 ton SFR
=
MCR =
ton Margin
=
WFO
=

(0.18 ton / m2 < C < 0.26 ton / m2 =


[ton/m ] 2
=
(L*B*D) 2/3
*C
[ton]

Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA

m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m

ton

[0,5*L+(Lkm+Lcb)+0,5*Ideck] Lubricating Oil


m SFR =
MCR
=
Margin =
m WLO'
=
ton =
m

Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24

m
WFWtotal =

m WFW =
ton =
m

Provision & Store


CPR
=
ton =
m WPR
=
=

ton
m

m
UMABLE & CREW

VS = 4.12 m/s
90.76 m = 8.00 nm/jam
S
13.73 m = Err:509 nm
6.34 m
5.25 m

1.2 ; Coef. Steward (1.2 ~ 1.33)


11.5 ; Coef. Deck (11.5 ~ 14.5)
8.5 ; Coef. Engine (8.5 ~ 11 untuk diesel)
2 ; Umumnya 2 orang
C st∙Cdk∙((Lpp∙B∙H∙35)/10^5 )^(1/6) + Ceng ∙ (BHP/ 〖 10 〗 ^5)
^(1/3)+cadet
18.3 orang
18 orang
Consumable and Crew

0.17 ton/orang ; Asumsi rata-rata berat manusia


Berat Crew Total
Zc · Cc&e

3.06 ton
gn chapter 11, hal. 11-25

Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

Err:509 ton/kW h
122.429 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

0.17 ton/orang . hari


gn chapter 11, hal. 11-24

0.52 ton

WFW total + 4% · WFW total


; terdapat penambahan koreksi 4%

0.541 ton

10 kg/orang h; Koef. Provision & Store


0.000416666666667 ton/ orang jam
CP∙S/Vs ∙Zc
; Berat Provision & Store

Err:509 ton
1. LWT
Steel Weight
WST = 1065.74 ton

Equipment & Outfitting Weight


WE&O = 217.06 ton

Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton

GROSS TONAGE
Input Data
H = 6.34 m
T = 5.25 m
VPO = 535.88 m3
VFC = 163.57 m3
VDH = 888.11 m3
∆ = 5793.601 ton
Zc = 18 orang
N1 = 0 orang
N2 = 0 orang

Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)

= 8081.13 m3
VH = VPO + VFC + VDH
= 1587.55 m3
V = VU + V H
= 9668.69 m3
K1 = 0.2+0.02∙log_10⁡V
= 0.28
GT = V ∙ K1

= 2704.40 m3
Duami -Jakarta : ITB

No Pelabuhan Asal/Tujuan

1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan

DATA PENDUKUNG ITB


Jumlah hari = 365
Hari Kerja = 330
Kecepatan Dinas = 5
Kecepatan Ballast = 7
Harga HFO = Rp 8,724
Harga MDO = Rp 9,000
Kecepatan Loading = 300
Kecepatan Unloading = 300
Kurs = Rp 13,000
Umur 25

DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 58.452
B = 13.427
H = 6.379
T = 4.525
GT = 1539
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 58.45
B = 13.43
H = 6.38
T = 4.52
VS = 5
= 2.572

Freeboard = 1.85

PERBANDINGAN UKURAN UTAMA :


L/B = 4.353
B/T = 2.967
L/T = 12.919
L/16 = 3.653
B/H = 2.105
L/B 4.35 3,5 < L/B < 10
B/T 2.97 1,8 < B/T < 5
L/T 12.92 10 < L/T < 30
H>L/16 3.65 H > L/16
B/H 2.10 1,47>B/H>2,38
PERHITUNGAN FROUD
LWL = 104%LPP
= 60.79

Fn = Vs / √( g. L )
= 0.105

PERHITUNGAN KOEFISIEN UKURAN UTAMA :


Koefisien Blok (Watson & Gilfillan) :
CB = – 4.22 + 27.8 √Fn – 39.1 Fn + 46.6 Fn3
= 0.74
Koefisien Luas Midship (Series '60) :
CM = 0.977 + 0.085 (CB – 0.60)
= 0.99
Koefisien Prismatik :
Cx = Cm
Cр = Cb/Cx
= 0.75
Koefisien Bidang Garis Air ;
CWP = Cb/(0.471+(0.551*Cb))
= 0.84
Longitudinal Center of Bouyancy :
a. LCB (%) = -13,5 + 19,4 ⋅ Cp
= 0.99
b. LCB dari M = LCB % / 100 . LPP
= 0.58
c. LCB dari AP = 0.5 · LPP + LCBM
= 29.80

Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 58.45
LWL = 60.79
B = 13.43
H = 6.38
T = 4.52
Vs = 2.57

Perhitungan Viscous Resistance

Cfo (Friction Coefficient - ITTC 1957)


𝜇/𝑟
v= = 1.188 x 10-6 m2/s (for salt water)
(kinematic viscosity)

(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)

=
131,574,185.2
Cfo =〖 (log⁡〖𝑅𝑛 − 2) 〗〗 ^2
0.075/

= 0.00200

• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =

= 0.266
〖𝐿𝑤𝑙〗 ^3/𝛻 82.38
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =

= 1.325

• Wetted Surface Area


Amid= Cm . B . T
ABT = 1.000 ---> tidak menggunakan
(luas Bulb di depan FP)

𝐿(2𝑇+𝐵) 〖𝐶 _𝑀 〗 ^0.5 (0.4530+0.4425 𝐶_𝐵−0.2862 𝐶_𝑀−0.003467 𝐵/𝑇+0.3696 𝐶_𝑊𝑃 )


+2.38 𝐴_𝐵𝑇/𝐶_𝐵 S=

= 1085.650 m2

• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆

= 9.766 kN

Perhitungan Resistance of Appendages

• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)

= 9.256
Lkeel = 0.6.Cb.Lwl Hkeel =
= 26.932 =
Sapp = Srudder + Sbilge Keel

= 45.273
• Stot = S + Sapp
= 1130.923
Harga (1 + k2) ---> PNA Vol II hlm. 92

Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome

+ k2 〖
(1(∑▒ 𝑆 _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )

= 1.400

• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=

= 1.328
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =

= 10.196 kN

Perhitungan Wave Making Resistance

• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =

= 34.8887
B/L = 0.221
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.221
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1

= 9.086

• Harga C2 ---> PNA Vol II hlm. 92


A BT γ B
e 1.89
C2 = BT  γ B  i 
---> menggunakan Bulb
=1
• Harga C3 ---> PNA Vol II hlm. 93
C3 = 1 - 0.8 AT (B.T.CM) ---> AT = 0 ( luas transom saat kecepatan
= 1.000 saat V=0 transom tidak tercelup air)
0.56∙√(ABT )

• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3

= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.209〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =

= -2.482

• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= 0.00000

• Harga λ
L/B = 4.528
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.944

• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ⁡〖〖𝐹𝑛〗 ^(−2)) 〗

= 0.00000006

• CA (Correlation Allowance)
Tf/Lwl = 0.0744
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000612
• w (Gaya Berat)
w= ∆.g
= 27419.014 kN

• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =

= 0.001679171424628 kN

Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 12.54 kN
= 12543.05 N

• Rtotal + 15% (margin)


= 14.425 kN
Kedalaman
Volume (Ton/Thn)

Muat Bongkar LWS


103,067,600 -7
103,067,600 -9
Err:509 Err:509
Err:509 Err:509

Jarak (Nm)
hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost

ROUNDTRIP
ton > Seatime
ton Dumai - Jakarta =
m Jakarta - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Jakarta =
Err:509
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi Sebenarnya =
m/S

KURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025

Principle of Naval Architecture Vol. II hal. 58

√Fn – 39.1 Fn + 46.6 Fn3


(Parametric Ship Design hal. 11-11)

5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)

(Parametric Ship Design hal. 11-10)

(Parametric Ship Design hal. 11-16)


(Parametric Ship Design hal. 11-19)
% Lpp

m dari M

m dari AP

Lwl . B . T .Cb
2726.84 m3
Lwl . B .T . Cb .ρ
2795.01 ton

KOEFISIEN UKURAN UTAMA :


m CB =
m CM =
m CP =
m CWP =
m Fn =
m/s Cstern =
Lcb =

m2/s (for salt water)

Practical Ship Design hlm .168

Practical Ship Design hlm .157

Pinciple of Naval Architecture Vol II hlm. 91


Pinciple of Naval Architecture Vol II hlm. 91

10% Amidship

3696 𝐶_𝑊𝑃 )

Pinciple of Naval Architecture Vol II hlm. 90

faktor tipe kapal (umum)


faktor tipe kemudi (umum)
faktor tipe profil kemudi (NACA)
faktor letak baling-baling
---> BKI Vol II hlm 14-2

0.18/(Cb-0.2) SBilge Keel = 4.Lkeel.HKeel


0.334 = 36.017
Value of 1+k2
--> (1+k2)=
1.3 to 1.5 1.4
2.8
1.5 to 2.0
3.0
2.0
1.4
2.8
2.0
2.7

_𝑖 〗 )/(∑▒𝑆_𝑖 )

Pinciple of Naval Architecture Vol II hlm. 90

〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3

〗 ^(−1.3757)
〗 ^(−1.3757)

luas transom saat kecepatan 0,


dak tercelup air)

Principle of Naval Architecture Vol II hlm. 92

---> untuk Cp < 0.8

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

---> untuk Tf/Lwl >0.04


/𝑊 𝑊
Konsumsi
Maksimum Utility IT+WT+AT Batubara

BOR SOR/YOR Jam/call ton/hari


60% 70% 6 282,377
60% 70% 4 282,377
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Dumai Medan Jakarta Surabaya


- Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509
Err:509 Err:509 - 386
Err:509 Err:509 386 -
min max
= 4.35 3.5 10
= 2.97 1.8 5
= 12.92 10 30
= 2.10 1.47 2.38
= Rp -

ROUNDTRIP Load Factor Kapal 90%


Utilitas Alat 67%
Err:509 jam Kecepatan Alat 300 ton/hour
Err:509 jam
Err:509 jam
Err:509 hari

6 jam
0.25 hari
4 jam
0.17 hari

Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
0 kali

ciple of Naval Architecture Vol. I hal. 19


ciple of Naval Architecture Vol. I hal. 19
ciple of Naval Architecture Vol. I hal. 19
Vol. II Tahun 2006
ciple of Naval Architecture Vol. I hal. 19

m/s²
≤ Fn ≤ 0,3
ton/m3

ametric Ship Design hal. 11-11)

ametric Ship Design hal. 11-12)

ametric Ship Design hal. 11-10)

ametric Ship Design hal. 11-16)


ametric Ship Design hal. 11-19)

0.74
0.99
0.75
0.84
0.105322636519638
0
0.58 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0

Perhitungan Awal :
1+k
CF
CA

CV
Principle of Naval Architecture Vol.

Principle of Naval Architecture Vol.

t
Principle of Naval Architecture Vol.

Va

Principle of Naval Architecture Vol.


Chapter 11 Parametric Design - M.G

Effective Horse Power (EHP) :


PE

Chapter 11 Parametric Design - M.G

Thrust Horse Power (THP) :


PT

Chapter 11 Parametric Design - M.G

Propulsive Coefficient Calculation :


ηH

Chapter 11 Parametric Design - M.G

ηO
ηr

ηD

Delivered Horse Power (DHP) :


PD

Chapter 11 Parametric Design - M.G

Shaft Horse Power (SHP) :


ηS

PS

Chapter 11 Parametric Design - M.G

Brake Horse Power Calculation (BHP) :


ηR

PB0

Chapter 11 Parametric Design - M.G


Koreksi MCR
PB
BHP

Chapter 11 Parametric Design - M.G


MAIN ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

AUXILARY ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL :
Perhitungan Harga Kapal
Input Data
WST = 674.726 Ton
WE&O = 147.305 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja

= $ 742,199.12
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 162,035.35
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509

Harga = Biaya + Keuntungan + Inflasi + Pajak


= Err:509
= Err:509
= Err:509 /tahun

BIAYA OPERASIONAL

Gaji Crew = Err:509 /tahun


Jumlah Crew = 8 Orang
Gaji Per Crew/Bulan = Rp 10,000,000.00
Repair & Maintenance = 3% dari harga kapal
= Err:509 /tahun
Asuransi Kapal = 1,5% dari harga kapal
= Err:509 /tahun
Supplies Crew = Rp 50,000.00 /orang/hari
= Err:509 /tahun
Dokumen & Administrasi = Rp 5,000,000.00 /trip
= Err:509

Total = Err:509 /tahun


AN PROPULSI & DAYA MESIN :

= 60.79 m P/D

= 13.43 m D
= 6.38 m z
= 4.52 m nrpm

= 0.10532263651964 nrps

= 2726.84 m3 Cb
= 2795.01 ton Vs

= 0.4 RT

= 1.33
= 0.0020
= 0.00061

= (1+ k) CF + CA
= 0.0033
ciple of Naval Architecture Vol. II hal. 162

= 0.3 Cb + 10 Cv Cb - 0.1
= 0.15
ciple of Naval Architecture Vol. II hal. 163

= 0.1 ; thrust deduction friction


ciple of Naval Architecture Vol. II hal. 163

= V (1 - w) ; Speed of Advantages
= 2.20
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27

Power (EHP) :
= RT.Vs
= 37.10 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27

wer (THP) :
= PE∙(1−w)/(1−t)
= 35.22 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29

ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.05
pter 11 Parametric Design - M.G. Parson ; page 11-29

= Open Water Test Propeller Efficiency


= (J/(2∙n))∙(KT/KQ)
= 0.6
= Rotative Efficiency
= 0.985

= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591

Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 62.77 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 64.06 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer Calculation (BHP) :


= Reduction Gear Efficiency
= 0.98
= Brake Horse Power (BHP0)
= PS/ηR
= 65.36 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
= 15% ∙ PB0
= 115% ∙ PB0 = BHP
= 75.17 Kw
= BHP ∙ 1.3596 HP
= 102.20 HP
pter 11 Parametric Design - M.G. Parson ; page 11-30
Merek Tipe Daya (kW) SFOC (g/kW/hr)

CUMMINS NTA855-M400 298 103


CATERPILLAR 3208 325 235
CUMMINS KTTA 19-M3 447 184
YUCHAI YC6C670L 492 195
YUCHAI YC6C700L 515 195
YUCHAI YC6C730L 536 195
YUCHAI YC6C865L 636 195
YUCHAI YC6C925L 680 195
YUCHAI YC6C960L 706 195
YUCHAI YC6CL1035L 760 195
MAN B&W 6L23/30A-E 800 188
MAN B&W 6L23/30A 960 189
CATERPILLAR 6M20C 1020 191
CATERPILLAR 6M20C 1080 190
CATERPILLAR 6M20C 1140 192
CATERPILLAR 6M20C 1200 189
MAN B&W 8L23/30A 1280 191
MAN B&W 6L21/31 1290 190
CATERPILLAR 8M20C 1360 192
CATERPILLAR 8M20C 1440 189
MAN B&W 6L28/32A 1470 191
MAN B&W 5L27/38 1500 190
MAN B&W 7L21/31 1505 192
CATERPILLAR 8M20C 1520 188
CATERPILLAR 9M20C 1530 185
CATERPILLAR 8M20C 1600 185
MAN B&W 5L27/38 1600 187
CATERPILLAR 9M20C 1620 185
CATERPILLAR 9M20C 1710 185
MAN B&W 7L28/32A 1715 189
MAN B&W 8L21/31 1720 195
CATERPILLAR 9M20C 1800 195
MAN B&W 9L21/31 1935 195
MAN B&W 8L28/32A 1960 195
MAN B&W 6L27/38 1980 194
CATERPILLAR 6M25C 2000 194
MAN B&W 9L28/32A 2205 194
MAN B&W 7L27/38 2310 194
CATERPILLAR 8M25C 2320 194
CATERPILLAR 8M25C 2400 196
CATERPILLAR 9M25C 2610 196
MAN B&W 8L27/38 2640 196
CATERPILLAR 8M25C 2666 194
CATERPILLAR 9M25C 2700 194
MAN B&W 9L27/38 2970 194
CATERPILLAR 9M25C 3000 194
MAN B&W 3000 189
MAN B&W 3500 195
MAN B&W 4000 195
MAN B&W 4500 195
MAN B&W 5000 195
MAN B&W 5500 194
MAN B&W 6000 194
MAN B&W 6500 194
MAN B&W 7000 194
MAN B&W 7500 189
MAN B&W 8000 192
MAN B&W 8500 194

LARY ENGINE

Merek Tipe Daya (kW) SFOC (g/kW/hr)

CATERPILLAR C9 217 212.1


CATERPILLAR C9 253 228.8
CATERPILLAR C9 253 209
CATERPILLAR C9 288 206.6
CATERPILLAR C9 311 229.5
CATERPILLAR C9 361 211.7
CATERPILLAR C18 404 210
CATERPILLAR C18 499 217
CATERPILLAR C18 514 209
CATERPILLAR C15 536 218.8
CATERPILLAR C15 540 218.8
CATERPILLAR C18 587 208
CATERPILLAR C18 624 215
CATERPILLAR C18 660 209
CATERPILLAR C32 791 203.8
CATERPILLAR C32 916 210.8
CATERPILLAR C32 923 203
CATERPILLAR C32 1047 210.4
CATERPILLAR C32 1172 207
CATERPILLAR C32 1333 207.2
CATERPILLAR C33 1500 209
CATERPILLAR C34 1700 206.6
CATERPILLAR C35 2153 218.8
CATERPILLAR C36 2337 218.8
CATERPILLAR C37 2745 210
CATERPILLAR C38 3000 209
CATERPILLAR C39 3254 208
CATERPILLAR C40 3559 209
CATERPILLAR C41 3749 217
CATERPILLAR C42 4000 215
BIAYA PERJALANAN :

Biaya bahan bakar :


1 > Main Engine

2 > Aux. Engine

Total

BIAYA PELABUHAN :

Pelabuhan Dumai
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal =
Tarif Tetap =
Tarif Variabel =

total

Pelabuhan Jakarta
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal <=
Tarif Tetap =
Tarif Variabel =

total

BIAYA BONGKAR MUAT:


Tarif Bongkar muat = Rp 30,000

>> Muat = Rp -
>> Bongkar = Rp -
Total = Rp -
= 1.00
= 2.83
= 4.00
= 110
= 1.83
= 0.74
= 2.57 m/s
= 14.42 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2

(parametric design hal 11-27)

; untuk mesin di after


Mesin yang SFOC yang
SLOC (g/kW/hr) Fuel Oil Consumption (ton)
memungkinkan memungkinkan

1 1 103 Err:509
1 1 235 Err:509
1 1 184 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1 1 188 Err:509
1.0 1 189 Err:509
0.6 1 191 Err:509
0.6 1 190 Err:509

0.6 1 192 Err:509

0.7 1 189 Err:509


1.0 1 191 Err:509
0.8 1 190 Err:509
0.7 1 192 Err:509
0.7 1 189 Err:509
1.0 1 191 Err:509
1.0 1 190 Err:509
0.8 1 192 Err:509
0.7 1 188 Err:509
0.7 1 185 Err:509
0.7 1 185 Err:509
1.0 1 187 Err:509
0.8 1 185 Err:509
0.8 1 185 Err:509
1.0 1 189 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1.0 1 195 Err:509
1.0 1 194 Err:509
0.8 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
0.8 1 194 Err:509
0.8 1 196 Err:509
0.9 1 196 Err:509
1.0 1 196 Err:509
0.9 1 194 Err:509
0.9 1 194 Err:509
1.0 1 194 Err:509
0.9 1 194 Err:509
0.9 1 189 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.0 1 194 Err:509
1.1 1 189 Err:509
1.1 1 192 Err:509
1.1 1 194 Err:509

Mesin yang SFOC yang


SLOC (g/kW/hr) Fuel Oil Consumption (ton)
memungkinkan memungkinkan

1.1 1 212.1 Err:509


1.1 1 228.8 Err:509
1.0 1 209 Err:509
1.0 1 206.6 Err:509
1.1 1 229.5 Err:509
1.1 1 211.7 Err:509
1.1 1 210 Err:509
1.1 1 217 Err:509
1.0 1 209 Err:509
1.1 1 218.8 Err:509
1.1 1 218.8 Err:509
1.0 1 208 Err:509
1.1 1 215 Err:509
1.0 1 209 Err:509
1.0 1 203.8 Err:509
1.1 1 210.8 Err:509
1.0 1 203 Err:509
1.1 1 210.4 Err:509
1.0 1 207 Err:509
1.0 1 207.2 Err:509
1.0 1 209 Err:509
1.0 1 206.6 Err:509
1.1 1 218.8 Err:509
1.1 1 218.8 Err:509
1.1 1 210 Err:509
1.0 1 209 Err:509
1.0 1 208 Err:509
1.0 1 209 Err:509
1.1 1 217 Err:509
1.1 1 215 Err:509
ITB
= Err:509
= Err:509
= Err:509
Err:509
= Err:509

tarif
Rp 60 Per GT/Kunjungan

Rp 49 per GT/Etmal

Rp 117,150 per GT/Kapal/Gerakan


Rp 53 per GT/Kapal/Gerakan
1539 GT
Rp 144,000 per Kapal yang Ditunda/Jam
Rp 2 per GT/Kapal yang Ditunda/Jam

total

tarif
Err:509 Per GT/Kunjungan

Err:509 per GT/Etmal

Err:509 per GT/Kapal/Gerakan


Err:509 per GT/Kapal/Gerakan
1539 GT
Err:509 per Kapal yang Ditunda/Jam
Err:509 per GT/Kapal yang Ditunda/Jam

total

/ton

/tahun
Fuel Oil
Biaya ME
Consumption (liter)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Fuel Oil
Biaya AE
Consumption (liter)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun

total
-

-
-

Rp -
-

Rp -

total
Err:509

Err:509

Err:509
Err:509

Err:509
Err:509

Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :

MCR Mesin ME :
BHP

Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mesin

MCR Mesin AE :
BHP

Mesin :
No. Urut Mesin
Merk
Type

Daya Mesin Yang Digunakan :


Daya

Konsumsi Bahan Bakar :


SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mensin
Berat Mesin
(ton)

1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509

Berat Mesin

(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
ITB

Capital Cost Err:509


Operating Cost Err:509
Voyage Cost Err:509
Cargo Handling Cost Rp -
TOTAL COST Err:509

Unit Cost Rp -

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 75.17 Kw
= 102.20 HP

Err:509
= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton

= 18.79 Kw
= 25.55 HP

= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =

/ton

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
112.75
28.19
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509

Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam

Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN

Input Data :
D= 2.828

n= 110
Z= 4
AE/AO = 0.40
PD = 63
PB = Err:509

PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=

Gearbox

Wgear =

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Shafting
𝑑s =

l =
=
=
=

M 
  =
 l 
=

M =
=

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Propeller

K =
=
=

Wprop =
=
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176

Electrical Units

Wagg =
P = PB
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176

Other Weight

Wot =
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177

Weight Total =
=

Titik Berat Machinery

hdb =
=
=
BKI Vol II. Bab 24 -3.3

KG =
=

Chapter 11 Parametric Design - M.G. Parson ; page 11-25

LCB =
=
=

LCGM =
=

LCGFP =
=
BERAT BAJA

Input Data :
m L

H
buah B
T

kW (Delivery Power at Propeller) FN


kW (Brake Horse Power) CSO Bulk Carrier

CKG Bulk Carriers

PERHITUNGAN :

Berat Mesin Induk 1. Volume Forecastle (VFC)


ton Panjang Forecastle (ℓFC)
Err:509
Lebar Forecastle (bFC)
Berat Mesin Genset
0.5 ton Tinggi Forecastle (tFC)
Volume Forecastle (VFC)

2. Volume Poop (VPO)


 PB 
( 0.34 ~ 0.4 ) ton Panjang Poop (ℓPO)
 n 
Err:509 ton Lebar Poop (bPO)
hneekluth Vol 2. hal 175
Tinggi Poop (tPO)
Volume Poop (VPO)

Diameter Poros Propeller


1/ 3 Volume Superstructure (VA)
 PD 
11,5*  
 n 
9.5 cm 1. Volume Layer 2 (VDH2)
Panjang Layer 2 (ℓDH2)
Panjang Poros Propeller
2,13 m untuk area di ceruk buritan Lebar Layer 2 (bDH2)
1,8 m untuk area gangway
3.93 m Tinggi Layer 2 (tDH2)
Volume Layer 2 (VDH2)

Berat poros / panjang poros


2/3 2. Volume Layer 3 (VDH3)
 PD 
0.081   Panjang Layer 3 (ℓDH3)
 n
0.1 ton/m Lebar Layer 3 (bDH3)

Berat Poros Propeller Tinggi Layer 3 (tDH3)


M  Volume Layer 3 (VDH3)
 l
 l 
0.2 Ton
hneekluth Vol 2. hal 175 3. Volume Layer 4 (VDH4)
Panjang Layer 4 (ℓDH4)

Lebar Layer 4 (bDH4)

Koefisien Fixed Propeller


(𝑑s/𝐷)∙(1.85∙𝐴𝐸/𝐴𝑂)−((𝑧−2)/100) Tinggi Layer 4 (tDH4)

0.005 Volume Layer 4 (VDH4)

Berat Propeler
D3 · K 4. Volume Anjungan (VAN)

0.11 t/m3 Panjang Anjungan (ℓAN)

hneekluth Vol 2. hal 175-176 Lebar Anjungan (bAN)

Tinggi Anjungan (tAN)


Volume Anjungan (VAN)
0.001P (15 + 0.; P=Pb

Err:509 Ton Volume Deck House (VDH)

hneekluth Vol 2. hal 176

DA

0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U

Tinggi Double bottom CS


B/15
0.9 m
T
WST
hdb+0.35∙(H−hdb)

2.8 m

on ; page 11-25 CKG

Panjang Ceruk Buritan KG


4% · LPP

2.3 m
LCG(%)

(-0,5 . Lpp ) + LCB +5


-21.9 m LCGM

-LCGm + ( 0,5.Lpp) LCGFP


51.1 m
Input Data :
= 58.45 m
= 6.38 m
= 13.43 m
= 4.52 m
= 0.11
= 0.0752

0.52 – 0.54

Volume Superstructure (VA)


ecastle (VFC)
ecastle (ℓFC) = 10,5% · LPP
= 6.14 m
= selebar kapal
= 13.43 m
= 2.5 m
ecastle (VFC) = 0.5 · ℓFC · bFC · tFC
= 103.01 m3

= 17,2% · LPP
= 10.05 m
= selebar kapal
= 13.43 m
= 2.5 m
= ℓPO · bPO · tPO
= 337.46 m3
tructure (VA) = VFC + VPO
= 440.47 m3
Volume Deck House (VDH)

= 16,1 % · L
= 9.4 m
= B-4
= 9.43 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 221.78 m3

er 3 (VDH3)
= 11,5 % · L
= 6.72 m
= B-4
= 9.43 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 158.41 m3
er 4 (VDH4)
= 8,5 % · L
= 5 m
= B-4
= 9.43 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4

= 117.09 m3

ungan (VAN)

= 7%·L
= 4.1 m
= B- 8
= 5.43 m
= 2.5 m
= ℓAN · bAN · tAN
55.51 m3

House (VDH) = VDH2 + VDH3 + VDH4 + VAN


= 552.78 m3

Berat Baja (WST)


= Tinggi Kapal Setelah Dikoreksi dengan Superstucture dan Deck House
= H+(VA+VDH)/(LPP∙B)
= 7.64 m

= 0.0752 t/m3

= Berat Kapal
= 2795.01 ton

= log⁡〖∆ /100 〗
= 1.45

CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11

Total Berat Baja


= LPP · B · DA · CS
= 674.73 ton

Titik Berat Baja


= Koefisien KG Baja
= 0.54
= DA * CKG
= 4.13 m

= -0,15 + LCB(%)
= 0.838 %L
= LCG(%) · LPP
= 0.490 m
= 0.5 · LPP - LCGM
= 28.74 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN

Grup III (Accommodation)


The specific volumetric and unit area weights are:
For small and medium sized cargo ships :
For large cargo ships, large Bulk Carriers, etc :
Therefore, for oat, it is used :

• POOP
Lpoop = 10.05
Bpoop = 13.43
Apoop = 134.99
Wpoop = 27.00
• DECKHOUSE
Layer II
LDH II = 9.41
BDH II = 9.43
ADH II = 88.71
WDH II = 17.74

Layer IV
LDH IV = 4.97
BDH IV = 9.43
ADH IV = 46.83
WDH IV = 9.37

W Group III = 71.22

Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C

= 76.09

Equipment and Outfitting Total Weight


= 147.30

Outfit Weight Center Estimation


DA = 7.64
KGE&O = 1.02 -1.08DA

= 8.03
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 36.826
Lcb = 2.923
LCGM dr FP = 52.867
LCGM = -23.641
Lkm = 10.000
Layer II

LDH II = 9.411
WDH II = 9.427
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide

= -21.009

Layer III

LDH III = 6.722


WDH III = 9.427
LCGII = -19.664

Layer IV
LDH IV = 4.968
WDH IV = 9.427
LCGIII = -18.787

Wheelhouse
LWH = 4.092
WWH = 5.427
LCGIV = -18.349

2. LCG2 (37,5% WE&O at LCGDH)


WE&O DH = 55.239
LCGM DH = -19.583

3. LCG3 (37,5% WE&O at midship)

WE&O Midship = 55.239


midship = 0

LCGE&O (LCG di belakang midship)


= -13.254
LCGE&O (dari FP)
= 42.480
Parametric design chapter 11, hal. 11-25
BERAT CONSUMABLE & CREW

Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =

• FORECASTLE Jumlah Crew


m L = 6.14 m Cst
forecasle =
m B forecastle = 13.43 m Cdk =
m2 A forecastle = 82.40 m2 Ceng
=
ton W forecastle = 16.48 ton cadet =
Jumlah Crew (Zc) =
=
Layer III =
m LDH III = 6.72 m Modul TMK bab Consumable and Crew
m BDH III = 9.43 m CC&E =
m2 ADH III = 63.36 m2 WC&E =
ton WDH III = 12.67 ton =
=
Wheel House Parametric design chapter 11, hal. 11-25
m LWH = 4.09 m

m BWH = 5.43 m Main Engine


m 2 AWH = 22.20 m 2
Fuel Oil
ton WWH = 4.44 ton SFR
=
MCR =
ton Margin
=
WFO
=

(0.18 ton / m2 < C < 0.26 ton / m2 =


[ton/m ] 2
=
(L*B*D) 2/3
*C
[ton]

Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA

m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m

ton

[0,5*L+(Lkm+Lcb)+0,5*Ideck] Lubricating Oil


m SFR =
MCR
=
Margin =
m WLO'
=
ton =
m

Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24

m
WFWtotal =

m WFW =
ton =
m

Provision & Store


CPR
=
ton =
m WPR
=
=

ton
m

m
UMABLE & CREW

VS = 2.57 m/s
58.45 m = 5.00 nm/jam
S
13.43 m = Err:509 nm
6.38 m
4.52 m

1.2 ; Coef. Steward (1.2 ~ 1.33)


11.5 ; Coef. Deck (11.5 ~ 14.5)
8.5 ; Coef. Engine (8.5 ~ 11 untuk diesel)
2 ; Umumnya 2 orang
C st∙Cdk∙((Lpp∙B∙H∙35)/10^5 )^(1/6) + Ceng ∙ (BHP/ 〖 10 〗 ^5)
^(1/3)+cadet
17.2 orang
17 orang
Consumable and Crew

0.17 ton/orang ; Asumsi rata-rata berat manusia


Berat Crew Total
Zc · Cc&e

2.89 ton
gn chapter 11, hal. 11-25

Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

Err:509 ton/kW h
18.792 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

0.17 ton/orang . hari


gn chapter 11, hal. 11-24

0.49 ton

WFW total + 4% · WFW total


; terdapat penambahan koreksi 4%

0.511 ton

10 kg/orang h; Koef. Provision & Store


0.000416666666667 ton/ orang jam
CP∙S/Vs ∙Zc
; Berat Provision & Store

Err:509 ton
1. LWT
Steel Weight
WST = 674.73 ton

Equipment & Outfitting Weight


WE&O = 147.30 ton

Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton

GROSS TONAGE
Input Data
H = 6.38 m
T = 4.52 m
VPO = 337.46 m3
VFC = 103.01 m3
VDH = 552.78 m3
∆ = 2795.007 ton
Zc = 17 orang
N1 = 0 orang
N2 = 0 orang

Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)

= 4603.98 m3
VH = VPO + VFC + VDH
= 993.25 m3
V = VU + V H
= 5597.23 m3
K1 = 0.2+0.02∙log_10⁡V
= 0.27
GT = V ∙ K1

= 1539.01 m3
Dumai - Jakarta
OF Chemical Tanker SPOB
Total Biaya Err:509 Err:509
Total Err:509
Biaya Satuan Rp -

DV
LPP 95.17 90.76
B 12.21 13.73
H 6.03 6.34
T 4.94 5.25
Frekuensi 46 123

T min 1
T max 5.9
Chemical Tanker SPOB
Frekuensi sisa Err:509 Err:509
Roundtrip per tahun Err:509 Err:509
Payload 0.00 0.00
Total Angkut - ton
Permintaan Err:509 ton
Freeboard 1.1 1.09
Batasan Freeboard >= 1
Keterangan Chemical Tanker SPOB
L/B 7.8 6.6
B/T 2.5 2.6
L/T 19.3 17.3
B/H 2.0 2.2

N Kapal Err:509 Err:509


ITB Biaya Penalti
Err:509 Sisa Permintaan =
Tarif Penalti =
Total Penalti =

Chemical Tanker SPOB


Min Maks Min
58.45 10 177.0 16.50833
13.43 5.6 17.7 3.5
6.38 3.8 7.4 1.1
4.52 1 5.9 1
0 0 1000 0

ITB
Err:509
Err:509
0.00

1.85
Chemical Tanker SPOB
ITB Min Maks Min
4.4 3.5 10 2.7
3.0 1.8 5 4.7
12.9 10 30 16.5
2.1 1.47 2.38 3.2

Err:509
Biaya Penalti Frekuensi Sisa
Err:509 ton Total Penalti =
Rp 10,123,170 per ton
Err:509

SPOB ITB
Maks Min Maks
175.1 16 120.5
33.4 5.0 21.2
5.6 1.8 4.5
5.9 1 5.9
1000 0 1000

SPOB ITB
Maks Min Maks
5.2 3.1 5.7
7.8 3.2 6.1
29.7 16.0 20.4
6.0 2.8 4.7
a Penalti Frekuensi Sisa
Err:509
Duami - Surabaya : Chemical Tanker

No Pelabuhan Asal/Tujuan

1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan

DATA PENDUKUNG Chemical Tanker


Jumlah hari = 365
Hari Kerja = 330
Kecepatan Dinas = 11
Kecepatan Ballast = 12
Harga HFO = Rp 8,724
Harga MDO = Rp 9,000
Kecepatan Loading = 200
Kecepatan Unloading = 200
Kurs = Rp 13,000
Umur 25

DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 108.47
B = 12.18
H = 5.73
T = 4.72
GT = 2602
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 108.47
B = 12.18
H = 5.73
T = 4.72
VS = 11
= 5.6584

Freeboard = 1.01

PERBANDINGAN UKURAN UTAMA :


L/B = 8.902
B/T = 2.579
L/T = 22.963
L/16 = 6.780
B/H = 2.125
L/B 8.90 3,5 < L/B < 10
B/T 2.58 1,8 < B/T < 5
L/T 22.96 10 < L/T < 30
H>L/16 6.78 H > L/16
B/H 2.12 1,47>B/H>2,38
PERHITUNGAN FROUD
LWL = 104%LPP
= 112.81

Fn = Vs / √( g. L )
= 0.170

PERHITUNGAN KOEFISIEN UKURAN UTAMA :


Koefisien Blok (Watson & Gilfillan) :
CB = – 4.22 + 27.8 √Fn – 39.1 Fn + 46.6 Fn3
= 0.82
Koefisien Luas Midship (Series '60) :
CM = 0.977 + 0.085 (CB – 0.60)
= 1.00
Koefisien Prismatik :
Cx = Cm
Cр = Cb/Cx
= 0.83
Koefisien Bidang Garis Air ;
CWP = Cb/(0.471+(0.551*Cb))
= 0.89
Longitudinal Center of Bouyancy :
a. LCB (%) = -13,5 + 19,4 ⋅ Cp
= 2.55
b. LCB dari M = LCB % / 100 . LPP
= 2.77
c. LCB dari AP = 0.5 · LPP + LCBM
= 57.00

Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 108.47
LWL = 112.81
B = 12.18
H = 5.73
T = 4.72
Vs = 5.66

Perhitungan Viscous Resistance

Cfo (Friction Coefficient - ITTC 1957)


𝜇/𝑟
v= = 1.188 x 10-6 m2/s (for salt water)
(kinematic viscosity)

(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)

=
537,187,962.7
Cfo =〖 (log⁡〖𝑅𝑛 − 2) 〗〗 ^2
0.075/

= 0.00166

• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =

= 0.232
〖𝐿𝑤𝑙〗 ^3/𝛻 268.31
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =

= 1.208

• Wetted Surface Area


Amid= Cm . B . T
ABT = 1.000 ---> tidak menggunakan
(luas Bulb di depan FP)

𝐿(2𝑇+𝐵) 〖𝐶 _𝑀 〗 ^0.5 (0.4530+0.4425 𝐶_𝐵−0.2862 𝐶_𝑀−0.003467 𝐵/𝑇+0.3696 𝐶_𝑊𝑃 )


+2.38 𝐴_𝐵𝑇/𝐶_𝐵 S=

= 2079.699 m2

• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆

= 68.260 kN

Perhitungan Resistance of Appendages

• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)

= 17.935
Lkeel = 0.6.Cb.Lwl Hkeel =
= 55.779 =
Sapp = Srudder + Sbilge Keel

= 82.290
• Stot = S + Sapp
= 2161.989
Harga (1 + k2) ---> PNA Vol II hlm. 92

Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome

+ k2 〖
(1(∑▒ 𝑆 _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )

= 1.400

• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=

= 1.215
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =

= 71.390 kN

Perhitungan Wave Making Resistance

• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =

= 38.4932
B/L = 0.108
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.108
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1

= 0.773

• Harga C2 ---> PNA Vol II hlm. 92


A BT γ B
e 1.89
C2 = BT  γ B  i 
---> menggunakan Bulb
=1
• Harga C3 ---> PNA Vol II hlm. 93
C3 = 1 - 0.8 AT (B.T.CM) ---> AT = 0 ( luas transom saat kecepatan
= 1.000 saat V=0 transom tidak tercelup air)
0.56∙√(ABT )

• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3

= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.148〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =

= -1.602

• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= -0.00001

• Harga λ
L/B = 9.259
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.919

• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ⁡〖〖𝐹𝑛〗 ^(−2)) 〗

= 0.00028944

• CA (Correlation Allowance)
Tf/Lwl = 0.0419
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000495
• w (Gaya Berat)
w= ∆.g
= 53807.210 kN

• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =

= 15.5738540145463 kN

Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 104.52 kN
= 104520.74 N

• Rtotal + 15% (margin)


= 120.199 kN
Kedalaman
Volume (Ton/Thn) Maksimum Utility

Muat Bongkar LWS BOR


103,067,600 -7 60%
103,067,600 -9 60%
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509

nker Jarak (Nm) Dumai


hari Dumai -
hari Medan Err:509
knot Jakarta Err:509
knot Surabaya Err:509
/liter
/liter L/B =
ton/jam B/T =
ton/jam L/T =
B/H =
thn Unit Cost =

ROUNDTRIP
ton > Seatime
ton Dumai - Surabaya = Err:509
m Medan - Surabaya = Err:509
m = Err:509
m = Err:509
m > Porttime =
Dumai = 6
m = 0.25
Surabaya = 4
103,067,600 0.17
1 =
Waktu Roundtrip = Err:509
m Waktu Roundtrip yang ditentukan Err:509
m Roundtrip per tahun = Err:509
m Jumlah Kapal = Err:509
m Mauatan/Kapal/Tahun = -
knot Frekuensi Sebenarnya = 72
m/S

URAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITOLAK
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81 m/s²
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025 ton/m3

Principle of Naval Architecture Vol. II hal. 58

√Fn – 39.1 Fn + 46.6 Fn3


(Parametric Ship Design hal. 11-11)

5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)

(Parametric Ship Design hal. 11-10)

(Parametric Ship Design hal. 11-16)


(Parametric Ship Design hal. 11-19)
% Lpp

m dari M

m dari AP

Lwl . B . T .Cb
5351.16 m3
Lwl . B .T . Cb .ρ
5484.93 ton

KOEFISIEN UKURAN UTAMA :


m CB = 0.82
m CM = 1.00
m CP = 0.83
m CWP = 0.89
m Fn = 0.170089675180444
m/s Cstern = 0
Lcb = 2.77

m2/s (for salt water)

Practical Ship Design hlm .168

Practical Ship Design hlm .157

Pinciple of Naval Architecture Vol II hlm. 91


Pinciple of Naval Architecture Vol II hlm. 91

10% Amidship

3696 𝐶_𝑊𝑃 )

Pinciple of Naval Architecture Vol II hlm. 90

faktor tipe kapal (umum)


faktor tipe kemudi (umum)
faktor tipe profil kemudi (NACA)
faktor letak baling-baling
---> BKI Vol II hlm 14-2

0.18/(Cb-0.2) SBilge Keel = 4.Lkeel.HKeel


0.288 = 64.354
Value of 1+k2
--> (1+k2)=
1.3 to 1.5 1.4
2.8
1.5 to 2.0
3.0
2.0
1.4
2.8
2.0
2.7

_𝑖 〗 )/(∑▒𝑆_𝑖 )

Pinciple of Naval Architecture Vol II hlm. 90

〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3

〗 ^(−1.3757)
〗 ^(−1.3757)

luas transom saat kecepatan 0,


dak tercelup air)

Principle of Naval Architecture Vol II hlm. 92

---> untuk Cp < 0.8

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

---> untuk Tf/Lwl >0.04


/𝑊 𝑊
Konsumsi
ksimum Utility IT+WT+AT Batubara BIAYA KAPITAL :
SOR/YOR Jam/call ton/hari Perhitungan
70% 6 282,377
70% 4 282,377 Input Data
Err:509 Err:509 Err:509 WST

Err:509 Err:509 Err:509 WE&O


WME
Medan Jakarta Surabaya Harga Baja
Err:509 Err:509 Err:509 Perhitungan Biaya
- Err:509 Err:509 1. Structural Cost
Err:509 - 386 PST
Err:509 386 -
min max 2. Outfit Cost
8.90 3.5 10 PE&O
2.58 1.8 5
22.96 10 30 3.Machinery Cost
2.12 1.47 2.38 PME
Rp -
4. Non-weight Cost
Load Factor Kapal 90% CNW

Utilitas Alat 67% PNW


jam Kecepatan Alat 200 ton/hour
jam Biaya
jam
hari Perhitungan Harga
1. Keuntungan
jam
hari 2. Inflasi
jam
hari 3. Pajak

jam Err:509
hari Harga
kali
kapal
Ton
kali
BIAYA OPERASIONAL

Gaji Crew
Vol. I hal. 19 Jumlah Crew
Vol. I hal. 19 Gaji Per Crew/Bulan
Vol. I hal. 19 Repair & Maintenance

Vol. I hal. 19 Asuransi Kapal

Supplies Crew

Dokumen & Administrasi

Total
m
PERHITUNGAN PROPULSI & DAYA MESIN :
INPUT DATA :
Lwl =
B =
H =
T =
Fn =
Vol. Disp. =
Disp. =
AE/A0 =

Perhitungan Awal :
1+k =
CF =
CA =

CV =
=
Principle of Naval Architecture Vol. II hal. 162

w =
=
Principle of Naval Architecture Vol. II hal. 163

t =
Principle of Naval Architecture Vol. II hal. 163

Va =
=
Principle of Naval Architecture Vol. II hal. 161
Chapter 11 Parametric Design - M.G. Parson ; page 11-27

Effective Horse Power (EHP) :


PE =
=
Chapter 11 Parametric Design - M.G. Parson ; page 11-27

Thrust Horse Power (THP) :


PT =
=
Chapter 11 Parametric Design - M.G. Parson ; page 11-29

Propulsive Coefficient Calculation :


ηH =
=
=
Chapter 11 Parametric Design - M.G. Parson ; page 11-29

ηO =
=
=
ηr =
=

ηD =
=
=

Delivered Horse Power (DHP) :


PD =
=
=
Chapter 11 Parametric Design - M.G. Parson ; page 11-29

Shaft Horse Power (SHP) :


ηS =
=
PS =
=
=
Chapter 11 Parametric Design - M.G. Parson ; page 11-29

Brake Horse Power Calculation (BHP) :


ηR =
=
PB0 =
=
=
Chapter 11 Parametric Design - M.G. Parson ; page 11-29
Koreksi MCR =
PB =
BHP =
=
=
Chapter 11 Parametric Design - M.G. Parson ; page 11-30
MAIN ENGINE

No Merek

1 CUMMINS
2 CATERPILLAR
3 CUMMINS KTTA
4 YUCHAI
5 YUCHAI
6 YUCHAI
7 YUCHAI
8 YUCHAI
9 YUCHAI
10 YUCHAI
11 MAN B&W
12 MAN B&W
13 CATERPILLAR
14 CATERPILLAR
15 CATERPILLAR
16 CATERPILLAR
17 MAN B&W
18 MAN B&W
19 CATERPILLAR
20 CATERPILLAR
21 MAN B&W
22 MAN B&W
23 MAN B&W
24 CATERPILLAR
25 CATERPILLAR
26 CATERPILLAR
27 MAN B&W
28 CATERPILLAR
29 CATERPILLAR
30 MAN B&W
31 MAN B&W
32 CATERPILLAR
33 MAN B&W
34 MAN B&W
35 MAN B&W
36 CATERPILLAR
37 MAN B&W
38 MAN B&W
39 CATERPILLAR
40 CATERPILLAR
41 CATERPILLAR
42 MAN B&W
43 CATERPILLAR
44 CATERPILLAR
45 MAN B&W
46 CATERPILLAR
47 MAN B&W
48 MAN B&W
49 MAN B&W
50 MAN B&W
51 MAN B&W
52 MAN B&W
53 MAN B&W
54 MAN B&W
55 MAN B&W
56 MAN B&W
57 MAN B&W
58 MAN B&W

AUXILARY ENGINE

No Merek

1 CATERPILLAR
2 CATERPILLAR
3 CATERPILLAR
4 CATERPILLAR
5 CATERPILLAR
6 CATERPILLAR
7 CATERPILLAR
8 CATERPILLAR
9 CATERPILLAR
10 CATERPILLAR
11 CATERPILLAR
12 CATERPILLAR
13 CATERPILLAR
14 CATERPILLAR
15 CATERPILLAR
16 CATERPILLAR
17 CATERPILLAR
18 CATERPILLAR
19 CATERPILLAR
20 CATERPILLAR
21 CATERPILLAR
22 CATERPILLAR
23 CATERPILLAR
24 CATERPILLAR
25 CATERPILLAR
26 CATERPILLAR
27 CATERPILLAR
28 CATERPILLAR
29 CATERPILLAR
30 CATERPILLAR
Perhitungan Harga Kapal

= 1033.061 Ton
= 216.246 Ton
= Err:509 Ton
= $ 1,100.00 /ton

= WST ∙ Harga Baja

= $ 1,136,367.65

= WE&O ∙ CE&O
= $ 237,870.47

= WME ∙ CME
= Err:509

= 10%
= CNW ∙ (PST + PE&O + PME)
= Err:509
= PST + PE&O + PME + PNW
= Err:509

= 5% ∙ Biaya
= Err:509
= 2% ∙ Biaya
= Err:509
= -9% ∙ Biaya
= Err:509

= Biaya + Keuntungan + Inflasi + Pajak


= Err:509
= Err:509
= Err:509 /tahun

= Err:509 /tahun
= 18 Orang
= Rp 10,000,000.00
= 3% dari harga kapal
= Err:509 /tahun
= 1,5% dari harga kapal
= Err:509 /tahun
= Rp 50,000.00 /orang/hari
= Err:509 /tahun
= Rp 5,000,000.00 /trip
= Err:509

= Err:509 /tahun
112.81 m P/D =

12.18 m D =
5.73 m z =
4.72 m nrpm =

0.17008967518044 nrps =
5351.16 m3 Cb =
5484.93 ton Vs =

0.4 RT =

1.22
0.0017
0.00049

(1+ k) CF + CA
0.0025

0.3 Cb + 10 Cv Cb - 0.1
0.17

0.1 ; thrust deduction friction

V (1 - w) ; Speed of Advantages
4.71

Parson ; page 11-27

RT.Vs
680.13 kW
Parson ; page 11-27

PE∙(1−w)/(1−t)
628.84 kW
Parson ; page 11-29

Hull Efficiency
(1 - t)/(1 - w) ; = PE / PT
1.08
Parson ; page 11-29

Open Water Test Propeller Efficiency


(J/(2∙n))∙(KT/KQ) (propeller B-series = 0.5 - 0.6 )
0.6
Rotative Efficiency ; Ship Resistance and Propultion
0.985 Modul 7 hal. 2

Quasi-Propulsive Coefficient
ɳoɳr (parametric design hal 11-27)
0.591

Delivered Power at Propeller


PE/ηD
1150.82 Kw
Parson ; page 11-29

Shaft Efficiency ; (0.981 ~ 0.985)


0.98 ; untuk mesin di after
Shaft Power
PD/ηS

1174.30 Kw
Parson ; page 11-29

Reduction Gear Efficiency


0.98
Brake Horse Power (BHP0)
PS/ηR

1198.27 Kw
Parson ; page 11-29
15% ∙ PB0
115% ∙ PB0 = BHP
1378.01 Kw
BHP ∙ 1.3596 HP
1873.54 HP
Parson ; page 11-30
Tipe Daya (kW) SFOC (g/kW/hr) SLOC (g/kW/hr)

NTA855-M400 298 103 1


3208 325 235 1
19-M3 447 184 1
YC6C670L 492 195 0.8
YC6C700L 515 195 0.8
YC6C730L 536 195 0.8
YC6C865L 636 195 0.8
YC6C925L 680 195 0.8
YC6C960L 706 195 0.8
YC6CL1035L 760 195 0.8
6L23/30A-E 800 188 1
6L23/30A 960 189 1.0
6M20C 1020 191 0.6
6M20C 1080 190 0.6
6M20C 1140 192 0.6
6M20C 1200 189 0.7
8L23/30A 1280 191 1.0
6L21/31 1290 190 0.8
8M20C 1360 192 0.7
8M20C 1440 189 0.7
6L28/32A 1470 191 1.0
5L27/38 1500 190 1.0
7L21/31 1505 192 0.8
8M20C 1520 188 0.7
9M20C 1530 185 0.7
8M20C 1600 185 0.7
5L27/38 1600 187 1.0
9M20C 1620 185 0.8
9M20C 1710 185 0.8
7L28/32A 1715 189 1.0
8L21/31 1720 195 0.8
9M20C 1800 195 0.8
9L21/31 1935 195 0.8
8L28/32A 1960 195 1.0
6L27/38 1980 194 1.0
6M25C 2000 194 0.8
9L28/32A 2205 194 1.0
7L27/38 2310 194 1.0
8M25C 2320 194 0.8
8M25C 2400 196 0.8
9M25C 2610 196 0.9
8L27/38 2640 196 1.0
8M25C 2666 194 0.9
9M25C 2700 194 0.9
9L27/38 2970 194 1.0
9M25C 3000 194 0.9
3000 189 0.9
3500 195 0.8
4000 195 0.8
4500 195 0.8
5000 195 0.8
5500 194 1.0
6000 194 1.0
6500 194 1.0
7000 194 1.0
7500 189 1.1
8000 192 1.1
8500 194 1.1

Tipe Daya (kW) SFOC (g/kW/hr) SLOC (g/kW/hr)

C9 217 212.1 1.1


C9 253 228.8 1.1
C9 253 209 1.0
C9 288 206.6 1.0
C9 311 229.5 1.1
C9 361 211.7 1.1
C18 404 210 1.1
C18 499 217 1.1
C18 514 209 1.0
C15 536 218.8 1.1
C15 540 218.8 1.1
C18 587 208 1.0
C18 624 215 1.1
C18 660 209 1.0
C32 791 203.8 1.0
C32 916 210.8 1.1
C32 923 203 1.0
C32 1047 210.4 1.1
C32 1172 207 1.0
C32 1333 207.2 1.0
C33 1500 209 1.0
C34 1700 206.6 1.0
C35 2153 218.8 1.1
C36 2337 218.8 1.1
C37 2745 210 1.1
C38 3000 209 1.0
C39 3254 208 1.0
C40 3559 209 1.0
C41 3749 217 1.1
C42 4000 215 1.1
BIAYA PERJALANAN :

Biaya bahan bakar :


1 > Main Engine =
=
2 > Aux. Engine =

Total =

BIAYA PELABUHAN :

Pelabuhan Dumai tarif


1 Jasa Labuh = Rp 60
2 Jasa Tambat
Dermaga Beton = Rp 49
3 Jasa Pandu
Tarif Tetap = Rp 117,150
Tarif Variable = Rp 53
4 Jasa Tunda Kapal = 2602
Tarif Tetap = Rp 144,000
Tarif Variabel = Rp 2

total

Pelabuhan Surabaya tarif


1 Jasa Labuh = Rp 95
2 Jasa Tambat
Dermaga Beton = Rp 95
3 Jasa Pandu
Tarif Tetap = Rp 150,000
Tarif Variable = Rp 30
4 Jasa Tunda Kapal <= 2602
Tarif Tetap = Err:509
Tarif Variabel = Err:509

total

BIAYA BONGKAR MUAT:


Tarif Bongkar muat = Rp 30,000 /ton

>> Muat = Rp -
>> Bongkar = Rp -
Total = Rp - /tahun
1.00
2.95
4.00
110
1.83
0.82
5.66 m/s
120.20 KN
er B-series = 0.5 - 0.6 )
sistance and Propultion

tric design hal 11-27)

mesin di after
SFOC yang Fuel Oil Fuel Oil
Mesin yang memungkinkan
memungkinkan Consumption (ton) Consumption (liter)

1 103 Err:509 Err:509


1 235 Err:509 Err:509
1 184 Err:509 Err:509
1 195 Err:509 Err:509
1 195 Err:509 Err:509
1 195 Err:509 Err:509
1 195 Err:509 Err:509
1 195 Err:509 Err:509
1 195 Err:509 Err:509
1 195 Err:509 Err:509
1 188 Err:509 Err:509
1 189 Err:509 Err:509
1 191 Err:509 Err:509
1 190 Err:509 Err:509
1 192 Err:509 Err:509
1 189 Err:509 Err:509
1 191 Err:509 Err:509
1 190 Err:509 Err:509
1 192 Err:509 Err:509
1 189 Err:509 Err:509
1 191 Err:509 Err:509
1 190 Err:509 Err:509
1 192 Err:509 Err:509
1 188 Err:509 Err:509
1 185 Err:509 Err:509
1 185 Err:509 Err:509
1 187 Err:509 Err:509
1 185 Err:509 Err:509
1 185 Err:509 Err:509
1 189 Err:509 Err:509
1 195 Err:509 Err:509
1 195 Err:509 Err:509
1 195 Err:509 Err:509
1 195 Err:509 Err:509
1 194 Err:509 Err:509
1 194 Err:509 Err:509
1 194 Err:509 Err:509
1 194 Err:509 Err:509
1 194 Err:509 Err:509
1 196 Err:509 Err:509
1 196 Err:509 Err:509
1 196 Err:509 Err:509
1 194 Err:509 Err:509
1 194 Err:509 Err:509
1 194 Err:509 Err:509
1 194 Err:509 Err:509
1 189 Err:509 Err:509
1 195 Err:509 Err:509
1 195 Err:509 Err:509
1 195 Err:509 Err:509
1 195 Err:509 Err:509
1 194 Err:509 Err:509
1 194 Err:509 Err:509
1 194 Err:509 Err:509
1 194 Err:509 Err:509
1 189 Err:509 Err:509
1 192 Err:509 Err:509
1 194 Err:509 Err:509

SFOC yang Fuel Oil Fuel Oil


Mesin yang memungkinkan
memungkinkan Consumption (ton) Consumption (liter)

1 212.1 Err:509 Err:509


1 228.8 Err:509 Err:509
1 209 Err:509 Err:509
1 206.6 Err:509 Err:509
1 229.5 Err:509 Err:509
1 211.7 Err:509 Err:509
1 210 Err:509 Err:509
1 217 Err:509 Err:509
1 209 Err:509 Err:509
1 218.8 Err:509 Err:509
1 218.8 Err:509 Err:509
1 208 Err:509 Err:509
1 215 Err:509 Err:509
1 209 Err:509 Err:509
1 203.8 Err:509 Err:509
1 210.8 Err:509 Err:509
1 203 Err:509 Err:509
1 210.4 Err:509 Err:509
1 207 Err:509 Err:509
1 207.2 Err:509 Err:509
1 209 Err:509 Err:509
1 206.6 Err:509 Err:509
1 218.8 Err:509 Err:509
1 218.8 Err:509 Err:509
1 210 Err:509 Err:509
1 209 Err:509 Err:509
1 208 Err:509 Err:509
1 209 Err:509 Err:509
1 217 Err:509 Err:509
1 215 Err:509 Err:509
Chemical Tanker
Err:509
Err:509
Err:509
Err:509
Err:509

Per GT/Kunjungan

per GT/Etmal

per GT/Kapal/Gerakan
per GT/Kapal/Gerakan
GT
per Kapal yang Ditunda/Jam
per GT/Kapal yang Ditunda/Jam

Per GT/Kunjungan

per GT/Etmal

per GT/Kapal/Gerakan
per GT/Kapal/Gerakan
GT
per Kapal yang Ditunda/Jam
per GT/Kapal yang Ditunda/Jam
Biaya ME

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Biaya AE

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun

total
11,241,550.72

9,255,543.43

8,434,800.00
19,785,129.27

Rp 10,368,000
449,662.03

Rp 59,534,685.44

total
17,799,121.97

17,799,121.97

10,800,000.00
11,241,550.72

Err:509
Err:509

Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :

MCR Mesin ME :
BHP

Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mesin

MCR Mesin AE :
BHP

Mesin :
No. Urut Mesin
Merk
Type

Daya Mesin Yang Digunakan :


Daya

Konsumsi Bahan Bakar :


SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mensin
Berat Mesin
(ton)

1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509

Berat Mesin

(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
Chemical Tanker

Capital Cost Err:509


Operating Cost Err:509
Voyage Cost Err:509
Cargo Handling Cost Rp -
TOTAL COST Err:509

Unit Cost Rp -

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 1378.01 Kw
= 1873.54 HP

Err:509
= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton

= 344.50 Kw
= 468.39 HP

= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =

/ton

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
2067.01
516.75
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509

Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam

Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN

Input Data :
D= 2.952

n= 110
Z= 4
AE/AO = 0.40
PD = 1151
PB = Err:509

PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=

Gearbox

Wgear =

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Shafting
𝑑s =

l =
=
=
=

M 
  =
 l 
=

M =
=

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Propeller

K =
=
=

Wprop =
=
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176

Electrical Units

Wagg =
P = PB
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176

Other Weight

Wot =
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177

Weight Total =
=

Titik Berat Machinery

hdb =
=
=
BKI Vol II. Bab 24 -3.3

KG =
=

Chapter 11 Parametric Design - M.G. Parson ; page 11-25

LCB =
=
=

LCGM =
=

LCGFP =
=
BERAT BAJA

Input Data :
m L

H
buah B
T

kW (Delivery Power at Propeller) FN


kW (Brake Horse Power) CSO Bulk Carrier

CKG Bulk Carriers

PERHITUNGAN :

Berat Mesin Induk 1. Volume Forecastle (VFC)


ton Panjang Forecastle (ℓFC)
Err:509
Lebar Forecastle (bFC)
Berat Mesin Genset
0.5 ton Tinggi Forecastle (tFC)
Volume Forecastle (VFC)

2. Volume Poop (VPO)


 PB 
( 0.34 ~ 0.4 ) ton Panjang Poop (ℓPO)
 n 
Err:509 ton Lebar Poop (bPO)
hneekluth Vol 2. hal 175
Tinggi Poop (tPO)
Volume Poop (VPO)

Diameter Poros Propeller


1/ 3 Volume Superstructure (VA)
 PD 
11,5*  
 n 
25.2 cm 1. Volume Layer 2 (VDH2)
Panjang Layer 2 (ℓDH2)
Panjang Poros Propeller
2,13 m untuk area di ceruk buritan Lebar Layer 2 (bDH2)
1,8 m untuk area gangway
3.93 m Tinggi Layer 2 (tDH2)
Volume Layer 2 (VDH2)

Berat poros / panjang poros


2/3 2. Volume Layer 3 (VDH3)
 PD 
0.081   Panjang Layer 3 (ℓDH3)
 n
0.4 ton/m Lebar Layer 3 (bDH3)

Berat Poros Propeller Tinggi Layer 3 (tDH3)


M  Volume Layer 3 (VDH3)
 l
 l 
1.5 Ton
hneekluth Vol 2. hal 175 3. Volume Layer 4 (VDH4)
Panjang Layer 4 (ℓDH4)

Lebar Layer 4 (bDH4)

Koefisien Fixed Propeller


(𝑑s/𝐷)∙(1.85∙𝐴𝐸/𝐴𝑂)−((𝑧−2)/100) Tinggi Layer 4 (tDH4)

0.043 Volume Layer 4 (VDH4)

Berat Propeler
D3 · K 4. Volume Anjungan (VAN)

1.11 t/m3 Panjang Anjungan (ℓAN)

hneekluth Vol 2. hal 175-176 Lebar Anjungan (bAN)

Tinggi Anjungan (tAN)


Volume Anjungan (VAN)
0.001P (15 + 0.; P=Pb

Err:509 Ton Volume Deck House (VDH)

hneekluth Vol 2. hal 176

DA

0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U

Tinggi Double bottom CS


B/15
0.8 m
T
WST
hdb+0.35∙(H−hdb)

2.5 m

on ; page 11-25 CKG

Panjang Ceruk Buritan KG


4% · LPP

4.3 m
LCG(%)

(-0,5 . Lpp ) + LCB +5


-44.9 m LCGM

-LCGm + ( 0,5.Lpp) LCGFP


99.1 m
Input Data :
= 108.47 m
= 5.73 m
= 12.18 m
= 4.72 m
= 0.17
= 0.0752

0.52 – 0.54

Volume Superstructure (VA)


ecastle (VFC)
ecastle (ℓFC) = 10,5% · LPP
= 11.39 m
= selebar kapal
= 12.18 m
= 2.5 m
ecastle (VFC) = 0.5 · ℓFC · bFC · tFC
= 173.48 m3

= 17,2% · LPP
= 18.66 m
= selebar kapal
= 12.18 m
= 2.5 m
= ℓPO · bPO · tPO
= 568.35 m3
tructure (VA) = VFC + VPO
= 741.83 m3
Volume Deck House (VDH)

= 16,1 % · L
= 17.5 m
= B-4
= 8.18 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 357.36 m3

er 3 (VDH3)
= 11,5 % · L
= 12.47 m
= B-4
= 8.18 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 255.26 m3
er 4 (VDH4)
= 8,5 % · L
= 9 m
= B-4
= 8.18 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4

= 188.67 m3

ungan (VAN)

= 7%·L
= 7.6 m
= B- 8
= 4.18 m
= 2.5 m
= ℓAN · bAN · tAN
79.44 m3

House (VDH) = VDH2 + VDH3 + VDH4 + VAN


= 880.72 m3

Berat Baja (WST)


= Tinggi Kapal Setelah Dikoreksi dengan Superstucture dan Deck House
= H+(VA+VDH)/(LPP∙B)
= 6.96 m

= 0.0752 t/m3

= Berat Kapal
= 5484.93 ton

= log⁡〖∆ /100 〗
= 1.74

CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11

Total Berat Baja


= LPP · B · DA · CS
= 1033.06 ton

Titik Berat Baja


= Koefisien KG Baja
= 0.54
= DA * CKG
= 3.76 m

= -0,15 + LCB(%)
= 2.400 %L
= LCG(%) · LPP
= 2.604 m
= 0.5 · LPP - LCGM
= 51.63 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN

Grup III (Accommodation)


The specific volumetric and unit area weights are:
For small and medium sized cargo ships :
For large cargo ships, large Bulk Carriers, etc :
Therefore, for oat, it is used :

• POOP
Lpoop = 18.66
Bpoop = 12.18
Apoop = 227.34
Wpoop = 45.47
• DECKHOUSE
Layer II
LDH II = 17.46
BDH II = 8.18
ADH II = 142.94
WDH II = 28.59

Layer IV
LDH IV = 9.22
BDH IV = 8.18
ADH IV = 75.47
WDH IV = 15.09

W Group III = 115.93

Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C

= 100.32

Equipment and Outfitting Total Weight


= 216.25

Outfit Weight Center Estimation


DA = 6.96
KGE&O = 1.02 -1.08DA

= 7.31
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 54.061
Lcb = 5.424
LCGM dr FP = 102.390
LCGM = -48.153
Lkm = 10.000
Layer II

LDH II = 17.464
WDH II = 8.185
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide

= -47.546

Layer III

LDH III = 12.475


WDH III = 8.185
LCGII = -45.051

Layer IV
LDH IV = 9.220
WDH IV = 8.185
LCGIII = -43.424

Wheelhouse
LWH = 7.593
WWH = 4.185
LCGIV = -42.610

2. LCG2 (37,5% WE&O at LCGDH)


WE&O DH = 81.092
LCGM DH = -44.943

3. LCG3 (37,5% WE&O at midship)

WE&O Midship = 81.092


midship = 0

LCGE&O (LCG di belakang midship)


= -28.892
LCGE&O (dari FP)
= 83.129
Parametric design chapter 11, hal. 11-25
BERAT CONSUMABLE & CREW

Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =

• FORECASTLE Jumlah Crew


m L = 11.39 m Cst
forecasle =
m B forecastle = 12.18 m Cdk =
m2 A forecastle = 138.78 m2 Ceng
=
ton W forecastle = 27.76 ton cadet =
Jumlah Crew (Zc) =
=
Layer III =
m LDH III = 12.47 m Modul TMK bab Consumable and Crew
m BDH III = 8.18 m CC&E =
m2 ADH III = 102.10 m2 WC&E =
ton WDH III = 20.42 ton =
=
Wheel House Parametric design chapter 11, hal. 11-25
m LWH = 7.59 m

m BWH = 4.18 m Main Engine


m 2 AWH = 31.78 m 2
Fuel Oil
ton WWH = 6.36 ton SFR
=
MCR =
ton Margin
=
WFO
=

(0.18 ton / m2 < C < 0.26 ton / m2 =


[ton/m ] 2
=
(L*B*D) 2/3
*C
[ton]

Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA

m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m

ton

[0,5*L+(Lkm+Lcb)+0,5*Ideck] Lubricating Oil


m SFR =
MCR
=
Margin =
m WLO'
=
ton =
m

Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24

m
WFWtotal =

m WFW =
ton =
m

Provision & Store


CPR
=
ton =
m WPR
=
=

ton
m

m
UMABLE & CREW

VS = 5.66 m/s
108.47 m = 11.00 nm/jam
S
12.18 m = Err:509 nm
5.73 m
4.72 m

1.2 ; Coef. Steward (1.2 ~ 1.33)


11.5 ; Coef. Deck (11.5 ~ 14.5)
8.5 ; Coef. Engine (8.5 ~ 11 untuk diesel)
2 ; Umumnya 2 orang
C st∙Cdk∙((Lpp∙B∙H∙35)/10^5 )^(1/6) + Ceng ∙ (BHP/ 〖 10 〗 ^5)
^(1/3)+cadet
18.2 orang
18 orang
Consumable and Crew

0.17 ton/orang ; Asumsi rata-rata berat manusia


Berat Crew Total
Zc · Cc&e

3.06 ton
gn chapter 11, hal. 11-25

Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

Err:509 ton/kW h
344.502 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

0.17 ton/orang . hari


gn chapter 11, hal. 11-24

0.52 ton

WFW total + 4% · WFW total


; terdapat penambahan koreksi 4%

0.541 ton

10 kg/orang h; Koef. Provision & Store


0.000416666666667 ton/ orang jam
CP∙S/Vs ∙Zc
; Berat Provision & Store

Err:509 ton
1. LWT
Steel Weight
WST = 1033.06 ton

Equipment & Outfitting Weight


WE&O = 216.25 ton

Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton

GROSS TONAGE
Input Data
H = 5.73 m
T = 4.72 m
VPO = 568.35 m3
VFC = 173.48 m3
VDH = 880.72 m3
∆ = 5484.935 ton
Zc = 18 orang
N1 = 0 orang
N2 = 0 orang

Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)

= 7691.59 m3
VH = VPO + VFC + VDH
= 1622.55 m3
V = VU + V H
= 9314.14 m3
K1 = 0.2+0.02∙log_10⁡V
= 0.28
GT = V ∙ K1

= 2602.21 m3
Duami - Surabaya : SPOB

No Pelabuhan Asal/Tujuan

1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan

DATA PENDUKUNG SPOB


Jumlah hari = 365
Hari Kerja = 330
Kecepatan Dinas = 8
Kecepatan Ballast = 10
Harga HFO = Rp 8,724
Harga MDO = Rp 9,000
Kecepatan Loading = 200
Kecepatan Unloading = 200
Kurs = Rp 13,000
Umur 25

DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 82.420
B = 13.350
H = 5.796
T = 4.775
GT = 2214
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 82.42
B = 13.35
H = 5.80
T = 4.77
VS = 8
= 4.1152

Freeboard = 1.02

PERBANDINGAN UKURAN UTAMA :


L/B = 6.174
B/T = 2.796
L/T = 17.262
L/16 = 5.151
B/H = 2.303
L/B 6.17 3,5 < L/B < 10
B/T 2.80 1,8 < B/T < 5
L/T 17.26 10 < L/T < 30
H>L/16 5.15 H > L/16
B/H 2.30 1,47>B/H>2,38
PERHITUNGAN FROUD
LWL = 104%LPP
= 85.72

Fn = Vs / √( g. L )
= 0.142

PERHITUNGAN KOEFISIEN UKURAN UTAMA :


Koefisien Blok (Watson & Gilfillan) :
CB = – 4.22 + 27.8 √Fn – 39.1 Fn + 46.6 Fn3
= 0.84
Koefisien Luas Midship (Series '60) :
CM = 0.977 + 0.085 (CB – 0.60)
= 1.00
Koefisien Prismatik :
Cx = Cm
Cр = Cb/Cx
= 0.84
Koefisien Bidang Garis Air ;
CWP = Cb/(0.471+(0.551*Cb))
= 0.90
Longitudinal Center of Bouyancy :
a. LCB (%) = -13,5 + 19,4 ⋅ Cp
= 2.78
b. LCB dari M = LCB % / 100 . LPP
= 2.30
c. LCB dari AP = 0.5 · LPP + LCBM
= 43.51

Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 82.42
LWL = 85.72
B = 13.35
H = 5.80
T = 4.77
Vs = 4.12

Perhitungan Viscous Resistance

Cfo (Friction Coefficient - ITTC 1957)


𝜇/𝑟
v= = 1.188 x 10-6 m2/s (for salt water)
(kinematic viscosity)

(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)

=
296,842,650.4
Cfo =〖 (log⁡〖𝑅𝑛 − 2) 〗〗 ^2
0.075/

= 0.00179

• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =

= 0.210
〖𝐿𝑤𝑙〗 ^3/𝛻 137.72
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =

= 1.319

• Wetted Surface Area


Amid= Cm . B . T
ABT = 1.000 ---> tidak menggunakan
(luas Bulb di depan FP)

𝐿(2𝑇+𝐵) 〖𝐶 _𝑀 〗 ^0.5 (0.4530+0.4425 𝐶_𝐵−0.2862 𝐶_𝑀−0.003467 𝐵/𝑇+0.3696 𝐶_𝑊𝑃 )


+2.38 𝐴_𝐵𝑇/𝐶_𝐵 S=

= 1688.332 m2

• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆

= 34.595 kN

Perhitungan Resistance of Appendages

• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)

= 13.773
Lkeel = 0.6.Cb.Lwl Hkeel =
= 43.048 =
Sapp = Srudder + Sbilge Keel

= 62.429
• Stot = S + Sapp
= 1750.761
Harga (1 + k2) ---> PNA Vol II hlm. 92

Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome

+ k2 〖
(1(∑▒ 𝑆 _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )

= 1.400

• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=

= 1.322
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =

= 35.953 kN

Perhitungan Wave Making Resistance

• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =

= 45.7157
B/L = 0.156
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.156
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1

= 3.488

• Harga C2 ---> PNA Vol II hlm. 92


A BT γ B
e 1.89
C2 = BT  γ B  i 
---> menggunakan Bulb
=1
• Harga C3 ---> PNA Vol II hlm. 93
C3 = 1 - 0.8 AT (B.T.CM) ---> AT = 0 ( luas transom saat kecepatan
= 1.000 saat V=0 transom tidak tercelup air)
0.56∙√(ABT )

• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3

= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.142〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =

= -1.976

• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= 0.00000

• Harga λ
L/B = 6.421
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 1.021

• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ⁡〖〖𝐹𝑛〗 ^(−2)) 〗

= 0.00003698

• CA (Correlation Allowance)
Tf/Lwl = 0.0557
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000551
• w (Gaya Berat)
w= ∆.g
= 45983.925 kN

• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =

= 1.70044371859208 kN

Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 46.03 kN
= 46025.82 N

• Rtotal + 15% (margin)


= 52.930 kN
Kedalaman
Volume (Ton/Thn)

Muat Bongkar LWS


103,067,600 -7
103,067,600 -9
Err:509 Err:509
Err:509 Err:509

Jarak (Nm)
hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost

ROUNDTRIP
ton > Seatime
ton Dumai - Surabaya =
m Surabaya - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Surabaya =
Err:509
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi Sebenarnya =
m/S

KURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025

Principle of Naval Architecture Vol. II hal. 58

√Fn – 39.1 Fn + 46.6 Fn3


(Parametric Ship Design hal. 11-11)

5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)

(Parametric Ship Design hal. 11-10)

(Parametric Ship Design hal. 11-16)


(Parametric Ship Design hal. 11-19)
% Lpp

m dari M

m dari AP

Lwl . B . T .Cb
4573.13 m3
Lwl . B .T . Cb .ρ
4687.45 ton

KOEFISIEN UKURAN UTAMA :


m CB =
m CM =
m CP =
m CWP =
m Fn =
m/s Cstern =
Lcb =

m2/s (for salt water)

Practical Ship Design hlm .168

Practical Ship Design hlm .157

Pinciple of Naval Architecture Vol II hlm. 91


Pinciple of Naval Architecture Vol II hlm. 91

10% Amidship

3696 𝐶_𝑊𝑃 )

Pinciple of Naval Architecture Vol II hlm. 90

faktor tipe kapal (umum)


faktor tipe kemudi (umum)
faktor tipe profil kemudi (NACA)
faktor letak baling-baling
---> BKI Vol II hlm 14-2

0.18/(Cb-0.2) SBilge Keel = 4.Lkeel.HKeel


0.283 = 48.655
Value of 1+k2
--> (1+k2)=
1.3 to 1.5 1.4
2.8
1.5 to 2.0
3.0
2.0
1.4
2.8
2.0
2.7

_𝑖 〗 )/(∑▒𝑆_𝑖 )

Pinciple of Naval Architecture Vol II hlm. 90

〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3

〗 ^(−1.3757)
〗 ^(−1.3757)

luas transom saat kecepatan 0,


dak tercelup air)

Principle of Naval Architecture Vol II hlm. 92

---> untuk Cp < 0.8

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

---> untuk Tf/Lwl >0.04


/𝑊 𝑊
Konsumsi
Maksimum Utility IT+WT+AT Batubara

BOR SOR/YOR Jam/call ton/hari


60% 70% 6 282,377
60% 70% 4 282,377
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Dumai Medan Jakarta Surabaya


- Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509
Err:509 Err:509 - 386
Err:509 Err:509 386 -
min max
= 6.17 3.5 10
= 2.80 1.8 5
= 17.26 10 30
= 2.30 1.47 2.38
= Rp -

ROUNDTRIP Load Factor Kapal 90%


Utilitas Alat 67%
Err:509 jam Kecepatan Alat 200 ton/hour
Err:509 jam
Err:509 jam
Err:509 hari

6 jam
0.25 hari
4 jam
0.17 hari

Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
60 kali

ciple of Naval Architecture Vol. I hal. 19


ciple of Naval Architecture Vol. I hal. 19
ciple of Naval Architecture Vol. I hal. 19
Vol. II Tahun 2006
ciple of Naval Architecture Vol. I hal. 19

m/s²
≤ Fn ≤ 0,3
ton/m3

ametric Ship Design hal. 11-11)

ametric Ship Design hal. 11-12)

ametric Ship Design hal. 11-10)

ametric Ship Design hal. 11-16)


ametric Ship Design hal. 11-19)

0.84
1.00
0.84
0.90
0.141913558598437
0
2.30 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0

Perhitungan Awal :
1+k
CF
CA

CV
Principle of Naval Architecture Vol.

Principle of Naval Architecture Vol.

t
Principle of Naval Architecture Vol.

Va

Principle of Naval Architecture Vol.


Chapter 11 Parametric Design - M.G

Effective Horse Power (EHP) :


PE

Chapter 11 Parametric Design - M.G

Thrust Horse Power (THP) :


PT

Chapter 11 Parametric Design - M.G

Propulsive Coefficient Calculation :


ηH

Chapter 11 Parametric Design - M.G

ηO
ηr

ηD

Delivered Horse Power (DHP) :


PD

Chapter 11 Parametric Design - M.G

Shaft Horse Power (SHP) :


ηS

PS

Chapter 11 Parametric Design - M.G

Brake Horse Power Calculation (BHP) :


ηR

PB0

Chapter 11 Parametric Design - M.G


Koreksi MCR
PB
BHP

Chapter 11 Parametric Design - M.G


MAIN ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

AUXILARY ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL :
Perhitungan Harga Kapal
Input Data
WST = 871.463 Ton
WE&O = 189.078 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja

= $ 958,608.89
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 207,985.29
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509

Harga = Biaya + Keuntungan + Inflasi + Pajak


= Err:509
= Err:509
= Err:509 /tahun

BIAYA OPERASIONAL :

Gaji Crew = Err:509 /tahun


Jumlah Crew = 18 Orang
Gaji Per Crew/Bulan = Rp 10,000,000.00
Repair & Maintenance = 3% dari harga kapal
= Err:509 /tahun
Asuransi Kapal = 1,5% dari harga kapal
= Err:509 /tahun
Supplies Crew = Rp 50,000.00 /orang/hari
= Err:509 /tahun
Dokumen & Administrasi = Rp 5,000,000.00 /trip
= Err:509

Total = Err:509 /tahun


AN PROPULSI & DAYA MESIN :

= 85.72 m P/D

= 13.35 m D
= 5.80 m z
= 4.77 m nrpm

= 0.14191355859844 nrps

= 4573.13 m3 Cb
= 4687.45 ton Vs

= 0.4 RT

= 1.32
= 0.0018
= 0.00055

= (1+ k) CF + CA
= 0.0029
ciple of Naval Architecture Vol. II hal. 162

= 0.3 Cb + 10 Cv Cb - 0.1
= 0.18
ciple of Naval Architecture Vol. II hal. 163

= 0.1 ; thrust deduction friction


ciple of Naval Architecture Vol. II hal. 163

= V (1 - w) ; Speed of Advantages
= 3.39
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27

Power (EHP) :
= RT.Vs
= 217.82 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27

wer (THP) :
= PE∙(1−w)/(1−t)
= 199.54 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29

ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.09
pter 11 Parametric Design - M.G. Parson ; page 11-29

= Open Water Test Propeller Efficiency


= (J/(2∙n))∙(KT/KQ)
= 0.6
= Rotative Efficiency
= 0.985

= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591

Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 368.56 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 376.08 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer Calculation (BHP) :


= Reduction Gear Efficiency
= 0.98
= Brake Horse Power (BHP0)
= PS/ηR
= 383.75 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
= 15% ∙ PB0
= 115% ∙ PB0 = BHP
= 441.31 Kw
= BHP ∙ 1.3596 HP
= 600.01 HP
pter 11 Parametric Design - M.G. Parson ; page 11-30
Merek Tipe Daya (kW) SFOC (g/kW/hr)

CUMMINS NTA855-M400 298 103


CATERPILLAR 3208 325 235
CUMMINS KTTA 19-M3 447 184
YUCHAI YC6C670L 492 195
YUCHAI YC6C700L 515 195
YUCHAI YC6C730L 536 195
YUCHAI YC6C865L 636 195
YUCHAI YC6C925L 680 195
YUCHAI YC6C960L 706 195
YUCHAI YC6CL1035L 760 195
MAN B&W 6L23/30A-E 800 188
MAN B&W 6L23/30A 960 189
CATERPILLAR 6M20C 1020 191
CATERPILLAR 6M20C 1080 190
CATERPILLAR 6M20C 1140 192
CATERPILLAR 6M20C 1200 189
MAN B&W 8L23/30A 1280 191
MAN B&W 6L21/31 1290 190
CATERPILLAR 8M20C 1360 192
CATERPILLAR 8M20C 1440 189
MAN B&W 6L28/32A 1470 191
MAN B&W 5L27/38 1500 190
MAN B&W 7L21/31 1505 192
CATERPILLAR 8M20C 1520 188
CATERPILLAR 9M20C 1530 185
CATERPILLAR 8M20C 1600 185
MAN B&W 5L27/38 1600 187
CATERPILLAR 9M20C 1620 185
CATERPILLAR 9M20C 1710 185
MAN B&W 7L28/32A 1715 189
MAN B&W 8L21/31 1720 195
CATERPILLAR 9M20C 1800 195
MAN B&W 9L21/31 1935 195
MAN B&W 8L28/32A 1960 195
MAN B&W 6L27/38 1980 194
CATERPILLAR 6M25C 2000 194
MAN B&W 9L28/32A 2205 194
MAN B&W 7L27/38 2310 194
CATERPILLAR 8M25C 2320 194
CATERPILLAR 8M25C 2400 196
CATERPILLAR 9M25C 2610 196
MAN B&W 8L27/38 2640 196
CATERPILLAR 8M25C 2666 194
CATERPILLAR 9M25C 2700 194
MAN B&W 9L27/38 2970 194
CATERPILLAR 9M25C 3000 194
MAN B&W 3000 189
MAN B&W 3500 195
MAN B&W 4000 195
MAN B&W 4500 195
MAN B&W 5000 195
MAN B&W 5500 194
MAN B&W 6000 194
MAN B&W 6500 194
MAN B&W 7000 194
MAN B&W 7500 189
MAN B&W 8000 192
MAN B&W 8500 194

LARY ENGINE

Merek Tipe Daya (kW) SFOC (g/kW/hr)

CATERPILLAR C9 217 212.1


CATERPILLAR C9 253 228.8
CATERPILLAR C9 253 209
CATERPILLAR C9 288 206.6
CATERPILLAR C9 311 229.5
CATERPILLAR C9 361 211.7
CATERPILLAR C18 404 210
CATERPILLAR C18 499 217
CATERPILLAR C18 514 209
CATERPILLAR C15 536 218.8
CATERPILLAR C15 540 218.8
CATERPILLAR C18 587 208
CATERPILLAR C18 624 215
CATERPILLAR C18 660 209
CATERPILLAR C32 791 203.8
CATERPILLAR C32 916 210.8
CATERPILLAR C32 923 203
CATERPILLAR C32 1047 210.4
CATERPILLAR C32 1172 207
CATERPILLAR C32 1333 207.2
CATERPILLAR C33 1500 209
CATERPILLAR C34 1700 206.6
CATERPILLAR C35 2153 218.8
CATERPILLAR C36 2337 218.8
CATERPILLAR C37 2745 210
CATERPILLAR C38 3000 209
CATERPILLAR C39 3254 208
CATERPILLAR C40 3559 209
CATERPILLAR C41 3749 217
CATERPILLAR C42 4000 215
BIAYA PERJALANAN :

Biaya bahan bakar :


1 > Main Engine

2 > Aux. Engine

Total

BIAYA PELABUHAN :

Pelabuhan Dumai
1 Jasa Labuh
2 Jasa Tambat
Dermaga Beton
3 Jasa Pandu
Tarif Tetap
Tarif Variable
4 Jasa Tunda Kapal
Tarif Tetap
Tarif Variabel

total

Pelabuhan Surabaya
1 Jasa Labuh
2 Jasa Tambat
Dermaga Beton
3 Jasa Pandu
Tarif Tetap
Tarif Variable
4 Jasa Tunda Kapal
Tarif Tetap
Tarif Variabel

total

BIAYA BONGKAR MUAT :


Tarif Bongkar muat =

>> Muat =
>> Bongkar =
Total =
= 1.00
= 2.98
= 4.00
= 110
= 1.83
= 0.84
= 4.12 m/s
= 52.93 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2

(parametric design hal 11-27)

; untuk mesin di after


SFOC yang
SLOC (g/kW/hr) Mesin yang memungkinkan
memungkinkan

1 1 103
1 1 235
1 1 184
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
1 1 188
1.0 1 189
0.6 1 191
0.6 1 190

0.6 1 192

0.7 1 189
1.0 1 191
0.8 1 190
0.7 1 192
0.7 1 189
1.0 1 191
1.0 1 190
0.8 1 192
0.7 1 188
0.7 1 185
0.7 1 185
1.0 1 187
0.8 1 185
0.8 1 185
1.0 1 189
0.8 1 195
0.8 1 195
0.8 1 195
1.0 1 195
1.0 1 194
0.8 1 194
1.0 1 194
1.0 1 194
0.8 1 194
0.8 1 196
0.9 1 196
1.0 1 196
0.9 1 194
0.9 1 194
1.0 1 194
0.9 1 194
0.9 1 189
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
1.0 1 194
1.0 1 194
1.0 1 194
1.0 1 194
1.1 1 189
1.1 1 192
1.1 1 194

SFOC yang
SLOC (g/kW/hr) Mesin yang memungkinkan
memungkinkan

1.1 1 212.1
1.1 1 228.8
1.0 1 209
1.0 1 206.6
1.1 1 229.5
1.1 1 211.7
1.1 1 210
1.1 1 217
1.0 1 209
1.1 1 218.8
1.1 1 218.8
1.0 1 208
1.1 1 215
1.0 1 209
1.0 1 203.8
1.1 1 210.8
1.0 1 203
1.1 1 210.4
1.0 1 207
1.0 1 207.2
1.0 1 209
1.0 1 206.6
1.1 1 218.8
1.1 1 218.8
1.1 1 210
1.0 1 209
1.0 1 208
1.0 1 209
1.1 1 217
1.1 1 215
RJALANAN :

SPOB
= Err:509
= Err:509
= Err:509
Err:509
Total = Err:509

LABUHAN :

tarif
= Rp 60 Per GT/Kunjungan

= Rp 49 per GT/Etmal

= Rp 117,150 per GT/Kapal/Gerakan


= Rp 53 per GT/Kapal/Gerakan
= 2214 GT
= Rp 144,000 per Kapal yang Ditunda/Jam
= Rp 2 per GT/Kapal yang Ditunda/Jam

total

tarif
= Rp 95 Per GT/Kunjungan

= Rp 95 per GT/Etmal

= Rp 150,000 per GT/Kapal/Gerakan


= Rp 30 per GT/Kapal/Gerakan
<= 2214 GT
= Err:509 per Kapal yang Ditunda/Jam
= Err:509 per GT/Kapal yang Ditunda/Jam

total

Rp 30,000 /ton

Rp -
Rp -
Rp - /tahun
Fuel Oil
Fuel Oil Consumption (ton) Biaya ME
Consumption (liter)

Err:509 Err:509 Err:509


Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509

Fuel Oil
Fuel Oil Consumption (ton) Biaya AE
Consumption (liter)

Err:509 Err:509 Err:509


Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun

total
7,971,237.71

6,562,985.71

7,029,000.00
14,029,378.36

Rp 8,640,000
318,849.51

Rp 44,551,451.29

total
12,621,126.37

12,621,126.37

9,000,000.00
7,971,237.71

Err:509
Err:509

Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :

MCR Mesin ME :
BHP

Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mesin

MCR Mesin AE :
BHP

Mesin :
No. Urut Mesin
Merk
Type

Daya Mesin Yang Digunakan :


Daya

Konsumsi Bahan Bakar :


SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mensin
Berat Mesin
(ton)

1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509

Berat Mesin

(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
SPOB

Capital Cost Err:509


Operating Cost Err:509
Voyage Cost Err:509
Cargo Handling Cost Rp -
TOTAL COST Err:509

Unit Cost Rp -

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 441.31 Kw
= 600.01 HP

Err:509
= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton

= 110.33 Kw
= 150.00 HP

= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =

/ton

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
661.97
165.49
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509

Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam

Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN

Input Data :
D= 2.984

n= 110
Z= 4
AE/AO = 0.40
PD = 369
PB = Err:509

PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=

Gearbox

Wgear =

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Shafting
𝑑s =

l =
=
=
=

M 
  =
 l 
=

M =
=

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Propeller

K =
=
=

Wprop =
=
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176

Electrical Units

Wagg =
P = PB
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176

Other Weight

Wot =
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177

Weight Total =
=

Titik Berat Machinery

hdb =
=
=
BKI Vol II. Bab 24 -3.3

KG =
=

Chapter 11 Parametric Design - M.G. Parson ; page 11-25

LCB =
=
=

LCGM =
=

LCGFP =
=
BERAT BAJA

Input Data :
m L

H
buah B
T

kW (Delivery Power at Propeller) FN


kW (Brake Horse Power) CSO Bulk Carrier

CKG Bulk Carriers

PERHITUNGAN :

Berat Mesin Induk 1. Volume Forecastle (VFC)


ton Panjang Forecastle (ℓFC)
Err:509
Lebar Forecastle (bFC)
Berat Mesin Genset
0.5 ton Tinggi Forecastle (tFC)
Volume Forecastle (VFC)

2. Volume Poop (VPO)


 PB 
( 0.34 ~ 0.4 ) ton Panjang Poop (ℓPO)
 n 
Err:509 ton Lebar Poop (bPO)
hneekluth Vol 2. hal 175
Tinggi Poop (tPO)
Volume Poop (VPO)

Diameter Poros Propeller


1/ 3 Volume Superstructure (VA)
 PD 
11,5*  
 n 
17.2 cm 1. Volume Layer 2 (VDH2)
Panjang Layer 2 (ℓDH2)
Panjang Poros Propeller
2,13 m untuk area di ceruk buritan Lebar Layer 2 (bDH2)
1,8 m untuk area gangway
3.93 m Tinggi Layer 2 (tDH2)
Volume Layer 2 (VDH2)

Berat poros / panjang poros


2/3 2. Volume Layer 3 (VDH3)
 PD 
0.081   Panjang Layer 3 (ℓDH3)
 n
0.2 ton/m Lebar Layer 3 (bDH3)

Berat Poros Propeller Tinggi Layer 3 (tDH3)


M  Volume Layer 3 (VDH3)
 l
 l 
0.7 Ton
hneekluth Vol 2. hal 175 3. Volume Layer 4 (VDH4)
Panjang Layer 4 (ℓDH4)

Lebar Layer 4 (bDH4)

Koefisien Fixed Propeller


(𝑑s/𝐷)∙(1.85∙𝐴𝐸/𝐴𝑂)−((𝑧−2)/100) Tinggi Layer 4 (tDH4)

0.023 Volume Layer 4 (VDH4)

Berat Propeler
D3 · K 4. Volume Anjungan (VAN)

0.60 t/m3 Panjang Anjungan (ℓAN)

hneekluth Vol 2. hal 175-176 Lebar Anjungan (bAN)

Tinggi Anjungan (tAN)


Volume Anjungan (VAN)
0.001P (15 + 0.; P=Pb

Err:509 Ton Volume Deck House (VDH)

hneekluth Vol 2. hal 176

DA

0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U

Tinggi Double bottom CS


B/15
0.9 m
T
WST
hdb+0.35∙(H−hdb)

2.6 m

on ; page 11-25 CKG

Panjang Ceruk Buritan KG


4% · LPP

3.3 m
LCG(%)

(-0,5 . Lpp ) + LCB +5


-32.9 m LCGM

-LCGm + ( 0,5.Lpp) LCGFP


74.1 m
Input Data :
= 82.42 m
= 5.80 m
= 13.35 m
= 4.77 m
= 0.14
= 0.0752

0.52 – 0.54

Volume Superstructure (VA)


ecastle (VFC)
ecastle (ℓFC) = 10,5% · LPP
= 8.65 m
= selebar kapal
= 13.35 m
= 2.5 m
ecastle (VFC) = 0.5 · ℓFC · bFC · tFC
= 144.41 m3

= 17,2% · LPP
= 14.18 m
= selebar kapal
= 13.35 m
= 2.5 m
= ℓPO · bPO · tPO
= 473.13 m3
tructure (VA) = VFC + VPO
= 617.55 m3
Volume Deck House (VDH)

= 16,1 % · L
= 13.3 m
= B-4
= 9.35 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 310.18 m3

er 3 (VDH3)
= 11,5 % · L
= 9.48 m
= B-4
= 9.35 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 221.55 m3
er 4 (VDH4)
= 8,5 % · L
= 7 m
= B-4
= 9.35 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4

= 163.76 m3

ungan (VAN)

= 7%·L
= 5.8 m
= B- 8
= 5.35 m
= 2.5 m
= ℓAN · bAN · tAN
77.17 m3

House (VDH) = VDH2 + VDH3 + VDH4 + VAN


= 772.65 m3

Berat Baja (WST)


= Tinggi Kapal Setelah Dikoreksi dengan Superstucture dan Deck House
= H+(VA+VDH)/(LPP∙B)
= 7.06 m

= 0.0752 t/m3

= Berat Kapal
= 4687.45 ton

= log⁡〖∆ /100 〗
= 1.67

CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11

Total Berat Baja


= LPP · B · DA · CS
= 871.46 ton

Titik Berat Baja


= Koefisien KG Baja
= 0.54
= DA * CKG
= 3.81 m

= -0,15 + LCB(%)
= 2.635 %L
= LCG(%) · LPP
= 2.171 m
= 0.5 · LPP - LCGM
= 39.04 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN

Grup III (Accommodation)


The specific volumetric and unit area weights are:
For small and medium sized cargo ships :
For large cargo ships, large Bulk Carriers, etc :
Therefore, for oat, it is used :

• POOP
Lpoop = 14.18
Bpoop = 13.35
Apoop = 189.25
Wpoop = 37.85
• DECKHOUSE
Layer II
LDH II = 13.27
BDH II = 9.35
ADH II = 124.07
WDH II = 24.81

Layer IV
LDH IV = 7.01
BDH IV = 9.35
ADH IV = 65.50
WDH IV = 13.10

W Group III = 99.66

Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C

= 89.41

Equipment and Outfitting Total Weight


= 189.08

Outfit Weight Center Estimation


DA = 7.06
KGE&O = 1.02 -1.08DA

= 7.41
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 47.269
Lcb = 4.121
LCGM dr FP = 76.596
LCGM = -35.386
Lkm = 10.000
Layer II

LDH II = 13.270
WDH II = 9.350
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide

= -33.724

Layer III

LDH III = 9.478


WDH III = 9.350
LCGII = -31.828

Layer IV
LDH IV = 7.006
WDH IV = 9.350
LCGIII = -30.592

Wheelhouse
LWH = 5.769
WWH = 5.350
LCGIV = -29.974

2. LCG2 (37,5% WE&O at LCGDH)


WE&O DH = 70.904
LCGM DH = -31.716

3. LCG3 (37,5% WE&O at midship)

WE&O Midship = 70.904


midship = 0

LCGE&O (LCG di belakang midship)


= -20.740
LCGE&O (dari FP)
= 61.950
Parametric design chapter 11, hal. 11-25
BERAT CONSUMABLE & CREW

Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =

• FORECASTLE Jumlah Crew


m L = 8.65 m Cst
forecasle =
m B forecastle = 13.35 m Cdk =
m2 A forecastle = 115.53 m2 Ceng
=
ton W forecastle = 23.11 ton cadet =
Jumlah Crew (Zc) =
=
Layer III =
m LDH III = 9.48 m Modul TMK bab Consumable and Crew
m BDH III = 9.35 m CC&E =
m2 ADH III = 88.62 m2 WC&E =
ton WDH III = 17.72 ton =
=
Wheel House Parametric design chapter 11, hal. 11-25
m LWH = 5.77 m

m BWH = 5.35 m Main Engine


m 2 AWH = 30.87 m 2
Fuel Oil
ton WWH = 6.17 ton SFR
=
MCR =
ton Margin
=
WFO
=

(0.18 ton / m2 < C < 0.26 ton / m2 =


[ton/m ] 2
=
(L*B*D) 2/3
*C
[ton]

Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA

m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m

ton

[0,5*L+(Lkm+Lcb)+0,5*Ideck] Lubricating Oil


m SFR =
MCR
=
Margin =
m WLO'
=
ton =
m

Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24

m
WFWtotal =

m WFW =
ton =
m

Provision & Store


CPR
=
ton =
m WPR
=
=

ton
m

m
UMABLE & CREW

VS = 4.12 m/s
82.42 m = 8.00 nm/jam
S
13.35 m = Err:509 nm
5.80 m
4.77 m

1.2 ; Coef. Steward (1.2 ~ 1.33)


11.5 ; Coef. Deck (11.5 ~ 14.5)
8.5 ; Coef. Engine (8.5 ~ 11 untuk diesel)
2 ; Umumnya 2 orang
C st∙Cdk∙((Lpp∙B∙H∙35)/10^5 )^(1/6) + Ceng ∙ (BHP/ 〖 10 〗 ^5)
^(1/3)+cadet
17.8 orang
18 orang
Consumable and Crew

0.17 ton/orang ; Asumsi rata-rata berat manusia


Berat Crew Total
Zc · Cc&e

3.06 ton
gn chapter 11, hal. 11-25

Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

Err:509 ton/kW h
110.329 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

0.17 ton/orang . hari


gn chapter 11, hal. 11-24

0.52 ton

WFW total + 4% · WFW total


; terdapat penambahan koreksi 4%

0.541 ton

10 kg/orang h; Koef. Provision & Store


0.000416666666667 ton/ orang jam
CP∙S/Vs ∙Zc
; Berat Provision & Store

Err:509 ton
1. LWT
Steel Weight
WST = 871.46 ton

Equipment & Outfitting Weight


WE&O = 189.08 ton

Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton

GROSS TONAGE
Input Data
H = 5.80 m
T = 4.77 m
VPO = 473.13 m3
VFC = 144.41 m3
VDH = 772.65 m3
∆ = 4687.454 ton
Zc = 18 orang
N1 = 0 orang
N2 = 0 orang

Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)

= 6574.01 m3
VH = VPO + VFC + VDH
= 1390.20 m3
V = VU + V H
= 7964.21 m3
K1 = 0.2+0.02∙log_10⁡V
= 0.28
GT = V ∙ K1

= 2214.23 m3
Duami - Surabaya : ITB

No Pelabuhan Asal/Tujuan

1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan

DATA PENDUKUNG ITB


Jumlah hari = 365
Hari Kerja = 330
Kecepatan Dinas = 5
Kecepatan Ballast = 7
Harga HFO = Rp 8,724
Harga MDO = Rp 9,000
Kecepatan Loading = 200
Kecepatan Unloading = 200
Kurs = Rp 13,000
Umur 25

DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 86.181
B = 15.470
H = 7.442
T = 4.447
GT = 2607
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 86.18
B = 15.47
H = 7.44
T = 4.45
VS = 5
= 2.572

Freeboard = 3.00

PERBANDINGAN UKURAN UTAMA :


L/B = 5.571
B/T = 3.479
L/T = 19.378
L/16 = 5.386
B/H = 2.079
L/B 5.57 3,5 < L/B < 10
B/T 3.48 1,8 < B/T < 5
L/T 19.38 10 < L/T < 30
H>L/16 5.39 H > L/16
B/H 2.08 1,47>B/H>2,38
PERHITUNGAN FROUD
LWL = 104%LPP
= 89.63

Fn = Vs / √( g. L )
= 0.087

PERHITUNGAN KOEFISIEN UKURAN UTAMA :


Koefisien Blok (Watson & Gilfillan) :
CB = – 4.22 + 27.8 √Fn – 39.1 Fn + 46.6 Fn3
= 0.61
Koefisien Luas Midship (Series '60) :
CM = 0.977 + 0.085 (CB – 0.60)
= 0.98
Koefisien Prismatik :
Cx = Cm
Cр = Cb/Cx
= 0.62
Koefisien Bidang Garis Air ;
CWP = Cb/(0.471+(0.551*Cb))
= 0.75
Longitudinal Center of Bouyancy :
a. LCB (%) = -13,5 + 19,4 ⋅ Cp
= -1.47
b. LCB dari M = LCB % / 100 . LPP
= -1.26
c. LCB dari AP = 0.5 · LPP + LCBM
= 41.83

Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 86.18
LWL = 89.63
B = 15.47
H = 7.44
T = 4.45
Vs = 2.57

Perhitungan Viscous Resistance

Cfo (Friction Coefficient - ITTC 1957)


𝜇/𝑟
v= = 1.188 x 10-6 m2/s (for salt water)
(kinematic viscosity)

(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)

=
193,993,161.1
Cfo =〖 (log⁡〖𝑅𝑛 − 2) 〗〗 ^2
0.075/

= 0.00190

• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =

= 0.348
〖𝐿𝑤𝑙〗 ^3/𝛻 192.53
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =

= 1.190

• Wetted Surface Area


Amid= Cm . B . T
ABT = 1.000 ---> tidak menggunakan
(luas Bulb di depan FP)

𝐿(2𝑇+𝐵) 〖𝐶 _𝑀 〗 ^0.5 (0.4530+0.4425 𝐶_𝐵−0.2862 𝐶_𝑀−0.003467 𝐵/𝑇+0.3696 𝐶_𝑊𝑃 )


+2.38 𝐴_𝐵𝑇/𝐶_𝐵 S=

= 1530.834 m2

• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆

= 11.715 kN

Perhitungan Resistance of Appendages

• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)

= 13.415
Lkeel = 0.6.Cb.Lwl Hkeel =
= 32.612 =
Sapp = Srudder + Sbilge Keel

= 71.188
• Stot = S + Sapp
= 1602.021
Harga (1 + k2) ---> PNA Vol II hlm. 92

Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome

+ k2 〖
(1(∑▒ 𝑆 _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )

= 1.400

• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=

= 1.199
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =

= 12.356 kN

Perhitungan Wave Making Resistance

• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =

= 14.8801
B/L = 0.173
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.173
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1

= 1.965

• Harga C2 ---> PNA Vol II hlm. 92


A BT γ B
e 1.89
C2 = BT  γ B  i 
---> menggunakan Bulb
=1
• Harga C3 ---> PNA Vol II hlm. 93
C3 = 1 - 0.8 AT (B.T.CM) ---> AT = 0 ( luas transom saat kecepatan
= 1.000 saat V=0 transom tidak tercelup air)
0.56∙√(ABT )

• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3

= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.343〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =

= -2.191

• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= 0.00000

• Harga λ
L/B = 5.794
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.723

• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ⁡〖〖𝐹𝑛〗 ^(−2)) 〗

= 0.00000001

• CA (Correlation Allowance)
Tf/Lwl = 0.0496
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000542
• w (Gaya Berat)
w= ∆.g
= 37603.599 kN

• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =

= 0.000189638290245 kN

Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 15.30 kN
= 15301.51 N

• Rtotal + 15% (margin)


= 17.597 kN
Kedalaman
Volume (Ton/Thn)

Muat Bongkar LWS


103,067,600 -7
103,067,600 -9
Err:509 Err:509
Err:509 Err:509

Jarak (Nm)
hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost

ROUNDTRIP
ton > Seatime
ton Dumai - Surabaya =
m Surabaya - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Surabaya =
Err:509
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi Sebenarnya =
m/S

KURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025

Principle of Naval Architecture Vol. II hal. 58

√Fn – 39.1 Fn + 46.6 Fn3


(Parametric Ship Design hal. 11-11)

5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)

(Parametric Ship Design hal. 11-10)

(Parametric Ship Design hal. 11-16)


(Parametric Ship Design hal. 11-19)
% Lpp

m dari M

m dari AP

Lwl . B . T .Cb
3739.70 m3
Lwl . B .T . Cb .ρ
3833.19 ton

KOEFISIEN UKURAN UTAMA :


m CB =
m CM =
m CP =
m CWP =
m Fn =
m/s Cstern =
Lcb =

m2/s (for salt water)

Practical Ship Design hlm .168

Practical Ship Design hlm .157

Pinciple of Naval Architecture Vol II hlm. 91


Pinciple of Naval Architecture Vol II hlm. 91

10% Amidship

3696 𝐶_𝑊𝑃 )

Pinciple of Naval Architecture Vol II hlm. 90

faktor tipe kapal (umum)


faktor tipe kemudi (umum)
faktor tipe profil kemudi (NACA)
faktor letak baling-baling
---> BKI Vol II hlm 14-2

0.18/(Cb-0.2) SBilge Keel = 4.Lkeel.HKeel


0.443 = 57.773
Value of 1+k2
--> (1+k2)=
1.3 to 1.5 1.4
2.8
1.5 to 2.0
3.0
2.0
1.4
2.8
2.0
2.7

_𝑖 〗 )/(∑▒𝑆_𝑖 )

Pinciple of Naval Architecture Vol II hlm. 90

〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3

〗 ^(−1.3757)
〗 ^(−1.3757)

luas transom saat kecepatan 0,


dak tercelup air)

Principle of Naval Architecture Vol II hlm. 92

---> untuk Cp < 0.8

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

Principle of Naval Architecture Vol II hlm. 92

---> untuk Tf/Lwl >0.04


/𝑊 𝑊
Konsumsi
Maksimum Utility IT+WT+AT Batubara

BOR SOR/YOR Jam/call ton/hari


60% 70% 6 282,377
60% 70% 4 282,377
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Dumai Medan Jakarta Surabaya


- Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509
Err:509 Err:509 - 386
Err:509 Err:509 386 -
min max
= 5.57 3.5 10
= 3.48 1.8 5
= 19.38 10 30
= 2.08 1.47 2.38
= Rp -

ROUNDTRIP Load Factor Kapal 90%


Utilitas Alat 67%
Err:509 jam Kecepatan Alat 200 ton/hour
Err:509 jam
Err:509 jam
Err:509 hari

6 jam
0.25 hari
4 jam
0.17 hari

Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
0 kali

ciple of Naval Architecture Vol. I hal. 19


ciple of Naval Architecture Vol. I hal. 19
ciple of Naval Architecture Vol. I hal. 19
Vol. II Tahun 2006
ciple of Naval Architecture Vol. I hal. 19

m/s²
≤ Fn ≤ 0,3
ton/m3

ametric Ship Design hal. 11-11)

ametric Ship Design hal. 11-12)

ametric Ship Design hal. 11-10)

ametric Ship Design hal. 11-16)


ametric Ship Design hal. 11-19)

0.61
0.98
0.62
0.75
0.086738889340489
0
-1.26 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0

Perhitungan Awal :
1+k
CF
CA

CV
Principle of Naval Architecture Vol.

Principle of Naval Architecture Vol.

t
Principle of Naval Architecture Vol.

Va

Principle of Naval Architecture Vol.


Chapter 11 Parametric Design - M.G

Effective Horse Power (EHP) :


PE

Chapter 11 Parametric Design - M.G

Thrust Horse Power (THP) :


PT

Chapter 11 Parametric Design - M.G

Propulsive Coefficient Calculation :


ηH

Chapter 11 Parametric Design - M.G

ηO
ηr

ηD

Delivered Horse Power (DHP) :


PD

Chapter 11 Parametric Design - M.G

Shaft Horse Power (SHP) :


ηS

PS

Chapter 11 Parametric Design - M.G

Brake Horse Power Calculation (BHP) :


ηR

PB0

Chapter 11 Parametric Design - M.G


Koreksi MCR
PB
BHP

Chapter 11 Parametric Design - M.G


MAIN ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

AUXILARY ENGINE

No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL:
Perhitungan Harga Kapal
Input Data
WST = 1310.050 Ton
WE&O = 246.309 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja

= $ 1,441,055.13
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 270,939.68
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509

Harga = Biaya + Keuntungan + Inflasi + Pajak


= Err:509
= Err:509
= Err:509 /tahun

BIAYA OPERASIONAL

Gaji Crew = Err:509 /tahun


Jumlah Crew = 19 Orang
Gaji Per Crew/Bulan = Rp 10,000,000.00
Repair & Maintenance = 3% dari harga kapal
= Err:509 /tahun
Asuransi Kapal = 1,5% dari harga kapal
= Err:509 /tahun
Supplies Crew = Rp 50,000.00 /orang/hari
= Err:509 /tahun
Dokumen & Administrasi = Rp 5,000,000.00 /trip
= Err:509

Total = Err:509 /tahun


AN PROPULSI & DAYA MESIN :

= 89.63 m P/D

= 15.47 m D
= 7.44 m z
= 4.45 m nrpm

= 0.08673888934049 nrps

= 3739.70 m3 Cb
= 3833.19 ton Vs

= 0.4 RT

= 1.20
= 0.0019
= 0.00054

= (1+ k) CF + CA
= 0.0028
ciple of Naval Architecture Vol. II hal. 162

= 0.3 Cb + 10 Cv Cb - 0.1
= 0.10
ciple of Naval Architecture Vol. II hal. 163

= 0.1 ; thrust deduction friction


ciple of Naval Architecture Vol. II hal. 163

= V (1 - w) ; Speed of Advantages
= 2.32
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27

Power (EHP) :
= RT.Vs
= 45.26 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27

wer (THP) :
= PE∙(1−w)/(1−t)
= 45.31 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29

ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.00
pter 11 Parametric Design - M.G. Parson ; page 11-29

= Open Water Test Propeller Efficiency


= (J/(2∙n))∙(KT/KQ)
= 0.6
= Rotative Efficiency
= 0.985

= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591

Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 76.58 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 78.14 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29

wer Calculation (BHP) :


= Reduction Gear Efficiency
= 0.98
= Brake Horse Power (BHP0)
= PS/ηR
= 79.74 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
= 15% ∙ PB0
= 115% ∙ PB0 = BHP
= 91.70 Kw
= BHP ∙ 1.3596 HP
= 124.67 HP
pter 11 Parametric Design - M.G. Parson ; page 11-30
Merek Tipe Daya (kW) SFOC (g/kW/hr)

CUMMINS NTA855-M400 298 103


CATERPILLAR 3208 325 235
CUMMINS KTTA 19-M3 447 184
YUCHAI YC6C670L 492 195
YUCHAI YC6C700L 515 195
YUCHAI YC6C730L 536 195
YUCHAI YC6C865L 636 195
YUCHAI YC6C925L 680 195
YUCHAI YC6C960L 706 195
YUCHAI YC6CL1035L 760 195
MAN B&W 6L23/30A-E 800 188
MAN B&W 6L23/30A 960 189
CATERPILLAR 6M20C 1020 191
CATERPILLAR 6M20C 1080 190
CATERPILLAR 6M20C 1140 192
CATERPILLAR 6M20C 1200 189
MAN B&W 8L23/30A 1280 191
MAN B&W 6L21/31 1290 190
CATERPILLAR 8M20C 1360 192
CATERPILLAR 8M20C 1440 189
MAN B&W 6L28/32A 1470 191
MAN B&W 5L27/38 1500 190
MAN B&W 7L21/31 1505 192
CATERPILLAR 8M20C 1520 188
CATERPILLAR 9M20C 1530 185
CATERPILLAR 8M20C 1600 185
MAN B&W 5L27/38 1600 187
CATERPILLAR 9M20C 1620 185
CATERPILLAR 9M20C 1710 185
MAN B&W 7L28/32A 1715 189
MAN B&W 8L21/31 1720 195
CATERPILLAR 9M20C 1800 195
MAN B&W 9L21/31 1935 195
MAN B&W 8L28/32A 1960 195
MAN B&W 6L27/38 1980 194
CATERPILLAR 6M25C 2000 194
MAN B&W 9L28/32A 2205 194
MAN B&W 7L27/38 2310 194
CATERPILLAR 8M25C 2320 194
CATERPILLAR 8M25C 2400 196
CATERPILLAR 9M25C 2610 196
MAN B&W 8L27/38 2640 196
CATERPILLAR 8M25C 2666 194
CATERPILLAR 9M25C 2700 194
MAN B&W 9L27/38 2970 194
CATERPILLAR 9M25C 3000 194
MAN B&W 3000 189
MAN B&W 3500 195
MAN B&W 4000 195
MAN B&W 4500 195
MAN B&W 5000 195
MAN B&W 5500 194
MAN B&W 6000 194
MAN B&W 6500 194
MAN B&W 7000 194
MAN B&W 7500 189
MAN B&W 8000 192
MAN B&W 8500 194

LARY ENGINE

Merek Tipe Daya (kW) SFOC (g/kW/hr)

CATERPILLAR C9 217 212.1


CATERPILLAR C9 253 228.8
CATERPILLAR C9 253 209
CATERPILLAR C9 288 206.6
CATERPILLAR C9 311 229.5
CATERPILLAR C9 361 211.7
CATERPILLAR C18 404 210
CATERPILLAR C18 499 217
CATERPILLAR C18 514 209
CATERPILLAR C15 536 218.8
CATERPILLAR C15 540 218.8
CATERPILLAR C18 587 208
CATERPILLAR C18 624 215
CATERPILLAR C18 660 209
CATERPILLAR C32 791 203.8
CATERPILLAR C32 916 210.8
CATERPILLAR C32 923 203
CATERPILLAR C32 1047 210.4
CATERPILLAR C32 1172 207
CATERPILLAR C32 1333 207.2
CATERPILLAR C33 1500 209
CATERPILLAR C34 1700 206.6
CATERPILLAR C35 2153 218.8
CATERPILLAR C36 2337 218.8
CATERPILLAR C37 2745 210
CATERPILLAR C38 3000 209
CATERPILLAR C39 3254 208
CATERPILLAR C40 3559 209
CATERPILLAR C41 3749 217
CATERPILLAR C42 4000 215
BIAYA PERJALANAN :

Biaya bahan bakar :


1 > Main Engine

2 > Aux. Engine

Total

BIAYA PELABUHAN :

Pelabuhan Dumai
1 Jasa Labuh
2 Jasa Tambat
Dermaga Beton
3 Jasa Pandu
Tarif Tetap
Tarif Variable
4 Jasa Tunda Kapal
Tarif Tetap
Tarif Variabel

total

Pelabuhan Surabaya
1 Jasa Labuh
2 Jasa Tambat
Dermaga Beton
3 Jasa Pandu
Tarif Tetap
Tarif Variable
4 Jasa Tunda Kapal
Tarif Tetap
Tarif Variabel

total

BIAYA BONGKAR MUAT :


Tarif Bongkar muat =

>> Muat =
>> Bongkar =
Total =
= 1.00
= 2.78
= 4.00
= 110
= 1.83
= 0.61
= 2.57 m/s
= 17.60 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2

(parametric design hal 11-27)

; untuk mesin di after


SFOC yang
SLOC (g/kW/hr) Mesin yang memungkinkan
memungkinkan

1 1 103
1 1 235
1 1 184
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
1 1 188
1.0 1 189
0.6 1 191
0.6 1 190

0.6 1 192

0.7 1 189
1.0 1 191
0.8 1 190
0.7 1 192
0.7 1 189
1.0 1 191
1.0 1 190
0.8 1 192
0.7 1 188
0.7 1 185
0.7 1 185
1.0 1 187
0.8 1 185
0.8 1 185
1.0 1 189
0.8 1 195
0.8 1 195
0.8 1 195
1.0 1 195
1.0 1 194
0.8 1 194
1.0 1 194
1.0 1 194
0.8 1 194
0.8 1 196
0.9 1 196
1.0 1 196
0.9 1 194
0.9 1 194
1.0 1 194
0.9 1 194
0.9 1 189
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
1.0 1 194
1.0 1 194
1.0 1 194
1.0 1 194
1.1 1 189
1.1 1 192
1.1 1 194

SFOC yang
SLOC (g/kW/hr) Mesin yang memungkinkan
memungkinkan

1.1 1 212.1
1.1 1 228.8
1.0 1 209
1.0 1 206.6
1.1 1 229.5
1.1 1 211.7
1.1 1 210
1.1 1 217
1.0 1 209
1.1 1 218.8
1.1 1 218.8
1.0 1 208
1.1 1 215
1.0 1 209
1.0 1 203.8
1.1 1 210.8
1.0 1 203
1.1 1 210.4
1.0 1 207
1.0 1 207.2
1.0 1 209
1.0 1 206.6
1.1 1 218.8
1.1 1 218.8
1.1 1 210
1.0 1 209
1.0 1 208
1.0 1 209
1.1 1 217
1.1 1 215
RJALANAN :

ITB
= Err:509
= Err:509
= Err:509
Err:509
Total = Err:509

LABUHAN :

tarif
= Rp 60 Per GT/Kunjungan

= Rp 49 per GT/Etmal

= Rp 117,150 per GT/Kapal/Gerakan


= Rp 53 per GT/Kapal/Gerakan
= 2607 GT
= Rp 144,000 per Kapal yang Ditunda/Jam
= Rp 2 per GT/Kapal yang Ditunda/Jam

total

tarif
= Rp 95 Per GT/Kunjungan

= Rp 95 per GT/Etmal

= Rp 150,000 per GT/Kapal/Gerakan


= Rp 30 per GT/Kapal/Gerakan
<= 2607 GT
= Err:509 per Kapal yang Ditunda/Jam
= Err:509 per GT/Kapal yang Ditunda/Jam

total

Rp 30,000 /ton

Rp -
Rp -
Rp - /tahun
Fuel Oil
Fuel Oil Consumption (ton) Biaya ME
Consumption (liter)

Err:509 Err:509 Err:509


Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509

Fuel Oil
Fuel Oil Consumption (ton) Biaya AE
Consumption (liter)

Err:509 Err:509 Err:509


Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun

total
-

-
-

Rp -
-

Rp -

total
-

-
-

Err:509
Err:509

Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :

MCR Mesin ME :
BHP

Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mesin

MCR Mesin AE :
BHP

Mesin :
No. Urut Mesin
Merk
Type

Daya Mesin Yang Digunakan :


Daya

Konsumsi Bahan Bakar :


SFOC

Konsumsi Pelumas (Oli) :


Cylinder Oil

Berat Mensin
Berat Mesin
(ton)

1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509

Berat Mesin

(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
ITB

Capital Cost Err:509


Operating Cost Err:509
Voyage Cost Err:509
Cargo Handling Cost Rp -
TOTAL COST Err:509

Unit Cost Rp -

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun

JASA TUNDA
/tahun
No

/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 91.70 Kw
= 124.67 HP

Err:509
= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton

= 22.92 Kw
= 31.17 HP

= Err:509
= Err:509

= Err:509 Kw
= Err:509 HP

= Err:509 g/kW/hr
= Err:509 ton/kw/hr

= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =

/ton

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam

Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
137.55
34.39
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509

Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam

Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN

Input Data :
D= 2.780

n= 110
Z= 4
AE/AO = 0.40
PD = 77
PB = Err:509

PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=

Gearbox

Wgear =

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Shafting
𝑑s =

l =
=
=
=

M 
  =
 l 
=

M =
=

=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175

Propeller

K =
=
=

Wprop =
=
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176

Electrical Units

Wagg =
P = PB
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176

Other Weight

Wot =
=

Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177

Weight Total =
=

Titik Berat Machinery

hdb =
=
=
BKI Vol II. Bab 24 -3.3

KG =
=

Chapter 11 Parametric Design - M.G. Parson ; page 11-25

LCB =
=
=

LCGM =
=

LCGFP =
=
BERAT BAJA

Input Data :
m L

H
buah B
T

kW (Delivery Power at Propeller) FN


kW (Brake Horse Power) CSO Bulk Carrier

CKG Bulk Carriers

PERHITUNGAN :

Berat Mesin Induk 1. Volume Forecastle (VFC)


ton Panjang Forecastle (ℓFC)
Err:509
Lebar Forecastle (bFC)
Berat Mesin Genset
0.5 ton Tinggi Forecastle (tFC)
Volume Forecastle (VFC)

2. Volume Poop (VPO)


 PB 
( 0.34 ~ 0.4 ) ton Panjang Poop (ℓPO)
 n 
Err:509 ton Lebar Poop (bPO)
hneekluth Vol 2. hal 175
Tinggi Poop (tPO)
Volume Poop (VPO)

Diameter Poros Propeller


1/ 3 Volume Superstructure (VA)
 PD 
11,5*  
 n 
10.2 cm 1. Volume Layer 2 (VDH2)
Panjang Layer 2 (ℓDH2)
Panjang Poros Propeller
2,13 m untuk area di ceruk buritan Lebar Layer 2 (bDH2)
1,8 m untuk area gangway
3.93 m Tinggi Layer 2 (tDH2)
Volume Layer 2 (VDH2)

Berat poros / panjang poros


2/3 2. Volume Layer 3 (VDH3)
 PD 
0.081   Panjang Layer 3 (ℓDH3)
 n
0.1 ton/m Lebar Layer 3 (bDH3)

Berat Poros Propeller Tinggi Layer 3 (tDH3)


M  Volume Layer 3 (VDH3)
 l
 l 
0.3 Ton
hneekluth Vol 2. hal 175 3. Volume Layer 4 (VDH4)
Panjang Layer 4 (ℓDH4)

Lebar Layer 4 (bDH4)

Koefisien Fixed Propeller


(𝑑s/𝐷)∙(1.85∙𝐴𝐸/𝐴𝑂)−((𝑧−2)/100) Tinggi Layer 4 (tDH4)

0.007 Volume Layer 4 (VDH4)

Berat Propeler
D3 · K 4. Volume Anjungan (VAN)

0.15 t/m3 Panjang Anjungan (ℓAN)

hneekluth Vol 2. hal 175-176 Lebar Anjungan (bAN)

Tinggi Anjungan (tAN)


Volume Anjungan (VAN)
0.001P (15 + 0.; P=Pb

Err:509 Ton Volume Deck House (VDH)

hneekluth Vol 2. hal 176

DA

0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U

Tinggi Double bottom CS


B/15
1.0 m
T
WST
hdb+0.35∙(H−hdb)

3.3 m

on ; page 11-25 CKG

Panjang Ceruk Buritan KG


4% · LPP

3.4 m
LCG(%)

(-0,5 . Lpp ) + LCB +5


-34.6 m LCGM

-LCGm + ( 0,5.Lpp) LCGFP


77.7 m
Input Data :
= 86.18 m
= 7.44 m
= 15.47 m
= 4.45 m
= 0.09
= 0.0752

0.52 – 0.54

Volume Superstructure (VA)


ecastle (VFC)
ecastle (ℓFC) = 10,5% · LPP
= 9.05 m
= selebar kapal
= 15.47 m
= 2.5 m
ecastle (VFC) = 0.5 · ℓFC · bFC · tFC
= 174.99 m3

= 17,2% · LPP
= 14.82 m
= selebar kapal
= 15.47 m
= 2.5 m
= ℓPO · bPO · tPO
= 573.30 m3
tructure (VA) = VFC + VPO
= 748.29 m3
Volume Deck House (VDH)

= 16,1 % · L
= 13.9 m
= B-4
= 11.47 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 397.89 m3

er 3 (VDH3)
= 11,5 % · L
= 9.91 m
= B-4
= 11.47 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 284.20 m3
er 4 (VDH4)
= 8,5 % · L
= 7 m
= B-4
= 11.47 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4

= 210.06 m3

ungan (VAN)

= 7%·L
= 6.0 m
= B- 8
= 7.47 m
= 2.5 m
= ℓAN · bAN · tAN
112.67 m3

House (VDH) = VDH2 + VDH3 + VDH4 + VAN


= 1004.82 m3

Berat Baja (WST)


= Tinggi Kapal Setelah Dikoreksi dengan Superstucture dan Deck House
= H+(VA+VDH)/(LPP∙B)
= 8.76 m

= 0.0752 t/m3

= Berat Kapal
= 3833.19 ton

= log⁡〖∆ /100 〗
= 1.58

CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11

Total Berat Baja


= LPP · B · DA · CS
= 1310.05 ton

Titik Berat Baja


= Koefisien KG Baja
= 0.54
= DA * CKG
= 4.73 m

= -0,15 + LCB(%)
= -1.615 %L
= LCG(%) · LPP
= -1.392 m
= 0.5 · LPP - LCGM
= 44.48 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN

Grup III (Accommodation)


The specific volumetric and unit area weights are:
For small and medium sized cargo ships :
For large cargo ships, large Bulk Carriers, etc :
Therefore, for oat, it is used :

• POOP
Lpoop = 14.82
Bpoop = 15.47
Apoop = 229.32
Wpoop = 45.86
• DECKHOUSE
Layer II
LDH II = 13.88
BDH II = 11.47
ADH II = 159.15
WDH II = 31.83

Layer IV
LDH IV = 7.33
BDH IV = 11.47
ADH IV = 84.03
WDH IV = 16.81

W Group III = 126.25

Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C

= 120.06

Equipment and Outfitting Total Weight


= 246.31

Outfit Weight Center Estimation


DA = 8.76
KGE&O = 1.02 -1.08DA

= 9.20
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 61.577
Lcb = 4.309
LCGM dr FP = 80.319
LCGM = -37.229
Lkm = 10.000
Layer II

LDH II = 13.875
WDH II = 11.470
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide

= -35.719

Layer III

LDH III = 9.911


WDH III = 11.470
LCGII = -33.737

Layer IV
LDH IV = 7.325
WDH IV = 11.470
LCGIII = -32.444

Wheelhouse
LWH = 6.033
WWH = 7.470
LCGIV = -31.798

2. LCG2 (37,5% WE&O at LCGDH)


WE&O DH = 92.366
LCGM DH = -33.580

3. LCG3 (37,5% WE&O at midship)

WE&O Midship = 92.366


midship = 0

LCGE&O (LCG di belakang midship)


= -21.900
LCGE&O (dari FP)
= 64.990
Parametric design chapter 11, hal. 11-25
BERAT CONSUMABLE & CREW

Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =

• FORECASTLE Jumlah Crew


m L = 9.05 m Cst
forecasle =
m B forecastle = 15.47 m Cdk =
m2 A forecastle = 139.99 m2 Ceng
=
ton W forecastle = 28.00 ton cadet =
Jumlah Crew (Zc) =
=
Layer III =
m LDH III = 9.91 m Modul TMK bab Consumable and Crew
m BDH III = 11.47 m CC&E =
m2 ADH III = 113.68 m2 WC&E =
ton WDH III = 22.74 ton =
=
Wheel House Parametric design chapter 11, hal. 11-25
m LWH = 6.03 m

m BWH = 7.47 m Main Engine


m 2 AWH = 45.07 m 2
Fuel Oil
ton WWH = 9.01 ton SFR
=
MCR =
ton Margin
=
WFO
=

(0.18 ton / m2 < C < 0.26 ton / m2 =


[ton/m ] 2
=
(L*B*D) 2/3
*C
[ton]

Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA

m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m

ton

[0,5*L+(Lkm+Lcb)+0,5*Ideck] Lubricating Oil


m SFR =
MCR
=
Margin =
m WLO'
=
ton =
m

Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24

m
WFWtotal =

m WFW =
ton =
m

Provision & Store


CPR
=
ton =
m WPR
=
=

ton
m

m
UMABLE & CREW

VS = 2.57 m/s
86.18 m = 5.00 nm/jam
S
15.47 m = Err:509 nm
7.44 m
4.45 m

1.2 ; Coef. Steward (1.2 ~ 1.33)


11.5 ; Coef. Deck (11.5 ~ 14.5)
8.5 ; Coef. Engine (8.5 ~ 11 untuk diesel)
2 ; Umumnya 2 orang
C st∙Cdk∙((Lpp∙B∙H∙35)/10^5 )^(1/6) + Ceng ∙ (BHP/ 〖 10 〗 ^5)
^(1/3)+cadet
19.0 orang
19 orang
Consumable and Crew

0.17 ton/orang ; Asumsi rata-rata berat manusia


Berat Crew Total
Zc · Cc&e

3.23 ton
gn chapter 11, hal. 11-25

Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

Err:509 ton/kW h
22.925 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)

Err:509 ton
Err:509 liter

8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)


Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)

Err:509 ton

0.17 ton/orang . hari


gn chapter 11, hal. 11-24

0.55 ton

WFW total + 4% · WFW total


; terdapat penambahan koreksi 4%

0.571 ton

10 kg/orang h; Koef. Provision & Store


0.000416666666667 ton/ orang jam
CP∙S/Vs ∙Zc
; Berat Provision & Store

Err:509 ton
1. LWT
Steel Weight
WST = 1310.05 ton

Equipment & Outfitting Weight


WE&O = 246.31 ton

Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton

GROSS TONAGE
Input Data
H = 7.44 m
T = 4.45 m
VPO = 573.30 m3
VFC = 174.99 m3
VDH = 1004.82 m3
∆ = 3833.191 ton
Zc = 19 orang
N1 = 0 orang
N2 = 0 orang

Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)

= 7577.42 m3
VH = VPO + VFC + VDH
= 1753.11 m3
V = VU + V H
= 9330.53 m3
K1 = 0.2+0.02∙log_10⁡V
= 0.28
GT = V ∙ K1

= 2606.93 m3
Dumai - Surabaya
OF Chemical Tanker SPOB
Total Biaya Err:509 Err:509
Total Err:509
Biaya Satuan Rp -

DV
LPP 108.47 82.42
B 12.18 13.35
H 5.73 5.80
T 4.72 4.77
Frekuensi 72 60

T min 1
T max 5.9
Chemical Tanker SPOB
Frekuensi sisa Err:509 Err:509
Roundtrip per tahun Err:509 Err:509
Payload 0.00 0.00
Total Angkut - ton
Permintaan Err:509 ton
Freeboard 1.01 1.02
Batasan Freeboard >= 1
Keterangan Chemical Tanker SPOB
L/B 8.9 6.2
B/T 2.6 2.8
L/T 23.0 17.3
B/H 2.1 2.3

N Kapal Err:509 Err:509


ITB Biaya Penalti
Err:509 Sisa Permintaan =
Tarif Penalti =
Total Penalti =

Chemical Tanker SPOB


Min Maks Min
86.18 10 177.0 16.50833
15.47 5.6 17.7 3.5
7.44 3.8 7.4 1.1
4.45 1 5.9 1
0 0 1000 0

ITB
Err:509
Err:509
0.00

3.00
Chemical Tanker SPOB
ITB Min Maks Min
5.6 3.5 10 2.7
3.5 1.8 5 4.7
19.4 10 30 16.5
2.1 1.47 2.38 3.2

Err:509
Biaya Penalti Frekuensi Sisa
Err:509 ton Total Penalti = Err:509
Rp 10,123,170 per ton
Err:509

SPOB ITB
Maks Min Maks
175.1 16 120.5
33.4 5.0 21.2
5.6 1.8 4.5
5.9 1 5.9
1000 0 1000

SPOB ITB
Maks Min Maks
5.2 3.1 5.7
7.8 3.2 6.1
29.7 16.0 20.4
6.0 2.8 4.7
KAPAL DAN RUTE YANG TERPILIH
DUMAI - MEDAN - JAKARTA - SURABA
Dumai - Medan Dumai - Jakarta
KOMPONEN Chemical Tanker Chemical Tanker
Jumlah kapal Err:509 Err:509
LPP 85.5 95.2
B 10.9 12.2
H 5.7 6.0
T 4.5 4.9
Frekuensi Sebenarnya 164 46
Payload (Ton) - -
DWT (Ton) - -
GT 1,743 2,335
Total Angkut (Ton) -
Pengiriman (Ton) 103,067,600 Err:509
Roundtrip per tahun Err:509 Err:509
Frekuensi Sisa (Kapal Menganggur) Err:509 Err:509
Total Biaya Setiap Jenis Kapal Err:509 Err:509
Total Biaya Err:509
Biaya Satuan Err:509
TE YANG TERPILIH
AKARTA - SURABAYA
Dumai - Jakarta Dumai - Surabaya
SPOB Chemical Tanker SPOB
Err:509 Err:509 Err:509
90.8 108.5 82.4
13.7 12.2 13.3
6.3 5.7 5.8
5.2 4.7 4.8
123 72 60
- - -
- - -
2,704 2,602 2,214
- -
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Model yang digunakan
Port To Port

Rute Hari Kerja 330


Dumai - Medan - Dumai Massa Jenis CPO 898
Dumai - Jakarta - Dumai 0.898
Dumai - Surabaya - Dumai

PERENCANAAN PENJADWALAN DUMAI - MEDAN


Kapal yang Terpilih = 1 Jenis
Kebutuhan Medan per Tahun = 103,067,600 ton/th
Kebutuhan Medan per Hari = 282,377 ton/hari
Hari Kerja = 330 hari
CHEMICAL TANKER
Jumlah = 2 Buah
Payload = - ton
Frekuensi Sebenarnya = 164 kali
Seatime Dumai - Medan = Err:509 jam
Seatime Medan - Dumai Err:509 jam
Port Time Dumai = 16.5 jam
Port Time Medan = 14.5 jam
Roundtrip = Err:509 hari
Roundtrip yang ditentukan = Err:509 hari
kg/m3
ton/m3
KAPAL 1
96
Err:509 Pengiriman ke - PELABUHAN Jarak (nm) Sea Time (jam)
Err:509
1 Dumai 291 Err:509
Err:509 Medan 291 Err:509
2 Dumai 291 Err:509
Medan 291 Err:509
3 Dumai 291 Err:509
Medan 291 Err:509
4 Dumai 291 Err:509
82 Medan 291 Err:509
5 Dumai 291 Err:509
Medan 291 Err:509
6 Dumai 291 Err:509
Medan 291 Err:509
7 Dumai 291 Err:509
Medan 291 Err:509
8 Dumai 291 Err:509
Medan 291 Err:509
9 Dumai 291 Err:509
Medan 291 Err:509
10 Dumai 291 Err:509
Medan 291 Err:509
11 Dumai 291 Err:509
Medan 291 Err:509
12 Dumai 291 Err:509
Medan 291 Err:509
13 Dumai 291 Err:509
Medan 291 Err:509
14 Dumai 291 Err:509
Medan 291 Err:509
15 Dumai 291 Err:509
Medan 291 Err:509
16 Dumai 291 Err:509
Medan 291 Err:509
17 Dumai 291 Err:509
Medan 291 Err:509
18 Dumai 291 Err:509
Medan 291 Err:509
19 Dumai 291 Err:509
Medan 291 Err:509
20 Dumai 291 Err:509
Medan 291 Err:509
21 Dumai 291 Err:509
Medan 291 Err:509
22 Dumai 291 Err:509
Medan 291 Err:509
23 Dumai 291 Err:509
Medan 291 Err:509
24 Dumai 291 Err:509
Medan 291 Err:509
25 Dumai 291 Err:509
Medan 291 Err:509
26 Dumai 291 Err:509
Medan 291 Err:509
27 Dumai 291 Err:509
Medan 291 Err:509
28 Dumai 291 Err:509
Medan 291 Err:509
29 Dumai 291 Err:509
Medan 291 Err:509
30 Dumai 291 Err:509
Medan 291 Err:509
31 Dumai 291 Err:509
Medan 291 Err:509
32 Dumai 291 Err:509
Medan 291 Err:509
33 Dumai 291 Err:509
Medan 291 Err:509
34 Dumai 291 Err:509
Medan 291 Err:509
35 Dumai 291 Err:509
Medan 291 Err:509
36 Dumai 291 Err:509
Medan 291 Err:509
37 Dumai 291 Err:509
Medan 291 Err:509
38 Dumai 291 Err:509
Medan 291 Err:509
39 Dumai 291 Err:509
Medan 291 Err:509
40 Dumai 291 Err:509
Medan 291 Err:509
41 Dumai 291 Err:509
Medan 291 Err:509
42 Dumai 291 Err:509
Medan 291 Err:509
43 Dumai 291 Err:509
Medan 291 Err:509
44 Dumai 291 Err:509
Medan 291 Err:509
45 Dumai 291 Err:509
Medan 291 Err:509
46 Dumai 291 Err:509
Medan 291 Err:509
47 Dumai 291 Err:509
Medan 291 Err:509
48 Dumai 291 Err:509
Medan 291 Err:509
49 Dumai 291 Err:509
Medan 291 Err:509
50 Dumai 291 Err:509
Medan 291 Err:509
51 Dumai 291 Err:509
Medan 291 Err:509
52 Dumai 291 Err:509
Medan 291 Err:509
53 Dumai 291 Err:509
Medan 291 Err:509
54 Dumai 291 Err:509
Medan 291 Err:509
55 Dumai 291 Err:509
Medan 291 Err:509
56 Dumai 291 Err:509
Medan 291 Err:509
57 Dumai 291 Err:509
Medan 291 Err:509
58 Dumai 291 Err:509
Medan 291 Err:509
59 Dumai 291 Err:509
Medan 291 Err:509
60 Dumai 291 Err:509
Medan 291 Err:509
61 Dumai 291 Err:509
Medan 291 Err:509
62 Dumai 291 Err:509
Medan 291 Err:509
63 Dumai 291 Err:509
Medan 291 Err:509
64 Dumai 291 Err:509
Medan 291 Err:509
65 Dumai 291 Err:509
Medan 291 Err:509
66 Dumai 291 Err:509
Medan 291 Err:509
67 Dumai 291 Err:509
Medan 291 Err:509
68 Dumai 291 Err:509
Medan 291 Err:509
69 Dumai 291 Err:509
Medan 291 Err:509
70 Dumai 291 Err:509
Medan 291 Err:509
71 Dumai 291 Err:509
Medan 291 Err:509
72 Dumai 291 Err:509
Medan 291 Err:509
73 Dumai 291 Err:509
Medan 291 Err:509
74 Dumai 291 Err:509
Medan 291 Err:509
75 Dumai 291 Err:509
Medan 291 Err:509
76 Dumai 291 Err:509
Medan 291 Err:509
77 Dumai 291 Err:509
Medan 291 Err:509
78 Dumai 291 Err:509
Medan 291 Err:509
79 Dumai 291 Err:509
Medan 291 Err:509
80 Dumai 291 Err:509
Medan 291 Err:509
81 Dumai 291 Err:509
Medan 291 Err:509
82 Dumai 291 Err:509
Medan 291 Err:509
KAPAL 2

Port Time (jam) ETA ETD


Pengiriman ke -
Hari Tanggal & Jam Hari Tanggal & Jam
16.53 Senin 1/1/18 1:00 Senin 1/1/18 17:31 83
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 84
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 85
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 86
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 87
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 88
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 89
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 90
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 91
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 92
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 93
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 94
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 95
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 96
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 97
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 98
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 99
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 100
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 101
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 102
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 103
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 104
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 105
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 106
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 107
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 108
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 109
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 110
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 111
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 112
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 113
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 114
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 115
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 116
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 117
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 118
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 119
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 120
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 121
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 122
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 123
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 124
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 125
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 126
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 127
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 128
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 129
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 130
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 131
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 132
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 133
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 134
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 135
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 136
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 137
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 138
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 139
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 140
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 141
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 142
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 143
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 144
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 145
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 146
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 147
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 148
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 149
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 150
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 151
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 152
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 153
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 154
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 155
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 156
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 157
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 158
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 159
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 160
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 161
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 162
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 163
14.53 Err:509 Err:509 Err:509 Err:509
16.53 Err:509 Err:509 Err:509 Err:509 164
14.53 Err:509 Err:509 Err:509 Err:509
AL 2

Jarak Sea Time ETA ETD


PELABUHAN Port Time (jam)
(nm) (jam) Hari Tanggal & Jam Hari Tanggal & Jam
Dumai 291 Err:509 16.53 Senin 1/1/18 23:31 Selasa 1/2/18 16:03
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
Dumai 291 Err:509 16.53 Err:509 Err:509 Err:509 Err:509
Medan 291 Err:509 14.53 Err:509 Err:509 Err:509 Err:509
4 3.12
82 82lm setahun
2 328 74 256 74 hari
330 330 1776 jam
328 888 jam
11
5.5
82
ETA
Pengiriman Ke - PELABUHAN Jarak (nm) Sea Time (jam) Port Time (jam)
Hari
1 Dumai 291 26.5 23.646 Senin
83 Dumai 291 26.5 23.646 Selasa
Medan 291 24.3 21.646 Rabu
Medan 291 24.3 21.646 Kamis
2 Dumai 291 26.5 23.646 Jumat
84 Dumai 291 26.5 23.646 Sabtu
Medan 291 24.3 21.646 Minggu
Medan 291 24.3 21.646 Senin
3 Dumai 291 26.5 23.646 Selasa
85 Dumai 291 26.5 23.646 Rabu
Medan 291 24.3 21.646 Kamis
Medan 291 24.3 21.646 Jumat
4 Dumai 291 26.5 23.646 Sabtu
86 Dumai 291 26.5 23.646 Minggu
Medan 291 24.3 21.646 Senin
Medan 291 24.3 21.646 Selasa
5 Dumai 291 26.5 23.646 Rabu
87 Dumai 291 26.5 23.646 Kamis
Medan 291 24.3 21.646 Jumat
Medan 291 24.3 21.646 Sabtu
6 Dumai 291 26.5 23.646 Minggu
88 Dumai 291 26.5 23.646 Senin
Medan 291 24.3 21.646 Selasa
Medan 291 24.3 21.646 Rabu
7 Dumai 291 26.5 23.646 Kamis
89 Dumai 291 26.5 23.646 Jumat
Medan 291 24.3 21.646 Sabtu
Medan 291 24.3 21.646 Minggu
8 Dumai 291 26.5 23.646 Senin
90 Dumai 291 26.5 23.646 Selasa
Medan 291 24.3 21.646 Rabu
Medan 291 24.3 21.646 Kamis
9 Dumai 291 26.5 23.646 Jumat
91 Dumai 291 26.5 23.646 Sabtu
Medan 291 24.3 21.646 Minggu
Medan 291 24.3 21.646 Senin
10 Dumai 291 26.5 23.646 Selasa
92 Dumai 291 26.5 23.646 Rabu
Medan 291 24.3 21.646 Kamis
Medan 291 24.3 21.646 Jumat
11 Dumai 291 26.5 23.646 Sabtu
93 Dumai 291 26.5 23.646 Minggu
Medan 291 24.3 21.646 Senin
Medan 291 24.3 21.646 Selasa
12 Dumai 291 26.5 23.646 Rabu
94 Dumai 291 26.5 23.646 Kamis
Medan 291 24.3 21.646 Jumat
Medan 291 24.3 21.646 Sabtu
13 Dumai 291 26.5 23.646 Minggu
95 Dumai 291 26.5 23.646 Senin
Medan 291 24.3 21.646 Selasa
Medan 291 24.3 21.646 Rabu
14 Dumai 291 26.5 23.646 Kamis
96 Dumai 291 26.5 23.646 Jumat
Medan 291 24.3 21.646 Sabtu
Medan 291 24.3 21.646 Minggu
15 Dumai 291 26.5 23.646 Senin
97 Dumai 291 26.5 23.646 Selasa
Medan 291 24.3 21.646 Rabu
Medan 291 24.3 21.646 Kamis
16 Dumai 291 26.5 23.646 Jumat
98 Dumai 291 26.5 23.646 Sabtu
Medan 291 24.3 21.646 Minggu
Medan 291 24.3 21.646 Senin
17 Dumai 291 26.5 23.646 Selasa
99 Dumai 291 26.5 23.646 Rabu
Medan 291 24.3 21.646 Kamis
Medan 291 24.3 21.646 Jumat
18 Dumai 291 26.5 23.646 Sabtu
100 Dumai 291 26.5 23.646 Minggu
Medan 291 24.3 21.646 Senin
Medan 291 24.3 21.646 Selasa
19 Dumai 291 26.5 23.646 Rabu
101 Dumai 291 26.5 23.646 Kamis
Medan 291 24.3 21.646 Jumat
Medan 291 24.3 21.646 Sabtu
20 Dumai 291 26.5 23.646 Minggu
102 Dumai 291 26.5 23.646 Senin
Medan 291 24.3 21.646 Selasa
Medan 291 24.3 21.646 Rabu
21 Dumai 291 26.5 23.646 Kamis
103 Dumai 291 26.5 23.646 Jumat
Medan 291 24.3 21.646 Sabtu
Medan 291 24.3 21.646 Minggu
22 Dumai 291 26.5 23.646 Senin
104 Dumai 291 26.5 23.646 Selasa
Medan 291 24.3 21.646 Rabu
Medan 291 24.3 21.646 Kamis
23 Dumai 291 26.5 23.646 Jumat
105 Dumai 291 26.5 23.646 Sabtu
Medan 291 24.3 21.646 Minggu
Medan 291 24.3 21.646 Senin
24 Dumai 291 26.5 23.646 Selasa
106 Dumai 291 26.5 23.646 Rabu
Medan 291 24.3 21.646 Kamis
Medan 291 24.3 21.646 Jumat
25 Dumai 291 26.5 23.646 Sabtu
107 Dumai 291 26.5 23.646 Minggu
Medan 291 24.3 21.646 Senin
Medan 291 24.3 21.646 Selasa
26 Dumai 291 26.5 23.646 Rabu
108 Dumai 291 26.5 23.646 Kamis
Medan 291 24.3 21.646 Jumat
Medan 291 24.3 21.646 Sabtu
27 Dumai 291 26.5 23.646 Minggu
109 Dumai 291 26.5 23.646 Senin
Medan 291 24.3 21.646 Selasa
Medan 291 24.3 21.646 Rabu
28 Dumai 291 26.5 23.646 Kamis
110 Dumai 291 26.5 23.646 Jumat
Medan 291 24.3 21.646 Sabtu
Medan 291 24.3 21.646 Minggu
29 Dumai 291 26.5 23.646 Senin
111 Dumai 291 26.5 23.646 Selasa
Medan 291 24.3 21.646 Rabu
Medan 291 24.3 21.646 Kamis
30 Dumai 291 26.5 23.646 Jumat
112 Dumai 291 26.5 23.646 Sabtu
Medan 291 24.3 21.646 Minggu
Medan 291 24.3 21.646 Senin
31 Dumai 291 26.5 23.646 Selasa
113 Dumai 291 26.5 23.646 Rabu
Medan 291 24.3 21.646 Kamis
Medan 291 24.3 21.646 Jumat
32 Dumai 291 26.5 23.646 Sabtu
114 Dumai 291 26.5 23.646 Minggu
Medan 291 24.3 21.646 Senin
Medan 291 24.3 21.646 Selasa
33 Dumai 291 26.5 23.646 Rabu
115 Dumai 291 26.5 23.646 Kamis
Medan 291 24.3 21.646 Jumat
Medan 291 24.3 21.646 Sabtu
34 Dumai 291 26.5 23.646 Minggu
116 Dumai 291 26.5 23.646 Senin
Medan 291 24.3 21.646 Selasa
Medan 291 24.3 21.646 Rabu
35 Dumai 291 26.5 23.646 Kamis
117 Dumai 291 26.5 23.646 Jumat
Medan 291 24.3 21.646 Sabtu
Medan 291 24.3 21.646 Minggu
36 Dumai 291 26.5 23.646 Senin
118 Dumai 291 26.5 23.646 Selasa
Medan 291 24.3 21.646 Rabu
Medan 291 24.3 21.646 Kamis
37 Dumai 291 26.5 23.646 Jumat
119 Dumai 291 26.5 23.646 Sabtu
Medan 291 24.3 21.646 Minggu
Medan 291 24.3 21.646 Senin
38 Dumai 291 26.5 23.646 Selasa
120 Dumai 291 26.5 23.646 Rabu
Medan 291 24.3 21.646 Kamis
Medan 291 24.3 21.646 Jumat
39 Dumai 291 26.5 23.646 Sabtu
121 Dumai 291 26.5 23.646 Minggu
Medan 291 24.3 21.646 Senin
Medan 291 24.3 21.646 Selasa
40 Dumai 291 26.5 23.646 Rabu
122 Dumai 291 26.5 23.646 Kamis
Medan 291 24.3 21.646 Jumat
Medan 291 24.3 21.646 Sabtu
41 Dumai 291 26.5 23.646 Minggu
123 Dumai 291 26.5 23.646 Senin
Medan 291 24.3 21.646 Selasa
Medan 291 24.3 21.646 Rabu
42 Dumai 291 26.5 23.646 Kamis
124 Dumai 291 26.5 23.646 Jumat
Medan 291 24.3 21.646 Sabtu
Medan 291 24.3 21.646 Minggu
43 Dumai 291 26.5 23.646 Senin
125 Dumai 291 26.5 23.646 Selasa
Medan 291 24.3 21.646 Rabu
Medan 291 24.3 21.646 Kamis
44 Dumai 291 26.5 23.646 Jumat
126 Dumai 291 26.5 23.646 Sabtu
Medan 291 24.3 21.646 Minggu
Medan 291 24.3 21.646 Senin
45 Dumai 291 26.5 23.646 Selasa
127 Dumai 291 26.5 23.646 Rabu
Medan 291 24.3 21.646 Kamis
Medan 291 24.3 21.646 Jumat
46 Dumai 291 26.5 23.646 Sabtu
128 Dumai 291 26.5 23.646 Minggu
Medan 291 24.3 21.646 Senin
Medan 291 24.3 21.646 Selasa
47 Dumai 291 26.5 23.646 Rabu
129 Dumai 291 26.5 23.646 Kamis
Medan 291 24.3 21.646 Jumat
Medan 291 24.3 21.646 Sabtu
48 Dumai 291 26.5 23.646 Minggu
130 Dumai 291 26.5 23.646 Senin
Medan 291 24.3 21.646 Selasa
Medan 291 24.3 21.646 Rabu
49 Dumai 291 26.5 23.646 Kamis
131 Dumai 291 26.5 23.646 Jumat
Medan 291 24.3 21.646 Sabtu
Medan 291 24.3 21.646 Minggu
50 Dumai 291 26.5 23.646 Senin
132 Dumai 291 26.5 23.646 Selasa
Medan 291 24.3 21.646 Rabu
Medan 291 24.3 21.646 Kamis
51 Dumai 291 26.5 23.646 Jumat
133 Dumai 291 26.5 23.646 Sabtu
Medan 291 24.3 21.646 Minggu
Medan 291 24.3 21.646 Senin
52 Dumai 291 26.5 23.646 Selasa
134 Dumai 291 26.5 23.646 Rabu
Medan 291 24.3 21.646 Kamis
Medan 291 24.3 21.646 Jumat
53 Dumai 291 26.5 23.646 Sabtu
135 Dumai 291 26.5 23.646 Minggu
Medan 291 24.3 21.646 Senin
Medan 291 24.3 21.646 Selasa
54 Dumai 291 26.5 23.646 Rabu
136 Dumai 291 26.5 23.646 Kamis
Medan 291 24.3 21.646 Jumat
Medan 291 24.3 21.646 Sabtu
55 Dumai 291 26.5 23.646 Minggu
137 Dumai 291 26.5 23.646 Senin
Medan 291 24.3 21.646 Selasa
Medan 291 24.3 21.646 Rabu
56 Dumai 291 26.5 23.646 Kamis
138 Dumai 291 26.5 23.646 Jumat
Medan 291 24.3 21.646 Sabtu
Medan 291 24.3 21.646 Minggu
57 Dumai 291 26.5 23.646 Senin
139 Dumai 291 26.5 23.646 Selasa
Medan 291 24.3 21.646 Rabu
Medan 291 24.3 21.646 Kamis
58 Dumai 291 26.5 23.646 Jumat
140 Dumai 291 26.5 23.646 Sabtu
Medan 291 24.3 21.646 Minggu
Medan 291 24.3 21.646 Senin
59 Dumai 291 26.5 23.646 Selasa
141 Dumai 291 26.5 23.646 Rabu
Medan 291 24.3 21.646 Kamis
Medan 291 24.3 21.646 Jumat
60 Dumai 291 26.5 23.646 Sabtu
142 Dumai 291 26.5 23.646 Minggu
Medan 291 24.3 21.646 Senin
Medan 291 24.3 21.646 Selasa
61 Dumai 291 26.5 23.646 Rabu
143 Dumai 291 26.5 23.646 Kamis
Medan 291 24.3 21.646 Jumat
Medan 291 24.3 21.646 Sabtu
62 Dumai 291 26.5 23.646 Minggu
144 Dumai 291 26.5 23.646 Senin
Medan 291 24.3 21.646 Selasa
Medan 291 24.3 21.646 Rabu
63 Dumai 291 26.5 23.646 Kamis
145 Dumai 291 26.5 23.646 Jumat
Medan 291 24.3 21.646 Sabtu
Medan 291 24.3 21.646 Minggu
64 Dumai 291 26.5 23.646 Senin
146 Dumai 291 26.5 23.646 Selasa
Medan 291 24.3 21.646 Rabu
Medan 291 24.3 21.646 Kamis
65 Dumai 291 26.5 23.646 Jumat
147 Dumai 291 26.5 23.646 Sabtu
Medan 291 24.3 21.646 Minggu
Medan 291 24.3 21.646 Senin
66 Dumai 291 26.5 23.646 Selasa
148 Dumai 291 26.5 23.646 Rabu
Medan 291 24.3 21.646 Kamis
Medan 291 24.3 21.646 Jumat
67 Dumai 291 26.5 23.646 Sabtu
149 Dumai 291 26.5 23.646 Minggu
Medan 291 24.3 21.646 Senin
Medan 291 24.3 21.646 Selasa
68 Dumai 291 26.5 23.646 Rabu
150 Dumai 291 26.5 23.646 Kamis
Medan 291 24.3 21.646 Jumat
Medan 291 24.3 21.646 Sabtu
69 Dumai 291 26.5 23.646 Minggu
151 Dumai 291 26.5 23.646 Senin
Medan 291 24.3 21.646 Selasa
Medan 291 24.3 21.646 Rabu
70 Dumai 291 26.5 23.646 Kamis
152 Dumai 291 26.5 23.646 Jumat
Medan 291 24.3 21.646 Sabtu
Medan 291 24.3 21.646 Minggu
71 Dumai 291 26.5 23.646 Senin
153 Dumai 291 26.5 23.646 Selasa
Medan 291 24.3 21.646 Rabu
Medan 291 24.3 21.646 Kamis
72 Dumai 291 26.5 23.646 Jumat
154 Dumai 291 26.5 23.646 Sabtu
Medan 291 24.3 21.646 Minggu
Medan 291 24.3 21.646 Senin
73 Dumai 291 26.5 23.646 Selasa
155 Dumai 291 26.5 23.646 Rabu
Medan 291 24.3 21.646 Kamis
Medan 291 24.3 21.646 Jumat
74 Dumai 291 26.5 23.646 Sabtu
156 Dumai 291 26.5 23.646 Minggu
Medan 291 24.3 21.646 Senin
Medan 291 24.3 21.646 Selasa
75 Dumai 291 26.5 23.646 Rabu
157 Dumai 291 26.5 23.646 Kamis
Medan 291 24.3 21.646 Jumat
Medan 291 24.3 21.646 Sabtu
76 Dumai 291 26.5 23.646 Minggu
158 Dumai 291 26.5 23.646 Senin
Medan 291 24.3 21.646 Selasa
Medan 291 24.3 21.646 Rabu
77 Dumai 291 26.5 23.646 Kamis
159 Dumai 291 26.5 23.646 Jumat
Medan 291 24.3 21.646 Sabtu
Medan 291 24.3 21.646 Minggu
78 Dumai 291 26.5 23.646 Senin
160 Dumai 291 26.5 23.646 Selasa
Medan 291 24.3 21.646 Rabu
Medan 291 24.3 21.646 Kamis
79 Dumai 291 26.5 23.646 Jumat
161 Dumai 291 26.5 23.646 Sabtu
Medan 291 24.3 21.646 Minggu
Medan 291 24.3 21.646 Senin
80 Dumai 291 26.5 23.646 Selasa
162 Dumai 291 26.5 23.646 Rabu
Medan 291 24.3 21.646 Kamis
Medan 291 24.3 21.646 Jumat
81 Dumai 291 26.5 23.646 Sabtu
163 Dumai 291 26.5 23.646 Minggu
Medan 291 24.3 21.646 Senin
Medan 291 24.3 21.646 Selasa
82 Dumai 291 26.5 23.646 Rabu
164 Dumai 291 26.5 23.646 Kamis
Medan 291 24.3 21.646 Jumat
Medan 291 24.3 21.646 Sabtu
ETA ETD
Tanggal & Jam Hari Tanggal & Jam No Kapal
1/1/18 1:00 Selasa 1/2/18 0:38 1
1/2/18 6:38 Rabu 1/3/18 6:17 2
1/3/18 3:06 Kamis 1/4/18 0:44 3 1
1/4/18 8:44 Jumat 1/5/18 6:23 4 2
1/5/18 0:59 Sabtu 1/6/18 0:38 5
1/6/18 6:38 Minggu 1/7/18 6:17 6
1/7/18 3:05 Senin 1/8/18 0:44 7 1
1/8/18 8:44 Selasa 1/9/18 6:23 8 2
1/9/18 0:59 Rabu 1/10/18 0:38 9
1/10/18 6:38 Kamis 1/11/18 6:17 10
1/11/18 3:05 Jumat 1/12/18 0:44 11 1
1/12/18 8:44 Sabtu 1/13/18 6:23 12 2
1/13/18 0:59 Minggu 1/14/18 0:38 13
1/14/18 6:38 Senin 1/15/18 6:16 14
1/15/18 3:05 Selasa 1/16/18 0:44 15 1
1/16/18 8:44 Rabu 1/17/18 6:22 16 2
1/17/18 0:59 Kamis 1/18/18 0:37 17
1/18/18 6:37 Jumat 1/19/18 6:16 18
1/19/18 3:05 Sabtu 1/20/18 0:43 19 1
1/20/18 8:43 Minggu 1/21/18 6:22 20 2
1/21/18 0:58 Senin 1/22/18 0:37 21
1/22/18 6:37 Selasa 1/23/18 6:16 22
1/23/18 3:04 Rabu 1/24/18 0:43 23 1
1/24/18 8:43 Kamis 1/25/18 6:22 24 2
1/25/18 0:58 Jumat 1/26/18 0:37 25
1/26/18 6:37 Sabtu 1/27/18 6:16 26
1/27/18 3:04 Minggu 1/28/18 0:43 27 1
1/28/18 8:43 Senin 1/29/18 6:22 28 2
1/29/18 0:58 Selasa 1/30/18 0:37 29
1/30/18 6:37 Rabu 1/31/18 6:16 30
1/31/18 3:04 Kamis 2/1/18 0:43 31 1
2/1/18 8:43 Jumat 2/2/18 6:22 32 2
2/2/18 0:58 Sabtu 2/3/18 0:37 33
2/3/18 6:37 Minggu 2/4/18 6:15 34
2/4/18 3:04 Senin 2/5/18 0:43 35 1
2/5/18 8:43 Selasa 2/6/18 6:21 36 2
2/6/18 0:58 Rabu 2/7/18 0:36 37
2/7/18 6:36 Kamis 2/8/18 6:15 38
2/8/18 3:04 Jumat 2/9/18 0:42 39 1
2/9/18 8:42 Sabtu 2/10/18 6:21 40 2
2/10/18 0:57 Minggu 2/11/18 0:36 41
2/11/18 6:36 Senin 2/12/18 6:15 42
2/12/18 3:03 Selasa 2/13/18 0:42 43 1
2/13/18 8:42 Rabu 2/14/18 6:21 44 2
2/14/18 0:57 Kamis 2/15/18 0:36 45
2/15/18 6:36 Jumat 2/16/18 6:15 46
2/16/18 3:03 Sabtu 2/17/18 0:42 47 1
2/17/18 8:42 Minggu 2/18/18 6:21 48 2
2/18/18 0:57 Senin 2/19/18 0:36 49
2/19/18 6:36 Selasa 2/20/18 6:15 50
2/20/18 3:03 Rabu 2/21/18 0:42 51 1
2/21/18 8:42 Kamis 2/22/18 6:21 52 2
2/22/18 0:57 Jumat 2/23/18 0:36 53
2/23/18 6:36 Sabtu 2/24/18 6:14 54
2/24/18 3:03 Minggu 2/25/18 0:42 55 1
2/25/18 8:42 Senin 2/26/18 6:20 56 2
2/26/18 0:57 Selasa 2/27/18 0:35 57
2/27/18 6:35 Rabu 2/28/18 6:14 58
2/28/18 3:03 Kamis 3/1/18 0:41 59 1
3/1/18 8:41 Jumat 3/2/18 6:20 60 2
3/2/18 0:56 Sabtu 3/3/18 0:35 61
3/3/18 6:35 Minggu 3/4/18 6:14 62
3/4/18 3:02 Senin 3/5/18 0:41 63 1
3/5/18 8:41 Selasa 3/6/18 6:20 64 2
3/6/18 0:56 Rabu 3/7/18 0:35 65
3/7/18 6:35 Kamis 3/8/18 6:14 66
3/8/18 3:02 Jumat 3/9/18 0:41 67 1
3/9/18 8:41 Sabtu 3/10/18 6:20 68 2
3/10/18 0:56 Minggu 3/11/18 0:35 69
3/11/18 6:35 Senin 3/12/18 6:13 70
3/12/18 3:02 Selasa 3/13/18 0:41 71 1
3/13/18 8:41 Rabu 3/14/18 6:20 72 2
3/14/18 0:56 Kamis 3/15/18 0:35 73
3/15/18 6:35 Jumat 3/16/18 6:13 74
3/16/18 3:02 Sabtu 3/17/18 0:41 75 1
3/17/18 8:41 Minggu 3/18/18 6:19 76 2
3/18/18 0:56 Senin 3/19/18 0:34 77
3/19/18 6:34 Selasa 3/20/18 6:13 78
3/20/18 3:02 Rabu 3/21/18 0:40 79 1
3/21/18 8:40 Kamis 3/22/18 6:19 80 2
3/22/18 0:55 Jumat 3/23/18 0:34 81
3/23/18 6:34 Sabtu 3/24/18 6:13 82
3/24/18 3:01 Minggu 3/25/18 0:40 83 1
3/25/18 8:40 Senin 3/26/18 6:19 84 2
3/26/18 0:55 Selasa 3/27/18 0:34 85
3/27/18 6:34 Rabu 3/28/18 6:13 86
3/28/18 3:01 Kamis 3/29/18 0:40 87 1
3/29/18 8:40 Jumat 3/30/18 6:19 88 2
3/30/18 0:55 Sabtu 3/31/18 0:34 89
3/31/18 6:34 Minggu 4/1/18 6:12 90
4/1/18 3:01 Senin 4/2/18 0:40 91 1
4/2/18 8:40 Selasa 4/3/18 6:18 92 2
4/3/18 0:55 Rabu 4/4/18 0:33 93
4/4/18 6:33 Kamis 4/5/18 6:12 94
4/5/18 3:01 Jumat 4/6/18 0:40 95 1
4/6/18 8:40 Sabtu 4/7/18 6:18 96 2
4/7/18 0:55 Minggu 4/8/18 0:33 97
4/8/18 6:33 Senin 4/9/18 6:12 98
4/9/18 3:01 Selasa 4/10/18 0:39 99 1
4/10/18 8:39 Rabu 4/11/18 6:18 100 2
4/11/18 0:54 Kamis 4/12/18 0:33 101
4/12/18 6:33 Jumat 4/13/18 6:12 102
4/13/18 3:00 Sabtu 4/14/18 0:39 103 1
4/14/18 8:39 Minggu 4/15/18 6:18 104 2
4/15/18 0:54 Senin 4/16/18 0:33 105
4/16/18 6:33 Selasa 4/17/18 6:12 106
4/17/18 3:00 Rabu 4/18/18 0:39 107 1
4/18/18 8:39 Kamis 4/19/18 6:18 108 2
4/19/18 0:54 Jumat 4/20/18 0:33 109
4/20/18 6:33 Sabtu 4/21/18 6:11 110
4/21/18 3:00 Minggu 4/22/18 0:39 111 1
4/22/18 8:39 Senin 4/23/18 6:17 112 2
4/23/18 0:54 Selasa 4/24/18 0:32 113
4/24/18 6:32 Rabu 4/25/18 6:11 114
4/25/18 3:00 Kamis 4/26/18 0:38 115 1
4/26/18 8:38 Jumat 4/27/18 6:17 116 2
4/27/18 0:53 Sabtu 4/28/18 0:32 117
4/28/18 6:32 Minggu 4/29/18 6:11 118
4/29/18 3:00 Senin 4/30/18 0:38 119 1
4/30/18 8:38 Selasa 5/1/18 6:17 120 2
5/1/18 0:53 Rabu 5/2/18 0:32 121
5/2/18 6:32 Kamis 5/3/18 6:11 122
5/3/18 2:59 Jumat 5/4/18 0:38 123 1
5/4/18 8:38 Sabtu 5/5/18 6:17 124 2
5/5/18 0:53 Minggu 5/6/18 0:32 125
5/6/18 6:32 Senin 5/7/18 6:11 126
5/7/18 2:59 Selasa 5/8/18 0:38 127 1
5/8/18 8:38 Rabu 5/9/18 6:17 128 2
5/9/18 0:53 Kamis 5/10/18 0:32 129
5/10/18 6:32 Jumat 5/11/18 6:10 130
5/11/18 2:59 Sabtu 5/12/18 0:38 131 1
5/12/18 8:38 Minggu 5/13/18 6:16 132 2
5/13/18 0:53 Senin 5/14/18 0:31 133
5/14/18 6:31 Selasa 5/15/18 6:10 134
5/15/18 2:59 Rabu 5/16/18 0:37 135 1
5/16/18 8:37 Kamis 5/17/18 6:16 136 2
5/17/18 0:52 Jumat 5/18/18 0:31 137
5/18/18 6:31 Sabtu 5/19/18 6:10 138
5/19/18 2:58 Minggu 5/20/18 0:37 139 1
5/20/18 8:37 Senin 5/21/18 6:16 140 2
5/21/18 0:52 Selasa 5/22/18 0:31 141
5/22/18 6:31 Rabu 5/23/18 6:10 142
5/23/18 2:58 Kamis 5/24/18 0:37 143 1
5/24/18 8:37 Jumat 5/25/18 6:16 144 2
5/25/18 0:52 Sabtu 5/26/18 0:31 145
5/26/18 6:31 Minggu 5/27/18 6:10 146
5/27/18 2:58 Senin 5/28/18 0:37 147 1
5/28/18 8:37 Selasa 5/29/18 6:16 148 2
5/29/18 0:52 Rabu 5/30/18 0:31 149
5/30/18 6:31 Kamis 5/31/18 6:09 150
5/31/18 2:58 Jumat 6/1/18 0:37 151 1
6/1/18 8:37 Sabtu 6/2/18 6:15 152 2
6/2/18 0:52 Minggu 6/3/18 0:30 153
6/3/18 6:30 Senin 6/4/18 6:09 154
6/4/18 2:58 Selasa 6/5/18 0:36 155 1
6/5/18 8:36 Rabu 6/6/18 6:15 156 2
6/6/18 0:51 Kamis 6/7/18 0:30 157
6/7/18 6:30 Jumat 6/8/18 6:09 158
6/8/18 2:57 Sabtu 6/9/18 0:36 159 1
6/9/18 8:36 Minggu 6/10/18 6:15 160 2
6/10/18 0:51 Senin 6/11/18 0:30 161
6/11/18 6:30 Selasa 6/12/18 6:09 162
6/12/18 2:57 Rabu 6/13/18 0:36 163 1
6/13/18 8:36 Kamis 6/14/18 6:15 164 2
6/14/18 0:51 Jumat 6/15/18 0:30 165
6/15/18 6:30 Sabtu 6/16/18 6:09 166
6/16/18 2:57 Minggu 6/17/18 0:36 167 1
6/17/18 8:36 Senin 6/18/18 6:15 168 2
6/18/18 0:51 Selasa 6/19/18 0:30 169
6/19/18 6:30 Rabu 6/20/18 6:08 170
6/20/18 2:57 Kamis 6/21/18 0:36 171 1
6/21/18 8:36 Jumat 6/22/18 6:14 172 2
6/22/18 0:51 Sabtu 6/23/18 0:29 173
6/23/18 6:29 Minggu 6/24/18 6:08 174
6/24/18 2:57 Senin 6/25/18 0:35 175 1
6/25/18 8:35 Selasa 6/26/18 6:14 176 2
6/26/18 0:50 Rabu 6/27/18 0:29 177
6/27/18 6:29 Kamis 6/28/18 6:08 178
6/28/18 2:56 Jumat 6/29/18 0:35 179 1
6/29/18 8:35 Sabtu 6/30/18 6:14 180 2
6/30/18 0:50 Minggu 7/1/18 0:29 181
7/1/18 6:29 Senin 7/2/18 6:08 182
7/2/18 2:56 Selasa 7/3/18 0:35 183 1
7/3/18 8:35 Rabu 7/4/18 6:14 184 2
7/4/18 0:50 Kamis 7/5/18 0:29 185
7/5/18 6:29 Jumat 7/6/18 6:07 186
7/6/18 2:56 Sabtu 7/7/18 0:35 187 1
7/7/18 8:35 Minggu 7/8/18 6:14 188 2
7/8/18 0:50 Senin 7/9/18 0:29 189
7/9/18 6:29 Selasa 7/10/18 6:07 190
7/10/18 2:56 Rabu 7/11/18 0:35 191 1
7/11/18 8:35 Kamis 7/12/18 6:13 192 2
7/12/18 0:50 Jumat 7/13/18 0:28 193
7/13/18 6:28 Sabtu 7/14/18 6:07 194
7/14/18 2:56 Minggu 7/15/18 0:34 195 1
7/15/18 8:34 Senin 7/16/18 6:13 196 2
7/16/18 0:49 Selasa 7/17/18 0:28 197
7/17/18 6:28 Rabu 7/18/18 6:07 198
7/18/18 2:55 Kamis 7/19/18 0:34 199 1
7/19/18 8:34 Jumat 7/20/18 6:13 200 2
7/20/18 0:49 Sabtu 7/21/18 0:28 201
7/21/18 6:28 Minggu 7/22/18 6:07 202
7/22/18 2:55 Senin 7/23/18 0:34 203 1
7/23/18 8:34 Selasa 7/24/18 6:13 204 2
7/24/18 0:49 Rabu 7/25/18 0:28 205
7/25/18 6:28 Kamis 7/26/18 6:06 206
7/26/18 2:55 Jumat 7/27/18 0:34 207 1
7/27/18 8:34 Sabtu 7/28/18 6:12 208 2
7/28/18 0:49 Minggu 7/29/18 0:27 209
7/29/18 6:27 Senin 7/30/18 6:06 210
7/30/18 2:55 Selasa 7/31/18 0:34 211 1
7/31/18 8:34 Rabu 8/1/18 6:12 212 2
8/1/18 0:49 Kamis 8/2/18 0:27 213
8/2/18 6:27 Jumat 8/3/18 6:06 214
8/3/18 2:55 Sabtu 8/4/18 0:33 215 1
8/4/18 8:33 Minggu 8/5/18 6:12 216 2
8/5/18 0:48 Senin 8/6/18 0:27 217
8/6/18 6:27 Selasa 8/7/18 6:06 218
8/7/18 2:54 Rabu 8/8/18 0:33 219 1
8/8/18 8:33 Kamis 8/9/18 6:12 220 2
8/9/18 0:48 Jumat 8/10/18 0:27 221
8/10/18 6:27 Sabtu 8/11/18 6:06 222
8/11/18 2:54 Minggu 8/12/18 0:33 223 1
8/12/18 8:33 Senin 8/13/18 6:12 224 2
8/13/18 0:48 Selasa 8/14/18 0:27 225
8/14/18 6:27 Rabu 8/15/18 6:05 226
8/15/18 2:54 Kamis 8/16/18 0:33 227 1
8/16/18 8:33 Jumat 8/17/18 6:11 228 2
8/17/18 0:48 Sabtu 8/18/18 0:26 229
8/18/18 6:26 Minggu 8/19/18 6:05 230
8/19/18 2:54 Senin 8/20/18 0:32 231 1
8/20/18 8:32 Selasa 8/21/18 6:11 232 2
8/21/18 0:47 Rabu 8/22/18 0:26 233
8/22/18 6:26 Kamis 8/23/18 6:05 234
8/23/18 2:54 Jumat 8/24/18 0:32 235 1
8/24/18 8:32 Sabtu 8/25/18 6:11 236 2
8/25/18 0:47 Minggu 8/26/18 0:26 237
8/26/18 6:26 Senin 8/27/18 6:05 238
8/27/18 2:53 Selasa 8/28/18 0:32 239 1
8/28/18 8:32 Rabu 8/29/18 6:11 240 2
8/29/18 0:47 Kamis 8/30/18 0:26 241
8/30/18 6:26 Jumat 8/31/18 6:05 242
8/31/18 2:53 Sabtu 9/1/18 0:32 243 1
9/1/18 8:32 Minggu 9/2/18 6:11 244 2
9/2/18 0:47 Senin 9/3/18 0:26 245
9/3/18 6:26 Selasa 9/4/18 6:04 246
9/4/18 2:53 Rabu 9/5/18 0:32 247 1
9/5/18 8:32 Kamis 9/6/18 6:10 248 2
9/6/18 0:47 Jumat 9/7/18 0:25 249
9/7/18 6:25 Sabtu 9/8/18 6:04 250
9/8/18 2:53 Minggu 9/9/18 0:31 251 1
9/9/18 8:31 Senin 9/10/18 6:10 252 2
9/10/18 0:46 Selasa 9/11/18 0:25 253
9/11/18 6:25 Rabu 9/12/18 6:04 254
9/12/18 2:52 Kamis 9/13/18 0:31 255 1
9/13/18 8:31 Jumat 9/14/18 6:10 256 2
9/14/18 0:46 Sabtu 9/15/18 0:25 257
9/15/18 6:25 Minggu 9/16/18 6:04 258
9/16/18 2:52 Senin 9/17/18 0:31 259 1
9/17/18 8:31 Selasa 9/18/18 6:10 260 2
9/18/18 0:46 Rabu 9/19/18 0:25 261
9/19/18 6:25 Kamis 9/20/18 6:04 262
9/20/18 2:52 Jumat 9/21/18 0:31 263 1
9/21/18 8:31 Sabtu 9/22/18 6:10 264 2
9/22/18 0:46 Minggu 9/23/18 0:25 265
9/23/18 6:25 Senin 9/24/18 6:03 266
9/24/18 2:52 Selasa 9/25/18 0:31 267 1
9/25/18 8:31 Rabu 9/26/18 6:09 268 2
9/26/18 0:46 Kamis 9/27/18 0:24 269
9/27/18 6:24 Jumat 9/28/18 6:03 270
9/28/18 2:52 Sabtu 9/29/18 0:30 271 1
9/29/18 8:30 Minggu 9/30/18 6:09 272 2
9/30/18 0:45 Senin 10/1/18 0:24 273
10/1/18 6:24 Selasa 10/2/18 6:03 274
10/2/18 2:51 Rabu 10/3/18 0:30 275 1
10/3/18 8:30 Kamis 10/4/18 6:09 276 2
10/4/18 0:45 Jumat 10/5/18 0:24 277
10/5/18 6:24 Sabtu 10/6/18 6:03 278
10/6/18 2:51 Minggu 10/7/18 0:30 279 1
10/7/18 8:30 Senin 10/8/18 6:09 280 2
10/8/18 0:45 Selasa 10/9/18 0:24 281
10/9/18 6:24 Rabu 10/10/18 6:03 282
10/10/18 2:51 Kamis 10/11/18 0:30 283 1
10/11/18 8:30 Jumat 10/12/18 6:09 284 2
10/12/18 0:45 Sabtu 10/13/18 0:24 285
10/13/18 6:24 Minggu 10/14/18 6:02 286
10/14/18 2:51 Senin 10/15/18 0:30 287 1
10/15/18 8:30 Selasa 10/16/18 6:08 288 2
10/16/18 0:45 Rabu 10/17/18 0:23 289
10/17/18 6:23 Kamis 10/18/18 6:02 290
10/18/18 2:51 Jumat 10/19/18 0:29 291 1
10/19/18 8:29 Sabtu 10/20/18 6:08 292 2
10/20/18 0:44 Minggu 10/21/18 0:23 293
10/21/18 6:23 Senin 10/22/18 6:02 294
10/22/18 2:50 Selasa 10/23/18 0:29 295 1
10/23/18 8:29 Rabu 10/24/18 6:08 296 2
10/24/18 0:44 Kamis 10/25/18 0:23 297
10/25/18 6:23 Jumat 10/26/18 6:02 298
10/26/18 2:50 Sabtu 10/27/18 0:29 299 1
10/27/18 8:29 Minggu 10/28/18 6:08 300 2
10/28/18 0:44 Senin 10/29/18 0:23 301
10/29/18 6:23 Selasa 10/30/18 6:01 302
10/30/18 2:50 Rabu 10/31/18 0:29 303 1
10/31/18 8:29 Kamis 11/1/18 6:08 304 2
11/1/18 0:44 Jumat 11/2/18 0:23 305
11/2/18 6:23 Sabtu 11/3/18 6:01 306
11/3/18 2:50 Minggu 11/4/18 0:29 307 1
11/4/18 8:29 Senin 11/5/18 6:07 308 2
11/5/18 0:44 Selasa 11/6/18 0:22 309
11/6/18 6:22 Rabu 11/7/18 6:01 310
11/7/18 2:50 Kamis 11/8/18 0:28 311 1
11/8/18 8:28 Jumat 11/9/18 6:07 312 2
11/9/18 0:43 Sabtu 11/10/18 0:22 313
11/10/18 6:22 Minggu 11/11/18 6:01 314
11/11/18 2:49 Senin 11/12/18 0:28 315 1
11/12/18 8:28 Selasa 11/13/18 6:07 316 2
11/13/18 0:43 Rabu 11/14/18 0:22 317
11/14/18 6:22 Kamis 11/15/18 6:01 318
11/15/18 2:49 Jumat 11/16/18 0:28 319 1
11/16/18 8:28 Sabtu 11/17/18 6:07 320 2
11/17/18 0:43 Minggu 11/18/18 0:22 321
11/18/18 6:22 Senin 11/19/18 6:00 322
11/19/18 2:49 Selasa 11/20/18 0:28 323 1
11/20/18 8:28 Rabu 11/21/18 6:06 324 2
11/21/18 0:43 Kamis 11/22/18 0:21 325
11/22/18 6:21 Jumat 11/23/18 6:00 326
11/23/18 2:49 Sabtu 11/24/18 0:28 327 1
11/24/18 8:28 Minggu 11/25/18 6:06 328 2
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
Total Angkut Kapal 1 dan 2 per tahun =
Total Angkut Total per tahun =
Tanggal Pelabuhan Barang Masuk (ton) Konsumsi Terpakai (ton) Jumlah Penyimpanan (ton)
1/1/2018 - - 282,377 Err:509
1/2/2018 - - 282,377 Err:509
1/3/2018 - - 282,377 Err:509
1/4/2018 - - 282,377 Err:509
1/5/2018 - - 282,377 Err:509
1/6/2018 - - 282,377 Err:509
1/7/2018 - - 282,377 Err:509
1/8/2018 - - 282,377 Err:509
1/9/2018 - - 282,377 Err:509
1/10/2018 - - 282,377 Err:509
1/11/2018 - - 282,377 Err:509
1/12/2018 - - 282,377 Err:509
1/13/2018 - - 282,377 Err:509
1/14/2018 - - 282,377 Err:509
1/15/2018 - - 282,377 Err:509
1/16/2018 - - 282,377 Err:509
1/17/2018 - - 282,377 Err:509
1/18/2018 - - 282,377 Err:509
1/19/2018 - - 282,377 Err:509
1/20/2018 - - 282,377 Err:509
1/21/2018 - - 282,377 Err:509
1/22/2018 - - 282,377 Err:509
1/23/2018 - - 282,377 Err:509
1/24/2018 - - 282,377 Err:509
1/25/2018 - - 282,377 Err:509
1/26/2018 - - 282,377 Err:509
1/27/2018 - - 282,377 Err:509
1/28/2018 - - 282,377 Err:509
1/29/2018 - - 282,377 Err:509
1/30/2018 - - 282,377 Err:509
1/31/2018 - - 282,377 Err:509
2/1/2018 - - 282,377 Err:509
2/2/2018 - - 282,377 Err:509
2/3/2018 - - 282,377 Err:509
2/4/2018 - - 282,377 Err:509
2/5/2018 - - 282,377 Err:509
2/6/2018 - - 282,377 Err:509
2/7/2018 - - 282,377 Err:509
2/8/2018 - - 282,377 Err:509
2/9/2018 - - 282,377 Err:509
2/10/2018 - - 282,377 Err:509
2/11/2018 - - 282,377 Err:509
2/12/2018 - - 282,377 Err:509
2/13/2018 - - 282,377 Err:509
2/14/2018 - - 282,377 Err:509
2/15/2018 - - 282,377 Err:509
2/16/2018 - - 282,377 Err:509
2/17/2018 - - 282,377 Err:509
2/18/2018 - - 282,377 Err:509
2/19/2018 - - 282,377 Err:509
2/20/2018 - - 282,377 Err:509
2/21/2018 - - 282,377 Err:509
2/22/2018 - - 282,377 Err:509
2/23/2018 - - 282,377 Err:509
2/24/2018 - - 282,377 Err:509
2/25/2018 - - 282,377 Err:509
2/26/2018 - - 282,377 Err:509
2/27/2018 - - 282,377 Err:509
2/28/2018 - - 282,377 Err:509
3/1/2018 - - 282,377 Err:509
3/2/2018 - - 282,377 Err:509
3/3/2018 - - 282,377 Err:509
3/4/2018 - - 282,377 Err:509
3/5/2018 - - 282,377 Err:509
3/6/2018 - - 282,377 Err:509
3/7/2018 - - 282,377 Err:509
3/8/2018 - - 282,377 Err:509
3/9/2018 - - 282,377 Err:509
3/10/2018 - - 282,377 Err:509
3/11/2018 - - 282,377 Err:509
3/12/2018 - - 282,377 Err:509
3/13/2018 - - 282,377 Err:509
3/14/2018 - - 282,377 Err:509
3/15/2018 - - 282,377 Err:509
3/16/2018 - - 282,377 Err:509
3/17/2018 - - 282,377 Err:509
3/18/2018 - - 282,377 Err:509
3/19/2018 - - 282,377 Err:509
3/20/2018 - - 282,377 Err:509
3/21/2018 - - 282,377 Err:509
3/22/2018 - - 282,377 Err:509
3/23/2018 - - 282,377 Err:509
3/24/2018 - - 282,377 Err:509
3/25/2018 - - 282,377 Err:509
3/26/2018 - - 282,377 Err:509
3/27/2018 - - 282,377 Err:509
3/28/2018 - - 282,377 Err:509
3/29/2018 - - 282,377 Err:509
3/30/2018 - - 282,377 Err:509
3/31/2018 - - 282,377 Err:509
4/1/2018 - - 282,377 Err:509
4/2/2018 - - 282,377 Err:509
4/3/2018 - - 282,377 Err:509
4/4/2018 - - 282,377 Err:509
4/5/2018 - - 282,377 Err:509
4/6/2018 - - 282,377 Err:509
4/7/2018 - - 282,377 Err:509
4/8/2018 - - 282,377 Err:509
4/9/2018 - - 282,377 Err:509
4/10/2018 - - 282,377 Err:509
4/11/2018 - - 282,377 Err:509
4/12/2018 - - 282,377 Err:509
4/13/2018 - - 282,377 Err:509
4/14/2018 - - 282,377 Err:509
4/15/2018 - - 282,377 Err:509
4/16/2018 - - 282,377 Err:509
4/17/2018 - - 282,377 Err:509
4/18/2018 - - 282,377 Err:509
4/19/2018 - - 282,377 Err:509
4/20/2018 - - 282,377 Err:509
4/21/2018 - - 282,377 Err:509
4/22/2018 - - 282,377 Err:509
4/23/2018 - - 282,377 Err:509
4/24/2018 - - 282,377 Err:509
4/25/2018 - - 282,377 Err:509
4/26/2018 - - 282,377 Err:509
4/27/2018 - - 282,377 Err:509
4/28/2018 - - 282,377 Err:509
4/29/2018 - - 282,377 Err:509
4/30/2018 - - 282,377 Err:509
5/1/2018 - - 282,377 Err:509
5/2/2018 - - 282,377 Err:509
5/3/2018 - - 282,377 Err:509
5/4/2018 - - 282,377 Err:509
5/5/2018 - - 282,377 Err:509
5/6/2018 - - 282,377 Err:509
5/7/2018 - - 282,377 Err:509
5/8/2018 - - 282,377 Err:509
5/9/2018 - - 282,377 Err:509
5/10/2018 - - 282,377 Err:509
5/11/2018 - - 282,377 Err:509
5/12/2018 - - 282,377 Err:509
5/13/2018 - - 282,377 Err:509
5/14/2018 - - 282,377 Err:509
5/15/2018 - - 282,377 Err:509
5/16/2018 - - 282,377 Err:509
5/17/2018 - - 282,377 Err:509
5/18/2018 - - 282,377 Err:509
5/19/2018 - - 282,377 Err:509
5/20/2018 - - 282,377 Err:509
5/21/2018 - - 282,377 Err:509
5/22/2018 - - 282,377 Err:509
5/23/2018 - - 282,377 Err:509
5/24/2018 - - 282,377 Err:509
5/25/2018 - - 282,377 Err:509
5/26/2018 - - 282,377 Err:509
5/27/2018 - - 282,377 Err:509
5/28/2018 - - 282,377 Err:509
5/29/2018 - - 282,377 Err:509
5/30/2018 - - 282,377 Err:509
5/31/2018 - - 282,377 Err:509
6/1/2018 - - 282,377 Err:509
6/2/2018 - - 282,377 Err:509
6/3/2018 - - 282,377 Err:509
6/4/2018 - - 282,377 Err:509
6/5/2018 - - 282,377 Err:509
6/6/2018 - - 282,377 Err:509
6/7/2018 - - 282,377 Err:509
6/8/2018 - - 282,377 Err:509
6/9/2018 - - 282,377 Err:509
6/10/2018 - - 282,377 Err:509
6/11/2018 - - 282,377 Err:509
6/12/2018 - - 282,377 Err:509
6/13/2018 - - 282,377 Err:509
6/14/2018 - - 282,377 Err:509
6/15/2018 - - 282,377 Err:509
6/16/2018 - - 282,377 Err:509
6/17/2018 - - 282,377 Err:509
6/18/2018 - - 282,377 Err:509
6/19/2018 - - 282,377 Err:509
6/20/2018 - - 282,377 Err:509
6/21/2018 - - 282,377 Err:509
6/22/2018 - - 282,377 Err:509
6/23/2018 - - 282,377 Err:509
6/24/2018 - - 282,377 Err:509
6/25/2018 - - 282,377 Err:509
6/26/2018 - - 282,377 Err:509
6/27/2018 - - 282,377 Err:509
6/28/2018 - - 282,377 Err:509
6/29/2018 - - 282,377 Err:509
6/30/2018 - - 282,377 Err:509
7/1/2018 - - 282,377 Err:509
7/2/2018 - - 282,377 Err:509
7/3/2018 - - 282,377 Err:509
7/4/2018 - - 282,377 Err:509
7/5/2018 - - 282,377 Err:509
7/6/2018 - - 282,377 Err:509
7/7/2018 - - 282,377 Err:509
7/8/2018 - - 282,377 Err:509
7/9/2018 - - 282,377 Err:509
7/10/2018 - - 282,377 Err:509
7/11/2018 - - 282,377 Err:509
7/12/2018 - - 282,377 Err:509
7/13/2018 - - 282,377 Err:509
7/14/2018 - - 282,377 Err:509
7/15/2018 - - 282,377 Err:509
7/16/2018 - - 282,377 Err:509
7/17/2018 - - 282,377 Err:509
7/18/2018 - - 282,377 Err:509
7/19/2018 - - 282,377 Err:509
7/20/2018 - - 282,377 Err:509
7/21/2018 - - 282,377 Err:509
7/22/2018 - - 282,377 Err:509
7/23/2018 - - 282,377 Err:509
7/24/2018 - - 282,377 Err:509
7/25/2018 - - 282,377 Err:509
7/26/2018 - - 282,377 Err:509
7/27/2018 - - 282,377 Err:509
7/28/2018 - - 282,377 Err:509
7/29/2018 - - 282,377 Err:509
7/30/2018 - - 282,377 Err:509
7/31/2018 - - 282,377 Err:509
8/1/2018 - - 282,377 Err:509
8/2/2018 - - 282,377 Err:509
8/3/2018 - - 282,377 Err:509
8/4/2018 - - 282,377 Err:509
8/5/2018 - - 282,377 Err:509
8/6/2018 - - 282,377 Err:509
8/7/2018 - - 282,377 Err:509
8/8/2018 - - 282,377 Err:509
8/9/2018 - - 282,377 Err:509
8/10/2018 - - 282,377 Err:509
8/11/2018 - - 282,377 Err:509
8/12/2018 - - 282,377 Err:509
8/13/2018 - - 282,377 Err:509
8/14/2018 - - 282,377 Err:509
8/15/2018 - - 282,377 Err:509
8/16/2018 - - 282,377 Err:509
8/17/2018 - - 282,377 Err:509
8/18/2018 - - 282,377 Err:509
8/19/2018 - - 282,377 Err:509
8/20/2018 - - 282,377 Err:509
8/21/2018 - - 282,377 Err:509
8/22/2018 - - 282,377 Err:509
8/23/2018 - - 282,377 Err:509
8/24/2018 - - 282,377 Err:509
8/25/2018 - - 282,377 Err:509
8/26/2018 - - 282,377 Err:509
8/27/2018 - - 282,377 Err:509
8/28/2018 - - 282,377 Err:509
8/29/2018 - - 282,377 Err:509
8/30/2018 - - 282,377 Err:509
8/31/2018 - - 282,377 Err:509
9/1/2018 - - 282,377 Err:509
9/2/2018 - - 282,377 Err:509
9/3/2018 - - 282,377 Err:509
9/4/2018 - - 282,377 Err:509
9/5/2018 - - 282,377 Err:509
9/6/2018 - - 282,377 Err:509
9/7/2018 - - 282,377 Err:509
9/8/2018 - - 282,377 Err:509
9/9/2018 - - 282,377 Err:509
9/10/2018 - - 282,377 Err:509
9/11/2018 - - 282,377 Err:509
9/12/2018 - - 282,377 Err:509
9/13/2018 - - 282,377 Err:509
9/14/2018 - - 282,377 Err:509
9/15/2018 - - 282,377 Err:509
9/16/2018 - - 282,377 Err:509
9/17/2018 - - 282,377 Err:509
9/18/2018 - - 282,377 Err:509
9/19/2018 - - 282,377 Err:509
9/20/2018 - - 282,377 Err:509
9/21/2018 - - 282,377 Err:509
9/22/2018 - - 282,377 Err:509
9/23/2018 - - 282,377 Err:509
9/24/2018 - - 282,377 Err:509
9/25/2018 - - 282,377 Err:509
9/26/2018 - - 282,377 Err:509
9/27/2018 - - 282,377 Err:509
9/28/2018 - - 282,377 Err:509
9/29/2018 - - 282,377 Err:509
9/30/2018 - - 282,377 Err:509
10/1/2018 - - 282,377 Err:509
10/2/2018 - - 282,377 Err:509
10/3/2018 - - 282,377 Err:509
10/4/2018 - - 282,377 Err:509
10/5/2018 - - 282,377 Err:509
10/6/2018 - - 282,377 Err:509
10/7/2018 - - 282,377 Err:509
10/8/2018 - - 282,377 Err:509
10/9/2018 - - 282,377 Err:509
10/10/2018 - - 282,377 Err:509
10/11/2018 - - 282,377 Err:509
10/12/2018 - - 282,377 Err:509
10/13/2018 - - 282,377 Err:509
10/14/2018 - - 282,377 Err:509
10/15/2018 - - 282,377 Err:509
10/16/2018 - - 282,377 Err:509
10/17/2018 - - 282,377 Err:509
10/18/2018 - - 282,377 Err:509
10/19/2018 - - 282,377 Err:509
10/20/2018 - - 282,377 Err:509
10/21/2018 - - 282,377 Err:509
10/22/2018 - - 282,377 Err:509
10/23/2018 - - 282,377 Err:509
10/24/2018 - - 282,377 Err:509
10/25/2018 - - 282,377 Err:509
10/26/2018 - - 282,377 Err:509
10/27/2018 - - 282,377 Err:509
10/28/2018 - - 282,377 Err:509
10/29/2018 - - 282,377 Err:509
10/30/2018 - - 282,377 Err:509
10/31/2018 - - 282,377 Err:509
11/1/2018 - - 282,377 Err:509
11/2/2018 - - 282,377 Err:509
11/3/2018 - - 282,377 Err:509
11/4/2018 - - 282,377 Err:509
11/5/2018 - - 282,377 Err:509
11/6/2018 - - 282,377 Err:509
11/7/2018 - - 282,377 Err:509
11/8/2018 - - 282,377 Err:509
11/9/2018 - - 282,377 Err:509
11/10/2018 - - 282,377 Err:509
11/11/2018 - - 282,377 Err:509
11/12/2018 - - 282,377 Err:509
11/13/2018 - - 282,377 Err:509
11/14/2018 - - 282,377 Err:509
11/15/2018 - - 282,377 Err:509
11/16/2018 - - 282,377 Err:509
11/17/2018 - - 282,377 Err:509
11/18/2018 - - 282,377 Err:509
11/19/2018 - - 282,377 Err:509
11/20/2018 - - 282,377 Err:509
11/21/2018 - - 282,377 Err:509
11/22/2018 - - 282,377 Err:509
11/23/2018 - - 282,377 Err:509
11/24/2018 - - 282,377 Err:509
11/25/2018 - - 282,377 Err:509
11/26/2018 - - 282,377 Err:509
11/27/2018 - - 282,377 Err:509
11/28/2018 - - 282,377 Err:509
11/29/2018 - - 282,377 Err:509
11/30/2018 - - 282,377 Err:509
12/1/2018 - - 282,377 Err:509
12/2/2018 - - 282,377 Err:509
12/3/2018 - - 282,377 Err:509
12/4/2018 - - 282,377 Err:509
12/5/2018 - - 282,377 Err:509
12/6/2018 - - 282,377 Err:509
12/7/2018 - - 282,377 Err:509
12/8/2018 - - 282,377 Err:509
12/9/2018 - - 282,377 Err:509
12/10/2018 - - 282,377 Err:509
12/11/2018 - - 282,377 Err:509
12/12/2018 - - 282,377 Err:509
12/13/2018 - - 282,377 Err:509
12/14/2018 - - 282,377 Err:509
12/15/2018 - - 282,377 Err:509
12/16/2018 - - 282,377 Err:509
12/17/2018 - - 282,377 Err:509
12/18/2018 - - 282,377 Err:509
12/19/2018 - - 282,377 Err:509
12/20/2018 - - 282,377 Err:509
12/21/2018 - - 282,377 Err:509
12/22/2018 - - 282,377 Err:509
12/23/2018 - - 282,377 Err:509
12/24/2018 - - 282,377 Err:509
12/25/2018 - - 282,377 Err:509
12/26/2018 - - 282,377 Err:509
12/27/2018 - - 282,377 Err:509
12/28/2018 - - 282,377 Err:509
12/29/2018 - - 282,377 Err:509
12/30/2018 - - 282,377 Err:509
12/31/2018 - - 282,377 Err:509
Angkut Kapal 1 dan 2 per tahun = - - Kapasitas Maksimum = Err:509
Total Angkut Total per tahun = -
STOCK
Payload Kapal = - ton
Massa Jenis CPO = 898 kg/m3
0.898 ton/m3
Stock Muatan Maksimal = Err:509 ton
Volume Stock Muatan = Err:509 m3
Safety Stock = Err:509 ton
Volume Safety Stock = Err:509 m3
Total Stock = Err:509 ton
Volume Total Stock = Err:509 m3
PERHITUNGAN PERENCANAAN PELABUHAN

Volume (ton/tahun)
NO Pelabuhan Asal/Tujuan
Muat
1 Dumai Asal 1,350,000
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan

Spesifikasi Kapal Chemical Tanker


LPP 85 m
LOA 89 m
B 10.9 m
H 5.7 m
T 4.5 m
DWT 0 ton
PAYLOAD 0 ton
GT 1743
JUMLAH Err:509 unit

Kedalaman Medan 5.9 m

PERHITUNGAN POMPA PELABUHAN

Muatan tanki kapal


0 ton
- liter/kedatangan
- m3

Produktivitas pompa saaat unloading


200 ton/jam
222,717 liter/jam

Spesifikasi pompa (berdasarkan katalog)


4 "
Line size
102 mm
Line Velocity 0.01245 m/s sumber : http://www.calculatoredge.com
1000 GPM 1 GPM =
Max Flow Rate
3785 liter/menit
100 mm
Diameter pipa
0.1 m

Produktivitas pompa (katalog)


227,100 liter/jam
227.10 m3/jam

Kebutuhan produktivitas pompa kapal


222,717 liter/jam

Line velocity (Kecepatan pompa satuan jarak )


0.012 m/s
0.03 km/jam

Diameter pompa
0.10 m

Waktu kebutuhan proses unloading


0.00 jam

Panjang pipa yang direncanakan


0.00 km
0.0 m
Volume (ton/tahun) Kedalaman Maksimum Utillity
Jenis alat Bongkar Muat
Bongkar LWS BOR SOR/YOR
-7 60% 70% Pump
350,000 -9 60% 70% Pump
580,000 -11 60% 70% Pump
420,000 -10 60% 70% Pump

Permintaan Medan
Permintaan Pengiriman 350,000 ton
Konsumsi / Hari 282377 ton
Frekuensi 164 kali
Kecepatan B/M 200 ton/jam

Jumlah Hari 365 hari/tahun


Hari Kerja 365 hari/tahun
Jam kerja 24 jam/hari
Total 8760 jam/tahun

PERHITUNGAN KOLAM PELABUHAN


FA
1 Area Penjangkaran
> MENUNGGU/INSPEKSI MUATAN
- Penjangkaran baik (swinging) :
jari-jari =
=

- penjangkaran jelek (swinging) :


jari jari =
=

> MENUNGGU CUACA BAIK


- kecepatan angin 20 m/s :
ww.calculatoredge.com jari jari =
3.785 liter =

2 Alur
NO LOKASI

1. Kedalaman nominal
1. Kedalaman nominal

Lebar (Alur Panjang)


2.
Lebar (Alur Pendek)

3. Panjang alur

3 KOLAM PUTAR (TURNING BASIN)


> Manuver dengan pandu
Db =
=

4 KOLAM DERMAGA (BASIN)


> PANJANG
- Dengan kapal pandu
L =
=

> LEBAR
- 1 Dermaga berhadapan
B =
=

5 KEDALAMAN PERAIRAN
> PERAIRAN TENANG
H =
=

; KUNING KONDISI YANG DIPILIH


IT + WT + AT Konsumsi CPO
Maks. Sarat
Jam/Call Ton/hari
6 5.9 3699
4 7.9 959
6 9.9 1589
4 8.9 1151

FASILITAS PERAIRAN

- penjangkaran baik (multiple) :


LOA + 6d jari-jari = LOA + 4,5d
116.1 m = 109.3

- penjangkaran jelek (multiple) :


LOA + 6d + 30 jari jari = LOA + 4,5d + 25
146.1 m = 134.3

- kecepatan angin 30 m/s :


LOA + 3d + 90 jari jari = LOA + 4d + 145
192.5 m = 252.0

OKASI UKURAN HASIL SATUAN KETERANGAN


1,2d 5.4 m Laut Terbuka
man nominal 1,15d 5.2 m Alur Masuk
man nominal
1,1d 5.0 m Depan Dermaga
2LOA 177.8 m Kapal sering papasan
Alur Panjang)
1,5LOA 133.3 m kapal jarang papasan
1,5LOA 133.3 m Kapal sering papasan
Alur Pendek)
1LOA 88.9 m kapal jarang papasan
7LOA 622.3 m 10.000 DWT; 16 knots
18LOA 1600.1 m 200.000 DWT; 16 knots
jang alur 1LOA 88.9 m 10.000 DWT; 5 knots
3LOA 266.7 m 200.000 DWT; 5 knots
5LOA 444.5 m Kapal ballast/kosong

> Manuver tanpa pandu


2LOA Db = 4LOA
177.8 m = 355.6

- Tanpa kapal pandu


1,25LOA L = 1,5LOA
111.1 m = 133.3

- > 1 Dermaga berhadapan


4B + 50 B = 2B + 50
93.8 m = 71.9

> PERAIRAN TERBUKA BERGELOMBANG


1,1d H = 1,2d
5.0 m = 5.4
PERHITUNGAN FASILITAS DARAT PELABUHAN
FASILITAS DARATAN
1 Analisis Kapasitas Pelabuhan
Produktivitas = Kecp. BM x jam kerja/tahun x jumlah ala
= 1051200 ton/tahun

m Demand = total shipcall x payload


= 0 ton/tahun

OA + 4,5d + 25 kebutuhan tambatan = 0


m 2 Dimensi Dermaga
Jumlah kapal = 1 kapal
Panjang Dermaga = n.Loa + (n-1).15+25.2
= 124.9 m
OA + 4d + 145
m Lebar Dermaga = 2*B
= 21.89 m
Tinggi Dermaga = 1.1 x H
= 9.9 m
ukuran jetty = 35x20 m2 =
panjang head jetty = =
lebar head jetty = =
panjang trestel = =
lebar trestel = 6m+2m =
ukuran dolphin = =
Catwalk = =
Jarak mooring = =
Peralatan BM
pompa = =
pipa = =
3 Analisis BOR
BOR = ((LOA + 10 ) x n x BT / (L x t)) x 100%
= 0.00%

m
PERHITUNGAN STORAGE PELABUHAN
FASILITAS STORAGE
1 Storage Maksimum
kerja/tahun x jumlah alat Total Stock
Volume Total Stock

Kebutuhan Tanki Timbun


Volume Tanki
Diameter Tanki
Tinggi Tanki

2 Analisis SOR
Total Muatan Timbun pertahun
Total Kapasitas Timbun Pertahun
SOR

3 Dimensi Bundwall
Volume Bundwall 120% Volume Tanki
Volume Bundwall masing-masing
700 m2 Tinggi Bundwall Minimal
35 m Luas Bundwall
20 m Panjang Sisi Bundwall
80 m
8m
9 m2
1.25 m
9.0 m

200 ton/jam
0.10 m

x BT / (L x t)) x 100%
FASILITAS STORAGE

= Err:509 ton
= Err:509 m3

= Err:509 unit
= 8073 m3
= 33.5 m
= 9.1 m

= Err:509 ton
= Err:509 ton
= Err:509

= 120%
9687.6 m3 sumber : AS1940
4m Singapore Standard
2421.9 m2
49.2 m
ANALISIS SENSITIFITAS LOAD FACTOR DAN BIAYA SATUAN

Keterangan Nilai
Load Factor 90%
Unit Cost Rp -

Rp -
70%
75%
80%
85%
90%
95%
100%

Analisis Sensitifitas
Column B

Rp12

Rp10

Rp8
Biaya Satuan

Rp6

Rp4

Rp2

Rp-
65% 70% 75% 80% 85% 90% 95% 100%

Load Factor
ANALISIS SENSITIFITAS LOAD FACTOR DAN BIAYA TOTAL

Keterangan Nilai
Total Biaya Err:509

Err:509
70%
75% #REF!
80% #REF!
85% #REF!
90% #REF!
95% #REF!
100% #REF!

Analisis Sensitifitas
Rp12

Rp10

Rp8
Total Biaya

Rp6

Rp4

Rp2

Rp-
70% 75% 80% 85% 90%
Load Factor

90% 95% 100% 105%


alisis Sensitifitas

Column I

85% 90% 95% 100%


Load Factor
PERHITUNGAN TOTAL BIAYA MENGUNAKAN BIAYA PENYEWAAN KAPAL

Spesifikasi Kapal Chemical Tanker


LPP 85 m
LOA 89 m
B 10.9 m
H 5.7 m
T 4.5 m
DWT 0 ton
PAYLOAD 0 ton
GT 1743
Frekuensi 164 kali
Waktu roundtrip Err:509 hari

DATA TIME CHARTER HIRE


SIZE DWT (Ton) TIME CHARTER HIRE (US $)
HANDY 40,000 $ 11,750.00
MR IMO3 45,000 $ 12,700.00
LR1 80,000 $ 13,000.00
LR2 120,000 $ 16,000.00
AFRA 160,000 $ 15,500.00
SUEZ 250,000 $ 18,500.00
VLCC 320,000 $ 27,000.00

Hasil regresi
Hasil regresi 0.0465 x +
Harga sewa kapal $ 9,605.60 per hari
Harga sewa kapal Rp 127,610,396 per hari

TOTAL COST:
Chemical Tanker

Biaya Sewa Kapal Err:509


Biaya Perjalanan Err:509
Biaya B/M Rp -
Total Biaya Err:509
Biaya Satuan Err:509
Regresi TCH
$30,000.00

$25,000.00
f(x) = 0.046512915129151 x + 9605.627
$20,000.00 R² = 0.890512007052085

$15,000.00

cost
$10,000.00

$5,000.00

$-
- 200,000 400,000
DWT

9605.6
110.38
13750
124.5697

Regresi TCH

= 0.046512915129151 x + 9605.62730627307
0.890512007052085

Column C
Linear (Column C)

200,000 400,000
WT