Dosen Pebimbing:
2,147,241.67
Macam Alternatif Rute
Rute
1 Buru Surabaya
PTP1
Dumai
Surabaya
**
Dumai Surabaya
951
951 1130
Konsumsi Batubara
Ton/hari
#VALUE!
0
0 Volume (ton/tahun)
NO Pelabuhan Asal/Tujuan
#REF! Muat Bongkar
1 Dumai Asal 2,000
2 Medan Tujuan 1,000
3 Jakarta Tujuan 500
4 Surabaya Tujuan 500
20.83
Kedalaman Maksimum Utillity IT + WT + AT Konsumsi CPO
Jenis alat Bongkar Muat Maks. Sarat
LWS BOR SOR/YOR Jam/Call Ton/hari
-7 60% 70% Pump 6 5.9 5
-9 60% 70% Pump 4 7.9 3
-11 60% 70% Pump 6 9.9 1
-10 60% 70% Pump 4 8.9 1
BURU
Jasa Tunda
No Jenis Jasa Tarif (Rp) Keterngan
1 Kapal s/d 3500 GT
a. Tarif Tetap Rp 144,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
2 Kapal 3501 GT s/d 8000 GT
a. Tarif Tetap Rp 360,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
3 Kapal 8001 GT s/d 14000 GT
a. Tarif Tetap Rp 570,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
4 Kapal 14001 GT s/d 18000 GT
a. Tarif Tetap Rp 750,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
5 Kapal 18001 GT s/d 26000 GT
a. Tarif Tetap Rp 1,200,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
6 Kapal 26001 GT s/d 40000 GT
a. Tarif Tetap Rp 1,200,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
7 Kapal 40001 GT s/d 75000 GT
a. Tarif Tetap Rp 1,200,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
8 Kapal 75000 GT keatas
a. Tarif Tetap Rp 1,560,000 per kapal per jam
b. Tarif Variabel Rp 2.40 Per GT Per Kapal Per Jam
Pemanduan
No Jenis Jasa Tarif (Rp) Keterangan
I. Angkutan laut dalam negeri
a. Tarif Tetap Rp 117,150 Per Kapal Per Gerakan
b. Tarif Variabel Rp 53 Per GT kapal Per gerakan
SURABAYA
Jasa Tunda
No Jenis Jasa Tarif (Rp) Keterngan
1 Kapal s/d 3500 GT
a. Tarif Tetap Rp 320,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
2 Kapal 3501 GT s/d 8000 GT
a. Tarif Tetap Rp 600,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
3 Kapal 8001 GT s/d 14000 GT
a. Tarif Tetap Rp 900,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
4 Kapal 14001 GT s/d 18000 GT
a. Tarif Tetap Rp 1,300,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
5 Kapal 18001 GT s/d 26000 GT
a. Tarif Tetap Rp 1,900,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
6 Kapal 26001 GT s/d 40000 GT
a. Tarif Tetap Rp 2,200,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
7 Kapal 40001 GT s/d 75000 GT
a. Tarif Tetap Rp 2,500,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
8 Kapal 75000 GT keatas
a. Tarif Tetap Rp 3,000,000 per kapal per jam
b. Tarif Variabel Rp 20.00 Per GT Per Kapal Per Jam
Pemanduan
No Jenis Jasa Tarif (Rp) Keterangan
I. Angkutan laut dalam negeri
a. Tarif Tetap Rp 150,000 Per Kapal Per Gerakan
b. Tarif Variabel Rp 30 Per GT kapal Per gerakan
TIME CHARTER HIRE
$30,000.00
$25,000.00
f(x) = 0.063383763837638 x + 5526.49710068529
R² = 0.756039244604595
$20,000.00
TCH ($)
$15,000.00
$10,000.00
$5,000.00
$-
- 50,000 100,000 150,000 200,000 250,000 300,000 350,000
DWT (ton)
1 USD = Rp 13,285
https://www.mataf.net/id/currency/converter-USD-IDR
s://www.market.bisnis.com
No Nama Kapal DWT (Ton) LPP (m) B (m) H (m) T (m) L/B
1 BAKTI SATU 1087 39.62 14.64 3.04 2.40 2.71
2 BEAUTIFUL 9 1493 54.86 15.24 3.05 2.30 3.60
3 BEE SIN LIFTER 1824 52.67 18.29 3.05 2.34 2.88
4 BAYSWEATER 128 2233 52.57 18.29 3.60 2.90 2.87
5 ATTILA 23 2525 61.45 18.20 3.60 2.80 3.38
6 HIUCHI 2 2950 89.03 17.00 5.00 3.00 5.24
7 BESTVIC 3468 67.30 19.50 4.20 3.30 3.45
8 BINA 88A 3964 70.23 21.34 4.80 3.90 3.29
9 BAHARI 4694 73.20 21.34 4.80 3.90 3.43
10 BINA MARINE 4776 70.22 21.34 4.80 3.90 3.29
11 PERTAMA ABADI 2801 5149 81.93 21.95 5.38 3.79 3.73
12 JIAN YANG CHENG YUN 5155 100.80 22.00 6.00 4.30 4.58
13 HUA LI 6277 84.27 29.38 5.49 4.10 2.87
14 TOLL SPB 3210 7675 98.00 24.00 7.00 4.60 4.08
15 TOLL SPB 3212 7675 98.00 24.00 7.00 4.50 4.08
16 Kimtrans 7675 97.00 24.00 7.00 4.50 4.04
17 MV. ROYAL STAR 8000 91.74 24.00 7.50 5.00 3.82
18 WU LIU XIAN FENG 8776 99.50 26.00 7.38 5.45 3.83
19 CASPIAN EXPLORER 8843 100.00 30.00 8.00 5.50 3.33
20 LINAU 78 8991 96.56 26.82 6.10 4.81 3.60
21 ZHI XIAN 2 9301 109.30 26.00 7.38 5.40 4.20
22 GTO 397 9590 87.84 30.48 6.10 4.85 2.88
23 SCANBARGE 9926 91.55 27.51 6.13 4.87 3.33
24 LARIS 10000 102.16 30.00 7.50 5.00 3.41
25 MV Bashundhara-4 10187 100.20 26.00 8.10 5.50 3.85
26 LAJU 12000 107.65 28.00 8.50 5.65 3.84
27 MV. JAYA AMARA 12000 120.00 27.50 8.00 5.50 4.36
28 YUE SHEN ZHOU 5 12388 131.40 32.00 8.00 5.40 4.11
29 YUAN JING 12626 134.50 32.20 8.00 5.20 4.18
30 XING YUN HAI 15405 124.00 35.00 8.70 6.00 3.54
batas bawah 1087 39.62 14.64 3.04 2.30 2.71
batas atas 15405 134.50 35.00 8.70 6.00 5.24
No Pelabuhan Asal/Tujuan
1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan
DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 85.47
B = 10.95
H = 5.74
T = 4.54
GT = 1743
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yang diangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 85.47
B = 10.95
H = 5.74
T = 4.54
VS = 11
= 5.6584
Freeboard = 1.20
Fn = Vs / √( g. L )
= 0.192
Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 85.47
LWL = 88.89
B = 10.95
H = 5.74
T = 4.54
Vs = 5.66
(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)
=
423,283,253.9
Cfo =〖 (log〖𝑅𝑛 − 2) 〗〗 ^2
0.075/
= 0.00171
• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =
= 0.244
〖𝐿𝑤𝑙〗 ^3/𝛻 202.70
=
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =
= 1.210
= 1472.245 m2
• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆
= 49.918 kN
• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)
= 13.574
Lkeel = 0.6.Cb.Lwl Hkeel =
= 41.860 =
Sapp = Srudder + Sbilge Keel
= 65.109
• Stot = S + Sapp
= 1537.354
Harga (1 + k2) ---> PNA Vol II hlm. 92
Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome
+ k2〖𝑆
(1(∑▒ _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )
= 1.400
• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=
= 1.218
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =
= 52.473 kN
• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =
= 30.4549
B/L = 0.123
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.123
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1
= 1.118
• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3
= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.172〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =
= -1.785
• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= -0.00028
• Harga λ
L/B = 8.120
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.900
• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ〖〖𝐹𝑛〗 ^(−2)) 〗
= 0.00041562
• CA (Correlation Allowance)
Tf/Lwl = 0.0510
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000544
• w (Gaya Berat)
w= ∆.g
= 34845.091 kN
• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =
= 14.4824357205291 kN
Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 80.68 kN
= 80676.58 N
ROUNDTRIP
ton > Seatime
ton Dumai - Medan =
m Medan - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Medan =
103,067,600
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi sebenarnya =
m/S
UKURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025
5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)
m dari M
m dari AP
Lwl . B . T .Cb
3465.36 m3
Lwl . B .T . Cb .ρ
3552.00 ton
10% Amidship
3696 𝐶_𝑊𝑃 )
_𝑖 〗 )/(∑▒𝑆_𝑖 )
〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3
〗 ^(−1.3757)
luas transom saat kecepatan 0,
dak tercelup air)
Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
164 kali
m/s²
≤ Fn ≤ 0,3
ton/m3
Perhitungan Awal :
1+k
CF
CA
CV
Principle of Naval Architecture Vo
t
Principle of Naval Architecture Vo
Va
ηO
ηr
ηD
PS
PB0
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
AUXILARY ENGINE
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL
Perhitungan Harga Kapal
Input Data
WST = 727.079 Ton
WE&O = 158.342 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja
= $ 799,786.52
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 174,176.22
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509
BIAYA OPERASIONAL
= 88.89 m P/D
= 10.95 m D
= 5.74 m z
= 4.54 m nrpm
= 0.19161325322838 nrps
= 3465.36 m3 Cb
= 3552.00 ton Vs
= 0.4 RT
= 1.22
= 0.0017
= 0.00054
= (1+ k) CF + CA
= 0.0026
ciple of Naval Architecture Vol. II hal. 162
= 0.3 Cb + 10 Cv Cb - 0.1
= 0.16
ciple of Naval Architecture Vol. II hal. 163
= V (1 - w) ; Speed of Advantages
= 4.78
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27
Power (EHP) :
= RT.Vs
= 524.98 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27
wer (THP) :
= PE∙(1−w)/(1−t)
= 492.28 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29
ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.07
pter 11 Parametric Design - M.G. Parson ; page 11-29
= Rotative Efficiency
= 0.985
= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591
Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 888.28 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 906.41 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
LARY ENGINE
Total
Biaya pelabuhan
Pelabuhan Dumai
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal =
Tarif Tetap =
Tarif Variabel =
total
Pelabuhan Medan
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal <=
Tarif Tetap =
Tarif Variabel =
total
>> Muat = Rp -
>> Bongkar = Rp -
Total = Rp -
= 1.00
= 2.84
= 4.00
= 110
= 1.83
= 0.78
= 5.66 m/s
= 92.78 KN
(propeller B-series = 0.5 - 0.6 )
1 1 103 Err:509
1 1 235 Err:509
1 1 184 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1 1 188 Err:509
1.0 1 189 Err:509
0.6 1 191 Err:509
0.6 1 190 Err:509
1.1 0 0 Err:509
1.1 0 0 Err:509
1.0 0 0 Err:509
1.0 1 206.6 Err:509
1.1 1 229.5 Err:509
1.1 1 211.7 Err:509
1.1 1 210 Err:509
1.1 1 217 Err:509
1.0 1 209 Err:509
1.1 1 218.8 Err:509
1.1 1 218.8 Err:509
1.0 1 208 Err:509
1.1 1 215 Err:509
1.0 1 209 Err:509
1.0 1 203.8 Err:509
1.1 1 210.8 Err:509
1.0 1 203 Err:509
1.1 1 210.4 Err:509
1.0 1 207 Err:509
1.0 1 207.2 Err:509
1.0 1 209 Err:509
1.0 1 206.6 Err:509
1.1 1 218.8 Err:509
1.1 1 218.8 Err:509
1.1 1 210 Err:509
1.0 1 209 Err:509
1.0 1 208 Err:509
1.0 1 209 Err:509
1.1 1 217 Err:509
1.1 1 215 Err:509
Chemical Tanker
= Err:509
= Err:509
= Err:509
Err:509
= Err:509
tarif
Rp 60 Per GT/Kunjungan
Rp 49 per GT/Etmal
total
tarif
Err:509 Per GT/Kunjungan
total
/ton
/tahun
Fuel Oil
Biaya ME
Consumption (liter)
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Fuel Oil
Biaya AE
Consumption (liter)
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun
total
17,152,578.51
14,122,289.64
19,212,600.00
30,188,538.17
Rp 23,616,000
686,103.14
Rp 104,978,109.46
total
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :
MCR Mesin ME :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC
Berat Mesin
MCR Mesin AE :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Berat Mensin
Berat Mesin
(ton)
1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509
Berat Mesin
(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
Chemical Tanker
Unit Cost Rp -
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 1063.65 Kw
= 1446.13 HP
Err:509
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
= 265.91 Kw
= 361.53 HP
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =
/ton
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
1595.47
398.87
lti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509
Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN
Input Data :
D= 2.836
n= 110
Z= 4
AE/AO = 0.40
PD = 888
PB = Err:509
PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=
Gearbox
Wgear =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Shafting
𝑑s =
l =
=
=
=
M
=
l
=
M =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Propeller
K =
=
=
Wprop =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176
Electrical Units
Wagg =
P = PB
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176
Other Weight
Wot =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177
Weight Total =
=
hdb =
=
=
BKI Vol II. Bab 24 -3.3
KG =
=
LCB =
=
=
LCGM =
=
LCGFP =
=
BERAT BAJA
Input Data :
m L
H
buah B
T
PERHITUNGAN :
Berat Propeler
D3 · K 4. Volume Anjungan (VAN)
DA
0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U
B/15
0.7 m
T
WST
hdb+0.35∙(H−hdb)
2.5 m
3.4 m
LCG(%)
= 5.74 m
= 10.95 m
= 4.54 m
= 0.19
= 0.0752
0.52 – 0.54
= 17,2% · LPP
= 14.70 m
= selebar kapal
= 10.95 m
= 2.5 m
= ℓPO · bPO · tPO
= 402.34 m3
tructure (VA) = VFC + VPO
= 525.14 m3
Volume Deck House (VDH)
= 16,1 % · L
= 13.8 m
= B-4
= 6.95 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 238.99 m3
er 3 (VDH3)
= 11,5 % · L
= 9.83 m
= B-4
= 6.95 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 170.71 m3
er 4 (VDH4)
= 8,5 % · L
= 7 m
= B-4
= 6.95 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4
= 126.18 m3
ungan (VAN)
= 7%·L
= 6.0 m
= B- 8
= 2.95 m
= 2.5 m
= ℓAN · bAN · tAN
44.08 m3
= 0.0752 t/m3
= Berat Kapal
= 3552.00 ton
= log〖∆ /100 〗
= 1.55
CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11
Total Berat Baja
= LPP · B · DA · CS
= 727.08 ton
= -0,15 + LCB(%)
= 1.688 %L
= LCG(%) · LPP
= 1.442 m
= 0.5 · LPP - LCGM
= 41.29 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN
• POOP
Lpoop = 14.70
Bpoop = 10.95
Apoop = 160.93
Wpoop = 32.19
• DECKHOUSE
Layer II
LDH II = 13.76
BDH II = 6.95
ADH II = 95.60
WDH II = 19.12
Layer IV
LDH IV = 7.27
BDH IV = 6.95
ADH IV = 50.47
WDH IV = 10.09
Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C
= 79.76
= 7.27
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 39.586
Lcb = 4.274
LCGM dr FP = 79.619
LCGM = -36.882
Lkm = 10.000
Layer II
LDH II = 13.761
WDH II = 6.947
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide
= -35.344
Layer III
Layer IV
LDH IV = 7.265
WDH IV = 6.947
LCGIII = -32.096
Wheelhouse
LWH = 5.983
WWH = 2.947
LCGIV = -31.455
Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =
=
Layer III =
m LDH III = 9.83 m Modul TMK bab Consumable and Crew
m BDH III = 6.95 m CC&E =
m2 ADH III = 68.28 m2 WC&E =
ton WDH III = 13.66 ton =
=
Wheel House Parametric design chapter 11, hal. 11-25
m LWH = 5.98 m
Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA
m Auxilary Engine
Fuel Oil
SFR =
m MCR =
m Margin =
WFO
m =
m asumsi Lmesin = 4m
=
=
m
ton
Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24
m
WFWtotal =
m WFW =
ton =
m
ton
m
m
UMABLE & CREW
VS = 5.66 m/s
85.47 m = 11.00 nm/jam
S
10.95 m = Err:509 nm
5.74 m
4.54 m
17.3 orang
17 orang
Consumable and Crew
0.17 ton/orang ; Asumsi rata-rata berat manusia
Berat Crew Total
Zc · Cc&e
2.89 ton
gn chapter 11, hal. 11-25
Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
Err:509 ton/kW h
265.912 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
8E-05 ton/kW hr; dari data mesin (diambil yang terbesar)
Err:509 kW
10% ; (5% ~ 10%)
SFR∙MCR∙S/Vs ∙(1+Margin)
Err:509 ton
0.49 ton
0.511 ton
Err:509 ton
1. LWT
Steel Weight
WST = 727.08 ton
Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton
GROSS TONAGE
Input Data
H = 5.74 m
T = 4.54 m
VPO = 402.34 m3
VFC = 122.81 m3
VDH = 579.95 m3
∆ = 3551.997 ton
Zc = 17 orang
N1 = 0 orang
N2 = 0 orang
Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)
= 5210.47 m3
VH = VPO + VFC + VDH
= 1105.10 m3
V = VU + V H
= 6315.57 m3
K1 = 0.2+0.02∙log_10V
= 0.28
GT = V ∙ K1
= 1743.15 m3
Duami - Medan : SPOB
No Pelabuhan Asal/Tujuan
1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan
DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 85.310
B = 11.026
H = 5.445
T = 4.075
GT = 1773
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 85.31
B = 11.03
H = 5.44
T = 4.07
VS = 8
= 4.1152
Freeboard = 1.37
Fn = Vs / √( g. L )
= 0.139
Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 85.31
LWL = 88.72
B = 11.03
H = 5.44
T = 4.07
Vs = 4.12
(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)
=
307,251,950.6
Cfo =〖 (log〖𝑅𝑛 − 2) 〗〗 ^2
0.075/
= 0.00178
• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =
= 0.212
〖𝐿𝑤𝑙〗 ^3/𝛻 209.76
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =
= 1.253
= 1462.265 m2
• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆
= 28.345 kN
• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)
= 12.166
Lkeel = 0.6.Cb.Lwl Hkeel =
= 44.464 =
Sapp = Srudder + Sbilge Keel
= 62.561
• Stot = S + Sapp
= 1524.826
Harga (1 + k2) ---> PNA Vol II hlm. 92
Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome
+ k2〖𝑆
(1(∑▒ _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )
= 1.400
• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=
= 1.259
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =
= 29.700 kN
• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =
= 41.5312
B/L = 0.124
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.124
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1
= 1.358
• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3
= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.143〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =
= -1.728
• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= 0.00000
• Harga λ
L/B = 8.047
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.970
• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ〖〖𝐹𝑛〗 ^(−2)) 〗
= 0.00005188
• CA (Correlation Allowance)
Tf/Lwl = 0.0459
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000544
• w (Gaya Berat)
w= ∆.g
= 33478.574 kN
• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =
= 1.73688223750268 kN
Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 38.64 kN
= 38640.07 N
Jarak (Nm)
hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost
ROUNDTRIP
ton > Seatime
ton Dumai - Medan =
m Medan - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Medan =
Err:509
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi sebenarnya =
m/S
KURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025
5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)
m dari M
m dari AP
Lwl . B . T .Cb
3329.46 m3
Lwl . B .T . Cb .ρ
3412.70 ton
10% Amidship
3696 𝐶_𝑊𝑃 )
_𝑖 〗 )/(∑▒𝑆_𝑖 )
〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3
〗 ^(−1.3757)
〗 ^(−1.3757)
6 jam
0.25 hari
4 jam
0.17 hari
Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
0 kali
m/s²
≤ Fn ≤ 0,3
ton/m3
0.84
1.00
0.84
0.90
0.139488921494948
0
2.35 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0
Perhitungan Awal :
1+k
CF
CA
CV
Principle of Naval Architecture Vol.
t
Principle of Naval Architecture Vol.
Va
ηO
ηr
ηD
PS
PB0
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
AUXILARY ENGINE
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL
Perhitungan Harga Kapal
Input Data
WST = 700.031 Ton
WE&O = 156.499 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja
= $ 770,033.81
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 172,149.07
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509
BIAYA OPERASIONAL
= 88.72 m P/D
= 11.03 m D
= 5.44 m z
= 4.07 m nrpm
= 0.13948892149495 nrps
= 3329.46 m3 Cb
= 3412.70 ton Vs
= 0.4 RT
= 1.26
= 0.0018
= 0.00054
= (1+ k) CF + CA
= 0.0028
ciple of Naval Architecture Vol. II hal. 162
= 0.3 Cb + 10 Cv Cb - 0.1
= 0.17
ciple of Naval Architecture Vol. II hal. 163
= V (1 - w) ; Speed of Advantages
= 3.40
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27
Power (EHP) :
= RT.Vs
= 182.86 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27
wer (THP) :
= PE∙(1−w)/(1−t)
= 167.85 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29
ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.09
pter 11 Parametric Design - M.G. Parson ; page 11-29
= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591
Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 309.41 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 315.73 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
LARY ENGINE
Total
BIAYA PELABUHAN :
Pelabuhan Dumai
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal =
Tarif Tetap =
Tarif Variabel =
total
Pelabuhan Medan
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal <=
Tarif Tetap =
Tarif Variabel =
total
>> Muat = Rp -
>> Bongkar = Rp -
Total = Rp -
= 1.00
= 2.55
= 4.00
= 110
= 1.83
= 0.84
= 4.12 m/s
= 44.44 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2
1 0 0 Err:509
1 0 0 Err:509
1 1 184 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1 1 188 Err:509
1.0 1 189 Err:509
0.6 1 191 Err:509
0.6 1 190 Err:509
tarif
Rp 60 Per GT/Kunjungan
Rp 49 per GT/Etmal
total
tarif
Err:509 Per GT/Kunjungan
total
/ton
/tahun
Fuel Oil
Biaya ME
Consumption (liter)
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Fuel Oil
Biaya AE
Consumption (liter)
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun
total
-
-
-
Rp -
-
Rp -
total
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :
MCR Mesin ME :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC
Berat Mesin
MCR Mesin AE :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Berat Mensin
Berat Mesin
(ton)
1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509
Berat Mesin
(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
SPOB
Unit Cost Rp -
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 370.50 Kw
= 503.73 HP
Err:509
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
= 92.62 Kw
= 125.93 HP
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =
/ton
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
555.75
138.94
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509
Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN
Input Data :
D= 2.547
n= 110
Z= 4
AE/AO = 0.40
PD = 309
PB = Err:509
PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=
Gearbox
Wgear =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Shafting
𝑑s =
l =
=
=
=
M
=
l
=
M =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Propeller
K =
=
=
Wprop =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176
Electrical Units
Wagg =
P = PB
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176
Other Weight
Wot =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177
Weight Total =
=
hdb =
=
=
BKI Vol II. Bab 24 -3.3
KG =
=
LCB =
=
=
LCGM =
=
LCGFP =
=
BERAT BAJA
Input Data :
m L
H
buah B
T
PERHITUNGAN :
Berat Propeler
D3 · K 4. Volume Anjungan (VAN)
DA
0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U
2.4 m
3.4 m
LCG(%)
0.52 – 0.54
= 17,2% · LPP
= 14.67 m
= selebar kapal
= 11.03 m
= 2.5 m
= ℓPO · bPO · tPO
= 404.47 m3
tructure (VA) = VFC + VPO
= 527.93 m3
Volume Deck House (VDH)
= 16,1 % · L
= 13.7 m
= B-4
= 7.03 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 241.26 m3
er 3 (VDH3)
= 11,5 % · L
= 9.81 m
= B-4
= 7.03 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 172.33 m3
er 4 (VDH4)
= 8,5 % · L
= 7 m
= B-4
= 7.03 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4
= 127.37 m3
ungan (VAN)
= 7%·L
= 6.0 m
= B- 8
= 3.03 m
= 2.5 m
= ℓAN · bAN · tAN
45.18 m3
= 0.0752 t/m3
= Berat Kapal
= 3412.70 ton
= log〖∆ /100 〗
= 1.53
CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11
= -0,15 + LCB(%)
= 2.603 %L
= LCG(%) · LPP
= 2.221 m
= 0.5 · LPP - LCGM
= 40.43 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN
• POOP
Lpoop = 14.67
Bpoop = 11.03
Apoop = 161.79
Wpoop = 32.36
• DECKHOUSE
Layer II
LDH II = 13.73
BDH II = 7.03
ADH II = 96.50
WDH II = 19.30
Layer IV
LDH IV = 7.25
BDH IV = 7.03
ADH IV = 50.95
WDH IV = 10.19
Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C
= 77.25
= 6.96
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 39.125
Lcb = 4.266
LCGM dr FP = 79.457
LCGM = -36.802
Lkm = 10.000
Layer II
LDH II = 13.735
WDH II = 7.026
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide
= -35.257
Layer III
Layer IV
LDH IV = 7.251
WDH IV = 7.026
LCGIII = -32.015
Wheelhouse
LWH = 5.972
WWH = 3.026
LCGIV = -31.375
Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =
Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA
m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m
ton
Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24
m
WFWtotal =
m WFW =
ton =
m
ton
m
m
UMABLE & CREW
VS = 4.12 m/s
85.31 m = 8.00 nm/jam
S
11.03 m = Err:509 nm
5.44 m
4.07 m
2.89 ton
gn chapter 11, hal. 11-25
Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
Err:509 ton/kW h
92.624 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
0.49 ton
0.511 ton
Err:509 ton
1. LWT
Steel Weight
WST = 700.03 ton
Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton
GROSS TONAGE
Input Data
H = 5.44 m
T = 4.07 m
VPO = 404.47 m3
VFC = 123.46 m3
VDH = 586.13 m3
∆ = 3412.699 ton
Zc = 17 orang
N1 = 0 orang
N2 = 0 orang
Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)
= 5307.67 m3
VH = VPO + VFC + VDH
= 1114.06 m3
V = VU + V H
= 6421.74 m3
K1 = 0.2+0.02∙log_10V
= 0.28
GT = V ∙ K1
= 1773.38 m3
Duami - Medan : ITB
No Pelabuhan Asal/Tujuan
1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan
DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 75.426
B = 12.605
H = 6.304
T = 4.766
GT = 1671
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 75.43
B = 12.61
H = 6.30
T = 4.77
VS = 5
= 2.572
Freeboard = 1.54
Fn = Vs / √( g. L )
= 0.093
Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 75.43
LWL = 78.44
B = 12.61
H = 6.30
T = 4.77
Vs = 2.57
(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)
=
169,782,828.7
Cfo =〖 (log〖𝑅𝑛 − 2) 〗〗 ^2
0.075/
= 0.00193
• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =
= 0.322
〖𝐿𝑤𝑙〗 ^3/𝛻 155.92
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =
= 1.198
= 1284.238 m2
• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆
= 10.083 kN
• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)
= 12.583
Lkeel = 0.6.Cb.Lwl Hkeel =
= 30.916 =
Sapp = Srudder + Sbilge Keel
= 61.305
• Stot = S + Sapp
= 1345.543
Harga (1 + k2) ---> PNA Vol II hlm. 92
Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome
+ k2〖𝑆
(1(∑▒ _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )
= 1.400
• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=
= 1.208
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =
= 10.646 kN
• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =
= 17.7289
B/L = 0.161
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.161
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1
= 2.125
• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3
= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.290〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =
= -2.155
• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= 0.00000
• Harga λ
L/B = 6.223
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.781
• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ〖〖𝐹𝑛〗 ^(−2)) 〗
= 0.00000002
• CA (Correlation Allowance)
Tf/Lwl = 0.0608
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000568
• w (Gaya Berat)
w= ∆.g
= 31127.927 kN
• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =
= 0.000729657889838 kN
Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 13.24 kN
= 13236.00 N
Jarak (Nm)
hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost
ROUNDTRIP
ton > Seatime
ton Dumai - Medan =
m Medan - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Medan =
Err:509
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi sebenarnya =
m/S
UKURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025
5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)
m dari M
m dari AP
Lwl . B . T .Cb
3095.69 m3
Lwl . B .T . Cb .ρ
3173.08 ton
10% Amidship
3696 𝐶_𝑊𝑃 )
_𝑖 〗 )/(∑▒𝑆_𝑖 )
〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3
〗 ^(−1.3757)
〗 ^(−1.3757)
6 jam
0.25 hari
4 jam
0.17 hari
Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
0 kali
m/s²
≤ Fn ≤ 0,3
ton/m3
0.66
0.98
0.67
0.79
0.092717173635863
0
-0.39 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0
Perhitungan Awal :
1+k
CF
CA
CV
Principle of Naval Architecture Vol.
t
Principle of Naval Architecture Vol.
Va
ηO
ηr
ηD
PS
PB0
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
AUXILARY ENGINE
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL
Perhitungan Harga Kapal
Input Data
WST = 805.738 Ton
WE&O = 170.213 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja
= $ 886,311.69
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 187,234.84
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509
BIAYA OPERASIONAL
= 78.44 m P/D
= 12.61 m D
= 6.30 m z
= 4.77 m nrpm
= 0.09271717363586 nrps
= 3095.69 m3 Cb
= 3173.08 ton Vs
= 0.4 RT
= 1.21
= 0.0019
= 0.00057
= (1+ k) CF + CA
= 0.0029
ciple of Naval Architecture Vol. II hal. 162
= 0.3 Cb + 10 Cv Cb - 0.1
= 0.12
ciple of Naval Architecture Vol. II hal. 163
= V (1 - w) ; Speed of Advantages
= 2.27
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27
Power (EHP) :
= RT.Vs
= 39.15 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27
wer (THP) :
= PE∙(1−w)/(1−t)
= 38.45 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29
ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.02
pter 11 Parametric Design - M.G. Parson ; page 11-29
= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591
Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 66.24 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 67.59 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
LARY ENGINE
Total
BIAYA PERLABUAHAN :
Pelabuhan Dumai
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal =
Tarif Tetap =
Tarif Variabel =
total
Pelabuhan Medan
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal <=
Tarif Tetap =
Tarif Variabel =
total
>> Muat = Rp -
>> Bongkar = Rp -
Total = Rp -
= 1.00
= 2.98
= 4.00
= 110
= 1.83
= 0.66
= 2.57 m/s
= 15.22 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2
1 1 103 Err:509
1 1 235 Err:509
1 1 184 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1 1 188 Err:509
1.0 1 189 Err:509
0.6 1 191 Err:509
0.6 1 190 Err:509
tarif
Rp 60 Per GT/Kunjungan
Rp 49 per GT/Etmal
otal
tarif
Err:509 Per GT/Kunjungan
otal
/ton
/tahun
Fuel Oil
Biaya ME
Consumption (liter)
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Fuel Oil
Biaya AE
Consumption (liter)
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun
total
-
-
-
Rp -
-
Rp -
total
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :
MCR Mesin ME :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC
Berat Mesin
MCR Mesin AE :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Berat Mensin
Berat Mesin
(ton)
1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509
Berat Mesin
(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
ITB
Unit Cost Rp -
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 79.32 Kw
= 107.84 HP
Err:509
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
= 19.83 Kw
= 26.96 HP
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =
/ton
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
118.98
29.75
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509
Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN
Input Data :
D= 2.979
n= 110
Z= 4
AE/AO = 0.40
PD = 66
PB = Err:509
PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=
Gearbox
Wgear =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Shafting
𝑑s =
l =
=
=
=
M
=
l
=
M =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Propeller
K =
=
=
Wprop =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176
Electrical Units
Wagg =
P = PB
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176
Other Weight
Wot =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177
Weight Total =
=
hdb =
=
=
BKI Vol II. Bab 24 -3.3
KG =
=
LCB =
=
=
LCGM =
=
LCGFP =
=
BERAT BAJA
Input Data :
m L
H
buah B
T
PERHITUNGAN :
Berat Propeler
D3 · K 4. Volume Anjungan (VAN)
DA
0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U
2.8 m
3.0 m
LCG(%)
0.52 – 0.54
= 17,2% · LPP
= 12.97 m
= selebar kapal
= 12.61 m
= 2.5 m
= ℓPO · bPO · tPO
= 408.82 m3
tructure (VA) = VFC + VPO
= 533.60 m3
Volume Deck House (VDH)
= 16,1 % · L
= 12.1 m
= B-4
= 8.61 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 261.24 m3
er 3 (VDH3)
= 11,5 % · L
= 8.67 m
= B-4
= 8.61 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 186.60 m3
er 4 (VDH4)
= 8,5 % · L
= 6 m
= B-4
= 8.61 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4
= 137.92 m3
ungan (VAN)
= 7%·L
= 5.3 m
= B- 8
= 4.61 m
= 2.5 m
= ℓAN · bAN · tAN
60.78 m3
= 0.0752 t/m3
= Berat Kapal
= 3173.08 ton
= log〖∆ /100 〗
= 1.50
CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11
= -0,15 + LCB(%)
= -0.671 %L
= LCG(%) · LPP
= -0.506 m
= 0.5 · LPP - LCGM
= 38.22 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN
• POOP
Lpoop = 12.97
Bpoop = 12.61
Apoop = 163.53
Wpoop = 32.71
• DECKHOUSE
Layer II
LDH II = 12.14
BDH II = 8.61
ADH II = 104.50
WDH II = 20.90
Layer IV
LDH IV = 6.41
BDH IV = 8.61
ADH IV = 55.17
WDH IV = 11.03
Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C
= 85.78
= 7.92
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 42.553
Lcb = 3.771
LCGM dr FP = 69.671
LCGM = -31.959
Lkm = 10.000
Layer II
LDH II = 12.144
WDH II = 8.605
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide
= -30.013
Layer III
Layer IV
LDH IV = 6.411
WDH IV = 8.605
LCGIII = -27.147
Wheelhouse
LWH = 5.280
WWH = 4.605
LCGIV = -26.581
Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =
Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA
m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m
ton
Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24
m
WFWtotal =
m WFW =
ton =
m
ton
m
m
UMABLE & CREW
VS = 2.57 m/s
75.43 m = 5.00 nm/jam
S
12.61 m = Err:509 nm
6.30 m
4.77 m
3.06 ton
gn chapter 11, hal. 11-25
Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
Err:509 ton/kW h
19.830 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
0.52 ton
0.541 ton
Err:509 ton
1. LWT
Steel Weight
WST = 805.74 ton
Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton
GROSS TONAGE
Input Data
H = 6.30 m
T = 4.77 m
VPO = 408.82 m3
VFC = 124.79 m3
VDH = 646.54 m3
∆ = 3173.081 ton
Zc = 18 orang
N1 = 0 orang
N2 = 0 orang
Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)
= 4880.67 m3
VH = VPO + VFC + VDH
= 1180.15 m3
V = VU + V H
= 6060.81 m3
K1 = 0.2+0.02∙log_10V
= 0.28
GT = V ∙ K1
= 1670.67 m3
Dumai - Medan
OF Chemical Tanker
Total Biaya Err:509
Total Err:509
Biaya Satuan Rp -
DV
LPP 85.47
B 10.95
H 5.74
T 4.54
Frekuensi 164
T min 1
T max 5.9
Chemical Tanker
Frekuensi kapal sisa Err:509
Roundtrip per tahun Err:509
Payload 0.00
Total Angkut -
Permintaan 103,067,600
Freeboard 1.20
Batasan Freeboard >=
Keterangan Chemical Tanker
L/B 7.8
B/T 2.4
L/T 18.8
B/H 1.9
N Kapal Err:509
SPOB ITB
Err:509 Err:509
Chemical Tanker
Min Maks
85.31 75.43 10 177.0
11.03 12.61 5.6 35.4
5.44 6.30 3.8 14.9
4.07 4.77 1 5.9
0 0 0 1000
SPOB ITB
Err:509 Err:509
Err:509 Err:509
0.00 0.00
ton
ton
1.37 1.54
1 Chemical Tanker
SPOB ITB Min Maks
7.7 6.0 3.5 10
2.7 2.6 1.8 5
20.9 15.8 10 30
2.0 2.0 1.47 2.38
Err:509 Err:509
Biaya Penalti Frekuensi Sisa
Total Penalti =
SPOB ITB
Min Maks Min Maks
17 175.1 16 120.5
3.5 22.4 5.0 19.6
1.1 3.7 1.8 4.2
1 5.9 1 5.9
0 1000 0 1000
SPOB ITB
Min Maks Min Maks
2.7 5.2 3.1 5.7
4.7 7.8 3.2 6.1
16.5 29.7 16.0 20.4
3.2 6.0 2.8 4.7
ya Penalti Frekuensi Sisa
Err:509
Duami - Jakarta : Chemical Tanker
No Pelabuhan Asal/Tujuan
1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan
DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 95.17
B = 12.21
H = 6.03
T = 4.94
GT = 2335
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 95.17
B = 12.21
H = 6.03
T = 4.94
VS = 11
= 5.6584
Freeboard = 1.09
Fn = Vs / √( g. L )
= 0.182
Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 95.17
LWL = 98.98
B = 12.21
H = 6.03
T = 4.94
Vs = 5.66
(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)
=
471,322,726.6
Cfo =〖 (log〖𝑅𝑛 − 2) 〗〗 ^2
0.075/
= 0.00168
• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =
= 0.236
〖𝐿𝑤𝑙〗 ^3/𝛻 201.53
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =
= 1.225
= 1838.116 m2
• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆
= 62.218 kN
• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)
= 16.462
Lkeel = 0.6.Cb.Lwl Hkeel =
= 47.832 =
Sapp = Srudder + Sbilge Keel
= 73.349
• Stot = S + Sapp
= 1911.465
Harga (1 + k2) ---> PNA Vol II hlm. 92
Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome
+ k2 〖
(1(∑▒ 𝑆 _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )
= 1.400
• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=
= 1.232
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =
= 65.056 kN
• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =
= 35.0056
B/L = 0.123
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.123
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1
= 1.225
• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3
= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.158〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =
= -1.767
• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= -0.00006
• Harga λ
L/B = 8.104
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.928
• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ〖〖𝐹𝑛〗 ^(−2)) 〗
= 0.00033437
• CA (Correlation Allowance)
Tf/Lwl = 0.0499
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000522
• w (Gaya Berat)
w= ∆.g
= 48385.110 kN
• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =
= 16.1783054023264 kN
Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 97.62 kN
= 97620.01 N
ROUNDTRIP
ton > Seatime
ton Dumai - Jakarta =
m Jakarta - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Jakarta =
103,067,600
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi Sebenarnya =
m/S
UKURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025
5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)
m dari M
m dari AP
Lwl . B . T .Cb
4811.93 m3
Lwl . B .T . Cb .ρ
4932.22 ton
10% Amidship
3696 𝐶_𝑊𝑃 )
_𝑖 〗 )/(∑▒𝑆_𝑖 )
〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3
〗 ^(−1.3757)
〗 ^(−1.3757)
6 jam
0.25 hari
4 jam
0.17 hari
Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
46 kali
m/s²
≤ Fn ≤ 0,3
ton/m3
0.81
0.99
0.81
0.88
0.181585805684186
0
2.11 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0
Perhitungan Awal :
1+k
CF
CA
CV
Principle of Naval Architecture Vol.
t
Principle of Naval Architecture Vol.
Va
ηO
ηr
ηD
PS
PB0
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
AUXILARY ENGINE
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL
Perhitungan Harga Kapal
Input Data
WST = 947.020
WE&O = 197.295
WME = Err:509
Harga Baja = $ 1,100.00
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja
= $ 1,041,722.04
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 217,024.58
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509
BIAYA OPERASIONAL
Total = Err:509
AN PROPULSI & DAYA MESIN :
= 98.98 m
= 12.21 m
= 6.03 m
= 4.94 m
= 0.18158580568419
= 4811.93 m3
= 4932.22 ton
= 0.4
= 1.23
= 0.0017
= 0.00052
= (1+ k) CF + CA
= 0.0026
ciple of Naval Architecture Vol. II hal. 162
= 0.3 Cb + 10 Cv Cb - 0.1
= 0.16
ciple of Naval Architecture Vol. II hal. 163
= V (1 - w) ; Speed of Advantages
= 4.74
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27
Power (EHP) :
= RT.Vs
= 635.23 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27
wer (THP) :
= PE∙(1−w)/(1−t)
= 591.09 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29
ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.07
pter 11 Parametric Design - M.G. Parson ; page 11-29
= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591
Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 1074.84 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 1096.77 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
LARY ENGINE
CATERPILLAR C9 217
CATERPILLAR C9 253
CATERPILLAR C9 253
CATERPILLAR C9 288
CATERPILLAR C9 311
CATERPILLAR C9 361
CATERPILLAR C18 404
CATERPILLAR C18 499
CATERPILLAR C18 514
CATERPILLAR C15 536
CATERPILLAR C15 540
CATERPILLAR C18 587
CATERPILLAR C18 624
CATERPILLAR C18 660
CATERPILLAR C32 791
CATERPILLAR C32 916
CATERPILLAR C32 923
CATERPILLAR C32 1047
CATERPILLAR C32 1172
CATERPILLAR C32 1333
CATERPILLAR C33 1500
CATERPILLAR C34 1700
CATERPILLAR C35 2153
CATERPILLAR C36 2337
CATERPILLAR C37 2745
CATERPILLAR C38 3000
CATERPILLAR C39 3254
CATERPILLAR C40 3559
CATERPILLAR C41 3749
CATERPILLAR C42 4000
BIAYA PERJALANAN
BIAYA PELABUHAN
Pelabuhan Dumai
1 Jasa Labuh
2 Jasa Tambat
Dermaga Beton
3 Jasa Pandu
Tarif Tetap
Tarif Variable
4 Jasa Tunda Kapal
Tarif Tetap
Tarif Variabel
Pelabuhan Jakarta
1 Jasa Labuh
2 Jasa Tambat
Dermaga Beton
3 Jasa Pandu
Tarif Tetap
Tarif Variable
4 Jasa Tunda Kapal
Tarif Tetap
/tahun Tarif Variabel
>> Muat =
/tahun >> Bongkar =
Total =
/tahun
/orang/hari
/tahun
/trip
/tahun
P/D = 1.00
D = 3.09
z = 4.00
nrpm = 110
nrps = 1.83
Cb = 0.81
Vs = 5.66 m/s
RT = 112.26 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2
103 1 0 0
235 1 0 0
184 1 0 0
195 0.8 0 0
195 0.8 0 0
195 0.8 0 0
195 0.8 0 0
195 0.8 0 0
195 0.8 0 0
195 0.8 0 0
188 1 0 0
189 1.0 0 0
191 0.6 0 0
190 0.6 0 0
192 0.6 0 0
189 0.7 0 0
191 1.0 0 0
190 0.8 1 190
192 0.7 1 192
189 0.7 1 189
191 1.0 1 191
190 1.0 1 190
192 0.8 1 192
188 0.7 1 188
185 0.7 1 185
185 0.7 1 185
187 1.0 1 187
185 0.8 1 185
185 0.8 1 185
189 1.0 1 189
195 0.8 1 195
195 0.8 1 195
195 0.8 1 195
195 1.0 1 195
194 1.0 1 194
194 0.8 1 194
194 1.0 1 194
194 1.0 1 194
194 0.8 1 194
196 0.8 1 196
196 0.9 1 196
196 1.0 1 196
194 0.9 1 194
194 0.9 1 194
194 1.0 1 194
194 0.9 1 194
189 0.9 1 189
195 0.8 1 195
195 0.8 1 195
195 0.8 1 195
195 0.8 1 195
194 1.0 1 194
194 1.0 1 194
194 1.0 1 194
194 1.0 1 194
189 1.1 1 189
192 1.1 1 192
194 1.1 1 194
SFOC yang
SFOC (g/kW/hr) SLOC (g/kW/hr) Mesin yang memungkinkan
memungkinkan
Chemical Tanker
= Err:509
= Err:509
= Err:509
Err:509
Total = Err:509
LABUHAN
tarif
= Rp 60 Per GT/Kunjungan
= Rp 49 per GT/Etmal
total
tarif
= Err:509 Per GT/Kunjungan
total
Rp 30,000 /ton
Rp -
Rp -
Rp - /tahun
Fuel Oil
Fuel Oil Consumption (ton) Biaya ME
Consumption (liter)
Fuel Oil
Fuel Oil Consumption (ton) Biaya AE
Consumption (liter)
total
6,445,266.09
5,306,602.41
5,388,900.00
11,343,668.31
Rp 6,624,000
257,810.64
Rp 35,366,247.46
total
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :
MCR Mesin ME :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC
Berat Mesin
MCR Mesin AE :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Berat Mensin
Berat Mesin
(ton)
1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509
Berat Mesin
(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
Chemical Tanker
Unit Cost Rp -
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 1287.03 Kw
= 1749.85 HP
Err:509
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
= 321.76 Kw
= 437.46 HP
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =
/ton
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
1930.54
482.64
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509
Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN
Input Data :
D= 3.089
n= 110
Z= 4
AE/AO = 0.40
PD = 1075
PB = Err:509
PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=
Gearbox
Wgear =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Shafting
𝑑s =
l =
=
=
=
M
=
l
=
M =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Propeller
K =
=
=
Wprop =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176
Electrical Units
Wagg =
P = PB
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176
Other Weight
Wot =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177
Weight Total =
=
hdb =
=
=
BKI Vol II. Bab 24 -3.3
KG =
=
LCB =
=
=
LCGM =
=
LCGFP =
=
BERAT BAJA
Input Data :
m L
H
buah B
T
PERHITUNGAN :
Berat Propeler
D3 · K 4. Volume Anjungan (VAN)
DA
0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U
2.6 m
3.8 m
LCG(%)
0.52 – 0.54
= 17,2% · LPP
= 16.37 m
= selebar kapal
= 12.21 m
= 2.5 m
= ℓPO · bPO · tPO
= 499.86 m3
tructure (VA) = VFC + VPO
= 652.43 m3
Volume Deck House (VDH)
= 16,1 % · L
= 15.3 m
= B-4
= 8.21 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 314.66 m3
er 3 (VDH3)
= 11,5 % · L
= 10.95 m
= B-4
= 8.21 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 224.76 m3
er 4 (VDH4)
= 8,5 % · L
= 8 m
= B-4
= 8.21 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4
= 166.12 m3
ungan (VAN)
= 7%·L
= 6.7 m
= B- 8
= 4.21 m
= 2.5 m
= ℓAN · bAN · tAN
70.19 m3
= 0.0752 t/m3
= Berat Kapal
= 4932.22 ton
= log〖∆ /100 〗
= 1.69
CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11
= -0,15 + LCB(%)
= 2.062 %L
= LCG(%) · LPP
= 1.962 m
= 0.5 · LPP - LCGM
= 45.63 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN
• POOP
Lpoop = 16.37
Bpoop = 12.21
Apoop = 199.94
Wpoop = 39.99
• DECKHOUSE
Layer II
LDH II = 15.32
BDH II = 8.21
ADH II = 125.86
WDH II = 25.17
Layer IV
LDH IV = 8.09
BDH IV = 8.21
ADH IV = 66.45
WDH IV = 13.29
Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C
= 95.25
= 7.62
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 49.324
Lcb = 4.759
LCGM dr FP = 89.223
LCGM = -41.636
Lkm = 10.000
Layer II
LDH II = 15.323
WDH II = 8.214
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide
= -40.490
Layer III
Layer IV
LDH IV = 8.090
WDH IV = 8.214
LCGIII = -36.874
Wheelhouse
LWH = 6.662
WWH = 4.214
LCGIV = -36.160
Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =
Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA
m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m
ton
Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24
m
WFWtotal =
m WFW =
ton =
m
ton
m
m
UMABLE & CREW
VS = 5.66 m/s
95.17 m = 11.00 nm/jam
S
12.21 m = Err:509 nm
6.03 m
4.94 m
3.06 ton
gn chapter 11, hal. 11-25
Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
Err:509 ton/kW h
321.757 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
0.52 ton
0.541 ton
Err:509 ton
1. LWT
Steel Weight
WST = 947.02 ton
Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton
GROSS TONAGE
Input Data
H = 6.03 m
T = 4.94 m
VPO = 499.86 m3
VFC = 152.57 m3
VDH = 775.72 m3
∆ = 4932.223 ton
Zc = 18 orang
N1 = 0 orang
N2 = 0 orang
Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)
= 6957.79 m3
VH = VPO + VFC + VDH
= 1428.15 m3
V = VU + V H
= 8385.94 m3
K1 = 0.2+0.02∙log_10V
= 0.28
GT = V ∙ K1
= 2335.24 m3
Duami - Jakarta : SPOB
No Pelabuhan Asal/Tujuan
1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan
DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 90.759
B = 13.731
H = 6.340
T = 5.249
GT = 2704
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 90.76
B = 13.73
H = 6.34
T = 5.25
VS = 8
= 4.1152
Freebroad = 1.09
Fn = Vs / √( g. L )
= 0.135
Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 90.76
LWL = 94.39
B = 13.73
H = 6.34
T = 5.25
Vs = 4.12
(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)
=
326,876,060.5
Cfo =〖 (log〖𝑅𝑛 − 2) 〗〗 ^2
0.075/
= 0.00177
• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =
= 0.218
〖𝐿𝑤𝑙〗 ^3/𝛻 148.78
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =
= 1.292
= 1958.916 m2
• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆
= 38.817 kN
• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)
= 16.674
Lkeel = 0.6.Cb.Lwl Hkeel =
= 47.053 =
Sapp = Srudder + Sbilge Keel
= 70.378
• Stot = S + Sapp
= 2029.294
Harga (1 + k2) ---> PNA Vol II hlm. 92
Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome
+ k2 〖
(1(∑▒ 𝑆 _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )
= 1.400
• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=
= 1.296
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =
= 40.329 kN
• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =
= 43.4913
B/L = 0.145
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.145
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1
= 2.706
• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3
= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.145〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =
= -1.920
• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= 0.00000
• Harga λ
L/B = 6.874
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.999
• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ〖〖𝐹𝑛〗 ^(−2)) 〗
= 0.00002418
• CA (Correlation Allowance)
Tf/Lwl = 0.0556
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000532
• w (Gaya Berat)
w= ∆.g
= 56835.221 kN
• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =
= 1.37431671277712 kN
Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 51.07 kN
= 51073.66 N
Jarak (Nm)
hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost
ROUNDTRIP
ton > Seatime
ton Dumai - Jakarta =
m Jakarta - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Jakarta =
Err:509
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi Sebenarnya =
m/S
UKURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025
5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)
m dari M
m dari AP
Lwl . B . T .Cb
5652.29 m3
Lwl . B .T . Cb .ρ
5793.60 ton
10% Amidship
3696 𝐶_𝑊𝑃 )
_𝑖 〗 )/(∑▒𝑆_𝑖 )
〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3
〗 ^(−1.3757)
〗 ^(−1.3757)
6 jam
0.25 hari
4 jam
0.17 hari
Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
123 kali
m/s²
≤ Fn ≤ 0,3
ton/m3
0.83
1.00
0.83
0.89
0.135236985984954
0
2.43 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0
Perhitungan Awal :
1+k
CF
CA
CV
Principle of Naval Architecture Vol.
t
Principle of Naval Architecture Vol.
Va
ηO
ηr
ηD
PS
PB0
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
AUXILARY ENGINE
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL
Perhitungan Harga Kapal
Input Data
WST = 1065.740 Ton
WE&O = 217.062 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja
= $ 1,172,313.92
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 238,768.28
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509
BIAYA OPERASIONAL
= 94.39 m P/D
= 13.73 m D
= 6.34 m z
= 5.25 m nrpm
= 0.13523698598495 nrps
= 5652.29 m3 Cb
= 5793.60 ton Vs
= 0.4 RT
= 1.30
= 0.0018
= 0.00053
= (1+ k) CF + CA
= 0.0028
ciple of Naval Architecture Vol. II hal. 162
= 0.3 Cb + 10 Cv Cb - 0.1
= 0.17
ciple of Naval Architecture Vol. II hal. 163
= V (1 - w) ; Speed of Advantages
= 3.40
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27
Power (EHP) :
= RT.Vs
= 241.71 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27
wer (THP) :
= PE∙(1−w)/(1−t)
= 222.18 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29
ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.09
pter 11 Parametric Design - M.G. Parson ; page 11-29
= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591
Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 408.98 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 417.32 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
LARY ENGINE
Total
BIAYA PELABUHAN
Pelabuhan Dumai
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal =
Tarif Tetap =
Tarif Variabel =
total
Pelabuhan Jakarta
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal <=
Tarif Tetap =
Tarif Variabel =
total
>> Muat = Rp -
>> Bongkar = Rp -
Total = Rp -
= 1.00
= 3.28
= 4.00
= 110
= 1.83
= 0.83
= 4.12 m/s
= 58.73 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2
1 0 0 Err:509
1 0 0 Err:509
1 0 0 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1 1 188 Err:509
1.0 1 189 Err:509
0.6 1 191 Err:509
0.6 1 190 Err:509
tarif
Rp 60 Per GT/Kunjungan
Rp 49 per GT/Etmal
total
tarif
Err:509 Per GT/Kunjungan
total
/ton
/tahun
Fuel Oil
Biaya ME
Consumption (liter)
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Fuel Oil
Biaya AE
Consumption (liter)
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun
total
19,958,489.20
16,432,489.44
14,409,450.00
35,126,940.99
Rp 17,712,000
798,339.57
Rp 104,437,709.20
total
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :
MCR Mesin ME :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC
Berat Mesin
MCR Mesin AE :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Berat Mensin
Berat Mesin
(ton)
1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509
Berat Mesin
(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
SPOB
Unit Cost Rp -
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 489.72 Kw
= 665.82 HP
Err:509
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
= 122.43 Kw
= 166.45 HP
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =
/ton
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
734.57
183.64
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509
Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN
Input Data :
D= 3.281
n= 110
Z= 4
AE/AO = 0.40
PD = 409
PB = Err:509
PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=
Gearbox
Wgear =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Shafting
𝑑s =
l =
=
=
=
M
=
l
=
M =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Propeller
K =
=
=
Wprop =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176
Electrical Units
Wagg =
P = PB
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176
Other Weight
Wot =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177
Weight Total =
=
hdb =
=
=
BKI Vol II. Bab 24 -3.3
KG =
=
LCB =
=
=
LCGM =
=
LCGFP =
=
BERAT BAJA
Input Data :
m L
H
buah B
T
PERHITUNGAN :
Berat Propeler
D3 · K 4. Volume Anjungan (VAN)
DA
0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U
2.8 m
3.6 m
LCG(%)
0.52 – 0.54
= 17,2% · LPP
= 15.61 m
= selebar kapal
= 13.73 m
= 2.5 m
= ℓPO · bPO · tPO
= 535.88 m3
tructure (VA) = VFC + VPO
= 699.44 m3
Volume Deck House (VDH)
= 16,1 % · L
= 14.6 m
= B-4
= 9.73 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 355.48 m3
er 3 (VDH3)
= 11,5 % · L
= 10.44 m
= B-4
= 9.73 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 253.92 m3
er 4 (VDH4)
= 8,5 % · L
= 8 m
= B-4
= 9.73 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4
= 187.68 m3
ungan (VAN)
= 7%·L
= 6.4 m
= B- 8
= 5.73 m
= 2.5 m
= ℓAN · bAN · tAN
91.03 m3
= 0.0752 t/m3
= Berat Kapal
= 5793.60 ton
= log〖∆ /100 〗
= 1.76
CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11
= -0,15 + LCB(%)
= 2.523 %L
= LCG(%) · LPP
= 2.290 m
= 0.5 · LPP - LCGM
= 43.09 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN
• POOP
Lpoop = 15.61
Bpoop = 13.73
Apoop = 214.35
Wpoop = 42.87
• DECKHOUSE
Layer II
LDH II = 14.61
BDH II = 9.73
ADH II = 142.19
WDH II = 28.44
Layer IV
LDH IV = 7.71
BDH IV = 9.73
ADH IV = 75.07
WDH IV = 15.01
Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C
= 103.14
= 7.99
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 54.266
Lcb = 4.538
LCGM dr FP = 84.851
LCGM = -39.472
Lkm = 10.000
Layer II
LDH II = 14.612
WDH II = 9.731
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide
= -38.148
Layer III
Layer IV
LDH IV = 7.714
WDH IV = 9.731
LCGIII = -34.699
Wheelhouse
LWH = 6.353
WWH = 5.731
LCGIV = -34.018
Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =
Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA
m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m
ton
Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24
m
WFWtotal =
m WFW =
ton =
m
ton
m
m
UMABLE & CREW
VS = 4.12 m/s
90.76 m = 8.00 nm/jam
S
13.73 m = Err:509 nm
6.34 m
5.25 m
3.06 ton
gn chapter 11, hal. 11-25
Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
Err:509 ton/kW h
122.429 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
0.52 ton
0.541 ton
Err:509 ton
1. LWT
Steel Weight
WST = 1065.74 ton
Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton
GROSS TONAGE
Input Data
H = 6.34 m
T = 5.25 m
VPO = 535.88 m3
VFC = 163.57 m3
VDH = 888.11 m3
∆ = 5793.601 ton
Zc = 18 orang
N1 = 0 orang
N2 = 0 orang
Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)
= 8081.13 m3
VH = VPO + VFC + VDH
= 1587.55 m3
V = VU + V H
= 9668.69 m3
K1 = 0.2+0.02∙log_10V
= 0.28
GT = V ∙ K1
= 2704.40 m3
Duami -Jakarta : ITB
No Pelabuhan Asal/Tujuan
1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan
DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 58.452
B = 13.427
H = 6.379
T = 4.525
GT = 1539
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 58.45
B = 13.43
H = 6.38
T = 4.52
VS = 5
= 2.572
Freeboard = 1.85
Fn = Vs / √( g. L )
= 0.105
Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 58.45
LWL = 60.79
B = 13.43
H = 6.38
T = 4.52
Vs = 2.57
(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)
=
131,574,185.2
Cfo =〖 (log〖𝑅𝑛 − 2) 〗〗 ^2
0.075/
= 0.00200
• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =
= 0.266
〖𝐿𝑤𝑙〗 ^3/𝛻 82.38
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =
= 1.325
= 1085.650 m2
• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆
= 9.766 kN
• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)
= 9.256
Lkeel = 0.6.Cb.Lwl Hkeel =
= 26.932 =
Sapp = Srudder + Sbilge Keel
= 45.273
• Stot = S + Sapp
= 1130.923
Harga (1 + k2) ---> PNA Vol II hlm. 92
Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome
+ k2 〖
(1(∑▒ 𝑆 _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )
= 1.400
• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=
= 1.328
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =
= 10.196 kN
• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =
= 34.8887
B/L = 0.221
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.221
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1
= 9.086
• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3
= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.209〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =
= -2.482
• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= 0.00000
• Harga λ
L/B = 4.528
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.944
• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ〖〖𝐹𝑛〗 ^(−2)) 〗
= 0.00000006
• CA (Correlation Allowance)
Tf/Lwl = 0.0744
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000612
• w (Gaya Berat)
w= ∆.g
= 27419.014 kN
• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =
= 0.001679171424628 kN
Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 12.54 kN
= 12543.05 N
Jarak (Nm)
hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost
ROUNDTRIP
ton > Seatime
ton Dumai - Jakarta =
m Jakarta - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Jakarta =
Err:509
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi Sebenarnya =
m/S
KURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025
5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)
m dari M
m dari AP
Lwl . B . T .Cb
2726.84 m3
Lwl . B .T . Cb .ρ
2795.01 ton
10% Amidship
3696 𝐶_𝑊𝑃 )
_𝑖 〗 )/(∑▒𝑆_𝑖 )
〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3
〗 ^(−1.3757)
〗 ^(−1.3757)
6 jam
0.25 hari
4 jam
0.17 hari
Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
0 kali
m/s²
≤ Fn ≤ 0,3
ton/m3
0.74
0.99
0.75
0.84
0.105322636519638
0
0.58 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0
Perhitungan Awal :
1+k
CF
CA
CV
Principle of Naval Architecture Vol.
t
Principle of Naval Architecture Vol.
Va
ηO
ηr
ηD
PS
PB0
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
AUXILARY ENGINE
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL :
Perhitungan Harga Kapal
Input Data
WST = 674.726 Ton
WE&O = 147.305 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja
= $ 742,199.12
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 162,035.35
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509
BIAYA OPERASIONAL
= 60.79 m P/D
= 13.43 m D
= 6.38 m z
= 4.52 m nrpm
= 0.10532263651964 nrps
= 2726.84 m3 Cb
= 2795.01 ton Vs
= 0.4 RT
= 1.33
= 0.0020
= 0.00061
= (1+ k) CF + CA
= 0.0033
ciple of Naval Architecture Vol. II hal. 162
= 0.3 Cb + 10 Cv Cb - 0.1
= 0.15
ciple of Naval Architecture Vol. II hal. 163
= V (1 - w) ; Speed of Advantages
= 2.20
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27
Power (EHP) :
= RT.Vs
= 37.10 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27
wer (THP) :
= PE∙(1−w)/(1−t)
= 35.22 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29
ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.05
pter 11 Parametric Design - M.G. Parson ; page 11-29
= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591
Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 62.77 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 64.06 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
LARY ENGINE
Total
BIAYA PELABUHAN :
Pelabuhan Dumai
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal =
Tarif Tetap =
Tarif Variabel =
total
Pelabuhan Jakarta
1 Jasa Labuh =
2 Jasa Tambat
Dermaga Beton =
3 Jasa Pandu
Tarif Tetap =
Tarif Variable =
4 Jasa Tunda Kapal <=
Tarif Tetap =
Tarif Variabel =
total
>> Muat = Rp -
>> Bongkar = Rp -
Total = Rp -
= 1.00
= 2.83
= 4.00
= 110
= 1.83
= 0.74
= 2.57 m/s
= 14.42 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2
1 1 103 Err:509
1 1 235 Err:509
1 1 184 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
0.8 1 195 Err:509
1 1 188 Err:509
1.0 1 189 Err:509
0.6 1 191 Err:509
0.6 1 190 Err:509
tarif
Rp 60 Per GT/Kunjungan
Rp 49 per GT/Etmal
total
tarif
Err:509 Per GT/Kunjungan
total
/ton
/tahun
Fuel Oil
Biaya ME
Consumption (liter)
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
Fuel Oil
Biaya AE
Consumption (liter)
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun
total
-
-
-
Rp -
-
Rp -
total
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :
MCR Mesin ME :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC
Berat Mesin
MCR Mesin AE :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Berat Mensin
Berat Mesin
(ton)
1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509
Berat Mesin
(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
ITB
Unit Cost Rp -
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 75.17 Kw
= 102.20 HP
Err:509
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
= 18.79 Kw
= 25.55 HP
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =
/ton
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
112.75
28.19
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509
Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN
Input Data :
D= 2.828
n= 110
Z= 4
AE/AO = 0.40
PD = 63
PB = Err:509
PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=
Gearbox
Wgear =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Shafting
𝑑s =
l =
=
=
=
M
=
l
=
M =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Propeller
K =
=
=
Wprop =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176
Electrical Units
Wagg =
P = PB
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176
Other Weight
Wot =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177
Weight Total =
=
hdb =
=
=
BKI Vol II. Bab 24 -3.3
KG =
=
LCB =
=
=
LCGM =
=
LCGFP =
=
BERAT BAJA
Input Data :
m L
H
buah B
T
PERHITUNGAN :
Berat Propeler
D3 · K 4. Volume Anjungan (VAN)
DA
0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U
2.8 m
2.3 m
LCG(%)
0.52 – 0.54
= 17,2% · LPP
= 10.05 m
= selebar kapal
= 13.43 m
= 2.5 m
= ℓPO · bPO · tPO
= 337.46 m3
tructure (VA) = VFC + VPO
= 440.47 m3
Volume Deck House (VDH)
= 16,1 % · L
= 9.4 m
= B-4
= 9.43 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 221.78 m3
er 3 (VDH3)
= 11,5 % · L
= 6.72 m
= B-4
= 9.43 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 158.41 m3
er 4 (VDH4)
= 8,5 % · L
= 5 m
= B-4
= 9.43 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4
= 117.09 m3
ungan (VAN)
= 7%·L
= 4.1 m
= B- 8
= 5.43 m
= 2.5 m
= ℓAN · bAN · tAN
55.51 m3
= 0.0752 t/m3
= Berat Kapal
= 2795.01 ton
= log〖∆ /100 〗
= 1.45
CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11
= -0,15 + LCB(%)
= 0.838 %L
= LCG(%) · LPP
= 0.490 m
= 0.5 · LPP - LCGM
= 28.74 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN
• POOP
Lpoop = 10.05
Bpoop = 13.43
Apoop = 134.99
Wpoop = 27.00
• DECKHOUSE
Layer II
LDH II = 9.41
BDH II = 9.43
ADH II = 88.71
WDH II = 17.74
Layer IV
LDH IV = 4.97
BDH IV = 9.43
ADH IV = 46.83
WDH IV = 9.37
Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C
= 76.09
= 8.03
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 36.826
Lcb = 2.923
LCGM dr FP = 52.867
LCGM = -23.641
Lkm = 10.000
Layer II
LDH II = 9.411
WDH II = 9.427
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide
= -21.009
Layer III
Layer IV
LDH IV = 4.968
WDH IV = 9.427
LCGIII = -18.787
Wheelhouse
LWH = 4.092
WWH = 5.427
LCGIV = -18.349
Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =
Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA
m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m
ton
Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24
m
WFWtotal =
m WFW =
ton =
m
ton
m
m
UMABLE & CREW
VS = 2.57 m/s
58.45 m = 5.00 nm/jam
S
13.43 m = Err:509 nm
6.38 m
4.52 m
2.89 ton
gn chapter 11, hal. 11-25
Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
Err:509 ton/kW h
18.792 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
0.49 ton
0.511 ton
Err:509 ton
1. LWT
Steel Weight
WST = 674.73 ton
Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton
GROSS TONAGE
Input Data
H = 6.38 m
T = 4.52 m
VPO = 337.46 m3
VFC = 103.01 m3
VDH = 552.78 m3
∆ = 2795.007 ton
Zc = 17 orang
N1 = 0 orang
N2 = 0 orang
Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)
= 4603.98 m3
VH = VPO + VFC + VDH
= 993.25 m3
V = VU + V H
= 5597.23 m3
K1 = 0.2+0.02∙log_10V
= 0.27
GT = V ∙ K1
= 1539.01 m3
Dumai - Jakarta
OF Chemical Tanker SPOB
Total Biaya Err:509 Err:509
Total Err:509
Biaya Satuan Rp -
DV
LPP 95.17 90.76
B 12.21 13.73
H 6.03 6.34
T 4.94 5.25
Frekuensi 46 123
T min 1
T max 5.9
Chemical Tanker SPOB
Frekuensi sisa Err:509 Err:509
Roundtrip per tahun Err:509 Err:509
Payload 0.00 0.00
Total Angkut - ton
Permintaan Err:509 ton
Freeboard 1.1 1.09
Batasan Freeboard >= 1
Keterangan Chemical Tanker SPOB
L/B 7.8 6.6
B/T 2.5 2.6
L/T 19.3 17.3
B/H 2.0 2.2
ITB
Err:509
Err:509
0.00
1.85
Chemical Tanker SPOB
ITB Min Maks Min
4.4 3.5 10 2.7
3.0 1.8 5 4.7
12.9 10 30 16.5
2.1 1.47 2.38 3.2
Err:509
Biaya Penalti Frekuensi Sisa
Err:509 ton Total Penalti =
Rp 10,123,170 per ton
Err:509
SPOB ITB
Maks Min Maks
175.1 16 120.5
33.4 5.0 21.2
5.6 1.8 4.5
5.9 1 5.9
1000 0 1000
SPOB ITB
Maks Min Maks
5.2 3.1 5.7
7.8 3.2 6.1
29.7 16.0 20.4
6.0 2.8 4.7
a Penalti Frekuensi Sisa
Err:509
Duami - Surabaya : Chemical Tanker
No Pelabuhan Asal/Tujuan
1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan
DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 108.47
B = 12.18
H = 5.73
T = 4.72
GT = 2602
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 108.47
B = 12.18
H = 5.73
T = 4.72
VS = 11
= 5.6584
Freeboard = 1.01
Fn = Vs / √( g. L )
= 0.170
Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 108.47
LWL = 112.81
B = 12.18
H = 5.73
T = 4.72
Vs = 5.66
(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)
=
537,187,962.7
Cfo =〖 (log〖𝑅𝑛 − 2) 〗〗 ^2
0.075/
= 0.00166
• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =
= 0.232
〖𝐿𝑤𝑙〗 ^3/𝛻 268.31
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =
= 1.208
= 2079.699 m2
• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆
= 68.260 kN
• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)
= 17.935
Lkeel = 0.6.Cb.Lwl Hkeel =
= 55.779 =
Sapp = Srudder + Sbilge Keel
= 82.290
• Stot = S + Sapp
= 2161.989
Harga (1 + k2) ---> PNA Vol II hlm. 92
Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome
+ k2 〖
(1(∑▒ 𝑆 _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )
= 1.400
• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=
= 1.215
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =
= 71.390 kN
• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =
= 38.4932
B/L = 0.108
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.108
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1
= 0.773
• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3
= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.148〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =
= -1.602
• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= -0.00001
• Harga λ
L/B = 9.259
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.919
• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ〖〖𝐹𝑛〗 ^(−2)) 〗
= 0.00028944
• CA (Correlation Allowance)
Tf/Lwl = 0.0419
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000495
• w (Gaya Berat)
w= ∆.g
= 53807.210 kN
• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =
= 15.5738540145463 kN
Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 104.52 kN
= 104520.74 N
ROUNDTRIP
ton > Seatime
ton Dumai - Surabaya = Err:509
m Medan - Surabaya = Err:509
m = Err:509
m = Err:509
m > Porttime =
Dumai = 6
m = 0.25
Surabaya = 4
103,067,600 0.17
1 =
Waktu Roundtrip = Err:509
m Waktu Roundtrip yang ditentukan Err:509
m Roundtrip per tahun = Err:509
m Jumlah Kapal = Err:509
m Mauatan/Kapal/Tahun = -
knot Frekuensi Sebenarnya = 72
m/S
URAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITOLAK
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81 m/s²
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025 ton/m3
5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)
m dari M
m dari AP
Lwl . B . T .Cb
5351.16 m3
Lwl . B .T . Cb .ρ
5484.93 ton
10% Amidship
3696 𝐶_𝑊𝑃 )
_𝑖 〗 )/(∑▒𝑆_𝑖 )
〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3
〗 ^(−1.3757)
〗 ^(−1.3757)
jam Err:509
hari Harga
kali
kapal
Ton
kali
BIAYA OPERASIONAL
Gaji Crew
Vol. I hal. 19 Jumlah Crew
Vol. I hal. 19 Gaji Per Crew/Bulan
Vol. I hal. 19 Repair & Maintenance
Supplies Crew
Total
m
PERHITUNGAN PROPULSI & DAYA MESIN :
INPUT DATA :
Lwl =
B =
H =
T =
Fn =
Vol. Disp. =
Disp. =
AE/A0 =
Perhitungan Awal :
1+k =
CF =
CA =
CV =
=
Principle of Naval Architecture Vol. II hal. 162
w =
=
Principle of Naval Architecture Vol. II hal. 163
t =
Principle of Naval Architecture Vol. II hal. 163
Va =
=
Principle of Naval Architecture Vol. II hal. 161
Chapter 11 Parametric Design - M.G. Parson ; page 11-27
ηO =
=
=
ηr =
=
ηD =
=
=
No Merek
1 CUMMINS
2 CATERPILLAR
3 CUMMINS KTTA
4 YUCHAI
5 YUCHAI
6 YUCHAI
7 YUCHAI
8 YUCHAI
9 YUCHAI
10 YUCHAI
11 MAN B&W
12 MAN B&W
13 CATERPILLAR
14 CATERPILLAR
15 CATERPILLAR
16 CATERPILLAR
17 MAN B&W
18 MAN B&W
19 CATERPILLAR
20 CATERPILLAR
21 MAN B&W
22 MAN B&W
23 MAN B&W
24 CATERPILLAR
25 CATERPILLAR
26 CATERPILLAR
27 MAN B&W
28 CATERPILLAR
29 CATERPILLAR
30 MAN B&W
31 MAN B&W
32 CATERPILLAR
33 MAN B&W
34 MAN B&W
35 MAN B&W
36 CATERPILLAR
37 MAN B&W
38 MAN B&W
39 CATERPILLAR
40 CATERPILLAR
41 CATERPILLAR
42 MAN B&W
43 CATERPILLAR
44 CATERPILLAR
45 MAN B&W
46 CATERPILLAR
47 MAN B&W
48 MAN B&W
49 MAN B&W
50 MAN B&W
51 MAN B&W
52 MAN B&W
53 MAN B&W
54 MAN B&W
55 MAN B&W
56 MAN B&W
57 MAN B&W
58 MAN B&W
AUXILARY ENGINE
No Merek
1 CATERPILLAR
2 CATERPILLAR
3 CATERPILLAR
4 CATERPILLAR
5 CATERPILLAR
6 CATERPILLAR
7 CATERPILLAR
8 CATERPILLAR
9 CATERPILLAR
10 CATERPILLAR
11 CATERPILLAR
12 CATERPILLAR
13 CATERPILLAR
14 CATERPILLAR
15 CATERPILLAR
16 CATERPILLAR
17 CATERPILLAR
18 CATERPILLAR
19 CATERPILLAR
20 CATERPILLAR
21 CATERPILLAR
22 CATERPILLAR
23 CATERPILLAR
24 CATERPILLAR
25 CATERPILLAR
26 CATERPILLAR
27 CATERPILLAR
28 CATERPILLAR
29 CATERPILLAR
30 CATERPILLAR
Perhitungan Harga Kapal
= 1033.061 Ton
= 216.246 Ton
= Err:509 Ton
= $ 1,100.00 /ton
= $ 1,136,367.65
= WE&O ∙ CE&O
= $ 237,870.47
= WME ∙ CME
= Err:509
= 10%
= CNW ∙ (PST + PE&O + PME)
= Err:509
= PST + PE&O + PME + PNW
= Err:509
= 5% ∙ Biaya
= Err:509
= 2% ∙ Biaya
= Err:509
= -9% ∙ Biaya
= Err:509
= Err:509 /tahun
= 18 Orang
= Rp 10,000,000.00
= 3% dari harga kapal
= Err:509 /tahun
= 1,5% dari harga kapal
= Err:509 /tahun
= Rp 50,000.00 /orang/hari
= Err:509 /tahun
= Rp 5,000,000.00 /trip
= Err:509
= Err:509 /tahun
112.81 m P/D =
12.18 m D =
5.73 m z =
4.72 m nrpm =
0.17008967518044 nrps =
5351.16 m3 Cb =
5484.93 ton Vs =
0.4 RT =
1.22
0.0017
0.00049
(1+ k) CF + CA
0.0025
0.3 Cb + 10 Cv Cb - 0.1
0.17
V (1 - w) ; Speed of Advantages
4.71
RT.Vs
680.13 kW
Parson ; page 11-27
PE∙(1−w)/(1−t)
628.84 kW
Parson ; page 11-29
Hull Efficiency
(1 - t)/(1 - w) ; = PE / PT
1.08
Parson ; page 11-29
Quasi-Propulsive Coefficient
ɳoɳr (parametric design hal 11-27)
0.591
1174.30 Kw
Parson ; page 11-29
1198.27 Kw
Parson ; page 11-29
15% ∙ PB0
115% ∙ PB0 = BHP
1378.01 Kw
BHP ∙ 1.3596 HP
1873.54 HP
Parson ; page 11-30
Tipe Daya (kW) SFOC (g/kW/hr) SLOC (g/kW/hr)
Total =
BIAYA PELABUHAN :
total
total
>> Muat = Rp -
>> Bongkar = Rp -
Total = Rp - /tahun
1.00
2.95
4.00
110
1.83
0.82
5.66 m/s
120.20 KN
er B-series = 0.5 - 0.6 )
sistance and Propultion
mesin di after
SFOC yang Fuel Oil Fuel Oil
Mesin yang memungkinkan
memungkinkan Consumption (ton) Consumption (liter)
Per GT/Kunjungan
per GT/Etmal
per GT/Kapal/Gerakan
per GT/Kapal/Gerakan
GT
per Kapal yang Ditunda/Jam
per GT/Kapal yang Ditunda/Jam
Per GT/Kunjungan
per GT/Etmal
per GT/Kapal/Gerakan
per GT/Kapal/Gerakan
GT
per Kapal yang Ditunda/Jam
per GT/Kapal yang Ditunda/Jam
Biaya ME
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Biaya AE
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
/roundtrip
/tahun
/roundtrip
/tahun
/tahun
total
11,241,550.72
9,255,543.43
8,434,800.00
19,785,129.27
Rp 10,368,000
449,662.03
Rp 59,534,685.44
total
17,799,121.97
17,799,121.97
10,800,000.00
11,241,550.72
Err:509
Err:509
Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :
MCR Mesin ME :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC
Berat Mesin
MCR Mesin AE :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Berat Mensin
Berat Mesin
(ton)
1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509
Berat Mesin
(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
Chemical Tanker
Unit Cost Rp -
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 1378.01 Kw
= 1873.54 HP
Err:509
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
= 344.50 Kw
= 468.39 HP
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =
/ton
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
2067.01
516.75
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509
Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN
Input Data :
D= 2.952
n= 110
Z= 4
AE/AO = 0.40
PD = 1151
PB = Err:509
PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=
Gearbox
Wgear =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Shafting
𝑑s =
l =
=
=
=
M
=
l
=
M =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Propeller
K =
=
=
Wprop =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176
Electrical Units
Wagg =
P = PB
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176
Other Weight
Wot =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177
Weight Total =
=
hdb =
=
=
BKI Vol II. Bab 24 -3.3
KG =
=
LCB =
=
=
LCGM =
=
LCGFP =
=
BERAT BAJA
Input Data :
m L
H
buah B
T
PERHITUNGAN :
Berat Propeler
D3 · K 4. Volume Anjungan (VAN)
DA
0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U
2.5 m
4.3 m
LCG(%)
0.52 – 0.54
= 17,2% · LPP
= 18.66 m
= selebar kapal
= 12.18 m
= 2.5 m
= ℓPO · bPO · tPO
= 568.35 m3
tructure (VA) = VFC + VPO
= 741.83 m3
Volume Deck House (VDH)
= 16,1 % · L
= 17.5 m
= B-4
= 8.18 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 357.36 m3
er 3 (VDH3)
= 11,5 % · L
= 12.47 m
= B-4
= 8.18 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 255.26 m3
er 4 (VDH4)
= 8,5 % · L
= 9 m
= B-4
= 8.18 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4
= 188.67 m3
ungan (VAN)
= 7%·L
= 7.6 m
= B- 8
= 4.18 m
= 2.5 m
= ℓAN · bAN · tAN
79.44 m3
= 0.0752 t/m3
= Berat Kapal
= 5484.93 ton
= log〖∆ /100 〗
= 1.74
CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11
= -0,15 + LCB(%)
= 2.400 %L
= LCG(%) · LPP
= 2.604 m
= 0.5 · LPP - LCGM
= 51.63 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN
• POOP
Lpoop = 18.66
Bpoop = 12.18
Apoop = 227.34
Wpoop = 45.47
• DECKHOUSE
Layer II
LDH II = 17.46
BDH II = 8.18
ADH II = 142.94
WDH II = 28.59
Layer IV
LDH IV = 9.22
BDH IV = 8.18
ADH IV = 75.47
WDH IV = 15.09
Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C
= 100.32
= 7.31
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 54.061
Lcb = 5.424
LCGM dr FP = 102.390
LCGM = -48.153
Lkm = 10.000
Layer II
LDH II = 17.464
WDH II = 8.185
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide
= -47.546
Layer III
Layer IV
LDH IV = 9.220
WDH IV = 8.185
LCGIII = -43.424
Wheelhouse
LWH = 7.593
WWH = 4.185
LCGIV = -42.610
Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =
Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA
m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m
ton
Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24
m
WFWtotal =
m WFW =
ton =
m
ton
m
m
UMABLE & CREW
VS = 5.66 m/s
108.47 m = 11.00 nm/jam
S
12.18 m = Err:509 nm
5.73 m
4.72 m
3.06 ton
gn chapter 11, hal. 11-25
Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
Err:509 ton/kW h
344.502 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
0.52 ton
0.541 ton
Err:509 ton
1. LWT
Steel Weight
WST = 1033.06 ton
Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton
GROSS TONAGE
Input Data
H = 5.73 m
T = 4.72 m
VPO = 568.35 m3
VFC = 173.48 m3
VDH = 880.72 m3
∆ = 5484.935 ton
Zc = 18 orang
N1 = 0 orang
N2 = 0 orang
Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)
= 7691.59 m3
VH = VPO + VFC + VDH
= 1622.55 m3
V = VU + V H
= 9314.14 m3
K1 = 0.2+0.02∙log_10V
= 0.28
GT = V ∙ K1
= 2602.21 m3
Duami - Surabaya : SPOB
No Pelabuhan Asal/Tujuan
1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan
DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 82.420
B = 13.350
H = 5.796
T = 4.775
GT = 2214
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 82.42
B = 13.35
H = 5.80
T = 4.77
VS = 8
= 4.1152
Freeboard = 1.02
Fn = Vs / √( g. L )
= 0.142
Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 82.42
LWL = 85.72
B = 13.35
H = 5.80
T = 4.77
Vs = 4.12
(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)
=
296,842,650.4
Cfo =〖 (log〖𝑅𝑛 − 2) 〗〗 ^2
0.075/
= 0.00179
• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =
= 0.210
〖𝐿𝑤𝑙〗 ^3/𝛻 137.72
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =
= 1.319
= 1688.332 m2
• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆
= 34.595 kN
• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)
= 13.773
Lkeel = 0.6.Cb.Lwl Hkeel =
= 43.048 =
Sapp = Srudder + Sbilge Keel
= 62.429
• Stot = S + Sapp
= 1750.761
Harga (1 + k2) ---> PNA Vol II hlm. 92
Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome
+ k2 〖
(1(∑▒ 𝑆 _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )
= 1.400
• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=
= 1.322
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =
= 35.953 kN
• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =
= 45.7157
B/L = 0.156
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.156
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1
= 3.488
• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3
= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.142〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =
= -1.976
• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= 0.00000
• Harga λ
L/B = 6.421
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 1.021
• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ〖〖𝐹𝑛〗 ^(−2)) 〗
= 0.00003698
• CA (Correlation Allowance)
Tf/Lwl = 0.0557
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000551
• w (Gaya Berat)
w= ∆.g
= 45983.925 kN
• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =
= 1.70044371859208 kN
Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 46.03 kN
= 46025.82 N
Jarak (Nm)
hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost
ROUNDTRIP
ton > Seatime
ton Dumai - Surabaya =
m Surabaya - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Surabaya =
Err:509
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi Sebenarnya =
m/S
KURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025
5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)
m dari M
m dari AP
Lwl . B . T .Cb
4573.13 m3
Lwl . B .T . Cb .ρ
4687.45 ton
10% Amidship
3696 𝐶_𝑊𝑃 )
_𝑖 〗 )/(∑▒𝑆_𝑖 )
〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3
〗 ^(−1.3757)
〗 ^(−1.3757)
6 jam
0.25 hari
4 jam
0.17 hari
Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
60 kali
m/s²
≤ Fn ≤ 0,3
ton/m3
0.84
1.00
0.84
0.90
0.141913558598437
0
2.30 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0
Perhitungan Awal :
1+k
CF
CA
CV
Principle of Naval Architecture Vol.
t
Principle of Naval Architecture Vol.
Va
ηO
ηr
ηD
PS
PB0
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
AUXILARY ENGINE
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL :
Perhitungan Harga Kapal
Input Data
WST = 871.463 Ton
WE&O = 189.078 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja
= $ 958,608.89
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 207,985.29
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509
BIAYA OPERASIONAL :
= 85.72 m P/D
= 13.35 m D
= 5.80 m z
= 4.77 m nrpm
= 0.14191355859844 nrps
= 4573.13 m3 Cb
= 4687.45 ton Vs
= 0.4 RT
= 1.32
= 0.0018
= 0.00055
= (1+ k) CF + CA
= 0.0029
ciple of Naval Architecture Vol. II hal. 162
= 0.3 Cb + 10 Cv Cb - 0.1
= 0.18
ciple of Naval Architecture Vol. II hal. 163
= V (1 - w) ; Speed of Advantages
= 3.39
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27
Power (EHP) :
= RT.Vs
= 217.82 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27
wer (THP) :
= PE∙(1−w)/(1−t)
= 199.54 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29
ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.09
pter 11 Parametric Design - M.G. Parson ; page 11-29
= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591
Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 368.56 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 376.08 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
LARY ENGINE
Total
BIAYA PELABUHAN :
Pelabuhan Dumai
1 Jasa Labuh
2 Jasa Tambat
Dermaga Beton
3 Jasa Pandu
Tarif Tetap
Tarif Variable
4 Jasa Tunda Kapal
Tarif Tetap
Tarif Variabel
total
Pelabuhan Surabaya
1 Jasa Labuh
2 Jasa Tambat
Dermaga Beton
3 Jasa Pandu
Tarif Tetap
Tarif Variable
4 Jasa Tunda Kapal
Tarif Tetap
Tarif Variabel
total
>> Muat =
>> Bongkar =
Total =
= 1.00
= 2.98
= 4.00
= 110
= 1.83
= 0.84
= 4.12 m/s
= 52.93 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2
1 1 103
1 1 235
1 1 184
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
1 1 188
1.0 1 189
0.6 1 191
0.6 1 190
0.6 1 192
0.7 1 189
1.0 1 191
0.8 1 190
0.7 1 192
0.7 1 189
1.0 1 191
1.0 1 190
0.8 1 192
0.7 1 188
0.7 1 185
0.7 1 185
1.0 1 187
0.8 1 185
0.8 1 185
1.0 1 189
0.8 1 195
0.8 1 195
0.8 1 195
1.0 1 195
1.0 1 194
0.8 1 194
1.0 1 194
1.0 1 194
0.8 1 194
0.8 1 196
0.9 1 196
1.0 1 196
0.9 1 194
0.9 1 194
1.0 1 194
0.9 1 194
0.9 1 189
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
1.0 1 194
1.0 1 194
1.0 1 194
1.0 1 194
1.1 1 189
1.1 1 192
1.1 1 194
SFOC yang
SLOC (g/kW/hr) Mesin yang memungkinkan
memungkinkan
1.1 1 212.1
1.1 1 228.8
1.0 1 209
1.0 1 206.6
1.1 1 229.5
1.1 1 211.7
1.1 1 210
1.1 1 217
1.0 1 209
1.1 1 218.8
1.1 1 218.8
1.0 1 208
1.1 1 215
1.0 1 209
1.0 1 203.8
1.1 1 210.8
1.0 1 203
1.1 1 210.4
1.0 1 207
1.0 1 207.2
1.0 1 209
1.0 1 206.6
1.1 1 218.8
1.1 1 218.8
1.1 1 210
1.0 1 209
1.0 1 208
1.0 1 209
1.1 1 217
1.1 1 215
RJALANAN :
SPOB
= Err:509
= Err:509
= Err:509
Err:509
Total = Err:509
LABUHAN :
tarif
= Rp 60 Per GT/Kunjungan
= Rp 49 per GT/Etmal
total
tarif
= Rp 95 Per GT/Kunjungan
= Rp 95 per GT/Etmal
total
Rp 30,000 /ton
Rp -
Rp -
Rp - /tahun
Fuel Oil
Fuel Oil Consumption (ton) Biaya ME
Consumption (liter)
Fuel Oil
Fuel Oil Consumption (ton) Biaya AE
Consumption (liter)
total
7,971,237.71
6,562,985.71
7,029,000.00
14,029,378.36
Rp 8,640,000
318,849.51
Rp 44,551,451.29
total
12,621,126.37
12,621,126.37
9,000,000.00
7,971,237.71
Err:509
Err:509
Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :
MCR Mesin ME :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC
Berat Mesin
MCR Mesin AE :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Berat Mensin
Berat Mesin
(ton)
1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509
Berat Mesin
(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
SPOB
Unit Cost Rp -
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 441.31 Kw
= 600.01 HP
Err:509
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
= 110.33 Kw
= 150.00 HP
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =
/ton
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
661.97
165.49
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509
Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN
Input Data :
D= 2.984
n= 110
Z= 4
AE/AO = 0.40
PD = 369
PB = Err:509
PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=
Gearbox
Wgear =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Shafting
𝑑s =
l =
=
=
=
M
=
l
=
M =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Propeller
K =
=
=
Wprop =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176
Electrical Units
Wagg =
P = PB
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176
Other Weight
Wot =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177
Weight Total =
=
hdb =
=
=
BKI Vol II. Bab 24 -3.3
KG =
=
LCB =
=
=
LCGM =
=
LCGFP =
=
BERAT BAJA
Input Data :
m L
H
buah B
T
PERHITUNGAN :
Berat Propeler
D3 · K 4. Volume Anjungan (VAN)
DA
0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U
2.6 m
3.3 m
LCG(%)
0.52 – 0.54
= 17,2% · LPP
= 14.18 m
= selebar kapal
= 13.35 m
= 2.5 m
= ℓPO · bPO · tPO
= 473.13 m3
tructure (VA) = VFC + VPO
= 617.55 m3
Volume Deck House (VDH)
= 16,1 % · L
= 13.3 m
= B-4
= 9.35 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 310.18 m3
er 3 (VDH3)
= 11,5 % · L
= 9.48 m
= B-4
= 9.35 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 221.55 m3
er 4 (VDH4)
= 8,5 % · L
= 7 m
= B-4
= 9.35 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4
= 163.76 m3
ungan (VAN)
= 7%·L
= 5.8 m
= B- 8
= 5.35 m
= 2.5 m
= ℓAN · bAN · tAN
77.17 m3
= 0.0752 t/m3
= Berat Kapal
= 4687.45 ton
= log〖∆ /100 〗
= 1.67
CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11
= -0,15 + LCB(%)
= 2.635 %L
= LCG(%) · LPP
= 2.171 m
= 0.5 · LPP - LCGM
= 39.04 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN
• POOP
Lpoop = 14.18
Bpoop = 13.35
Apoop = 189.25
Wpoop = 37.85
• DECKHOUSE
Layer II
LDH II = 13.27
BDH II = 9.35
ADH II = 124.07
WDH II = 24.81
Layer IV
LDH IV = 7.01
BDH IV = 9.35
ADH IV = 65.50
WDH IV = 13.10
Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C
= 89.41
= 7.41
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 47.269
Lcb = 4.121
LCGM dr FP = 76.596
LCGM = -35.386
Lkm = 10.000
Layer II
LDH II = 13.270
WDH II = 9.350
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide
= -33.724
Layer III
Layer IV
LDH IV = 7.006
WDH IV = 9.350
LCGIII = -30.592
Wheelhouse
LWH = 5.769
WWH = 5.350
LCGIV = -29.974
Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =
Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA
m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m
ton
Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24
m
WFWtotal =
m WFW =
ton =
m
ton
m
m
UMABLE & CREW
VS = 4.12 m/s
82.42 m = 8.00 nm/jam
S
13.35 m = Err:509 nm
5.80 m
4.77 m
3.06 ton
gn chapter 11, hal. 11-25
Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
Err:509 ton/kW h
110.329 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
0.52 ton
0.541 ton
Err:509 ton
1. LWT
Steel Weight
WST = 871.46 ton
Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton
GROSS TONAGE
Input Data
H = 5.80 m
T = 4.77 m
VPO = 473.13 m3
VFC = 144.41 m3
VDH = 772.65 m3
∆ = 4687.454 ton
Zc = 18 orang
N1 = 0 orang
N2 = 0 orang
Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)
= 6574.01 m3
VH = VPO + VFC + VDH
= 1390.20 m3
V = VU + V H
= 7964.21 m3
K1 = 0.2+0.02∙log_10V
= 0.28
GT = V ∙ K1
= 2214.23 m3
Duami - Surabaya : ITB
No Pelabuhan Asal/Tujuan
1 Dumai Asal
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan
DIMENSI AWAL :
Payload (0) = 0.00
DWT = 0.00
LPP = 86.181
B = 15.470
H = 7.442
T = 4.447
GT = 2607
Tmax = 6.4
Frekuensi permintaan = 0.00 0.00
Total yangdiangkut kapal = - >=
Total Kapal Batas minimum = Err:509 >=
KOREKSI UKURAN UTAMA KAPAL :
LPP = 86.18
B = 15.47
H = 7.44
T = 4.45
VS = 5
= 2.572
Freeboard = 3.00
Fn = Vs / √( g. L )
= 0.087
Volume Displasemen =
=
Displasemen =
=
PERHITUNGAN HAMBATAN :
UKURAN UTAMA :
LPP = 86.18
LWL = 89.63
B = 15.47
H = 7.44
T = 4.45
Vs = 2.57
(𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
Rn =
(Reynold Number)
=
193,993,161.1
Cfo =〖 (log〖𝑅𝑛 − 2) 〗〗 ^2
0.075/
= 0.00190
• Harga (1+k1)
c = 1 + 0.011 Cstren
= 1.000
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝 −1))`
/𝐿 =
= 0.348
〖𝐿𝑤𝑙〗 ^3/𝛻 192.53
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
( 〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
1 + k1 =
= 1.190
= 1530.834 m2
• Viscous Resistance
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
RV = (1+𝑘_1 )𝑆
= 11.715 kN
• S total
C1 = 1.000
C2 = 1.000
(tidak menggunakan bulb)
C3 = 1.000
C4 = 1.000
〖 2 S𝐶rudder = 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
〗 _(1.)
= 13.415
Lkeel = 0.6.Cb.Lwl Hkeel =
= 32.612 =
Sapp = Srudder + Sbilge Keel
= 71.188
• Stot = S + Sapp
= 1602.021
Harga (1 + k2) ---> PNA Vol II hlm. 92
Type of appendages
Rudder of single-screw ship
Spade-type rudders of twin-screw ships
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
Shafts
Sonar Dome
+ k2 〖
(1(∑▒ 𝑆 _𝑖 〖
)effective = (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 )
= 1.400
• Harga (1 + k)
(1+𝑘_1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡
1+k=
= 1.199
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
(1+𝑘)
RV =
= 12.356 kN
• Harga C1 dan C4
saat even keel --> Ta=Tf=T
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 )
iE =
= 14.8801
B/L = 0.173
C4 = B/L ---> for 0.11 < B/L < 0.25
= 0.173
2223105 𝐶_4^3.7861 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
𝐶_4^3.7861
2223105 C = 〖 (𝑇/𝐵) 〗 ^1.0796 〖 (90−𝑖_𝐸) 〗 ^(−1.3757)
1
= 1.965
• Harga C5 dan m1
C5 = 8.0798 CP - 13.8673 CP2 + 6.9844 CP3
= 𝐿/𝑇−(1.7525 Tf−hB−0.4464∙rB
1.343〖 𝛻〗 ^(1/3))/𝐿−4.7932
0.01404 𝐵/𝐿−𝐶_5
m1 =
= -2.191
• Harga C6 dan m2
→𝑢𝑛𝑡𝑢𝑘 𝐿^3/𝛻
C6 = -1.69385
𝐶_(6 m =
) 0.4𝑒^(
2 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
= 0.00000
• Harga λ
L/B = 5.794
λ = 1.446 Cp - 0.03 L/B ---> untuk L/B < 12
= 0.723
• Harga Rw/W
d= -0.900
𝑅𝑤/𝑊
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2=cos(λ〖〖𝐹𝑛〗 ^(−2)) 〗
= 0.00000001
• CA (Correlation Allowance)
Tf/Lwl = 0.0496
CA = 0.006 (Lwl + 100)-0.16 - 0.00205
= 0.000542
• w (Gaya Berat)
w= ∆.g
= 37603.599 kN
• 𝑅𝑤/𝑊 𝑥 𝑊
Rw =
= 0.000189638290245 kN
Total of Resistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
• Rtotal =
= 15.30 kN
= 15301.51 N
Jarak (Nm)
hari Dumai
hari Medan
knot Jakarta
knot Surabaya
/liter
/liter L/B
ton/jam B/T
ton/jam L/T
B/H
thn Unit Cost
ROUNDTRIP
ton > Seatime
ton Dumai - Surabaya =
m Surabaya - Dumai =
m =
m =
m > Porttime =
Dumai =
m =
Surabaya =
Err:509
1 =
Waktu Roundtrip =
m Waktu Roundtrip yang ditentukan
m Roundtrip per tahun =
m Jumlah Kapal =
m Mauatan/Kapal/Tahun =
knot Frekuensi Sebenarnya =
m/S
KURAN UTAMA :
→ 3,5 > L/B > 10 Principle of Naval Architecture Vol. I hal. 19
→ 1,8 > B/T > 5 Principle of Naval Architecture Vol. I hal. 19
→ 10 > L/T > 30 Principle of Naval Architecture Vol. I hal. 19
→ H > L/16 BKI Vol. II Tahun 2006
→ 1,47>B/H>2,38 Principle of Naval Architecture Vol. I hal. 19
DITERIMA
DITERIMA
DITERIMA
DITERIMA
DITERIMA
PERHITUNGAN FROUDE NUMBER :
g = 9.81
syarat Fn = 0,15 ≤ Fn ≤ 0,3
ρ = 1.025
5 (CB – 0.60)
(Parametric Ship Design hal. 11-12)
m dari M
m dari AP
Lwl . B . T .Cb
3739.70 m3
Lwl . B .T . Cb .ρ
3833.19 ton
10% Amidship
3696 𝐶_𝑊𝑃 )
_𝑖 〗 )/(∑▒𝑆_𝑖 )
〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3
〗 ^(−1.3757)
〗 ^(−1.3757)
6 jam
0.25 hari
4 jam
0.17 hari
Err:509 jam
Err:509 hari
Err:509 kali
Err:509 kapal
- Ton
0 kali
m/s²
≤ Fn ≤ 0,3
ton/m3
0.61
0.98
0.62
0.75
0.086738889340489
0
-1.26 m
PERHITUNGAN PROPULSI & DAYA ME
INPUT DATA :
Lwl
B
H
T
Fn
Vol. Disp.
Disp.
AE/A0
Perhitungan Awal :
1+k
CF
CA
CV
Principle of Naval Architecture Vol.
t
Principle of Naval Architecture Vol.
Va
ηO
ηr
ηD
PS
PB0
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
AUXILARY ENGINE
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BIAYA KAPITAL:
Perhitungan Harga Kapal
Input Data
WST = 1310.050 Ton
WE&O = 246.309 Ton
WME = Err:509 Ton
Harga Baja = $ 1,100.00 /ton
Perhitungan Biaya
1. Structural Cost
PST = WST ∙ Harga Baja
= $ 1,441,055.13
2. Outfit Cost
PE&O = WE&O ∙ CE&O
= $ 270,939.68
3.Machinery Cost
PME = WME ∙ CME
= Err:509
4. Non-weight Cost
CNW = 10%
PNW = CNW ∙ (PST + PE&O + PME)
= Err:509
Biaya = PST + PE&O + PME + PNW
= Err:509
Perhitungan Harga
1. Keuntungan = 5% ∙ Biaya
= Err:509
2. Inflasi = 2% ∙ Biaya
= Err:509
3. Pajak = -9% ∙ Biaya
= Err:509
BIAYA OPERASIONAL
= 89.63 m P/D
= 15.47 m D
= 7.44 m z
= 4.45 m nrpm
= 0.08673888934049 nrps
= 3739.70 m3 Cb
= 3833.19 ton Vs
= 0.4 RT
= 1.20
= 0.0019
= 0.00054
= (1+ k) CF + CA
= 0.0028
ciple of Naval Architecture Vol. II hal. 162
= 0.3 Cb + 10 Cv Cb - 0.1
= 0.10
ciple of Naval Architecture Vol. II hal. 163
= V (1 - w) ; Speed of Advantages
= 2.32
ciple of Naval Architecture Vol. II hal. 161
pter 11 Parametric Design - M.G. Parson ; page 11-27
Power (EHP) :
= RT.Vs
= 45.26 kW
pter 11 Parametric Design - M.G. Parson ; page 11-27
wer (THP) :
= PE∙(1−w)/(1−t)
= 45.31 kW
pter 11 Parametric Design - M.G. Parson ; page 11-29
ficient Calculation :
= Hull Efficiency
= (1 - t)/(1 - w) ; = PE / PT
= 1.00
pter 11 Parametric Design - M.G. Parson ; page 11-29
= Quasi-Propulsive Coefficient
= ɳoɳr
= 0.591
Power (DHP) :
= Delivered Power at Propeller
= PE/ηD
= 76.58 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
wer (SHP) :
= Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98
= Shaft Power
= PD/ηS
= 78.14 Kw
pter 11 Parametric Design - M.G. Parson ; page 11-29
LARY ENGINE
Total
BIAYA PELABUHAN :
Pelabuhan Dumai
1 Jasa Labuh
2 Jasa Tambat
Dermaga Beton
3 Jasa Pandu
Tarif Tetap
Tarif Variable
4 Jasa Tunda Kapal
Tarif Tetap
Tarif Variabel
total
Pelabuhan Surabaya
1 Jasa Labuh
2 Jasa Tambat
Dermaga Beton
3 Jasa Pandu
Tarif Tetap
Tarif Variable
4 Jasa Tunda Kapal
Tarif Tetap
Tarif Variabel
total
>> Muat =
>> Bongkar =
Total =
= 1.00
= 2.78
= 4.00
= 110
= 1.83
= 0.61
= 2.57 m/s
= 17.60 KN
(propeller B-series = 0.5 - 0.6 )
; Ship Resistance and Propultion
Modul 7 hal. 2
1 1 103
1 1 235
1 1 184
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
1 1 188
1.0 1 189
0.6 1 191
0.6 1 190
0.6 1 192
0.7 1 189
1.0 1 191
0.8 1 190
0.7 1 192
0.7 1 189
1.0 1 191
1.0 1 190
0.8 1 192
0.7 1 188
0.7 1 185
0.7 1 185
1.0 1 187
0.8 1 185
0.8 1 185
1.0 1 189
0.8 1 195
0.8 1 195
0.8 1 195
1.0 1 195
1.0 1 194
0.8 1 194
1.0 1 194
1.0 1 194
0.8 1 194
0.8 1 196
0.9 1 196
1.0 1 196
0.9 1 194
0.9 1 194
1.0 1 194
0.9 1 194
0.9 1 189
0.8 1 195
0.8 1 195
0.8 1 195
0.8 1 195
1.0 1 194
1.0 1 194
1.0 1 194
1.0 1 194
1.1 1 189
1.1 1 192
1.1 1 194
SFOC yang
SLOC (g/kW/hr) Mesin yang memungkinkan
memungkinkan
1.1 1 212.1
1.1 1 228.8
1.0 1 209
1.0 1 206.6
1.1 1 229.5
1.1 1 211.7
1.1 1 210
1.1 1 217
1.0 1 209
1.1 1 218.8
1.1 1 218.8
1.0 1 208
1.1 1 215
1.0 1 209
1.0 1 203.8
1.1 1 210.8
1.0 1 203
1.1 1 210.4
1.0 1 207
1.0 1 207.2
1.0 1 209
1.0 1 206.6
1.1 1 218.8
1.1 1 218.8
1.1 1 210
1.0 1 209
1.0 1 208
1.0 1 209
1.1 1 217
1.1 1 215
RJALANAN :
ITB
= Err:509
= Err:509
= Err:509
Err:509
Total = Err:509
LABUHAN :
tarif
= Rp 60 Per GT/Kunjungan
= Rp 49 per GT/Etmal
total
tarif
= Rp 95 Per GT/Kunjungan
= Rp 95 per GT/Etmal
total
Rp 30,000 /ton
Rp -
Rp -
Rp - /tahun
Fuel Oil
Fuel Oil Consumption (ton) Biaya ME
Consumption (liter)
Fuel Oil
Fuel Oil Consumption (ton) Biaya AE
Consumption (liter)
total
-
-
-
Rp -
-
Rp -
total
-
-
-
Err:509
Err:509
Err:509
PENENTUAN MESIN UTAMA DAN MESIN BANTU :
MCR Mesin ME :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Daya Mesin Yang Digunakan :
Daya
Konsumsi Bahan Bakar :
SFOC
Berat Mesin
MCR Mesin AE :
BHP
Mesin :
No. Urut Mesin
Merk
Type
Berat Mensin
Berat Mesin
(ton)
1.4
2
1.83
4.8
4.8
4.7
4.8
4.8
4.4
5.38
15
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Err:509
Berat Mesin
(ton)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Err:509
TOTAL COST:
ITB
Unit Cost Rp -
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
JASA TUNDA
/tahun
No
/tahun 1
2
/tahun 3
/tahun 4
5
/tahun 6
/tahun 7
8
/tahun
= 91.70 Kw
= 124.67 HP
Err:509
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
= 22.92 Kw
= 31.17 HP
= Err:509
= Err:509
= Err:509 Kw
= Err:509 HP
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 g/kW/hr
= Err:509 ton/kw/hr
= Err:509 ton
No. Urut Mesin
Biaya Penalti Frekuensi Tidak Beroperasi
Regresi TCH 0.00634
Tarif Penalti =
Frekuensi sisa =
Total Penalti =
/ton
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Rp 144,000 /call/jam
2001 3500 Rp 144,000 /call/jam
3501 8000 Rp 360,000 /call/jam
8001 14000 Rp 570,000 /call/jam
14001 18000 Rp 750,000 /call/jam
18001 26000 Rp 1,200,000 /call/jam
26001 40000 Rp 1,200,000 /call/jam
40001 75000 Rp 1,200,000 /call/jam
Ukuran GT Tarif
Batas Bawah Batas Atas Tetap Keterangan
0 2000 Err:509 /call/jam
2001 3500 Err:509 /call/jam
3501 8000 Err:509 /call/jam
8001 14000 Err:509 /call/jam
14001 18000 Err:509 /call/jam
18001 26000 Err:509 /call/jam
26001 40000 Err:509 /call/jam
40001 75000 Err:509 /call/jam
137.55
34.39
alti Frekuensi Tidak Beroperasi
x + 5526.5
Rp 73,419,553
Err:509
Err:509
Variabel Keterangan
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
2.4 /GT/call/jam
Variabel Keterangan
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
Err:509 /GT/call/jam
BERAT MESIN
Input Data :
D= 2.780
n= 110
Z= 4
AE/AO = 0.40
PD = 77
PB = Err:509
PERHITUNGAN :
Main Engine
We =
=
Auxiliary Engine
Wae =
=
Gearbox
Wgear =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Shafting
𝑑s =
l =
=
=
=
M
=
l
=
M =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175
Propeller
K =
=
=
Wprop =
=
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 175-176
Electrical Units
Wagg =
P = PB
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 176
Other Weight
Wot =
=
Ship Design for Efficient and Economy Schneekluth Vol 2. hal 177
Weight Total =
=
hdb =
=
=
BKI Vol II. Bab 24 -3.3
KG =
=
LCB =
=
=
LCGM =
=
LCGFP =
=
BERAT BAJA
Input Data :
m L
H
buah B
T
PERHITUNGAN :
Berat Propeler
D3 · K 4. Volume Anjungan (VAN)
DA
0,04-0,07 P
Err:509 Ton
CSO
hneekluth Vol 2. hal 177
Disp.
We + Wae + Wgear + M + Wprop + Wagg + Wot
Err:509 Ton
U
3.3 m
3.4 m
LCG(%)
0.52 – 0.54
= 17,2% · LPP
= 14.82 m
= selebar kapal
= 15.47 m
= 2.5 m
= ℓPO · bPO · tPO
= 573.30 m3
tructure (VA) = VFC + VPO
= 748.29 m3
Volume Deck House (VDH)
= 16,1 % · L
= 13.9 m
= B-4
= 11.47 m
= 2.5 m
= ℓDH2 · bDH2 · tDH2
= 397.89 m3
er 3 (VDH3)
= 11,5 % · L
= 9.91 m
= B-4
= 11.47 m
= 2.5 m
= ℓDH3 · bDH3 · TDH3
= 284.20 m3
er 4 (VDH4)
= 8,5 % · L
= 7 m
= B-4
= 11.47 m
= 2.5 m
= ℓDH4 · bDH4 · tDH4
= 210.06 m3
ungan (VAN)
= 7%·L
= 6.0 m
= B- 8
= 7.47 m
= 2.5 m
= ℓAN · bAN · tAN
112.67 m3
= 0.0752 t/m3
= Berat Kapal
= 3833.19 ton
= log〖∆ /100 〗
= 1.58
CSO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
=
= 0.11
= -0,15 + LCB(%)
= -1.615 %L
= LCG(%) · LPP
= -1.392 m
= 0.5 · LPP - LCGM
= 44.48 m
erat Baja (WST)
n Deck House
PERALATAN & PERLENGKAPAN
• POOP
Lpoop = 14.82
Bpoop = 15.47
Apoop = 229.32
Wpoop = 45.86
• DECKHOUSE
Layer II
LDH II = 13.88
BDH II = 11.47
ADH II = 159.15
WDH II = 31.83
Layer IV
LDH IV = 7.33
BDH IV = 11.47
ADH IV = 84.03
WDH IV = 16.81
Grup IV (Miscellaneous)
C = (0.18 ton / m2 < C < 0.26 ton
= 0.26
W Group IV = (L*B*D)2/3 * C
= 120.06
= 9.20
1. LCG1 (25% WE&O at LCGM)
25% WE&O = 61.577
Lcb = 4.309
LCGM dr FP = 80.319
LCGM = -37.229
Lkm = 10.000
Layer II
LDH II = 13.875
WDH II = 11.470
LCGI = [0,5*L+(Lkm+Lcb)+0,5*Ide
= -35.719
Layer III
Layer IV
LDH IV = 7.325
WDH IV = 11.470
LCGIII = -32.444
Wheelhouse
LWH = 6.033
WWH = 7.470
LCGIV = -31.798
Input
eights are: L =
um sized cargo ships : 160 – 170 kg/m2 B
=
ps, large Bulk Carriers, etc : 180 – 200 kg/m2 H =
it is used : 200 kg/m
2 T =
Lubricating Oil
utfitting Total Weight SFR =
[ton] MCR =
Margin
=
WLO'
=
m =
1.02 -1.08DA
m Auxilary Engine
Fuel Oil
SFR =
m MCR =
Margin
m =
WFO
m =
m asumsi Lmesin = 4m
=
=
m
ton
Fresh Water
Jumlah har=
m WFW =
ton Parametric design chapter 11, hal. 11-24
m
WFWtotal =
m WFW =
ton =
m
ton
m
m
UMABLE & CREW
VS = 2.57 m/s
86.18 m = 5.00 nm/jam
S
15.47 m = Err:509 nm
7.44 m
4.45 m
3.23 ton
gn chapter 11, hal. 11-25
Err:509 ton/kW h
Err:509 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
Err:509 ton/kW h
22.925 kW
10% ; batas (5% ~ 10%)
SFR∙MCR∙S/V_S ∙(1+Margin)
Err:509 ton
Err:509 liter
Err:509 ton
0.55 ton
0.571 ton
Err:509 ton
1. LWT
Steel Weight
WST = 1310.05 ton
Machinery Weight
Machinery Weight Err:509 ton
LWT = Err:509 ton
GROSS TONAGE
Input Data
H = 7.44 m
T = 4.45 m
VPO = 573.30 m3
VFC = 174.99 m3
VDH = 1004.82 m3
∆ = 3833.191 ton
Zc = 19 orang
N1 = 0 orang
N2 = 0 orang
Gross Tonnage
VU = ∆∙((1.25∙H/T)−0.115)
= 7577.42 m3
VH = VPO + VFC + VDH
= 1753.11 m3
V = VU + V H
= 9330.53 m3
K1 = 0.2+0.02∙log_10V
= 0.28
GT = V ∙ K1
= 2606.93 m3
Dumai - Surabaya
OF Chemical Tanker SPOB
Total Biaya Err:509 Err:509
Total Err:509
Biaya Satuan Rp -
DV
LPP 108.47 82.42
B 12.18 13.35
H 5.73 5.80
T 4.72 4.77
Frekuensi 72 60
T min 1
T max 5.9
Chemical Tanker SPOB
Frekuensi sisa Err:509 Err:509
Roundtrip per tahun Err:509 Err:509
Payload 0.00 0.00
Total Angkut - ton
Permintaan Err:509 ton
Freeboard 1.01 1.02
Batasan Freeboard >= 1
Keterangan Chemical Tanker SPOB
L/B 8.9 6.2
B/T 2.6 2.8
L/T 23.0 17.3
B/H 2.1 2.3
ITB
Err:509
Err:509
0.00
3.00
Chemical Tanker SPOB
ITB Min Maks Min
5.6 3.5 10 2.7
3.5 1.8 5 4.7
19.4 10 30 16.5
2.1 1.47 2.38 3.2
Err:509
Biaya Penalti Frekuensi Sisa
Err:509 ton Total Penalti = Err:509
Rp 10,123,170 per ton
Err:509
SPOB ITB
Maks Min Maks
175.1 16 120.5
33.4 5.0 21.2
5.6 1.8 4.5
5.9 1 5.9
1000 0 1000
SPOB ITB
Maks Min Maks
5.2 3.1 5.7
7.8 3.2 6.1
29.7 16.0 20.4
6.0 2.8 4.7
KAPAL DAN RUTE YANG TERPILIH
DUMAI - MEDAN - JAKARTA - SURABA
Dumai - Medan Dumai - Jakarta
KOMPONEN Chemical Tanker Chemical Tanker
Jumlah kapal Err:509 Err:509
LPP 85.5 95.2
B 10.9 12.2
H 5.7 6.0
T 4.5 4.9
Frekuensi Sebenarnya 164 46
Payload (Ton) - -
DWT (Ton) - -
GT 1,743 2,335
Total Angkut (Ton) -
Pengiriman (Ton) 103,067,600 Err:509
Roundtrip per tahun Err:509 Err:509
Frekuensi Sisa (Kapal Menganggur) Err:509 Err:509
Total Biaya Setiap Jenis Kapal Err:509 Err:509
Total Biaya Err:509
Biaya Satuan Err:509
TE YANG TERPILIH
AKARTA - SURABAYA
Dumai - Jakarta Dumai - Surabaya
SPOB Chemical Tanker SPOB
Err:509 Err:509 Err:509
90.8 108.5 82.4
13.7 12.2 13.3
6.3 5.7 5.8
5.2 4.7 4.8
123 72 60
- - -
- - -
2,704 2,602 2,214
- -
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Model yang digunakan
Port To Port
Volume (ton/tahun)
NO Pelabuhan Asal/Tujuan
Muat
1 Dumai Asal 1,350,000
2 Medan Tujuan
3 Jakarta Tujuan
4 Surabaya Tujuan
Diameter pompa
0.10 m
Permintaan Medan
Permintaan Pengiriman 350,000 ton
Konsumsi / Hari 282377 ton
Frekuensi 164 kali
Kecepatan B/M 200 ton/jam
2 Alur
NO LOKASI
1. Kedalaman nominal
1. Kedalaman nominal
3. Panjang alur
> LEBAR
- 1 Dermaga berhadapan
B =
=
5 KEDALAMAN PERAIRAN
> PERAIRAN TENANG
H =
=
FASILITAS PERAIRAN
m
PERHITUNGAN STORAGE PELABUHAN
FASILITAS STORAGE
1 Storage Maksimum
kerja/tahun x jumlah alat Total Stock
Volume Total Stock
2 Analisis SOR
Total Muatan Timbun pertahun
Total Kapasitas Timbun Pertahun
SOR
3 Dimensi Bundwall
Volume Bundwall 120% Volume Tanki
Volume Bundwall masing-masing
700 m2 Tinggi Bundwall Minimal
35 m Luas Bundwall
20 m Panjang Sisi Bundwall
80 m
8m
9 m2
1.25 m
9.0 m
200 ton/jam
0.10 m
x BT / (L x t)) x 100%
FASILITAS STORAGE
= Err:509 ton
= Err:509 m3
= Err:509 unit
= 8073 m3
= 33.5 m
= 9.1 m
= Err:509 ton
= Err:509 ton
= Err:509
= 120%
9687.6 m3 sumber : AS1940
4m Singapore Standard
2421.9 m2
49.2 m
ANALISIS SENSITIFITAS LOAD FACTOR DAN BIAYA SATUAN
Keterangan Nilai
Load Factor 90%
Unit Cost Rp -
Rp -
70%
75%
80%
85%
90%
95%
100%
Analisis Sensitifitas
Column B
Rp12
Rp10
Rp8
Biaya Satuan
Rp6
Rp4
Rp2
Rp-
65% 70% 75% 80% 85% 90% 95% 100%
Load Factor
ANALISIS SENSITIFITAS LOAD FACTOR DAN BIAYA TOTAL
Keterangan Nilai
Total Biaya Err:509
Err:509
70%
75% #REF!
80% #REF!
85% #REF!
90% #REF!
95% #REF!
100% #REF!
Analisis Sensitifitas
Rp12
Rp10
Rp8
Total Biaya
Rp6
Rp4
Rp2
Rp-
70% 75% 80% 85% 90%
Load Factor
Column I
Hasil regresi
Hasil regresi 0.0465 x +
Harga sewa kapal $ 9,605.60 per hari
Harga sewa kapal Rp 127,610,396 per hari
TOTAL COST:
Chemical Tanker
$25,000.00
f(x) = 0.046512915129151 x + 9605.627
$20,000.00 R² = 0.890512007052085
$15,000.00
cost
$10,000.00
$5,000.00
$-
- 200,000 400,000
DWT
9605.6
110.38
13750
124.5697
Regresi TCH
= 0.046512915129151 x + 9605.62730627307
0.890512007052085
Column C
Linear (Column C)
200,000 400,000
WT