4.93150684931507
Spesifikasi
Port Of Bethioua Algeria satuan
Kedalaman = 18 m
Lebar Alur = 176 m
Panjang Dermaga = 8352 m
Produktivitas B/M = 1260 MT/jam
AT+WT+IT = 6 jam
Port of Tanjung Priok
Kedalaman = 14 m
Lebar Alur = 150 m
Produktivitas B/M = 900 MT/Jam
Panjang Dermaga = 12,167.8 m
AT+WT+IT = 8 jam
Port Of Balikpapan
Kedalaman = 11 m
Lebar Alur = 66 m
Produktivitas B/M = MT/jam
Panjang Dermaga = 999.5 m
AT+WT+IT = jam
Pelabuhan Panjang (Lampung)
Kedalaman = 7m
Lebar Alur = 100 m
Produktivitas B/M = MT/jam
Panjang Dermaga = 200 m
AT+WT+IT = jam
Pangkalan Susu
Kedalaman = 5.5 m
Lebar Alur = m
Produktivitas B/M = MT/jam
Panjang Dermaga = m
AT+WT+IT = jam
Jarak
Transhipment
Pelabuhan Asal Pelabuhan Tujuan Jarak
Balikpapan 886
Tanjung Priok Pangkalan Susu 516
Lampung 1064
Impor
Algeria (bethioua) Tanjung Priok 7756
Demand = 4,100,000
1 Kl = 0.353 ton
Nm
KL
L
kg/liter
kg
ton
KL/th
L
kg/liter
kg/liter
ton/th
importir term FOB masih harus cari kapal yang mau mengangkut muatan
Pelabuhan Kapasitas (Ton) Kapasitas L
4100000
Decision Variable
Ukuran Utama min value max
LPP 152 163.6 500
B 25.6 41.0732617855224 50
H 16.4 19.5724967998381 68
T 10 13.5547462438954 14
Payload 46,793
Frekuensi 8
Kapasitas Tanki 52,413
Cargo Carried 374,344
Demand 4,100,000
11 kapal
rate 14100
harga LPG CP Aramco $ 360.00 /MT
Rp 5,076,000 /MT
harga jual LPG 12kg Rp 150,000
1 ton 1000 kg
84 LPG 12 kg
harga jual LPG Rp 12,600,000 per-ton
Constraints
Rasio Ukuran min Value max
L/B 4.70 3.98337331609159 7.63
L/H 8.12 8.3591856815451 15.48
B/H 1.47 2.09851927454969 2.38
L/T 10.00 12.0703207612595 30.00
B/T 3.03 3.03017563342586 3.90
slanderness
Harga Kapal
Value Rp 530,194,924,303
Max Rp 634,500,000,000
11
Estimasi harga kapal
TIDAK MEMENUHI Berat baja 18,069 ton
MEMENUHI biaya material + jasa 3,122,733 rp/kg
MEMENUHI Biaya baja 56,425 Jt-Rp
MEMENUHI
MEMENUHI Asumsi
Biaya baja = 45% biaya pembangunan
Harga kapal Rp 530,194,924,303 Jt-Rp
umur ekonomis 20 tahun
discount rate 5%
min berat kapal Anuitas Rp42,544,212,441.47 Jt-Rp/th
DITERIMA
Asumsi biaya operasional Kapal
Radius pelayaran 15,206
Commission Days 355
Service Speed
Less sea margin 16
Average speed 0
FO ME 693.77 ton/RT
FO AE 76.05 ton/RT
FO Total 769.81 ton/RT
ton to liter 769,815
FO Total 769,815 liter/RT
Unit Biaya
Unit Cost per-kapal
Capital Cost / tahun Rp 42,544,212,441
Voyage Cost / tahun Rp 49,894,230,110
Operational Cost /tahun Rp 163,332,108,533
Cargo Handling Cost / tahun Rp 26,882,034,368
Total Cost / Tahun Rp 318,225,911,120
Total Ton Carried /Tahun 374,344
Unit Cost Rp850,089
Total Cost / Trip Rp35,331,573,181
Penentuan Penalti
Demand 4,100,000 ton
Cargo Carried 4,117,787 ton
sisa kapasitas 17,787 ton
Batas selisih
min value max
0% 0% 0%
Kapalnya boleh dari aljazair
No. Items Value Satuan Re
1 LWL 168.52 Meter No.
2 LPP 163.61 Meter 1
3 B 41.07 Meter 2
4 T 13.55 Meter 3
5 H 19.57 Meter 4
6 Vs 17 Knot 5
8.74555555555556 m/s 6
7 CB 0.72 7
8 LWT 19643.95 Ton
9 Daya Mesin 5970.000 Kw
10 Jumlah Kru 15 Orang Ukura
11 Fuel Consumption 264.41 Ton No.
12 Hold Capacity 80349.31 m3 1
13 Gross Tonnage 38115.19 2
14 Net Tonnage 20423.79 3
15 Trim 4.61 Meter 4
16 Roll Period 6.9 Detik 5
17 Harga Kapal Rp 530.19 Milyar- Rp/ Unit
18 Capital Cost Rp 42,544,212,441 /tahun
19 Operational Cost Rp 20,369,919,817 / roundtrip No.
20 Voyage Cost Rp 6,236,778,764 / roundtrip 1
21 Port Charge Rp - / Roundrip 2
22 Fuel Cost Rp 309,820.41 / Roundtrip 3
4
5
6
7
8
9
10
Batasan
Requirement Koreksi Ukuran Utama
Items Value Satuan No. Items
Jenis Kapal LPG Tanker 1 L/B
Jenis Muatan LPG 2 L/H
DWT 47322.24 Ton 3 B/H
Payload 46,793 Ton 4 B/T
Kecepatan Dinas 17 Knot Ship Design for Efficient and Economy Schneekluth Vol 2. hal 16
Radius Pelayaran 15206 Nm 5 L/B
Rute Aljazair 6 L/T
Jakarta Indonesia 7 B/T
Principles of Naval Architecture Vol 2. hal 19
Ukuran Utama Kapal 8 L/16
Items Value Satuan BKI Vol 2 section 1 tahun 2006
LPP 163.61 Meter
B 41.07 Meter Batasan Ruang Muat
H 19.57 Meter No. Items
T 13.55 Meter 1 Payload
Vs 17.00 Knot 2 Massa Jenis
5 Vol.Muatan Total
Koefisien 6 ∆ Vol. Ruang Muat
Items Value Satuan 7 ∆ Vol. Ruang Muat dan Vol. Muatan
Fn 0.22
Cb 0.72 Status
Cm 0.99
Cp 0.73
Selisih Displacement Dengan Berat
Cwp 0.80
LCB 0.31 % Lpp Berat
LCB 0.50 (Meter) dari M
LCB 82.31 (Meter) dari AP Displacement Berdasarkan rumus
Lwl 168.52 Meter Displacement
Vol. Disp 67181.05 m3
Displacemen 68860.58 Ton Perhitungan
Selisih Displacement
Selisih dalam persen
Kondisi
Trim
No. Items
1 Trim
2 Kondisi Trim
3 ∆ (LCG - LCB)
4 0.1 ∙ LPP
5 Batasan Trim
Batasan
Value min max Kriteria
3.98 4.70 7.63 TIDAK MEMENUHI
8.36 8.12 15.48 MEMENUHI
2.10 1.47 2.38 MEMENUHI
3.03 1.84 2.98 TIDAK MEMENUHI
my Schneekluth Vol 2. hal 160
3.98 5.10 7.10 TIDAK MEMENUHI
12.07 10.00 30.00 MEMENUHI
3.03 2.40 3.90 MEMENUHI
2. hal 19
10.23 19.57 MEMENUHI
Kriteria Dipenuhi
2. Koefisien Midship
CM = 0.977+0.085∙(C_B−0.6) b. LCB dari M
= 0.987 LCB
3. Koefisien Prismatik
CP = C_ c. LCB dari AP
B/ LCB
= C_
M 0.726
Utama Lainnya
6. Longitudinal Center of Bouyancy
a. LCB (%)
= 8.80 - 38.9 · Fn
= 0.308 % LCB
b. LCB dari M
= (LCB (%))/100∙L_PP
= 0.504 m dari M
c. LCB dari AP
= 0.5 · LPP + LCBM
= 82.309 m dari AP
7. Volume Displasement
= L x B x T x Cb
= 67181.054 m3
8. Displasement
= V⋅ρ
= 68,861 ton
PERHITUNGAN HAMBATAN
DIKETAHUI
LPP 163.61 m
Bo 41.07 m
Ho 19.57 m
To 13.55 m
Cb 0.72 PNA Vol. II hlm.91
Cm 0.99 Cstern
Cwp 0.80 -25
Cp 0.73 -10
LCB 0.31 m 0
Lwl 168.52 m 10
Fn 0.22
Vs 8.75 m/s
67181.05 m³
PERHITUNGAN HAMBATAN
〖𝐿𝑤𝑙〗 ^3/𝛻
•
Perhitungan Viscous Resistance
Cfo (Friction Coefficient - ITTC 1957)
v= 𝜇/𝑟 = 1.188 x 10-6 m2/s (for salt water)
(kinematic viscosity)
Rn = (𝐿𝑤𝑙 . 𝑉𝑠)/𝑣
(Reynold Number)
= 1,240,238,129
Cfo =〖 (log〖𝑅𝑛 − 2) 〗〗 ^2
0.075/
= 0.00149
Harga (1+k1)
c = 1 + 0.011 Cstren
= 1
𝐿_𝑅 1 − 𝐶_𝑝+ (0.06
/𝐿 = 𝐶_𝑝.𝐿𝐶𝐵)/((4𝐶_𝑝
𝑤𝑙 −1))`
= 0.281
〖𝐿𝑤𝑙〗 ^3/𝛻 71.24
=
0.93+0.4871𝑐(𝐵/𝐿𝑤𝑙)^1.0681 (𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216
1 + k(1 =〖𝐿𝑤𝑙〗 ^3/𝛻)^0.3649 〖 (1−𝐶_𝑝) 〗 ^(−0.6042)
= 1.338
= 305966.999 m2
Viscous Resistance
RV = 1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0
(1+𝑘_1 )𝑆
= 23914.333 kN
Perhitungan Resistance of Appendages
• S total
-6 2
0 m /s (for salt water) C1 = 1.000
C2 = 1.000
C3 =
1.000
C4 = 1.000
S
〖 2 𝐶rudder =
〗 _(1.) 𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100
= 77.619
Lkeel = 0.6.Cb.Lwl
= 72.401
Sapp = Srudder + Sbilge Keel
= 178.633
• Stot = S + Sapp
= 306145.632
Harga (1 + k2)
Type of appendages
Rudder of single-screw ship
𝑇/𝐿𝑤𝑙)^0.4611 (𝐿𝑤𝑙/𝐿_𝑅 )^0.1216 Spade-type rudders of twin-screw ships
𝐶_𝑝) 〗 ^(−0.6042)
Skeg-rudders of twin-screw shipd
Shaft Brackets
Bossings
Bilge Keel
Stabilizer Fins
menggunakan bulb Shafts
Sonar Dome
• Harga (1 + k)
1 + (1+𝑘_1)+[(1+𝑘_2
k= )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜
= 1.338
Resistance of Appendages
1/2 ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡
RV =(1+𝑘)
= 23929.399
of Appendages Perhitungan Wave Making Resis
• Harga C1 dan C4
faktor tipe kapal (umum) saat even keel --> Ta=T
125.67 𝐵/(𝐿 )−162.25
(tidak menggunakan bulb) faktor tipe kemudi (umum) iE =
faktor tipe profil kemudi (NACA)
faktor letak baling-baling =
𝐶_(2.) 𝐶_(3.) 𝐶_(4.) (1.75 . 𝐿 . 𝑇)/100 B/L =
C4 =
=
Hkeel = 0.18/(Cb-0.2) SBilge Keel = 4.Lkeel.HKeel 2223105 𝐶_4^3.7861
C1 = 〖
= 0.349 = 101.014 =
• Harga C2
C2 =
=
• Harga C3
Type of appendages Value of 1+k2 C3 =
gle-screw ship 1.3 to 1.5 --> (1+k2)= 1.3 =
dders of twin-screw ships 2.8
of twin-screw shipd 1.5 to 2.0 • Harga C5 dan m1
s 3.0 C5 =
2.0 =
1.4 0.01404 𝐿/𝑇−(1.7
m1 =
2.8
2.0 =
2.7
• Harga C6 dan m2
∑▒ 〖𝑆 _𝑖 〖 (1+𝑘_2) 〗 _𝑖 〗 )/(∑▒𝑆_𝑖 ) C6 =
𝐶_(6 )m0.4𝑒^(
2
= 〖− 0.0
1.443 =
• Harga λ
1)+[(1+𝑘_2 )−(1+𝑘_1 )]𝑆_𝑎𝑝𝑝/𝑆_𝑡𝑜𝑡 L/B =
λ=
=
Appendages
ρ. 〖𝑉𝑠〗 ^2 𝐶_𝐹0 𝑆_𝑡𝑜𝑡 • Harga Rw/W
𝑘) d=
kN 𝑅𝑤/𝑊
=
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗
𝐶_1 𝐶_2 𝐶_3 𝑒^(𝑚_1
= 〖𝐹𝑛〗
• CA (Correlation Allowan
Tf/Lwl =
CA =
=
• w (Gaya Berat)
w=
=
•
Rw =
=
an Wave Making Resistance Total of Resistance
Harga C1 dan C4 • Rtotal =
saat even keel --> Ta=Tf=T =
125.67 𝐵/(𝐿 )−162.25 𝐶_𝑝^2+234.32𝐶_𝑝^3+0.1551 〖 ( 𝐿𝐶𝐵+(6.8(𝑇_𝑎−𝑇_𝑓 ) )/𝑇 ) 〗 ^3
=
Harga C5 dan m1
8.0798 CP - 13.8673 CP2 + 6.9844 CP3 ---> untuk Cp < 0.8
1.230
0.01404 𝐿/𝑇−(1.7525 〖 𝛻〗 ^(1/3))/𝐿−4.7932 𝐵/𝐿−𝐶_5
-2.646
Harga C6 dan m2
-1.69385 →𝑢𝑛𝑡𝑢𝑘 〖𝐿𝑊𝐿〗 ^3/𝛻 <
= 512
𝐶_(6 ) 0.4𝑒^( 〖− 0.034 𝐹_𝑛 〗 ^(−3.29) )
-0.00421
3.983
1.446 Cp - 0.03 L/B ---> untuk L/B < 12
0.930
Harga Rw/W
-0.900
𝑅𝑤/𝑊
𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2 cos(λ〖〖𝐹𝑛〗 ^(−2)) 〗
𝐶_2 𝐶_3 𝑒^(𝑚_1 〖𝐹𝑛〗 ^𝑑 )+𝑚_2 cos(λ〖〖𝐹𝑛〗 ^(−2)) 〗
-0.00293682
CA (Correlation Allowance)
0.0000
---> untuk Tf/Lwl >0.04
0.006 (Lwl + 100)-0.16 - 0.00205
0.000402
w (Gaya Berat)
∆.g
659046.140 kN
𝑅𝑤/𝑊 𝑥 𝑊
1935.49777125839 kN
esistance
1/2 𝜌 𝑉_𝑠^2 𝑆_𝑡𝑜𝑡 [𝐶_𝐹 (1+𝑘)+𝐶_𝐴 ]+𝑅_𝑤/𝑊 𝑊
287.07 kN
287,073 N
Perhitungan Awal
1+k = 1.33775174
CF =0.075/
〖 (log_10
=Rn−2) 〗^
0.00149
2
CA = 0.0004
CV =(1+k)⋅C_F+ C_A
= 0.00239592
w =0.3⋅C_B+10⋅C_V⋅C_B−0.1
= 0.132
Va = Speed of Advance
= V_S⋅(1−w)
= 7.591
si dan Daya Mesin
Effective Horse Power (EHP)
PE = R_T⋅V_
S
= 2887.203 kW
= 2784.630 kW
= 0.6
ηD = Quasi-Propulsive Coefficient
= η_H∙η_O∙η_r
= 0.613
= 4711.726 kW
Shaft Horse Power
ηS = Shaft Efficiency ; (0.981 ~ 0.985)
= 0.98 ; untuk mesin di after
PS = Shaft Power
= PD/η_
S
= 4807.884 kW
= PS/η_R
= 4906.004 kW
= 7,566 HP
MAIN ENGINE
MCR Mesin A =
BHP (ditambah 20%) = 6,770.3 kW B =
= 7,565.9 HP C =
D =
Mesin F =
Merk = MAN H =
Type = 6L42MC J =
K =
Daya Mesin yang digunakan M =
Daya = 5970 kW Q =
= 8005.901877 HP R =
W =
Konsumsi Fuel Oil
= 127 g/kWh
GENERATOR SET
Generator Set
Daya Genset = 25% Engine
= 1692.571 kW
= 25% Engine
= 1891.480 BHP
memakai 2 genset
Pemilihan Genset
Daya = 217 kW
Width = 966 mm
Length = 1544 mm
Height = 1005 mm
Dry mass = 0.5 ton
Total Dry Mass = 1.00 ton
SFOC 212.1
Mesin
Merk = CATERPILLAR
Type = C9
Merk Tipe Daya (kW0 SFOC Berat Mesin
CATERPILLAR C42 4000 215 0.5
CATERPILLAR C41 3749 217 0.5
CATERPILLAR C40 3559 209 0.5
CATERPILLAR C39 3254 208 0.5
CATERPILLAR C38 3000 209 0.5
CATERPILLAR C37 2745 210 0.5
CATERPILLAR C36 2337 218.8 0.5
CATERPILLAR C35 2153 218.8 0.5
CATERPILLAR C34 1700 206.6 0.5
CATERPILLAR C33 1500 209 0.5
CATERPILLAR C32 1333 207.2 0.5
CATERPILLAR C32 1172 207 0.5
CATERPILLAR C32 1047 210.4 0.5
CATERPILLAR C32 923 203 0.5
CATERPILLAR C32 916 210.8 0.5
CATERPILLAR C32 791 203.8 0.5
CATERPILLAR C18 660 209 0.5
CATERPILLAR C18 624 215 0.5
CATERPILLAR C18 587 208 0.5
CATERPILLAR C15 540 218.8 0.5
CATERPILLAR C15 536 218.8 0.5
CATERPILLAR C18 514 209 0.5
CATERPILLAR C18 499 217 0.5
CATERPILLAR C18 404 210 0.5
CATERPILLAR C9 361 211.7 0.5
CATERPILLAR C9 311 229.5 0.5
CATERPILLAR C9 288 206.6 0.5
CATERPILLAR C9 253 209 1.2
CATERPILLAR C9 253 228.8 0.5
CATERPILLAR C9 217 212.1 0.5
CATERPILLAR 7H25/33 2100 210.4 0.225
CATERPILLAR 8H25/33 2400 203 0.241
CATERPILLAR 9H25/33 2700 210.8 0.262
CATERPILLAR 6H32/40 3000 203.8 0.337
CATERPILLAR 7H32/40 3500 209 0.386
CATERPILLAR 8H32/40 4000 215 0.415
CATERPILLAR 9H32/40 4500 208 0.446
CATERPILLAR 12H32/40V 6000 218.8 0.56
CATERPILLAR 14H32/40V 7000 218.8 0.633
CATERPILLAR 16H32/40V 8000 209 0.691
CATERPILLAR 18H32/40V 9000 217 0.763
CATERPILLAR 20H32/40V 10000 210 0.84
CATERPILLAR 6H21/32 1200 215.1 0.151
CATERPILLAR 7H21/32 1400 216.7 0.167
CATERPILLAR 8H21/32 1600 218.4 0.184
CATERPILLAR 9H21/32 1800 219.8 0.198
CATERPILLAR 6H25/33 1800 220.2 0.202
CATERPILLAR 7H25/33 2100 222.5 0.225
CATERPILLAR 8H25/33 2400 224.1 0.241
No Merk
3975 mm Pemilihan Mesin Induk : 1 Yanmar
2898 mm Daya [ kW = 5970 2 Yanmar
4136 mm RPM = 248 rpm 3 Yanmar
1566 mm Panjang = 6.4 m 4 Yanmar
328 mm Lebar = 2.46 mm 5 Yanmar
1587 mm Tinggi = 7.04 mm 6 Yanmar
770 mm Dry mass = 25 ton 7 Yanmar
1077 mm 8 Yanmar
636 mm 9 Yanmar
360 mm 10 Yanmar
595 mm 11 Yanmar
900 mm 12 Yanmar
13 Yanmar
14 Yanmar
15 Yanmar
16 Yanmar
17 Yanmar
18 Yanmar
19 Yanmar
20 Yanmar
21 Yanmar
22 Yanmar
23 Yanmar
24 Yanmar
25 Yanmar
26 Yanmar
27 Yanmar
28 Yanmar
29 Yanmar
30 Yanmar
31 Yanmar
32 Yanmar
33 Yanmar
34 Yanmar
35 Yanmar
36 Hyundai
37 Hyundai
38 Hyundai
39 Hyundai
40 Hyundai
41 Hyundai
42 Hyundai
43 Hyundai
44 Hyundai
45 MAN
46 MAN
47 MAN
48 MAN
49 MAN
50 MAN
51 MAN
52 MAN
53 MAN
54 MAN
55 MAN
56 MAN
57 MAN
58 MAN
59 MAN
60 MAN
61 MAN
62 MAN
63 MAN
64 MAN
65 MAN
66 MAN
67 MAN
68 MAN
69 MAN
70 MAN
71 MAN
72 MAN
73 MAN
74 MAN
75 MAN
76 MAN
77 MAN
78 MAN
79 MAN
80 MAN
81 MAN
82 MAN
83 MAN
84 MAN
85 MAN
86 MAN
87 MAN
88 MAN
89 MAN
90 MAN
91 MAN
92 MAN
93 MAN
94 MAN
95 MAN
96 MAN
97 MAN
98 MAN
99 MAN
100 MAN
101 MAN
102 MAN
103 MAN
104 MAN
105 MAN
106 MAN
107 MAN
108 MAN
109 MAN
110 MAN
111 MAN
112 MAN
113 MAN
114 MAN
115 MAN
116 MAN
117 MAN
118 MAN
MAIN ENGINE
Tipe Daya (kW) Speed (rpm) L B H Consumption (L/h)HP
4CHE3M 2550 57 1.258 0.688 1.018 20 78
4CHE3L 2600 63 1.258 0.688 1.018 20 85
6CHE3M 2550 85 1.496 0.69 1.018 30 115
6CHE3L 2600 96 1.496 0.69 1.018 31 130
6CH-HTE3M 2550 125 1.600 0.736 1.096 45 170
6CH-HTE3L 2600 140 1.600 0.736 1.096 45 190
6CH-WUTE-M 2550 188 1.600 0.736 1.096 60 255
6CH-WUTE-L 280 206 1.600 0.736 1.096 60 290
6CH-WDTE-M 2550 154 1.600 0.736 1.096 80 209
6CH-WDTE-L 2600 169 1.600 0.736 1.096 80 230
6LY2M-WDT 3200 259 1.212 0.708 0.766 80 352
6LY2M-WST 3201 294 1.212 0.708 0.766 90 400
6CXBM-GT-M1 2500 294 1.390 0.901 0.989 80 400
6CXBM-GT-H1 2400 265 1.390 0.901 0.989 80 360
6CXBM-GT-L 2700 341 1.390 0.901 0.989 100 464
6CXBM-GT-S 2700 374 1.390 0.901 0.989 100 509
6HA2M-WHT-M 1950 257 1.585 1.016 1.26 80 350
6HA2M-WHT-H 1880 204 1.585 1.016 1.26 80 278
6HA2M-WDT 1950 298 1.585 1.036 1.26 80 405
6HYM-WET 1950 368 1.556 1.014 1.133 100 500
6HYM-WET-M 2100 441 1.556 1.014 1.133 100 600
6HYM-WET-L 2150 478 1.556 1.014 1.133 150 650
6HYM-WET-S 2200 515 1.556 1.014 1.133 150 700
6AYM-WST-H 1900 485 2.000 1.305 1.431 150 659
6AYM-WET-H 1840 555 2.000 1.305 1.431 150 755
6AYM-WET-M 1900 610 2.000 1.305 1.431 150 829
6AYM-WGT-L 1938 670 2.000 1.305 1.431 200 911
6AYEM-ET-M 1900 610 2.000 1.305 1.531 150 829
6AYEM-ET-C 1840 555 2.000 1.305 1.531 150 755
6AYEM-GT-L 1938 670 2.000 1.305 1.531 160 911
6AYEM-GT-S 2000 749 2.000 1.305 1.531 200 1018
12AYM-WST 1900 1,030 2.759 1.644 1.707 300 1400
12AYM-WET-H 1840 1,140 2.759 1.644 1.707 300 1550
12AYM-WET-M 1900 1,220 2.759 1.644 1.707 400 1695
12AYM-WGT-L 1940 1,340 2.759 1.644 1.707 400 1822
6H21/32P 1,200 900 2.904 2.081 3.407 183
8H21/32P 1,600 900 3.634 2.169 3.841 183
9H21/32P 1,800 900 3.994 2.169 3.841 183
6H25/33P 1,740 900 2.83 2.108 2.534 181
8H25/33P 2,320 900 3.59 2.108 2.941 181
9H25/33P 2,610 900 3.97 2.108 2.941 181
6H32/40P 3,000 750 4.515 1.46 3.295 181
8H32/40P 4,000 750 5.545 1.46 3.495 181
9H32/40P 4,500 750 6.085 1.46 3.495 181
6L23/30A-E 800 268 3.55 1.09 2.651 188 1090
6L23/30A 960 292 4.55 1.09 2.651 190 1305
8L23/30A 1,280 292 5.29 1.09 2.651 190 1740
12V23/30A 1,920 292 5.956 1.757 2.58 191 2610
6L21/31 1,290 279 5.476 1.065 3.354 181 1755
7L21/31 1,505 279 5.750 1.065 3.354 181 1505
8L21/31 1,720 279 6.186 1.065 3.354 181 1720
9L21/31 1,935 279 6.541 1.065 3.354 181 1935
6L28/32A 1,470 252 6.599 1.3 3.78 188 2000
7L28/32A 1,715 252 7.027 1.3 3.78 188 2330
8L28/32A 1,960 252 7.507 1.3 3.78 188 2665
9L28/32A 2,205 248 8.039 1.3 3.78 188 3000
6L27/38 2,040 256 6.229 1.5 3.747 182 2775
7L27/38 2,380 256 6.674 1.5 3.747 182 3235
8L27/38 2,720 256 7.119 1.5 3.717 182 3700
9L27/38 3,060 256 7.563 1.5 3.907 182 4160
12V28/32A 2,940 248 7.496 2.015 4.155 189 4000
16V28/32A 3,920 248 8.516 2.015 4.155 189 5330
4L35MC 2,600 210 4.000 1.98 5.575 177 3520
5L35MC 3,250 210 4.600 1.98 5.575 177 4400
6L35MC 3,900 210 5.200 1.98 5.575 177 5280
7L35MC 4,550 210 5.800 1.98 5.575 177 6160
8L35MC 5,200 210 6.400 1.98 5.575 177 7040
9L35MC 5,850 210 7.000 1.98 5.575 177 7920
10L35MC 6,500 210 7.600 1.98 5.575 177 8800
11L35MC 7,150 210 8.200 1.98 5.575 177 9680
12L35MC 7,800 210 8.800 1.98 5.575 177 10560
4S35MC 2,960 173 4.035 2.2 5.575 178 4040
5S35MC 3,700 173 4.635 2.2 5.575 178 5050
6S35MC 4,440 173 5.235 2.2 5.575 178 6060
7S35MC 5,180 173 5.835 2.2 5.575 178 7070
8S35MC 5,920 173 6.435 2.2 5.575 178 8080
9S35MC 6,660 173 7.035 2.2 5.575 178 9090
10S35MC 7,400 173 7.635 2.2 5.575 178 1010
11S35MC 8,140 173 8.235 2.2 5.575 178 11110
12S35MC 8,880 173 9.435 2.2 5.575 178 12120
4L42MC 3,980 176 4.921 2.46 7.04 177 5420
5L42MC 4,975 176 5.669 2.46 7.04 177 6775
6L42MC 5,970 176 6.417 2.46 7.04 177 8130
7L42MC 6,965 176 7.165 2.46 7.04 177 9485
8L42MC 7,960 176 7.913 2.46 7.04 177 10840
9L42MC 8,955 176 8.661 2.46 7.04 177 12195
10L42MC 9,950 176 10.065 2.46 7.04 177 13550
11L42MC 10,945 176 10.813 2.46 7.04 177 14905
12L42MC 11,940 176 11.561 2.46 7.04 177 16260
4S42MC 4,320 136 4.829 2.67 8.2 177 5880
5S42MC 5,400 136 5.577 2.67 8.2 177 7350
6S42MC 6,480 136 6.325 2.67 8.2 177 8820
7S42MC 7,560 136 7.073 2.67 8.2 177 10290
8S42MC 8,640 136 7.821 2.67 8.2 177 11760
9S42MC 9,920 136 8.569 2.67 8.2 177 13230
10S42MC 12,800 136 10.065 2.67 8.2 177 14700
11S42MC 11,880 136 10.813 2.67 8.2 177 16170
12S42MC 12,960 136 11.561 2.67 8.2 177 17640
4S46MC 5,240 129 4.659 2.924 8.836 174 7140
5S46MC 6,550 129 5.441 2.924 8.836 174 8925
6S46MC 7,860 129 6.223 2.924 8.836 174 10710
7S46MC 9,170 129 7.005 2.924 8.836 174 12495
8S46MC 10,480 129 7.787 2.924 8.836 174 14280
4L50MC 5,320 148 5.712 2.71 8.344 173 7420
5L50MC 6,650 148 6.602 2.71 8.344 173 9050
6L50MC 7,980 148 7.492 2.71 8.344 173 10860
7L50MC 9,310 148 8.382 2.71 8.344 173 12670
8L50MC 10,640 148 9.272 2.71 8.344 173 14480
4S50MC 5,720 127 5.712 2.95 9.185 171 7760
5S50MC 7,150 127 6.602 2.95 9.185 171 9700
6S50MC 8,580 127 7.492 2.95 9.185 171 11640
7S50MC 10,010 127 8.382 2.95 9.185 171 13580
8S50MC 15,440 127 9.272 2.95 9.185 171 15520
4S50MC-C 6,320 127 5.035 3.15 9.235 171 8580
5S50MC-C 7,900 127 5.875 3.15 9.235 171 10725
6S50MC-C 9,480 127 6.715 3.15 9.235 171 12870
7S50MC-C 11,060 127 7.555 3.15 9.235 171 15015
8S50MC-C 12,460 127 8.395 3.15 9.235 171 17160
Dry Weight Column1
0.570 0.4
0.570 0.5
0.700 0.5
0.700 0.5
0.895 0.5
0.895 0.5
0.940 0.5
0.940 0.5
0.900 0.5
0.900 0.5
0.535 0.8
0.535 0.5
0.856 0.9
0.856 1.0
0.856 0.8
0.856 0.9
1.455 0.9
1.455 1.0
1.465 0.9
1.781 0.8
1.781 0.8
1.781 0.8
1.781 1.0
2.915 1.0
2.915 0.8
2.915 0.8
2.915 1.0
3.113 1.0
3.113 0.8
3.113 0.8
3.113 0.8
4.950 0.8
4.950 1.0
4.950 0.8
4.950 0.8
18 0.7
21 1.0
23 0.7
23 0.7
26.9 0.8
29.3 1.0
35.7 1.0
43.5 0.7
46.6 0.7
17.6 0.8
17.6 1.0
20.1 0.7
17.5 0.6
13.9 0.6
15.2 0.6
16.6 1.0
18.2 1
19 0.8
21 0.8
23.5 0.8
26.5 0.8
30 0.8
33.5 0.8
37 0.8
40.5 1
29.5 1
37 0.4
50 0.5
58 0.5
67 0.5
75 0.5
83 0.5
92 0.5
108 0.5
118 0.5
126 0.5
57 0.8
65 0.5
75 0.9
84 1.0
93 0.8
103 0.9
122 0.9
132 1.0
141 0.9
95 0.8
110 0.8
125 0.8
143 1.0
158 1.0
176 0.8
210 0.8
229 1.0
244 1.0
109 0.8
125 0.8
143 0.8
160 0.8
176 1.0
195 0.8
232 0.8
249 0.7
269 1.0
133 0.7
153 0.7
171 0.8
197 1.0
217 1.0
163 0.7
188 0.7
215 0.8
249 1.0
276 0.7
171 0.6
195 0.6
225 0.6
255 1.0
288 1
155 0.8
181 0.8
207 0.8
238 0.8
273 0.8
Perhitungan Berat Permesinan
Input Data
D = Diameter Propeler
= 8.133 m
nrpm = 248 rpm
z = 4 blade
AE/AO = 0.4
PD = Delivered Power at Propeller
= 4711.726 kW
PB = Brake Horse Power
= 4906.004 kW
We = Berat Mesin Induk
= 25 ton
Lpp = 163.61 m
Unit Propulsi
Wgear = Berat Gear Box
= (0.34~0.4)∙□(64&PB/n)
= 5.935 ton
l = Panjang Poros
= 3.5 m untuk area gearbox, poros, gangway dsb + 1.5 m untuk area
gangway
= 8.181 m 5.30% 6%
Ms/l = Berat Poros/Panjang Poros
0.081∙(□(64&PD/n_rpm
= ))∙□(64&2/3)
= 1.026 ton/m
Ms = Berat Poros Propeler
= M_s/l∙l
= 8.393 ton
11.5∙∛(PD⁄n_rpm ) Titik Berat Machinery :
ds = hdb =
= 30.686 cm ((350+45∙B))/10^3
=
= 0.307 m
K = Koefisien Fixed Propeler =
(𝑑_𝑠/𝐷)∙(1.85∙𝐴𝐸/𝐴𝑂)−((𝑧−2)/100)
= KG =
=
= 0.007920918496665 LCB =
Wprop = Berat Propeler =
= D3 · K =
= 4.26092088671314 ton LCGFP =
Wproptotal = Wgear + Ms + Wprop =
= 18.588 ton LCGM =
=
Unit Elektrikal
Wgs = Berat untuk 2 Genset
= 1.00 ton
Lain - Lain :
Wot = (0.04 ~ 0.07) · PB
= 343.420264167851 ton
2.19829678034851 m 2198.297 mm
h_db+0.35∙(H−h_db)
8.27926678716988 m
Panjang Ceruk Buritan
5% · LPP
8.18050675006471 m
LWL - LCB - 5
155.34 m
- (LCGFP - 0.5 · LPP)
-73.5328648006212 m
Rute dan Jarak
Rute Import
Pelabuhan Asal = Port of Bethioua
Pelabuhan Tujuan = Port of Tanjung Priok
Total Jarak = 7,756 nm
= 14,364 km
Vs = 18 knot
= 9.3 m/s
Sea Time = 861.778 jam
= 862 jam
= 35.9166667 hari
= 36 hari
m = 33.07 m
m3 649.3345 m3
k House
Berat Baja (WST) Titik Bera
DA = Tinggi Kapal Setelah Dikoreksi dengan Superstucture CKG =
dan Deck House
=
H+(V_A+V_DH)/(L_PP∙B)
= KG =
=
= 21.0352 m
CSO = 0.0752 t/m3 LCG(%) =
D = =
= 68,861 ton LCGM =
U = log〖∆ /100 〗 =
= LCGFP =
= 2.8380 =
CS =C_SO+0.06∙e^(−(0.5∙U+0.1∙U^2.45))
= 0.1278
WST = LPP · B · DA · CS
= 18,069 ton
Titik Berat Baja
Koefisien KG Baja
0.52
DA * CKG
10.938 m
-0,15 + LCB(%)
-0.158 %L
LCG(%) · LPP
-0.259 m
0.5 · LPP - LCGM
82.064 m
Perhitungan Crew & Consumable
Input Data
LPP = 163.6 m SFR =
B = 18.2 m MCR =
H = 19.57 m Margin =
T = 13.55 m WFO' =SFR∙MCR∙S/V_
VS = 8.746 m/s
= 17.000 knot =
S (RT) = 5685.0 mil laut ; Jarak Pelayaran WFO =
BHP = 5970.0 kW
= 8005.9 HP =
Crew List
Lubricating Oil F
8.2105263E-07 ton/kW h ; dari data mesin (diambil yang terbesar) Cw1 = 120
1194.000 kW = 0.005
5% ; (5% ~ 10%) Cw2 = 0.005
=SFR∙MCR∙S/V_S ∙(1+Margin)` W〖FW1= C 〗 _w1∙S/V_S ∙Z_c
= 227.8864
WFW = WFW total + 2% · WFW total
= 232.4441
Diesel Oil Provision & Store
; Diktat IGM Santosa hal. 38 (0.1 ~ 0.2)
CPR = 3
= 0.000125
ton Bahan bakar = MGO W
〖PR = C 〗 _P∙S/V_S ∙Z_c
W_DO′+2%∙W_DO′)/π ; Diktat IGM Santosa
Penambahan 2% untuk koreksi = 0.627
ton dan π = 0.85
Total Berat Consumable and Crew (Wcons
= WLO + WPR + WFW + WDO + WFO
= 529.21
Fresh Water
kg/orang hari ; Koef. untuk cuci, mandi, dan minum kru
ton/orang jam
ton/HP ; Koef. air tawar untuk pendingin mesin
〗 _w1∙S/V_S ∙Z_c ; Berat air tawar untuk mandi, cuci, minum
ton
; Berat air tawar untuk pendingin mesin
ton
(WFW1 + WFW2) · 3.5
ton
WFW total + 2% · WFW total ; terdapat penambahan koreksi 2%
ton
Provision & Store
kg/orang hari ; Koef. Provision & Store
ton/ orang jam
; Berat Provision & Store
ton
= 23.0858 m
&E poop)∙LCG_poop+W_(C&E
LCGC&E = II)∙LCG_II+W_(C&E III)∙LCG_III+W_(C&E IV)∙LCG_IV)/(W_(C&E poop)+W_(C&E II)+W_(C&E III)+W
= 36.3331 m
= 7.11185 m
(W_(C&E)∙LCG_(C&E)+W_FW∙LCG_FW+
LCG = 〖 W_LO∙LCG 〗 _LO+W_DO∙LCG_DO+W_FO∙LCG_FO)/(W_(C&E)+W_FW+W_LO+W_DO+W
= 154.523 m
Titik Berat Air Tawar
LWL - (LCB + LCH + LKM) ; Panjang ruang muat Dimensi Tangki
m ⟐ tFW = H-T
= 6.0 m
⟐ ℓFW = 65% · B
m = 26.6976201605896 m
m ; asumsi ⟐ VFW W_FW/1+2%∙W_FW/1
=
m ; asumsi = 237.092980480001 m3
⟐ pFW V_FW/(t_FW∙ℓ_FW
= )
m
= 1.476 m
m ; asumsi Titik Berat Tangki
⟐ KGFW = T + 0.5 · tFW
m = 10.545870965924 m
⟐ LCGFW = LWL - LCB + 0.5 · tFW
m ; asumsi = 166.727314329304 m
FW+W_LO+W_DO+W_FO )
)+W_FW+W_LO+W_DO+W_FO )
Titik Berat Lubricating Oil Titik Berat Diesel Oil
Dimensi Tangki Dimensi Tangki
⟐ tLO = hDB ⟐ tDO = hDB
= 2m = 2m
⟐ ℓLO = 65% · B ⟐ ℓDO = 65% · B
= 26.6976201605896 m = 26.69762 m
⟐ VLO W_LO/0.9+2%∙W_LO/0.9
= ⟐ VDO W_DO/0.85+2%∙W_DO/0.85
=
= 0.001 m3 = 38.07534 m3
⟐ pLO V_LO/(t_LO∙ℓ_LO
= ) ⟐ pDO V_DO/(t_DO∙ℓ_DO
= )
= 0.000 m = 0.648259 m
Titik Berat Tangki Titik Berat Tangki
⟐ KGLO = 0.5 · tLO ⟐ KGDO = 0.5 · tDO
= 1.1 m = 1.1 m
⟐ LCGLO = LWL - LCB - LKM + 0.5 · pLO ⟐ LCGDO = LWL - LCB - LKM + 0.5 · pDO
= 146.801 m = 147.1256 m
Titik Berat Fuel Oil Berat Kru Per Layer
Dimensi Tangki WC&E /layer = Jumlah kru per layer · berat rat
⟐ ℓFO = 65% · B WC&E Poop = 0.56 ton
= 26.69762 m WC&E II = 0.14 ton
⟐ VFO = W_FO/0.95+2%∙W_FO/0.95 WC&E III = 0.21 ton
WC&E IV = 0.14 ton
= 299.667 m3 WC&E total = 1.05 ton
⟐ tFO = 2m
⟐ pFO = V_FO/(ℓ_FO∙p_FO ) Titik Berat Kru dan Luggage
KG
= 5.102 m ⟐ KGpoop = H + 0.5 hP
Titik Berat Tangki = 20.8225 m
⟐ KGFO = hDB + 0.5 · tFO ⟐ KGII = H + hP + 0.5 · hII
= 4.751 m = 23.2725 m
⟐ LCGFO = LWL - LCB - LKM + 0.5 · LCF - 0.5 · pFO ⟐ KGIII = H + hP + hII + 0.5 · hIII
= 145.1504 m = 25.6725 m
⟐ KGIV = H + hP + hII + hIII + 0.5 · hIV
= 28.0725 m
LCG
⟐ LCGpoop = 0.5 · LP +LRM + LCH + LCF
= 39.87801 m
⟐ LCGII = 0.5 · LII +LRM + LCH + LCF
= 35.78776 m
⟐ LCGIII = 0.5 · LIII +LRM + LCH + LCF
= 31.69751 m
⟐ LCGIV = 0.5 · LIV +LRM + LCH + LCF
= 29.65238 m
ru per layer · berat rat
Input Data
LPP = 163.610135001294 m
B = 41.0732617855224 m
H = 19.57 m
CALV = 140 kg/m2 ; Ship Design for Efficiency and Economy hal. 172
Grup III
1. Poop 3. Layer III
ℓPO = 32.7220270002589 m ℓDH3 = 16.361014
bPO = 41.07 m bDH3 = 37.07
APO = ℓPO ∙ bPO ADH3 = ℓDH3 ∙ bDH3
= 1344 m2 = 606.556
WPO (A_PO∙C_ALV)/1000
= WDH3 (A_DH3∙C_ALV)/1000
=
2. Layer II 4. Layer IV
ℓDH2 = 24.5415202501941 m ℓDH4 = 12.27076
bDH2 = 39.07 m bDH4 = 35.07
ADH2 = ℓDH2 ∙ bDH2 ADH4 = ℓDH4 ∙ bDH4
= 958.9 m2 = 430.376
WDH2 (A_DH2∙C_ALV)/1000
= WDH4 (A_DH4∙C_ALV)/1000
=
= 134.248414349075 = 60.2525815
HATCH WAY
Panjang = 0.75 (Lpp - (Lkm + Lcb + Lch) / h = 51.410 m
Tinggi = 0.6 m
Lebar = 18.0293047 m
Hold = 2
Kostanta deduction of structure = 0.02
Vu = L .H.B.h = 1112.262 m3
5. Anjungan
m ℓAN = 8.18050675006471 m
m bAN = 33.07 m
AAN = ℓDH4 ∙ bDH4
2
m = 270.6 m2
H3∙C_ALV)/1000 WAN = (A_AN∙C_ALV)/1000
= 672.435 ton
ton
Perhitungan Titik Berat Peralatan dan Perlengkap
KGE&O
DA = 21.035 m
Tinggi Kapal Setelah Dikoreksi dengan Superstucture dan Deck House
KGE&O = (1.02 ~ 1.08) ∙ DA ; Ship Design for Efficiency and Economy hal. 173
= 22.718 m
LCG1
1. Kamar Mesin
WE&O KM = 25% ∙ WE&O
asumsi WE&O di Kamar Mesin
= 296.698 ton
LCGM M = Titik Berat Permesinan terhadap Midship
= -73.5329 m
2. Layer II
ℓDH2 = 24.54152 m
WDH2 = 134.248 ton
; untuk ukuran sedang LCGDH2 = - 0.5 ∙ LPP + (LKM + LCB) - 0.5 ∙ ℓDH2
= -72.3588 m di belakang M
3. Layer III
ℓDH3 = 16.36101 m
WDH3 = 84.918 ton
LCGDH3 = - 0.5 ∙ LPP + (LKM + LCB) - 0.5 ∙ ℓDH3
= -68.2686 m di belakang M
n Perlengkapan
4. Layer IV LCG
ℓDH4 = 12.27076 m (〖
LCG = 〗 _(E&O)∙LCG_M+ 〖 37.5%∙W 〗 _(
E&O25%∙W
= -69.123
LCG3
WE&O Other = 37.5% ∙ WE&O
asumsi WE&O di tempat lain
= 445.047
LCGOther = 0 m di belakang M
E&O)∙LCG_M+ 〖 37.5%∙W 〗 _(E&O)∙LCG_DH+ 〖〖 37.5%∙W 〗 _(E&O)∙LCG 〗 _Other)/W_(E&O)
m di belakang M
m dari AP
m dari FP
H2+W_DH3+W_DH4+W_DH5 )
Perhitungan Kapasitas Ruang Muat
Perhitungan
1. Chamber 7. Konstanta Deduction
C = □(64&1/50)∙B s =
= 0.8 m
□(64&2/3)∙C
Cm = 8. Kamar Mesin
= 0.5 m ℓKM =
2. Sheer bKM =
kapal menggunakan sheer
Sa = 25(Lpp/3 + 10) . 10-3 = 1.613 m hKM =
Sf = 50(Lpp/3 + 10) . 10-3 = 3.227 m =
Sm = 1/6 . (Sa + Sf) = 0.807 m VKM =
=
3. D' ; IGM Santosa hal. 58
D' = H + Cm + Sm
= 20.927 m
HATCH WAY
Panjang 0.75 (Lpp - (Lkm + Lcb + Lch) / h = 51.410 m
Tinggi = 0.6 m
Lebar = 18.0293 m
Hold = 2
Kostanta deduction of structure = 0.02
Vu = L .H.B.h = 1112.262 m3
9. Ceruk Buritan Koreksi
Normal Section ℓCB = 12 · Jarak Gading 1. Double Bottom
0 = 7.2 m ℓDB
C_B+c∙(H/T−1)∙(1−C_B)c bCB = 50% ∙ B
0.716 20.53663 m bDB
hCB = H
ume Dibawah Upperdeck Diantara L PP = 20 m hDB
CB Deck · LPP · B · D' VCB = 0.5 ∙ ℓCB ∙ bCB ∙ hCB VDB
100698.277 m3 = 1447.031 m3
= 14348.940 m3
m³/ton
ton
m3
m3
Perhitungan Berat Total dan Titik Berat Total
Berat Baja
WST = 18069.148 ton
KGST = 10.94 m
LCGST = 82.064 m ; dari FP
Berat Permesinan
WM = 388.009
KGM = 8.279 m
LCGM = 155.34 m ; dari FP
Berat Consumable
Wcons = 529.214
KGcons = 7.11 m
LCGcons = 154.523 m ; dari FP
Berat Payload
Wpayload = 46793 ton
KGpayload = (H - hDB) · 0.5 + hDB
= 10 m
LCGpayload = (0.5 · LRM) + (0.5 · LCF) + LCH
= 76.701 m ; dari FP
Total
Berat LWT
LWT = WST + WE&O + WM DWT =
= 19643.949 ton
Berat Total
W = LWT + Wcons + Wpayload
= 66966.193 ton
KG Total
KG (W_ST∙KG_ST+W_(E&O)∙KG_(E&O)+W_M∙KG_M+W_cons∙KG_cons+W_payload∙KG_payload)/(W_ST+W_(E&O)
=
= 10.5 m
= 78.883 m
LCB = 82 m 3.426 m
Koreksi 0.020941
Disp. = 68860.580 ton 2.094125 %
Selisih Displ. & Berat Kapal = 1894.387
Margin = 2.8%
Kondisi = Diterima
47322.244 ton
payload)/(W_ST+W_(E&O)+W_M+W_cons+W_payload )
∙LCG_payload)/(W_ST+W_(E&O)+W_M+W_cons+W_payload )
Perhitungan Trim
Chapter 11 Parametric Design , Michael G. Parsons
m4
; jarak B dan M secara melintang
m
= 10775.8977354639 mm
= 10.8 m
Prosentase pengur
[ Adapted from : International Con
Line
x.L 0 0.1
Kapal
dengan I 0.0% 5.0%
forecastle
dan tanpa
bridge
Kapal
dengan
forecastle
dan tanpa
bridge
Kapal
dengan II 0.0% 6.3%
forecastle
dan bridge
Batasan
1. Lambung Timbul Sebenarnya
Fba = H-T
= 6.02 m
Lambung Timbul Sebenarnya harus lebih besar dari Lambung Timbul Total
Kondisi = Diterima
20422.62
≥ 0.25 ∙ = 9528.797
Diterima
+K_3∙(N_1∙N_1/10)
20423.79
NT ≥ 0.30 ∙ GT
Diterima
Regresi Kurva Faktor h dan Faktor CI
Regresi Kurva Faktor h
X = Cpv
Y = faktor h F=0
f =0 f = 0.5 f = 1.0 0.60
X Y X Y X Y 0.50
0.500 0.333 0.500 0.335 0.5000 0.3351 f(x) = 1.2409071 x⁴ − 3.4551355 x³ + 3.5356
0.40
R² = 0.999900204779365
0.522 0.340 0.516 0.340 0.5106 0.34
0.581 0.360 0.561 0.360 0.5447 0.36 0.30
Y
0.643 0.380 0.613 0.380 0.5838 0.38 0.20
0.706 0.400 0.668 0.400 0.6302 0.40 0.10
0.768 0.420 0.725 0.420 0.6804 0.42 0.00
0.830 0.440 0.789 0.440 0.7393 0.44 0.40 0.50 0.60 0.70 0.80 0.90 1.0
0.891 0.460 0.856 0.460 0.8109 0.46 X
0.954 0.480 0.933 0.480 0.9000 0.48
1.000 0.500 1.000 0.500 1.0000 0.50
F = 0,5 F=1
0.60 0.60
0.50 0.50
f(x) = 1.09716 x⁴ − 3.06847 x³ + 2.95503 x² − 0.788913 x f(x) = 0.8215496 x⁴ − 1.8734526 x³ + 0.97716
0.40 0.40
+ 0.305026
F = 0,5
0.30= 0.99993585487532
R² 0.30
Y
Y
Polynomial (F = 0,5)
0.20 0.20
0.10 0.10
0.00 0.00
0.40 0.60 0.80 1.00 1.20 0.40 0.50 0.60 0.70 0.80 0.90 1.0
X X
Hasil Regresi Kurva Faktor h
1. f=0
Y =a x + b x + c x + d x + e
4 3 2
F=0 a = 1.2409
b = -3.4551
c = 3.5356
9071 x⁴ − 3.4551355 x³ + 3.535622 x² − 1.2507296 x + 0.4288284 d = -1.2507
00204779365
e = 0.4288
F=0
Polynomial (F = 0)
2. f = 0.5
Y =a x + b x + c x + d x + e
4 3 2
a = 1.0972
0 0.60 0.70 0.80 0.90 1.00 1.10 b = -3.0685
X c = 2.9550
d = -0.7889
e = 0.3050
3. f = 1.0
F=1 Y =a x + b x + c x + d x + e
4 3 2
a = 0.8215
b = -1.8735
496 x⁴ − 1.8734526 x³ + 0.9771629 x² + 0.6029059 x − 0.0282376 c = 0.9772
F=1 d = 0.6029
Linear (F = 1) e = -0.0282
Polynomial (F = 1)
X
Regresi Kurva Faktor CI
Line
X = Cw X = Cw" 0.09
Y = CI Y = CI' 0.08
0.07 f(x) = 0.344923 x
Garis 1 Garis 2 0.06 − 0.325781 x +
X Y X Y 0.05 R² = 0.99998388
0.5000 0.0236 0.5000 0.02 0.04
Y
0.03
0.5686 0.0300 0.5775 0.03
0.02
0.6683 0.0400 0.6555 0.04 0.01
0.7539 0.0500 0.7309 0.05 0.00
0.00 0.20 0.40 0.60 0.80
0.8332 0.0600 0.8072 0.06
0.9027 0.0700 0.8840 0.07 X
0.9581 0.0800 0.9536 0.08
Line 1
0.09
0.08
0.07f(x) = 0.553874 x⁴ − 1.47092 x³ + 1.51326 x² − 0.604256 x
+ 0.0967186
0.06
R² = 0.999961958260348
0.05
Garis 1
0.04
Y
Polynomial (Garis 1)
0.03
0.02
0.01
0.00
0.40 0.50 0.60 0.70 0.80 0.90 1.00
X
Hasil Regresi Kurva Faktor CI
Line 2 1. Garis 1
Y =a x + b x + c x + d x + e
4 3 2
0.09
0.08 a = 0.5539
0.07 f(x) = 0.344923 x⁴ − 0.962639 x³ + 0.998694 x²
0.06 − 0.325781 x + 0.032013 b = -1.4709
0.05 R² = 0.999983884073094 c = 1.5133
Garis 2
0.04 d = -0.6043
Y
Polynomial (Garis 2)
0.03
e = 0.0967
0.02
0.01
0.00 2. Garis 2
0.00 0.20 0.40 0.60 0.80 1.00
Y =a x + b x + c x + d x + e
4 3 2
X a = 0.3449
b = -0.9626
c = 0.9987
d = -0.3258
e = 0.032
Perhitungan Stabilitas
Satuan Perhitungan Awal
Panjang ⇨ 1 feet = 0.34 m CPV
Berat ⇨ 1 long ton = 1.016 ton
Input Data A0
LPP = 481 ft
B = 121 ft AM
Bw = 355 ft ; maximum waterline breadth
T = 40 ft S
HM = 57.6 ft
SF = 9.5 ft ; Sheer fore
SA = 4.7 ft ; Sheer aft
= 0.891 =
= LPP ∙ BW ∙ CWP ; luas bidang garis air δ = D_T/2−∆_0
= 137465.12 ft2
= BW ∙ CX ∙ T ; luas area midship =
2 CW' = A_2/(L_PP∙D)
= 108319.904 ft
(𝓁_ST∙h_ST )+(0.5∙L_PP∙S_F/3)+(0.5∙L_PP∙S_A/3)
=
=
; sheer rata-rata CX' = (A_M+(B∙F))/(B∙D)
= 2245.689 ft
= S/L_PP +H_M
; tinggi kapal rata-rata
=
= 62.2330 ft CPV'' = (35∙D_T)/(A_2∙B)
= D-T ; lambung timbul rata-rata
= 22.366 ft =
C_W^′−((140∙δ)∙(1−C_PV^′′
= 1.01 ∙ A0 ; area of waterline plane at depth D CW'' =
2
= 138839.77 ft maybe estimate from A0 and nature
of stations above waterline =
f0 =
(H∙(A_1/A_0
−1))/(2∙F∙(1−C_PV))
=
f1 (D∙(1−A_0/A_1 ))/(2∙F∙(1−C_PV^′))
=
Periode Rolling
T = (0.79∙B)/√(G^′ Mo)
= 6.896 detik
= ∆ 〗 _0+((A_0+A_1)/2)∙(F/35) Hasil Regresi Kurva Faktor h
1. f=0
Y =a x + b x + c x + d x + e
4 3 2
88284.300
= D_T/2−∆_0 a = 1.2409
b = -3.4551
-24718.431 c = 3.5356
A_2/(L_PP∙D)
d = -1.2507
e = 0.4288
0.981
(A_M+(B∙F))/(B∙D) 2. f = 0.5
Y =a x + b x + c x + d x + e
4 3 2
5.258 a = 1.0972
35∙D_T)/(A_1∙D) b = -3.0685
c = 2.9550
0.358 d = -0.7889
35∙D_T)/(A_2∙B) e = 0.3050
0.870 3. f = 1.0
C_W^′−((140∙δ)∙(1−C_PV^′′))/(L_PP∙D∙B)
Y =a x + b x + c x + d x + e
4 3 2
a = 0.8215
1.106 b = -1.8735
(H∙(A_1/A_0
−1))/(2∙F∙(1−C_PV)) c = 0.9772
d = 0.6029
-0.0015 e = -0.0282
(D∙(1−A_0/A_1 ))/(2∙F∙(1−C_PV^′))
a = 0.5539
b = -1.4709
c = 1.5133
d = -0.6043
e = 0.0967
2. Garis 2
=a x + b x + c x + d x + e
4 3 2
Y
a = 0.3449
b = -0.9626
c = 0.9987
d = -0.3258
e = 0.032
f2 = jika CX' ≥ 0.89, maka f2= 9.1 ∙ (CX' - 0.89)
jika CX' ≤ 0.89, maka f2= 0 C2PV''
Perhitungan h
= 39.750 Referensi : Regresi Kurva Faktor h
KG = 31 ft h2 untuk f==0 0.453
h2 untuk f==0.5 0.463
Perhitungan h1 CPV' h2 untuk f==1 0.473
Referensi : Regresi Kurva Faktor h h2 interpolasi= 1.307
h1 untuk f= 0 = 0.296
= (D_T∙h_2∙B)/(4∙D_0 )−(((|ᵹ|^2 𝑥
h1 untuk f= 0.5 = 0.278 G'B90 ᵹ|/𝐵) 𝑥 (1 − 𝐶𝑃𝑉′′))))
h1 untuk f= 1 = 0.240
h1 interpolasi = 0.295
(((D∙(1−h_1 )∙D_T )−δ))/(2∙D_(isp 0) )
KG' = = 9.0
= 12.415
b2 = 〗 _0+ 〖 G`M 〗 _90)/8
( 〖 G`M
= 2.059
3∙( 〖 G`M 〗 _0− 〖 G`M 〗 _90)/32−3∙(( 〖 G`B 〗 _9
3∙( 〖 G`M 〗 _0− 〖 G`M 〗 _90)/32−3∙(( 〖 G`B 〗 _9
b3 =
= -1.821
Perhitungan Lengan Stabilitas
Φ 0° 5° 10°
GG' ∙ sin (1 ∙ Φ) - - 0.23 - 0.45
b1 ∙ sin (2 ∙ Φ) 0 2.154755 4.244105
b2 ∙ sin (4 ∙ Φ) 0 0.703888 1.322962
b3 ∙ sin (6 ∙ Φ) 0 -0.909887 -1.576212
GZ (ft) - 1.722 3.539
)/(4∙D_0 )−(((|ᵹ|^2 𝑥 17.5)/((𝛥0 𝑥 (𝐴2 − 70 𝑥 (|
𝑃𝑉′′)))) GZ (m) - 5.064 10.408
〖 G`M 〗 _90)/8
= 35 Matriks
= 40 1 35 1225
= Err:502 1 40 1600
= 36.480 1 45 2025
= 37.745
75° 0.294
80° -3.560
85° -6.022
90° -7.646
Kurva Stabilitas
40 50 60 70 80 90 100
Data Outfit Cost Hasil Regresi :
WST = 18069.15 Ton X Y 1. Outfit Cost
WEO = 1186.79 Ton 108.51 19195.88 Y =
WME = 25.00 Ton 250.00 18791.55 a =
500.00 18089.06 b =
Perhitungan biaya 750.00 17378.67 c =
CST = $ 900 1000.00 16734.41 d =
CEO = $ 9,776.41 1250.00 16206.22 e =
CME = $ 3,353,531 1500.00 15639.63
Biaya struktural = CST x WST 1750.00 15084.85
PST = $ 16,262,233 2000.00 14496.41
Biaya Outfit & Equipment = CEO x WEO 2250.00 13975.38
PEO = $ 11,602,564 2500.00 13556.51
Biaya Machinery = CME 2750.00 13142.50
PME = $ 3,353,531 3000.00 12681.38
Biaya Non-Weight = 10% (P ST
+P EO
+P ME
)
PNW = $ 3,121,833 2603HP =
jasa pembangunan kapal 1HP =
Total Cost = PST+PEO+PME+PNW
= $ 34,340,162 HP 8005.9019 =
Capital Cost
Koreksi = Inflasi + Subsidi + Profit
Inflasi = 6,5% Cost
= $ 2,232,110.50
Subsidi negara = - 2% Cost
= $ (686,803)
Profit = 5% Cost
= $ 1,717,008.08
Total Harga = Total biaya + koreksi
= $ 37,602,477
347.5
2.825
4.165
Perhitungan Frekuensi
Roundtrip Days = 42
Commission Days = 355
Frekuensi = 8
Cargo Carried = 374,344
Demand = 4,100,000
Jumlah Kapal Dibutuhkan = 11
Voyage Cost
Biaya Bahan Bakar
Fuel Oil
Harga HFO/Ton = 298.5
WFO Jakarta - Suez = 261.89
Biaya Bunkering Jakarta = $ 78,175
Total WFO yang diisi = 698.80
Kebutuhan WFO = 693.77
= 5550.14
Selisih = 1%
Biaya Bahan Fuel Oil = $ 254,342
= $ 2,034,735
Diesel Oil
Harga MDO/Ton = $ 373.75
MDO Jakarta - Suez = 31.4
Biaya Bunkering Jakarta = $ 11,746
Total MDO yang diisi = 83.856
Kebutuhan MDO = 76.048
608.38
Selisih = 10%
Biaya Diesel Oil = $ 55,478.58
= $ 443,829
Total Biaya Bahan Bakar = $ 309,820
= $ 2,478,563
Biaya Pelabuhan
GT = 38115.19
Pelabuhan Tanjung Priok, Jakarta
Tarif Labuh = Rp 73
Biaya Labuh = Rp 2,782,409
Tarif Tambat = Rp 68
Etmal = 1
Biaya Tambat = Rp 2,591,833
Tarif Tetap Pandu = Rp 78,400
Tarif Variable Pandu = Rp 22
Asumsi Jumlah Gerakan = 1
Biaya Pandu = Rp 916,934
Tarif Tetap Tunda = Rp 1,550,000
Tarif Variable Tunda = Rp 3
Lama Penundaan = 1
Biaya Tunda = Rp 1,664,346
Total Biaya Pelabuhan Tanjung Priok = Rp 7,955,521
Rp 2,824,209,996
Pelabuhan Aljazair
Tarif Labuh = € 2.50
Biaya Labuh = $ 2.96
Tarif Tambat =
Biaya Tambat = $ 275.73
Tarif Tetap Pandu =
Tarif Variable Pandu =
Jam Pemanduan =
Biaya Pandu = $ 91.04
Tarif Tetap Tunda =
Tarif Variable Tunda =
Jam Penundaan =
Biaya Tunda = $ 177.06
Total Biaya Aljazair = $ 547
$ 4,374
Total Biaya Pelabuhan = Rp -
= Rp -
Suez Toll
Biaya Tunda = $ 179
Suez Canal Dues = $ 63,993
Ministry Fees = $ 1,525
Frist Time Canal Transit = $ 330
Total Suez Toll Cost = $ 65,696.66
= $ 131,393.32
= $ 1,051,477
Biaya Bahan Bakar = $ 309,820.41
Biaya Pelabuhan = $ 546.79
Suez Toll Cost = $ 131,393.32
Total biaya dalam dollar $ 441,760.51
Kurs USD Rp 14,100.0
Total Voyage Cost Rp 6,236,778,764
Rp 49,894,230,110
hari Konsumsi Fuel Oil Suez - Aljazair Konsumsi Fuel Oil Aljazair
hari SFR = 0.000127 ton/kW h SFR =
shipment/th MCR = 5416.228 kW MCR =
ton/th Margin = 3% Margin =
WFO' =SFR∙MCR∙S/V_S ∙(1+Margin) WFO' =SFR∙MCR∙S/V_S ∙(1+Ma
ton/th
kapal
= 79.93511 ton =
WFO = W =
(W_FO′+4%∙W_FO′)/πFO
= 87.51 ton =
$/MT Harga IFO/Ton = 396 $/MT Harga IFO/Ton =
WFO Suez - Aljazair = 87.51 ton WFO Suez - Aljazair =
Biaya Bunkering Suez = $ 34,653 Biaya Bunkering Suez =
ton /roundtrip Diesel Oil Suez - Aljazair Diesel Oil Aljazair - Su
ton /roundtrip CDO = 0.1 CDO =
ton /tahun WDO' = WFO · CDO WDO' =
= 8.750791 ton =
/roundtrip WDO =(W_DO′+2%∙W_DO′)/π WDO =(W_DO′+2%∙W
/tahun
= 10.501 ton =
$/MT Harga MGO/Ton = 884 $/ton Harga MGO/Ton =
WDO Suez - Aljazair = 10.50 ton WDO Suez - Aljazair =
Biaya Bunkering Suez = $ 9,283 Biaya Bunkering Suez =
ton/roundtrip
/tahun
/roundtrip
/tahun
/roundtrip
/tahun Rp 34,947,741,755
ta Rp 1,788,008,479
GT/Kunjungan
/trip Rp 38,211
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
$ 2.96 /Kunjungan
/trip
/tahun
/roundtrip
/tahun
/trip
/roundtrip
/tahun
Rp 7,955,521
/roundtrip
/tahun
nsumsi Fuel Oil Aljazair - Suez Konsumsi Fuel Oil Suez - Jakarta
0.000127 ton/kW h SFR = 0.000127
5416.228 kW MCR = 5416.228
3% Margin = 4%
=SFR∙MCR∙S/V_S ∙(1+Margin) WFO' =SFR∙MCR∙S/V_S ∙(1+Margin)
ost
k, Jakarta
Ton/m3
abuhan Aljazair
$ 2.71 /MT
Rp 1,572,245,817
/roundtrip
/th
Operational Cost
Jumlah Crew =
Manning Cost Manning Cost Total =
=
=
Kebutuhan Perbekalan
Jumlah Crew =
Biaya Perbekalan =
Biaya Perbekalan total =
Kebutuhan Minyak Pelumas
Perbekalan dan minyak pelumas Frekuensi =
Konsumsi minyak pelumas =
=
Harga minyal pelumas =
Biaya minyak pelumas =
Total Biaya =
Asumsi biaya reparasi =
Reparasi dan Perawatan Total Biaya Reparasi dan Perawatan =
=
Asumsi premi asuransi =
Asuransi Total biaya asuransi =
=
Asumsi biaya administrasi =
Administrasi Total Biaya administrasi =
=
=
Total Operating Cost
=
Unit Biaya
Unit Cost per-kapal
Capital Cost / tahun Rp 42,544,212,441
Voyage Cost / tahun Rp 49,894,230,110
Operational Cost /tahun Rp 163,332,108,533
Cargo Handling Cost / tahun Rp 26,882,034,368
Total Cost / Tahun Rp 282,652,585,452
Total Ton Carried /Tahun 374,344
Unit Cost Rp755,061
Total Cost / Trip Rp35,331,573,181
V
Rp150,000,000,000
f(x) = 392592.343840184 x + 135719952179.778
Rp100,000,000,000 R² = 0.011986159628991
Rp50,000,000,000
Rp-
0 20000 40000 60000
Axis Title
Skema No
Kapal 1 VCH 1
v Kapal 2 TCH 2
Kapal 3 VCH 3
v Kapal 4 TCH 4
Kapal 5 VCH 5
v Kapal 6 TCH 6
Kapal 7 VCH 7
Kapal 8 VCH 8
v Kapal 9 TCH 9
Kapal 10 VCH 10
Kapal 11 VCH 11
v Kapal 12 TCH 12
Kapal 13 VCH 13
v Kapal 14 TCH 14
Kapal 15 VCH 15
Kapal SH1 SH 16
v Kapal 17 TCH 17
Kapal 18 VCH 18
v Kapal 19 TCH 19
Kapal SH2 SH 20
v Kapal 21 TCH 21
Kapal 22 VCH 22
1
3
5
7
8
10
11
13
15
18
22
Nama Kapal2 Tipe LPP B T H
FORMOSAGAS CRYSTAL LPG TANKER 153.5 23.1 7.6
FORMOSAGAS DIAMOND LPG TANKER 153.5 23.13 7
GAS PRODIGY LPG TANKER 104 18 5.9
GAS IMPERIALE LPG TANKER 95.88 15 5.9
GAS INSPIRATION LPG TANKER 99.98 17.2 4.4
BTC BALYENA LPG TANKER 97.22 15.5 5.4
LPG20 VLGC 222 37.2 10 21
VCH TCH SH
GAS WALIO 2 PRIMA LAUTLPG20
GAS AMARIN JAYA 4 SC DISCOVERY
BTC BALYENA
XLVI
GAS ARIA 6 JABBAR ENERGY
CIPTA DIAMOND 9 GAS AMBALAT
PERTAMINA GAS 2 12 MATHRAKI
NAVIGATOR GLOBAL 14 DECORA
GAS ARAR 17 NAVIGATOR PLUTO
GAS WIDURI 19 RUBRA
NAVIGATOR ARIES 21 GAS VENUS
SC COMMANDER LVII
ARIMBI
Kapal Bekas
Vs Cargo Hold DWT Payload Tahun
16.7 6 17659 16250 2006
13.6 6 17659 16262 2006
12.3 2 3933 5001 2003
10.9 2 3161 3314 2008
10.6 2 4999 5018 2006
13.5 2 3717 3444 2016
18 53.076 46651.06 2011
Mesin GT Class
Akasaka 5UEC33LSII 13572 BKI
Akasaka 5UEC33LSII 13492.44 LR
Akasaka 5UEC33LSII 13234.26 AMERICAN BUREAU OF SHIPPING
2729.22 CLASSNK
4172.22 CLASSNK
Akasaka 6UEC37LA 3000.66 LR
Akasaka 6UEC37LA 2998.32
42652.74 CLASSNK
Akasaka 6AH24 2939.82 AMERICAN BUREAU OF SHIPPING
MAN-B&W 5S50MC 13015.86
2496
MAN-B&W 6S50MC 15304.38 DET NORSKE VERITAS
13572
MAN-B&W 6S46MC-C 18155.28
MAN-B&W 6S46MC-C 18197.4 LR
MAN-B&W 6S50MS 41.39928
Sulzer 6RND68 18318.3 GERMANISCHER LLOYD
Mitsubishi 6UEC60LS 38783.94 CLASSNK
Mitsubishi 6UEC60LS 41183.22 BV
Sulzer 7RTA-62 2899.26 ClassnNK
2471.82
3276
WFO Biaya Tunda Priok Biaya Tunda Perak Biaya Tunda Balikpapan
Rp 186,000 Rp 186,000 Rp 186,000
Rp 186,000 Rp 186,000 Rp 186,000
Rp 186,000 Rp 186,000 Rp 186,000
Rp 186,000 Rp 186,000 Rp 186,000
Rp 186,000 Rp 186,000 Rp 186,000
Rp 186,000 Rp 186,000 Rp 186,000
Rp 186,000 Rp 186,000 Rp 186,000
Rp 465,000 Rp 465,000 Rp 465,000
Rp 465,000 Rp 465,000 Rp 465,000
Rp 736,250 Rp 736,250 Rp 736,250
Rp 736,250 Rp 736,250 Rp 736,250
Rp 968,750 Rp 968,750 Rp 968,750
Rp 1,550,000 Rp 1,550,000 Rp 1,550,000
Rp 1,550,000 Rp 1,550,000 Rp 1,550,000
Rp 1,550,000 Rp 1,550,000 Rp 1,550,000
Rp 1,550,000 Rp 1,550,000 Rp 1,550,000
Rp 1,550,000 Rp 1,550,000 Rp 1,550,000
Rp 1,550,000 Rp 1,550,000 Rp 1,550,000
Rp 1,550,000 Rp 1,550,000 Rp 1,550,000
Rp 1,550,000 Rp 1,550,000 Rp 1,550,000
Rp 1,550,000 Rp 1,550,000 Rp 1,550,000
Rp 186,000 Rp 186,000 Rp 186,000
No
1
2
3
4
5
No
1
2
3
4
5
6
7
8
9
Biaya Tunda Lampung Biaya Tunda Pangkalan Susu 10
Rp 186,000 Rp 186,000 11
Rp 186,000 Rp 186,000 12
Rp 186,000 Rp 186,000 13
Rp 186,000 Rp 186,000 14
Rp 186,000 Rp 186,000 15
Rp 186,000 Rp 186,000 16
Rp 186,000 Rp 186,000 17
Rp 465,000 Rp 465,000 18
Rp 465,000 Rp 465,000 19
Rp 736,250 Rp 736,250 20
Rp 736,250 Rp 736,250
Rp 968,750 Rp 968,750
Rp 1,550,000 Rp 1,550,000
Rp 1,550,000 Rp 1,550,000 No
Rp 1,550,000 Rp 1,550,000 1
Rp 1,550,000 Rp 1,550,000 2
Rp 1,550,000 Rp 1,550,000 3
Rp 1,550,000 Rp 1,550,000 4
Rp 1,550,000 Rp 1,550,000 5
Rp 1,550,000 Rp 1,550,000
Rp 1,550,000 Rp 1,550,000 Tarif Tunda
Rp 186,000 Rp 186,000 No
1
2
3
4
5
6
7
8
Kode Pelabuhan LWS Kecepatan B/M AT+WT+ IT
1 Tanjung Priok 14 900 8
2 Tanjung Perak 10 600 6
3 Balikpapan 13 600 5
4 Lampung 10 700 7
5 Pangkalan Susu 10 650 7
Tarif
Kode Pelabuhan Labuh Tambat Pandu
1 Tanjung Priok 73 68 74800
2 Tanjung Perak 73 68 74800
3 Balikpapan 73 68 74800
4 Lampung 73 68 74800
5 Pangkalan Susu 73 68 74800
Tarif Tunda
Max GT Tarif
3,500 Rp 186,000
8,000 Rp 465,000
14,000 Rp 736,250
18,000 Rp 968,750
26,000 Rp 1,550,000
40,000 Rp 1,550,000
75,000 Rp 1,550,000
1,000,000,000 Rp 2,092,500
Demand/tahun Kapasitas Tanki CHC
- 90000 Skenario Rute Kombinasi
2,000,000 50,000 Rp 1,980 1 121
700,000 30,000 Rp 1,880 2 131
PTP
600,000 20,000 Rp 1,780 3 141
800,000 30,000 Rp 1,485 4 151
5 123451
6 123541
7 124351
8 124531
9 125341
10 125431
11 132541
12 132451
13 134521
14 134251
15 135421
16 135241
17 142351
18 142531
19 143251
20 143521
21 145231
22 145321
23 152431
24 152341
25 153421
26 153241
27 154321
28 154231
29 1231
30 1321
Var Pandu Var Tunda 31 1241
22 3 32 1421
22 3 33 1341
22 3 34 1431
MTP
22 3 35 1251
22 3 36 1521
37 1351
38 1531
39 1451
40 1541
41 12341
42 12431
43 13241
44 13421
45 14231
46 14321
47 12351
48 12531
49 13251
50 13521
51 15231
52 15321
53 12451
54 12541
55 14251
56 14521
57 15241
58 15421
59 13451
60 13541
61 14351
62 14531
63 15341
64 15431
Demand Terpenuhi ID_POL POL ID_POD1 POD1 S1
2,000,000 1 Tanjung Priok 2 Tanjung Perak 438
700,000 1 Tanjung Priok 3 Balikpapan 765
600,000 1 Tanjung Priok 4 Lampung 117
800,000 1 Tanjung Priok 5 Pangkalan Susu 887
4,100,000 1 Tanjung Priok 2 Tanjung Perak 438
4,100,000 1 Tanjung Priok 2 Tanjung Perak 438
4,100,000 1 Tanjung Priok 2 Tanjung Perak 438
4,100,000 1 Tanjung Priok 2 Tanjung Perak 438
4,100,000 1 Tanjung Priok 2 Tanjung Perak 438
4,100,000 1 Tanjung Priok 2 Tanjung Perak 438
4,100,000 1 Tanjung Priok 3 Balikpapan 765
4,100,000 1 Tanjung Priok 3 Balikpapan 765
4,100,000 1 Tanjung Priok 3 Balikpapan 765
4,100,000 1 Tanjung Priok 3 Balikpapan 765
4,100,000 1 Tanjung Priok 3 Balikpapan 765
4,100,000 1 Tanjung Priok 3 Balikpapan 765
4,100,000 1 Tanjung Priok 4 Lampung 117
4,100,000 1 Tanjung Priok 4 Lampung 117
4,100,000 1 Tanjung Priok 4 Lampung 117
4,100,000 1 Tanjung Priok 4 Lampung 117
4,100,000 1 Tanjung Priok 4 Lampung 117
4,100,000 1 Tanjung Priok 4 Lampung 117
4,100,000 1 Tanjung Priok 5 Pangkalan Susu 887
4,100,000 1 Tanjung Priok 5 Pangkalan Susu 887
4,100,000 1 Tanjung Priok 5 Pangkalan Susu 765
4,100,000 1 Tanjung Priok 5 Pangkalan Susu 887
4,100,000 1 Tanjung Priok 5 Pangkalan Susu 887
4,100,000 1 Tanjung Priok 5 Pangkalan Susu 887
2,700,000 1 Tanjung Priok 2 Tanjung Perak 438
2,700,000 1 Tanjung Priok 3 Balikpapan 765
2,600,000 1 Tanjung Priok 2 Tanjung Perak 438
2,600,000 1 Tanjung Priok 4 Lampung 117
1,300,000 1 Tanjung Priok 3 Balikpapan 765
1,300,000 1 Tanjung Priok 4 Lampung 117
2,800,000 1 Tanjung Priok 2 Tanjung Perak 438
2,800,000 1 Tanjung Priok 5 Pangkalan Susu 887
1,500,000 1 Tanjung Priok 3 Balikpapan 765
1,500,000 1 Tanjung Priok 5 Pangkalan Susu 887
1,400,000 1 Tanjung Priok 4 Lampung 117
1,400,000 1 Tanjung Priok 5 Pangkalan Susu 887
3,300,000 1 Tanjung Priok 2 Tanjung Perak 438
3,300,000 1 Tanjung Priok 2 Tanjung Perak 438
3,300,000 1 Tanjung Priok 3 Balikpapan 765
3,300,000 1 Tanjung Priok 3 Balikpapan 765
3,300,000 1 Tanjung Priok 4 Lampung 117
3,300,000 1 Tanjung Priok 4 Lampung 117
3,500,000 1 Tanjung Priok 2 Tanjung Perak 438
3,500,000 1 Tanjung Priok 2 Tanjung Perak 438
3,500,000 1 Tanjung Priok 3 Balikpapan 765
3,500,000 1 Tanjung Priok 3 Balikpapan 765
3,500,000 1 Tanjung Priok 5 Pangkalan Susu 887
3,500,000 1 Tanjung Priok 5 Pangkalan Susu 887
3,400,000 1 Tanjung Priok 2 Tanjung Perak 438
3,400,000 1 Tanjung Priok 2 Tanjung Perak 438
3,400,000 1 Tanjung Priok 4 Lampung 117
3,400,000 1 Tanjung Priok 4 Lampung 117
3,400,000 1 Tanjung Priok 5 Pangkalan Susu 887
3,400,000 1 Tanjung Priok 5 Pangkalan Susu 887
2,100,000 1 Tanjung Priok 3 Balikpapan 765
2,100,000 1 Tanjung Priok 3 Balikpapan 765
2,100,000 1 Tanjung Priok 4 Lampung 117
2,100,000 1 Tanjung Priok 4 Lampung 117
2,100,000 1 Tanjung Priok 5 Pangkalan Susu 887
2,100,000 1 Tanjung Priok 5 Pangkalan Susu 887
ID_POD2 POD 2 S2 ID_POD3 POD3 S3 ID_POD4
Err:508 0 0 Err:508 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
3 Balikpapan 481 4 Lampung 872 5
3 Balikpapan 495 5 Pangkalan Susu 1454 4
4 Lampung 495 3 Balikpapan 872 5
4 Lampung 495 5 Pangkalan Susu 934 3
5 Pangkalan Susu 1154 3 Balikpapan 1454 4
5 Pangkalan Susu 1154 4 Lampung 934 3
2 Tanjung Perak 481 5 Pangkalan Susu 1154 4
2 Tanjung Perak 481 4 Lampung 495 5
4 Lampung 872 5 Pangkalan Susu 934 2
4 Lampung 872 2 Tanjung Perak 495 5
5 Pangkalan Susu 1454 4 Lampung 934 2
5 Pangkalan Susu 1454 2 Tanjung Perak 1154 4
2 Tanjung Perak 495 3 Balikpapan 481 5
2 Tanjung Perak 495 5 Pangkalan Susu 1154 3
3 Balikpapan 872 2 Tanjung Perak 481 5
3 Balikpapan 872 5 Pangkalan Susu 1454 2
5 Pangkalan Susu 934 2 Tanjung Perak 1154 3
5 Pangkalan Susu 934 3 Balikpapan 1454 2
2 Tanjung Perak 1154 4 Lampung 495 3
2 Tanjung Perak 1154 3 Balikpapan 481 4
3 Balikpapan 1454 4 Lampung 872 2
3 Balikpapan 1454 2 Tanjung Perak 481 4
4 Lampung 934 3 Balikpapan 872 2
4 Lampung 934 2 Tanjung Perak 495 3
3 Balikpapan 481 0 - 0 0
2 Tanjung Perak 481 0 - 0 0
4 Lampung 495 0 - 0 0
2 Tanjung Perak 495 0 - 0 0
4 Lampung 872 0 - 0 0
3 Balikpapan 872 0 - 0 0
5 Pangkalan Susu 1154 0 - 0 0
2 Tanjung Perak 1154 0 - 0 0
5 Pangkalan Susu 1454 0 - 0 0
3 Balikpapan 1454 0 - 0 0
5 Pangkalan Susu 934 0 - 0 0
4 Lampung 934 0 - 0 0
3 Balikpapan 481 4 Lampung 872 0
4 Lampung 495 3 Balikpapan 872 0
2 Tanjung Perak 481 4 Lampung 495 0
4 Lampung 872 2 Tanjung Perak 495 0
2 Tanjung Perak 495 3 Balikpapan 481 0
3 Balikpapan 872 2 Tanjung Perak 481 0
3 Balikpapan 481 5 Pangkalan Susu 1454 0
5 Pangkalan Susu 1154 3 Balikpapan 1454 0
2 Tanjung Perak 481 5 Pangkalan Susu 1154 0
5 Pangkalan Susu 1454 2 Tanjung Perak 1154 0
2 Tanjung Perak 1154 3 Balikpapan 481 0
3 Balikpapan 1454 2 Tanjung Perak 481 0
4 Lampung 495 5 Pangkalan Susu 934 0
5 Pangkalan Susu 1154 4 Lampung 934 0
2 Tanjung Perak 495 5 Pangkalan Susu 1154 0
5 Pangkalan Susu 934 2 Tanjung Perak 1154 0
2 Tanjung Perak 1154 4 Lampung 495 0
4 Lampung 934 2 Tanjung Perak 495 0
4 Lampung 872 5 Pangkalan Susu 934 0
5 Pangkalan Susu 1454 4 Lampung 934 0
3 Balikpapan 872 5 Pangkalan Susu 1454 0
5 Pangkalan Susu 934 3 Balikpapan 1454 0
3 Balikpapan 1454 4 Lampung 872 0
4 Lampung 934 3 Balikpapan 872 0
POD4 S4 ID_TUKS TUKS S5 S Trip S RT
Err:508 0 1 Tanjung Priok 438 438 876
0 1 Tanjung Priok 765 765 1530
0 1 Tanjung Priok 117 117 234
0 1 Tanjung Priok 887 887 1774
Pangkalan Susu 934 1 Tanjung Priok 887 2725 3612
Lampung 934 1 Tanjung Priok 117 3321 3438
Pangkalan Susu 1454 1 Tanjung Priok 887 3259 4146
Balikpapan 1454 1 Tanjung Priok 765 3321 4086
Lampung 872 1 Tanjung Priok 117 3918 4035
Balikpapan 872 1 Tanjung Priok 765 3398 4163
Lampung 934 1 Tanjung Priok 117 3334 3451
Pangkalan Susu 934 1 Tanjung Priok 887 2675 3562
Tanjung Perak 1154 1 Tanjung Priok 438 3725 4163
Pangkalan Susu 1154 1 Tanjung Priok 887 3286 4173
Tanjung Perak 495 1 Tanjung Priok 438 3648 4086
Lampung 495 1 Tanjung Priok 117 3868 3985
Pangkalan Susu 1454 1 Tanjung Priok 887 2547 3434
Balikpapan 1454 1 Tanjung Priok 765 3220 3985
Pangkalan Susu 1154 1 Tanjung Priok 887 2624 3511
Tanjung Perak 1154 1 Tanjung Priok 438 3597 4035
Balikpapan 481 1 Tanjung Priok 765 2686 3451
Tanjung Perak 481 1 Tanjung Priok 438 2986 3424
Balikpapan 872 1 Tanjung Priok 765 3408 4173
Lampung 872 1 Tanjung Priok 117 3394 3511
Tanjung Perak 495 1 Tanjung Priok 438 3586 4024
Lampung 495 1 Tanjung Priok 117 3317 3434
Tanjung Perak 481 1 Tanjung Priok 438 3174 3612
Balikpapan 481 1 Tanjung Priok 765 2797 3562
- 0 1 Tanjung Priok 765 919 1684
- 0 1 Tanjung Priok 438 1246 1684
- 0 1 Tanjung Priok 117 933 1050
- 0 1 Tanjung Priok 438 612 1050
- 0 1 Tanjung Priok 117 1637 1754
- 0 1 Tanjung Priok 765 989 1754
- 0 1 Tanjung Priok 887 1592 2479
- 0 1 Tanjung Priok 438 2041 2479
- 0 1 Tanjung Priok 887 2219 3106
- 0 1 Tanjung Priok 765 2341 3106
- 0 1 Tanjung Priok 887 1051 1938
- 0 1 Tanjung Priok 117 1821 1938
- 0 1 Tanjung Priok 117 1791 1908
- 0 1 Tanjung Priok 765 1805 2570
- 0 1 Tanjung Priok 117 1741 1858
- 0 1 Tanjung Priok 438 2132 2570
- 0 1 Tanjung Priok 765 1093 1858
- 0 1 Tanjung Priok 438 1470 1908
- 0 1 Tanjung Priok 887 2373 3260
- 0 1 Tanjung Priok 765 3046 3811
- 0 1 Tanjung Priok 887 2400 3287
- 0 1 Tanjung Priok 438 3373 3811
- 0 1 Tanjung Priok 765 2522 3287
- 0 1 Tanjung Priok 438 2822 3260
- 0 1 Tanjung Priok 887 1867 2754
- 0 1 Tanjung Priok 887 2526 3413
- 0 1 Tanjung Priok 117 1766 1883
- 0 1 Tanjung Priok 887 2205 3092
- 0 1 Tanjung Priok 117 2536 2653
- 0 1 Tanjung Priok 438 2316 2754
- 0 1 Tanjung Priok 887 2571 3458
- 0 1 Tanjung Priok 117 3153 3270
- 0 1 Tanjung Priok 887 2443 3330
- 0 1 Tanjung Priok 765 2505 3270
- 0 1 Tanjung Priok 117 3213 3330
- 0 1 Tanjung Priok 765 2693 3458
Pemilihan Rute
Rute 1 121 876
Rute 2 131 1530
Rute 3 141 234
Rute 4 151 1774
Rute 29 1231 1684
Rute 30 1321 1684
Rute 31 1241 1050
Rute 32 1421 1050
Rute 33 1341 1754
Rute 34 1431 1754
Rute 35 1251 2479
Rute 36 1521 2479
Rute 37 1351 3106
Rute 38 1531 3106
Rute 39 1451 1938
Rute 40 1541 1938
Rute VCH
Rute Kombinasi Kapal 10 Kapal 11 Kapal 13 Kapal 22
Rute 1 121 43 58 58 70
Rute 2 131 31 43 58 50
Rute 3 141 70 116 116 116
Rute 4 151 27 39 50 44
Rute 29 1231 26 35 38 38
Rute 30 1321 26 35 38 38
Rute 31 1241 35 50 50 50
Rute 32 1421 35 50 50 50
Rute 33 1341 25 35 38 38
Rute 34 1431 25 35 38 38
Rute 35 1251 20 31 31 31
Rute 36 1521 20 26 31 31
Rute 37 1351 16 23 29 26
Rute 38 1531 16 23 29 26
Rute 39 1451 23 35 38 35
Rute 40 1541 23 35 38 35
Rute VCH
Rute Kombinasi Kapal 10 Kapal 11 Kapal 13 Kapal 22
Rute 1 121 12890.7 11821.6 12114.3 6445.1
Rute 2 131 12890.7 11821.6 12114.3 6445.1
Rute 3 141 12890.7 11821.6 12114.3 6445.1
Rute 4 151 12890.7 11821.6 12114.3 6445.1
Rute 29 1231 12890.7 11821.6 12114.3 6445.1
Rute 30 1321 12890.7 11821.6 12114.3 6445.1
Rute 31 1241 12890.7 11821.6 12114.3 6445.1
Rute 32 1421 12890.7 11821.6 12114.3 6445.1
Rute 33 1341 12890.7 11821.6 12114.3 6445.1
Rute 34 1431 12890.7 11821.6 12114.3 6445.1
Rute 35 1251 12890.7 11821.6 12114.3 6445.1
Rute 36 1521 12890.7 11821.6 12114.3 6445.1
Rute 37 1351 12890.7 11821.6 12114.3 6445.1
Rute 38 1531 12890.7 11821.6 12114.3 6445.1
Rute 39 1451 12890.7 11821.6 12114.3 6445.1
Rute 40 1541 12890.7 11821.6 12114.3 6445.1
CC+OC+VC /roundtrip
Rute
VCH
Rute Kombinasi Kapal 10 Kapal 11 Kapal 13 Kapal 22
Rute 1 121 ### Rp 40,301,784,492 Rp239,604,857,292 Rp 47,159,443,987
Rute 2 131 ### Rp 44,396,115,472 Rp384,192,702,484 Rp 51,948,103,982
Rute 3 141 ### Rp 34,323,348,526 Rp149,945,951,052 Rp 36,506,831,637
Rute 4 151 ### Rp 44,883,944,717 Rp381,997,128,670 Rp 52,245,473,699
Rute 29 1231 ### Rp 42,286,034,512 Rp294,086,948,437 Rp 48,403,609,458
Rute 30 1321 ### Rp 42,286,034,512 Rp294,086,948,437 Rp 48,403,609,458
Rute 31 1241 ### Rp 40,678,276,848 Rp245,009,712,913 Rp 44,321,126,482
Rute 32 1421 ### Rp 40,678,276,848 Rp245,009,712,913 Rp 44,321,126,482
Rute 33 1341 ### Rp 42,923,256,929 Rp304,401,452,911 Rp 49,270,953,477
Rute 34 1431 ### Rp 42,923,256,929 Rp304,401,452,911 Rp 49,270,953,477
Rute 35 1251 ### Rp 44,279,143,685 Rp344,727,938,553 Rp 52,633,736,915
Rute 36 1521 ### Rp 44,279,143,685 Rp344,727,938,553 Rp 52,633,736,915
Rute 37 1351 ### Rp 45,753,642,122 Rp389,080,939,596 Rp 54,121,161,246
Rute 38 1531 ### Rp 45,753,642,122 Rp389,080,939,596 Rp 54,121,161,246
Rute 39 1451 ### Rp 44,598,241,569 Rp331,513,864,669 Rp 49,129,929,844
Rute 40 1541 ### Rp 44,598,241,569 Rp331,513,864,669 Rp 49,129,929,844
VC
Rute
VCH
Rute Kombinasi Kapal 10 Kapal 11 Kapal 13 Kapal 22
Rute 1 121 Rp - Rp - Rp - Rp -
Rute 2 131 Rp - Rp - Rp - Rp -
Rute 3 141 Rp - Rp - Rp - Rp -
Rute 4 151 Rp - Rp - Rp - Rp -
Rute 29 1231 Rp - Rp - Rp - Rp -
Rute 30 1321 Rp - Rp - Rp - Rp -
Rute 31 1241 Rp - Rp - Rp - Rp -
Rute 32 1421 Rp - Rp - Rp - Rp -
Rute 33 1341 Rp - Rp - Rp - Rp -
Rute 34 1431 Rp - Rp - Rp - Rp -
Rute 35 1251 Rp - Rp - Rp - Rp -
Rute 36 1521 Rp - Rp - Rp - Rp -
Rute 37 1351 Rp - Rp - Rp - Rp -
Rute 38 1531 Rp - Rp - Rp - Rp -
Rute 39 1451 Rp - Rp - Rp - Rp -
Rute 40 1541 Rp - Rp - Rp - Rp -
Frekuensi Maksimum
TCH
Kapal 2 Kapal 4 Kapal 9 Kapal 12 Kapal 14
70 50 87 50 70
43 29 58 38 43
175 116 175 87 116
44 27 50 35 44
38 25 43 31 35
38 25 43 38 35
50 38 58 43 43
50 38 58 43 43
38 25 43 31 38
38 25 43 31 38
29 18 35 25 26
29 18 35 25 26
23 15 29 21 23
23 15 29 21 23
35 23 38 29 31
35 23 38 29 31
Payload Kapal
TCH
Kapal 2 Kapal 4 Kapal 9 Kapal 12 Kapal 14
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
2001.5 2289.0 2917.6 13257.4 11989.2
12890.7
CC+OC /tahun
TCH
Kapal 2 Kapal 4 Kapal 9 Kapal 12 Kapal 14
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
Rp32,669,734,972 Rp26,658,092,727 Rp26,990,747,578 Rp40,354,100,490 Rp38,314,599,917
VC
TCH
Kapal 2 Kapal 4 Kapal 9 Kapal 12 Kapal 14
Rp 772,871,736 Rp 1,028,183,675 Rp 576,123,694 Rp 3,801,098,690 Rp 2,737,920,467
Rp 1,274,852,097 Rp 1,776,433,716 Rp 927,957,609 Rp 6,260,331,865 Rp 4,694,122,105
Rp 274,963,926 Rp 363,471,194 Rp 228,545,413 Rp 1,268,090,456 Rp 921,686,761
Rp 1,357,660,646 Rp 1,988,798,883 Rp 1,077,915,643 Rp 7,206,227,923 Rp 5,300,551,316
Rp 1,423,928,544 Rp 2,015,398,515 Rp 1,128,885,448 Rp 7,018,821,582 Rp 5,300,152,213
Rp 1,423,928,544 Rp 2,015,398,515 Rp 1,128,885,448 Rp 7,018,821,582 Rp 5,300,152,213
Rp 1,022,077,869 Rp 1,279,006,641 Rp 783,716,456 Rp 4,513,067,129 Rp 3,503,822,471
Rp 1,022,077,869 Rp 1,279,006,641 Rp 783,716,456 Rp 4,513,067,129 Rp 3,503,822,471
Rp 1,447,685,095 Rp 2,054,656,147 Rp 1,149,966,726 Rp 7,257,292,168 Rp 5,364,841,615
Rp 1,447,685,095 Rp 2,054,656,147 Rp 1,149,966,726 Rp 7,257,292,168 Rp 5,364,841,615
Rp 1,973,761,386 Rp 2,842,082,942 Rp 1,522,541,380 Rp 10,073,058,381 Rp 7,606,519,522
Rp 1,973,761,386 Rp 2,842,082,942 Rp 1,522,541,380 Rp 10,073,058,381 Rp 7,606,519,522
Rp 2,466,578,507 Rp 3,498,383,074 Rp 1,865,602,244 Rp 12,439,668,345 Rp 9,385,433,295
Rp 2,466,578,507 Rp 3,498,383,074 Rp 1,865,602,244 Rp 12,439,668,345 Rp 9,385,433,295
Rp 1,603,472,986 Rp 2,234,013,615 Rp 1,282,496,794 Rp 7,999,426,566 Rp 6,041,573,365
Rp 1,603,472,986 Rp 2,234,013,615 Rp 1,282,496,794 Rp 7,999,426,566 Rp 6,041,573,365
Second Hand Rute
Kapal 17 Kapal 21 Kapal SH1 Kapal SH2 Rute
58 38 38 58 Rute 1
43 31 35 43 Rute 2
87 50 50 87 Rute 3
39 32 32 39 Rute 4
35 23 25 31 Rute 29
35 23 25 31 Rute 30
43 58 29 38 Rute 31
43 29 29 38 Rute 32
35 25 25 31 Rute 33
35 25 25 31 Rute 34
29 20 21 26 Rute 35
29 20 21 26 Rute 36
25 18 19 23 Rute 37
25 18 19 23 Rute 38
31 23 25 29 Rute 39
31 23 25 29 Rute 40
CC+OC /tahun
Second Hand
Kapal 17 Kapal 21 Kapal SH1 Kapal SH2
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
Rp39,732,470,770 Rp28,302,818,591 Rp38,686,861,241 Rp38,686,861,241
VC
Second Hand
Kapal 17 Kapal 21 Kapal SH1 Kapal SH2
Rp 3,068,674,015 Rp 899,386,343 Rp 4,290,053,793 Rp 602,493,383
Rp 5,070,507,643 Rp 1,187,169,299 Rp 6,859,543,606 Rp 867,503,005
Rp 1,100,035,285 Rp 614,546,203 Rp 1,655,778,474 Rp 340,273,881
Rp 5,845,302,294 Rp 1,233,316,974 Rp 7,886,605,017 Rp 984,185,366
Rp 5,719,293,393 Rp 1,540,365,859 Rp 7,880,174,477 Rp 1,116,299,525
Rp 22,935,706,854 Rp 1,540,365,859 Rp 7,880,174,477 Rp 1,116,299,525
Rp 3,772,356,794 Rp 1,176,194,601 Rp 5,275,970,279 Rp 855,512,302
Rp 3,772,356,794 Rp 1,176,194,601 Rp 5,275,970,279 Rp 855,512,302
Rp 5,909,187,042 Rp 1,472,923,844 Rp 8,143,296,794 Rp 1,128,831,970
Rp 5,909,187,042 Rp 1,472,923,844 Rp 8,143,296,794 Rp 1,128,831,970
Rp 8,102,985,385 Rp 1,854,545,238 Rp 11,089,560,005 Rp 1,405,911,372
Rp 8,102,985,385 Rp 1,854,545,238 Rp 11,089,560,005 Rp 1,405,911,372
Rp 10,030,932,620 Rp 2,136,508,982 Rp 13,667,451,970 Rp 1,665,445,351
Rp 10,030,932,620 Rp 2,136,508,982 Rp 13,667,451,970 Rp 1,665,445,351
Rp 6,521,857,408 Rp 1,589,072,831 Rp 8,834,932,600 Rp 1,235,413,935
Rp 6,521,857,408 Rp 1,589,072,831 Rp 8,834,932,600 Rp 1,235,413,935
Frekuensi Terpakai
Rute VCH
Kombinasi Kapal 10 Kapal 11 Kapal 13 Kapal 22 Kapal 2 Kapal 4
121 43 12 0 0 0 0
131 49 0 0 0 0 0
141 0 0 0 0 0 0
151 27 -12 0 0 0 0
1231 26 0 0 0 0 0
1321 26 0 0 0 0 0
1241 35 0 0 0 0 0
1421 35 0 0 0 0 0
1341 0 0 0 -90 0 0
1431 0 0 0 0 0 0
1251 20 0 0 0 0 0
1521 20 0 0 0 0 0
1351 16 0 0 0 0 0
1531 16 0 0 0 0 0
1451 30 0 0 0 0 0
1541 23 0 0 0 0 0
Cargo Carried
Rute VCH
Kombinasi Kapal 10 Kapal 11 Kapal 13 Kapal 22 Kapal 2 Kapal 4
121 554,300.87 ### - - - -
131 637,237.55 - - - - -
141 - - - - - -
151 348,049.39 - - - - -
1231 335,158.67 - - - - -
1321 335,158.67 - - - - -
1241 451,175.13 - - - - -
1421 451,175.13 - - - - -
1341 - - - - - -
1431 - - - - - -
1251 257,814.36 - - - - -
1521 257,814.36 - - - - -
1351 206,251.49 - - - - -
1531 206,251.49 - - - - -
1451 384,687.60 - - - - -
1541 296,486.51 - - - - -
Frekuensi Terpakai
TCH Second Hand
Kapal 9 Kapal 12 Kapal 14 Kapal 17 Kapal 21 Kapal SH1
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
Cargo Carried
TCH Second Hand
Kapal 9 Kapal 12 Kapal 14 Kapal 17 Kapal 21 Kapal SH1
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
Second Hand Rute VCH
Kapal SH2 Rute Kombinasi Kapal 10 Kapal 11
0 Rute 1 121 0.11086017 0.028102786
0 Rute 2 131 0.12744751 0
0 Rute 3 141 0 0
0 Rute 4 151 0.069609877 -0.028102786
0 Rute 29 1231 0.067031734 0
0 Rute 30 1321 0.067031734 0
0 Rute 31 1241 0.090235026 0
0 Rute 32 1421 0.090235026 0
0 Rute 33 1341 0 0
0 Rute 34 1431 0 0
0 Rute 35 1251 0.051562872 0
0 Rute 36 1521 0.051562872 0
0 Rute 37 1351 0.041250298 0
0 Rute 38 1531 0.041250298 0
0 Rute 39 1451 0.07693752 0
0 Rute 40 1541 0.059297303 0
0.94431224 0
Second Hand
Kapal SH2
- CC+OC+VC /roundtrip
Rute
- VCH
- Rute Kombinasi Kapal 10 Kapal 11
- Rute 1 121 Rp 821,256,149,704 Rp 1,132,592,425
- Rute 2 131 Rp 949,954,165,423 Rp -
- Rute 3 141 Rp - Rp -
- Rute 4 151 Rp 518,563,150,713 Rp -
- Rute 29 1231 Rp 498,645,905,809 Rp -
- Rute 30 1321 Rp 498,645,905,809 Rp -
- Rute 31 1241 Rp 667,840,511,009 Rp -
- Rute 32 1421 Rp 667,840,511,009 Rp -
- Rute 33 1341 Rp - Rp -
- Rute 34 1431 Rp - Rp -
- Rute 35 1251 Rp 384,867,708,510 Rp -
- Rute 36 1521 Rp 384,867,708,510 Rp -
- Rute 37 1351 Rp 308,024,922,236 Rp -
Rute 38 1531 Rp 308,024,922,236 Rp -
Rute 39 1451 Rp 572,291,019,402 Rp -
- Rute 40 1541 Rp 441,076,265,282 Rp -
Rute
VCH
Rute Kombinasi Kapal 10 Kapal 11
Rute 1 121 Rp - Rp -
Rute 2 131 Rp - Rp -
Rute 3 141 Rp - Rp -
Rute 4 151 Rp - Rp -
Rute 29 1231 Rp - Rp -
Rute 30 1321 Rp - Rp -
Rute 31 1241 Rp - Rp -
Rute 32 1421 Rp - Rp -
Rute 33 1341 Rp - Rp -
Rute 34 1431 Rp - Rp -
Rute 35 1251 Rp - Rp -
Rute 36 1521 Rp - Rp -
Rute 37 1351 Rp - Rp -
Rute 38 1531 Rp - Rp -
Rute 39 1451 Rp - Rp -
Rute 40 1541 Rp - Rp -
Rute
VCH
Rute Kombinasi Kapal 10 Kapal 11
Rute 1 121 Rp 1,375,733,301 Rp 1,375,733,301
Rute 2 131 Rp 1,198,006,593 Rp -
Rute 3 141 Rp - Rp -
Rute 4 151 Rp 516,853,338 Rp -
Rute 29 1231 Rp 655,235,196 Rp -
Rute 30 1321 Rp 646,856,229 Rp -
Rute 31 1241 Rp 882,047,379 Rp -
Rute 32 1421 Rp 870,768,001 Rp -
Rute 33 1341 Rp - Rp -
Rute 34 1431 Rp - Rp -
Rute 35 1251 Rp 504,027,074 Rp -
Rute 36 1521 Rp 497,581,715 Rp -
Rute 37 1351 Rp 403,221,659 Rp -
Rute 38 1531 Rp 398,065,372 Rp -
Rute 39 1451 Rp 752,064,266 Rp -
Rute 40 1541 Rp 572,218,972 Rp -
Rute
VCH
Rute Kombinasi Kapal 10 Kapal 11
Rute 1 121 554300.85 140513.93
Rute 2 131 637237.55 0
Rute 3 141 0 0
Rute 4 151 348049.385 -140513.93
Rute 29 1231 335158.67 0
Rute 30 1321 335158.67 0
Rute 31 1241 451175.13 0
Rute 32 1421 451175.13 0
Rute 33 1341 0 0
Rute 34 1431 0 0
Rute 35 1251 257814.36 0
Rute 36 1521 257814.36 0
Rute 37 1351 206251.49 0
Rute 38 1531 206251.49 0
Rute 39 1451 384687.6 0
Rute 40 1541 296486.515 0
Pemilihan Kapal
VCH
Kapal 13 Kapal 22 Kapal 2 Kapal 4
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 1 0
0 0 0 0
0 0 0 1
0 0 1 1
= =
1 1
CC+OC+VC /roundtrip
VCH
Kapal 13 Kapal 22 Kapal 2 Kapal 4
Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
VC
VCH
Kapal 13 Kapal 22 Kapal 2 Kapal 4
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
CHC
VCH
Kapal 13 Kapal 22 Kapal 2 Kapal 4
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Trigger
VCH
Kapal 13 Kapal 22 Kapal 2 Kapal 4
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
Pemilihan Kapal
TCH
Kapal 9 Kapal 12 Kapal 14 Kapal 17
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 1
1 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 1 0
0 0 0 0
0 0 0 0
0 1 0 0
0 0 0 0
1 1 1 1
= = = =
1 1 1 1
CC+OC
TCH
Kapal 9 Kapal 12 Kapal 14 Kapal 17
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
VC
TCH
Kapal 9 Kapal 12 Kapal 14 Kapal 17
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
CHC
TCH
Kapal 9 Kapal 12 Kapal 14 Kapal 17
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Trigger
TCH
Kapal 9 Kapal 12 Kapal 14 Kapal 17
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
Pelabuhan
Second Hand Tanjung Perak
Kapal 21 Kapal SH1 Kapal SH2 Balikpapan
0 0 0 Lampung
1 0 0 Pangkalan Susu
0 0 0
0 0 0 5%
0 0 0 Pelabuhan
0 0 0 Tanjung Perak
0 0 0 Balikpapan
0 0 0 Lampung
0 0 0 Pangkalan Susu
0 0 0 Total
0 0 1
0 0 0 Selisih
0 1 0
0 0 0
0 0 0
0 0 0
Rute
1 1 1
= = = Rute 1
1 1 1 Rute 2
Rute 3
CC+OC Rute 4
Second Hand Rute 29
Kapal 21 Kapal SH1 Kapal SH2 Rute 30
Rp - Rp - Rp - Rute 31
Rp - Rp - Rp - Rute 32
Rp - Rp - Rp - Rute 33
Rp - Rp - Rp - Rute 34
Rp - Rp - Rp - Rute 35
Rp - Rp - Rp - Rute 36
Rp - Rp - Rp - Rute 37
Rp - Rp - Rp - Rute 38
Rp - Rp - Rp - Rute 39
Rp - Rp - Rp - Rute 40
Rp - Rp - Rp -
Rp - Rp - Rp - Pe
Rp - Rp - Rp - Rute
Rp - Rp - Rp - Rute
Rp - Rp - Rp - Rute 1
Rp - Rp - Rp - Rute 2
Rute 3
Rute 4
Second Hand Rute 29
Kapal 21 Kapal SH1 Kapal SH2 Rute 30
Rp - Rp - Rp - Rute 31
Rp - Rp - Rp - Rute 32
Rp - Rp - Rp - Rute 33
Rp - Rp - Rp - Rute 34
Rp - Rp - Rp - Rute 35
Rp - Rp - Rp - Rute 36
Rp - Rp - Rp - Rute 37
Rp - Rp - Rp - Rute 38
Rp - Rp - Rp - Rute 39
Rp - Rp - Rp - Rute 40
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Second Hand
Kapal 21 Kapal SH1 Kapal SH2
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
5000000
Second Hand
Kapal 21 Kapal SH1 Kapal SH2
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Demand Kapasitas Tangki
2,000,000 50,000
700,000 30,000
600,000 20,000
800,000 30,000
762,075 19%
1%
Rp 7,033,679,850,472
Rp 12,600,000
Rp 9,602,146,810,246
Rp 16,635,826,660,718
Rp 3,421,549
Rute Terpilih Kapal Frekuensi Rute Terpilih
Kapal 10
Kapal 11
2
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 1 121 Kapal 9 Rute 1 121
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1 58
Kapal SH2 22
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2 31
Kapal 4
Rute 2 131 Kapal 9 58 Rute 2 131
Kapal 12 38
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
Kapal 10 45
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4 29
Rute 3 141 Kapal 9 Rute 3 141
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Rute 4 151
Kapal 4 Kapal 4
Kapal 9 Rute 4 151 Kapal 9
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 38 Kapal SH2
Kapal 10 Kapal 10
Kapal 11 Kapal 11
Kapal 13 Kapal 13
Kapal 22 Kapal 22
Kapal 2 Kapal 2
Kapal 4 Kapal 4
Kapal 9 Rute 29 1231 Kapal 9
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 Kapal SH2
Kapal 10 Kapal 10
Kapal 11 Kapal 11
Kapal 13 Kapal 13
Kapal 22 Kapal 22
Kapal 2 Kapal 2
Kapal 4 Kapal 4
Kapal 9 Rute 30 1321 Kapal 9
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 Kapal SH2
Kapal 10 Kapal 10
Kapal 11 Kapal 11
Kapal 13 Kapal 13
Kapal 22 Kapal 22
Kapal 2 Kapal 2
Kapal 4 Kapal 4
Kapal 9 Rute 31 1241 Kapal 9
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 Kapal SH2
Kapal 10 Kapal 10
Kapal 11 Kapal 11
Kapal 13 Kapal 13
Kapal 22 Kapal 22
Kapal 2 Kapal 2
Kapal 4 Kapal 4
Kapal 9 Rute 32 1421 Kapal 9
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 Kapal SH2
Kapal 10 Kapal 10
Kapal 11 Kapal 11
Kapal 13 Kapal 13
Kapal 22 Kapal 22
Kapal 2 Kapal 2
Kapal 4 Kapal 4
Kapal 9 Rute 33 1341 Kapal 9
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 Kapal SH2
Kapal 10 Kapal 10
Kapal 11 Kapal 11
Kapal 13 Kapal 13
Kapal 22 Kapal 22
Kapal 2 Kapal 2
Kapal 4 Kapal 4
Kapal 9 Rute 34 1431 Kapal 9
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 Kapal SH2
Kapal 10 Kapal 10
Kapal 11 Kapal 11
Kapal 13 Kapal 13
Kapal 22 Kapal 22
Kapal 2 Kapal 2
Kapal 4 Kapal 4
Kapal 9 Rute 35 1251 Kapal 9
Rute 35 1251
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 Kapal SH2
Kapal 10 Kapal 10
Kapal 11 Kapal 11
Kapal 13 Kapal 13
Kapal 22 Kapal 22
Kapal 2 Kapal 2
Kapal 4 Kapal 4
Kapal 9 Rute 36 1521 Kapal 9
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 Kapal SH2
Kapal 10 Kapal 10
Kapal 11 Kapal 11
Kapal 13 Kapal 13
Kapal 22 Kapal 22
Kapal 2 Kapal 2
Kapal 4 Kapal 4
Kapal 9 Rute 37 1351 Kapal 9
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 Kapal SH2
Kapal 10 Kapal 10
Kapal 11 Kapal 11
Kapal 13 Kapal 13
Kapal 22 Kapal 22
Kapal 2 Kapal 2
Kapal 4 Kapal 4
Kapal 9 Rute 38 1531 Kapal 9
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 Kapal SH2
Kapal 10 Kapal 10
Kapal 11 Kapal 11
Kapal 13 Kapal 13
Kapal 22 Kapal 22
Kapal 2 Kapal 2
Kapal 4 Kapal 4
Kapal 9 Rute 39 1451 Kapal 9
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 Kapal SH2
Kapal 10 Kapal 10
Kapal 11 Kapal 11
Kapal 13 Kapal 13
Kapal 22 Kapal 22
Kapal 2 Kapal 2
Kapal 4 Kapal 4
Kapal 9 Rute 40 1541 Kapal 9
Kapal 12 Kapal 12
Kapal 14 Kapal 14
Kapal 17 Kapal 17
Kapal 21 Kapal 21
Kapal SH1 Kapal SH1
Kapal SH2 Kapal SH2
Cargo Carried - Demand 100 Selisih Cargo Carried - Demand
Total Cost Rp 470,518,304,333 Total Cost
Unit Cost Rp 114,758 Unit Cost
Rute 4 151
Kapal 4
Rute 4 151 Kapal 9
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
39 Kapal SH2 39
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 29 1231 Kapal 9
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
Kapal 10
35 Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 30 1321 Kapal 9
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 31 1241 Kapal 9
Kapal 12
Kapal 14
Kapal 17
54 Kapal 21 53
Kapal SH1
Kapal SH2
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 32 1421 Kapal 9
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 33 1341 Kapal 9
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 34 1431 Kapal 9
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 35 1251 Kapal 9
Rute 35 1251
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 36 1521 Kapal 9
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 37 1351 Kapal 9
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 38 1531 Kapal 9
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 39 1451 Kapal 9
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
Kapal 10
Kapal 11
Kapal 13
Kapal 22
Kapal 2
Kapal 4
Rute 40 1541 Kapal 9
Kapal 12
Kapal 14
Kapal 17
Kapal 21
Kapal SH1
Kapal SH2
526 Selisih Cargo Carried - Demand 11,699
Rp 262,202,157,131 Total Cost Rp 642,647,702,802
Rp 63,944 Unit Cost Rp 156,297
Second Hand
No Kode Rute Kapal SH1
1 121 Rute 1 Rp 75,406,151
2 131 Rute 2 Rp 142,961,608
3 141 Rute 3 Rp 15,339,848
4 151 Rute 4 Rp 181,269,898
5 123451 Rute 5 Rp 843,581,345
6 123541 Rute 6 Rp 802,957,314
7 124351 Rute 7 Rp 1,042,736,258
8 124531 Rute 8 Rp 1,027,650,411
9 125341 Rute 9 Rp 1,014,827,441
10 125431 Rute 10 Rp 1,047,010,581
11 132541 Rute 11 Rp 805,992,443
12 132451 Rute 12 Rp 831,907,773
13 134521 Rute 13 Rp 1,047,010,581
14 134251 Rute 14 Rp 1,049,524,889
15 135421 Rute 15 Rp 1,027,650,411
16 135241 Rute 16 Rp 1,002,255,901
17 142351 Rute 17 Rp 802,023,428
18 142531 Rute 18 Rp 1,002,255,901
19 143251 Rute 19 Rp 820,000,730
20 143521 Rute 20 Rp 1,014,827,441
21 145231 Rute 21 Rp 805,992,443
22 145321 Rute 22 Rp 799,688,714
23 152431 Rute 23 Rp 1,049,524,889
24 152341 Rute 24 Rp 820,000,730
25 153421 Rute 25 Rp 802,023,428
26 153241 Rute 26 Rp 802,023,428
27 154321 Rute 27 Rp 843,581,345
28 154231 Rute 28 Rp 831,907,773
29 1231 Rute 29 Rp 220,267,827
30 1321 Rute 30 Rp 220,267,827
31 1241 Rute 31 Rp 118,427,694
32 1421 Rute 32 Rp 118,427,694
33 1341 Rute 33 Rp 229,419,908
34 1431 Rute 34 Rp 229,419,908
35 1251 Rute 35 Rp 385,963,469
36 1521 Rute 36 Rp 385,963,469
37 1351 Rute 37 Rp 534,455,010
38 1531 Rute 38 Rp 534,455,010
39 1451 Rute 39 Rp 253,476,805
40 1541 Rute 40 Rp 253,476,805
41 12341 Rute 41 Rp 328,402,794
42 12431 Rute 42 Rp 494,321,555
43 13241 Rute 43 Rp 319,801,215
44 13421 Rute 44 Rp 494,321,555
45 14231 Rute 45 Rp 319,801,215
46 14321 Rute 46 Rp 328,402,794
47 12351 Rute 47 Rp 666,175,037
48 12531 Rute 48 Rp 830,653,287
49 13251 Rute 49 Rp 671,690,800
50 13521 Rute 50 Rp 830,653,287
51 15231 Rute 51 Rp 671,690,800
52 15321 Rute 52 Rp 666,175,037
53 12451 Rute 53 Rp 529,699,346
54 12541 Rute 54 Rp 697,431,026
55 14251 Rute 55 Rp 324,102,005
56 14521 Rute 56 Rp 631,854,735
57 15241 Rute 57 Rp 510,280,015
58 15421 Rute 58 Rp 529,699,346
59 13451 Rute 59 Rp 753,732,229
60 13541 Rute 60 Rp 668,217,912
61 14351 Rute 61 Rp 680,475,163
62 14531 Rute 62 Rp 668,217,912
63 15341 Rute 63 Rp 680,475,163
64 15431 Rute 64 Rp 753,732,229
No Kode Rute Kapal 1
1 121 Rute 1 Rp 241,954,943
2 131 Rute 2 Rp 417,370,843
3 141 Rute 3 Rp 70,305,444
4 151 Rute 4 Rp 482,050,347
5 123451 Rute 5 Rp 983,687,975
6 123541 Rute 6 Rp 937,166,148
7 124351 Rute 7 Rp 1,126,461,857
8 124531 Rute 8 Rp 1,110,419,847
9 125341 Rute 9 Rp 1,096,784,140
10 125431 Rute 10 Rp 1,131,007,093
11 132541 Rute 11 Rp 940,641,917
12 132451 Rute 12 Rp 970,319,634
13 134521 Rute 13 Rp 1,131,007,093
14 134251 Rute 14 Rp 1,133,680,761
15 135421 Rute 15 Rp 1,110,419,847
16 135241 Rute 16 Rp 1,083,415,799
17 142351 Rute 17 Rp 936,096,681
18 142531 Rute 18 Rp 1,083,415,799
19 143251 Rute 19 Rp 956,683,926
20 143521 Rute 20 Rp 1,096,784,140
21 145231 Rute 21 Rp 940,641,917
22 145321 Rute 22 Rp 933,423,012
23 152431 Rute 23 Rp 1,133,680,761
24 152341 Rute 24 Rp 956,683,926
25 153421 Rute 25 Rp 936,096,681
26 153241 Rute 26 Rp 936,096,681
27 154321 Rute 27 Rp 983,687,975
28 154231 Rute 28 Rp 970,319,634
29 1231 Rute 29 Rp 461,021,137
30 1321 Rute 30 Rp 461,021,137
31 1241 Rute 31 Rp 291,510,573
32 1421 Rute 32 Rp 291,510,573
33 1341 Rute 33 Rp 479,736,815
34 1431 Rute 34 Rp 479,736,815
35 1251 Rute 35 Rp 673,577,759
36 1521 Rute 36 Rp 673,577,759
37 1351 Rute 37 Rp 841,216,756
38 1531 Rute 38 Rp 841,216,756
39 1451 Rute 39 Rp 528,932,310
40 1541 Rute 40 Rp 528,932,310
41 12341 Rute 41 Rp 524,503,109
42 12431 Rute 42 Rp 701,499,944
43 13241 Rute 43 Rp 511,134,768
44 13421 Rute 44 Rp 701,499,944
45 14231 Rute 45 Rp 511,134,768
46 14321 Rute 46 Rp 524,503,109
47 12351 Rute 47 Rp 885,983,050
48 12531 Rute 48 Rp 1,033,302,168
49 13251 Rute 49 Rp 893,201,954
50 13521 Rute 50 Rp 1,033,302,168
51 15231 Rute 51 Rp 893,201,954
52 15321 Rute 52 Rp 885,983,050
53 12451 Rute 53 Rp 750,695,439
54 12541 Rute 54 Rp 926,890,173
55 14251 Rute 55 Rp 517,818,938
56 14521 Rute 56 Rp 841,065,424
57 15241 Rute 57 Rp 723,691,390
58 15421 Rute 58 Rp 750,695,439
59 13451 Rute 59 Rp 938,921,680
60 13541 Rute 60 Rp 888,656,718
61 14351 Rute 61 Rp 904,698,727
62 14531 Rute 62 Rp 888,656,718
63 15341 Rute 63 Rp 904,698,727
64 15431 Rute 64 Rp 938,921,680
Data Kapal
No Data Kapal 1 Kapal 2
1 Nama Kapal GAS WALIO PRIMA LAUTAN II
2 T Kapal 7 8.7
3 Payload 2046.3 2001.5
4 TCH/tahun Rp 32,673,343,753 Rp 32,669,734,972
5 CC+OC Rp - Rp -
6 Umur 16 9
Unit Cost VCH/ton
Kapal 1 Kapal 3 Kapal 5
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Rp 999,999,999,999,999 Rp 999,999,999,999,999 Rp 999,999,999,999,999
Second Hand
Kapal SH2 Kapal 1 Kapal 3
Rp 2,408,638 Rp 3,456,499 Rp 2,529,056
Rp 5,629,660 Rp 8,347,417 Rp 6,537,550
Rp 456,929 Rp 401,745 Rp 367,690
Rp 7,166,768 Rp 10,955,690 Rp 8,755,776
Rp 33,484,595 Rp 46,842,285 Rp 38,847,964
Rp 30,119,408 Rp 44,626,959 Rp 37,013,432
Rp 40,773,287 Rp 59,287,466 Rp 51,149,788
Rp 40,189,478 Rp 58,443,150 Rp 50,422,301
Rp 39,693,240 Rp 57,725,481 Rp 49,803,938
Rp 40,938,700 Rp 59,526,689 Rp 51,355,909
Rp 30,231,846 Rp 44,792,472 Rp 37,150,495
Rp 33,026,705 Rp 46,205,697 Rp 38,320,799
Rp 40,938,700 Rp 59,526,689 Rp 51,355,909
Rp 41,036,002 Rp 59,667,408 Rp 51,477,157
Rp 40,189,478 Rp 58,443,150 Rp 50,422,301
Rp 39,206,732 Rp 57,021,884 Rp 46,854,951
Rp 30,084,812 Rp 44,576,032 Rp 36,971,259
Rp 39,206,732 Rp 57,021,884 Rp 46,854,951
Rp 30,750,788 Rp 45,556,377 Rp 37,783,092
Rp 39,693,240 Rp 57,725,481 Rp 49,803,938
Rp 30,231,846 Rp 44,792,472 Rp 37,150,495
Rp 29,998,322 Rp 44,448,715 Rp 36,865,827
Rp 41,036,002 Rp 59,667,408 Rp 51,477,157
Rp 30,750,788 Rp 45,556,377 Rp 37,783,092
Rp 30,084,812 Rp 44,576,032 Rp 36,971,259
Rp 30,084,812 Rp 44,576,032 Rp 36,971,259
Rp 33,484,595 Rp 46,842,285 Rp 38,847,964
Rp 33,026,705 Rp 46,205,697 Rp 38,320,799
Rp 8,590,873 Rp 12,132,135 Rp 9,742,513
Rp 8,590,873 Rp 12,132,135 Rp 9,742,513
Rp 4,410,903 Rp 5,026,044 Rp 4,572,171
Rp 4,410,903 Rp 5,026,044 Rp 4,572,171
Rp 8,942,414 Rp 12,624,653 Rp 10,137,274
Rp 8,942,414 Rp 12,624,653 Rp 10,137,274
Rp 15,003,257 Rp 21,728,315 Rp 19,732,645
Rp 15,003,257 Rp 21,728,315 Rp 19,732,645
Rp 21,204,246 Rp 33,648,670 Rp 29,375,256
Rp 21,204,246 Rp 33,648,670 Rp 29,375,256
Rp 10,546,911 Rp 13,919,271 Rp 12,645,314
Rp 10,546,911 Rp 13,919,271 Rp 12,645,314
Rp 10,433,534 Rp 13,802,713 Rp 12,546,552
Rp 16,225,374 Rp 24,189,653 Rp 20,558,096
Rp 10,165,116 Rp 13,450,915 Rp 12,227,479
Rp 16,225,374 Rp 24,189,653 Rp 20,558,096
Rp 10,165,116 Rp 13,450,915 Rp 12,227,479
Rp 10,433,534 Rp 13,802,713 Rp 12,546,552
Rp 25,652,765 Rp 35,439,322 Rp 30,947,033
Rp 31,517,705 Rp 49,204,865 Rp 40,792,951
Rp 25,862,937 Rp 35,728,078 Rp 31,198,855
Rp 31,517,705 Rp 49,204,865 Rp 40,792,951
Rp 25,862,937 Rp 35,728,078 Rp 31,198,855
Rp 25,652,765 Rp 35,439,322 Rp 30,947,033
Rp 18,881,736 Rp 25,886,050 Rp 21,997,424
Rp 26,843,737 Rp 40,299,573 Rp 33,668,987
Rp 10,299,325 Rp 13,626,814 Rp 12,387,015
Rp 23,185,745 Rp 33,642,617 Rp 29,380,139
Rp 18,198,087 Rp 24,954,876 Rp 21,207,358
Rp 18,881,736 Rp 25,886,050 Rp 21,997,424
Rp 27,194,023 Rp 40,822,682 Rp 34,105,479
Rp 25,730,607 Rp 35,546,269 Rp 31,040,301
Rp 26,197,654 Rp 36,187,949 Rp 31,599,905
Rp 25,730,607 Rp 35,546,269 Rp 31,040,301
Rp 26,197,654 Rp 36,187,949 Rp 31,599,905
Rp 27,194,023 Rp 40,822,682 Rp 34,105,479
Kapal 2 Kapal 3 Kapal 4
Rp 18,635,901,342 Rp 220,027,831 Rp 430,453,757
Rp 459,230,694 Rp 379,177,880 Rp 749,949,535
Rp 76,764,980 Rp 64,345,728 Rp 117,368,049
Rp 531,238,127 Rp 437,788,780 Rp 868,383,611
Rp 1,083,822,786 Rp 893,503,162 Rp 7,837,172,177
Rp 1,032,473,222 Rp 851,308,947 Rp 1,683,354,602
Rp 1,241,412,825 Rp 1,022,995,753 Rp 2,028,626,692
Rp 1,223,706,079 Rp 1,008,446,023 Rp 1,999,366,346
Rp 1,208,655,345 Rp 996,078,754 Rp 1,974,495,051
Rp 1,246,429,737 Rp 1,027,118,176 Rp 2,036,917,124
Rp 1,036,309,684 Rp 854,461,389 Rp 1,689,694,344
Rp 1,069,067,164 Rp 881,378,388 Rp 1,743,825,985
Rp 1,246,429,737 Rp 1,027,118,176 Rp 2,036,917,124
Rp 1,249,380,861 Rp 1,029,543,131 Rp 2,041,793,848
Rp 1,223,706,079 Rp 1,008,446,023 Rp 1,999,366,346
Rp 1,193,899,723 Rp 983,953,979 Rp 1,950,111,429
Rp 1,031,292,773 Rp 850,338,965 Rp 1,681,403,913
Rp 1,193,899,723 Rp 983,953,979 Rp 1,950,111,429
Rp 1,054,016,430 Rp 869,011,118 Rp 1,718,954,691
Rp 1,208,655,345 Rp 996,078,754 Rp 1,974,495,051
Rp 1,036,309,684 Rp 854,461,389 Rp 1,689,694,344
Rp 1,028,341,648 Rp 847,914,010 Rp 1,676,527,188
Rp 1,249,380,861 Rp 1,029,543,131 Rp 2,041,793,848
Rp 1,054,016,430 Rp 869,011,118 Rp 1,718,954,691
Rp 1,031,292,773 Rp 850,338,965 Rp 1,681,403,913
Rp 1,031,292,773 Rp 850,338,965 Rp 1,681,403,913
Rp 1,083,822,786 Rp 893,503,162 Rp 1,768,209,608
Rp 1,069,067,164 Rp 881,378,388 Rp 1,743,825,985
Rp 507,695,343 Rp 418,928,077 Rp 825,282,440
Rp 507,695,343 Rp 418,928,077 Rp 825,282,440
Rp 320,594,061 Rp 265,185,938 Rp 516,098,111
Rp 320,594,061 Rp 265,185,938 Rp 516,098,111
Rp 528,353,214 Rp 435,902,762 Rp 859,419,511
Rp 528,353,214 Rp 435,902,762 Rp 859,419,511
Rp 742,309,728 Rp 611,711,990 Rp 1,212,982,032
Rp 742,309,728 Rp 611,711,990 Rp 1,212,982,032
Rp 927,345,224 Rp 763,756,662 Rp 1,518,752,654
Rp 927,345,224 Rp 763,756,662 Rp 1,518,752,654
Rp 582,653,902 Rp 480,521,931 Rp 949,151,241
Rp 582,653,902 Rp 480,521,931 Rp 949,151,241
Rp 577,375,864 Rp 476,768,959 Rp 935,868,416
Rp 772,740,295 Rp 637,300,972 Rp 1,258,707,573
Rp 562,620,242 Rp 464,644,184 Rp 911,484,794
Rp 772,740,295 Rp 637,300,972 Rp 1,258,707,573
Rp 562,620,242 Rp 464,644,184 Rp 911,484,794
Rp 577,375,864 Rp 476,768,959 Rp 935,868,416
Rp 976,367,874 Rp 804,622,859 Rp 1,595,201,559
Rp 1,138,974,825 Rp 938,237,872 Rp 1,863,909,075
Rp 984,335,910 Rp 811,170,237 Rp 1,608,368,715
Rp 1,138,974,825 Rp 938,237,872 Rp 1,863,909,075
Rp 984,335,910 Rp 811,170,237 Rp 1,608,368,715
Rp 976,367,874 Rp 804,622,859 Rp 1,595,201,559
Rp 827,040,983 Rp 681,920,142 Rp 1,348,439,303
Rp 1,021,520,076 Rp 841,724,668 Rp 1,669,815,443
Rp 569,998,053 Rp 470,706,571 Rp 923,676,605
Rp 926,788,985 Rp 763,883,616 Rp 1,513,272,589
Rp 797,234,627 Rp 657,428,097 Rp 1,299,184,386
Rp 827,040,983 Rp 681,920,142 Rp 1,348,439,303
Rp 1,034,800,136 Rp 852,636,965 Rp 1,691,760,703
Rp 979,318,998 Rp 807,047,813 Rp 1,600,078,283
Rp 997,025,744 Rp 821,597,543 Rp 1,629,338,630
Rp 979,318,998 Rp 807,047,813 Rp 1,600,078,283
Rp 997,025,744 Rp 821,597,543 Rp 1,629,338,630
Rp 1,034,800,136 Rp 852,636,965 Rp 1,691,760,703
VCH
Kapal 5 Kapal 7 Kapal 8
Rp 3,121,835 Rp 3,237,936 Rp 102,703,916
Rp 8,261,310 Rp 9,801,149 Rp 268,825,191
Rp 441,282 Rp 444,081 Rp 13,721,760
Rp 10,363,812 Rp 12,886,975 Rp 306,349,232
Rp 43,467,305 Rp 54,984,567 Rp 1,472,362,505
Rp 39,096,871 Rp 47,799,562 Rp 1,347,622,448
Rp 56,464,888 Rp 69,702,456 Rp 1,836,688,224
Rp 55,655,681 Rp 65,264,127 Rp 1,810,138,315
Rp 54,967,855 Rp 64,453,901 Rp 1,787,570,891
Rp 56,694,164 Rp 69,986,746 Rp 1,844,210,699
Rp 39,242,978 Rp 47,979,152 Rp 1,352,711,181
Rp 42,872,300 Rp 54,228,054 Rp 1,396,161,129
Rp 56,694,164 Rp 69,986,746 Rp 1,844,210,699
Rp 56,829,031 Rp 70,153,975 Rp 1,848,635,684
Rp 55,655,681 Rp 65,264,127 Rp 1,810,138,315
Rp 54,293,516 Rp 63,659,563 Rp 1,765,445,967
Rp 39,051,915 Rp 47,744,304 Rp 1,346,056,684
Rp 54,293,516 Rp 63,659,563 Rp 1,765,445,967
Rp 42,265,395 Rp 48,808,027 Rp 1,376,197,640
Rp 54,967,855 Rp 64,453,901 Rp 1,787,570,891
Rp 39,242,978 Rp 47,979,152 Rp 1,352,711,181
Rp 38,939,525 Rp 47,606,158 Rp 1,342,142,274
Rp 56,829,031 Rp 70,153,975 Rp 1,848,635,684
Rp 42,265,395 Rp 48,808,027 Rp 1,376,197,640
Rp 39,051,915 Rp 47,744,304 Rp 1,346,056,684
Rp 39,051,915 Rp 47,744,304 Rp 1,346,056,684
Rp 43,467,305 Rp 54,984,567 Rp 1,472,362,505
Rp 42,872,300 Rp 54,228,054 Rp 1,396,161,129
Rp 9,874,694 Rp 12,541,296 Rp 343,353,726
Rp 9,874,694 Rp 12,541,296 Rp 343,353,726
Rp 4,347,100 Rp 5,824,680 Rp 153,073,903
Rp 4,347,100 Rp 5,824,680 Rp 153,073,903
Rp 11,605,659 Rp 13,058,540 Rp 357,602,177
Rp 11,605,659 Rp 13,058,540 Rp 357,602,177
Rp 20,257,768 Rp 25,544,370 Rp 664,704,508
Rp 20,257,768 Rp 25,544,370 Rp 664,704,508
Rp 31,664,370 Rp 38,119,063 Rp 1,020,646,519
Rp 31,664,370 Rp 38,119,063 Rp 1,020,646,519
Rp 12,806,418 Rp 16,315,278 Rp 459,366,570
Rp 12,806,418 Rp 16,315,278 Rp 459,366,570
Rp 12,663,740 Rp 16,101,357 Rp 452,489,536
Rp 21,059,988 Rp 26,522,337 Rp 748,415,205
Rp 12,337,447 Rp 15,683,284 Rp 440,655,274
Rp 21,059,988 Rp 26,522,337 Rp 748,415,205
Rp 12,337,447 Rp 15,683,284 Rp 440,655,274
Rp 12,663,740 Rp 16,101,357 Rp 452,489,536
Rp 33,304,396 Rp 41,657,198 Rp 1,145,413,217
Rp 45,738,599 Rp 52,891,401 Rp 1,493,260,259
Rp 35,344,740 Rp 42,000,353 Rp 1,154,888,788
Rp 45,738,599 Rp 52,891,401 Rp 1,493,260,259
Rp 35,344,740 Rp 42,000,353 Rp 1,154,888,788
Rp 33,304,396 Rp 41,657,198 Rp 1,145,413,217
Rp 24,509,706 Rp 30,367,441 Rp 801,919,594
Rp 36,686,320 Rp 43,601,740 Rp 1,199,108,121
Rp 12,500,594 Rp 15,892,320 Rp 446,572,405
Rp 31,605,061 Rp 38,001,938 Rp 1,016,360,294
Rp 23,621,337 Rp 29,260,845 Rp 772,550,337
Rp 24,509,706 Rp 30,367,441 Rp 801,919,594
Rp 37,165,456 Rp 44,173,663 Rp 1,214,900,739
Rp 35,163,734 Rp 41,784,292 Rp 1,148,922,688
Rp 35,802,581 Rp 42,546,858 Rp 1,169,979,513
Rp 35,163,734 Rp 41,784,292 Rp 1,148,922,688
Rp 35,802,581 Rp 42,546,858 Rp 1,169,979,513
Rp 37,165,456 Rp 48,014,852 Rp 1,214,900,739
Kapal 5 Kapal 6 Kapal 7
Rp 181,066,437 Rp 316,471,099 Rp 281,700,407
Rp 313,929,784 Rp 550,786,337 Rp 490,057,428
Rp 51,188,710 Rp 87,002,984 Rp 77,714,213
Rp 362,733,413 Rp 637,440,518 Rp 567,026,891
Rp 738,944,187 Rp 1,298,043,898 Rp 1,154,675,907
Rp 703,743,682 Rp 1,235,851,606 Rp 1,099,389,929
Rp 846,973,325 Rp 1,488,909,900 Rp 1,324,346,666
Rp 834,835,219 Rp 1,467,464,282 Rp 1,305,282,536
Rp 824,517,830 Rp 1,449,235,507 Rp 1,289,078,025
Rp 850,412,454 Rp 1,494,986,159 Rp 1,329,748,170
Rp 706,373,605 Rp 1,240,498,156 Rp 1,103,520,490
Rp 728,829,100 Rp 1,280,172,550 Rp 1,138,789,131
Rp 850,412,454 Rp 1,494,986,159 Rp 1,329,748,170
Rp 852,435,472 Rp 1,498,560,429 Rp 1,332,925,525
Rp 834,835,219 Rp 1,467,464,282 Rp 1,305,282,536
Rp 814,402,742 Rp 1,431,364,158 Rp 1,273,191,250
Rp 702,934,475 Rp 1,234,421,898 Rp 1,098,118,987
Rp 814,402,742 Rp 1,431,364,158 Rp 1,273,191,250
Rp 718,511,710 Rp 1,261,943,774 Rp 1,122,584,621
Rp 824,517,830 Rp 1,449,235,507 Rp 1,289,078,025
Rp 706,373,605 Rp 1,240,498,156 Rp 1,103,520,490
Rp 700,911,457 Rp 1,230,847,628 Rp 1,094,941,632
Rp 852,435,472 Rp 1,498,560,429 Rp 1,332,925,525
Rp 718,511,710 Rp 1,261,943,774 Rp 1,122,584,621
Rp 702,934,475 Rp 1,234,421,898 Rp 1,098,118,987
Rp 702,934,475 Rp 1,234,421,898 Rp 1,098,118,987
Rp 738,944,187 Rp 1,298,043,898 Rp 1,154,675,907
Rp 728,829,100 Rp 1,280,172,550 Rp 1,138,789,131
Rp 345,614,304 Rp 606,117,627 Rp 539,275,748
Rp 345,614,304 Rp 606,117,627 Rp 539,275,748
Rp 217,354,992 Rp 379,508,928 Rp 337,831,437
Rp 217,354,992 Rp 379,508,928 Rp 337,831,437
Rp 359,775,427 Rp 631,137,515 Rp 561,517,233
Rp 359,775,427 Rp 631,137,515 Rp 561,517,233
Rp 506,444,200 Rp 890,272,068 Rp 791,875,475
Rp 506,444,200 Rp 890,272,068 Rp 791,875,475
Rp 633,287,400 Rp 1,114,378,778 Rp 991,095,636
Rp 633,287,400 Rp 1,114,378,778 Rp 991,095,636
Rp 396,998,950 Rp 696,904,078 Rp 619,980,566
Rp 396,998,950 Rp 696,904,078 Rp 619,980,566
Rp 392,575,947 Rp 687,584,805 Rp 611,851,553
Rp 526,499,709 Rp 924,201,459 Rp 822,192,458
Rp 382,460,859 Rp 669,713,457 Rp 595,964,778
Rp 526,499,709 Rp 924,201,459 Rp 822,192,458
Rp 382,460,859 Rp 669,713,457 Rp 595,964,778
Rp 392,575,947 Rp 687,584,805 Rp 611,851,553
Rp 666,087,920 Rp 1,170,826,068 Rp 1,041,429,956
Rp 777,556,187 Rp 1,367,768,329 Rp 1,216,502,220
Rp 671,550,067 Rp 1,180,476,597 Rp 1,050,008,815
Rp 777,556,187 Rp 1,367,768,329 Rp 1,216,502,220
Rp 671,550,067 Rp 1,180,476,597 Rp 1,050,008,815
Rp 666,087,920 Rp 1,170,826,068 Rp 1,041,429,956
Rp 563,723,232 Rp 989,968,022 Rp 880,655,791
Rp 697,040,089 Rp 1,225,512,395 Rp 1,090,043,489
Rp 387,518,403 Rp 678,649,131 Rp 603,908,166
Rp 632,101,225 Rp 1,110,778,337 Rp 988,050,392
Rp 543,290,755 Rp 953,867,898 Rp 848,564,505
Rp 563,723,232 Rp 989,968,022 Rp 880,655,791
Rp 706,143,668 Rp 1,241,596,608 Rp 1,104,341,587
Rp 668,110,938 Rp 1,174,400,338 Rp 1,044,607,312
Rp 680,249,043 Rp 1,195,845,956 Rp 1,063,671,442
Rp 668,110,938 Rp 1,174,400,338 Rp 1,044,607,312
Rp 680,249,043 Rp 1,195,845,956 Rp 1,063,671,442
Rp 706,143,668 Rp 1,241,596,608 Rp 1,104,341,587
Kapal 19 Kapal 21
Rp 999,999,999,999,999 Rp 14,226
Rp 999,999,999,999,999 Rp 40,802
Rp 999,999,999,999,999 Rp 47,242
Rp 999,999,999,999,999 Rp 35,752
Rp 999,999,999,999,999 Rp 7,052
Rp 999,999,999,999,999 Rp 7,045
Rp 999,999,999,999,999 Rp 7,073
Rp 999,999,999,999,999 Rp 7,071
Rp 999,999,999,999,999 Rp 7,069
Rp 999,999,999,999,999 Rp 7,074
Rp 999,999,999,999,999 Rp 7,045
Rp 999,999,999,999,999 Rp 7,050
Rp 999,999,999,999,999 Rp 7,074
Rp 999,999,999,999,999 Rp 7,074
Rp 999,999,999,999,999 Rp 7,071
Rp 999,999,999,999,999 Rp 7,067
Rp 999,999,999,999,999 Rp 7,044
Rp 999,999,999,999,999 Rp 7,067
Rp 999,999,999,999,999 Rp 7,047
Rp 999,999,999,999,999 Rp 7,069
Rp 999,999,999,999,999 Rp 7,045
Rp 999,999,999,999,999 Rp 7,044
Rp 999,999,999,999,999 Rp 7,074
Rp 999,999,999,999,999 Rp 7,047
Rp 999,999,999,999,999 Rp 7,044
Rp 999,999,999,999,999 Rp 7,044
Rp 999,999,999,999,999 Rp 7,052
Rp 999,999,999,999,999 Rp 7,050
Rp 999,999,999,999,999 Rp 10,588
Rp 999,999,999,999,999 Rp 10,588
Rp 999,999,999,999,999 Rp 10,955
Rp 999,999,999,999,999 Rp 10,955
Rp 999,999,999,999,999 Rp 21,999
Rp 999,999,999,999,999 Rp 21,999
Rp 999,999,999,999,999 Rp 10,257
Rp 999,999,999,999,999 Rp 10,257
Rp 999,999,999,999,999 Rp 19,216
Rp 999,999,999,999,999 Rp 19,216
Rp 999,999,999,999,999 Rp 20,450
Rp 999,999,999,999,999 Rp 20,450
Rp 999,999,999,999,999 Rp 8,675
Rp 999,999,999,999,999 Rp 8,708
Rp 999,999,999,999,999 Rp 8,672
Rp 999,999,999,999,999 Rp 8,708
Rp 999,999,999,999,999 Rp 8,672
Rp 999,999,999,999,999 Rp 8,675
Rp 999,999,999,999,999 Rp 8,243
Rp 999,999,999,999,999 Rp 8,270
Rp 999,999,999,999,999 Rp 8,245
Rp 999,999,999,999,999 Rp 8,270
Rp 999,999,999,999,999 Rp 8,245
Rp 999,999,999,999,999 Rp 8,243
Rp 999,999,999,999,999 Rp 8,461
Rp 999,999,999,999,999 Rp 8,493
Rp 999,999,999,999,999 Rp 8,418
Rp 999,999,999,999,999 Rp 8,478
Rp 999,999,999,999,999 Rp 8,456
Rp 999,999,999,999,999 Rp 8,461
Rp 999,999,999,999,999 Rp 13,755
Rp 999,999,999,999,999 Rp 13,740
Rp 999,999,999,999,999 Rp 13,744
Rp 999,999,999,999,999 Rp 13,740
Rp 999,999,999,999,999 Rp 13,744
Rp 999,999,999,999,999 Rp 13,755
Payload Kapal
Rute Kapal 2
Rute 1 2001.5
Rute 2 2001.5
Rute 3 2001.5
Rute 4 2001.5
Rute 5 2001.5
Rute 6 2001.5
Rute 7 2001.5
Rute 8 2001.5
Rute 9 2001.5
Rute 10 2001.5
Rute 11 2001.5
Rute 12 2001.5
Rute 13 2001.5
Rute 14 2001.5
Rute 15 2001.5
Rute 16 2001.5
Rute 17 2001.5
Rute 18 2001.5
Rute 19 2001.5
Rute 20 2001.5
Rute 21 2001.5
Rute 22 2001.5
Rute 23 2001.5
Rute 24 2001.5
Rute 25 2001.5
Rute 26 2001.5
Rute 27 2001.5
Rute 28 2001.5
Rute 29 2001.5
Rute 30 2001.5
Rute 31 2001.5
Rute 32 2001.5
Rute 33 2001.5
Rute 34 2001.5
Rute 35 2001.5
Rute 36 2001.5
Rute 37 2001.5
Rute 38 2001.5
Rute 39 2001.5
Rute 40 2001.5
Rute 41 2001.5
Rute 42 2001.5
Rute 43 2001.5
Rute 44 2001.5
Rute 45 2001.5
Rute 46 2001.5
Rute 47 2001.5
Rute 48 2001.5
Rute 49 2001.5
Rute 50 2001.5
Rute 51 2001.5
Rute 52 2001.5
Rute 53 2001.5
Rute 54 2001.5
Rute 55 2001.5
Rute 56 2001.5
Rute 57 2001.5
Rute 58 2001.5
Rute 59 2001.5
Rute 60 2001.5
Rute 61 2001.5
Rute 62 2001.5
Rute 63 2001.5
Rute 64 2001.5
Kapal 18 Kapal 22 Kapal 2 Kapal 4
Rp 311,161,869 Rp 3,516,878 Rp 266,227,162 Rp 8,609,075
Rp 749,883,215 Rp 8,558,702 Rp 10,679,784 Rp 25,860,329
Rp 56,366,560 Rp 588,884 Rp 438,657 Rp 1,011,794
Rp 912,768,747 Rp 11,249,526 Rp 12,073,594 Rp 32,162,356
Rp 4,647,047,714 Rp 48,001,643 Rp 57,043,305 Rp 653,097,681
Rp 3,931,957,229 Rp 45,706,023 Rp 51,623,661 Rp 129,488,816
Rp 5,333,255,608 Rp 60,841,222 Rp 73,024,284 Rp 184,420,608
Rp 5,256,153,598 Rp 59,966,303 Rp 71,982,711 Rp 181,760,577
Rp 5,190,616,889 Rp 56,261,492 Rp 67,147,519 Rp 179,499,550
Rp 5,355,101,178 Rp 61,089,116 Rp 73,319,396 Rp 185,174,284
Rp 3,946,806,505 Rp 45,877,535 Rp 51,815,484 Rp 129,976,488
Rp 4,582,796,038 Rp 47,341,982 Rp 56,266,693 Rp 145,318,832
Rp 5,355,101,178 Rp 61,089,116 Rp 73,319,396 Rp 185,174,284
Rp 5,367,951,513 Rp 61,234,935 Rp 73,492,992 Rp 185,617,623
Rp 5,256,153,598 Rp 59,966,303 Rp 71,982,711 Rp 181,760,577
Rp 5,126,365,213 Rp 55,568,848 Rp 66,327,762 Rp 177,282,857
Rp 3,927,388,221 Rp 45,653,250 Rp 51,564,639 Rp 129,338,763
Rp 5,126,365,213 Rp 55,568,848 Rp 66,327,762 Rp 177,282,857
Rp 4,517,259,329 Rp 46,669,128 Rp 52,700,821 Rp 143,246,224
Rp 5,190,616,889 Rp 56,261,492 Rp 67,147,519 Rp 179,499,550
Rp 3,946,806,505 Rp 45,877,535 Rp 51,815,484 Rp 129,976,488
Rp 3,915,965,701 Rp 41,562,942 Rp 51,417,082 Rp 128,963,630
Rp 5,367,951,513 Rp 61,234,935 Rp 73,492,992 Rp 185,617,623
Rp 4,517,259,329 Rp 46,669,128 Rp 52,700,821 Rp 143,246,224
Rp 3,927,388,221 Rp 45,653,250 Rp 51,564,639 Rp 129,338,763
Rp 3,927,388,221 Rp 45,653,250 Rp 51,564,639 Rp 129,338,763
Rp 4,647,047,714 Rp 48,001,643 Rp 57,043,305 Rp 147,350,801
Rp 4,582,796,038 Rp 47,341,982 Rp 56,266,693 Rp 145,318,832
Rp 1,083,650,218 Rp 12,393,329 Rp 13,360,404 Rp 33,011,298
Rp 1,083,650,218 Rp 12,393,329 Rp 13,360,404 Rp 33,011,298
Rp 515,272,072 Rp 5,905,840 Rp 6,411,881 Rp 13,581,529
Rp 515,272,072 Rp 5,905,840 Rp 6,411,881 Rp 13,581,529
Rp 1,128,626,391 Rp 12,903,698 Rp 13,904,032 Rp 34,376,780
Rp 1,128,626,391 Rp 12,903,698 Rp 13,904,032 Rp 34,376,780
Rp 1,822,229,758 Rp 22,297,008 Rp 25,596,887 Rp 67,387,891
Rp 1,822,229,758 Rp 22,297,008 Rp 25,596,887 Rp 67,387,891
Rp 2,663,078,725 Rp 33,266,243 Rp 40,319,358 Rp 101,250,177
Rp 2,663,078,725 Rp 33,266,243 Rp 40,319,358 Rp 101,250,177
Rp 1,329,972,772 Rp 15,466,260 Rp 16,647,254 Rp 41,267,445
Rp 1,329,972,772 Rp 15,466,260 Rp 16,647,254 Rp 41,267,445
Rp 1,511,538,016 Rp 15,270,512 Rp 16,496,453 Rp 40,689,931
Rp 2,405,048,335 Rp 24,754,483 Rp 29,720,781 Rp 74,041,622
Rp 1,366,855,772 Rp 13,700,396 Rp 16,074,864 Rp 39,629,774
Rp 2,405,048,335 Rp 24,754,483 Rp 29,720,781 Rp 74,041,622
Rp 1,366,855,772 Rp 13,700,396 Rp 16,074,864 Rp 39,629,774
Rp 1,511,538,016 Rp 15,270,512 Rp 16,496,453 Rp 40,689,931
Rp 3,354,891,667 Rp 36,361,988 Rp 42,450,777 Rp 113,942,968
Rp 4,357,038,265 Rp 50,557,543 Rp 59,946,043 Rp 155,325,756
Rp 3,382,648,390 Rp 36,661,210 Rp 42,797,213 Rp 114,883,480
Rp 4,357,038,265 Rp 50,557,543 Rp 59,946,043 Rp 155,325,756
Rp 3,382,648,390 Rp 36,661,210 Rp 42,797,213 Rp 114,883,480
Rp 3,354,891,667 Rp 36,361,988 Rp 42,450,777 Rp 113,942,968
Rp 2,577,009,183 Rp 26,512,365 Rp 31,809,269 Rp 84,277,456
Rp 3,512,179,768 Rp 38,057,580 Rp 48,643,813 Rp 119,272,532
Rp 1,385,213,394 Rp 15,072,614 Rp 16,285,659 Rp 40,159,852
Rp 3,182,183,163 Rp 33,173,232 Rp 40,295,173 Rp 100,884,839
Rp 2,275,732,828 Rp 25,547,441 Rp 30,662,870 Rp 76,422,611
Rp 2,577,009,183 Rp 26,512,365 Rp 31,809,269 Rp 84,277,456
Rp 3,558,440,975 Rp 41,909,004 Rp 49,276,197 Rp 120,840,050
Rp 3,365,171,935 Rp 36,472,811 Rp 42,579,087 Rp 114,291,306
Rp 3,426,853,543 Rp 37,137,749 Rp 47,477,416 Rp 116,381,331
Rp 3,365,171,935 Rp 36,472,811 Rp 42,579,087 Rp 114,291,306
Rp 3,426,853,543 Rp 37,137,749 Rp 47,477,416 Rp 116,381,331
Rp 3,558,440,975 Rp 41,909,004 Rp 49,276,197 Rp 120,840,050
Kapal 12 Kapal 13 Kapal 14 Kapal 15
Rp 2,603,492,765 Rp 2,893,972,425 Rp 1,904,842,643 Rp 3,445,303,769
Rp 4,541,439,127 Rp 5,049,319,186 Rp 3,320,312,888 Rp 6,010,831,287
Rp 701,652,814 Rp 778,721,073 Rp 515,892,091 Rp 927,397,911
Rp 5,263,698,803 Rp 5,852,688,491 Rp 3,847,642,637 Rp 6,967,234,392
Rp 10,719,823,534 Rp 11,918,718,964 Rp 7,837,172,177 Rp 14,188,908,237
Rp 10,204,371,585 Rp 11,345,426,541 Rp 7,460,727,635 Rp 13,506,485,154
Rp 12,301,727,792 Rp 13,678,133,640 Rp 8,992,467,496 Rp 16,283,241,147
Rp 12,123,985,741 Rp 13,480,446,598 Rp 8,862,659,033 Rp 16,047,922,842
Rp 11,972,904,997 Rp 13,312,412,612 Rp 8,752,321,840 Rp 15,847,902,283
Rp 12,352,088,040 Rp 13,734,144,969 Rp 9,029,246,561 Rp 16,349,914,666
Rp 10,242,882,362 Rp 11,388,258,734 Rp 7,488,852,802 Rp 13,557,470,787
Rp 10,571,705,158 Rp 11,753,979,762 Rp 7,728,998,458 Rp 13,992,809,650
Rp 12,352,088,040 Rp 13,734,144,969 Rp 9,029,246,561 Rp 16,349,914,666
Rp 12,381,711,716 Rp 13,767,092,809 Rp 9,050,881,304 Rp 16,389,134,384
Rp 12,123,985,741 Rp 13,480,446,598 Rp 8,862,659,033 Rp 16,047,922,842
Rp 11,824,786,621 Rp 13,147,673,410 Rp 8,644,148,121 Rp 15,651,803,696
Rp 10,192,522,114 Rp 11,332,247,405 Rp 7,452,073,737 Rp 13,490,797,267
Rp 11,824,786,621 Rp 13,147,673,410 Rp 8,644,148,121 Rp 15,651,803,696
Rp 10,420,624,414 Rp 11,585,945,776 Rp 7,618,661,264 Rp 13,792,789,091
Rp 11,972,904,997 Rp 13,312,412,612 Rp 8,752,321,840 Rp 15,847,902,283
Rp 10,242,882,362 Rp 11,388,258,734 Rp 7,488,852,802 Rp 13,557,470,787
Rp 10,162,898,439 Rp 11,299,299,565 Rp 7,430,438,993 Rp 13,451,577,550
Rp 12,381,711,716 Rp 13,767,092,809 Rp 9,050,881,304 Rp 16,389,134,384
Rp 10,420,624,414 Rp 11,585,945,776 Rp 7,618,661,264 Rp 13,792,789,091
Rp 10,192,522,114 Rp 11,332,247,405 Rp 7,452,073,737 Rp 13,490,797,267
Rp 10,192,522,114 Rp 11,332,247,405 Rp 7,452,073,737 Rp 13,490,797,267
Rp 10,719,823,534 Rp 11,918,718,964 Rp 7,837,172,177 Rp 14,188,908,237
Rp 10,571,705,158 Rp 11,753,979,762 Rp 7,728,998,458 Rp 13,992,809,650
Rp 5,000,478,132 Rp 461,021,137 Rp 3,656,912,486 Rp 6,618,248,197
Rp 5,000,478,132 Rp 5,559,191,731 Rp 3,656,912,486 Rp 6,618,248,197
Rp 3,122,337,121 Rp 3,470,298,652 Rp 2,285,269,728 Rp 4,131,718,113
Rp 3,122,337,121 Rp 3,470,298,652 Rp 2,285,269,728 Rp 4,131,718,113
Rp 5,207,843,859 Rp 5,789,826,614 Rp 3,808,355,692 Rp 6,892,786,219
Rp 5,207,843,859 Rp 5,789,826,614 Rp 3,808,355,692 Rp 6,892,786,219
Rp 7,355,560,315 Rp 673,577,759 Rp 5,376,874,618 Rp 9,736,215,731
Rp 7,355,560,315 Rp 8,178,545,041 Rp 5,376,874,618 Rp 9,736,215,731
Rp 9,212,964,753 Rp 10,244,374,633 Rp 6,733,373,054 Rp 12,195,292,013
Rp 9,212,964,753 Rp 10,244,374,633 Rp 6,733,373,054 Rp 12,195,292,013
Rp 5,752,919,484 Rp 6,396,066,877 Rp 4,206,434,978 Rp 7,614,429,019
Rp 5,752,919,484 Rp 6,396,066,877 Rp 4,206,434,978 Rp 7,614,429,019
Rp 5,667,998,865 Rp 6,300,815,160 Rp 4,146,071,290 Rp 7,501,319,129
Rp 7,629,086,166 Rp 8,481,962,193 Rp 5,578,291,330 Rp 701,499,944
Rp 5,519,880,488 Rp 6,136,075,958 Rp 4,037,897,571 Rp 7,305,220,542
Rp 7,629,086,166 Rp 8,481,962,193 Rp 5,578,291,330 Rp 10,097,664,421
Rp 5,519,880,488 Rp 6,136,075,958 Rp 4,037,897,571 Rp 7,305,220,542
Rp 5,667,998,865 Rp 6,300,815,160 Rp 4,146,071,290 Rp 7,501,319,129
Rp 9,673,119,758 Rp 10,755,363,179 Rp 7,071,088,652 Rp 12,803,824,922
Rp 11,305,384,265 Rp 12,570,789,183 Rp 8,263,163,036 Rp 14,964,831,352
Rp 9,753,103,682 Rp 10,844,322,348 Rp 7,129,502,460 Rp 12,909,718,159
Rp 1,033,302,168 Rp 12,570,789,183 Rp 8,263,163,036 Rp 14,964,831,352
Rp 9,753,103,682 Rp 10,844,322,348 Rp 7,129,502,460 Rp 12,909,718,159
Rp 9,673,119,758 Rp 10,755,363,179 Rp 7,071,088,652 Rp 12,803,824,922
Rp 8,174,161,791 Rp 9,088,202,456 Rp 5,976,370,616 Rp 10,819,307,222
Rp 10,126,361,990 Rp 11,259,465,136 Rp 7,402,100,232 Rp 13,403,886,599
Rp 5,593,939,676 Rp 6,218,445,559 Rp 4,091,984,430 Rp 7,403,269,835
Rp 9,175,442,014 Rp 10,201,839,460 Rp 6,707,624,956 Rp 12,144,933,670
Rp 7,874,962,671 Rp 8,755,429,268 Rp 5,757,859,703 Rp 10,423,188,076
Rp 8,174,161,791 Rp 9,088,202,456 Rp 5,976,370,616 Rp 10,819,307,222
Rp 10,259,668,528 Rp 11,407,730,418 Rp 7,499,456,579 Rp 13,580,375,327
Rp 9,702,743,434 Rp 10,788,311,019 Rp 7,092,723,396 Rp 12,843,044,640
Rp 9,880,485,485 Rp 10,985,998,061 Rp 7,222,531,859 Rp 13,078,362,944
Rp 9,702,743,434 Rp 10,788,311,019 Rp 7,092,723,396 Rp 12,843,044,640
Rp 9,880,485,485 Rp 10,985,998,061 Rp 7,222,531,859 Rp 13,078,362,944
Rp 10,259,668,528 Rp 11,407,730,418 Rp 7,499,456,579 Rp 13,580,375,327
Kapal 21 Kapal 22
GAS VENUS ARIMBI
5.5 5
45613.7 6445.1
Rp 28,302,818,591 Rp 27,341,835,765
Rp - Rp -
6 10
Kapal 18 Kapal 22 Rute
44772.678 6445.068 Rute 1
44772.678 6445.068 Rute 2
44772.678 6445.068 Rute 3
44772.678 6445.068 Rute 4
44772.678 6445.068 Rute 5
44772.678 6445.068 Rute 6
44772.678 6445.068 Rute 7
44772.678 6445.068 Rute 8
44772.678 6445.068 Rute 9
44772.678 6445.068 Rute 10
44772.678 6445.068 Rute 11
44772.678 6445.068 Rute 12
44772.678 6445.068 Rute 13
44772.678 6445.068 Rute 14
44772.678 6445.068 Rute 15
44772.678 6445.068 Rute 16
44772.678 6445.068 Rute 17
44772.678 6445.068 Rute 18
44772.678 6445.068 Rute 19
44772.678 6445.068 Rute 20
44772.678 6445.068 Rute 21
44772.678 6445.068 Rute 22
44772.678 6445.068 Rute 23
44772.678 6445.068 Rute 24
44772.678 6445.068 Rute 25
44772.678 6445.068 Rute 26
44772.678 6445.068 Rute 27
44772.678 6445.068 Rute 28
44772.678 6445.068 Rute 29
44772.678 6445.068 Rute 30
44772.678 6445.068 Rute 31
44772.678 6445.068 Rute 32
44772.678 6445.068 Rute 33
44772.678 6445.068 Rute 34
44772.678 6445.068 Rute 35
44772.678 6445.068 Rute 36
44772.678 6445.068 Rute 37
44772.678 6445.068 Rute 38
44772.678 6445.068 Rute 39
44772.678 6445.068 Rute 40
44772.678 6445.068 Rute 41
44772.678 6445.068 Rute 42
44772.678 6445.068 Rute 43
44772.678 6445.068 Rute 44
44772.678 6445.068 Rute 45
44772.678 6445.068 Rute 46
44772.678 6445.068 Rute 47
44772.678 6445.068 Rute 48
44772.678 6445.068 Rute 49
44772.678 6445.068 Rute 50
44772.678 6445.068 Rute 51
44772.678 6445.068 Rute 52
44772.678 6445.068 Rute 53
44772.678 6445.068 Rute 54
44772.678 6445.068 Rute 55
44772.678 6445.068 Rute 56
44772.678 6445.068 Rute 57
44772.678 6445.068 Rute 58
44772.678 6445.068 Rute 59
44772.678 6445.068 Rute 60
44772.678 6445.068 Rute 61
44772.678 6445.068 Rute 62
44772.678 6445.068 Rute 63
44772.678 6445.068 Rute 64
Payload Kapal
Rute
Rute 1
Rute 2
Rute 3
Rute 4
Rute 5
Rute 6
Rute 7
Rute 8
Rute 9
Rute 10
Rute 11
Rute 12
Rute 13
Rute 14
Rute 15
Rute 16
Rute 17
Rute 18
Rute 19
Rute 20
Rute 21
Rute 22
Rute 23
Rute 24
Rute 25
Rute 26
Rute 27
Rute 28
Rute 29
Rute 30
Rute 31
Rute 32
Rute 33
Rute 34
Rute 35
Rute 36
Rute 37
Rute 38
Rute 39
Rute 40
Rute 41
Rute 42
Rute 43
Rute 44
Rute 45
Rute 46
Rute 47
Rute 48
Rute 49
Rute 50
Rute 51
Rute 52
Rute 53
Rute 54
Rute 55
Rute 56
Rute 57
Rute 58
Rute 59
Rute 60
Rute 61
Rute 62
Rute 63
Rute 64
Freku
Kapal 1 Kapal 3 Kapal 5
70 87 58
50 58 38
175 175 116
44 50 35
21 23 17
21 23 18
19 20 15
19 20 15
19 20 15
19 20 15
21 23 18
21 23 17
19 20 15
19 20 15
19 20 15
19 21 15
21 23 18
19 21 15
21 23 17
19 20 15
21 23 18
21 23 18
19 20 15
21 23 17
21 23 18
21 23 18
21 23 17
21 23 17
38 43 35
38 43 35
58 58 50
58 58 50
38 43 31
38 43 31
31 31 25
31 31 25
25 26 20
25 26 20
38 38 31
38 38 31
38 38 31
29 31 25
38 38 31
29 31 25
38 38 31
38 38 31
25 26 20
21 23 17
25 26 19
21 23 17
25 26 19
25 26 20
29 31 23
23 25 19
38 38 31
25 26 20
29 31 23
29 31 23
23 25 19
25 26 19
25 26 19
25 26 19
25 26 19
23 25 19
Kapal 19 Kapal 21
38 38
31 31
50 50
30 32
12 12
12 13
12 12
12 12
12 12
12 12
12 13
12 13
12 12
12 12
12 12
12 12
12 13
12 12
12 13
12 12
12 13
12 13
12 12
12 13
12 13
12 13
12 12
12 13
21 23
21 23
26 58
26 29
23 25
23 25
19 20
19 20
17 18
17 18
23 23
23 23
18 18
16 16
18 18
16 16
18 18
18 18
15 15
14 14
15 15
14 14
15 15
15 15
15 16
14 15
18 18
15 15
16 16
15 16
14 15
15 15
15 15
15 15
15 15
14 15
Seleksi Kapal
Keterpilihan Kode T
999 Kapal 1 7
1 Kapal 2 8.7
999 Kapal 3 7.8
1 Kapal 4 4
999 Kapal 5 4.8
999 Kapal 6 5.4
999 Kapal 7 5.6
999 Kapal 8 11.92
1 Kapal 9 5.5
1 Kapal 10 7.7
1 Kapal 11 5
1 Kapal 12 8.4
1 Kapal 13 8.35
1 Kapal 14 8
999 Kapal 15 8.9
1 Kapal SH1 10
1 Kapal 17 6.8
999 Kapal 18 11.2
999 Kapal 19 11.7
1 Kapal SH2 5.4
1 Kapal 21 5.5
1 Kapal 22 5
Kebutuhan Kapal
Jumlah Satuan
Kapal 1 0 unit
Kapal 2 0 unit
Kapal 3 0 unit
Kapal 4 0 unit
Kapal 5 0 unit
Kapal 6 0 unit
Kapal 7 0 unit
Kapal 8 0 unit
Kapal 9 0 unit
Kapal 10 0 unit
Kapal 11 0 unit
Kapal 12 0 unit
Kapal 13 0 unit
Kapal 14 0 unit
Kapal 15 0 unit
Kapal 16 0 unit
Kapal 17 0 unit
Kapal 18 0 unit
Kapal 19 0 unit
Kapal 20 0 unit
Kapal 21 0 unit
Kapal 22 0 unit
Pemilihan Rute
No Kode Rute
1 121 Rute 1
2 131 Rute 2
3 141 Rute 3
4 151 Rute 4
29 1231 Rute 29
30 1321 Rute 30
31 1241 Rute 31
32 1421 Rute 32
33 1341 Rute 33
34 1431 Rute 34
35 1251 Rute 35
36 1521 Rute 36
37 1351 Rute 37
38 1531 Rute 38
39 1451 Rute 39
40 1541 Rute 40
41 12341 Rute 41
42 12431 Rute 42
43 13241 Rute 43
44 13421 Rute 44
45 14231 Rute 45
46 14321 Rute 46
47 12351 Rute 47
48 12531 Rute 48
49 13251 Rute 49
50 13521 Rute 50
51 15231 Rute 51
52 15321 Rute 52
53 12451 Rute 53
54 12541 Rute 54
55 14251 Rute 55
56 14521 Rute 56
57 15241 Rute 57
58 15421 Rute 58
59 13451 Rute 59
60 13541 Rute 60
61 14351 Rute 61
62 14531 Rute 62
63 15341 Rute 63
64 15431 Rute 64
No Kode Rute
1 121 Rute 1
2 131 Rute 2
3 141 Rute 3
4 151 Rute 4
5 123451 Rute 5
6 123541 Rute 6
7 124351 Rute 7
8 124531 Rute 8
9 125341 Rute 9
10 125431 Rute 10
11 132541 Rute 11
12 132451 Rute 12
13 134521 Rute 13
14 134251 Rute 14
15 135421 Rute 15
16 135241 Rute 16
17 142351 Rute 17
18 142531 Rute 18
19 143251 Rute 19
20 143521 Rute 20
21 145231 Rute 21
22 145321 Rute 22
23 152431 Rute 23
24 152341 Rute 24
25 153421 Rute 25
26 153241 Rute 26
27 154321 Rute 27
28 154231 Rute 28
29 1231 Rute 29
30 1321 Rute 30
31 1241 Rute 31
32 1421 Rute 32
33 1341 Rute 33
34 1431 Rute 34
35 1251 Rute 35
36 1521 Rute 36
37 1351 Rute 37
38 1531 Rute 38
39 1451 Rute 39
40 1541 Rute 40
41 12341 Rute 41
42 12431 Rute 42
43 13241 Rute 43
44 13421 Rute 44
45 14231 Rute 45
46 14321 Rute 46
47 12351 Rute 47
48 12531 Rute 48
49 13251 Rute 49
50 13521 Rute 50
51 15231 Rute 51
52 15321 Rute 52
53 12451 Rute 53
54 12541 Rute 54
55 14251 Rute 55
56 14521 Rute 56
57 15241 Rute 57
58 15421 Rute 58
59 13451 Rute 59
60 13541 Rute 60
61 14351 Rute 61
62 14531 Rute 62
63 15341 Rute 63
64 15431 Rute 64
Supply 4,100,000
Selisih Batas
- 2,000,000 0% 2 50%
- 700,000 0% 3 17% 33%
- 600,000 0% 4 17% 33%
- 800,000 0% 5 17% 33%
100% 100%
POD 1 POD 2 POD 3 POD 4 Demand
2 0 0 0 2000000
3 0 0 0 700000
4 0 0 0 600000
5 0 0 0 800000
2 3 4 5 4100000
2 3 5 5 4100000
2 4 3 4 4100000
2 4 5 5 4100000
2 5 3 3 4100000
2 5 4 4 4100000
3 2 5 3 4100000
3 2 4 4 4100000
3 4 5 5 4100000
3 4 2 2 4100000
3 5 4 5 4100000
3 5 2 2 4100000
4 2 3 4 4100000
4 2 5 5 4100000
4 3 2 3 4100000
4 3 5 5 4100000
4 5 2 2 4100000
4 5 3 3 4100000
5 2 4 2 4100000
5 2 3 3 4100000
5 3 4 4 4100000
5 3 2 2 4100000
5 4 3 4 4100000
5 4 2 2 4100000
2 3 0 3 2700000
3 2 0 0 2700000
2 4 0 0 2600000
4 2 0 0 2600000
3 4 0 0 1300000
4 3 0 0 1300000
2 5 0 0 2800000
5 2 0 0 2800000
3 5 0 0 1500000
5 3 0 0 1500000
4 5 0 0 1400000
5 4 0 0 1400000
2 3 4 0 3300000
2 4 3 0 3300000
3 2 4 0 3300000
3 4 2 0 3300000
4 2 3 0 3300000
4 3 2 0 3300000
2 3 5 0 3500000
2 5 3 0 3500000
3 2 5 0 3500000
3 5 2 0 3500000
5 2 3 0 3500000
5 3 2 0 3500000
2 4 5 0 3400000
2 5 4 0 3400000
4 2 5 0 3400000
4 5 2 0 3400000
5 2 4 0 3400000
5 4 2 0 3400000
3 4 5 0 2100000
3 5 4 0 2100000
4 3 5 0 2100000
4 5 3 0 2100000
5 3 4 0 2100000
5 4 3 0 2100000
Second Hand
Rute
Penyesuaian Umur Kapal SH1 Kapal SH2
9999 Rute 1 0 0
1 Rute 2 0 0
9999 Rute 3 0 0
1 Rute 4 0 0
9999 Rute 5 0 0
9999 Rute 6 0 0
9999 Rute 7 0 0
1 Rute 8 0 0
1 Rute 9 0 0
1 Rute 10 0 0
1 Rute 11 0 0
1 Rute 12 0 0
1 Rute 13 0 0
1 Rute 14 0 0
9999 Rute 15 0 0
1 Rute 16 0 0
1 Rute 17 0 0
9999 Rute 18 0 0
9999 Rute 19 0 0
1 Rute 20 0 0
1 Rute 21 0 0
1 Rute 22 0 0
Rute 23 0 0
Rute 24 0 0
Rute 25 0 0
Rute 26 0 0
Rute 27 0 0
Rute 28 0 0
Rute 29 0 0
Rute 30 0 0
Rute 31 0 0
Rute 32 0 0
16.6666666666667 Rute 33 0 0
Rute 34 0 0
Rute 35 0 0
Rute 36 0 0
Rute 37 0 0
Rute 38 0 0
Rute 39 0 0
Rute 40 0 0
Rute 41 0 0
Rute 42 0 0
Rute 43 0 0
Rute 44 0 0
Rute 45 0 0
Rute 46 0 0
Rute 47 0 0
Rute 48 0 0
Rute 49 0 0
Rute 50 0 0
Rute 51 0 0
Rute 52 0 0
Rute 53 0 0
Rute 54 0 0
Rute 55 0 0
Rute 56 0 0
Rute 57 0 0
Rute 58 0 0
Rute 59 0 0
Rute 60 0 0
Rute 61 0 0
Rute 62 0 0
Rute 63 0 0
Rute 64 0 0
0 0
= =
1 1
Second Hand
Rute
Kapal SH1 Kapal SH2
Rute 1 0 0
Rute 2 0 0
Rute 3 0 0
Rute 4 0 0
Rute 5 0 0
Rute 6 0 0
Rute 7 0 0
Rute 8 0 0
Rute 9 0 0
Rute 10 0 0
Rute 11 0 0
Rute 12 0 0
Rute 13 0 0
Rute 14 0 0
Rute 15 0 0
Rute 16 0 0
Rute 17 0 0
Rute 18 0 0
Rute 19 0 0
Rute 20 0 0
Rute 21 0 0
Rute 22 0 0
Rute 23 0 0
Rute 24 0 0
Rute 25 0 0
Rute 26 0 0
Rute 27 0 0
Rute 28 0 0
Rute 29 0 0
Rute 30 0 0
Rute 31 0 0
Rute 32 0 0
Rute 33 0 0
Rute 34 0 0
Rute 35 0 0
Rute 36 0 0
Rute 37 0 0
Rute 38 0 0
Rute 39 0 0
Rute 40 0 0
Rute 41 0 0
Rute 42 0 0
Rute 43 0 0
Rute 44 0 0
Rute 45 0 0
Rute 46 0 0
Rute 47 0 0
Rute 48 0 0
Rute 49 0 0
Rute 50 0 0
Rute 51 0 0
Rute 52 0 0
Rute 53 0 0
Rute 54 0 0
Rute 55 0 0
Rute 56 0 0
Rute 57 0 0
Rute 58 0 0
Rute 59 0 0
Rute 60 0 0
Rute 61 0 0
Rute 62 0 0
Rute 63 0 0
Rute 64 0 0
Second Hand
Rute
Kapal SH1 Kapal SH2
Rute 1 0 0
Rute 2 0 0
Rute 3 0 0
Rute 4 0 0
Rute 5 0 0
Rute 6 0 0
Rute 7 0 0
Rute 8 0 0
Rute 9 0 0
Rute 10 0 0
Rute 11 0 0
Rute 12 0 0
Rute 13 0 0
Rute 14 0 0
Rute 15 0 0
Rute 16 0 0
Rute 17 0 0
Rute 18 0 0
Rute 19 0 0
Rute 20 0 0
Rute 21 0 0
Rute 22 0 0
Rute 23 0 0
Rute 24 0 0
Rute 25 0 0
Rute 26 0 0
Rute 27 0 0
Rute 28 0 0
Rute 29 0 0
Rute 30 0 0
Rute 31 0 0
Rute 32 0 0
Rute 33 0 0
Rute 34 0 0
Rute 35 0 0
Rute 36 0 0
Rute 37 0 0
Rute 38 0 0
Rute 39 0 0
Rute 40 0 0
Rute 41 0 0
Rute 42 0 0
Rute 43 0 0
Rute 44 0 0
Rute 45 0 0
Rute 46 0 0
Rute 47 0 0
Rute 48 0 0
Rute 49 0 0
Rute 50 0 0
Rute 51 0 0
Rute 52 0 0
Rute 53 0 0
Rute 54 0 0
Rute 55 0 0
Rute 56 0 0
Rute 57 0 0
Rute 58 0 0
Rute 59 0 0
Rute 60 0 0
Rute 61 0 0
Rute 62 0 0
Rute 63 0 0
Rute 64 0 0
Second Hand
Rute
Kapal SH1 Kapal SH2
Rute 1 Rp - Rp -
Rute 2 Rp - Rp -
Rute 3 Rp - Rp -
Rute 4 Rp - Rp -
Rute 5 Rp - Rp -
Rute 6 Rp - Rp -
Rute 7 Rp - Rp -
Rute 8 Rp - Rp -
Rute 9 Rp - Rp -
Rute 10 Rp - Rp -
Rute 11 Rp - Rp -
Rute 12 Rp - Rp -
Rute 13 Rp - Rp -
Rute 14 Rp - Rp -
Rute 15 Rp - Rp -
Rute 16 Rp - Rp -
Rute 17 Rp - Rp -
Rute 18 Rp - Rp -
Rute 19 Rp - Rp -
Rute 20 Rp - Rp -
Rute 21 Rp - Rp -
Rute 22 Rp - Rp -
Rute 23 Rp - Rp -
Rute 24 Rp - Rp -
Rute 25 Rp - Rp -
Rute 26 Rp - Rp -
Rute 27 Rp - Rp -
Rute 28 Rp - Rp -
Rute 29 Rp - Rp -
Rute 30 Rp - Rp -
Rute 31 Rp - Rp -
Rute 32 Rp - Rp -
Rute 33 Rp - Rp -
Rute 34 Rp - Rp -
Rute 35 Rp - Rp -
Rute 36 Rp - Rp -
Rute 37 Rp - Rp -
Rute 38 Rp - Rp -
Rute 39 Rp - Rp -
Rute 40 Rp - Rp -
Rute 41 Rp - Rp -
Rute 42 Rp - Rp -
Rute 43 Rp - Rp -
Rute 44 Rp - Rp -
Rute 45 Rp - Rp -
Rute 46 Rp - Rp -
Rute 47 Rp - Rp -
Rute 48 Rp - Rp -
Rute 49 Rp - Rp -
Rute 50 Rp - Rp -
Rute 51 Rp - Rp -
Rute 52 Rp - Rp -
Rute 53 Rp - Rp -
Rute 54 Rp - Rp -
Rute 55 Rp - Rp -
Rute 56 Rp - Rp -
Rute 57 Rp - Rp -
Rute 58 Rp - Rp -
Rute 59 Rp - Rp -
Rute 60 Rp - Rp -
Rute 61 Rp - Rp -
Rute 62 Rp - Rp -
Rute 63 Rp - Rp -
Rute 64 Rp - Rp -
Second Hand
Rute
Kapal SH1 Kapal SH2
Rute 1 - -
Rute 2 - -
Rute 3 - -
Rute 4 - -
Rute 5 - -
Rute 6 - -
Rute 7 - -
Rute 8 - -
Rute 9 - -
Rute 10 - -
Rute 11 - -
Rute 12 - -
Rute 13 - -
Rute 14 - -
Rute 15 - -
Rute 16 - -
Rute 17 - -
Rute 18 - -
Rute 19 - -
Rute 20 - -
Rute 21 - -
Rute 22 - -
Rute 23 - -
Rute 24 - -
Rute 25 - -
Rute 26 - -
Rute 27 - -
Rute 28 - -
Rute 29 - -
Rute 30 - -
Rute 31 - -
Rute 32 - -
Rute 33 - -
Rute 34 - -
Rute 35 - -
Rute 36 - -
Rute 37 - -
Rute 38 - -
Rute 39 - -
Rute 40 - -
Rute 41 - -
Rute 42 - -
Rute 43 - -
Rute 44 - -
Rute 45 - -
Rute 46 - -
Rute 47 - -
Rute 48 - -
Rute 49 - -
Rute 50 - -
Rute 51 - -
Rute 52 - -
Rute 53 - -
Rute 54 - -
Rute 55 - -
Rute 56 - -
Rute 57 - -
Rute 58 - -
Rute 59 - -
Rute 60 - -
Rute 61 - -
Rute 62 - -
Rute 63 - -
Rute 64 - -
VCH
Kapal 1 Kapal 3 Kapal 5 Kapal 7 Kapal 8
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
= = = = =
1 1 1 1 1
VCH
Kapal 1 Kapal 3 Kapal 5 Kapal 7 Kapal 8
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
VCH
Kapal 1 Kapal 3 Kapal 5 Kapal 7 Kapal 8
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
VCH
Kapal 1 Kapal 3 Kapal 5 Kapal 7 Kapal 8
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
VCH
Kapal 1 Kapal 3 Kapal 5 Kapal 7 Kapal 8
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Keputusan Sewa
VCH
Kapal 10 Kapal 11 Kapal 13 Kapal 15 Kapal 18
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
= = = = =
1 1 1 1 1
Frekuensi Terpakai
VCH
Kapal 10 Kapal 11 Kapal 13 Kapal 15 Kapal 18
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
Cargo Carried
VCH
Kapal 10 Kapal 11 Kapal 13 Kapal 15 Kapal 18
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
Cost
VCH
Kapal 10 Kapal 11 Kapal 13 Kapal 15 Kapal 18
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Trigger
VCH
Kapal 10 Kapal 11 Kapal 13 Kapal 15 Kapal 18
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
TCH
Kapal 22 Kapal 2 Kapal 4 Kapal 6 Kapal 9
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
= = = = =
1 1 1 1 1
TCH
Kapal 22 Kapal 2 Kapal 4 Kapal 6 Kapal 9
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
TCH
Kapal 22 Kapal 2 Kapal 4 Kapal 6 Kapal 9
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
` 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
TCH
Kapal 22 Kapal 2 Kapal 4 Kapal 6 Kapal 9
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
TCH
Kapal 22 Kapal 2 Kapal 4 Kapal 6 Kapal 9
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
TCH
Kapal 12 Kapal 14 Kapal 17 Kapal 19 Kapal 21
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
= = = = =
1 1 1 1 1
TCH
Kapal 12 Kapal 14 Kapal 17 Kapal 19 Kapal 21
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
TCH
Kapal 12 Kapal 14 Kapal 17 Kapal 19 Kapal 21
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
TCH
Kapal 12 Kapal 14 Kapal 17 Kapal 19 Kapal 21
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp - Rp -
TCH
Kapal 12 Kapal 14 Kapal 17 Kapal 19 Kapal 21
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Rute
Rute 1
Rute 2
Rute 3
Rute 4
Rute 5
Rute 6
Rute 7
Rute 8
Rute 9
Rute 10
Rute 11
Rute 12
Rute 13
Rute 14
Rute 15
Rute 16
Rute 17
Rute 18
Rute 19
Rute 20
Rute 21
Rute 22
Rute 23
Rute 24
Rute 25
Rute 26
Rute 27
Rute 28
Rute 29
Rute 30
Rute 31
Rute 32
Rute 33
Rute 34
Rute 35
Rute 36
Rute 37
Rute 38
Rute 39
Rute 40
Rute 41
Rute 42
Rute 43
Rute 44
Rute 45
Rute 46
Rute 47
Rute 48
Rute 49
Rute 50
Rute 51
Rute 52
Rute 53
Rute 54
Rute 55
Rute 56
Rute 57
Rute 58
Rute 59
Rute 60
Rute 61
Rute 62
Rute 63
Rute 64
Pembagian Muatan
Total POD 1 POD 2 POD 3 POD 4
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Kapal SH1 Kapal SH2 Kapal 1 Kapal 3 Kapal 5
38 58 70 87 58
35 43 50 58 38
50 87 175 175 116
32 39 44 50 35
14 17 21 23 17
14 18 21 23 18
13 16 19 20 15
13 16 19 20 15
13 16 19 20 15
13 16 19 20 15
14 18 21 23 18
14 17 21 23 17
13 16 19 20 15
13 16 19 20 15
13 16 19 20 15
13 16 19 21 15
14 18 21 23 18
13 16 19 21 15
14 18 21 23 17
13 16 19 20 15
14 18 21 23 18
14 18 21 23 18
13 16 19 20 15
14 18 21 23 17
14 18 21 23 18
14 18 21 23 18
14 17 21 23 17
14 17 21 23 17
25 31 38 43 35
25 31 38 43 35
29 38 58 58 50
29 38 58 58 50
25 31 38 43 31
25 31 38 43 31
21 26 31 31 25
21 26 31 31 25
19 23 25 26 20
19 23 25 26 20
25 29 38 38 31
25 29 38 38 31
19 29 38 38 31
17 25 29 31 25
19 29 38 38 31
17 25 29 31 25
19 29 38 38 31
19 29 38 38 31
16 20 25 26 20
15 19 21 23 17
16 20 25 26 19
15 19 21 23 17
16 20 25 26 19
16 20 25 26 20
17 23 29 31 23
16 20 23 25 19
19 29 38 38 31
16 21 25 26 20
17 23 29 31 23
17 23 29 31 23
15 20 23 25 19
16 20 25 26 19
16 20 25 26 19
16 20 25 26 19
16 20 25 26 19
15 20 23 25 19
CHC
POD 1 POD 2 POD 3 POD 4
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Frekuensi M
Kapal 7 Kapal 8 Kapal 10 Kapal 11 Kapal 13
87 87 43 58 58
50 58 31 43 58
175 175 70 116 116
44 59 27 39 50
21 25 14 18 21
23 26 14 18 23
19 23 12 16 20
20 23 12 16 20
20 23 12 16 20
19 23 12 16 20
23 26 14 18 23
21 26 14 18 21
19 23 12 16 20
19 23 12 16 20
20 23 12 16 20
20 23 12 17 20
23 26 14 18 23
20 23 12 17 20
23 26 14 18 23
20 23 12 16 20
23 26 14 18 23
23 26 14 19 23
19 23 12 16 20
23 26 14 18 23
23 26 14 18 23
23 26 14 18 23
21 25 14 18 21
21 26 14 18 21
43 50 26 35 38
43 50 26 35 38
58 70 35 50 50
58 70 35 50 50
43 50 25 35 38
43 50 25 35 38
31 38 20 31 31
31 38 20 26 31
26 31 16 23 29
26 31 16 23 29
38 43 23 35 38
38 43 23 35 38
38 43 23 29 35
31 35 18 25 29
38 43 23 29 35
31 35 18 25 29
38 43 23 29 35
38 43 23 29 35
25 29 15 20 25
23 26 14 18 23
25 29 15 20 25
23 26 14 18 23
25 29 15 20 25
25 29 15 20 25
29 35 17 23 29
25 29 15 20 25
38 43 23 29 35
26 31 15 21 26
29 35 18 23 29
29 35 17 23 29
25 29 23 19 25
25 29 15 20 25
25 29 15 20 25
25 29 15 20 25
25 29 15 20 25
23 29 14 19 25
CC+OC
Kapal CC+OC
Total CHC Second Hand
Rp - Kapal SH1 Rp0
Rp - Kapal SH2 Rp0
Rp - Kapal 1 Rp0
Rp - Kapal 3 Rp0
Rp - Kapal 5 Rp0
Rp - Kapal 7 Rp0
Rp - Kapal 8 Rp0
Rp - Kapal 10 Rp0
Rp - Kapal 11 Rp0
Rp - Kapal 13 Rp0
Rp - Kapal 15 Rp0
Rp - Kapal 18 Rp0
Rp - Kapal 22 Rp0
Rp -
Rp - TCH
Rp - Kapal 2 Rp0
Rp - Kapal 4 Rp0
Rp - Kapal 6 Rp0
Rp - Kapal 9 Rp0
Rp - Kapal 12 Rp0
Rp - Kapal 14 Rp0
Rp - Kapal 17 Rp0
Rp - Kapal 19 Rp0
Rp - Kapal 21 Rp0
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Frekuensi Maksimum
Kapal 15 Kapal 18 Kapal 22 Kapal 2 Kapal 4
70 29 70 70 50
43 21 50 43 29
116 43 116 175 116
39 20 44 44 27
18 8 21 19 12
19 9 21 20 13
16 8 19 17 11
17 8 19 17 11
17 8 20 18 11
16 8 19 17 11
19 9 21 20 13
18 8 21 19 12
16 8 19 17 11
16 8 19 17 11
17 8 19 17 11
17 8 20 18 11
19 9 21 20 13
17 8 20 18 11
19 8 21 20 12
17 8 20 18 11
19 9 21 20 13
19 9 23 20 13
16 8 19 17 11
19 8 21 20 12
19 9 21 20 13
19 9 21 20 13
18 8 21 19 12
18 8 21 19 12
35 16 38 38 25
35 16 38 38 25
50 21 50 50 38
50 21 50 50 38
38 16 38 38 25
38 16 38 38 25
26 14 31 29 18
26 14 31 29 18
23 12 26 23 15
23 12 26 23 15
35 15 35 35 23
35 15 35 35 23
29 13 35 35 23
25 11 29 26 17
29 14 38 35 23
25 11 29 26 17
29 14 38 35 23
29 13 35 35 23
20 10 25 23 14
19 9 21 19 12
20 10 25 23 14
19 9 21 19 12
20 10 25 23 14
20 10 25 23 14
23 11 29 26 16
20 10 25 21 14
29 14 35 35 23
21 10 26 23 15
23 12 29 26 17
23 11 29 26 16
20 10 23 21 14
20 10 25 23 14
20 10 25 21 14
20 10 25 23 14
20 10 25 21 14
20 10 23 21 14
Total Cost
Kapal 6 Kapal 9 Kapal 12 Kapal 14 Kapal 17
70 87 50 70 58
50 58 38 43 43
175 175 87 116 87
44 50 35 44 39
20 23 17 18 19
21 23 18 19 20
19 20 15 16 17
19 20 15 17 18
19 21 16 17 18
18 20 15 16 17
21 23 18 19 20
21 23 17 18 19
18 20 15 16 17
18 20 15 16 17
19 20 15 17 18
19 21 16 17 18
21 23 18 19 20
19 21 16 17 18
21 23 17 19 19
19 21 16 17 18
21 23 18 19 20
21 25 18 19 20
18 20 15 16 17
21 23 17 19 19
21 23 18 19 20
21 23 18 19 20
20 23 17 18 19
21 23 17 18 19
38 43 31 35 35
38 43 38 35 35
58 58 43 43 43
58 58 43 43 43
38 43 31 38 35
38 43 31 38 35
31 35 25 26 29
31 35 25 26 29
25 29 21 23 25
25 29 21 23 25
35 38 29 31 31
35 38 29 31 31
38 38 38 29 29
29 31 29 25 25
38 43 29 29 31
29 31 23 25 25
38 43 29 29 31
38 38 26 29 29
25 26 19 20 21
21 23 17 19 20
25 26 19 20 21
21 23 17 19 20
25 26 19 20 21
25 26 19 20 21
29 31 21 23 25
23 26 19 20 21
38 38 26 29 31
25 29 20 21 23
29 31 23 25 25
29 31 21 23 25
23 25 19 20 21
25 26 19 20 21
23 26 19 20 21
25 26 19 20 21
23 26 19 20 21
23 25 19 20 21
Kapal 19 Kapal 21
38 38
31 31
50 50
30 32
12 12
12 13
12 12
12 12
12 12
12 12
12 13
12 13
12 12
12 12
12 12
12 12
12 13
12 12
12 13
12 12
12 13
12 13
12 12
12 13
12 13
12 13
12 12
12 13
21 23
21 23
26 58
26 29
23 25
23 25
19 20
19 20
17 18
17 18
23 23
23 23
18 18
16 16
18 18
16 16
18 18
18 18
15 15
14 14
15 15
14 14
15 15
15 15
15 16
14 15
18 18
15 15
16 16
15 16
14 15
15 15
15 15
15 15
15 15
14 15
TERPILIH
Data Kapal Perhitungan waktu
Nama Kapal = Rute =
Tipe = Seatime
DWT = ton Jarak POL - POD =
Payload = ton Jarak POD - POL =
LPP = m Seatime roundtrip =
B = m =
T = m
H = m Port Time
Vs = knot Port of Loading (POL) =
Daya ME = HP AT+WT+IT =
Daya AE = HP Produktivitas B/M =
SFOC ME = gr/HP.jam Payload =
SFOC AE = gr/HP.jam Effective Time =
Bahan bakar Port Time POL =
ME HFO = =
AE HSD =
Jumlah kru = Port of Discharging (POD) =
Umur Ekonomis = AT+WT+IT =
SLOC = Produktivitas B/M =
Commission Days = hari Payload =
Konsumsi LO = ton/roundtrip Effective Time =
Rute = Port Time POD =
Jarak Total = Nm =
Kecepatan B/M POL = MT/jam
Kecepatan B/M POD = MT/jam Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Perhitungan Sewa
Margin Profit =
Time Charter Hire
Cicilan tahunan =
= /hari
= /bulan
Tarif TCH
= /tahun
= /masa kontrak
Unit Cost Skema TCH =
0 1 2
Kenaikan Biaya
Gaji Kru
Perbekalan
Minyak Pelumas
Reparasi dan Perawatan
Asuransi
Biaya umum
Total FV
NPV
Capita
Anuitas Operating Cost /tahun
OW
BAREBOAT CHARTER
Perhitungan Biaya
TIME CHARTER
3 4 5 6 7 8 9
OWNER CHARTERER
AREBOAT CHARTER
OWNER CHARTERER
TIME CHARTER
OWNER CHARTERER
VOYAGE CHARTER
OWNER
10
TIDAK TERPILIH
Data Kapal
Nama Kapal = GAS WALIO 1
Tipe = LPG Tanker
Manning Cost
DWT = 17400 ton
Payload = 2046 ton
LPP = 158 m
B = 26 m
T = 7m
GT 13572
Vs = 11.7 knot Perbelakan dan
Daya ME = 2684 HP Minyak
Pelumas
Daya AE = 698 HP
SFOC ME = 167 gr/HP.jam
SFOC AE = 133.6 gr/HP.jam
Bahan bakar
ME HFO = 885.7 kg/m3
AE HSD = 997 kg/m3
Reparasi dan
Jumlah kru = 15 Perawatan
Umur Ekonomis = 16
SLOC = 0.00015 liter/HP.jam
Massa Jenis SLOC 0.000912 ton/liter Asuransi
Commission Days = 350 hari
SFR 0.002684
MCR 2147.2 Administrasi
Harga = Rp 136,523,318,604
Total Operating Cost
Perhitungan Sewa
Margin Profit = 15% dari total PV
Rp1,955,602,096 /tahun
Time Charter Hire
Cicilan tahunan = Rp32,673,343,753
= Rp93,352,411 /hari
= Rp2,722,778,646 /bulan
Tarif TCH
= Rp32,673,343,753 /tahun
= Rp326,733,437,532 /masa kontrak
Unit Cost Skema TCH =
PTP - Tanjung Perak Rp 16,337
PTP - Balikpapan Rp 46,676
PTP - Lampung Rp 54,456
PTP - Pangkalan Susu Rp 40,842
Operating Cost
Jumlah
Jumlah Crew = 15 orang
Faktor Gaji = 13 kali 1
Manning Cost Total = Rp 140,110,000 /bulan 1
= Rp 1,821,430,000 /tahun 1
Kebutuhan Perbekalan 1
Jumlah Crew = 15 orang 1
Biaya Perbekalan = Rp 50,000 /hari 1
Biaya Perbekalan total = Rp 262,500,000 /tahun 1
Kebutuhan Minyak Pelumas 1
1
SLOC = 0.00015 liter/HP.jam 1
= 25908 liter/tahun 2
Harga minyak pelumas = Rp 35,000 /liter 1
Biaya Minyak pelumas = Rp 906,765,996 /tahun 1
Total Perbekalan dan Minyak = Rp 906,765,996 /tahun 1
Asumsi persentase = 3% harga kapal 15
Biaya reparasi dan perawatan = Rp 3,413,082,965 /tahun
= Rp 34,130,829,651 /masa sewa
Asumsi persentase asuransi = 1% harga kapal Umur
Total biaya asuransi = Rp 1,638,279,823 /tahun Sisa
= Rp 16,382,798,232 /masa sewa masa sewa
Asumsi Persentase = 1% harga kapal kenaikan
Total biaya administrasi = Rp 1,365,233,186 /tahun
= Rp 13,652,331,860 /masa sewa
= Rp 9,407,291,970 /tahun periode
Total Operating Cost
= Rp 94,072,919,699 /masa sewa
rate
Perhit
WACC
CC
OC
Total
Tunjangan
Jabatan Gaji Pokok Sertifikat
Jabatan
Master/Captain Rp 10,000,000 Rp 2,600,000 Rp 1,600,000
Chief Engineer Rp 8,000,000 Rp 1,900,000 Rp 1,500,000
Second Engineer Rp 7,950,000 Rp 1,900,000 Rp 1,500,000
Chief Officer Rp 8,000,000 Rp 2,500,000 Rp 1,200,000
Second Officer Rp 7,950,000 Rp 2,500,000 Rp 1,200,000
Quarter Master Rp 6,500,000 Rp 1,000,000 Rp 500,000
Electrician Rp 5,000,000 Rp 900,000 Rp 500,000
Steward Rp 3,500,000 Rp 500,000
Oiler Rp 4,500,000 Rp 1,000,000 Rp 500,000
Boys Rp 3,500,000 Rp 500,000 Rp 500,000
Cadet Rp 100,000 Rp 500,000 Rp -
Chief Cook Rp 4,000,000 Rp 500,000 Rp 450,000
Assistant Cook Rp 3,500,000 Rp 500,000 Rp 450,000
Boatswain Rp 3,500,000 Rp 500,000 Rp 450,000
Total Rp 76,000,000 Rp 17,300,000 Rp 10,350,000
16 0 1
4 Kenaikan Biaya
10 Gaji Kru Rp1,821,430,000 Rp1,912,501,500
2% Perbekalan Rp262,500,000 Rp275,625,000
3% Minyak Pelumas Rp906,765,996 Rp952,104,295
5% Reparasi dan Perawatan Rp3,413,082,965 Rp3,762,923,969
2 Asuransi Rp1,638,279,823 Rp1,771,799,629
5 Biaya umum Rp1,365,233,186 Rp1,433,494,845
5% Total FV Rp9,407,291,970 Rp10,108,449,239
NPV Rp100,670,940,094
Anuitas Operating Cost Rp13,037,347,308 /tahun
Perhitungan Biaya
Rp 136,523,318,604
Rp17,680,394,348.70
Rp13,037,347,308
Rp30,717,741,657 /tahun
Tunjangan
Bonus Voyage Tunjangan Seniority
Berlayar Kesehatan
Rp 1,600,000 Rp 1,500,000 Rp 1,600,000 Rp 260,000
Rp 1,600,000 Rp 1,500,000 Rp 1,400,000 Rp 350,000
Rp 1,600,000 Rp 1,500,000 Rp 1,400,000 Rp -
Rp 1,400,000 Rp 1,500,000 Rp 1,400,000 Rp 200,000
Rp 1,400,000 Rp 1,500,000 Rp 1,400,000 Rp 200,000
Rp 450,000 Rp 500,000 Rp 500,000 Rp 200,000
Rp 450,000 Rp 400,000 Rp 450,000 -
Rp 450,000 Rp 300,000 Rp 400,000 -
Rp 450,000 Rp 500,000 Rp 500,000 Rp 200,000
Rp 450,000 Rp 400,000 Rp 350,000 -
Rp 450,000 Rp 400,000 Rp - -
Rp 450,000 Rp 400,000 Rp 350,000 Rp 100,000
Rp 450,000 Rp 400,000 Rp 350,000 Rp 100,000
Rp 450,000 Rp 400,000 Rp 350,000 Rp 100,000
Rp 11,650,000 Rp 11,200,000 Rp 10,450,000 Rp 1,710,000
OWNER CHARTERER
BAREBOAT CHARTER
OWNER CHARTERER
TIME CHARTER
OWNER CHARTERER
VOYAGE CHARTER
OWNER
Total Total Gaji
Rp 19,160,000 Rp 19,160,000
Rp 16,250,000 Rp 16,250,000
Rp 15,850,000 Rp 15,850,000
Rp 16,200,000 Rp 16,200,000
Rp 16,150,000 Rp 16,150,000
Rp 9,650,000 Rp 9,650,000
Rp 7,700,000 Rp 7,700,000
Rp 5,150,000 Rp 5,150,000
Rp 7,650,000 Rp 7,650,000
Rp 5,700,000 Rp 5,700,000
Rp 1,450,000 Rp 2,900,000
Rp 6,250,000 Rp 6,250,000
Rp 5,750,000 Rp 5,750,000
Rp 5,750,000 Rp 5,750,000
Rp 138,660,000 Rp 140,110,000
6 7 8 9
C/H Costs
R
1
RUTE
Rute
POL Tanjung Priok
POD 1 Tanjung Perak
Jarak POL - POD 1 438 Nm
POD 2 -
Jarak POD 1 - POD 2 0 Nm
POD 3 -
Jarak POD 2 - POD 3 0 Nm
POD 4 -
Jarak POD 3 - POD 4 0 Nm
TUKS Tanjung Priok
Jarak POD 4 - TUKS 438 Nm
10
Rp2,966,917,540
Rp436,136,536
Rp1,477,026,258
Rp5,837,530,128
Rp2,748,642,757
Rp2,223,821,001
Rp15,690,074,220
Perhitungan waktu
Rute = 121
Seatime
Jarak Total = 876 Nm
Seatime Total = 38 jam
Seatime roundtrip = 76 jam
= 4 hari
Perhitungan Frekuensi
Roundtrip days = 5 hari
Commission Days = 350 hari
Frekuensi = 70 shipment/th
Cargo Carried = 143242 ton/th
= 1432418 ton/kontrak
Port of Discharging 3 =
Tarif Labuh =
Biaya Labuh =
Tarif Tambat =
Etmal =
Biaya Tambat =
Tarif Tetap Pandu =
Tarif Variable Pandu =
Asumsi Jumlah Gerakan =
Biaya Pandu =
Tarif Tetap Tunda =
Tarif Variable Tunda =
Lama Penundaan =
Biaya Tunda =
Total Biaya pelabuhan POD 3 =
=
Port of Discharging 4 =
Tarif Labuh =
Biaya Labuh =
Tarif Tambat =
Etmal =
Biaya Tambat =
Tarif Tetap Pandu =
Tarif Variable Pandu =
Asumsi Jumlah Gerakan =
Biaya Pandu =
Tarif Tetap Tunda =
Tarif Variable Tunda =
Lama Penundaan =
Biaya Tunda =
Total Biaya pelabuhan POD 4 =
=
Total Biaya Pelabuhan =
=
2
RUTE
Voyage Cost Rute
Biaya Bahan Bakar POL
Fuel Oil POD 1
Rp 4,208,850 /ton Jarak POL - POD 1
444.437 ton POD 2
Rp 1,870,569,838 /roundtrip Jarak POD 1 - POD 2
/th POD 3
Diesel Oil Jarak POD 2 - POD 3
Rp 5,269,875 /ton POD 4
44.4 ton Jarak POD 3 - POD 4
Rp 234,212,890 TUKS
/th Jarak POD 4 - TUKS
Rp 234,213,335 /roundtrip
Rp 16,394,933,416 /th
Biaya Pelabuhan
Tanjung Priok
Rp 73 GT/Kunjungan
Rp 990,756 /trip
Rp 68 /GT/etmal
1
Rp 922,896 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,120,152
Rp 186,000
Rp 3
Rp 1 jam
Rp 558,000
Rp 3,591,804 /trip
Rp 251,426,280 /tahun
Tanjung Perak
Rp 73 GT/Kunjungan
Rp 990,756 /trip
Rp 68 /GT/etmal
1
Rp 922,896 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,120,152
Rp 186,000
Rp 3
2 jam
Rp 1,116,000
Rp 4,149,804 /trip
Rp 290,486,280 /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
Rp 186,000
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
Rp 186,000
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
Rp 186,000
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
Rp 7,741,608 /roundtrip
Rp 541,912,560 /tahun
Rute Perhitungan waktu
Tanjung Priok Rute = 131
Balikpapan Seatime
765 Nm Jarak Total = 1530 Nm
0 Seatime Total = 66 jam
0 Nm Seatime roundtrip = 132 jam
0 = 6 hari
0 Nm
0 Seatime POL - POD 1
0 Nm POL = Tanjung Priok
Tanjung Priok POD 1 = Balikpapan
765 Nm Jarak 1 = 765 Nm
Seatime 1 = 66 jam
Perhitungan Frekuensi
Roundtrip days = 7 hari
Commission Days = 350 hari
Frekuensi = 50 shipment/th
Cargo Carried = 102316 ton/th
= 1023156 ton/kontrak
Port of Discharging 2 = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya Labuh = Rp - /trip
Tarif Tambat = Rp - /GT/etmal
Etmal = 1
Biaya Tambat = Rp - /trip
Tarif Tetap Pandu = Rp - /kapal/gerakan
Tarif Variable Pandu = Rp - /GT/Kapal/Gerakan
Asumsi Jumlah Gerakan = 3 gerakan
Biaya Pandu = Rp -
Tarif Tetap Tunda = Rp 186,000
Tarif Variable Tunda = Rp 3
Lama Penundaan = 1 jam
Biaya Tunda = Rp 558,000
Total Biaya pelabuhan POD 2 = Rp 558,000 /trip
= Rp 27,900,000 /tahun
Port of Discharging 3 = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya Labuh = Rp - /trip
Tarif Tambat = Rp - /GT/etmal
Etmal = 1
Biaya Tambat = Rp - /trip
Tarif Tetap Pandu = Rp - /kapal/gerakan
Tarif Variable Pandu = Rp - /GT/Kapal/Gerakan
Asumsi Jumlah Gerakan = 3 gerakan
Biaya Pandu = Rp -
Tarif Tetap Tunda = Rp 186,000
Tarif Variable Tunda = Rp -
Lama Penundaan = 1 jam
Biaya Tunda = Rp -
Total Biaya pelabuhan POD 3 = Rp - /trip
= Rp - /tahun
Port of Discharging 4 = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya Labuh = Rp - /trip
Tarif Tambat = Rp - /GT/etmal
Etmal = 1
Biaya Tambat = Rp - /trip
Tarif Tetap Pandu = Rp - /kapal/gerakan
Tarif Variable Pandu = Rp - /GT/Kapal/Gerakan
Asumsi Jumlah Gerakan = 3 gerakan
Biaya Pandu = Rp -
Tarif Tetap Tunda = Rp 186,000
Tarif Variable Tunda = Rp -
Lama Penundaan = 1 jam
Biaya Tunda = Rp -
Total Biaya pelabuhan POD 4 = Rp - /trip
= Rp - /tahun
Total Biaya Pelabuhan = Rp 8,299,608 /roundtrip
= Rp 414,980,400 /tahun
3
RUTE
Rute
POL Tanjung Priok
POD 1 Lampung
Jarak POL - POD 1 117 Nm
POD 2 0
Jarak POD 1 - POD 2 0 Nm
POD 3 0
Jarak POD 2 - POD 3 0 Nm
POD 4 0
Jarak POD 3 - POD 4 0 Nm
TUKS Tanjung Priok
Jarak POD 4 - TUKS 117 Nm
Perhitungan waktu Port Time
Rute = 141 Port Time POL
Seatime Port Time POD 1
Jarak Total = 234 Nm Port Time POD 2
Seatime Total = 10 jam Port Time POD 3
Seatime roundtrip = 20 jam Port Time POD 4
= 1 hari
Total Port Time
Port of Discharging 3 = 0
Tarif Labuh = Rp -
Biaya Labuh = Rp -
Tarif Tambat = Rp -
Etmal = 1
Biaya Tambat = Rp -
Tarif Tetap Pandu = Rp -
Tarif Variable Pandu = Rp -
Asumsi Jumlah Gerakan = 3
Biaya Pandu = Rp -
Tarif Tetap Tunda = Rp 186,000
Tarif Variable Tunda = Rp -
Lama Penundaan = 1
Biaya Tunda = Rp -
Total Biaya pelabuhan POD 3 = Rp -
= Rp -
Port of Discharging 4 = 0
Tarif Labuh = Rp -
Biaya Labuh = Rp -
Tarif Tambat = Rp -
Etmal = 1
Biaya Tambat = Rp -
Tarif Tetap Pandu = Rp -
Tarif Variable Pandu = Rp -
Asumsi Jumlah Gerakan = 3
Biaya Pandu = Rp -
Tarif Tetap Tunda = Rp 186,000
Tarif Variable Tunda = Rp -
Lama Penundaan = 1
Biaya Tunda = Rp -
Total Biaya pelabuhan POD 4 = Rp -
= Rp -
Total Biaya Pelabuhan = Rp 7,741,608
= Rp 1,354,781,400
4
RUTE
Rute
r POL Tanjung Priok
POD 1 Pangkalan Susu
/ton Jarak POL - POD 1 887 Nm
ton POD 2 0
/roundtrip Jarak POD 1 - POD 2 0 Nm
/th POD 3 0
Jarak POD 2 - POD 3 0 Nm
/ton POD 4 0
ton Jarak POD 3 - POD 4 0 Nm
TUKS Tanjung Priok
/th Jarak POD 4 - TUKS 887 Nm
/roundtrip
/th
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu
Rute = 151
Seatime
Jarak Total = 1774 Nm
Seatime Total = 76 jam
Seatime roundtrip = 152 jam
= 7 hari
Perhitungan Frekuensi
Roundtrip days = 8 hari
Commission Days = 350 hari
Frekuensi = 43.75 shipment/th
Cargo Carried = 89526 ton/th
= 895262 ton/kontrak
Port of Discharging 2 = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya Labuh = Rp - /trip
Tarif Tambat = Rp - /GT/etmal
Etmal = 1
Biaya Tambat = Rp - /trip
Tarif Tetap Pandu = Rp - /kapal/gerakan
Tarif Variable Pandu = Rp - /GT/Kapal/Gerakan
Asumsi Jumlah Gerakan = 3 gerakan
Biaya Pandu = Rp -
Tarif Tetap Tunda = Rp 186,000
Tarif Variable Tunda = Rp -
Lama Penundaan = 1 jam
Biaya Tunda = Rp -
Total Biaya pelabuhan POD 2 = Rp - /trip
= Rp - /tahun
Port of Discharging 3 = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya Labuh = Rp - /trip
Tarif Tambat = Rp - /GT/etmal
Etmal = 1
Biaya Tambat = Rp - /trip
Tarif Tetap Pandu = Rp - /kapal/gerakan
Tarif Variable Pandu = Rp - /GT/Kapal/Gerakan
Asumsi Jumlah Gerakan = 3 gerakan
Biaya Pandu = Rp -
Tarif Tetap Tunda = Rp 186,000
Tarif Variable Tunda = Rp -
Lama Penundaan = 1 jam
Biaya Tunda = Rp -
Total Biaya pelabuhan POD 3 = Rp - /trip
= Rp - /tahun
Port of Discharging 4 = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya Labuh = Rp - /trip
Tarif Tambat = Rp - /GT/etmal
Etmal = 1
Biaya Tambat = Rp - /trip
Tarif Tetap Pandu = Rp - /kapal/gerakan
Tarif Variable Pandu = Rp - /GT/Kapal/Gerakan
Asumsi Jumlah Gerakan = 3 gerakan
Biaya Pandu = Rp -
Tarif Tetap Tunda = Rp 186,000
Tarif Variable Tunda = Rp -
Lama Penundaan = 1 jam
Biaya Tunda = Rp -
Total Biaya pelabuhan POD 4 = Rp - /trip
= Rp - /tahun
Total Biaya Pelabuhan = Rp 7,741,608 /roundtrip
= Rp 338,695,350 /tahun
5
RUTE
Rute Perhitungan waktu
POL Tanjung Priok Rute =
POD 1 Tanjung Perak Seatime
Jarak POL - POD 1 438 Nm Jarak Total =
POD 2 Balikpapan Seatime Total =
Jarak POD 1 - POD 2 481 Nm Seatime roundtrip =
POD 3 Lampung =
Jarak POD 2 - POD 3 872 Nm
POD 4 Pangkalan Susu Seatime POL - POD 1
Jarak POD 3 - POD 4 934 Nm POL =
TUKS Tanjung Priok POD 1 =
Jarak POD 4 - TUKS 887 Nm Jarak 1 =
Seatime 1 =
Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH =
Perhitungan waktu Port Time
123451 Port Time POL = 11
Seatime Port Time POD 1 = 10
3612 Nm Port Time POD 2 = 9
235 jam Port Time POD 3 = 10
311 jam Port Time POD 4 = 11
13 hari = 51
Total Port Time
= 3
Seatime POL - POD 1
Tanjung Priok Port Time POL
Tanjung Perak Port of Loading (POL) = Tanjung Priok
438 Nm AT+WT+IT = 8
38 jam Produktivitas B/M = 900
Payload = 2046
Seatime POD 1 - POD 2 Effective Time = 3
Balikpapan Port Time POL = 11
Lampung =
481
42 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6
Balikpapan Produktivitas B/M = 600
Lampung Payload = 2046
872 Nm Effective Time = 4
75 jam Port Time POL 1 = 10
=
Seatime POD 3 - POD 4
Lampung Port Time POD 2
Pangkalan Susu POL 2 = Balikpapan
934 Nm AT+WT+IT = 5
80 jam Produktivitas B/M = 600
Payload = 2046
Seatime POD 4 - TUKS Effective Time = 4
Pangkalan Susu Port Time POL 2 = 9
Tanjung Priok =
887 Nm
76 jam Port Time POD 3
POL 3 = Lampung
AT+WT+IT = 7
Perhitungan Frekuensi Produktivitas B/M = 700
16 hari Payload = 2046
350 hari Effective Time = 3
21.875 shipment/th Port Time POD 3 = 10
44763 ton/th =
447631 ton/kontrak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu
Rute = 123541
Seatime
Jarak Total = 3438 Nm
Seatime Total = 286 jam
Seatime roundtrip = 296 jam
= 13 hari
Perhitungan Frekuensi
Roundtrip days = 16 hari
Commission Days = 350 hari
Frekuensi = 21.875 shipment/th
Cargo Carried = 44763 ton/th
= 447631 ton/kontrak
Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH =
Perhitungan waktu Port Time
124351 Port Time POL = 11 jam
Seatime Port Time POD 1 = 10 jam
4146 Nm Port Time POD 2 = 10 jam
281 jam Port Time POD 3 = 9 jam
357 jam Port Time POD 4 = 11 jam
15 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
Tanjung Priok Port Time POL
Tanjung Perak Port of Loading (POL) = Tanjung Priok
438 Nm AT+WT+IT = 8 jam
38 jam Produktivitas B/M = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective Time = 3 jam
Lampung Port Time POL = 11 jam
Balikpapan = hari
495
43 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
Lampung Produktivitas B/M = 600 MT/jam
Balikpapan Payload = 2046 ton
872 Nm Effective Time = 4 jam
75 jam Port Time POL 1 = 10 jam
= hari
Seatime POD 3 - POD 4
Balikpapan Port Time POD 2
Pangkalan Susu POL 2 = Lampung
1454 Nm AT+WT+IT = 7 jam
125 jam Produktivitas B/M = 700 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective Time = 3 jam
Pangkalan Susu Port Time POL 2 = 10 jam
Tanjung Priok = hari
887 Nm
76 jam Port Time POD 3
POL 3 = Balikpapan
AT+WT+IT = 5 jam
Perhitungan Frekuensi Produktivitas B/M = 600 MT/jam
18 hari Payload = 2046 ton
350 hari Effective Time = 4 jam
19.4444444444444 shipment/th Port Time POD 3 = 9 jam
39789 ton/th = hari
397894 ton/kontrak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu
Rute = 125341
Seatime
Jarak Total = 4035 Nm
Seatime Total = 337 jam
Seatime roundtrip = 347 jam
= 15 hari
Perhitungan Frekuensi
Roundtrip days = 18 hari
Commission Days = 350 hari
Frekuensi = 19.4444444444444 shipment/th
Cargo Carried = 39789 ton/th
= 397894 ton/kontrak
Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH =
Perhitungan waktu Port Time
125431 Port Time POL = 11 jam
Seatime Port Time POD 1 = 10 jam
4163 Nm Port Time POD 2 = 11 jam
292 jam Port Time POD 3 = 10 jam
358 jam Port Time POD 4 = 9 jam
15 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
Tanjung Priok Port Time POL
Tanjung Perak Port of Loading (POL) = Tanjung Priok
438 Nm AT+WT+IT = 8 jam
38 jam Produktivitas B/M = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective Time = 3 jam
Pangkalan Susu Port Time POL = 11 jam
Lampung = hari
1154
99 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
Pangkalan Susu Produktivitas B/M = 600 MT/jam
Lampung Payload = 2046 ton
934 Nm Effective Time = 4 jam
80 jam Port Time POL 1 = 10 jam
= hari
Seatime POD 3 - POD 4
Lampung Port Time POD 2
Balikpapan POL 2 = Pangkalan Susu
872 Nm AT+WT+IT = 7 jam
75 jam Produktivitas B/M = 650 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective Time = 4 jam
Balikpapan Port Time POL 2 = 11 jam
Tanjung Priok = hari
765 Nm
66 jam Port Time POD 3
POL 3 = Lampung
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivitas B/M = 700 MT/jam
18 hari Payload = 2046 ton
350 hari Effective Time = 3 jam
19.4444444444444 shipment/th Port Time POD 3 = 10 jam
39789 ton/th = hari
397894 ton/kontrak
Port of Discharging 3 =
Tarif Labuh =
Biaya Labuh =
Tarif Tambat =
Etmal =
Biaya Tambat =
Tarif Tetap Pandu =
Tarif Variable Pandu =
Asumsi Jumlah Gerakan =
Biaya Pandu =
Tarif Tetap Tunda =
Tarif Variable Tunda =
Lama Penundaan =
Biaya Tunda =
Total Biaya pelabuhan POD 3 =
=
Port of Discharging 4 =
Tarif Labuh =
Biaya Labuh =
Tarif Tambat =
Etmal =
Biaya Tambat =
Tarif Tetap Pandu =
Tarif Variable Pandu =
Asumsi Jumlah Gerakan =
Biaya Pandu =
Tarif Tetap Tunda =
Tarif Variable Tunda =
Lama Penundaan =
Biaya Tunda =
Total Biaya pelabuhan POD 4 =
=
Total Biaya Pelabuhan =
=
RUTE
Voyage Cost
Biaya Bahan Bakar
Fuel Oil
Rp 4,208,850 /ton
1750.860 ton
Rp 7,369,105,605 /roundtrip
/th
Diesel Oil
Rp 5,269,875 /ton
175.1 ton
Rp 922,681,146
/th
Rp 922,682,897 /roundtrip
Rp 20,183,688,363 /th
Biaya Pelabuhan
Tanjung Priok
Rp 73 GT/Kunjungan
Rp 990,756 /trip
Rp 68 /GT/etmal
1
Rp 922,896 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,120,152
Rp 186,000
Rp 3
Rp 1 jam
Rp 558,000
Rp 3,591,804 /trip
Rp 78,570,713 /tahun
Balikpapan
Rp 73 GT/Kunjungan
Rp 990,756 /trip
Rp 68 /GT/etmal
1
Rp 922,896 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,120,152
Rp 186,000
Rp 3
2 jam
Rp 1,116,000
Rp 4,149,804 /trip
Rp 90,776,963 /tahun
Tanjung Perak
Rp 73 GT/Kunjungan
Rp 990,756 /trip
Rp 68 /GT/etmal
1
Rp 922,896 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,120,152
Rp 186,000
Rp -
1 jam
Rp -
Rp 3,033,804 /trip
Rp 66,364,463 /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
Rp 990,756 /trip
Rp 68 /GT/etmal
1
Rp 922,896 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,120,152
Rp 186,000
Rp 3
1 jam
Rp 558,000
Rp 3,591,804 /trip
Rp 78,570,713 /tahun
Lampung
Rp 73 GT/Kunjungan
Rp 990,756 /trip
Rp 68 /GT/etmal
1
Rp 922,896 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,120,152
Rp 186,000
Rp 3
1 jam
Rp 558,000
Rp 3,591,804 /trip
Rp 78,570,713 /tahun
Rp 17,959,020 /roundtrip
Rp 392,853,563 /tahun
12
Rute Perhitungan waktu
POL Tanjung Priok Rute =
POD 1 Balikpapan Seatime
Jarak POL - POD 1 765 Nm Jarak Total =
POD 2 Tanjung Perak Seatime Total =
Jarak POD 1 - POD 2 481 Nm Seatime roundtrip =
POD 3 Lampung =
Jarak POD 2 - POD 3 495 Nm
POD 4 Pangkalan Susu Seatime POL - POD 1
Jarak POD 3 - POD 4 934 Nm POL =
TUKS Tanjung Priok POD 1 =
Jarak POD 4 - TUKS 887 Nm Jarak 1 =
Seatime 1 =
Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH =
Perhitungan waktu Port Time
132451 Port Time POL = 11 jam
Seatime Port Time POD 1 = 9 jam
3562 Nm Port Time POD 2 = 10 jam
231 jam Port Time POD 3 = 10 jam
307 jam Port Time POD 4 = 11 jam
13 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
Tanjung Priok Port Time POL
Balikpapan Port of Loading (POL) = Tanjung Priok
765 Nm AT+WT+IT = 8 jam
66 jam Produktivitas B/M = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective Time = 3 jam
Tanjung Perak Port Time POL = 11 jam
Lampung = hari
481
42 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
Tanjung Perak Produktivitas B/M = 600 MT/jam
Lampung Payload = 2046 ton
495 Nm Effective Time = 4 jam
43 jam Port Time POL 1 = 9 jam
= hari
Seatime POD 3 - POD 4
Lampung Port Time POD 2
Pangkalan Susu POL 2 = Tanjung Perak
934 Nm AT+WT+IT = 6 jam
80 jam Produktivitas B/M = 600 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective Time = 4 jam
Pangkalan Susu Port Time POL 2 = 10 jam
Tanjung Priok = hari
887 Nm
76 jam Port Time POD 3
POL 3 = Lampung
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivitas B/M = 700 MT/jam
16 hari Payload = 2046 ton
350 hari Effective Time = 3 jam
21.875 shipment/th Port Time POD 3 = 10 jam
44763 ton/th = hari
447631 ton/kontrak
Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH =
Perhitungan waktu Port Time
134521 Port Time POL = 11 jam
Seatime Port Time POD 1 = 9 jam
4163 Nm Port Time POD 2 = 10 jam
320 jam Port Time POD 3 = 11 jam
358 jam Port Time POD 4 = 10 jam
15 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
Tanjung Priok Port Time POL
Balikpapan Port of Loading (POL) = Tanjung Priok
765 Nm AT+WT+IT = 8 jam
66 jam Produktivitas B/M = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective Time = 3 jam
Lampung Port Time POL = 11 jam
Pangkalan Susu = hari
872
75 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
Lampung Produktivitas B/M = 600 MT/jam
Pangkalan Susu Payload = 2046 ton
934 Nm Effective Time = 4 jam
80 jam Port Time POL 1 = 9 jam
= hari
Seatime POD 3 - POD 4
Pangkalan Susu Port Time POD 2
Tanjung Perak POL 2 = Lampung
1154 Nm AT+WT+IT = 7 jam
99 jam Produktivitas B/M = 700 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective Time = 3 jam
Tanjung Perak Port Time POL 2 = 10 jam
Tanjung Priok = hari
438 Nm
38 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivitas B/M = 650 MT/jam
18 hari Payload = 2046 ton
350 hari Effective Time = 4 jam
19.4444444444444 shipment/th Port Time POD 3 = 11 jam
39789 ton/th = hari
397894 ton/kontrak
Port of Discharging 3 =
Tarif Labuh =
Biaya Labuh =
Tarif Tambat =
Etmal =
Biaya Tambat =
Tarif Tetap Pandu =
Tarif Variable Pandu =
Asumsi Jumlah Gerakan =
Biaya Pandu =
Tarif Tetap Tunda =
Tarif Variable Tunda =
Lama Penundaan =
Biaya Tunda =
Total Biaya pelabuhan POD 3 =
=
Port of Discharging 4 =
Tarif Labuh =
Biaya Labuh =
Tarif Tambat =
Etmal =
Biaya Tambat =
Tarif Tetap Pandu =
Tarif Variable Pandu =
Asumsi Jumlah Gerakan =
Biaya Pandu =
Tarif Tetap Tunda =
Tarif Variable Tunda =
Lama Penundaan =
Biaya Tunda =
Total Biaya pelabuhan POD 4 =
=
Total Biaya Pelabuhan =
=
15
RUTE
Voyage Cost Rute
Biaya Bahan Bakar POL
Fuel Oil POD 1
Rp 4,208,850 /ton Jarak POL - POD 1
2117.165 ton POD 2
Rp 8,910,830,974 /roundtrip Jarak POD 1 - POD 2
/th POD 3
Diesel Oil Jarak POD 2 - POD 3
Rp 5,269,875 /ton POD 4
211.7 ton Jarak POD 3 - POD 4
Rp 1,115,719,624 TUKS
/th Jarak POD 4 - TUKS
Rp 1,115,721,741 /roundtrip
Rp 21,694,589,404 /th
Biaya Pelabuhan
Tanjung Priok
Rp 73 GT/Kunjungan
Rp 990,756 /trip
Rp 68 /GT/etmal
1
Rp 922,896 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,120,152
Rp 186,000
Rp 3
Rp 1 jam
Rp 558,000
Rp 3,591,804 /trip
Rp 69,840,633 /tahun
Balikpapan
Rp 73 GT/Kunjungan
Rp 990,756 /trip
Rp 68 /GT/etmal
1
Rp 922,896 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,120,152
Rp 186,000
Rp 3
2 jam
Rp 1,116,000
Rp 4,149,804 /trip
Rp 80,690,633 /tahun
Lampung
Rp 73 GT/Kunjungan
Rp 990,756 /trip
Rp 68 /GT/etmal
1
Rp 922,896 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,120,152
Rp 186,000
Rp -
1 jam
Rp -
Rp 3,033,804 /trip
Rp 58,990,633 /tahun
Tanjung Perak
Rp 73 GT/Kunjungan
Rp 990,756 /trip
Rp 68 /GT/etmal
1
Rp 922,896 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,120,152
Rp 186,000
Rp 3
1 jam
Rp 558,000
Rp 3,591,804 /trip
Rp 69,840,633 /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
Rp 990,756 /trip
Rp 68 /GT/etmal
1
Rp 922,896 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,120,152
Rp 186,000
Rp 3
1 jam
Rp 558,000
Rp 3,591,804 /trip
Rp 69,840,633 /tahun
Rp 17,959,020 /roundtrip
Rp 349,203,167 /tahun
Rute Perhitungan waktu
Tanjung Priok Rute = 135421
Balikpapan Seatime
765 Nm Jarak Total = 4086 Nm
Pangkalan Susu Seatime Total = 314 jam
1454 Nm Seatime roundtrip = 352 jam
Lampung = 15 hari
934 Nm
Tanjung Perak Seatime POL - POD 1
495 Nm POL = Tanjung Priok
Tanjung Priok POD 1 = Balikpapan
438 Nm Jarak 1 = 765 Nm
Seatime 1 = 66 jam
Perhitungan Frekuensi
Roundtrip days = 18 hari
Commission Days = 350 hari
Frekuensi = 19.4444444444444 shipment/th
Cargo Carried = 39789 ton/th
= 397894 ton/kontrak
Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH =
Perhitungan waktu Port Time
135241 Port Time POL = 11 jam
Seatime Port Time POD 1 = 9 jam
3985 Nm Port Time POD 2 = 11 jam
333 jam Port Time POD 3 = 10 jam
343 jam Port Time POD 4 = 10 jam
15 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
Tanjung Priok Port Time POL
Balikpapan Port of Loading (POL) = Tanjung Priok
765 Nm AT+WT+IT = 8 jam
66 jam Produktivitas B/M = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective Time = 3 jam
Pangkalan Susu Port Time POL = 11 jam
Tanjung Perak = hari
1454
125 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
Pangkalan Susu Produktivitas B/M = 600 MT/jam
Tanjung Perak Payload = 2046 ton
1154 Nm Effective Time = 4 jam
99 jam Port Time POL 1 = 9 jam
= hari
Seatime POD 3 - POD 4
Tanjung Perak Port Time POD 2
Lampung POL 2 = Pangkalan Susu
495 Nm AT+WT+IT = 7 jam
43 jam Produktivitas B/M = 650 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective Time = 4 jam
Lampung Port Time POL 2 = 11 jam
Tanjung Priok = hari
117 Nm
10 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivitas B/M = 600 MT/jam
18 hari Payload = 2046 ton
350 hari Effective Time = 4 jam
19.4444444444444 shipment/th Port Time POD 3 = 10 jam
39789 ton/th = hari
397894 ton/kontrak
Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH =
Perhitungan waktu Port Time
142351 Port Time POL = 11 jam
Seatime Port Time POD 1 = 10 jam
3434 Nm Port Time POD 2 = 10 jam
220 jam Port Time POD 3 = 9 jam
296 jam Port Time POD 4 = 11 jam
13 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
Tanjung Priok Port Time POL
Lampung Port of Loading (POL) = Tanjung Priok
117 Nm AT+WT+IT = 8 jam
10 jam Produktivitas B/M = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective Time = 3 jam
Tanjung Perak Port Time POL = 11 jam
Balikpapan = hari
495
43 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
Tanjung Perak Produktivitas B/M = 700 MT/jam
Balikpapan Payload = 2046 ton
481 Nm Effective Time = 3 jam
42 jam Port Time POL 1 = 10 jam
= hari
Seatime POD 3 - POD 4
Balikpapan Port Time POD 2
Pangkalan Susu POL 2 = Tanjung Perak
1454 Nm AT+WT+IT = 6 jam
125 jam Produktivitas B/M = 600 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective Time = 4 jam
Pangkalan Susu Port Time POL 2 = 10 jam
Tanjung Priok = hari
887 Nm
76 jam Port Time POD 3
POL 3 = Balikpapan
AT+WT+IT = 5 jam
Perhitungan Frekuensi Produktivitas B/M = 600 MT/jam
16 hari Payload = 2046 ton
350 hari Effective Time = 4 jam
21.875 shipment/th Port Time POD 3 = 9 jam
44763 ton/th = hari
447631 ton/kontrak
Seatime POD 1 -
POD 1
POD 2
Jarak 2
Seatime 2
Seatime PO2 -
POD 2
POD 3
Jarak 3
Seatime 3
Seatime POD 3 -
POD 3
POD 4
Jarak 4
Seatime 4
Seatime POD 4
POD 4
TUKS
Jarak 5
Seatime 5
Perhitungan Fre
Roundtrip days
Commission Days
Frekuensi
Cargo Carried
Voyage Charte
Probabilitas Angkut
Cicilan tahunan (CC+OC)
VC
Tarif VCH
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH
Perhitungan waktu Port Time
= 142531 Port Time POL =
Seatime Port Time POD 1 =
= 3985 Nm Port Time POD 2 =
= 277 jam Port Time POD 3 =
= 343 jam Port Time POD 4 =
= 15 hari =
Total Port Time
=
Seatime POL - POD 1
= Tanjung Priok Port Time POL
= Lampung Port of Loading (POL) =
= 117 Nm AT+WT+IT =
= 10 jam Produktivitas B/M =
Payload =
Seatime POD 1 - POD 2 Effective Time =
= Tanjung Perak Port Time POL =
= Pangkalan Susu =
= 495
= 43 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
= Tanjung Perak Produktivitas B/M =
= Pangkalan Susu Payload =
= 1154 Nm Effective Time =
= 99 jam Port Time POL 1 =
=
Seatime POD 3 - POD 4
= Pangkalan Susu Port Time POD 2
= Balikpapan POL 2 =
= 1454 Nm AT+WT+IT =
= 125 jam Produktivitas B/M =
Payload =
Seatime POD 4 - TUKS Effective Time =
= Balikpapan Port Time POL 2 =
= Tanjung Priok =
= 765 Nm
= 66 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivitas B/M =
= 18 hari Payload =
= 350 hari Effective Time =
= 19.4444444444444 shipment/th Port Time POD 3 =
= 39789 ton/th =
= 397894 ton/kontrak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu
Rute = 143251
Seatime
Jarak Total = 3511 Nm
Seatime Total = 226 jam
Seatime roundtrip = 302 jam
= 13 hari
Perhitungan Frekuensi
Roundtrip days = 16 hari
Commission Days = 350 hari
Frekuensi = 21.875 shipment/th
Cargo Carried = 44763 ton/th
= 447631 ton/kontrak
Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH =
Perhitungan waktu Port Time
143521 Port Time POL = 11
Seatime Port Time POD 1 = 10
4035 Nm Port Time POD 2 = 9
309 jam Port Time POD 3 = 11
347 jam Port Time POD 4 = 10
15 hari = 51
Total Port Time
= 3
Seatime POL - POD 1
Tanjung Priok Port Time POL
Lampung Port of Loading (POL) = Tanjung Priok
117 Nm AT+WT+IT = 8
10 jam Produktivitas B/M = 900
Payload = 2046
Seatime POD 1 - POD 2 Effective Time = 3
Balikpapan Port Time POL = 11
Pangkalan Susu =
872
75 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7
Balikpapan Produktivitas B/M = 700
Pangkalan Susu Payload = 2046
1454 Nm Effective Time = 3
125 jam Port Time POL 1 = 10
=
Seatime POD 3 - POD 4
Pangkalan Susu Port Time POD 2
Tanjung Perak POL 2 = Balikpapan
1154 Nm AT+WT+IT = 5
99 jam Produktivitas B/M = 600
Payload = 2046
Seatime POD 4 - TUKS Effective Time = 4
Tanjung Perak Port Time POL 2 = 9
Tanjung Priok =
438 Nm
38 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7
Perhitungan Frekuensi Produktivitas B/M = 650
18 hari Payload = 2046
350 hari Effective Time = 4
19.4444444444444 shipment/th Port Time POD 3 = 11
39789 ton/th =
397894 ton/kontrak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu
Rute = 145231
Seatime
Jarak Total = 3451 Nm
Seatime Total = 231 jam
Seatime roundtrip = 297 jam
= 13 hari
Perhitungan Frekuensi
Roundtrip days = 16 hari
Commission Days = 350 hari
Frekuensi = 21.875 shipment/th
Cargo Carried = 44763 ton/th
= 447631 ton/kontrak
Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH =
Perhitungan waktu Port Time
145321 Port Time POL = 11
Seatime Port Time POD 1 = 10
3424 Nm Port Time POD 2 = 11
257 jam Port Time POD 3 = 9
295 jam Port Time POD 4 = 10
13 hari = 51
Total Port Time
= 3
Seatime POL - POD 1
Tanjung Priok Port Time POL
Lampung Port of Loading (POL) = Tanjung Priok
117 Nm AT+WT+IT = 8
10 jam Produktivitas B/M = 900
Payload = 2046
Seatime POD 1 - POD 2 Effective Time = 3
Pangkalan Susu Port Time POL = 11
Balikpapan =
934
80 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7
Pangkalan Susu Produktivitas B/M = 700
Balikpapan Payload = 2046
1454 Nm Effective Time = 3
125 jam Port Time POL 1 = 10
=
Seatime POD 3 - POD 4
Balikpapan Port Time POD 2
Tanjung Perak POL 2 = Pangkalan Susu
481 Nm AT+WT+IT = 7
42 jam Produktivitas B/M = 650
Payload = 2046
Seatime POD 4 - TUKS Effective Time = 4
Tanjung Perak Port Time POL 2 = 11
Tanjung Priok =
438 Nm
38 jam Port Time POD 3
POL 3 = Balikpapan
AT+WT+IT = 5
Perhitungan Frekuensi Produktivitas B/M = 600
16 hari Payload = 2046
350 hari Effective Time = 4
21.875 shipment/th Port Time POD 3 = 9
44763 ton/th =
447631 ton/kontrak
Perhitungan Frekuensi
Roundtrip days = 18 hari
Commission Days = 350 hari
Frekuensi = 19.4444444444444 shipment/th
Cargo Carried = 39789 ton/th
= 397894 ton/kontrak
Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH =
Perhitungan waktu Port Time
152341 Port Time POL = 11 jam
Seatime Port Time POD 1 = 11 jam
3511 Nm Port Time POD 2 = 10 jam
292 jam Port Time POD 3 = 9 jam
302 jam Port Time POD 4 = 10 jam
13 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
Tanjung Priok Port Time POL
Pangkalan Susu Port of Loading (POL) = Tanjung Priok
887 Nm AT+WT+IT = 8 jam
76 jam Produktivitas B/M = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective Time = 3 jam
Tanjung Perak Port Time POL = 11 jam
Balikpapan = hari
1154
99 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
Tanjung Perak Produktivitas B/M = 650 MT/jam
Balikpapan Payload = 2046 ton
481 Nm Effective Time = 4 jam
42 jam Port Time POL 1 = 11 jam
= hari
Seatime POD 3 - POD 4
Balikpapan Port Time POD 2
Lampung POL 2 = Tanjung Perak
872 Nm AT+WT+IT = 6 jam
75 jam Produktivitas B/M = 600 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective Time = 4 jam
Lampung Port Time POL 2 = 10 jam
Tanjung Priok = hari
117 Nm
10 jam Port Time POD 3
POL 3 = Balikpapan
AT+WT+IT = 5 jam
Perhitungan Frekuensi Produktivitas B/M = 600 MT/jam
16 hari Payload = 2046 ton
350 hari Effective Time = 4 jam
21.875 shipment/th Port Time POD 3 = 9 jam
44763 ton/th = hari
447631 ton/kontrak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time
Rute = 153241 Port Time POL
Seatime Port Time POD 1
Jarak Total = 3434 Nm Port Time POD 2
Seatime Total = 286 jam Port Time POD 3
Seatime roundtrip = 296 jam Port Time POD 4
= 13 hari
Total Port Time
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time
Rute = 154321 Port Time POL
Seatime Port Time POD 1
Jarak Total = 3612 Nm Port Time POD 2
Seatime Total = 273 jam Port Time POD 3
Seatime roundtrip = 311 jam Port Time POD 4
= 13 hari
Total Port Time
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time
Rute = 154231 Port Time POL
Seatime Port Time POD 1
Jarak Total = 3562 Nm Port Time POD 2
Seatime Total = 241 jam Port Time POD 3
Seatime roundtrip = 307 jam Port Time POD 4
= 13 hari
Total Port Time
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
= 1231 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 1684 Nm Port Time = 9 jam Harga IFO
= 80 jam Port Time = 0 jam IFO
= 146 jam Port Time = 0 jam Biaya Fuel
= 7 hari = 30 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese
= 438 Nm AT+WT+IT = 8 jam
= 38 jam Produktivi = 900 MT/jam Total Biay
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Balikpapan Port Time = 11 jam Port of Loa
= - = hari Tarif Labuh
= 481 Biaya L
= 42 Port Time POD 1 Tarif Tamb
POD 1 = Tanjung Perak Etmal
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya
= Balikpapan Produktivi = 600 MT/jam Tarif Teta
= - Payload = 2046 ton Tarif Varia
= 0 Nm Effective T = 4 jam Asumsi Jum
= 0 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Balikpapan Biaya
= 0 Nm AT+WT+IT = 5 jam Total Biay
= 0 jam Produktivi = 600 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= - Port Time = 9 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 66 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 9 hari Payload = 2046 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 38.88889 shipment/th Port Time = 0 jam Tarif Teta
= 79579 ton/th = hari Tarif Varia
= 795788 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 79579 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2046 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
30
RUTE
Voyage Cost Rute
Biaya Bahan Bakar POL Tanjung Priok
Fuel Oil POD 1 Balikpapan
= ### /ton Jarak POL 765 Nm
= 854.375 ton POD 2 Tanjung Perak
= ### /roundtrip Jarak POD 481 Nm
= /th POD 3 -
Diesel Oil Jarak POD 0 Nm
= ### /ton POD 4 -
= 85.4 ton Jarak POD 0 Nm
= ### TUKS Tanjung Priok
= /th Jarak POD 438 Nm
= ### /roundtrip
= ### /th
Biaya Pelabuhan
= Tanjung Priok
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= Rp 1 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1321 Port Time = 11 jam
Seatime Port Time = 9 jam
Jarak Total = 1684 Nm Port Time = 10 jam
Seatime To = 108 jam Port Time = 0 jam
Seatime ro = 146 jam Port Time = 0 jam
= 7 hari = 30 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 66 jam Produktivi = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Tanjung Perak Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 481
Seatime 2 = 42 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Tanjung Perak Produktivi = 600 MT/jam
POD 3 = - Payload = 2046 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 9 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Tanjung Perak
Jarak 4 = 0 Nm AT+WT+IT = 6 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 38 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 9 hari Payload = 2046 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 38.88889 shipment/th Port Time = 0 jam
Cargo Carr = 79579 ton/th = hari
= 795788 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1241 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 1050 Nm Port Time = 10 jam
Seatime To = 81 jam Port Time = 0 jam
Seatime ro = 91 jam Port Time = 0 jam
= 4 hari = 31 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 38 jam Produktivi = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Lampung Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 495
Seatime 2 = 43 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Lampung Produktivi = 600 MT/jam
POD 3 = - Payload = 2046 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 700 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective T = 3 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 10 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 6 hari Payload = 2046 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 58.33333 shipment/th Port Time = 0 jam
Cargo Carr = 119368 ton/th = hari
= 1193682 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1421 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 1050 Nm Port Time = 10 jam
Seatime To = 53 jam Port Time = 0 jam
Seatime ro = 91 jam Port Time = 0 jam
= 4 hari = 31 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 10 jam Produktivi = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Tanjung Perak Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 495
Seatime 2 = 43 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Tanjung Perak Produktivi = 700 MT/jam
POD 3 = - Payload = 2046 ton
Jarak 3 = 0 Nm Effective T = 3 jam
Seatime 3 = 0 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Tanjung Perak
Jarak 4 = 0 Nm AT+WT+IT = 6 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 38 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 6 hari Payload = 2046 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 58.33333 shipment/th Port Time = 0 jam
Cargo Carr = 119368 ton/th = hari
= 1193682 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1341 Port Time = 11 jam
Seatime Port Time = 9 jam
Jarak Total = 1754 Nm Port Time = 10 jam
Seatime To = 141 jam Port Time = 0 jam
Seatime ro = 151 jam Port Time = 0 jam
= 7 hari = 30 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 66 jam Produktivi = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Lampung Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 872
Seatime 2 = 75 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Lampung Produktivi = 600 MT/jam
POD 3 = - Payload = 2046 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 9 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 700 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective T = 3 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 10 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 9 hari Payload = 2046 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 38.8888888888889 shipment/th Port Time = 0 jam
Cargo Carr = 79579 ton/th = hari
= 795788 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1431 Port Time = 11
Seatime Port Time = 10
Jarak Total = 1754 Nm Port Time = 9
Seatime To = 85 jam Port Time = 0
Seatime ro = 151 jam Port Time = 0
= 7 hari = 30
Total Port Time
= 2
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8
Seatime 1 = 10 jam Produktivi = 900
Payload = 2046
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = Balikpapan Port Time = 11
POD 2 = - =
Jarak 2 = 872
Seatime 2 = 75 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7
POD 2 = Balikpapan Produktivi = 700
POD 3 = - Payload = 2046
Jarak 3 = 0 Nm Effective T = 3
Seatime 3 = 0 jam Port Time = 10
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5
Seatime 4 = 0 jam Produktivi = 600
Payload = 2046
Seatime POD 4 - TUKS Effective T = 4
POD 4 = - Port Time = 9
TUKS = Tanjung Priok =
Jarak 5 = 765 Nm
Seatime 5 = 66 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0
Perhitungan Frekuensi Produktivi = 0
Roundtrip = 9 hari Payload = 2046
Commissio = 350 hari Effective T = 0
Frekuensi = 38.8888888888889 shipment/th Port Time = 0
Cargo Carr = 79579 ton/th =
= 795788 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1251 Port Time =
Tanjung Perak Seatime Port Time =
Nm Jarak Total = 2479 Nm Port Time =
Pangkalan Susu Seatime To = 137 jam Port Time =
Nm Seatime ro = 213 jam Port Time =
= 9 hari =
Total Port Time
Nm =
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa =
Nm Jarak 1 = 438 Nm AT+WT+IT =
Seatime 1 = 38 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Pangkalan Susu Port Time =
POD 2 = - =
Jarak 2 = 1154
Seatime 2 = 99 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Pangkalan Susu Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 887 Nm
Seatime 5 = 76 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 11 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 31.8181818181818 shipment/th Port Time =
Cargo Carr = 65110 ton/th =
= 651099 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1521 Port Time =
Pangkalan Susu Seatime Port Time =
887 Nm Jarak Total = 2479 Nm Port Time =
Tanjung Perak Seatime To = 175 jam Port Time =
1154 Nm Seatime ro = 213 jam Port Time =
- = 9 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Pangkalan Susu Port of Loa =
438 Nm Jarak 1 = 887 Nm AT+WT+IT =
Seatime 1 = 76 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Tanjung Perak Port Time =
POD 2 = - =
Jarak 2 = 1154
Seatime 2 = 99 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Tanjung Perak Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 438 Nm
Seatime 5 = 38 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 11 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 31.81818 shipment/th Port Time =
Cargo Carr = 65110 ton/th =
= 651099 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1351 Port Time =
Balikpapan Seatime Port Time =
765 Nm Jarak Total = 3106 Nm Port Time =
Pangkalan Susu Seatime To = 191 jam Port Time =
1454 Nm Seatime ro = 267 jam Port Time =
- = 12 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Balikpapan Port of Loa =
887 Nm Jarak 1 = 765 Nm AT+WT+IT =
Seatime 1 = 66 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Pangkalan Susu Port Time =
POD 2 = - =
Jarak 2 = 1454
Seatime 2 = 125 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Pangkalan Susu Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 887 Nm
Seatime 5 = 76 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 14 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 25 shipment/th Port Time =
Cargo Carr = 51158 ton/th =
= 511578 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1531 Port Time =
Pangkalan Susu Seatime Port Time =
887 Nm Jarak Total = 3106 Nm Port Time =
Balikpapan Seatime To = 201 jam Port Time =
1454 Nm Seatime ro = 267 jam Port Time =
- = 12 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Pangkalan Susu Port of Loa =
765 Nm Jarak 1 = 887 Nm AT+WT+IT =
Seatime 1 = 76 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Balikpapan Port Time =
POD 2 = - =
Jarak 2 = 1454
Seatime 2 = 125 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Balikpapan Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 765 Nm
Seatime 5 = 66 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 14 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 25 shipment/th Port Time =
Cargo Carr = 51158 ton/th =
= 511578 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1451 Port Time =
Lampung Seatime Port Time =
117 Nm Jarak Total = 1938 Nm Port Time =
Pangkalan Susu Seatime To = 90 jam Port Time =
934 Nm Seatime ro = 166 jam Port Time =
- = 7 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Lampung Port of Loa =
887 Nm Jarak 1 = 117 Nm AT+WT+IT =
Seatime 1 = 10 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Pangkalan Susu Port Time =
POD 2 = - =
Jarak 2 = 934
Seatime 2 = 80 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Pangkalan Susu Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 887 Nm
Seatime 5 = 76 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 9 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 38.88889 shipment/th Port Time =
Cargo Carr = 79579 ton/th =
= 795788 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1541 Port Time =
Pangkalan Susu Seatime Port Time =
887 Nm Jarak Total = 1938 Nm Port Time =
Lampung Seatime To = 156 jam Port Time =
934 Nm Seatime ro = 166 jam Port Time =
- = 7 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Pangkalan Susu Port of Loa =
117 Nm Jarak 1 = 887 Nm AT+WT+IT =
Seatime 1 = 76 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Lampung Port Time =
POD 2 = - =
Jarak 2 = 934
Seatime 2 = 80 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Lampung Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 10 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 9 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 38.88889 shipment/th Port Time =
Cargo Carr = 79579 ton/th =
= 795788 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 12341 Port Time
Tanjung Perak Seatime Port Time
438 Nm Jarak Total = 1908 Nm Port Time
Balikpapan Seatime To = 155 jam Port Time
481 Nm Seatime ro = 165 jam Port Time
Lampung = 7 hari
Total Port Time
872 Nm
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time P
Tanjung Priok POD 1 = Tanjung Perak Port of Loa
117 Nm Jarak 1 = 438 Nm AT+WT+IT
Seatime 1 = 38 jam Produktivi
Payload
Seatime POD 1 - POD 2 Effective T
POD 1 = Balikpapan Port Time
POD 2 = Lampung
Jarak 2 = 481
Seatime 2 = 42 Port Time PO
POD 1
Seatime PO2 - POD 3 AT+WT+IT
POD 2 = Balikpapan Produktivi
POD 3 = Lampung Payload
Jarak 3 = 872 Nm Effective T
Seatime 3 = 75 jam Port Time
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
42
Rute Perhitungan waktu
POL Tanjung Priok Rute = 12431
POD 1 Tanjung Perak Seatime
Jarak POL 438 Nm Jarak Total = 2570 Nm
POD 2 Lampung Seatime To = 156 jam
Jarak POD 495 Nm Seatime ro = 222 jam
POD 3 Balikpapan = 10 hari
Jarak POD 872 Nm
POD 4 - Seatime POL - POD 1
Jarak POD 0 Nm POL = Tanjung Priok
TUKS Tanjung Priok POD 1 = Tanjung Perak
Jarak POD 765 Nm Jarak 1 = 438 Nm
Seatime 1 = 38 jam
Perhitungan Frekuensi
Roundtrip = 12 hari
Commissio = 350 hari
Frekuensi = 29.1666666666667 shipment/th
Cargo Carr = 59684 ton/th
= 596841 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
43
RUTE
Rute Perhitungan waktu
POL Tanjung Priok Rute = 13241
POD 1 Balikpapan Seatime
Jarak POL 765 Nm Jarak Total = 1858 Nm
POD 2 Tanjung Perak Seatime To = 151 jam
Jarak POD 481 Nm Seatime ro = 161 jam
POD 3 Lampung = 7 hari
Jarak POD 495 Nm
POD 4 - Seatime POL - POD 1
Jarak POD 0 Nm POL = Tanjung Priok
TUKS Tanjung Priok POD 1 = Balikpapan
Jarak POD 117 Nm Jarak 1 = 765 Nm
Seatime 1 = 66 jam
Perhitungan Frekuensi
Roundtrip = 9 hari
Commissio = 350 hari
Frekuensi = 38.8888888888889 shipment/th
Cargo Carr = 79579 ton/th
= 795788 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
44
RUTE
Rute Perhitungan waktu
POL Tanjung Priok Rute = 13421
POD 1 Balikpapan Seatime
Jarak POL 765 Nm Jarak Total = 2570 Nm
POD 2 Lampung Seatime To = 184 jam
Jarak POD 872 Nm Seatime ro = 222 jam
POD 3 Tanjung Perak = 10 hari
Jarak POD 495 Nm
POD 4 - Seatime POL - POD 1
Jarak POD 0 Nm POL = Tanjung Priok
TUKS Tanjung Priok POD 1 = Balikpapan
Jarak POD 438 Nm Jarak 1 = 765 Nm
Seatime 1 = 66 jam
Perhitungan Frekuensi
Roundtrip = 12 hari
Commissio = 350 hari
Frekuensi = 29.1666666666667 shipment/th
Cargo Carr = 59684 ton/th
= 596841 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
45
RUTE
Rute Perhitungan waktu
POL Tanjung Priok Rute =
POD 1 Lampung Seatime
Jarak POL 117 Nm Jarak Total =
POD 2 Tanjung Perak Seatime To =
/roundtrip Jarak POD 495 Nm Seatime ro =
POD 3 Balikpapan =
Jarak POD 481 Nm
POD 4 - Seatime POL - POD 1
Jarak POD 0 Nm POL =
TUKS Tanjung Priok POD 1 =
Jarak POD 765 Nm Jarak 1 =
/roundtrip Seatime 1 =
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip =
Commissio =
Frekuensi =
Cargo Carr =
=
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
Perhitungan waktu Port Time Voyage Co
14231 Port Time = 11 jam Biaya Bahan B
Seatime Port Time = 10 jam Fuel Oil
1858 Nm Port Time = 10 jam Harga IFO
95 jam Port Time = 9 jam IFO
161 jam Port Time = 0 jam Biaya Fuel
7 hari = 40 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
Tanjung Priok Port Time POL WFO
Lampung Port of Loa = Tanjung Priok Biaya Diese
117 Nm AT+WT+IT = 8 jam
10 jam Produktivi = 900 MT/jam Total Biay
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabu
Tanjung Perak Port Time = 11 jam Port of Loa
Balikpapan = hari Tarif Labuh
495 Biaya L
43 Port Time POD 1 Tarif Tamb
POD 1 = Lampung Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
Tanjung Perak Produktivi = 700 MT/jam Tarif Teta
Balikpapan Payload = 2046 ton Tarif Varia
481 Nm Effective T = 3 jam Asumsi Jum
42 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
Balikpapan Port Time POD 2 Lama Penu
- POL 2 = Tanjung Perak Biaya
0 Nm AT+WT+IT = 6 jam Total Biay
0 jam Produktivi = 600 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
- Port Time = 10 jam Tarif Labuh
Tanjung Priok = hari Biaya L
765 Nm Tarif Tamb
66 jam Port Time POD 3 Etmal
POL 3 = Balikpapan Biaya
AT+WT+IT = 5 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia
9 hari Payload = 2046 ton Asumsi Jum
350 hari Effective T = 4 jam Biaya
38.8888888888889 shipment/th Port Time = 9 jam Tarif Teta
79579 ton/th = hari Tarif Varia
795788 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
79579 POD 4 = -
Rp 32,673,343,753 AT+WT+IT = 0 jam
Rp 511,134,768 /roundtrip Produktivi = 0 MT/jam Port of Dis
Rp 19,877,463,199 /tahun Payload = 2046 ton Tarif Labuh
Rp 55,532,426,432 /tahun Effective T = 0 jam Biaya L
Rp 1,427,976,680 /roundtrip Port Time = 0 jam Tarif Tamb
Rp 555,324,264,316 /masa kontrak = hari Etmal
- Biaya
800,000 Tarif Teta
700,000 Tarif Varia
- Asumsi Jum
3,300,000 Biaya
Rp 16,828 /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
46
RUTE
Voyage Cost Rute Perhit
Biaya Bahan Bakar POL Tanjung Priok Rute
Fuel Oil POD 1 Lampung S
= ### /ton Jarak POL 117 Nm Jarak Total
= 942.653 ton POD 2 Balikpapan Seatime To
= ### /roundtrip Jarak POD 872 Nm Seatime ro
= /th POD 3 Tanjung Perak
Diesel Oil Jarak POD 481 Nm
= ### /ton POD 4 - Seatim
= 94.3 ton Jarak POD 0 Nm POL
= ### TUKS Tanjung Priok POD 1
= /th Jarak POD 438 Nm Jarak 1
= ### /roundtrip Seatime 1
= ### /th
Biaya Pelabuhan Seatime
= Tanjung Priok POD 1
= Rp 73 GT/Kunjungan POD 2
= ### /trip Jarak 2
= Rp 68 /GT/etmal Seatime 2
= 1
= ### /trip Seatime
= ### /kapal/gerakan POD 2
= Rp 22 /GT/Kapal/Gerakan POD 3
= 3 gerakan Jarak 3
= ### Seatime 3
= ###
= Rp 3 Seatime
= Rp 1 jam POD 3
= ### POD 4
= ### /trip Jarak 4
= ### /tahun Seatime 4
= Lampung Seatime
= Rp 73 GT/Kunjungan POD 4
= ### /trip TUKS
= Rp 68 /GT/etmal Jarak 5
= 1 Seatime 5
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan Perhitun
= 3 gerakan Roundtrip
= ### Commissio
= ### Frekuensi
= Rp 3 Cargo Carr
= 2 jam
= ###
= ### /trip Voyage
= ### /tahun Probabilita
Cicilan ta
= Tanjung Perak VC
= Rp 73 GT/Kunjungan
= ### /trip Tarif VCH
= Rp 68 /GT/etmal
= 1
= ### /trip Demand POD 1
= ### /kapal/gerakan Demand POD 2
= Rp 22 /GT/Kapal/Gerakan Demand POD 3
= 3 gerakan Demand POD 4
= ### Total Demand
= ### Unit Cost
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
= 14321 Port Time = 11 jam
Seatime Port Time = 10 jam
= 1908 Nm Port Time = 9 jam
= 127 jam Port Time = 10 jam
= 165 jam Port Time = 0 jam
= 7 hari = 40 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
= Tanjung Priok Port Time POL
= Lampung Port of Loa = Tanjung Priok
= 117 Nm AT+WT+IT = 8 jam
= 10 jam Produktivi = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
= Balikpapan Port Time = 11 jam
= Tanjung Perak = hari
= 872
= 75 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
= Balikpapan Produktivi = 700 MT/jam
= Tanjung Perak Payload = 2046 ton
= 481 Nm Effective T = 3 jam
= 42 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
= Tanjung Perak Port Time POD 2
= - POL 2 = Balikpapan
= 0 Nm AT+WT+IT = 5 jam
= 0 jam Produktivi = 600 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective T = 4 jam
= - Port Time = 9 jam
= Tanjung Priok = hari
= 438 Nm
= 38 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
= 9 hari Payload = 2046 ton
= 350 hari Effective T = 4 jam
= 38.8888888888889 shipment/th Port Time = 10 jam
= 79579 ton/th = hari
= 795788 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 12351 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 3260 Nm Port Time = 9 jam
Seatime To = 205 jam Port Time = 11 jam
Seatime ro = 281 jam Port Time = 0 jam
= 12 hari = 41 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 38 jam Produktivi = 900 MT/jam
Payload = 2046 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Balikpapan Port Time = 11 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 481
Seatime 2 = 42 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Balikpapan Produktivi = 600 MT/jam
POD 3 = Pangkalan Susu Payload = 2046 ton
Jarak 3 = 1454 Nm Effective T = 4 jam
Seatime 3 = 125 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2046 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 9 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 76 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 14 hari Payload = 2046 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 25 shipment/th Port Time = 11 jam
Cargo Carr = 51158 ton/th = hari
= 511578 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
TERPILIH
Data Kapal O
Nama Kapal = PRIMA LAUTAN II 2
Tipe = LPG Tanker
Manning Cost
DWT = 17298 ton
Payload = 2001 ton
LPP = 165 m
B = 26 m
T = 8.7 m
GT 13492
Vs = 10.6 knot
Perbelakan dan
Daya ME = 2684 HP Minyak Pelumas
Daya AE = 698 HP
SFOC ME = 167 gr/HP.jam
SFOC AE = 133.6 gr/HP.jam
Bahan bakar
ME HFO = 885.7 kg/m3
AE HSD = 997 kg/m3
Reparasi dan
Jumlah kru = 15 Perawatan
Umur Ekonomis = 9
SLOC = 0.00015 liter/HP.jam
Massa Jenis SLOC 0.000912 ton/liter Asuransi
Commission Days = 350 hari
SFR 0.002684
MCR 2147.2 Administrasi
Harga = Rp 136,505,724,971
Total Operating Cost
Perhitungan Sewa
Margin Profit = 15% dari total PV
Rp1,955,428,576 /tahun
Time Charter Hire
Cicilan tahunan = Rp32,669,734,972
= Rp93,342,100 /hari
= Rp2,722,477,914 /bulan
Tarif TCH
= Rp32,669,734,972 /tahun
= Rp326,697,349,718 /masa kontrak
Unit Cost Skema TCH =
PTP - Tanjung Perak Rp 16,335
PTP - Balikpapan Rp 46,671
PTP - Lampung Rp 54,450
PTP - Pangkalan Susu Rp 40,837
Operating Cost
Jumlah
Jumlah Crew = 15 orang
Faktor Gaji = 13 kali 1
Manning Cost Total = Rp 140,110,000 /bulan 1
= Rp 1,821,430,000 /tahun 1
Kebutuhan Perbekalan 1
Jumlah Crew = 15 orang 1
Biaya Perbekalan = Rp 50,000 /hari 1
Biaya Perbekalan total = Rp 262,500,000 /tahun 1
Kebutuhan Minyak Pelumas 1
1
SLOC = 0.00015 liter/HP.jam 1
= 25908 liter/tahun 2
Harga minyak pelumas = Rp 35,000 /liter 1
Biaya Minyak pelumas = Rp 906,765,996 /tahun 1
Total Perbekalan dan Minyak = Rp 906,765,996 /tahun 1
Asumsi persentase = 3% harga kapal 15
Biaya reparasi dan perawatan = Rp 3,412,643,124 /tahun
= Rp 34,126,431,243 /masa sewa
Asumsi persentase asuransi = 1% harga kapal Umur
Total biaya asuransi = Rp 1,638,068,700 /tahun Sisa
= Rp 16,380,686,996 /masa sewa masa sewa
Asumsi Persentase = 1% harga kapal kenaikan
Total biaya administrasi = Rp 1,365,057,250 /tahun
= Rp 13,650,572,497 /masa sewa
= Rp 9,406,465,069 /tahun periode
Total Operating Cost
= Rp 94,064,650,691 /masa sewa
rate
Perhitungan
WACC
CC
OC
Total
Tunjanga
Jabatan Gaji Pokok Sertifikat
Jabatan
Master/Captain Rp 10,000,000 Rp 2,600,000 Rp 1,600,000
Chief Engineer Rp 8,000,000 Rp 1,900,000 Rp 1,500,000
Second Engineer Rp 7,950,000 Rp 1,900,000 Rp 1,500,000
Chief Officer Rp 8,000,000 Rp 2,500,000 Rp 1,200,000
Second Officer Rp 7,950,000 Rp 2,500,000 Rp 1,200,000
Quarter Master Rp 6,500,000 Rp 1,000,000 Rp 500,000
Electrician Rp 5,000,000 Rp 900,000 Rp 500,000
Steward Rp 3,500,000 Rp 500,000
Oiler Rp 4,500,000 Rp 1,000,000 Rp 500,000
Boys Rp 3,500,000 Rp 500,000 Rp 500,000
Cadet Rp 100,000 Rp 500,000 Rp -
Chief Cook Rp 4,000,000 Rp 500,000 Rp 450,000
Assistant Cook Rp 3,500,000 Rp 500,000 Rp 450,000
Boatswain Rp 3,500,000 Rp 500,000 Rp 450,000
Total Rp 76,000,000 Rp 17,300,000 Rp 10,350,000
2011 0 1
11 Kenaikan Biaya
10 Gaji Kru Rp1,821,430,000 Rp1,912,501,500
2% Perbekalan Rp262,500,000 Rp275,625,000
3% Minyak Pelumas Rp906,765,996 Rp952,104,295
5% Reparasi dan Perawatan Rp3,412,643,124 Rp3,762,439,045
2 Asuransi Rp1,638,068,700 Rp1,771,571,299
5 Biaya umum Rp1,365,057,250 Rp1,433,310,112
5% Total FV Rp9,406,465,069 Rp10,107,551,251
NPV Rp100,662,007,555
Anuitas Operating Cost Rp13,036,190,504 /tahun
Perhitungan Biaya
Rp 136,505,724,971
Rp17,678,115,892.69
Rp13,036,190,504
Rp30,714,306,396 /tahun
Tunjangan Tunjangan
Bonus Voyage Seniority
Berlayar Kesehatan
Rp 1,600,000 Rp 1,500,000 Rp 1,600,000 Rp 260,000
Rp 1,600,000 Rp 1,500,000 Rp 1,400,000 Rp 350,000
Rp 1,600,000 Rp 1,500,000 Rp 1,400,000 Rp -
Rp 1,400,000 Rp 1,500,000 Rp 1,400,000 Rp 200,000
Rp 1,400,000 Rp 1,500,000 Rp 1,400,000 Rp 200,000
Rp 450,000 Rp 500,000 Rp 500,000 Rp 200,000
Rp 450,000 Rp 400,000 Rp 450,000 -
Rp 450,000 Rp 300,000 Rp 400,000 -
Rp 450,000 Rp 500,000 Rp 500,000 Rp 200,000
Rp 450,000 Rp 400,000 Rp 350,000 -
Rp 450,000 Rp 400,000 Rp - -
Rp 450,000 Rp 400,000 Rp 350,000 Rp 100,000
Rp 450,000 Rp 400,000 Rp 350,000 Rp 100,000
Rp 450,000 Rp 400,000 Rp 350,000 Rp 100,000
Rp 11,650,000 Rp 11,200,000 Rp 10,450,000 Rp 1,710,000
OWNER CHARTERER
BAREBOAT CHARTER
OWNER
OWNER CHARTERER
CHARTERER
TIME CHARTER
TIME CHARTER
OWNER
OWNER CHARTERER
CHARTERER
VOYAGE
VOYAGE CHARTER
CHARTER OWNER
OWNER
Total Total Gaji
Rp 19,160,000 Rp 19,160,000
Rp 16,250,000 Rp 16,250,000
Rp 15,850,000 Rp 15,850,000
Rp 16,200,000 Rp 16,200,000
Rp 16,150,000 Rp 16,150,000
Rp 9,650,000 Rp 9,650,000
Rp 7,700,000 Rp 7,700,000
Rp 5,150,000 Rp 5,150,000
Rp 7,650,000 Rp 7,650,000
Rp 5,700,000 Rp 5,700,000
Rp 1,450,000 Rp 2,900,000
Rp 6,250,000 Rp 6,250,000
Rp 5,750,000 Rp 5,750,000
Rp 5,750,000 Rp 5,750,000
Rp 138,660,000 Rp 140,110,000
6 7 8 9 10
C/H Costs
R
R
R
R
1
RUTE
Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH =
Perhitungan waktu Port Time
121 Port Time POL = 11 jam
Seatime Port Time POD 1 = 10 jam
876 Nm Port Time POD 2 = 0 jam
42 jam Port Time POD 3 = 0 jam
84 jam Port Time POD 4 = 0 jam
4 hari = 21 jam
Total Port Time
= 1 hari
Seatime POL - POD 1
Tanjung Priok Port Time POL
Tanjung Perak Port of Loading (POL) = Tanjung Priok
438 Nm AT+WT+IT = 8 jam
42 jam Produktivitas B/M = 900 MT/jam
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective Time = 3 jam
- Port Time POL = 11 jam
- = hari
0
0 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
- Produktivitas B/M = 600 MT/jam
- Payload = 2001 ton
0 Nm Effective Time = 4 jam
0 jam Port Time POL 1 = 10 jam
= hari
Seatime POD 3 - POD 4
- Port Time POD 2
- POL 2 = -
0 Nm AT+WT+IT = 0 jam
0 jam Produktivitas B/M = 0 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective Time = 0 jam
- Port Time POL 2 = 0 jam
Tanjung Priok = hari
438 Nm
42 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivitas B/M = 0 MT/jam
5 hari Payload = 2001 ton
350 hari Effective Time = 0 jam
70 shipment/th Port Time POD 3 = 0 jam
140105 ton/th = hari
1401049 ton/kontrak
Port of Discharging 2 = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya Labuh = Rp - /trip
Tarif Tambat = Rp - /GT/etmal
Etmal = 1
Biaya Tambat = Rp - /trip
Tarif Tetap Pandu = Rp - /kapal/gerakan
Tarif Variable Pandu = Rp - /GT/Kapal/Gerakan
Asumsi Jumlah Gerakan = 3 gerakan
Biaya Pandu = Rp -
Tarif Tetap Tunda = Rp 186,000
Tarif Variable Tunda = Rp -
Lama Penundaan = 1 jam
Biaya Tunda = Rp -
Total Biaya pelabuhan POD 2 = Rp - /trip
= Rp - /tahun
Port of Discharging 3 = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya Labuh = Rp - /trip
Tarif Tambat = Rp - /GT/etmal
Etmal = 1
Biaya Tambat = Rp - /trip
Tarif Tetap Pandu = Rp - /kapal/gerakan
Tarif Variable Pandu = Rp - /GT/Kapal/Gerakan
Asumsi Jumlah Gerakan = 3 gerakan
Biaya Pandu = Rp -
Tarif Tetap Tunda = Rp 186,000
Tarif Variable Tunda = Rp -
Lama Penundaan = 1 jam
Biaya Tunda = Rp -
Total Biaya pelabuhan POD 3 = Rp - /trip
= Rp - /tahun
Port of Discharging 4 = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya Labuh = Rp - /trip
Tarif Tambat = Rp - /GT/etmal
Etmal = 1
Biaya Tambat = Rp - /trip
Tarif Tetap Pandu = Rp - /kapal/gerakan
Tarif Variable Pandu = Rp - /GT/Kapal/Gerakan
Asumsi Jumlah Gerakan = 3 gerakan
Biaya Pandu = Rp -
Tarif Tetap Tunda = Rp 186,000
Tarif Variable Tunda = Rp -
Lama Penundaan = 1 jam
Biaya Tunda = Rp -
Total Biaya pelabuhan POD 4 = Rp - /trip
= Rp - /tahun
Total Biaya Pelabuhan = Rp 7,708,670 /roundtrip
= Rp 539,606,911 /tahun
2
RUTE
Perhitungan Frekuensi
Roundtrip =
Commissio =
Frekuensi =
Cargo Carr =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost =
Perhitungan waktu Port Time
131 Port Time = 11 jam Bia
Seatime Port Time = 9 jam
1530 Nm Port Time = 0 jam Harga IFO
73 jam Port Time = 0 jam IFO
146 jam Port Time = 0 jam Biaya Fuel
7 hari = 20 jam
Total Port Time
= 1 hari
Seatime POL - POD 1 Harga HSD
Tanjung Priok Port Time POL WFO
Balikpapan Port of Loa = Tanjung Priok Biaya Diese
765 Nm AT+WT+IT = 8 jam
73 jam Produktivi = 900 MT/jam Total Biay
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Bi
0 Port Time = 11 jam Port of Loa
0 = hari Tarif Labuh
0 Biaya L
0 Port Time POD 1 Tarif Tamb
POD 1 = Balikpapan Etmal
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya
0 Produktivi = 600 MT/jam Tarif Teta
0 Payload = 2001 ton Tarif Varia
0 Nm Effective T = 4 jam Asumsi Jum
0 jam Port Time = 9 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
0 Port Time POD 2 Lama Penu
0 POL 2 = 0 Biaya
0 Nm AT+WT+IT = 0 jam Total Biay
0 jam Produktivi = 0 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 0 jam Port of Dis
0 Port Time = 0 jam Tarif Labuh
Tanjung Priok = hari Biaya L
765 Nm Tarif Tamb
73 jam Port Time POD 3 Etmal
POL 3 = 0 Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
8 hari Payload = 2001 ton Asumsi Jum
350 hari Effective T = 0 jam Biaya
43.75 shipment/th Port Time = 0 jam Tarif Teta
87566 ton/th = hari Tarif Varia
875655 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
87566 POD 4 = 0
Rp 32,669,734,972 AT+WT+IT = 0 jam
Rp 459,230,694 /roundtrip Produktivi = 0 MT/jam Port of Dis
Rp 20,091,342,846 /tahun Payload = 2001 ton Tarif Labuh
Rp 55,774,779,245 /tahun Effective T = 0 jam Biaya L
Rp 1,274,852,097 /roundtrip Port Time = 0 jam Tarif Tamb
Rp 557,747,792,448 /masa kontrak = hari Etmal
- Biaya
- Tarif Teta
- Tarif Varia
- Asumsi Jum
700,000 Biaya
Rp 79,678 /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
3
RUTE
= Balikpapan
= Rp 73 GT/Kunjungan
= Rp 984,948 /trip
= Rp 68 /GT/etmal
= 1
= Rp 917,486 /trip
= Rp 74,800 /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= Rp 1,114,901
= Rp 186,000
= Rp 3
= 2 jam
= Rp 1,116,000
= Rp 4,133,335 /trip
= Rp 180,833,410 /tahun
= 0
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= Rp 186,000
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= 0
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= Rp 186,000
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= 0
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= Rp 186,000
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= Rp 7,708,670 /roundtrip
= Rp 337,254,320 /tahun
Rute Perhitungan waktu
Tanjung Priok Rute = 141
Seatime
Nm Jarak Total = 234 Nm
Seatime Total = 12 jam
Nm Seatime roundtrip = 24 jam
= 1 hari
Nm
Seatime POL - POD 1
Nm POL = Tanjung Priok
Tanjung Priok POD 1 = Lampung
Nm Jarak 1 = 117 Nm
Seatime 1 = 12 jam
Perhitungan Frekuensi
Roundtrip days = 2 hari
Commission Days = 350 hari
Frekuensi = 175 shipment/th
Cargo Carried = 350262 ton/th
= 3502622 ton/kontrak
Port of Discharging 3 =
Tarif Labuh =
Biaya Labuh =
Tarif Tambat =
Etmal =
Biaya Tambat =
Tarif Tetap Pandu =
Tarif Variable Pandu =
Asumsi Jumlah Gerakan =
Biaya Pandu =
Tarif Tetap Tunda =
Tarif Variable Tunda =
Lama Penundaan =
Biaya Tunda =
Total Biaya pelabuhan POD 3 =
=
Port of Discharging 4 =
Tarif Labuh =
Biaya Labuh =
Tarif Tambat =
Etmal =
Biaya Tambat =
Tarif Tetap Pandu =
Tarif Variable Pandu =
Asumsi Jumlah Gerakan =
Biaya Pandu =
Tarif Tetap Tunda =
Tarif Variable Tunda =
Lama Penundaan =
Biaya Tunda =
Total Biaya pelabuhan POD 4 =
=
Total Biaya Pelabuhan =
=
4
RUTE
Lampung
Rp 73 GT/Kunjungan
Rp 984,948 /trip
Rp 68 /GT/etmal
1
Rp 917,486 /trip
Rp 74,800 /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
Rp 1,114,901
Rp 186,000
Rp 3
2 jam
Rp 1,116,000
Rp 4,133,335 /trip
Rp 723,333,639 /tahun
0
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
Rp 186,000
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
0
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
Rp 186,000
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
0
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
Rp 186,000
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
Rp 7,708,670 /roundtrip
Rp 1,349,017,278 /tahun
Perhitungan waktu Port Time
Rute = 151 Port Time = 11 jam
Seatime Port Time = 11 jam
Jarak Total = 1774 Nm Port Time = 0 jam
Seatime To = 84 jam Port Time = 0 jam
Seatime ro = 168 jam Port Time = 0 jam
= 7 hari = 22 jam
Total Port Time
= 1 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Pangkalan Susu Port of Loa = Tanjung Priok
Jarak 1 = 887 Nm AT+WT+IT = 8 jam
Seatime 1 = 84 jam Produktivi = 900 MT/jam
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = 0 Port Time = 11 jam
POD 2 = 0 = hari
Jarak 2 = 0
Seatime 2 = 0 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = 0 Produktivi = 650 MT/jam
POD 3 = 0 Payload = 2001 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = 0 Port Time POD 2
POD 4 = 0 POL 2 = 0
Jarak 4 = 0 Nm AT+WT+IT = 0 jam
Seatime 4 = 0 jam Produktivi = 0 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 0 jam
POD 4 = 0 Port Time = 0 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 84 jam Port Time POD 3
POL 3 = 0
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 8 hari Payload = 2001 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 43.75 shipment/th Port Time = 0 jam
Cargo Carr = 87566 ton/th = hari
= 875655 ton/kontrak
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 123451 Port Time = 11
Tanjung Perak Seatime Port Time = 10
Nm Jarak Total = 3612 Nm Port Time = 9
Balikpapan Seatime To = 260 jam Port Time = 10
Nm Seatime ro = 344 jam Port Time = 11
= 15 hari = 51
Total Port Time
Nm = 3
Pangkalan Susu Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Nm Jarak 1 = 438 Nm AT+WT+IT = 8
Seatime 1 = 42 jam Produktivi = 900
Payload = 2001
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = Balikpapan Port Time = 11
POD 2 = Lampung =
Jarak 2 = 481
Seatime 2 = 46 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6
POD 2 = Balikpapan Produktivi = 600
POD 3 = Lampung Payload = 2001
Jarak 3 = 872 Nm Effective T = 4
Seatime 3 = 83 jam Port Time = 10
=
Seatime POD 3 - POD 4
POD 3 = Lampung Port Time POD 2
POD 4 = Pangkalan Susu POL 2 = Balikpapan
Jarak 4 = 934 Nm AT+WT+IT = 5
Seatime 4 = 89 jam Produktivi = 600
Payload = 2001
Seatime POD 4 - TUKS Effective T = 4
POD 4 = Pangkalan Susu Port Time = 9
TUKS = Tanjung Priok =
Jarak 5 = 887 Nm
Seatime 5 = 84 jam Port Time POD 3
POL 3 = Lampung
AT+WT+IT = 7
Perhitungan Frekuensi Produktivi = 700
Roundtrip = 18 hari Payload = 2001
Commissio = 350 hari Effective T = 3
Frekuensi = 19.44444 shipment/th Port Time = 10
Cargo Carr = 38918 ton/th =
= 389180 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 20 hari
Commissio = 350 hari
Frekuensi = 17.5 shipment/th
Cargo Carr = 35026 ton/th
= 350262 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 20 hari
Commissio = 350 hari
Frekuensi = 17.5 shipment/th
Cargo Carr = 35026 ton/th
= 350262 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip =
Commissio =
Frekuensi =
Cargo Carr =
=
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
Perhitungan waktu Port Time Voyage Cost
125341 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
4035 Nm Port Time = 11 jam Harga IFO =
372 jam Port Time = 9 jam IFO =
384 jam Port Time = 10 jam Biaya Fuel =
16 hari = 51 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese=
438 Nm AT+WT+IT = 8 jam =
42 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2001 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Pangkalan Susu Port Time = 11 jam Port of Loa =
Balikpapan = hari Tarif Labuh =
1154 Biaya L =
109 Port Time POD 1 Tarif Tamb =
POD 1 = Tanjung Perak Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya =
Pangkalan Susu Produktivi = 600 MT/jam Tarif Teta =
Balikpapan Payload = 2001 ton Tarif Varia =
1454 Nm Effective T = 4 jam Asumsi Jum=
138 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Balikpapan Port Time POD 2 Lama Penu =
Lampung POL 2 = Pangkalan Susu Biaya =
872 Nm AT+WT+IT = 7 jam Total Biay =
83 jam Produktivi = 650 MT/jam =
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
Lampung Port Time = 11 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
117 Nm Tarif Tamb =
12 jam Port Time POD 3 Etmal =
POL 3 = Balikpapan Biaya =
AT+WT+IT = 5 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
19 hari Payload = 2001 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
18.42105 shipment/th Port Time = 9 jam Tarif Teta =
36870 ton/th = hari Tarif Varia =
368697 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
36870 POD 4 = Lampung =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 700 MT/jam Port of Dis =
### /tahun Payload = 2001 ton Tarif Labuh =
### /tahun Effective T = 3 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
700,000 Tarif Varia =
600,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
10
RUTE
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 125431 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 4163 Nm Port Time = 11 jam Harga IFO
= 323 jam Port Time = 10 jam IFO
= 396 jam Port Time = 9 jam Biaya Fuel
= 17 hari = 51 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese
= 438 Nm AT+WT+IT = 8 jam
= 42 jam Produktivi = 900 MT/jam Total Biay
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Pangkalan Susu Port Time = 11 jam Port of Loa
= Lampung = hari Tarif Labuh
= 1154 Biaya L
= 109 Port Time POD 1 Tarif Tamb
POD 1 = Tanjung Perak Etmal
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya
= Pangkalan Susu Produktivi = 600 MT/jam Tarif Teta
= Lampung Payload = 2001 ton Tarif Varia
= 934 Nm Effective T = 4 jam Asumsi Jum
= 89 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Lampung Port Time POD 2 Lama Penu
= Balikpapan POL 2 = Pangkalan Susu Biaya
= 872 Nm AT+WT+IT = 7 jam Total Biay
= 83 jam Produktivi = 650 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= Balikpapan Port Time = 11 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 73 jam Port Time POD 3 Etmal
POL 3 = Lampung Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia
= 20 hari Payload = 2001 ton Asumsi Jum
= 350 hari Effective T = 3 jam Biaya
= 17.5 shipment/th Port Time = 10 jam Tarif Teta
= 35026 ton/th = hari Tarif Varia
= 350262 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 35026 POD 4 = Balikpapan
= ### AT+WT+IT = 5 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis
### /tahun Payload = 2001 ton Tarif Labuh
= ### /tahun Effective T = 4 jam Biaya L
### /roundtrip Port Time = 9 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 800,000 Tarif Teta
Demand POD 3 600,000 Tarif Varia
Demand POD 4 700,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
11
RUTE
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 132541 Port Time = 11 jam
Seatime Port Time = 9 jam
Jarak Total = 3451 Nm Port Time = 10 jam
Seatime To = 317 jam Port Time = 11 jam
Seatime ro = 329 jam Port Time = 10 jam
= 14 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 73 jam Produktivi = 900 MT/jam
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Tanjung Perak Port Time = 11 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 481
Seatime 2 = 46 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Tanjung Perak Produktivi = 600 MT/jam
POD 3 = Pangkalan Susu Payload = 2001 ton
Jarak 3 = 1154 Nm Effective T = 4 jam
Seatime 3 = 109 jam Port Time = 9 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = Lampung POL 2 = Tanjung Perak
Jarak 4 = 934 Nm AT+WT+IT = 6 jam
Seatime 4 = 89 jam Produktivi = 600 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = Lampung Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 12 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 17 hari Payload = 2001 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 20.58824 shipment/th Port Time = 11 jam
Cargo Carr = 41207 ton/th = hari
= 412073 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 20 hari
Commissio = 350 hari
Frekuensi = 17.5 shipment/th
Cargo Carr = 35026 ton/th
= 350262 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 20
Commissio = 350
Frekuensi = 17.5
Cargo Carr = 35026
= 350262
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Tanjung Perak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
135241 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 9 jam Fuel Oil
3985 Nm Port Time = 11 jam Harga IFO =
367 jam Port Time = 10 jam IFO =
379 jam Port Time = 10 jam Biaya Fuel =
16 hari = 51 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
73 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2001 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Pangkalan Susu Port Time = 11 jam Port of Loa =
Tanjung Perak = hari Tarif Labuh =
1454 Biaya L =
138 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
Pangkalan Susu Produktivi = 600 MT/jam Tarif Teta =
Tanjung Perak Payload = 2001 ton Tarif Varia =
1154 Nm Effective T = 4 jam Asumsi Jum=
109 jam Port Time = 9 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Tanjung Perak Port Time POD 2 Lama Penu =
Lampung POL 2 = Pangkalan Susu Biaya =
495 Nm AT+WT+IT = 7 jam Total Biay =
47 jam Produktivi = 650 MT/jam =
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
Lampung Port Time = 11 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
117 Nm Tarif Tamb =
12 jam Port Time POD 3 Etmal =
POL 3 = Tanjung Perak Biaya =
AT+WT+IT = 6 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
19 hari Payload = 2001 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
18.42105 shipment/th Port Time = 10 jam Tarif Teta =
36870 ton/th = hari Tarif Varia =
368697 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
36870 POD 4 = Lampung =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 700 MT/jam Port of Dis =
### /tahun Payload = 2001 ton Tarif Labuh =
### /tahun Effective T = 3 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
800,000 Tarif Varia =
600,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
17
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 142351 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 3434 Nm Port Time = 10 jam Harga IFO
= 243 jam Port Time = 9 jam IFO
= 327 jam Port Time = 11 jam Biaya Fuel
= 14 hari = 51 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Lampung Port of Loa = Tanjung Priok Biaya Diese
= 117 Nm AT+WT+IT = 8 jam
= 12 jam Produktivi = 900 MT/jam Total Biay
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Tanjung Perak Port Time = 11 jam Port of Loa
= Balikpapan = hari Tarif Labuh
= 495 Biaya L
= 47 Port Time POD 1 Tarif Tamb
POD 1 = Lampung Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Tanjung Perak Produktivi = 700 MT/jam Tarif Teta
= Balikpapan Payload = 2001 ton Tarif Varia
= 481 Nm Effective T = 3 jam Asumsi Jum
= 46 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Balikpapan Port Time POD 2 Lama Penu
= Pangkalan Susu POL 2 = Tanjung Perak Biaya
= 1454 Nm AT+WT+IT = 6 jam Total Biay
= 138 jam Produktivi = 600 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= Pangkalan Susu Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 887 Nm Tarif Tamb
= 84 jam Port Time POD 3 Etmal
POL 3 = Balikpapan Biaya
AT+WT+IT = 5 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia
= 17 hari Payload = 2001 ton Asumsi Jum
= 350 hari Effective T = 4 jam Biaya
= 20.58824 shipment/th Port Time = 9 jam Tarif Teta
= 41207 ton/th = hari Tarif Varia
= 412073 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 41207 POD 4 = Pangkalan Susu
= ### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis
### /tahun Payload = 2001 ton Tarif Labuh
= ### /tahun Effective T = 4 jam Biaya L
### /roundtrip Port Time = 11 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 800,000 Tarif Teta
Demand POD 3 700,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
18
RUTE
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 142531 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 3985 Nm Port Time = 10 jam
Seatime To = 306 jam Port Time = 11 jam
Seatime ro = 379 jam Port Time = 9 jam
= 16 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 12 jam Produktivi = 900 MT/jam
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Tanjung Perak Port Time = 11 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 495
Seatime 2 = 47 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Tanjung Perak Produktivi = 700 MT/jam
POD 3 = Pangkalan Susu Payload = 2001 ton
Jarak 3 = 1154 Nm Effective T = 3 jam
Seatime 3 = 109 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = Balikpapan POL 2 = Tanjung Perak
Jarak 4 = 1454 Nm AT+WT+IT = 6 jam
Seatime 4 = 138 jam Produktivi = 600 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = Balikpapan Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 765 Nm
Seatime 5 = 73 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 19 hari Payload = 2001 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 18.42105 shipment/th Port Time = 11 jam
Cargo Carr = 36870 ton/th = hari
= 368697 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 17 hari
Commissio = 350 hari
Frekuensi = 20.58824 shipment/th
Cargo Carr = 41207 ton/th
= 412073 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 17 hari
Commissio = 350 hari
Frekuensi = 20.58824 shipment/th
Cargo Carr = 41207 ton/th
= 412073 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 20
Commissio = 350
Frekuensi = 17.5
Cargo Carr = 35026
= 350262
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
152431 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 11 jam Fuel Oil
Nm Port Time = 10 jam Harga IFO = ###
jam Port Time = 10 jam IFO = 2336.871
jam Port Time = 9 jam Biaya Fuel = ###
hari = 51 jam =
Total Port Time
= 3 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 233.7
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2001 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Tanjung Perak Port Time = 11 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Tanjung Perak Produktivi = 650 MT/jam Tarif Teta = ###
Payload = 2001 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 11 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
Balikpapan POL 2 = Tanjung Perak Biaya = ###
Nm AT+WT+IT = 6 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2001 ton
OD 4 - TUKS Effective T = 4 jam Port of Dis = Pangkalan Susu
Balikpapan Port Time = 10 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Lampung Biaya = ###
AT+WT+IT = 7 jam Tarif Teta = ###
an Frekuensi Produktivi = 700 MT/jam Tarif Varia = Rp 22
hari Payload = 2001 ton Asumsi Jum= 3
hari Effective T = 3 jam Biaya = ###
shipment/th Port Time = 10 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = Balikpapan = ###
AT+WT+IT = 5 jam
/roundtrip Produktivi = 600 MT/jam Port of Dis = Tanjung Perak
/tahun Payload = 2001 ton Tarif Labuh = Rp 73
/tahun Effective T = 4 jam Biaya L = ###
/roundtrip Port Time = 9 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Balikpapan
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
152341 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 11 jam Fuel Oil
3511 Nm Port Time = 10 jam Harga IFO =
322 jam Port Time = 9 jam IFO =
334 jam Port Time = 10 jam Biaya Fuel =
14 hari = 51 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese=
887 Nm AT+WT+IT = 8 jam =
84 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2001 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Tanjung Perak Port Time = 11 jam Port of Loa =
Balikpapan = hari Tarif Labuh =
1154 Biaya L =
109 Port Time POD 1 Tarif Tamb =
POD 1 = Pangkalan Susu Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Tanjung Perak Produktivi = 650 MT/jam Tarif Teta =
Balikpapan Payload = 2001 ton Tarif Varia =
481 Nm Effective T = 4 jam Asumsi Jum=
46 jam Port Time = 11 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Balikpapan Port Time POD 2 Lama Penu =
Lampung POL 2 = Tanjung Perak Biaya =
872 Nm AT+WT+IT = 6 jam Total Biay =
83 jam Produktivi = 600 MT/jam =
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
Lampung Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
117 Nm Tarif Tamb =
12 jam Port Time POD 3 Etmal =
POL 3 = Balikpapan Biaya =
AT+WT+IT = 5 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
17 hari Payload = 2001 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
20.58824 shipment/th Port Time = 9 jam Tarif Teta =
41207 ton/th = hari Tarif Varia =
412073 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
41207 POD 4 = Lampung =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 700 MT/jam Port of Dis =
### /tahun Payload = 2001 ton Tarif Labuh =
### /tahun Effective T = 3 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
700,000 Tarif Varia =
600,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
25
RUTE
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 153241 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 11 jam Fuel Oil
= 3434 Nm Port Time = 9 jam Harga IFO
= 315 jam Port Time = 10 jam IFO
= 327 jam Port Time = 10 jam Biaya Fuel
= 14 hari = 51 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese
= 887 Nm AT+WT+IT = 8 jam
= 84 jam Produktivi = 900 MT/jam Total Biay
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Balikpapan Port Time = 11 jam Port of Loa
= Tanjung Perak = hari Tarif Labuh
= 1454 Biaya L
= 138 Port Time POD 1 Tarif Tamb
POD 1 = Pangkalan Susu Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Balikpapan Produktivi = 650 MT/jam Tarif Teta
= Tanjung Perak Payload = 2001 ton Tarif Varia
= 481 Nm Effective T = 4 jam Asumsi Jum
= 46 jam Port Time = 11 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Tanjung Perak Port Time POD 2 Lama Penu
= Lampung POL 2 = Balikpapan Biaya
= 495 Nm AT+WT+IT = 5 jam Total Biay
= 47 jam Produktivi = 600 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= Lampung Port Time = 9 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 117 Nm Tarif Tamb
= 12 jam Port Time POD 3 Etmal
POL 3 = Tanjung Perak Biaya
AT+WT+IT = 6 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia
= 17 hari Payload = 2001 ton Asumsi Jum
= 350 hari Effective T = 4 jam Biaya
= 20.58824 shipment/th Port Time = 10 jam Tarif Teta
= 41207 ton/th = hari Tarif Varia
= 412073 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 41207 POD 4 = Lampung
= ### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 700 MT/jam Port of Dis
### /tahun Payload = 2001 ton Tarif Labuh
= ### /tahun Effective T = 3 jam Biaya L
### /roundtrip Port Time = 10 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 600,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
26
RUTE
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 153241 Port Time = 11 jam
Seatime Port Time = 11 jam
Jarak Total = 3434 Nm Port Time = 9 jam
Seatime To = 315 jam Port Time = 10 jam
Seatime ro = 327 jam Port Time = 10 jam
= 14 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Pangkalan Susu Port of Loa = Tanjung Priok
Jarak 1 = 887 Nm AT+WT+IT = 8 jam
Seatime 1 = 84 jam Produktivi = 900 MT/jam
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Balikpapan Port Time = 11 jam
POD 2 = Tanjung Perak = hari
Jarak 2 = 1454
Seatime 2 = 138 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Balikpapan Produktivi = 650 MT/jam
POD 3 = Tanjung Perak Payload = 2001 ton
Jarak 3 = 481 Nm Effective T = 4 jam
Seatime 3 = 46 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = Lampung POL 2 = Balikpapan
Jarak 4 = 495 Nm AT+WT+IT = 5 jam
Seatime 4 = 47 jam Produktivi = 600 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = Lampung Port Time = 9 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 12 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 17 hari Payload = 2001 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 20.58824 shipment/th Port Time = 10 jam
Cargo Carr = 41207 ton/th = hari
= 412073 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 9 hari
Commissio = 350 hari
Frekuensi = 38.8888888888889 shipment/th
Cargo Carr = 77836 ton/th
= 778360 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = Rp 10,726,005
= Rp 417,122,426
30
RUTE
Rute Perhitung
kar POL Tanjung Priok Rute
POD 1 Balikpapan Seati
/ton Jarak POL - 765 Nm Jarak Total
ton POD 2 Tanjung Perak Seatime To
/roundtrip Jarak POD 481 Nm Seatime ro
/th POD 3 -
Jarak POD 0 Nm
/ton POD 4 - Seatime PO
ton Jarak POD 0 Nm POL
TUKS Tanjung Priok POD 1
/th Jarak POD 438 Nm Jarak 1
/roundtrip Seatime 1
/th
n Seatime PO
POD 1
GT/Kunjungan POD 2
/trip Jarak 2
/GT/etmal Seatime 2
/trip Seatime PO
/kapal/gerakan POD 2
/GT/Kapal/Gerakan POD 3
gerakan Jarak 3
Seatime 3
Seatime PO
jam POD 3
POD 4
/trip Jarak 4
/tahun Seatime 4
Seatime PO
GT/Kunjungan POD 4
/trip TUKS
/GT/etmal Jarak 5
Seatime 5
/trip
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan
gerakan Roundtrip
Commissio
Frekuensi
Cargo Carr
jam
/trip Voyage Ch
/tahun Probabilita
Cicilan ta
VC
GT/Kunjungan
/trip Tarif VCH
/GT/etmal
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time
= 1321 Port Time = 11 jam
Seatime Port Time = 9 jam
= 1684 Nm Port Time = 10 jam
= 119 jam Port Time = 0 jam
= 161 jam Port Time = 0 jam
= 7 hari = 30 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
= Tanjung Priok Port Time POL
= Balikpapan Port of Loa = Tanjung Priok
= 765 Nm AT+WT+IT = 8 jam
= 73 jam Produktivi = 900 MT/jam
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
= Tanjung Perak Port Time = 11 jam
= - = hari
= 481
= 46 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
= Tanjung Perak Produktivi = 600 MT/jam
= - Payload = 2001 ton
= 0 Nm Effective T = 4 jam
= 0 jam Port Time = 9 jam
= hari
Seatime POD 3 - POD 4
= - Port Time POD 2
= - POL 2 = Tanjung Perak
= 0 Nm AT+WT+IT = 6 jam
= 0 jam Produktivi = 600 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam
= - Port Time = 10 jam
= Tanjung Priok = hari
= 438 Nm
= 42 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
= 9 hari Payload = 2001 ton
= 350 hari Effective T = 0 jam
= 38.8888888888889 shipment/th Port Time = 0 jam
= 77836 ton/th = hari
= 778360 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = Rp 10,726,005 /roundtrip
= Rp 417,122,426 /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1241 Port Time =
Tanjung Perak Seatime Port Time =
Nm Jarak Total = 1050 Nm Port Time =
Seatime To = 89 jam Port Time =
Nm Seatime ro = 101 jam Port Time =
= 5 hari =
Total Port Time
Nm =
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa =
Nm Jarak 1 = 438 Nm AT+WT+IT =
Seatime 1 = 42 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Lampung Port Time =
POD 2 = - =
Jarak 2 = 495
Seatime 2 = 47 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Lampung Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 12 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 7 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 50 shipment/th Port Time =
Cargo Carr = 100075 ton/th =
= 1000749 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = Rp 10,726,005 /roundtrip
= Rp 536,300,262 /tahun
32
RUTE
Perhitungan Frekuensi
Roundtrip = 7 hari
Commissio = 350 hari
Frekuensi = 50 shipment/th
Cargo Carr = 100075 ton/th
= 1000749 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
33
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 9
Commissio = 350
Frekuensi = 38.88889
Cargo Carr = 77836
= 778360
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
1341 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 9 jam Fuel Oil
Nm Port Time = 10 jam Harga IFO = ###
jam Port Time = 0 jam IFO = 982.236
jam Port Time = 0 jam Biaya Fuel = ###
hari = 30 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 98.2
Balikpapan Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2001 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Port Time = 11 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Balikpapan Etmal = 1
O2 - POD 3 AT+WT+IT = 5 jam Biaya = ###
Produktivi = 600 MT/jam Tarif Teta = ###
Payload = 2001 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 9 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = Lampung Biaya = ###
Nm AT+WT+IT = 7 jam Total Biay = ###
jam Produktivi = 700 MT/jam = ###
Payload = 2001 ton
OD 4 - TUKS Effective T = 3 jam Port of Dis = Balikpapan
Port Time = 10 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = - Biaya = ###
AT+WT+IT = 0 jam Tarif Teta = ###
an Frekuensi Produktivi = 0 MT/jam Tarif Varia = Rp 22
hari Payload = 2001 ton Asumsi Jum= 3
hari Effective T = 0 jam Biaya = ###
shipment/th Port Time = 0 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Lampung
/tahun Payload = 2001 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
34
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
1431 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
1754 Nm Port Time = 9 jam Harga IFO =
95 jam Port Time = 0 jam IFO =
168 jam Port Time = 0 jam Biaya Fuel =
7 hari = 30 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Lampung Port of Loa = Tanjung Priok Biaya Diese=
117 Nm AT+WT+IT = 8 jam =
12 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2001 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa =
- = hari Tarif Labuh =
872 Biaya L =
83 Port Time POD 1 Tarif Tamb =
POD 1 = Lampung Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Balikpapan Produktivi = 700 MT/jam Tarif Teta =
- Payload = 2001 ton Tarif Varia =
0 Nm Effective T = 3 jam Asumsi Jum=
0 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
- Port Time POD 2 Lama Penu =
- POL 2 = Balikpapan Biaya =
0 Nm AT+WT+IT = 5 jam Total Biay =
0 jam Produktivi = 600 MT/jam =
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
- Port Time = 9 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
765 Nm Tarif Tamb =
73 jam Port Time POD 3 Etmal =
POL 3 = - Biaya =
AT+WT+IT = 0 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia =
9 hari Payload = 2001 ton Asumsi Jum=
350 hari Effective T = 0 jam Biaya =
38.88889 shipment/th Port Time = 0 jam Tarif Teta =
77836 ton/th = hari Tarif Varia =
778360 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
77836 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2001 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
- Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
35
RUTE
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 1251 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 2479 Nm Port Time = 11 jam Harga IFO
= 151 jam Port Time = 0 jam IFO
= 235 jam Port Time = 0 jam Biaya Fuel
= 10 hari = 32 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese
= 438 Nm AT+WT+IT = 8 jam
= 42 jam Produktivi = 900 MT/jam Total Biay
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Pangkalan Susu Port Time = 11 jam Port of Loa
= - = hari Tarif Labuh
= 1154 Biaya L
= 109 Port Time POD 1 Tarif Tamb
POD 1 = Tanjung Perak Etmal
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya
= Pangkalan Susu Produktivi = 600 MT/jam Tarif Teta
= - Payload = 2001 ton Tarif Varia
= 0 Nm Effective T = 4 jam Asumsi Jum
= 0 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Pangkalan Susu Biaya
= 0 Nm AT+WT+IT = 7 jam Total Biay
= 0 jam Produktivi = 650 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= - Port Time = 11 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 887 Nm Tarif Tamb
= 84 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 12 hari Payload = 2001 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 29.16667 shipment/th Port Time = 0 jam Tarif Teta
= 58377 ton/th = hari Tarif Varia
= 583770 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 58377 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2001 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 800,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
36
RUTE
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1521 Port Time = 11 jam
Seatime Port Time = 11 jam
Jarak Total = 2479 Nm Port Time = 10 jam
Seatime To = 193 jam Port Time = 0 jam
Seatime ro = 235 jam Port Time = 0 jam
= 10 hari = 32 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Pangkalan Susu Port of Loa = Tanjung Priok
Jarak 1 = 887 Nm AT+WT+IT = 8 jam
Seatime 1 = 84 jam Produktivi = 900 MT/jam
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Tanjung Perak Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 1154
Seatime 2 = 109 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Tanjung Perak Produktivi = 650 MT/jam
POD 3 = - Payload = 2001 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Tanjung Perak
Jarak 4 = 0 Nm AT+WT+IT = 6 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 42 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 12 hari Payload = 2001 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 29.16667 shipment/th Port Time = 0 jam
Cargo Carr = 58377 ton/th = hari
= 583770 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1351 Port Time = 11 jam
Seatime Port Time = 9 jam
Jarak Total = 3106 Nm Port Time = 11 jam
Seatime To = 211 jam Port Time = 0 jam
Seatime ro = 295 jam Port Time = 0 jam
= 13 hari = 31 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 73 jam Produktivi = 900 MT/jam
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Pangkalan Susu Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 1454
Seatime 2 = 138 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Pangkalan Susu Produktivi = 600 MT/jam
POD 3 = - Payload = 2001 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 9 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Pangkalan Susu
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 650 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 84 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 15 hari Payload = 2001 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 23.33333 shipment/th Port Time = 0 jam
Cargo Carr = 46702 ton/th = hari
= 467016 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1531 Port Time = 11
Pangkalan Susu Seatime Port Time = 11
Nm Jarak Total = 3106 Nm Port Time = 9
Balikpapan Seatime To = 222 jam Port Time = 0
Nm Seatime ro = 295 jam Port Time = 0
= 13 hari = 31
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Pangkalan Susu Port of Loa = Tanjung Priok
Nm Jarak 1 = 887 Nm AT+WT+IT = 8
Seatime 1 = 84 jam Produktivi = 900
Payload = 2001
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = Balikpapan Port Time = 11
POD 2 = - =
Jarak 2 = 1454
Seatime 2 = 138 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7
POD 2 = Balikpapan Produktivi = 650
POD 3 = - Payload = 2001
Jarak 3 = 0 Nm Effective T = 4
Seatime 3 = 0 jam Port Time = 11
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5
Seatime 4 = 0 jam Produktivi = 600
Payload = 2001
Seatime POD 4 - TUKS Effective T = 4
POD 4 = - Port Time = 9
TUKS = Tanjung Priok =
Jarak 5 = 765 Nm
Seatime 5 = 73 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0
Perhitungan Frekuensi Produktivi = 0
Roundtrip = 15 hari Payload = 2001
Commissio = 350 hari Effective T = 0
Frekuensi = 23.33333 shipment/th Port Time = 0
Cargo Carr = 46702 ton/th =
= 467016 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1451 Port Time =
Lampung Seatime Port Time =
117 Nm Jarak Total = 1938 Nm Port Time =
Pangkalan Susu Seatime To = 101 jam Port Time =
934 Nm Seatime ro = 185 jam Port Time =
- = 8 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Lampung Port of Loa =
887 Nm Jarak 1 = 117 Nm AT+WT+IT =
Seatime 1 = 12 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Pangkalan Susu Port Time =
POD 2 = - =
Jarak 2 = 934
Seatime 2 = 89 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Pangkalan Susu Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 887 Nm
Seatime 5 = 84 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 10 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 35 shipment/th Port Time =
Cargo Carr = 70052 ton/th =
= 700524 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
40
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
41
RUTE
Perhitungan Frekuensi
Roundtrip = 10 hari
Commissio = 350 hari
Frekuensi = 35 shipment/th
Cargo Carr = 70052 ton/th
= 700524 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
42
RUTE
Perhitungan Frekuensi
Roundtrip = 13 hari
Commissio = 350 hari
Frekuensi = 26.92308 shipment/th
Cargo Carr = 53886 ton/th
= 538865 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
43
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 10
Commissio = 350
Frekuensi = 35
Cargo Carr = 70052
= 700524
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
13241 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 9 jam Fuel Oil
Nm Port Time = 10 jam Harga IFO = ###
jam Port Time = 10 jam IFO = 1040.476
jam Port Time = 0 jam Biaya Fuel = ###
hari = 40 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 104.0
Balikpapan Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2001 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Tanjung Perak Port Time = 11 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Balikpapan Etmal = 1
O2 - POD 3 AT+WT+IT = 5 jam Biaya = ###
Tanjung Perak Produktivi = 600 MT/jam Tarif Teta = ###
Payload = 2001 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 9 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = Tanjung Perak Biaya = ###
Nm AT+WT+IT = 6 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2001 ton
OD 4 - TUKS Effective T = 4 jam Port of Dis = Balikpapan
Port Time = 10 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Lampung Biaya = ###
AT+WT+IT = 7 jam Tarif Teta = ###
an Frekuensi Produktivi = 700 MT/jam Tarif Varia = Rp 22
hari Payload = 2001 ton Asumsi Jum= 3
hari Effective T = 3 jam Biaya = ###
shipment/th Port Time = 10 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Tanjung Perak
/tahun Payload = 2001 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
44
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
13421 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 9 jam Fuel Oil
2570 Nm Port Time = 10 jam Harga IFO =
203 jam Port Time = 10 jam IFO =
245 jam Port Time = 0 jam Biaya Fuel =
11 hari = 40 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
73 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2001 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Lampung Port Time = 11 jam Port of Loa =
Tanjung Perak = hari Tarif Labuh =
872 Biaya L =
83 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
Lampung Produktivi = 600 MT/jam Tarif Teta =
Tanjung Perak Payload = 2001 ton Tarif Varia =
495 Nm Effective T = 4 jam Asumsi Jum=
47 jam Port Time = 9 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Tanjung Perak Port Time POD 2 Lama Penu =
- POL 2 = Lampung Biaya =
0 Nm AT+WT+IT = 7 jam Total Biay =
0 jam Produktivi = 700 MT/jam =
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 3 jam Port of Dis =
- Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
438 Nm Tarif Tamb =
42 jam Port Time POD 3 Etmal =
POL 3 = Tanjung Perak Biaya =
AT+WT+IT = 6 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
13 hari Payload = 2001 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
26.92308 shipment/th Port Time = 10 jam Tarif Teta =
53886 ton/th = hari Tarif Varia =
538865 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
53886 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2001 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
600,000 Tarif Teta =
800,000 Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
45
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 14231 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 1858 Nm Port Time = 10 jam Harga IFO
= 105 jam Port Time = 9 jam IFO
= 178 jam Port Time = 0 jam Biaya Fuel
= 8 hari = 40 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Lampung Port of Loa = Tanjung Priok Biaya Diese
= 117 Nm AT+WT+IT = 8 jam
= 12 jam Produktivi = 900 MT/jam Total Biay
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Tanjung Perak Port Time = 11 jam Port of Loa
= Balikpapan = hari Tarif Labuh
= 495 Biaya L
= 47 Port Time POD 1 Tarif Tamb
POD 1 = Lampung Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Tanjung Perak Produktivi = 700 MT/jam Tarif Teta
= Balikpapan Payload = 2001 ton Tarif Varia
= 481 Nm Effective T = 3 jam Asumsi Jum
= 46 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Balikpapan Port Time POD 2 Lama Penu
= - POL 2 = Tanjung Perak Biaya
= 0 Nm AT+WT+IT = 6 jam Total Biay
= 0 jam Produktivi = 600 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= - Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 73 jam Port Time POD 3 Etmal
POL 3 = Balikpapan Biaya
AT+WT+IT = 5 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia
= 10 hari Payload = 2001 ton Asumsi Jum
= 350 hari Effective T = 4 jam Biaya
= 35 shipment/th Port Time = 9 jam Tarif Teta
= 70052 ton/th = hari Tarif Varia
= 700524 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 70052 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2001 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 800,000 Tarif Teta
Demand POD 3 700,000 Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
50
RUTE
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 14321 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 1908 Nm Port Time = 9 jam
Seatime To = 141 jam Port Time = 10 jam
Seatime ro = 183 jam Port Time = 0 jam
= 8 hari = 40 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 12 jam Produktivi = 900 MT/jam
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Balikpapan Port Time = 11 jam
POD 2 = Tanjung Perak = hari
Jarak 2 = 872
Seatime 2 = 83 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Balikpapan Produktivi = 700 MT/jam
POD 3 = Tanjung Perak Payload = 2001 ton
Jarak 3 = 481 Nm Effective T = 3 jam
Seatime 3 = 46 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 9 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 42 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 10 hari Payload = 2001 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 35 shipment/th Port Time = 10 jam
Cargo Carr = 70052 ton/th = hari
= 700524 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 12351 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 3260 Nm Port Time = 9 jam
Seatime To = 226 jam Port Time = 11 jam
Seatime ro = 310 jam Port Time = 0 jam
= 13 hari = 41 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 42 jam Produktivi = 900 MT/jam
Payload = 2001 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Balikpapan Port Time = 11 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 481
Seatime 2 = 46 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Balikpapan Produktivi = 600 MT/jam
POD 3 = Pangkalan Susu Payload = 2001 ton
Jarak 3 = 1454 Nm Effective T = 4 jam
Seatime 3 = 138 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2001 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 9 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 84 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 15 hari Payload = 2001 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 23.33333 shipment/th Port Time = 11 jam
Cargo Carr = 46702 ton/th = hari
= 467016 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
TIDAK TERPILIH
Perhitungan Sewa
Margin Prof= 15% dari total PV
### /tahun
Time Charter Hire
Cicilan tah = ###
= Rp76,278,530 /hari
= ### /bulan
Tarif TCH
= ### /tahun
= ### /masa kontrak
Unit Cost =
PTP - Tanjung Perak Rp 13,349
PTP - Balikpapan Rp 38,139
PTP - Lampung Rp 44,496
PTP - Pangkalan Susu Rp 33,372
Tunjangan
Jumlah Jabatan Gaji Pokok Sertifikat
orang Jabatan
kali 1 Master/Captain Rp 10,000,000 Rp 2,600,000 Rp 1,600,000
/bulan 1 Chief Engineer Rp 8,000,000 Rp 1,900,000 Rp 1,500,000
/tahun 1 Second Engineer Rp 7,950,000 Rp 1,900,000 Rp 1,500,000
bekalan 1 Chief Officer Rp 8,000,000 Rp 2,500,000 Rp 1,200,000
orang 1 Second Officer Rp 7,950,000 Rp 2,500,000 Rp 1,200,000
/hari 1 Quarter Master Rp 6,500,000 Rp 1,000,000 Rp 500,000
/tahun 1 Electrician Rp 5,000,000 Rp 900,000 Rp 500,000
k Pelumas 1 Steward Rp 3,500,000 Rp 500,000
1 Oiler Rp 4,500,000 Rp 1,000,000 Rp 500,000
liter/HP.jam 1 Boys Rp 3,500,000 Rp 500,000 Rp 500,000
liter/tahun 2 Cadet Rp 100,000 Rp 500,000 Rp -
/liter 1 Chief Cook Rp 4,000,000 Rp 500,000 Rp 450,000
/tahun 1 Assistant Cook Rp 3,500,000 Rp 500,000 Rp 450,000
/tahun 1 Boatswain Rp 3,500,000 Rp 500,000 Rp 450,000
harga kapal 15 Total Rp 76,000,000 Rp 17,300,000 Rp 10,350,000
/tahun
/masa sewa Perhitungan Se
harga kapal Umur 2010 0 1
/tahun Sisa 10 Kenaikan Biaya
/masa sewa masa sewa 10 Gaji Kru Rp1,821,430,000 Rp1,912,501,500
harga kapal kenaikan 2% Perbekalan Rp262,500,000 Rp275,625,000
/tahun 3% Minyak Pelumas Rp906,765,996 Rp952,104,295
/masa sewa 5% Reparasi dan Pera Rp906,765,996 Rp999,709,510
/tahun periode 2 Asuransi Rp906,765,996 Rp980,667,424
/masa sewa 5 Biaya umum Rp906,765,996 Rp952,104,295
rate 5% Total FV Rp5,710,993,982 Rp6,072,712,025
NPV Rp60,545,330,095
Anuitas Operating Rp7,840,897,240 /tahun
Perhitungan Biaya
WACC ###
CC ###
OC Rp7,840,897,240
Total Rp25,521,350,769 /tahun
Tunjangan Tunjanga
Bonus Voyage n Total Total Gaji
Berlayar Kesehatan Seniority
Rp 1,600,000 Rp 1,500,000 Rp 1,600,000 ### ### ###
Rp 1,600,000 Rp 1,500,000 Rp 1,400,000 ### ### ###
Rp 1,600,000 Rp 1,500,000 Rp 1,400,000 Rp - ### ###
Rp 1,400,000 Rp 1,500,000 Rp 1,400,000 ### ### ###
Rp 1,400,000 Rp 1,500,000 Rp 1,400,000 ### ### ###
Rp 450,000 Rp 500,000 Rp 500,000 ### ### ###
Rp 450,000 Rp 400,000 Rp 450,000 - ### ###
Rp 450,000 Rp 300,000 Rp 400,000 - ### ###
Rp 450,000 Rp 500,000 Rp 500,000 ### ### ###
Rp 450,000 Rp 400,000 Rp 350,000 - ### ###
Rp 450,000 Rp 400,000 Rp - - ### ###
Rp 450,000 Rp 400,000 Rp 350,000 ### ### ###
Rp 450,000 Rp 400,000 Rp 350,000 ### ### ###
Rp 450,000 Rp 400,000 Rp 350,000 ### ### ###
Rp 11,650,000 Rp 11,200,000 Rp 10,450,000 ### ### ###
OWNER CHARTERER
BAREBOAT CHARTER
OWNER
OWNER CHARTERER
CHARTERER
TIME
TIME CHARTER
CHARTER
OWNER
OWNER CHARTERER
CHARTERER
VOYAGE
VOYAGE CHARTER
CHARTER OWNER
OWNER
1
RUTE
Perhitungan Frekuensi
Roundtrip = 4
Commissio = 350
Frekuensi = 87.5
Cargo Carr = 179154
= 1791542
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
2
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
131 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 9 jam Fuel Oil
1530 Nm Port Time = 0 jam Harga IFO =
60 jam Port Time = 0 jam IFO =
120 jam Port Time = 0 jam Biaya Fuel =
5 hari = 20 jam =
Total Port Time
= 1 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
60 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2047 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
0 Port Time = 11 jam Port of Loa =
0 = hari Tarif Labuh =
0 Biaya L =
0 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
0 Produktivi = 600 MT/jam Tarif Teta =
0 Payload = 2047 ton Tarif Varia =
0 Nm Effective T = 4 jam Asumsi Jum=
0 jam Port Time = 9 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
0 Port Time POD 2 Lama Penu =
0 POL 2 = 0 Biaya =
0 Nm AT+WT+IT = 0 jam Total Biay =
0 jam Produktivi = 0 MT/jam =
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 0 jam Port of Dis =
0 Port Time = 0 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
765 Nm Tarif Tamb =
60 jam Port Time POD 3 Etmal =
POL 3 = 0 Biaya =
AT+WT+IT = 0 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia =
6 hari Payload = 2047 ton Asumsi Jum=
350 hari Effective T = 0 jam Biaya =
58.33333 shipment/th Port Time = 0 jam Tarif Teta =
119436 ton/th = hari Tarif Varia =
1194361 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
119436 POD 4 = 0 =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2047 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
- Tarif Teta =
- Tarif Varia =
- Asumsi Jum=
700,000 Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
3
RUTE
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
2 jam
###
### /trip
### /tahun
0
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp 3
1 jam
###
### /trip
### /tahun
0
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
0
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time
Rute = 141 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 234 Nm Port Time = 0 jam
Seatime To = 10 jam Port Time = 0 jam
Seatime ro = 20 jam Port Time = 0 jam
= 1 hari = 21 jam
Total Port Time
= 1 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 10 jam Produktivi = 900 MT/jam
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = 0 Port Time = 11 jam
POD 2 = 0 = hari
Jarak 2 = 0
Seatime 2 = 0 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = 0 Produktivi = 700 MT/jam
POD 3 = 0 Payload = 2047 ton
Jarak 3 = 0 Nm Effective T = 3 jam
Seatime 3 = 0 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = 0 Port Time POD 2
POD 4 = 0 POL 2 = 0
Jarak 4 = 0 Nm AT+WT+IT = 0 jam
Seatime 4 = 0 jam Produktivi = 0 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 0 jam
POD 4 = 0 Port Time = 0 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 10 jam Port Time POD 3
POL 3 = 0
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 2 hari Payload = 2047 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 175 shipment/th Port Time = 0 jam
Cargo Carr = 358308 ton/th = hari
= 3583083 ton/kontrak
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 151 Port Time = 11 jam
Seatime Port Time = 11 jam
Jarak Total = 1774 Nm Port Time = 0 jam
Seatime To = 69 jam Port Time = 0 jam
Seatime ro = 138 jam Port Time = 0 jam
= 6 hari = 22 jam
Total Port Time
= 1 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Pangkalan Susu Port of Loa = Tanjung Priok
Jarak 1 = 887 Nm AT+WT+IT = 8 jam
Seatime 1 = 69 jam Produktivi = 900 MT/jam
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = 0 Port Time = 11 jam
POD 2 = 0 = hari
Jarak 2 = 0
Seatime 2 = 0 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = 0 Produktivi = 650 MT/jam
POD 3 = 0 Payload = 2047 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = 0 Port Time POD 2
POD 4 = 0 POL 2 = 0
Jarak 4 = 0 Nm AT+WT+IT = 0 jam
Seatime 4 = 0 jam Produktivi = 0 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 0 jam
POD 4 = 0 Port Time = 0 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 69 jam Port Time POD 3
POL 3 = 0
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 7 hari Payload = 2047 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 50 shipment/th Port Time = 0 jam
Cargo Carr = 102374 ton/th = hari
= 1023738 ton/kontrak
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 123451 Port Time = 11
Tanjung Perak Seatime Port Time = 10
Nm Jarak Total = 3612 Nm Port Time = 9
Balikpapan Seatime To = 213 jam Port Time = 10
Nm Seatime ro = 282 jam Port Time = 11
= 12 hari = 51
Total Port Time
Nm = 3
Pangkalan Susu Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Nm Jarak 1 = 438 Nm AT+WT+IT = 8
Seatime 1 = 34 jam Produktivi = 900
Payload = 2047
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = Balikpapan Port Time = 11
POD 2 = Lampung =
Jarak 2 = 481
Seatime 2 = 38 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6
POD 2 = Balikpapan Produktivi = 600
POD 3 = Lampung Payload = 2047
Jarak 3 = 872 Nm Effective T = 4
Seatime 3 = 68 jam Port Time = 10
=
Seatime POD 3 - POD 4
POD 3 = Lampung Port Time POD 2
POD 4 = Pangkalan Susu POL 2 = Balikpapan
Jarak 4 = 934 Nm AT+WT+IT = 5
Seatime 4 = 73 jam Produktivi = 600
Payload = 2047
Seatime POD 4 - TUKS Effective T = 4
POD 4 = Pangkalan Susu Port Time = 9
TUKS = Tanjung Priok =
Jarak 5 = 887 Nm
Seatime 5 = 69 jam Port Time POD 3
POL 3 = Lampung
AT+WT+IT = 7
Perhitungan Frekuensi Produktivi = 700
Roundtrip = 15 hari Payload = 2047
Commissio = 350 hari Effective T = 3
Frekuensi = 23.33333 shipment/th Port Time = 10
Cargo Carr = 47774 ton/th =
= 477744 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 17 hari
Commissio = 350 hari
Frekuensi = 20.58824 shipment/th
Cargo Carr = 42154 ton/th
= 421539 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 17 hari
Commissio = 350 hari
Frekuensi = 20.58824 shipment/th
Cargo Carr = 42154 ton/th
= 421539 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip =
Commissio =
Frekuensi =
Cargo Carr =
=
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
Perhitungan waktu Port Time Voyage Cost
125341 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
4035 Nm Port Time = 11 jam Harga IFO =
305 jam Port Time = 9 jam IFO =
315 jam Port Time = 10 jam Biaya Fuel =
14 hari = 51 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese=
438 Nm AT+WT+IT = 8 jam =
34 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2047 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Pangkalan Susu Port Time = 11 jam Port of Loa =
Balikpapan = hari Tarif Labuh =
1154 Biaya L =
90 Port Time POD 1 Tarif Tamb =
POD 1 = Tanjung Perak Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya =
Pangkalan Susu Produktivi = 600 MT/jam Tarif Teta =
Balikpapan Payload = 2047 ton Tarif Varia =
1454 Nm Effective T = 4 jam Asumsi Jum=
113 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Balikpapan Port Time POD 2 Lama Penu =
Lampung POL 2 = Pangkalan Susu Biaya =
872 Nm AT+WT+IT = 7 jam Total Biay =
68 jam Produktivi = 650 MT/jam =
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
Lampung Port Time = 11 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
117 Nm Tarif Tamb =
10 jam Port Time POD 3 Etmal =
POL 3 = Balikpapan Biaya =
AT+WT+IT = 5 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
17 hari Payload = 2047 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
20.58824 shipment/th Port Time = 9 jam Tarif Teta =
42154 ton/th = hari Tarif Varia =
421539 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
42154 POD 4 = Lampung =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 700 MT/jam Port of Dis =
### /tahun Payload = 2047 ton Tarif Labuh =
### /tahun Effective T = 3 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
700,000 Tarif Varia =
600,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
10
RUTE
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 125431 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 4163 Nm Port Time = 11 jam Harga IFO
= 265 jam Port Time = 10 jam IFO
= 325 jam Port Time = 9 jam Biaya Fuel
= 14 hari = 51 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese
= 438 Nm AT+WT+IT = 8 jam
= 34 jam Produktivi = 900 MT/jam Total Biay
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Pangkalan Susu Port Time = 11 jam Port of Loa
= Lampung = hari Tarif Labuh
= 1154 Biaya L
= 90 Port Time POD 1 Tarif Tamb
POD 1 = Tanjung Perak Etmal
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya
= Pangkalan Susu Produktivi = 600 MT/jam Tarif Teta
= Lampung Payload = 2047 ton Tarif Varia
= 934 Nm Effective T = 4 jam Asumsi Jum
= 73 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Lampung Port Time POD 2 Lama Penu
= Balikpapan POL 2 = Pangkalan Susu Biaya
= 872 Nm AT+WT+IT = 7 jam Total Biay
= 68 jam Produktivi = 650 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= Balikpapan Port Time = 11 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 60 jam Port Time POD 3 Etmal
POL 3 = Lampung Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia
= 17 hari Payload = 2047 ton Asumsi Jum
= 350 hari Effective T = 3 jam Biaya
= 20.58824 shipment/th Port Time = 10 jam Tarif Teta
= 42154 ton/th = hari Tarif Varia
= 421539 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 42154 POD 4 = Balikpapan
= ### AT+WT+IT = 5 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis
### /tahun Payload = 2047 ton Tarif Labuh
= ### /tahun Effective T = 4 jam Biaya L
### /roundtrip Port Time = 9 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 800,000 Tarif Teta
Demand POD 3 600,000 Tarif Varia
Demand POD 4 700,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
11
RUTE
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 132541 Port Time = 11 jam
Seatime Port Time = 9 jam
Jarak Total = 3451 Nm Port Time = 10 jam
Seatime To = 261 jam Port Time = 11 jam
Seatime ro = 271 jam Port Time = 10 jam
= 12 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 60 jam Produktivi = 900 MT/jam
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Tanjung Perak Port Time = 11 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 481
Seatime 2 = 38 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Tanjung Perak Produktivi = 600 MT/jam
POD 3 = Pangkalan Susu Payload = 2047 ton
Jarak 3 = 1154 Nm Effective T = 4 jam
Seatime 3 = 90 jam Port Time = 9 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = Lampung POL 2 = Tanjung Perak
Jarak 4 = 934 Nm AT+WT+IT = 6 jam
Seatime 4 = 73 jam Produktivi = 600 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = Lampung Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 10 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 15 hari Payload = 2047 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 23.33333 shipment/th Port Time = 11 jam
Cargo Carr = 47774 ton/th = hari
= 477744 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 17 hari
Commissio = 350 hari
Frekuensi = 20.58824 shipment/th
Cargo Carr = 42154 ton/th
= 421539 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 17
Commissio = 350
Frekuensi = 20.58824
Cargo Carr = 42154
= 421539
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Tanjung Perak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
135241 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 9 jam Fuel Oil
3985 Nm Port Time = 11 jam Harga IFO =
302 jam Port Time = 10 jam IFO =
312 jam Port Time = 10 jam Biaya Fuel =
13 hari = 51 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
60 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2047 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Pangkalan Susu Port Time = 11 jam Port of Loa =
Tanjung Perak = hari Tarif Labuh =
1454 Biaya L =
113 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
Pangkalan Susu Produktivi = 600 MT/jam Tarif Teta =
Tanjung Perak Payload = 2047 ton Tarif Varia =
1154 Nm Effective T = 4 jam Asumsi Jum=
90 jam Port Time = 9 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Tanjung Perak Port Time POD 2 Lama Penu =
Lampung POL 2 = Pangkalan Susu Biaya =
495 Nm AT+WT+IT = 7 jam Total Biay =
39 jam Produktivi = 650 MT/jam =
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
Lampung Port Time = 11 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
117 Nm Tarif Tamb =
10 jam Port Time POD 3 Etmal =
POL 3 = Tanjung Perak Biaya =
AT+WT+IT = 6 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
16 hari Payload = 2047 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
21.875 shipment/th Port Time = 10 jam Tarif Teta =
44789 ton/th = hari Tarif Varia =
447885 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
44789 POD 4 = Lampung =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 700 MT/jam Port of Dis =
### /tahun Payload = 2047 ton Tarif Labuh =
### /tahun Effective T = 3 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
800,000 Tarif Varia =
600,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
17
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 142351 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 3434 Nm Port Time = 10 jam Harga IFO
= 200 jam Port Time = 9 jam IFO
= 269 jam Port Time = 11 jam Biaya Fuel
= 12 hari = 51 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Lampung Port of Loa = Tanjung Priok Biaya Diese
= 117 Nm AT+WT+IT = 8 jam
= 10 jam Produktivi = 900 MT/jam Total Biay
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Tanjung Perak Port Time = 11 jam Port of Loa
= Balikpapan = hari Tarif Labuh
= 495 Biaya L
= 39 Port Time POD 1 Tarif Tamb
POD 1 = Lampung Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Tanjung Perak Produktivi = 700 MT/jam Tarif Teta
= Balikpapan Payload = 2047 ton Tarif Varia
= 481 Nm Effective T = 3 jam Asumsi Jum
= 38 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Balikpapan Port Time POD 2 Lama Penu
= Pangkalan Susu POL 2 = Tanjung Perak Biaya
= 1454 Nm AT+WT+IT = 6 jam Total Biay
= 113 jam Produktivi = 600 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= Pangkalan Susu Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 887 Nm Tarif Tamb
= 69 jam Port Time POD 3 Etmal
POL 3 = Balikpapan Biaya
AT+WT+IT = 5 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia
= 15 hari Payload = 2047 ton Asumsi Jum
= 350 hari Effective T = 4 jam Biaya
= 23.33333 shipment/th Port Time = 9 jam Tarif Teta
= 47774 ton/th = hari Tarif Varia
= 477744 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 47774 POD 4 = Pangkalan Susu
= ### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis
### /tahun Payload = 2047 ton Tarif Labuh
= ### /tahun Effective T = 4 jam Biaya L
### /roundtrip Port Time = 11 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 800,000 Tarif Teta
Demand POD 3 700,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
18
RUTE
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 142531 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 3985 Nm Port Time = 10 jam
Seatime To = 252 jam Port Time = 11 jam
Seatime ro = 312 jam Port Time = 9 jam
= 13 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 10 jam Produktivi = 900 MT/jam
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Tanjung Perak Port Time = 11 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 495
Seatime 2 = 39 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Tanjung Perak Produktivi = 700 MT/jam
POD 3 = Pangkalan Susu Payload = 2047 ton
Jarak 3 = 1154 Nm Effective T = 3 jam
Seatime 3 = 90 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = Balikpapan POL 2 = Tanjung Perak
Jarak 4 = 1454 Nm AT+WT+IT = 6 jam
Seatime 4 = 113 jam Produktivi = 600 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = Balikpapan Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 765 Nm
Seatime 5 = 60 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 16 hari Payload = 2047 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 21.875 shipment/th Port Time = 11 jam
Cargo Carr = 44789 ton/th = hari
= 447885 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 47774 ton/th
= 477744 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 47774 ton/th
= 477744 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 17
Commissio = 350
Frekuensi = 20.58824
Cargo Carr = 42154
= 421539
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
152431 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 11 jam Fuel Oil
Nm Port Time = 10 jam Harga IFO = ###
jam Port Time = 10 jam IFO = 1920.220
jam Port Time = 9 jam Biaya Fuel = ###
hari = 51 jam =
Total Port Time
= 3 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 192.0
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2047 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Tanjung Perak Port Time = 11 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Tanjung Perak Produktivi = 650 MT/jam Tarif Teta = ###
Payload = 2047 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 11 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
Balikpapan POL 2 = Tanjung Perak Biaya = ###
Nm AT+WT+IT = 6 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2047 ton
OD 4 - TUKS Effective T = 4 jam Port of Dis = Pangkalan Susu
Balikpapan Port Time = 10 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Lampung Biaya = ###
AT+WT+IT = 7 jam Tarif Teta = ###
an Frekuensi Produktivi = 700 MT/jam Tarif Varia = Rp 22
hari Payload = 2047 ton Asumsi Jum= 3
hari Effective T = 3 jam Biaya = ###
shipment/th Port Time = 10 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = Balikpapan = ###
AT+WT+IT = 5 jam
/roundtrip Produktivi = 600 MT/jam Port of Dis = Tanjung Perak
/tahun Payload = 2047 ton Tarif Labuh = Rp 73
/tahun Effective T = 4 jam Biaya L = ###
/roundtrip Port Time = 9 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Balikpapan
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
152341 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 11 jam Fuel Oil
3511 Nm Port Time = 10 jam Harga IFO =
265 jam Port Time = 9 jam IFO =
275 jam Port Time = 10 jam Biaya Fuel =
12 hari = 51 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese=
887 Nm AT+WT+IT = 8 jam =
69 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2047 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Tanjung Perak Port Time = 11 jam Port of Loa =
Balikpapan = hari Tarif Labuh =
1154 Biaya L =
90 Port Time POD 1 Tarif Tamb =
POD 1 = Pangkalan Susu Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Tanjung Perak Produktivi = 650 MT/jam Tarif Teta =
Balikpapan Payload = 2047 ton Tarif Varia =
481 Nm Effective T = 4 jam Asumsi Jum=
38 jam Port Time = 11 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Balikpapan Port Time POD 2 Lama Penu =
Lampung POL 2 = Tanjung Perak Biaya =
872 Nm AT+WT+IT = 6 jam Total Biay =
68 jam Produktivi = 600 MT/jam =
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
Lampung Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
117 Nm Tarif Tamb =
10 jam Port Time POD 3 Etmal =
POL 3 = Balikpapan Biaya =
AT+WT+IT = 5 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
15 hari Payload = 2047 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
23.33333 shipment/th Port Time = 9 jam Tarif Teta =
47774 ton/th = hari Tarif Varia =
477744 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
47774 POD 4 = Lampung =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 700 MT/jam Port of Dis =
### /tahun Payload = 2047 ton Tarif Labuh =
### /tahun Effective T = 3 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
700,000 Tarif Varia =
600,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
26
RUTE
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 153241 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 11 jam Fuel Oil
= 3434 Nm Port Time = 9 jam Harga IFO
= 259 jam Port Time = 10 jam IFO
= 269 jam Port Time = 10 jam Biaya Fuel
= 12 hari = 51 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese
= 887 Nm AT+WT+IT = 8 jam
= 69 jam Produktivi = 900 MT/jam Total Biay
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Balikpapan Port Time = 11 jam Port of Loa
= Tanjung Perak = hari Tarif Labuh
= 1454 Biaya L
= 113 Port Time POD 1 Tarif Tamb
POD 1 = Pangkalan Susu Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Balikpapan Produktivi = 650 MT/jam Tarif Teta
= Tanjung Perak Payload = 2047 ton Tarif Varia
= 481 Nm Effective T = 4 jam Asumsi Jum
= 38 jam Port Time = 11 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Tanjung Perak Port Time POD 2 Lama Penu
= Lampung POL 2 = Balikpapan Biaya
= 495 Nm AT+WT+IT = 5 jam Total Biay
= 39 jam Produktivi = 600 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= Lampung Port Time = 9 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 117 Nm Tarif Tamb
= 10 jam Port Time POD 3 Etmal
POL 3 = Tanjung Perak Biaya
AT+WT+IT = 6 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia
= 15 hari Payload = 2047 ton Asumsi Jum
= 350 hari Effective T = 4 jam Biaya
= 23.33333 shipment/th Port Time = 10 jam Tarif Teta
= 47774 ton/th = hari Tarif Varia
= 477744 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 47774 POD 4 = Lampung
= ### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 700 MT/jam Port of Dis
### /tahun Payload = 2047 ton Tarif Labuh
= ### /tahun Effective T = 3 jam Biaya L
### /roundtrip Port Time = 10 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 600,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
26
RUTE
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 153241 Port Time = 11 jam
Seatime Port Time = 11 jam
Jarak Total = 3434 Nm Port Time = 9 jam
Seatime To = 259 jam Port Time = 10 jam
Seatime ro = 269 jam Port Time = 10 jam
= 12 hari = 51 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Pangkalan Susu Port of Loa = Tanjung Priok
Jarak 1 = 887 Nm AT+WT+IT = 8 jam
Seatime 1 = 69 jam Produktivi = 900 MT/jam
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Balikpapan Port Time = 11 jam
POD 2 = Tanjung Perak = hari
Jarak 2 = 1454
Seatime 2 = 113 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Balikpapan Produktivi = 650 MT/jam
POD 3 = Tanjung Perak Payload = 2047 ton
Jarak 3 = 481 Nm Effective T = 4 jam
Seatime 3 = 38 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = Lampung POL 2 = Balikpapan
Jarak 4 = 495 Nm AT+WT+IT = 5 jam
Seatime 4 = 39 jam Produktivi = 600 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = Lampung Port Time = 9 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 10 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 15 hari Payload = 2047 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 23.33333 shipment/th Port Time = 10 jam
Cargo Carr = 47774 ton/th = hari
= 477744 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
30
RUTE
Perhitungan Frekuensi
Roundtrip = 8 hari
Commissio = 350 hari
Frekuensi = 43.75 shipment/th
Cargo Carr = 89577 ton/th
= 895771 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
31
RUTE
Perhitungan Frekuensi
Roundtrip = 6 hari
Commissio = 350 hari
Frekuensi = 58.33333 shipment/th
Cargo Carr = 119436 ton/th
= 1194361 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
32
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 6
Commissio = 350
Frekuensi = 58.33333
Cargo Carr = 119436
= 1194361
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
1421 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 10 jam Fuel Oil
Nm Port Time = 10 jam Harga IFO = ###
jam Port Time = 0 jam IFO = 483.161
jam Port Time = 0 jam Biaya Fuel = ###
hari = 31 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 48.3
Lampung Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2047 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Tanjung Perak Port Time = 11 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Lampung Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Tanjung Perak Produktivi = 700 MT/jam Tarif Teta = ###
Payload = 2047 ton Tarif Varia = Rp 22
Nm Effective T = 3 jam Asumsi Jum= 3
jam Port Time = 10 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = Tanjung Perak Biaya = ###
Nm AT+WT+IT = 6 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2047 ton
OD 4 - TUKS Effective T = 4 jam Port of Dis = Lampung
Port Time = 10 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = - Biaya = ###
AT+WT+IT = 0 jam Tarif Teta = ###
an Frekuensi Produktivi = 0 MT/jam Tarif Varia = Rp 22
hari Payload = 2047 ton Asumsi Jum= 3
hari Effective T = 0 jam Biaya = ###
shipment/th Port Time = 0 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Tanjung Perak
/tahun Payload = 2047 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
33
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
1341 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 9 jam Fuel Oil
1754 Nm Port Time = 10 jam Harga IFO =
128 jam Port Time = 0 jam IFO =
138 jam Port Time = 0 jam Biaya Fuel =
6 hari = 30 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
60 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2047 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Lampung Port Time = 11 jam Port of Loa =
- = hari Tarif Labuh =
872 Biaya L =
68 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
Lampung Produktivi = 600 MT/jam Tarif Teta =
- Payload = 2047 ton Tarif Varia =
0 Nm Effective T = 4 jam Asumsi Jum=
0 jam Port Time = 9 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
- Port Time POD 2 Lama Penu =
- POL 2 = Lampung Biaya =
0 Nm AT+WT+IT = 7 jam Total Biay =
0 jam Produktivi = 700 MT/jam =
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 3 jam Port of Dis =
- Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
117 Nm Tarif Tamb =
10 jam Port Time POD 3 Etmal =
POL 3 = - Biaya =
AT+WT+IT = 0 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia =
8 hari Payload = 2047 ton Asumsi Jum=
350 hari Effective T = 0 jam Biaya =
43.75 shipment/th Port Time = 0 jam Tarif Teta =
89577 ton/th = hari Tarif Varia =
895771 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
89577 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2047 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
600,000 Tarif Teta =
- Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
34
RUTE
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 1431 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 1754 Nm Port Time = 9 jam Harga IFO
= 78 jam Port Time = 0 jam IFO
= 138 jam Port Time = 0 jam Biaya Fuel
= 6 hari = 30 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Lampung Port of Loa = Tanjung Priok Biaya Diese
= 117 Nm AT+WT+IT = 8 jam
= 10 jam Produktivi = 900 MT/jam Total Biay
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Balikpapan Port Time = 11 jam Port of Loa
= - = hari Tarif Labuh
= 872 Biaya L
= 68 Port Time POD 1 Tarif Tamb
POD 1 = Lampung Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Balikpapan Produktivi = 700 MT/jam Tarif Teta
= - Payload = 2047 ton Tarif Varia
= 0 Nm Effective T = 3 jam Asumsi Jum
= 0 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Balikpapan Biaya
= 0 Nm AT+WT+IT = 5 jam Total Biay
= 0 jam Produktivi = 600 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= - Port Time = 9 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 60 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 8 hari Payload = 2047 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 43.75 shipment/th Port Time = 0 jam Tarif Teta
= 89577 ton/th = hari Tarif Varia
= 895771 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 89577 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2047 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
35
RUTE
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1251 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 2479 Nm Port Time = 11 jam
Seatime To = 124 jam Port Time = 0 jam
Seatime ro = 193 jam Port Time = 0 jam
= 9 hari = 32 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 34 jam Produktivi = 900 MT/jam
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Pangkalan Susu Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 1154
Seatime 2 = 90 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Pangkalan Susu Produktivi = 600 MT/jam
POD 3 = - Payload = 2047 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Pangkalan Susu
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 650 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 69 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 11 hari Payload = 2047 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 31.81818 shipment/th Port Time = 0 jam
Cargo Carr = 65147 ton/th = hari
= 651470 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1521 Port Time = 11 jam
Seatime Port Time = 11 jam
Jarak Total = 2479 Nm Port Time = 10 jam
Seatime To = 159 jam Port Time = 0 jam
Seatime ro = 193 jam Port Time = 0 jam
= 9 hari = 32 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Pangkalan Susu Port of Loa = Tanjung Priok
Jarak 1 = 887 Nm AT+WT+IT = 8 jam
Seatime 1 = 69 jam Produktivi = 900 MT/jam
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Tanjung Perak Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 1154
Seatime 2 = 90 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Tanjung Perak Produktivi = 650 MT/jam
POD 3 = - Payload = 2047 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Tanjung Perak
Jarak 4 = 0 Nm AT+WT+IT = 6 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 34 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 11 hari Payload = 2047 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 31.81818 shipment/th Port Time = 0 jam
Cargo Carr = 65147 ton/th = hari
= 651470 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1351 Port Time = 11
Balikpapan Seatime Port Time = 9
Nm Jarak Total = 3106 Nm Port Time = 11
Pangkalan Susu Seatime To = 173 jam Port Time = 0
Nm Seatime ro = 242 jam Port Time = 0
= 11 hari = 31
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Balikpapan Port of Loa = Tanjung Priok
Nm Jarak 1 = 765 Nm AT+WT+IT = 8
Seatime 1 = 60 jam Produktivi = 900
Payload = 2047
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = Pangkalan Susu Port Time = 11
POD 2 = - =
Jarak 2 = 1454
Seatime 2 = 113 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5
POD 2 = Pangkalan Susu Produktivi = 600
POD 3 = - Payload = 2047
Jarak 3 = 0 Nm Effective T = 4
Seatime 3 = 0 jam Port Time = 9
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Pangkalan Susu
Jarak 4 = 0 Nm AT+WT+IT = 7
Seatime 4 = 0 jam Produktivi = 650
Payload = 2047
Seatime POD 4 - TUKS Effective T = 4
POD 4 = - Port Time = 11
TUKS = Tanjung Priok =
Jarak 5 = 887 Nm
Seatime 5 = 69 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0
Perhitungan Frekuensi Produktivi = 0
Roundtrip = 13 hari Payload = 2047
Commissio = 350 hari Effective T = 0
Frekuensi = 26.92308 shipment/th Port Time = 0
Cargo Carr = 55124 ton/th =
= 551244 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1531 Port Time =
Pangkalan Susu Seatime Port Time =
887 Nm Jarak Total = 3106 Nm Port Time =
Balikpapan Seatime To = 182 jam Port Time =
1454 Nm Seatime ro = 242 jam Port Time =
- = 11 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Pangkalan Susu Port of Loa =
765 Nm Jarak 1 = 887 Nm AT+WT+IT =
Seatime 1 = 69 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Balikpapan Port Time =
POD 2 = - =
Jarak 2 = 1454
Seatime 2 = 113 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Balikpapan Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 765 Nm
Seatime 5 = 60 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 13 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 26.92308 shipment/th Port Time =
Cargo Carr = 55124 ton/th =
= 551244 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
39
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
40
RUTE
Perhitungan Frekuensi
Roundtrip = 9 hari
Commissio = 350 hari
Frekuensi = 38.88889 shipment/th
Cargo Carr = 79624 ton/th
= 796241 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
41
RUTE
Perhitungan Frekuensi
Roundtrip = 9 hari
Commissio = 350 hari
Frekuensi = 38.88889 shipment/th
Cargo Carr = 79624 ton/th
= 796241 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
42
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 11
Commissio = 350
Frekuensi = 31.81818
Cargo Carr = 65147
= 651470
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
12431 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 10 jam Fuel Oil
Nm Port Time = 10 jam Harga IFO = ###
jam Port Time = 9 jam IFO = 1182.594
jam Port Time = 0 jam Biaya Fuel = ###
hari = 40 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 118.3
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2047 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Port Time = 11 jam Port of Loa = Tanjung Priok
Balikpapan = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Tanjung Perak Etmal = 1
O2 - POD 3 AT+WT+IT = 6 jam Biaya = ###
Produktivi = 600 MT/jam Tarif Teta = ###
Balikpapan Payload = 2047 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 10 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Balikpapan Port Time POD 2 Lama Penu = Rp 1
POL 2 = Lampung Biaya = ###
Nm AT+WT+IT = 7 jam Total Biay = ###
jam Produktivi = 700 MT/jam = ###
Payload = 2047 ton
OD 4 - TUKS Effective T = 3 jam Port of Dis = Tanjung Perak
Port Time = 10 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Balikpapan Biaya = ###
AT+WT+IT = 5 jam Tarif Teta = ###
an Frekuensi Produktivi = 600 MT/jam Tarif Varia = Rp 22
hari Payload = 2047 ton Asumsi Jum= 3
hari Effective T = 4 jam Biaya = ###
shipment/th Port Time = 9 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Lampung
/tahun Payload = 2047 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
43
RUTE
jam
/trip
/tahun
Balikpapan
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
13241 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 9 jam Fuel Oil
1858 Nm Port Time = 10 jam Harga IFO =
137 jam Port Time = 10 jam IFO =
147 jam Port Time = 0 jam Biaya Fuel =
7 hari = 40 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
60 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2047 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Tanjung Perak Port Time = 11 jam Port of Loa =
Lampung = hari Tarif Labuh =
481 Biaya L =
38 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
Tanjung Perak Produktivi = 600 MT/jam Tarif Teta =
Lampung Payload = 2047 ton Tarif Varia =
495 Nm Effective T = 4 jam Asumsi Jum=
39 jam Port Time = 9 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Lampung Port Time POD 2 Lama Penu =
- POL 2 = Tanjung Perak Biaya =
0 Nm AT+WT+IT = 6 jam Total Biay =
0 jam Produktivi = 600 MT/jam =
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
- Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
117 Nm Tarif Tamb =
10 jam Port Time POD 3 Etmal =
POL 3 = Lampung Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia =
9 hari Payload = 2047 ton Asumsi Jum=
350 hari Effective T = 3 jam Biaya =
38.88889 shipment/th Port Time = 10 jam Tarif Teta =
79624 ton/th = hari Tarif Varia =
796241 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
79624 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2047 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
600,000 Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
44
RUTE
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 13421 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 9 jam Fuel Oil
= 2570 Nm Port Time = 10 jam Harga IFO
= 167 jam Port Time = 10 jam IFO
= 201 jam Port Time = 0 jam Biaya Fuel
= 9 hari = 40 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Balikpapan Port of Loa = Tanjung Priok Biaya Diese
= 765 Nm AT+WT+IT = 8 jam
= 60 jam Produktivi = 900 MT/jam Total Biay
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Lampung Port Time = 11 jam Port of Loa
= Tanjung Perak = hari Tarif Labuh
= 872 Biaya L
= 68 Port Time POD 1 Tarif Tamb
POD 1 = Balikpapan Etmal
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya
= Lampung Produktivi = 600 MT/jam Tarif Teta
= Tanjung Perak Payload = 2047 ton Tarif Varia
= 495 Nm Effective T = 4 jam Asumsi Jum
= 39 jam Port Time = 9 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Tanjung Perak Port Time POD 2 Lama Penu
= - POL 2 = Lampung Biaya
= 0 Nm AT+WT+IT = 7 jam Total Biay
= 0 jam Produktivi = 700 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 3 jam Port of Dis
= - Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 438 Nm Tarif Tamb
= 34 jam Port Time POD 3 Etmal
POL 3 = Tanjung Perak Biaya
AT+WT+IT = 6 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia
= 11 hari Payload = 2047 ton Asumsi Jum
= 350 hari Effective T = 4 jam Biaya
= 31.81818 shipment/th Port Time = 10 jam Tarif Teta
= 65147 ton/th = hari Tarif Varia
= 651470 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 65147 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2047 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 600,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
45
RUTE
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 14231 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 1858 Nm Port Time = 10 jam
Seatime To = 87 jam Port Time = 9 jam
Seatime ro = 147 jam Port Time = 0 jam
= 7 hari = 40 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 10 jam Produktivi = 900 MT/jam
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Tanjung Perak Port Time = 11 jam
POD 2 = Balikpapan = hari
Jarak 2 = 495
Seatime 2 = 39 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Tanjung Perak Produktivi = 700 MT/jam
POD 3 = Balikpapan Payload = 2047 ton
Jarak 3 = 481 Nm Effective T = 3 jam
Seatime 3 = 38 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Balikpapan Port Time POD 2
POD 4 = - POL 2 = Tanjung Perak
Jarak 4 = 0 Nm AT+WT+IT = 6 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 765 Nm
Seatime 5 = 60 jam Port Time POD 3
POL 3 = Balikpapan
AT+WT+IT = 5 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 9 hari Payload = 2047 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 38.88889 shipment/th Port Time = 9 jam
Cargo Carr = 79624 ton/th = hari
= 796241 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 14321 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 1908 Nm Port Time = 9 jam
Seatime To = 116 jam Port Time = 10 jam
Seatime ro = 150 jam Port Time = 0 jam
= 7 hari = 40 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 10 jam Produktivi = 900 MT/jam
Payload = 2047 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Balikpapan Port Time = 11 jam
POD 2 = Tanjung Perak = hari
Jarak 2 = 872
Seatime 2 = 68 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Balikpapan Produktivi = 700 MT/jam
POD 3 = Tanjung Perak Payload = 2047 ton
Jarak 3 = 481 Nm Effective T = 3 jam
Seatime 3 = 38 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2047 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 9 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 34 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 9 hari Payload = 2047 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 38.88889 shipment/th Port Time = 10 jam
Cargo Carr = 79624 ton/th = hari
= 796241 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 12351 Port Time = 11
Tanjung Perak Seatime Port Time = 10
Nm Jarak Total = 3260 Nm Port Time = 9
Balikpapan Seatime To = 185 jam Port Time = 11
Nm Seatime ro = 254 jam Port Time = 0
Pangkalan Susu = 11 hari = 41
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Nm Jarak 1 = 438 Nm AT+WT+IT = 8
Seatime 1 = 34 jam Produktivi = 900
Payload = 2047
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = Balikpapan Port Time = 11
POD 2 = Pangkalan Susu =
Jarak 2 = 481
Seatime 2 = 38 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6
POD 2 = Balikpapan Produktivi = 600
POD 3 = Pangkalan Susu Payload = 2047
Jarak 3 = 1454 Nm Effective T = 4
Seatime 3 = 113 jam Port Time = 10
=
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5
Seatime 4 = 0 jam Produktivi = 600
Payload = 2047
Seatime POD 4 - TUKS Effective T = 4
POD 4 = - Port Time = 9
TUKS = Tanjung Priok =
Jarak 5 = 887 Nm
Seatime 5 = 69 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7
Perhitungan Frekuensi Produktivi = 650
Roundtrip = 13 hari Payload = 2047
Commissio = 350 hari Effective T = 4
Frekuensi = 26.92308 shipment/th Port Time = 11
Cargo Carr = 55124 ton/th =
= 551244 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
TERPILIH
Perhitungan Sewa
Margin Prof= 15% dari total PV
Rp1,169,394,679 /tahun
Time Charter Hire
Cicilan tah = Rp26,658,092,727
= Rp76,165,979 /hari
= Rp2,221,507,727 /bulan
Tarif TCH
= Rp26,658,092,727 /tahun
= Rp266,580,927,270 /masa kontrak
Unit Cost =
PTP - Tanjung Perak Rp 13,329
PTP - Balikpapan Rp 38,083
PTP - Lampung Rp 44,430
PTP - Pangkalan Susu Rp 33,323
Operating Cost
Jumlah Jabatan Gaji Pokok
15 orang
13 kali 1 Master/Captain Rp 10,000,000
Rp 140,110,000 /bulan 1 Chief Engineer Rp 8,000,000
Rp 1,821,430,000 /tahun 1 Second Engineer Rp 7,950,000
Kebutuhan Perbekalan 1 Chief Officer Rp 8,000,000
15 orang 1 Second Officer Rp 7,950,000
Rp 50,000 /hari 1 Quarter Master Rp 6,500,000
Rp 262,500,000 /tahun 1 Electrician Rp 5,000,000
Kebutuhan Minyak Pelumas 1 Steward Rp 3,500,000
1 Oiler Rp 4,500,000
0.00015 liter/HP.jam 1 Boys Rp 3,500,000
25675 liter/tahun 2 Cadet Rp 100,000
Rp 35,000 /liter 1 Chief Cook Rp 4,000,000
Rp 898,634,156 /tahun 1 Assistant Cook Rp 3,500,000
Rp 898,634,156 /tahun 1 Boatswain Rp 3,500,000
Rp 898,634,156 harga kapal 15 Total Rp 76,000,000
Rp 898,634,156 /tahun
Rp 898,634,156 /masa sewa
Rp 898,634,156 harga kapal Umur 2010
Rp 898,634,156 /tahun Sisa 10 Kenaikan Biaya
Rp 898,634,156 /masa sewa masa sewa 10 Gaji Kru
Rp 898,634,156 harga kapal kenaikan 2% Perbekalan
Rp 898,634,156 /tahun 3% Minyak Pelumas
Rp 898,634,156 /masa sewa 5% Reparasi dan Peraw
Rp 898,634,156 /tahun periode 2 Asuransi
Rp 898,634,156 /masa sewa 5 Biaya umum
rate 5% Total FV
NPV
Anuitas Operating C
Perhitungan Biaya
WACC Rp 136,618,598,410
CC Rp17,692,733,519.51
OC Rp7,795,964,528
Total Rp25,488,698,048 /tahun
Tunjangan Tunjanga
Sertifikat Bonus Voyage n
Jabatan Berlayar Kesehatan Seniority
Rp 2,600,000 Rp 1,600,000 Rp 1,600,000 Rp 1,500,000 Rp 1,600,000 ###
Rp 1,900,000 Rp 1,500,000 Rp 1,600,000 Rp 1,500,000 Rp 1,400,000 ###
Rp 1,900,000 Rp 1,500,000 Rp 1,600,000 Rp 1,500,000 Rp 1,400,000 Rp -
Rp 2,500,000 Rp 1,200,000 Rp 1,400,000 Rp 1,500,000 Rp 1,400,000 ###
Rp 2,500,000 Rp 1,200,000 Rp 1,400,000 Rp 1,500,000 Rp 1,400,000 ###
Rp 1,000,000 Rp 500,000 Rp 450,000 Rp 500,000 Rp 500,000 ###
Rp 900,000 Rp 500,000 Rp 450,000 Rp 400,000 Rp 450,000 -
Rp 500,000 Rp 450,000 Rp 300,000 Rp 400,000 -
Rp 1,000,000 Rp 500,000 Rp 450,000 Rp 500,000 Rp 500,000 ###
Rp 500,000 Rp 500,000 Rp 450,000 Rp 400,000 Rp 350,000 -
Rp 500,000 Rp - Rp 450,000 Rp 400,000 Rp - -
Rp 500,000 Rp 450,000 Rp 450,000 Rp 400,000 Rp 350,000 ###
Rp 500,000 Rp 450,000 Rp 450,000 Rp 400,000 Rp 350,000 ###
Rp 500,000 Rp 450,000 Rp 450,000 Rp 400,000 Rp 350,000 ###
Rp 17,300,000 Rp 10,350,000 Rp 11,650,000 Rp 11,200,000 Rp 10,450,000 ###
OWNER
OWNER CHARTERER
CHARTERER
TIME
TIME CHARTER
CHARTER
OWNER
OWNER CHARTERER
CHARTERER
VOYAGE
VOYAGE CHARTER
CHARTER OWNER
OWNER
1
RUTE
Rute
POL Tanjung Priok
POD 1 Tanjung Perak
Total Total Gaji
Jarak POL 438 Nm
### ### POD 2 -
### ### Jarak POD 0 Nm
### ### POD 3 -
### ### Jarak POD 0 Nm
### ### POD 4 -
### ### Jarak POD 0 Nm
### ### TUKS Tanjung Priok
### ### Jarak POD 438 Nm
### ###
### ###
### ###
### ###
### ###
### ###
### ###
6 7 8 9 10
CHARTERER
CHARTERER
CHARTERER
CHARTERER
CHARTERER
OWNER
OWNER
Perhitungan waktu Port Time
Rute = 121 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 876 Nm Port Time = 0 jam
Seatime To = 70 jam Port Time = 0 jam
Seatime ro = 140 jam Port Time = 0 jam
= 6 hari = 21 jam
Total Port Time
= 1 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 70 jam Produktivi = 900 MT/jam
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = - Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 0
Seatime 2 = 0 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = - Produktivi = 600 MT/jam
POD 3 = - Payload = 2289 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = -
Jarak 4 = 0 Nm AT+WT+IT = 0 jam
Seatime 4 = 0 jam Produktivi = 0 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 0 jam
POD 4 = - Port Time = 0 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 70 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 7 hari Payload = 2289 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 50 shipment/th Port Time = 0 jam
Cargo Carr = 114450 ton/th = hari
= 1144503 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 131 Port Time = 11
Balikpapan Seatime Port Time = 9
Nm Jarak Total = 1530 Nm Port Time = 0
Seatime To = 122 jam Port Time = 0
Nm Seatime ro = 244 jam Port Time = 0
= 11 hari = 20
Total Port Time
Nm = 1
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Balikpapan Port of Loa = Tanjung Priok
Nm Jarak 1 = 765 Nm AT+WT+IT = 8
Seatime 1 = 122 jam Produktivi = 900
Payload = 2289
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = 0 Port Time = 11
POD 2 = 0 =
Jarak 2 = 0
Seatime 2 = 0 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5
POD 2 = 0 Produktivi = 600
POD 3 = 0 Payload = 2289
Jarak 3 = 0 Nm Effective T = 4
Seatime 3 = 0 jam Port Time = 9
=
Seatime POD 3 - POD 4
POD 3 = 0 Port Time POD 2
POD 4 = 0 POL 2 = 0
Jarak 4 = 0 Nm AT+WT+IT = 0
Seatime 4 = 0 jam Produktivi = 0
Payload = 2289
Seatime POD 4 - TUKS Effective T = 0
POD 4 = 0 Port Time = 0
TUKS = Tanjung Priok =
Jarak 5 = 765 Nm
Seatime 5 = 122 jam Port Time POD 3
POL 3 = 0
AT+WT+IT = 0
Perhitungan Frekuensi Produktivi = 0
Roundtrip = 12 hari Payload = 2289
Commissio = 350 hari Effective T = 0
Frekuensi = 29.16667 shipment/th Port Time = 0
Cargo Carr = 66763 ton/th =
= 667627 ton/kontrak
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
3
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
4
RUTE
Perhitungan Frekuensi
Roundtrip = 13 hari
Commissio = 350 hari
Frekuensi = 26.92308 shipment/th
Cargo Carr = 61627 ton/th
= 616271 ton/kontrak
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
5
RUTE
Perhitungan Frekuensi
Roundtrip = 27 hari
Commissio = 350 hari
Frekuensi = 12.96296 shipment/th
Cargo Carr = 29672 ton/th
= 296723 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip =
Commissio =
Frekuensi =
Cargo Carr =
=
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
Perhitungan waktu Port Time Voyage Cost
123541 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
3438 Nm Port Time = 9 jam Harga IFO =
529 jam Port Time = 11 jam IFO =
548 jam Port Time = 11 jam Biaya Fuel =
23 hari = 52 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese=
438 Nm AT+WT+IT = 8 jam =
70 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2289 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa =
Pangkalan Susu = hari Tarif Labuh =
495 Biaya L =
79 Port Time POD 1 Tarif Tamb =
POD 1 = Tanjung Perak Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya =
Balikpapan Produktivi = 600 MT/jam Tarif Teta =
Pangkalan Susu Payload = 2289 ton Tarif Varia =
1454 Nm Effective T = 4 jam Asumsi Jum=
231 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Pangkalan Susu Port Time POD 2 Lama Penu =
Lampung POL 2 = Balikpapan Biaya =
934 Nm AT+WT+IT = 5 jam Total Biay =
149 jam Produktivi = 600 MT/jam =
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
Lampung Port Time = 9 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
117 Nm Tarif Tamb =
19 jam Port Time POD 3 Etmal =
POL 3 = Pangkalan Susu Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia =
26 hari Payload = 2289 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
13.46154 shipment/th Port Time = 11 jam Tarif Teta =
30814 ton/th = hari Tarif Varia =
308135 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
30814 POD 4 = Lampung =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 700 MT/jam Port of Dis =
### /tahun Payload = 2289 ton Tarif Labuh =
### /tahun Effective T = 4 jam Biaya L =
### /roundtrip Port Time = 11 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
800,000 Tarif Varia =
600,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
7
RUTE
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 124351 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 4146 Nm Port Time = 11 jam Harga IFO
= 519 jam Port Time = 9 jam IFO
= 660 jam Port Time = 11 jam Biaya Fuel
= 28 hari = 52 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese
= 438 Nm AT+WT+IT = 8 jam
= 70 jam Produktivi = 900 MT/jam Total Biay
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Lampung Port Time = 11 jam Port of Loa
= Balikpapan = hari Tarif Labuh
= 495 Biaya L
= 79 Port Time POD 1 Tarif Tamb
POD 1 = Tanjung Perak Etmal
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya
= Lampung Produktivi = 600 MT/jam Tarif Teta
= Balikpapan Payload = 2289 ton Tarif Varia
= 872 Nm Effective T = 4 jam Asumsi Jum
= 139 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Balikpapan Port Time POD 2 Lama Penu
= Pangkalan Susu POL 2 = Lampung Biaya
= 1454 Nm AT+WT+IT = 7 jam Total Biay
= 231 jam Produktivi = 700 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= Pangkalan Susu Port Time = 11 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 887 Nm Tarif Tamb
= 141 jam Port Time POD 3 Etmal
POL 3 = Balikpapan Biaya
AT+WT+IT = 5 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia
= 31 hari Payload = 2289 ton Asumsi Jum
= 350 hari Effective T = 4 jam Biaya
= 11.29032 shipment/th Port Time = 9 jam Tarif Teta
= 25844 ton/th = hari Tarif Varia
= 258436 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 25844 POD 4 = Pangkalan Susu
= ### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis
### /tahun Payload = 2289 ton Tarif Labuh
= ### /tahun Effective T = 4 jam Biaya L
### /roundtrip Port Time = 11 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 600,000 Tarif Teta
Demand POD 3 700,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
8
RUTE
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 124531 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 4086 Nm Port Time = 11 jam
Seatime To = 529 jam Port Time = 11 jam
Seatime ro = 651 jam Port Time = 9 jam
= 28 hari = 52 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 70 jam Produktivi = 900 MT/jam
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Lampung Port Time = 11 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 495
Seatime 2 = 79 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Lampung Produktivi = 600 MT/jam
POD 3 = Pangkalan Susu Payload = 2289 ton
Jarak 3 = 934 Nm Effective T = 4 jam
Seatime 3 = 149 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = Balikpapan POL 2 = Lampung
Jarak 4 = 1454 Nm AT+WT+IT = 7 jam
Seatime 4 = 231 jam Produktivi = 700 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = Balikpapan Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 765 Nm
Seatime 5 = 122 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 31 hari Payload = 2289 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 11.29032 shipment/th Port Time = 11 jam
Cargo Carr = 25844 ton/th = hari
= 258436 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 27 hari
Commissio = 350 hari
Frekuensi = 12.96296 shipment/th
Cargo Carr = 29672 ton/th
= 296723 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 31
Commissio = 350
Frekuensi = 11.29032
Cargo Carr = 25844
= 258436
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
134521 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 9 jam Fuel Oil
Nm Port Time = 11 jam Harga IFO = ###
jam Port Time = 11 jam IFO = 3852.419
jam Port Time = 10 jam Biaya Fuel = ###
hari = 52 jam =
Total Port Time
= 3 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 385.2
Balikpapan Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2289 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Port Time = 11 jam Port of Loa = Tanjung Priok
Pangkalan Susu = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Balikpapan Etmal = 1
O2 - POD 3 AT+WT+IT = 5 jam Biaya = ###
Produktivi = 600 MT/jam Tarif Teta = ###
Pangkalan Susu Payload = 2289 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 9 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Pangkalan Susu Port Time POD 2 Lama Penu = Rp 1
Tanjung Perak POL 2 = Lampung Biaya = ###
Nm AT+WT+IT = 7 jam Total Biay = ###
jam Produktivi = 700 MT/jam = ###
Payload = 2289 ton
OD 4 - TUKS Effective T = 4 jam Port of Dis = Balikpapan
Tanjung Perak Port Time = 11 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Pangkalan Susu Biaya = ###
AT+WT+IT = 7 jam Tarif Teta = ###
an Frekuensi Produktivi = 650 MT/jam Tarif Varia = Rp 22
hari Payload = 2289 ton Asumsi Jum= 3
hari Effective T = 4 jam Biaya = ###
shipment/th Port Time = 11 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = Tanjung Perak = ###
AT+WT+IT = 6 jam
/roundtrip Produktivi = 600 MT/jam Port of Dis = Lampung
/tahun Payload = 2289 ton Tarif Labuh = Rp 73
/tahun Effective T = 4 jam Biaya L = ###
/roundtrip Port Time = 10 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Seatime POD 3 - PO
jam POD 3
POD 4
/trip Jarak 4
/tahun Seatime 4
jam
/trip
/tahun
Pangkalan Susu
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Tanjung Perak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
= 134251 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 9 jam Fuel Oil
= 4173 Nm Port Time = 11 jam Harga IFO
= 524 jam Port Time = 10 jam IFO
= 665 jam Port Time = 11 jam Biaya Fuel
= 28 hari = 52 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Balikpapan Port of Loa = Tanjung Priok Biaya Diese
= 765 Nm AT+WT+IT = 8 jam
= 122 jam Produktivi = 900 MT/jam Total Biay
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Lampung Port Time = 11 jam Port of Loa
= Tanjung Perak = hari Tarif Labuh
= 872 Biaya L
= 139 Port Time POD 1 Tarif Tamb
POD 1 = Balikpapan Etmal
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya
= Lampung Produktivi = 600 MT/jam Tarif Teta
= Tanjung Perak Payload = 2289 ton Tarif Varia
= 495 Nm Effective T = 4 jam Asumsi Jum
= 79 jam Port Time = 9 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Tanjung Perak Port Time POD 2 Lama Penu
= Pangkalan Susu POL 2 = Lampung Biaya
= 1154 Nm AT+WT+IT = 7 jam Total Biay
= 184 jam Produktivi = 700 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= Pangkalan Susu Port Time = 11 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 887 Nm Tarif Tamb
= 141 jam Port Time POD 3 Etmal
POL 3 = Tanjung Perak Biaya
AT+WT+IT = 6 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia
= 31 hari Payload = 2289 ton Asumsi Jum
= 350 hari Effective T = 4 jam Biaya
= 11.29032 shipment/th Port Time = 10 jam Tarif Teta
= 25844 ton/th = hari Tarif Varia
= 258436 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 25844 POD 4 = Pangkalan Susu
= ### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis
### /tahun Payload = 2289 ton Tarif Labuh
= ### /tahun Effective T = 4 jam Biaya L
### /roundtrip Port Time = 11 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 600,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
15
RUTE
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 135421 Port Time = 11 jam
Seatime Port Time = 9 jam
Jarak Total = 4086 Nm Port Time = 11 jam
Seatime To = 581 jam Port Time = 11 jam
Seatime ro = 651 jam Port Time = 10 jam
= 28 hari = 52 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 122 jam Produktivi = 900 MT/jam
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Pangkalan Susu Port Time = 11 jam
POD 2 = Lampung = hari
Jarak 2 = 1454
Seatime 2 = 231 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Pangkalan Susu Produktivi = 600 MT/jam
POD 3 = Lampung Payload = 2289 ton
Jarak 3 = 934 Nm Effective T = 4 jam
Seatime 3 = 149 jam Port Time = 9 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Lampung Port Time POD 2
POD 4 = Tanjung Perak POL 2 = Pangkalan Susu
Jarak 4 = 495 Nm AT+WT+IT = 7 jam
Seatime 4 = 79 jam Produktivi = 650 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = Tanjung Perak Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 70 jam Port Time POD 3
POL 3 = Lampung
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 700 MT/jam
Roundtrip = 31 hari Payload = 2289 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 11.29032 shipment/th Port Time = 11 jam
Cargo Carr = 25844 ton/th = hari
= 258436 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 30 hari
Commissio = 350 hari
Frekuensi = 11.66667 shipment/th
Cargo Carr = 26705 ton/th
= 267051 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 27 hari
Commissio = 350 hari
Frekuensi = 12.96296 shipment/th
Cargo Carr = 29672 ton/th
= 296723 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 30
Commissio = 350
Frekuensi = 11.66667
Cargo Carr = 26705
= 267051
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
143521 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 11 jam Fuel Oil
Nm Port Time = 9 jam Harga IFO = ###
jam Port Time = 11 jam IFO = 3733.968
jam Port Time = 10 jam Biaya Fuel = ###
hari = 52 jam =
Total Port Time
= 3 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 373.4
Lampung Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2289 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa = Tanjung Priok
Pangkalan Susu = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Lampung Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Balikpapan Produktivi = 700 MT/jam Tarif Teta = ###
Pangkalan Susu Payload = 2289 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 11 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Pangkalan Susu Port Time POD 2 Lama Penu = Rp 1
Tanjung Perak POL 2 = Balikpapan Biaya = ###
Nm AT+WT+IT = 5 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2289 ton
OD 4 - TUKS Effective T = 4 jam Port of Dis = Lampung
Tanjung Perak Port Time = 9 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Pangkalan Susu Biaya = ###
AT+WT+IT = 7 jam Tarif Teta = ###
an Frekuensi Produktivi = 650 MT/jam Tarif Varia = Rp 22
hari Payload = 2289 ton Asumsi Jum= 3
hari Effective T = 4 jam Biaya = ###
shipment/th Port Time = 11 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = Tanjung Perak = ###
AT+WT+IT = 6 jam
/roundtrip Produktivi = 600 MT/jam Port of Dis = Balikpapan
/tahun Payload = 2289 ton Tarif Labuh = Rp 73
/tahun Effective T = 4 jam Biaya L = ###
/roundtrip Port Time = 10 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Seatime POD 3 - PO
jam POD 3
POD 4
/trip Jarak 4
/tahun Seatime 4
Seatime POD 4 - TU
GT/Kunjungan POD 4
/trip TUKS
/GT/etmal Jarak 5
Seatime 5
/trip
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Freku
gerakan Roundtrip
Commissio
Frekuensi
Cargo Carr
jam
jam
/trip
/tahun
Pangkalan Susu
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Tanjung Perak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
= 145231 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 11 jam Fuel Oil
= 3451 Nm Port Time = 11 jam Harga IFO
= 429 jam Port Time = 10 jam IFO
= 551 jam Port Time = 9 jam Biaya Fuel
= 23 hari = 52 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Lampung Port of Loa = Tanjung Priok Biaya Diese
= 117 Nm AT+WT+IT = 8 jam
= 19 jam Produktivi = 900 MT/jam Total Biay
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Pangkalan Susu Port Time = 11 jam Port of Loa
= Tanjung Perak = hari Tarif Labuh
= 934 Biaya L
= 149 Port Time POD 1 Tarif Tamb
POD 1 = Lampung Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Pangkalan Susu Produktivi = 700 MT/jam Tarif Teta
= Tanjung Perak Payload = 2289 ton Tarif Varia
= 1154 Nm Effective T = 4 jam Asumsi Jum
= 184 jam Port Time = 11 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Tanjung Perak Port Time POD 2 Lama Penu
= Balikpapan POL 2 = Pangkalan Susu Biaya
= 481 Nm AT+WT+IT = 7 jam Total Biay
= 77 jam Produktivi = 650 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= Balikpapan Port Time = 11 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 122 jam Port Time POD 3 Etmal
POL 3 = Tanjung Perak Biaya
AT+WT+IT = 6 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia
= 26 hari Payload = 2289 ton Asumsi Jum
= 350 hari Effective T = 4 jam Biaya
= 13.46154 shipment/th Port Time = 10 jam Tarif Teta
= 30814 ton/th = hari Tarif Varia
= 308135 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 30814 POD 4 = Balikpapan
= ### AT+WT+IT = 5 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis
### /tahun Payload = 2289 ton Tarif Labuh
= ### /tahun Effective T = 4 jam Biaya L
### /roundtrip Port Time = 9 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 800,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 700,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
22
RUTE
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 145321 Port Time = 11 jam
Seatime Port Time = 11 jam
Jarak Total = 3424 Nm Port Time = 11 jam
Seatime To = 476 jam Port Time = 9 jam
Seatime ro = 546 jam Port Time = 10 jam
= 23 hari = 52 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 19 jam Produktivi = 900 MT/jam
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Pangkalan Susu Port Time = 11 jam
POD 2 = Balikpapan = hari
Jarak 2 = 934
Seatime 2 = 149 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Pangkalan Susu Produktivi = 700 MT/jam
POD 3 = Balikpapan Payload = 2289 ton
Jarak 3 = 1454 Nm Effective T = 4 jam
Seatime 3 = 231 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Balikpapan Port Time POD 2
POD 4 = Tanjung Perak POL 2 = Pangkalan Susu
Jarak 4 = 481 Nm AT+WT+IT = 7 jam
Seatime 4 = 77 jam Produktivi = 650 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = Tanjung Perak Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 70 jam Port Time POD 3
POL 3 = Balikpapan
AT+WT+IT = 5 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 26 hari Payload = 2289 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 13.46154 shipment/th Port Time = 9 jam
Cargo Carr = 30814 ton/th = hari
= 308135 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 27 hari
Commissio = 350 hari
Frekuensi = 12.96296 shipment/th
Cargo Carr = 29672 ton/th
= 296723 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 27 hari
Commissio = 350 hari
Frekuensi = 12.96296 shipment/th
Cargo Carr = 29672 ton/th
= 296723 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 14
Commissio = 350
Frekuensi = 25
Cargo Carr = 57225
= 572252
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
1231 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 10 jam Fuel Oil
Nm Port Time = 9 jam Harga IFO = ###
jam Port Time = 0 jam IFO = 1558.365
jam Port Time = 0 jam Biaya Fuel = ###
hari = 30 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 155.8
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2289 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Tanjung Perak Etmal = 1
O2 - POD 3 AT+WT+IT = 6 jam Biaya = ###
Balikpapan Produktivi = 600 MT/jam Tarif Teta = ###
Payload = 2289 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 10 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = Balikpapan Biaya = ###
Nm AT+WT+IT = 5 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2289 ton
OD 4 - TUKS Effective T = 4 jam Port of Dis = Tanjung Perak
Port Time = 9 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = - Biaya = ###
AT+WT+IT = 0 jam Tarif Teta = ###
an Frekuensi Produktivi = 0 MT/jam Tarif Varia = Rp 22
hari Payload = 2289 ton Asumsi Jum= 3
hari Effective T = 0 jam Biaya = ###
shipment/th Port Time = 0 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Balikpapan
/tahun Payload = 2289 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
30
RUTE
Seatime POD 3 - PO
jam POD 3
POD 4
/trip Jarak 4
/tahun Seatime 4
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
= 1321 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 9 jam Fuel Oil
= 1684 Nm Port Time = 10 jam Harga IFO
= 199 jam Port Time = 0 jam IFO
= 269 jam Port Time = 0 jam Biaya Fuel
= 12 hari = 30 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Balikpapan Port of Loa = Tanjung Priok Biaya Diese
= 765 Nm AT+WT+IT = 8 jam
= 122 jam Produktivi = 900 MT/jam Total Biay
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Tanjung Perak Port Time = 11 jam Port of Loa
= - = hari Tarif Labuh
= 481 Biaya L
= 77 Port Time POD 1 Tarif Tamb
POD 1 = Balikpapan Etmal
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya
= Tanjung Perak Produktivi = 600 MT/jam Tarif Teta
= - Payload = 2289 ton Tarif Varia
= 0 Nm Effective T = 4 jam Asumsi Jum
= 0 jam Port Time = 9 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Tanjung Perak Biaya
= 0 Nm AT+WT+IT = 6 jam Total Biay
= 0 jam Produktivi = 600 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= - Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 438 Nm Tarif Tamb
= 70 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 14 hari Payload = 2289 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 25 shipment/th Port Time = 0 jam Tarif Teta
= 57225 ton/th = hari Tarif Varia
= 572252 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 57225 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2289 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 800,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
31
RUTE
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1241 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 1050 Nm Port Time = 11 jam
Seatime To = 149 jam Port Time = 0 jam
Seatime ro = 168 jam Port Time = 0 jam
= 7 hari = 32 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 70 jam Produktivi = 900 MT/jam
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Lampung Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 495
Seatime 2 = 79 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Lampung Produktivi = 600 MT/jam
POD 3 = - Payload = 2289 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 700 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 19 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 9 hari Payload = 2289 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 38.88889 shipment/th Port Time = 0 jam
Cargo Carr = 89017 ton/th = hari
= 890169 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1421 Port Time = 11 jam
Seatime Port Time = 11 jam
Jarak Total = 1050 Nm Port Time = 10 jam
Seatime To = 98 jam Port Time = 0 jam
Seatime ro = 168 jam Port Time = 0 jam
= 7 hari = 32 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 19 jam Produktivi = 900 MT/jam
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Tanjung Perak Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 495
Seatime 2 = 79 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Tanjung Perak Produktivi = 700 MT/jam
POD 3 = - Payload = 2289 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Tanjung Perak
Jarak 4 = 0 Nm AT+WT+IT = 6 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 70 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 9 hari Payload = 2289 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 38.88889 shipment/th Port Time = 0 jam
Cargo Carr = 89017 ton/th = hari
= 890169 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1341 Port Time = 11
Balikpapan Seatime Port Time = 9
Nm Jarak Total = 1754 Nm Port Time = 11
Seatime To = 261 jam Port Time = 0
Nm Seatime ro = 280 jam Port Time = 0
= 12 hari = 31
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Balikpapan Port of Loa = Tanjung Priok
Nm Jarak 1 = 765 Nm AT+WT+IT = 8
Seatime 1 = 122 jam Produktivi = 900
Payload = 2289
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = Lampung Port Time = 11
POD 2 = - =
Jarak 2 = 872
Seatime 2 = 139 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5
POD 2 = Lampung Produktivi = 600
POD 3 = - Payload = 2289
Jarak 3 = 0 Nm Effective T = 4
Seatime 3 = 0 jam Port Time = 9
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7
Seatime 4 = 0 jam Produktivi = 700
Payload = 2289
Seatime POD 4 - TUKS Effective T = 4
POD 4 = - Port Time = 11
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 19 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0
Perhitungan Frekuensi Produktivi = 0
Roundtrip = 14 hari Payload = 2289
Commissio = 350 hari Effective T = 0
Frekuensi = 25 shipment/th Port Time = 0
Cargo Carr = 57225 ton/th =
= 572252 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1431 Port Time =
Lampung Seatime Port Time =
117 Nm Jarak Total = 1754 Nm Port Time =
Balikpapan Seatime To = 158 jam Port Time =
872 Nm Seatime ro = 280 jam Port Time =
- = 12 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Lampung Port of Loa =
765 Nm Jarak 1 = 117 Nm AT+WT+IT =
Seatime 1 = 19 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Balikpapan Port Time =
POD 2 = - =
Jarak 2 = 872
Seatime 2 = 139 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Balikpapan Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 765 Nm
Seatime 5 = 122 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 14 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 25 shipment/th Port Time =
Cargo Carr = 57225 ton/th =
= 572252 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
35
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
36
RUTE
Perhitungan Frekuensi
Roundtrip = 19 hari
Commissio = 350 hari
Frekuensi = 18.42105 shipment/th
Cargo Carr = 42166 ton/th
= 421659 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
37
RUTE
Perhitungan Frekuensi
Roundtrip = 23 hari
Commissio = 350 hari
Frekuensi = 15.21739 shipment/th
Cargo Carr = 34833 ton/th
= 348327 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
38
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 23
Commissio = 350
Frekuensi = 15.21739
Cargo Carr = 34833
= 348327
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
1531 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 11 jam Fuel Oil
Nm Port Time = 9 jam Harga IFO = ###
jam Port Time = 0 jam IFO = 2874.276
jam Port Time = 0 jam Biaya Fuel = ###
hari = 31 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 287.4
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2289 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Balikpapan Produktivi = 650 MT/jam Tarif Teta = ###
Payload = 2289 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 11 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = Balikpapan Biaya = ###
Nm AT+WT+IT = 5 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2289 ton
OD 4 - TUKS Effective T = 4 jam Port of Dis = Pangkalan Susu
Port Time = 9 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = - Biaya = ###
AT+WT+IT = 0 jam Tarif Teta = ###
an Frekuensi Produktivi = 0 MT/jam Tarif Varia = Rp 22
hari Payload = 2289 ton Asumsi Jum= 3
hari Effective T = 0 jam Biaya = ###
shipment/th Port Time = 0 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Balikpapan
/tahun Payload = 2289 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
39
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
1451 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 11 jam Fuel Oil
1938 Nm Port Time = 11 jam Harga IFO =
168 jam Port Time = 0 jam IFO =
309 jam Port Time = 0 jam Biaya Fuel =
13 hari = 33 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Lampung Port of Loa = Tanjung Priok Biaya Diese=
117 Nm AT+WT+IT = 8 jam =
19 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2289 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Pangkalan Susu Port Time = 11 jam Port of Loa =
- = hari Tarif Labuh =
934 Biaya L =
149 Port Time POD 1 Tarif Tamb =
POD 1 = Lampung Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Pangkalan Susu Produktivi = 700 MT/jam Tarif Teta =
- Payload = 2289 ton Tarif Varia =
0 Nm Effective T = 4 jam Asumsi Jum=
0 jam Port Time = 11 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
- Port Time POD 2 Lama Penu =
- POL 2 = Pangkalan Susu Biaya =
0 Nm AT+WT+IT = 7 jam Total Biay =
0 jam Produktivi = 650 MT/jam =
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
- Port Time = 11 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
141 jam Port Time POD 3 Etmal =
POL 3 = - Biaya =
AT+WT+IT = 0 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia =
15 hari Payload = 2289 ton Asumsi Jum=
350 hari Effective T = 0 jam Biaya =
23.33333 shipment/th Port Time = 0 jam Tarif Teta =
53410 ton/th = hari Tarif Varia =
534101 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
53410 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2289 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
- Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
40
RUTE
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 1541 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 11 jam Fuel Oil
= 1938 Nm Port Time = 11 jam Harga IFO
= 290 jam Port Time = 0 jam IFO
= 309 jam Port Time = 0 jam Biaya Fuel
= 13 hari = 33 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese
= 887 Nm AT+WT+IT = 8 jam
= 141 jam Produktivi = 900 MT/jam Total Biay
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Lampung Port Time = 11 jam Port of Loa
= - = hari Tarif Labuh
= 934 Biaya L
= 149 Port Time POD 1 Tarif Tamb
POD 1 = Pangkalan Susu Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Lampung Produktivi = 650 MT/jam Tarif Teta
= - Payload = 2289 ton Tarif Varia
= 0 Nm Effective T = 4 jam Asumsi Jum
= 0 jam Port Time = 11 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Lampung Biaya
= 0 Nm AT+WT+IT = 7 jam Total Biay
= 0 jam Produktivi = 700 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= - Port Time = 11 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 117 Nm Tarif Tamb
= 19 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 15 hari Payload = 2289 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 23.33333 shipment/th Port Time = 0 jam Tarif Teta
= 53410 ton/th = hari Tarif Varia
= 534101 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 53410 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2289 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 600,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
41
RUTE
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 12341 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 1908 Nm Port Time = 9 jam
Seatime To = 286 jam Port Time = 11 jam
Seatime ro = 305 jam Port Time = 0 jam
= 13 hari = 41 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 70 jam Produktivi = 900 MT/jam
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Balikpapan Port Time = 11 jam
POD 2 = Lampung = hari
Jarak 2 = 481
Seatime 2 = 77 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Balikpapan Produktivi = 600 MT/jam
POD 3 = Lampung Payload = 2289 ton
Jarak 3 = 872 Nm Effective T = 4 jam
Seatime 3 = 139 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Lampung Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 9 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 19 jam Port Time POD 3
POL 3 = Lampung
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 700 MT/jam
Roundtrip = 15 hari Payload = 2289 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 23.33333 shipment/th Port Time = 11 jam
Cargo Carr = 53410 ton/th = hari
= 534101 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 12431 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 2570 Nm Port Time = 11 jam
Seatime To = 288 jam Port Time = 9 jam
Seatime ro = 410 jam Port Time = 0 jam
= 18 hari = 41 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 70 jam Produktivi = 900 MT/jam
Payload = 2289 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Lampung Port Time = 11 jam
POD 2 = Balikpapan = hari
Jarak 2 = 495
Seatime 2 = 79 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Lampung Produktivi = 600 MT/jam
POD 3 = Balikpapan Payload = 2289 ton
Jarak 3 = 872 Nm Effective T = 4 jam
Seatime 3 = 139 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Balikpapan Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 700 MT/jam
Payload = 2289 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 765 Nm
Seatime 5 = 122 jam Port Time POD 3
POL 3 = Balikpapan
AT+WT+IT = 5 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 20 hari Payload = 2289 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 17.5 shipment/th Port Time = 9 jam
Cargo Carr = 40058 ton/th = hari
= 400576 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 13241 Port Time = 11
Balikpapan Seatime Port Time = 9
Nm Jarak Total = 1858 Nm Port Time = 10
Tanjung Perak Seatime To = 278 jam Port Time = 11
Nm Seatime ro = 297 jam Port Time = 0
= 13 hari = 41
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Balikpapan Port of Loa = Tanjung Priok
Nm Jarak 1 = 765 Nm AT+WT+IT = 8
Seatime 1 = 122 jam Produktivi = 900
Payload = 2289
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = Tanjung Perak Port Time = 11
POD 2 = Lampung =
Jarak 2 = 481
Seatime 2 = 77 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5
POD 2 = Tanjung Perak Produktivi = 600
POD 3 = Lampung Payload = 2289
Jarak 3 = 495 Nm Effective T = 4
Seatime 3 = 79 jam Port Time = 9
=
Seatime POD 3 - POD 4
POD 3 = Lampung Port Time POD 2
POD 4 = - POL 2 = Tanjung Perak
Jarak 4 = 0 Nm AT+WT+IT = 6
Seatime 4 = 0 jam Produktivi = 600
Payload = 2289
Seatime POD 4 - TUKS Effective T = 4
POD 4 = - Port Time = 10
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 19 jam Port Time POD 3
POL 3 = Lampung
AT+WT+IT = 7
Perhitungan Frekuensi Produktivi = 700
Roundtrip = 15 hari Payload = 2289
Commissio = 350 hari Effective T = 4
Frekuensi = 23.33333 shipment/th Port Time = 11
Cargo Carr = 53410 ton/th =
= 534101 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 13421 Port Time =
Balikpapan Seatime Port Time =
765 Nm Jarak Total = 2570 Nm Port Time =
Lampung Seatime To = 340 jam Port Time =
872 Nm Seatime ro = 410 jam Port Time =
Tanjung Perak = 18 hari =
Total Port Time
495 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Balikpapan Port of Loa =
438 Nm Jarak 1 = 765 Nm AT+WT+IT =
Seatime 1 = 122 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Lampung Port Time =
POD 2 = Tanjung Perak =
Jarak 2 = 872
Seatime 2 = 139 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Lampung Produktivi =
POD 3 = Tanjung Perak Payload =
Jarak 3 = 495 Nm Effective T =
Seatime 3 = 79 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 438 Nm
Seatime 5 = 70 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 20 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 17.5 shipment/th Port Time =
Cargo Carr = 40058 ton/th =
= 400576 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
45
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
46
RUTE
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 53410 ton/th
= 534101 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
47
RUTE
Perhitungan Frekuensi
Roundtrip = 24 hari
Commissio = 350 hari
Frekuensi = 14.58333 shipment/th
Cargo Carr = 33381 ton/th
= 333813 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
48
RUTE
Rute
POL
POD 1
Jarak POL
POD 2
/roundtrip Jarak POD
POD 3
Jarak POD
POD 4
Jarak POD
TUKS
Jarak POD
/roundtrip
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
TIDAK TERPILIH
Perhitungan Sewa
Margin Prof= 15% dari total PV
### /tahun
Time Charter Hire
Cicilan tah = ###
= ### /hari
= ### /bulan
Tarif TCH
= ### /tahun
= ### /masa kontrak
Unit Cost =
PTP - Tanjung Perak ###
PTP - Balikpapan ###
PTP - Lampung ###
PTP - Pangkalan Susu ###
Tunjangan
Jumlah Jabatan Gaji Pokok Sertifikat
Jabatan Berlayar Kesehatan
1 Master/Captain ### Rp 2,600,000 ### ### ###
1 Chief Engineer ### Rp 1,900,000 ### ### ###
1 Second Engineer ### Rp 1,900,000 ### ### ###
1 Chief Officer ### Rp 2,500,000 ### ### ###
1 Second Officer ### Rp 2,500,000 ### ### ###
1 Quarter Master ### Rp 1,000,000 ### ### ###
1 Electrician ### Rp 900,000 ### ### ###
1 Steward ### Rp 500,000 ### ###
1 Oiler ### Rp 1,000,000 ### ### ###
liter/HP.jam 1 Boys ### Rp 500,000 ### ### ###
liter/tahun 2 Cadet ### Rp 500,000 Rp - ### ###
1 Chief Cook ### Rp 500,000 ### ### ###
1 Assistant Cook ### Rp 500,000 ### ### ###
1 Boatswain ### Rp 500,000 ### ### ###
harga kapal 15 Total ### Rp 17,300,000 ### ### ###
Rute
POL
Tunjanga
Bonus POD 1
Voyage n Total Total Gaji
Seniority Jarak POL
### ### ### ### POD 2
### ### ### ### Jarak POD
### Rp - ### ### POD 3
### ### ### ### Jarak POD
### ### ### ### POD 4
### ### ### ### Jarak POD
### - ### ### TUKS
### - ### ### Jarak POD
### ### ### ###
### - ### ###
Rp - - ### ###
### ### ### ###
### ### ### ###
### ### ### ###
### ### ### ###
Sewa Kapal
4 5 6 7 8 9 10
OWNER CHARTERER
BAREBOAT CHARTER
BAREBOATCHARTER
OWNER
OWNER CHARTERER
CHARTERER
TIME
TIME CHARTER
CHARTER
OWNER
OWNER CHARTERER
CHARTERER
VOYAGE
VOYAGE CHARTER
CHARTER OWNER
OWNER
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 121 Port Time =
Tanjung Perak Seatime Port Time =
438 Nm Jarak Total = 876 Nm Port Time =
- Seatime To = 49 jam Port Time =
0 Nm Seatime ro = 98 jam Port Time =
- = 5 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa =
438 Nm Jarak 1 = 438 Nm AT+WT+IT =
Seatime 1 = 49 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = - Port Time =
POD 2 = - =
Jarak 2 = 0
Seatime 2 = 0 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = - Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 438 Nm
Seatime 5 = 49 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 6 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 58.33333 shipment/th Port Time =
Cargo Carr = 166627 ton/th =
= 1666266 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
2
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
3
RUTE
Perhitungan Frekuensi
Roundtrip = 3 hari
Commissio = 350 hari
Frekuensi = 116.6667 shipment/th
Cargo Carr = 333253 ton/th
= 3332532 ton/kontrak
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
4
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 10
Commissio = 350
Frekuensi = 35
Cargo Carr = 99976
= 999760
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
151 Port Time = 12 jam Biaya Bahan Bakar
time Port Time = 12 jam Fuel Oil
Nm Port Time = 0 jam Harga IFO = ###
jam Port Time = 0 jam IFO = 681.008
jam Port Time = 0 jam Biaya Fuel = ###
hari = 24 jam =
Total Port Time
= 1 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 68.1
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2856 ton = ###
OD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Port Time = 12 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Produktivi = 650 MT/jam Tarif Teta = ###
Payload = 2856 ton Tarif Varia = Rp 22
Nm Effective T = 5 jam Asumsi Jum= 3
jam Port Time = 12 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = 0 Biaya = ###
Nm AT+WT+IT = 0 jam Total Biay = ###
jam Produktivi = 0 MT/jam = ###
Payload = 2856 ton
OD 4 - TUKS Effective T = 0 jam Port of Dis = Pangkalan Susu
Port Time = 0 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = 0 Biaya = ###
AT+WT+IT = 0 jam Tarif Teta = ###
an Frekuensi Produktivi = 0 MT/jam Tarif Varia = Rp 22
hari Payload = 2856 ton Asumsi Jum= 3
hari Effective T = 0 jam Biaya = ###
shipment/th Port Time = 0 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = 0 = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = 0
/tahun Payload = 2856 ton Tarif Labuh = Rp -
/tahun Effective T = 0 jam Biaya L = Rp -
/roundtrip Port Time = 0 jam Tarif Tamb = Rp -
/masa kontrak = hari Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = 0
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = 0
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
5
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
123451 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 11 jam Fuel Oil
3612 Nm Port Time = 10 jam Harga IFO =
301 jam Port Time = 12 jam IFO =
399 jam Port Time = 12 jam Biaya Fuel =
17 hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese=
438 Nm AT+WT+IT = 8 jam =
49 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2856 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Balikpapan Port Time = 12 jam Port of Loa =
Lampung = hari Tarif Labuh =
481 Biaya L =
53 Port Time POD 1 Tarif Tamb =
POD 1 = Tanjung Perak Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya =
Balikpapan Produktivi = 600 MT/jam Tarif Teta =
Lampung Payload = 2856 ton Tarif Varia =
872 Nm Effective T = 5 jam Asumsi Jum=
96 jam Port Time = 11 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Lampung Port Time POD 2 Lama Penu =
Pangkalan Susu POL 2 = Balikpapan Biaya =
934 Nm AT+WT+IT = 5 jam Total Biay =
103 jam Produktivi = 600 MT/jam =
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Pangkalan Susu Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
98 jam Port Time POD 3 Etmal =
POL 3 = Lampung Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia =
20 hari Payload = 2856 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
17.5 shipment/th Port Time = 12 jam Tarif Teta =
49988 ton/th = hari Tarif Varia =
499880 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
49988 POD 4 = Pangkalan Susu =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis =
### /tahun Payload = 2856 ton Tarif Labuh =
### /tahun Effective T = 5 jam Biaya L =
### /roundtrip Port Time = 12 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
600,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
Rp 9,821 /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
6
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
2 jam
###
### /trip
### /tahun
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp -
1 jam
Rp -
### /trip
### /tahun
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time
Rute = 123541 Port Time = 12 jam
Seatime Port Time = 11 jam
Jarak Total = 3438 Nm Port Time = 10 jam
Seatime To = 367 jam Port Time = 12 jam
Seatime ro = 380 jam Port Time = 12 jam
= 16 hari = 57 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 49 jam Produktivi = 900 MT/jam
Payload = 2856 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Balikpapan Port Time = 12 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 495
Seatime 2 = 55 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Balikpapan Produktivi = 600 MT/jam
POD 3 = Pangkalan Susu Payload = 2856 ton
Jarak 3 = 1454 Nm Effective T = 5 jam
Seatime 3 = 160 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = Lampung POL 2 = Balikpapan
Jarak 4 = 934 Nm AT+WT+IT = 5 jam
Seatime 4 = 103 jam Produktivi = 600 MT/jam
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = Lampung Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 13 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 19 hari Payload = 2856 ton
Commissio = 350 hari Effective T = 5 jam
Frekuensi = 18.42105 shipment/th Port Time = 12 jam
Cargo Carr = 52619 ton/th = hari
= 526189 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 23 hari
Commissio = 350 hari
Frekuensi = 15.21739 shipment/th
Cargo Carr = 43468 ton/th
= 434678 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 19 hari
Commissio = 350 hari
Frekuensi = 18.42105 shipment/th
Cargo Carr = 52619 ton/th
= 526189 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip =
Commissio =
Frekuensi =
Cargo Carr =
=
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
Perhitungan waktu Port Time Voyage Cost
132451 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
3562 Nm Port Time = 11 jam Harga IFO =
296 jam Port Time = 12 jam IFO =
394 jam Port Time = 12 jam Biaya Fuel =
17 hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
85 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2856 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Tanjung Perak Port Time = 12 jam Port of Loa =
Lampung = hari Tarif Labuh =
481 Biaya L =
53 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
Tanjung Perak Produktivi = 600 MT/jam Tarif Teta =
Lampung Payload = 2856 ton Tarif Varia =
495 Nm Effective T = 5 jam Asumsi Jum=
55 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Lampung Port Time POD 2 Lama Penu =
Pangkalan Susu POL 2 = Tanjung Perak Biaya =
934 Nm AT+WT+IT = 6 jam Total Biay =
103 jam Produktivi = 600 MT/jam =
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Pangkalan Susu Port Time = 11 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
98 jam Port Time POD 3 Etmal =
POL 3 = Lampung Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia =
20 hari Payload = 2856 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
17.5 shipment/th Port Time = 12 jam Tarif Teta =
49988 ton/th = hari Tarif Varia =
499880 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
49988 POD 4 = Pangkalan Susu =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis =
### /tahun Payload = 2856 ton Tarif Labuh =
### /tahun Effective T = 5 jam Biaya L =
### /roundtrip Port Time = 12 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
600,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
Rp 9,772 /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
13
RUTE
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 134521 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 4163 Nm Port Time = 12 jam Harga IFO
= 411 jam Port Time = 12 jam IFO
= 460 jam Port Time = 11 jam Biaya Fuel
= 20 hari = 57 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Balikpapan Port of Loa = Tanjung Priok Biaya Diese
= 765 Nm AT+WT+IT = 8 jam
= 85 jam Produktivi = 900 MT/jam Total Biay
Payload = 2856 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Lampung Port Time = 12 jam Port of Loa
= Pangkalan Susu = hari Tarif Labuh
= 872 Biaya L
= 96 Port Time POD 1 Tarif Tamb
POD 1 = Balikpapan Etmal
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya
= Lampung Produktivi = 600 MT/jam Tarif Teta
= Pangkalan Susu Payload = 2856 ton Tarif Varia
= 934 Nm Effective T = 5 jam Asumsi Jum
= 103 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Pangkalan Susu Port Time POD 2 Lama Penu
= Tanjung Perak POL 2 = Lampung Biaya
= 1154 Nm AT+WT+IT = 7 jam Total Biay
= 127 jam Produktivi = 700 MT/jam
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= Tanjung Perak Port Time = 12 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 438 Nm Tarif Tamb
= 49 jam Port Time POD 3 Etmal
POL 3 = Pangkalan Susu Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia
= 23 hari Payload = 2856 ton Asumsi Jum
= 350 hari Effective T = 5 jam Biaya
= 15.21739 shipment/th Port Time = 12 jam Tarif Teta
= 43468 ton/th = hari Tarif Varia
= 434678 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 43468 POD 4 = Tanjung Perak
= ### AT+WT+IT = 6 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis
### /tahun Payload = 2856 ton Tarif Labuh
= ### /tahun Effective T = 5 jam Biaya L
### /roundtrip Port Time = 11 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 600,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= Rp 9,824 /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
14
RUTE
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 134251 Port Time = 12 jam
Seatime Port Time = 10 jam
Jarak Total = 4173 Nm Port Time = 12 jam
Seatime To = 363 jam Port Time = 11 jam
Seatime ro = 461 jam Port Time = 12 jam
= 20 hari = 57 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 85 jam Produktivi = 900 MT/jam
Payload = 2856 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Lampung Port Time = 12 jam
POD 2 = Tanjung Perak = hari
Jarak 2 = 872
Seatime 2 = 96 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Lampung Produktivi = 600 MT/jam
POD 3 = Tanjung Perak Payload = 2856 ton
Jarak 3 = 495 Nm Effective T = 5 jam
Seatime 3 = 55 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = Pangkalan Susu POL 2 = Lampung
Jarak 4 = 1154 Nm AT+WT+IT = 7 jam
Seatime 4 = 127 jam Produktivi = 700 MT/jam
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = Pangkalan Susu Port Time = 12 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 98 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 23 hari Payload = 2856 ton
Commissio = 350 hari Effective T = 5 jam
Frekuensi = 15.21739 shipment/th Port Time = 11 jam
Cargo Carr = 43468 ton/th = hari
= 434678 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 19 hari
Commissio = 350 hari
Frekuensi = 18.42105 shipment/th
Cargo Carr = 52619 ton/th
= 526189 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 22
Commissio = 350
Frekuensi = 15.90909
Cargo Carr = 45444
= 454436
jam
/trip
/tahun
Pangkalan Susu
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Balikpapan
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
143251 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 12 jam Fuel Oil
3511 Nm Port Time = 10 jam Harga IFO =
289 jam Port Time = 11 jam IFO =
387 jam Port Time = 12 jam Biaya Fuel =
17 hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Lampung Port of Loa = Tanjung Priok Biaya Diese=
117 Nm AT+WT+IT = 8 jam =
13 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2856 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Balikpapan Port Time = 12 jam Port of Loa =
Tanjung Perak = hari Tarif Labuh =
872 Biaya L =
96 Port Time POD 1 Tarif Tamb =
POD 1 = Lampung Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Balikpapan Produktivi = 700 MT/jam Tarif Teta =
Tanjung Perak Payload = 2856 ton Tarif Varia =
481 Nm Effective T = 5 jam Asumsi Jum=
53 jam Port Time = 12 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Tanjung Perak Port Time POD 2 Lama Penu =
Pangkalan Susu POL 2 = Balikpapan Biaya =
1154 Nm AT+WT+IT = 5 jam Total Biay =
127 jam Produktivi = 600 MT/jam =
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Pangkalan Susu Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
98 jam Port Time POD 3 Etmal =
POL 3 = Tanjung Perak Biaya =
AT+WT+IT = 6 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
20 hari Payload = 2856 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
17.5 shipment/th Port Time = 11 jam Tarif Teta =
49988 ton/th = hari Tarif Varia =
499880 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
49988 POD 4 = Pangkalan Susu =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis =
### /tahun Payload = 2856 ton Tarif Labuh =
### /tahun Effective T = 5 jam Biaya L =
### /roundtrip Port Time = 12 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
800,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
Rp 9,721 /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
20
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 143521 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 12 jam Fuel Oil
= 4035 Nm Port Time = 10 jam Harga IFO
= 396 jam Port Time = 12 jam IFO
= 445 jam Port Time = 11 jam Biaya Fuel
= 19 hari = 57 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Lampung Port of Loa = Tanjung Priok Biaya Diese
= 117 Nm AT+WT+IT = 8 jam
= 13 jam Produktivi = 900 MT/jam Total Biay
Payload = 2856 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Balikpapan Port Time = 12 jam Port of Loa
= Pangkalan Susu = hari Tarif Labuh
= 872 Biaya L
= 96 Port Time POD 1 Tarif Tamb
POD 1 = Lampung Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Balikpapan Produktivi = 700 MT/jam Tarif Teta
= Pangkalan Susu Payload = 2856 ton Tarif Varia
= 1454 Nm Effective T = 5 jam Asumsi Jum
= 160 jam Port Time = 12 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Pangkalan Susu Port Time POD 2 Lama Penu
= Tanjung Perak POL 2 = Balikpapan Biaya
= 1154 Nm AT+WT+IT = 5 jam Total Biay
= 127 jam Produktivi = 600 MT/jam
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= Tanjung Perak Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 438 Nm Tarif Tamb
= 49 jam Port Time POD 3 Etmal
POL 3 = Pangkalan Susu Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia
= 22 hari Payload = 2856 ton Asumsi Jum
= 350 hari Effective T = 5 jam Biaya
= 15.90909 shipment/th Port Time = 12 jam Tarif Teta
= 45444 ton/th = hari Tarif Varia
= 454436 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 45444 POD 4 = Tanjung Perak
= ### AT+WT+IT = 6 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis
### /tahun Payload = 2856 ton Tarif Labuh
= ### /tahun Effective T = 5 jam Biaya L
### /roundtrip Port Time = 11 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= Rp 9,874 /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
21
RUTE
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 145231 Port Time = 12 jam
Seatime Port Time = 12 jam
Jarak Total = 3451 Nm Port Time = 12 jam
Seatime To = 296 jam Port Time = 11 jam
Seatime ro = 381 jam Port Time = 10 jam
= 16 hari = 57 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 13 jam Produktivi = 900 MT/jam
Payload = 2856 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Pangkalan Susu Port Time = 12 jam
POD 2 = Tanjung Perak = hari
Jarak 2 = 934
Seatime 2 = 103 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Pangkalan Susu Produktivi = 700 MT/jam
POD 3 = Tanjung Perak Payload = 2856 ton
Jarak 3 = 1154 Nm Effective T = 5 jam
Seatime 3 = 127 jam Port Time = 12 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = Balikpapan POL 2 = Pangkalan Susu
Jarak 4 = 481 Nm AT+WT+IT = 7 jam
Seatime 4 = 53 jam Produktivi = 650 MT/jam
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = Balikpapan Port Time = 12 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 765 Nm
Seatime 5 = 85 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 19 hari Payload = 2856 ton
Commissio = 350 hari Effective T = 5 jam
Frekuensi = 18.42105 shipment/th Port Time = 11 jam
Cargo Carr = 52619 ton/th = hari
= 526189 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 19 hari
Commissio = 350 hari
Frekuensi = 18.42105 shipment/th
Cargo Carr = 52619 ton/th
= 526189 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 19 hari
Commissio = 350 hari
Frekuensi = 18.42105 shipment/th
Cargo Carr = 52619 ton/th
= 526189 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 20
Commissio = 350
Frekuensi = 17.5
Cargo Carr = 49988
= 499880
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
154321 Port Time = 12 jam Biaya Bahan Bakar
time Port Time = 12 jam Fuel Oil
Nm Port Time = 12 jam Harga IFO = ###
jam Port Time = 10 jam IFO = 1386.584
jam Port Time = 11 jam Biaya Fuel = ###
hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 138.7
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2856 ton = ###
OD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Port Time = 12 jam Port of Loa = Tanjung Priok
Balikpapan = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Produktivi = 650 MT/jam Tarif Teta = ###
Balikpapan Payload = 2856 ton Tarif Varia = Rp 22
Nm Effective T = 5 jam Asumsi Jum= 3
jam Port Time = 12 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Balikpapan Port Time POD 2 Lama Penu = Rp 1
Tanjung Perak POL 2 = Lampung Biaya = ###
Nm AT+WT+IT = 7 jam Total Biay = ###
jam Produktivi = 700 MT/jam = ###
Payload = 2856 ton
OD 4 - TUKS Effective T = 5 jam Port of Dis = Pangkalan Susu
Tanjung Perak Port Time = 12 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Balikpapan Biaya = ###
AT+WT+IT = 5 jam Tarif Teta = ###
an Frekuensi Produktivi = 600 MT/jam Tarif Varia = Rp 22
hari Payload = 2856 ton Asumsi Jum= 3
hari Effective T = 5 jam Biaya = ###
shipment/th Port Time = 10 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = Tanjung Perak = ###
AT+WT+IT = 6 jam
/roundtrip Produktivi = 600 MT/jam Port of Dis = Lampung
/tahun Payload = 2856 ton Tarif Labuh = Rp 73
/tahun Effective T = 5 jam Biaya L = ###
/roundtrip Port Time = 11 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
jam
/trip
/tahun
Balikpapan
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Tanjung Perak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
154231 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 12 jam Fuel Oil
3562 Nm Port Time = 12 jam Harga IFO =
309 jam Port Time = 11 jam IFO =
394 jam Port Time = 10 jam Biaya Fuel =
17 hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese=
887 Nm AT+WT+IT = 8 jam =
98 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2856 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Lampung Port Time = 12 jam Port of Loa =
Tanjung Perak = hari Tarif Labuh =
934 Biaya L =
103 Port Time POD 1 Tarif Tamb =
POD 1 = Pangkalan Susu Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Lampung Produktivi = 650 MT/jam Tarif Teta =
Tanjung Perak Payload = 2856 ton Tarif Varia =
495 Nm Effective T = 5 jam Asumsi Jum=
55 jam Port Time = 12 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Tanjung Perak Port Time POD 2 Lama Penu =
Balikpapan POL 2 = Lampung Biaya =
481 Nm AT+WT+IT = 7 jam Total Biay =
53 jam Produktivi = 700 MT/jam =
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Balikpapan Port Time = 12 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
765 Nm Tarif Tamb =
85 jam Port Time POD 3 Etmal =
POL 3 = Tanjung Perak Biaya =
AT+WT+IT = 6 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
20 hari Payload = 2856 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
17.5 shipment/th Port Time = 11 jam Tarif Teta =
49988 ton/th = hari Tarif Varia =
499880 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
49988 POD 4 = Balikpapan =
### AT+WT+IT = 5 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis =
### /tahun Payload = 2856 ton Tarif Labuh =
### /tahun Effective T = 5 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
600,000 Tarif Teta =
800,000 Tarif Varia =
700,000 Asumsi Jum=
### Biaya =
Rp 9,772 /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
29
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 1231 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 11 jam Fuel Oil
= 1684 Nm Port Time = 10 jam Harga IFO
= 102 jam Port Time = 0 jam IFO
= 187 jam Port Time = 0 jam Biaya Fuel
= 8 hari = 33 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese
= 438 Nm AT+WT+IT = 8 jam
= 49 jam Produktivi = 900 MT/jam Total Biay
Payload = 2856 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Balikpapan Port Time = 12 jam Port of Loa
= - = hari Tarif Labuh
= 481 Biaya L
= 53 Port Time POD 1 Tarif Tamb
POD 1 = Tanjung Perak Etmal
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya
= Balikpapan Produktivi = 600 MT/jam Tarif Teta
= - Payload = 2856 ton Tarif Varia
= 0 Nm Effective T = 5 jam Asumsi Jum
= 0 jam Port Time = 11 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Balikpapan Biaya
= 0 Nm AT+WT+IT = 5 jam Total Biay
= 0 jam Produktivi = 600 MT/jam
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= - Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 85 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 10 hari Payload = 2856 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 35 shipment/th Port Time = 0 jam Tarif Teta
= 99976 ton/th = hari Tarif Varia
= 999760 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 99976 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2856 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
30
RUTE
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1321 Port Time = 12 jam
Seatime Port Time = 10 jam
Jarak Total = 1684 Nm Port Time = 11 jam
Seatime To = 138 jam Port Time = 0 jam
Seatime ro = 187 jam Port Time = 0 jam
= 8 hari = 33 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 85 jam Produktivi = 900 MT/jam
Payload = 2856 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Tanjung Perak Port Time = 12 jam
POD 2 = - = hari
Jarak 2 = 481
Seatime 2 = 53 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Tanjung Perak Produktivi = 600 MT/jam
POD 3 = - Payload = 2856 ton
Jarak 3 = 0 Nm Effective T = 5 jam
Seatime 3 = 0 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Tanjung Perak
Jarak 4 = 0 Nm AT+WT+IT = 6 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = - Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 49 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 10 hari Payload = 2856 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 35 shipment/th Port Time = 0 jam
Cargo Carr = 99976 ton/th = hari
= 999760 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1241 Port Time = 12
Tanjung Perak Seatime Port Time = 11
Nm Jarak Total = 1050 Nm Port Time = 12
Seatime To = 104 jam Port Time = 0
Nm Seatime ro = 117 jam Port Time = 0
= 5 hari = 35
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Nm Jarak 1 = 438 Nm AT+WT+IT = 8
Seatime 1 = 49 jam Produktivi = 900
Payload = 2856
Seatime POD 1 - POD 2 Effective T = 4
POD 1 = Lampung Port Time = 12
POD 2 = - =
Jarak 2 = 495
Seatime 2 = 55 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6
POD 2 = Lampung Produktivi = 600
POD 3 = - Payload = 2856
Jarak 3 = 0 Nm Effective T = 5
Seatime 3 = 0 jam Port Time = 11
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7
Seatime 4 = 0 jam Produktivi = 700
Payload = 2856
Seatime POD 4 - TUKS Effective T = 5
POD 4 = - Port Time = 12
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 13 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0
Perhitungan Frekuensi Produktivi = 0
Roundtrip = 7 hari Payload = 2856
Commissio = 350 hari Effective T = 0
Frekuensi = 50 shipment/th Port Time = 0
Cargo Carr = 142823 ton/th =
= 1428228 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1421 Port Time =
Lampung Seatime Port Time =
117 Nm Jarak Total = 1050 Nm Port Time =
Tanjung Perak Seatime To = 68 jam Port Time =
495 Nm Seatime ro = 117 jam Port Time =
- = 5 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Lampung Port of Loa =
438 Nm Jarak 1 = 117 Nm AT+WT+IT =
Seatime 1 = 13 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Tanjung Perak Port Time =
POD 2 = - =
Jarak 2 = 495
Seatime 2 = 55 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Tanjung Perak Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 438 Nm
Seatime 5 = 49 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 7 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 50 shipment/th Port Time =
Cargo Carr = 142823 ton/th =
= 1428228 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
33
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
34
RUTE
Perhitungan Frekuensi
Roundtrip = 11 hari
Commissio = 350 hari
Frekuensi = 31.81818 shipment/th
Cargo Carr = 90887 ton/th
= 908872 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
35
RUTE
Perhitungan Frekuensi
Roundtrip = 14 hari
Commissio = 350 hari
Frekuensi = 25 shipment/th
Cargo Carr = 71411 ton/th
= 714114 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
36
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 14
Commissio = 350
Frekuensi = 25
Cargo Carr = 71411
= 714114
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
1521 Port Time = 12 jam Biaya Bahan Bakar
time Port Time = 12 jam Fuel Oil
Nm Port Time = 11 jam Harga IFO = ###
jam Port Time = 0 jam IFO = 951.645
jam Port Time = 0 jam Biaya Fuel = ###
hari = 35 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 95.2
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2856 ton = ###
OD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Tanjung Perak Port Time = 12 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Tanjung Perak Produktivi = 650 MT/jam Tarif Teta = ###
Payload = 2856 ton Tarif Varia = Rp 22
Nm Effective T = 5 jam Asumsi Jum= 3
jam Port Time = 12 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = Tanjung Perak Biaya = ###
Nm AT+WT+IT = 6 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2856 ton
OD 4 - TUKS Effective T = 5 jam Port of Dis = Pangkalan Susu
Port Time = 11 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = - Biaya = ###
AT+WT+IT = 0 jam Tarif Teta = ###
an Frekuensi Produktivi = 0 MT/jam Tarif Varia = Rp 22
hari Payload = 2856 ton Asumsi Jum= 3
hari Effective T = 0 jam Biaya = ###
shipment/th Port Time = 0 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Tanjung Perak
/tahun Payload = 2856 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
37
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
1351 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
3106 Nm Port Time = 12 jam Harga IFO =
245 jam Port Time = 0 jam IFO =
343 jam Port Time = 0 jam Biaya Fuel =
15 hari = 34 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
85 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2856 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Pangkalan Susu Port Time = 12 jam Port of Loa =
- = hari Tarif Labuh =
1454 Biaya L =
160 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
Pangkalan Susu Produktivi = 600 MT/jam Tarif Teta =
- Payload = 2856 ton Tarif Varia =
0 Nm Effective T = 5 jam Asumsi Jum=
0 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
- Port Time POD 2 Lama Penu =
- POL 2 = Pangkalan Susu Biaya =
0 Nm AT+WT+IT = 7 jam Total Biay =
0 jam Produktivi = 650 MT/jam =
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
- Port Time = 12 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
98 jam Port Time POD 3 Etmal =
POL 3 = - Biaya =
AT+WT+IT = 0 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia =
17 hari Payload = 2856 ton Asumsi Jum=
350 hari Effective T = 0 jam Biaya =
20.58824 shipment/th Port Time = 0 jam Tarif Teta =
58809 ton/th = hari Tarif Varia =
588094 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
58809 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2856 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
- Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
38
RUTE
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 1531 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 12 jam Fuel Oil
= 3106 Nm Port Time = 10 jam Harga IFO
= 258 jam Port Time = 0 jam IFO
= 343 jam Port Time = 0 jam Biaya Fuel
= 15 hari = 34 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese
= 887 Nm AT+WT+IT = 8 jam
= 98 jam Produktivi = 900 MT/jam Total Biay
Payload = 2856 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Balikpapan Port Time = 12 jam Port of Loa
= - = hari Tarif Labuh
= 1454 Biaya L
= 160 Port Time POD 1 Tarif Tamb
POD 1 = Pangkalan Susu Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Balikpapan Produktivi = 650 MT/jam Tarif Teta
= - Payload = 2856 ton Tarif Varia
= 0 Nm Effective T = 5 jam Asumsi Jum
= 0 jam Port Time = 12 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Balikpapan Biaya
= 0 Nm AT+WT+IT = 5 jam Total Biay
= 0 jam Produktivi = 600 MT/jam
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= - Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 85 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 17 hari Payload = 2856 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 20.58824 shipment/th Port Time = 0 jam Tarif Teta
= 58809 ton/th = hari Tarif Varia
= 588094 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 58809 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2856 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
39
RUTE
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1451 Port Time = 12 jam
Seatime Port Time = 12 jam
Jarak Total = 1938 Nm Port Time = 12 jam
Seatime To = 116 jam Port Time = 0 jam
Seatime ro = 214 jam Port Time = 0 jam
= 9 hari = 36 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 13 jam Produktivi = 900 MT/jam
Payload = 2856 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Pangkalan Susu Port Time = 12 jam
POD 2 = - = hari
Jarak 2 = 934
Seatime 2 = 103 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Pangkalan Susu Produktivi = 700 MT/jam
POD 3 = - Payload = 2856 ton
Jarak 3 = 0 Nm Effective T = 5 jam
Seatime 3 = 0 jam Port Time = 12 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Pangkalan Susu
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 650 MT/jam
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = - Port Time = 12 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 98 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 11 hari Payload = 2856 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 31.81818 shipment/th Port Time = 0 jam
Cargo Carr = 90887 ton/th = hari
= 908872 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1541 Port Time = 12 jam
Seatime Port Time = 12 jam
Jarak Total = 1938 Nm Port Time = 12 jam
Seatime To = 201 jam Port Time = 0 jam
Seatime ro = 214 jam Port Time = 0 jam
= 9 hari = 36 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Pangkalan Susu Port of Loa = Tanjung Priok
Jarak 1 = 887 Nm AT+WT+IT = 8 jam
Seatime 1 = 98 jam Produktivi = 900 MT/jam
Payload = 2856 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Lampung Port Time = 12 jam
POD 2 = - = hari
Jarak 2 = 934
Seatime 2 = 103 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Lampung Produktivi = 650 MT/jam
POD 3 = - Payload = 2856 ton
Jarak 3 = 0 Nm Effective T = 5 jam
Seatime 3 = 0 jam Port Time = 12 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 700 MT/jam
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = - Port Time = 12 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 13 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 11 hari Payload = 2856 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 31.81818 shipment/th Port Time = 0 jam
Cargo Carr = 90887 ton/th = hari
= 908872 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 12341 Port Time = 12
Tanjung Perak Seatime Port Time = 11
Nm Jarak Total = 1908 Nm Port Time = 10
Balikpapan Seatime To = 198 jam Port Time = 12
Nm Seatime ro = 211 jam Port Time = 0
= 9 hari = 45
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Nm Jarak 1 = 438 Nm AT+WT+IT = 8
Seatime 1 = 49 jam Produktivi = 900
Payload = 2856
Seatime POD 1 - POD 2 Effective T = 4
POD 1 = Balikpapan Port Time = 12
POD 2 = Lampung =
Jarak 2 = 481
Seatime 2 = 53 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6
POD 2 = Balikpapan Produktivi = 600
POD 3 = Lampung Payload = 2856
Jarak 3 = 872 Nm Effective T = 5
Seatime 3 = 96 jam Port Time = 11
=
Seatime POD 3 - POD 4
POD 3 = Lampung Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5
Seatime 4 = 0 jam Produktivi = 600
Payload = 2856
Seatime POD 4 - TUKS Effective T = 5
POD 4 = - Port Time = 10
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 13 jam Port Time POD 3
POL 3 = Lampung
AT+WT+IT = 7
Perhitungan Frekuensi Produktivi = 700
Roundtrip = 11 hari Payload = 2856
Commissio = 350 hari Effective T = 5
Frekuensi = 31.81818 shipment/th Port Time = 12
Cargo Carr = 90887 ton/th =
= 908872 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 12431 Port Time =
Tanjung Perak Seatime Port Time =
438 Nm Jarak Total = 2570 Nm Port Time =
Lampung Seatime To = 200 jam Port Time =
495 Nm Seatime ro = 285 jam Port Time =
Balikpapan = 12 hari =
Total Port Time
872 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa =
765 Nm Jarak 1 = 438 Nm AT+WT+IT =
Seatime 1 = 49 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Lampung Port Time =
POD 2 = Balikpapan =
Jarak 2 = 495
Seatime 2 = 55 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Lampung Produktivi =
POD 3 = Balikpapan Payload =
Jarak 3 = 872 Nm Effective T =
Seatime 3 = 96 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = Balikpapan Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 765 Nm
Seatime 5 = 85 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 14 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 25 shipment/th Port Time =
Cargo Carr = 71411 ton/th =
= 714114 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
43
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
44
RUTE
Perhitungan Frekuensi
Roundtrip = 14 hari
Commissio = 350 hari
Frekuensi = 25 shipment/th
Cargo Carr = 71411 ton/th
= 714114 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
45
RUTE
Perhitungan Frekuensi
Roundtrip = 11 hari
Commissio = 350 hari
Frekuensi = 31.81818 shipment/th
Cargo Carr = 90887 ton/th
= 908872 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
46
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 11
Commissio = 350
Frekuensi = 31.81818
Cargo Carr = 90887
= 908872
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
14321 Port Time = 12 jam Biaya Bahan Bakar
time Port Time = 12 jam Fuel Oil
Nm Port Time = 10 jam Harga IFO = ###
jam Port Time = 11 jam IFO = 732.448
jam Port Time = 0 jam Biaya Fuel = ###
hari = 45 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 73.2
Lampung Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2856 ton = ###
OD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Balikpapan Port Time = 12 jam Port of Loa = Tanjung Priok
Tanjung Perak = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Lampung Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Balikpapan Produktivi = 700 MT/jam Tarif Teta = ###
Tanjung Perak Payload = 2856 ton Tarif Varia = Rp 22
Nm Effective T = 5 jam Asumsi Jum= 3
jam Port Time = 12 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Tanjung Perak Port Time POD 2 Lama Penu = Rp 1
POL 2 = Balikpapan Biaya = ###
Nm AT+WT+IT = 5 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2856 ton
OD 4 - TUKS Effective T = 5 jam Port of Dis = Lampung
Port Time = 10 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Tanjung Perak Biaya = ###
AT+WT+IT = 6 jam Tarif Teta = ###
an Frekuensi Produktivi = 600 MT/jam Tarif Varia = Rp 22
hari Payload = 2856 ton Asumsi Jum= 3
hari Effective T = 5 jam Biaya = ###
shipment/th Port Time = 11 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Balikpapan
/tahun Payload = 2856 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
47
RUTE
jam
/trip
/tahun
Tanjung Perak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
12351 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 11 jam Fuel Oil
3260 Nm Port Time = 10 jam Harga IFO =
262 jam Port Time = 12 jam IFO =
360 jam Port Time = 0 jam Biaya Fuel =
15 hari = 45 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese=
438 Nm AT+WT+IT = 8 jam =
49 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2856 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Balikpapan Port Time = 12 jam Port of Loa =
Pangkalan Susu = hari Tarif Labuh =
481 Biaya L =
53 Port Time POD 1 Tarif Tamb =
POD 1 = Tanjung Perak Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya =
Balikpapan Produktivi = 600 MT/jam Tarif Teta =
Pangkalan Susu Payload = 2856 ton Tarif Varia =
1454 Nm Effective T = 5 jam Asumsi Jum=
160 jam Port Time = 11 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Pangkalan Susu Port Time POD 2 Lama Penu =
- POL 2 = Balikpapan Biaya =
0 Nm AT+WT+IT = 5 jam Total Biay =
0 jam Produktivi = 600 MT/jam =
Payload = 2856 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
- Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
98 jam Port Time POD 3 Etmal =
POL 3 = Pangkalan Susu Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia =
17 hari Payload = 2856 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
20.58824 shipment/th Port Time = 12 jam Tarif Teta =
58809 ton/th = hari Tarif Varia =
588094 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
58809 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2856 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
800,000 Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
48
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
2 jam
###
### /trip
### /tahun
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp -
1 jam
Rp -
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
TIDAK TERPILIH
Perhitungan Sewa
Margin Prof= 15% dari total PV
### /tahun
Time Charter Hire
Cicilan tah = ###
= ### /hari
= ### /bulan
Tarif TCH
= ### /tahun
= ### /masa kontrak
Unit Cost =
PTP - Tanjung Perak ###
PTP - Balikpapan ###
PTP - Lampung ###
PTP - Pangkalan Susu ###
Tunjangan
Jumlah Jabatan Gaji Pokok Sertifikat
Jabatan Berlayar Kesehatan
1 Master/Captain ### Rp 2,600,000 ### ### ###
1 Chief Engineer ### Rp 1,900,000 ### ### ###
1 Second Engineer ### Rp 1,900,000 ### ### ###
1 Chief Officer ### Rp 2,500,000 ### ### ###
1 Second Officer ### Rp 2,500,000 ### ### ###
1 Quarter Master ### Rp 1,000,000 ### ### ###
1 Electrician ### Rp 900,000 ### ### ###
1 Steward ### Rp 500,000 ### ###
1 Oiler ### Rp 1,000,000 ### ### ###
liter/HP.jam 1 Boys ### Rp 500,000 ### ### ###
liter/tahun 2 Cadet ### Rp 500,000 Rp - ### ###
1 Chief Cook ### Rp 500,000 ### ### ###
1 Assistant Cook ### Rp 500,000 ### ### ###
1 Boatswain ### Rp 500,000 ### ### ###
harga kapal 15 Total ### Rp 17,300,000 ### ### ###
Rute
POL
Tunjanga
Bonus POD 1
Voyage n Total Total Gaji
Seniority Jarak POL
### ### ### ### POD 2
### ### ### ### Jarak POD
### Rp - ### ### POD 3
### ### ### ### Jarak POD
### ### ### ### POD 4
### ### ### ### Jarak POD
### - ### ### TUKS
### - ### ### Jarak POD
### ### ### ###
### - ### ###
Rp - - ### ###
### ### ### ###
### ### ### ###
### ### ### ###
### ### ### ###
n Sewa Kapal
4 5 6 7 8 9 10
OWNER CHARTERER
BAREBOAT CHARTER
BAREBOATCHARTER
OWNER
OWNER CHARTERER
CHARTERER
TIME CHARTER
TIME CHARTER
OWNER
OWNER CHARTERER
CHARTERER
VOYAGE CHARTER
VOYAGE CHARTER OWNER
OWNER
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 121 Port Time =
Tanjung Perak Seatime Port Time =
438 Nm Jarak Total = 876 Nm Port Time =
- Seatime To = 38 jam Port Time =
0 Nm Seatime ro = 76 jam Port Time =
- = 4 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa =
438 Nm Jarak 1 = 438 Nm AT+WT+IT =
Seatime 1 = 38 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = - Port Time =
POD 2 = - =
Jarak 2 = 0
Seatime 2 = 0 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = - Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 438 Nm
Seatime 5 = 38 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 5 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 70 shipment/th Port Time =
Cargo Carr = 168215 ton/th =
= 1682155 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
2
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
3
RUTE
Perhitungan Frekuensi
Roundtrip = 2 hari
Commissio = 350 hari
Frekuensi = 175 shipment/th
Cargo Carr = 420539 ton/th
= 4205387 ton/kontrak
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
4
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 8
Commissio = 350
Frekuensi = 43.75
Cargo Carr = 105135
= 1051347
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
151 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 11 jam Fuel Oil
Nm Port Time = 0 jam Harga IFO = ###
jam Port Time = 0 jam IFO = 1203.205
jam Port Time = 0 jam Biaya Fuel = ###
hari = 22 jam =
Total Port Time
= 1 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 120.3
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2403 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Port Time = 11 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Produktivi = 650 MT/jam Tarif Teta = ###
Payload = 2403 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 11 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = 0 Biaya = ###
Nm AT+WT+IT = 0 jam Total Biay = ###
jam Produktivi = 0 MT/jam = ###
Payload = 2403 ton
OD 4 - TUKS Effective T = 0 jam Port of Dis = Pangkalan Susu
Port Time = 0 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = 0 Biaya = ###
AT+WT+IT = 0 jam Tarif Teta = ###
an Frekuensi Produktivi = 0 MT/jam Tarif Varia = Rp 22
hari Payload = 2403 ton Asumsi Jum= 3
hari Effective T = 0 jam Biaya = ###
shipment/th Port Time = 0 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = 0 = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = 0
/tahun Payload = 2403 ton Tarif Labuh = Rp -
/tahun Effective T = 0 jam Biaya L = Rp -
/roundtrip Port Time = 0 jam Tarif Tamb = Rp -
/masa kontrak = hari Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = 0
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = 0
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
5
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
123451 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 11 jam Fuel Oil
3612 Nm Port Time = 10 jam Harga IFO =
237 jam Port Time = 11 jam IFO =
314 jam Port Time = 11 jam Biaya Fuel =
14 hari = 54 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese=
438 Nm AT+WT+IT = 8 jam =
38 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2403 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa =
Lampung = hari Tarif Labuh =
481 Biaya L =
42 Port Time POD 1 Tarif Tamb =
POD 1 = Tanjung Perak Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya =
Balikpapan Produktivi = 600 MT/jam Tarif Teta =
Lampung Payload = 2403 ton Tarif Varia =
872 Nm Effective T = 5 jam Asumsi Jum=
76 jam Port Time = 11 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Lampung Port Time POD 2 Lama Penu =
Pangkalan Susu POL 2 = Balikpapan Biaya =
934 Nm AT+WT+IT = 5 jam Total Biay =
81 jam Produktivi = 600 MT/jam =
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Pangkalan Susu Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
77 jam Port Time POD 3 Etmal =
POL 3 = Lampung Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia =
17 hari Payload = 2403 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
20.58824 shipment/th Port Time = 11 jam Tarif Teta =
49475 ton/th = hari Tarif Varia =
494751 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
49475 POD 4 = Pangkalan Susu =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis =
### /tahun Payload = 2403 ton Tarif Labuh =
### /tahun Effective T = 4 jam Biaya L =
### /roundtrip Port Time = 11 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
600,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
6
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
2 jam
###
### /trip
### /tahun
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp -
1 jam
Rp -
### /trip
### /tahun
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time
Rute = 123541 Port Time = 11 jam
Seatime Port Time = 11 jam
Jarak Total = 3438 Nm Port Time = 10 jam
Seatime To = 288 jam Port Time = 11 jam
Seatime ro = 299 jam Port Time = 11 jam
= 13 hari = 54 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 38 jam Produktivi = 900 MT/jam
Payload = 2403 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Balikpapan Port Time = 11 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 495
Seatime 2 = 43 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Balikpapan Produktivi = 600 MT/jam
POD 3 = Pangkalan Susu Payload = 2403 ton
Jarak 3 = 1454 Nm Effective T = 5 jam
Seatime 3 = 126 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = Lampung POL 2 = Balikpapan
Jarak 4 = 934 Nm AT+WT+IT = 5 jam
Seatime 4 = 81 jam Produktivi = 600 MT/jam
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = Lampung Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 11 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 16 hari Payload = 2403 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 21.875 shipment/th Port Time = 11 jam
Cargo Carr = 52567 ton/th = hari
= 525673 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 19 hari
Commissio = 350 hari
Frekuensi = 18.42105 shipment/th
Cargo Carr = 44267 ton/th
= 442672 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 16 hari
Commissio = 350 hari
Frekuensi = 21.875 shipment/th
Cargo Carr = 52567 ton/th
= 525673 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip =
Commissio =
Frekuensi =
Cargo Carr =
=
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
Perhitungan waktu Port Time Voyage Cost
132451 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
3562 Nm Port Time = 11 jam Harga IFO =
232 jam Port Time = 11 jam IFO =
309 jam Port Time = 11 jam Biaya Fuel =
13 hari = 54 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
66 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2403 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Tanjung Perak Port Time = 11 jam Port of Loa =
Lampung = hari Tarif Labuh =
481 Biaya L =
42 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
Tanjung Perak Produktivi = 600 MT/jam Tarif Teta =
Lampung Payload = 2403 ton Tarif Varia =
495 Nm Effective T = 5 jam Asumsi Jum=
43 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Lampung Port Time POD 2 Lama Penu =
Pangkalan Susu POL 2 = Tanjung Perak Biaya =
934 Nm AT+WT+IT = 6 jam Total Biay =
81 jam Produktivi = 600 MT/jam =
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Pangkalan Susu Port Time = 11 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
77 jam Port Time POD 3 Etmal =
POL 3 = Lampung Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia =
16 hari Payload = 2403 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
21.875 shipment/th Port Time = 11 jam Tarif Teta =
52567 ton/th = hari Tarif Varia =
525673 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
52567 POD 4 = Pangkalan Susu =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis =
### /tahun Payload = 2403 ton Tarif Labuh =
### /tahun Effective T = 4 jam Biaya L =
### /roundtrip Port Time = 11 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
600,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
13
RUTE
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 134521 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 4163 Nm Port Time = 11 jam Harga IFO
= 323 jam Port Time = 11 jam IFO
= 361 jam Port Time = 11 jam Biaya Fuel
= 16 hari = 54 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Balikpapan Port of Loa = Tanjung Priok Biaya Diese
= 765 Nm AT+WT+IT = 8 jam
= 66 jam Produktivi = 900 MT/jam Total Biay
Payload = 2403 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Lampung Port Time = 11 jam Port of Loa
= Pangkalan Susu = hari Tarif Labuh
= 872 Biaya L
= 76 Port Time POD 1 Tarif Tamb
POD 1 = Balikpapan Etmal
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya
= Lampung Produktivi = 600 MT/jam Tarif Teta
= Pangkalan Susu Payload = 2403 ton Tarif Varia
= 934 Nm Effective T = 5 jam Asumsi Jum
= 81 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Pangkalan Susu Port Time POD 2 Lama Penu
= Tanjung Perak POL 2 = Lampung Biaya
= 1154 Nm AT+WT+IT = 7 jam Total Biay
= 100 jam Produktivi = 700 MT/jam
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= Tanjung Perak Port Time = 11 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 438 Nm Tarif Tamb
= 38 jam Port Time POD 3 Etmal
POL 3 = Pangkalan Susu Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia
= 19 hari Payload = 2403 ton Asumsi Jum
= 350 hari Effective T = 4 jam Biaya
= 18.42105 shipment/th Port Time = 11 jam Tarif Teta
= 44267 ton/th = hari Tarif Varia
= 442672 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 44267 POD 4 = Tanjung Perak
= ### AT+WT+IT = 6 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis
### /tahun Payload = 2403 ton Tarif Labuh
= ### /tahun Effective T = 5 jam Biaya L
### /roundtrip Port Time = 11 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 600,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
14
RUTE
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 134251 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 4173 Nm Port Time = 11 jam
Seatime To = 285 jam Port Time = 11 jam
Seatime ro = 362 jam Port Time = 11 jam
= 16 hari = 54 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 66 jam Produktivi = 900 MT/jam
Payload = 2403 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Lampung Port Time = 11 jam
POD 2 = Tanjung Perak = hari
Jarak 2 = 872
Seatime 2 = 76 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Lampung Produktivi = 600 MT/jam
POD 3 = Tanjung Perak Payload = 2403 ton
Jarak 3 = 495 Nm Effective T = 5 jam
Seatime 3 = 43 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = Pangkalan Susu POL 2 = Lampung
Jarak 4 = 1154 Nm AT+WT+IT = 7 jam
Seatime 4 = 100 jam Produktivi = 700 MT/jam
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = Pangkalan Susu Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 77 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 19 hari Payload = 2403 ton
Commissio = 350 hari Effective T = 5 jam
Frekuensi = 18.42105 shipment/th Port Time = 11 jam
Cargo Carr = 44267 ton/th = hari
= 442672 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 16 hari
Commissio = 350 hari
Frekuensi = 21.875 shipment/th
Cargo Carr = 52567 ton/th
= 525673 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 18
Commissio = 350
Frekuensi = 19.44444
Cargo Carr = 46727
= 467265
jam
/trip
/tahun
Pangkalan Susu
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Balikpapan
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
143251 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 11 jam Fuel Oil
3511 Nm Port Time = 10 jam Harga IFO =
229 jam Port Time = 11 jam IFO =
306 jam Port Time = 11 jam Biaya Fuel =
13 hari = 54 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Lampung Port of Loa = Tanjung Priok Biaya Diese=
117 Nm AT+WT+IT = 8 jam =
11 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2403 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa =
Tanjung Perak = hari Tarif Labuh =
872 Biaya L =
76 Port Time POD 1 Tarif Tamb =
POD 1 = Lampung Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Balikpapan Produktivi = 700 MT/jam Tarif Teta =
Tanjung Perak Payload = 2403 ton Tarif Varia =
481 Nm Effective T = 4 jam Asumsi Jum=
42 jam Port Time = 11 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Tanjung Perak Port Time POD 2 Lama Penu =
Pangkalan Susu POL 2 = Balikpapan Biaya =
1154 Nm AT+WT+IT = 5 jam Total Biay =
100 jam Produktivi = 600 MT/jam =
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Pangkalan Susu Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
77 jam Port Time POD 3 Etmal =
POL 3 = Tanjung Perak Biaya =
AT+WT+IT = 6 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
16 hari Payload = 2403 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
21.875 shipment/th Port Time = 11 jam Tarif Teta =
52567 ton/th = hari Tarif Varia =
525673 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
52567 POD 4 = Pangkalan Susu =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis =
### /tahun Payload = 2403 ton Tarif Labuh =
### /tahun Effective T = 4 jam Biaya L =
### /roundtrip Port Time = 11 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
800,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
20
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 143521 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 11 jam Fuel Oil
= 4035 Nm Port Time = 10 jam Harga IFO
= 313 jam Port Time = 11 jam IFO
= 351 jam Port Time = 11 jam Biaya Fuel
= 15 hari = 54 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Lampung Port of Loa = Tanjung Priok Biaya Diese
= 117 Nm AT+WT+IT = 8 jam
= 11 jam Produktivi = 900 MT/jam Total Biay
Payload = 2403 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Balikpapan Port Time = 11 jam Port of Loa
= Pangkalan Susu = hari Tarif Labuh
= 872 Biaya L
= 76 Port Time POD 1 Tarif Tamb
POD 1 = Lampung Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Balikpapan Produktivi = 700 MT/jam Tarif Teta
= Pangkalan Susu Payload = 2403 ton Tarif Varia
= 1454 Nm Effective T = 4 jam Asumsi Jum
= 126 jam Port Time = 11 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Pangkalan Susu Port Time POD 2 Lama Penu
= Tanjung Perak POL 2 = Balikpapan Biaya
= 1154 Nm AT+WT+IT = 5 jam Total Biay
= 100 jam Produktivi = 600 MT/jam
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= Tanjung Perak Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 438 Nm Tarif Tamb
= 38 jam Port Time POD 3 Etmal
POL 3 = Pangkalan Susu Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia
= 18 hari Payload = 2403 ton Asumsi Jum
= 350 hari Effective T = 4 jam Biaya
= 19.44444 shipment/th Port Time = 11 jam Tarif Teta
= 46727 ton/th = hari Tarif Varia
= 467265 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 46727 POD 4 = Tanjung Perak
= ### AT+WT+IT = 6 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis
### /tahun Payload = 2403 ton Tarif Labuh
= ### /tahun Effective T = 5 jam Biaya L
### /roundtrip Port Time = 11 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
21
RUTE
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 145231 Port Time = 11 jam
Seatime Port Time = 11 jam
Jarak Total = 3451 Nm Port Time = 11 jam
Seatime To = 234 jam Port Time = 11 jam
Seatime ro = 300 jam Port Time = 10 jam
= 13 hari = 54 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 11 jam Produktivi = 900 MT/jam
Payload = 2403 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Pangkalan Susu Port Time = 11 jam
POD 2 = Tanjung Perak = hari
Jarak 2 = 934
Seatime 2 = 81 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Pangkalan Susu Produktivi = 700 MT/jam
POD 3 = Tanjung Perak Payload = 2403 ton
Jarak 3 = 1154 Nm Effective T = 4 jam
Seatime 3 = 100 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = Balikpapan POL 2 = Pangkalan Susu
Jarak 4 = 481 Nm AT+WT+IT = 7 jam
Seatime 4 = 42 jam Produktivi = 650 MT/jam
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = Balikpapan Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 765 Nm
Seatime 5 = 66 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 16 hari Payload = 2403 ton
Commissio = 350 hari Effective T = 5 jam
Frekuensi = 21.875 shipment/th Port Time = 11 jam
Cargo Carr = 52567 ton/th = hari
= 525673 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 16 hari
Commissio = 350 hari
Frekuensi = 21.875 shipment/th
Cargo Carr = 52567 ton/th
= 525673 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 16 hari
Commissio = 350 hari
Frekuensi = 21.875 shipment/th
Cargo Carr = 52567 ton/th
= 525673 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 17
Commissio = 350
Frekuensi = 20.58824
Cargo Carr = 49475
= 494751
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
154321 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 11 jam Fuel Oil
Nm Port Time = 11 jam Harga IFO = ###
jam Port Time = 10 jam IFO = 2449.819
jam Port Time = 11 jam Biaya Fuel = ###
hari = 54 jam =
Total Port Time
= 3 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 245.0
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2403 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Port Time = 11 jam Port of Loa = Tanjung Priok
Balikpapan = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Produktivi = 650 MT/jam Tarif Teta = ###
Balikpapan Payload = 2403 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 11 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Balikpapan Port Time POD 2 Lama Penu = Rp 1
Tanjung Perak POL 2 = Lampung Biaya = ###
Nm AT+WT+IT = 7 jam Total Biay = ###
jam Produktivi = 700 MT/jam = ###
Payload = 2403 ton
OD 4 - TUKS Effective T = 4 jam Port of Dis = Pangkalan Susu
Tanjung Perak Port Time = 11 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Balikpapan Biaya = ###
AT+WT+IT = 5 jam Tarif Teta = ###
an Frekuensi Produktivi = 600 MT/jam Tarif Varia = Rp 22
hari Payload = 2403 ton Asumsi Jum= 3
hari Effective T = 5 jam Biaya = ###
shipment/th Port Time = 10 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = Tanjung Perak = ###
AT+WT+IT = 6 jam
/roundtrip Produktivi = 600 MT/jam Port of Dis = Lampung
/tahun Payload = 2403 ton Tarif Labuh = Rp 73
/tahun Effective T = 5 jam Biaya L = ###
/roundtrip Port Time = 11 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
jam
/trip
/tahun
Balikpapan
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Tanjung Perak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
154231 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 11 jam Fuel Oil
3562 Nm Port Time = 11 jam Harga IFO =
243 jam Port Time = 11 jam IFO =
309 jam Port Time = 10 jam Biaya Fuel =
13 hari = 54 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese=
887 Nm AT+WT+IT = 8 jam =
77 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2403 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Lampung Port Time = 11 jam Port of Loa =
Tanjung Perak = hari Tarif Labuh =
934 Biaya L =
81 Port Time POD 1 Tarif Tamb =
POD 1 = Pangkalan Susu Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Lampung Produktivi = 650 MT/jam Tarif Teta =
Tanjung Perak Payload = 2403 ton Tarif Varia =
495 Nm Effective T = 4 jam Asumsi Jum=
43 jam Port Time = 11 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Tanjung Perak Port Time POD 2 Lama Penu =
Balikpapan POL 2 = Lampung Biaya =
481 Nm AT+WT+IT = 7 jam Total Biay =
42 jam Produktivi = 700 MT/jam =
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
Balikpapan Port Time = 11 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
765 Nm Tarif Tamb =
66 jam Port Time POD 3 Etmal =
POL 3 = Tanjung Perak Biaya =
AT+WT+IT = 6 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
16 hari Payload = 2403 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
21.875 shipment/th Port Time = 11 jam Tarif Teta =
52567 ton/th = hari Tarif Varia =
525673 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
52567 POD 4 = Balikpapan =
### AT+WT+IT = 5 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis =
### /tahun Payload = 2403 ton Tarif Labuh =
### /tahun Effective T = 5 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
600,000 Tarif Teta =
800,000 Tarif Varia =
700,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
29
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 1231 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 11 jam Fuel Oil
= 1684 Nm Port Time = 10 jam Harga IFO
= 80 jam Port Time = 0 jam IFO
= 146 jam Port Time = 0 jam Biaya Fuel
= 7 hari = 32 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese
= 438 Nm AT+WT+IT = 8 jam
= 38 jam Produktivi = 900 MT/jam Total Biay
Payload = 2403 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Balikpapan Port Time = 11 jam Port of Loa
= - = hari Tarif Labuh
= 481 Biaya L
= 42 Port Time POD 1 Tarif Tamb
POD 1 = Tanjung Perak Etmal
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya
= Balikpapan Produktivi = 600 MT/jam Tarif Teta
= - Payload = 2403 ton Tarif Varia
= 0 Nm Effective T = 5 jam Asumsi Jum
= 0 jam Port Time = 11 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Balikpapan Biaya
= 0 Nm AT+WT+IT = 5 jam Total Biay
= 0 jam Produktivi = 600 MT/jam
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= - Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 66 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 9 hari Payload = 2403 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 38.88889 shipment/th Port Time = 0 jam Tarif Teta
= 93453 ton/th = hari Tarif Varia
= 934530 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 93453 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2403 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
30
RUTE
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1321 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 1684 Nm Port Time = 11 jam
Seatime To = 108 jam Port Time = 0 jam
Seatime ro = 146 jam Port Time = 0 jam
= 7 hari = 32 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 66 jam Produktivi = 900 MT/jam
Payload = 2403 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Tanjung Perak Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 481
Seatime 2 = 42 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Tanjung Perak Produktivi = 600 MT/jam
POD 3 = - Payload = 2403 ton
Jarak 3 = 0 Nm Effective T = 5 jam
Seatime 3 = 0 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Tanjung Perak
Jarak 4 = 0 Nm AT+WT+IT = 6 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = - Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 38 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 9 hari Payload = 2403 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 38.88889 shipment/th Port Time = 0 jam
Cargo Carr = 93453 ton/th = hari
= 934530 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1241 Port Time = 11
Tanjung Perak Seatime Port Time = 11
Nm Jarak Total = 1050 Nm Port Time = 11
Seatime To = 81 jam Port Time = 0
Nm Seatime ro = 92 jam Port Time = 0
= 4 hari = 33
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Nm Jarak 1 = 438 Nm AT+WT+IT = 8
Seatime 1 = 38 jam Produktivi = 900
Payload = 2403
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = Lampung Port Time = 11
POD 2 = - =
Jarak 2 = 495
Seatime 2 = 43 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6
POD 2 = Lampung Produktivi = 600
POD 3 = - Payload = 2403
Jarak 3 = 0 Nm Effective T = 5
Seatime 3 = 0 jam Port Time = 11
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7
Seatime 4 = 0 jam Produktivi = 700
Payload = 2403
Seatime POD 4 - TUKS Effective T = 4
POD 4 = - Port Time = 11
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 11 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0
Perhitungan Frekuensi Produktivi = 0
Roundtrip = 6 hari Payload = 2403
Commissio = 350 hari Effective T = 0
Frekuensi = 58.33333 shipment/th Port Time = 0
Cargo Carr = 140180 ton/th =
= 1401796 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1421 Port Time =
Lampung Seatime Port Time =
117 Nm Jarak Total = 1050 Nm Port Time =
Tanjung Perak Seatime To = 54 jam Port Time =
495 Nm Seatime ro = 92 jam Port Time =
- = 4 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Lampung Port of Loa =
438 Nm Jarak 1 = 117 Nm AT+WT+IT =
Seatime 1 = 11 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Tanjung Perak Port Time =
POD 2 = - =
Jarak 2 = 495
Seatime 2 = 43 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Tanjung Perak Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 438 Nm
Seatime 5 = 38 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 6 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 58.33333 shipment/th Port Time =
Cargo Carr = 140180 ton/th =
= 1401796 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
33
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
34
RUTE
Perhitungan Frekuensi
Roundtrip = 9 hari
Commissio = 350 hari
Frekuensi = 38.88889 shipment/th
Cargo Carr = 93453 ton/th
= 934530 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
35
RUTE
Perhitungan Frekuensi
Roundtrip = 11 hari
Commissio = 350 hari
Frekuensi = 31.81818 shipment/th
Cargo Carr = 76462 ton/th
= 764616 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
36
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 11
Commissio = 350
Frekuensi = 31.81818
Cargo Carr = 76462
= 764616
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
1521 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 11 jam Fuel Oil
Nm Port Time = 11 jam Harga IFO = ###
jam Port Time = 0 jam IFO = 1681.368
jam Port Time = 0 jam Biaya Fuel = ###
hari = 33 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 168.1
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2403 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Tanjung Perak Port Time = 11 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Tanjung Perak Produktivi = 650 MT/jam Tarif Teta = ###
Payload = 2403 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 11 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = Tanjung Perak Biaya = ###
Nm AT+WT+IT = 6 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2403 ton
OD 4 - TUKS Effective T = 5 jam Port of Dis = Pangkalan Susu
Port Time = 11 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = - Biaya = ###
AT+WT+IT = 0 jam Tarif Teta = ###
an Frekuensi Produktivi = 0 MT/jam Tarif Varia = Rp 22
hari Payload = 2403 ton Asumsi Jum= 3
hari Effective T = 0 jam Biaya = ###
shipment/th Port Time = 0 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Tanjung Perak
/tahun Payload = 2403 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
37
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
1351 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
3106 Nm Port Time = 11 jam Harga IFO =
192 jam Port Time = 0 jam IFO =
269 jam Port Time = 0 jam Biaya Fuel =
12 hari = 32 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
66 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2403 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Pangkalan Susu Port Time = 11 jam Port of Loa =
- = hari Tarif Labuh =
1454 Biaya L =
126 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
Pangkalan Susu Produktivi = 600 MT/jam Tarif Teta =
- Payload = 2403 ton Tarif Varia =
0 Nm Effective T = 5 jam Asumsi Jum=
0 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
- Port Time POD 2 Lama Penu =
- POL 2 = Pangkalan Susu Biaya =
0 Nm AT+WT+IT = 7 jam Total Biay =
0 jam Produktivi = 650 MT/jam =
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
- Port Time = 11 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
77 jam Port Time POD 3 Etmal =
POL 3 = - Biaya =
AT+WT+IT = 0 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia =
14 hari Payload = 2403 ton Asumsi Jum=
350 hari Effective T = 0 jam Biaya =
25 shipment/th Port Time = 0 jam Tarif Teta =
60077 ton/th = hari Tarif Varia =
600770 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
60077 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2403 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
- Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
38
RUTE
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 1531 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 11 jam Fuel Oil
= 3106 Nm Port Time = 10 jam Harga IFO
= 203 jam Port Time = 0 jam IFO
= 269 jam Port Time = 0 jam Biaya Fuel
= 12 hari = 32 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese
= 887 Nm AT+WT+IT = 8 jam
= 77 jam Produktivi = 900 MT/jam Total Biay
Payload = 2403 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Balikpapan Port Time = 11 jam Port of Loa
= - = hari Tarif Labuh
= 1454 Biaya L
= 126 Port Time POD 1 Tarif Tamb
POD 1 = Pangkalan Susu Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Balikpapan Produktivi = 650 MT/jam Tarif Teta
= - Payload = 2403 ton Tarif Varia
= 0 Nm Effective T = 4 jam Asumsi Jum
= 0 jam Port Time = 11 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Balikpapan Biaya
= 0 Nm AT+WT+IT = 5 jam Total Biay
= 0 jam Produktivi = 600 MT/jam
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= - Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 66 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 14 hari Payload = 2403 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 25 shipment/th Port Time = 0 jam Tarif Teta
= 60077 ton/th = hari Tarif Varia
= 600770 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 60077 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2403 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
39
RUTE
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1451 Port Time = 11 jam
Seatime Port Time = 11 jam
Jarak Total = 1938 Nm Port Time = 11 jam
Seatime To = 92 jam Port Time = 0 jam
Seatime ro = 169 jam Port Time = 0 jam
= 8 hari = 33 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 11 jam Produktivi = 900 MT/jam
Payload = 2403 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Pangkalan Susu Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 934
Seatime 2 = 81 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Pangkalan Susu Produktivi = 700 MT/jam
POD 3 = - Payload = 2403 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Pangkalan Susu
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 650 MT/jam
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 77 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 10 hari Payload = 2403 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 35 shipment/th Port Time = 0 jam
Cargo Carr = 84108 ton/th = hari
= 841077 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1541 Port Time = 11 jam
Seatime Port Time = 11 jam
Jarak Total = 1938 Nm Port Time = 11 jam
Seatime To = 158 jam Port Time = 0 jam
Seatime ro = 169 jam Port Time = 0 jam
= 8 hari = 33 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Pangkalan Susu Port of Loa = Tanjung Priok
Jarak 1 = 887 Nm AT+WT+IT = 8 jam
Seatime 1 = 77 jam Produktivi = 900 MT/jam
Payload = 2403 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Lampung Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 934
Seatime 2 = 81 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Lampung Produktivi = 650 MT/jam
POD 3 = - Payload = 2403 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 700 MT/jam
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 11 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 10 hari Payload = 2403 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 35 shipment/th Port Time = 0 jam
Cargo Carr = 84108 ton/th = hari
= 841077 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 12341 Port Time = 11
Tanjung Perak Seatime Port Time = 11
Nm Jarak Total = 1908 Nm Port Time = 10
Balikpapan Seatime To = 156 jam Port Time = 11
Nm Seatime ro = 167 jam Port Time = 0
= 7 hari = 43
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Nm Jarak 1 = 438 Nm AT+WT+IT = 8
Seatime 1 = 38 jam Produktivi = 900
Payload = 2403
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = Balikpapan Port Time = 11
POD 2 = Lampung =
Jarak 2 = 481
Seatime 2 = 42 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6
POD 2 = Balikpapan Produktivi = 600
POD 3 = Lampung Payload = 2403
Jarak 3 = 872 Nm Effective T = 5
Seatime 3 = 76 jam Port Time = 11
=
Seatime POD 3 - POD 4
POD 3 = Lampung Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5
Seatime 4 = 0 jam Produktivi = 600
Payload = 2403
Seatime POD 4 - TUKS Effective T = 5
POD 4 = - Port Time = 10
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 11 jam Port Time POD 3
POL 3 = Lampung
AT+WT+IT = 7
Perhitungan Frekuensi Produktivi = 700
Roundtrip = 9 hari Payload = 2403
Commissio = 350 hari Effective T = 4
Frekuensi = 38.88889 shipment/th Port Time = 11
Cargo Carr = 93453 ton/th =
= 934530 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 12431 Port Time =
Tanjung Perak Seatime Port Time =
438 Nm Jarak Total = 2570 Nm Port Time =
Lampung Seatime To = 157 jam Port Time =
495 Nm Seatime ro = 223 jam Port Time =
Balikpapan = 10 hari =
Total Port Time
872 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa =
765 Nm Jarak 1 = 438 Nm AT+WT+IT =
Seatime 1 = 38 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Lampung Port Time =
POD 2 = Balikpapan =
Jarak 2 = 495
Seatime 2 = 43 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Lampung Produktivi =
POD 3 = Balikpapan Payload =
Jarak 3 = 872 Nm Effective T =
Seatime 3 = 76 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = Balikpapan Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 765 Nm
Seatime 5 = 66 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 12 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 29.16667 shipment/th Port Time =
Cargo Carr = 70090 ton/th =
= 700898 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
43
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
44
RUTE
Perhitungan Frekuensi
Roundtrip = 12 hari
Commissio = 350 hari
Frekuensi = 29.16667 shipment/th
Cargo Carr = 70090 ton/th
= 700898 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
45
RUTE
Perhitungan Frekuensi
Roundtrip = 9 hari
Commissio = 350 hari
Frekuensi = 38.88889 shipment/th
Cargo Carr = 93453 ton/th
= 934530 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
46
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 9
Commissio = 350
Frekuensi = 38.88889
Cargo Carr = 93453
= 934530
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
14321 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 11 jam Fuel Oil
Nm Port Time = 10 jam Harga IFO = ###
jam Port Time = 11 jam IFO = 1294.090
jam Port Time = 0 jam Biaya Fuel = ###
hari = 43 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 129.4
Lampung Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2403 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa = Tanjung Priok
Tanjung Perak = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Lampung Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Balikpapan Produktivi = 700 MT/jam Tarif Teta = ###
Tanjung Perak Payload = 2403 ton Tarif Varia = Rp 22
Nm Effective T = 4 jam Asumsi Jum= 3
jam Port Time = 11 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Tanjung Perak Port Time POD 2 Lama Penu = Rp 1
POL 2 = Balikpapan Biaya = ###
Nm AT+WT+IT = 5 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2403 ton
OD 4 - TUKS Effective T = 5 jam Port of Dis = Lampung
Port Time = 10 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Tanjung Perak Biaya = ###
AT+WT+IT = 6 jam Tarif Teta = ###
an Frekuensi Produktivi = 600 MT/jam Tarif Varia = Rp 22
hari Payload = 2403 ton Asumsi Jum= 3
hari Effective T = 5 jam Biaya = ###
shipment/th Port Time = 11 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Balikpapan
/tahun Payload = 2403 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
47
RUTE
jam
/trip
/tahun
Tanjung Perak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
12351 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 11 jam Fuel Oil
3260 Nm Port Time = 10 jam Harga IFO =
206 jam Port Time = 11 jam IFO =
283 jam Port Time = 0 jam Biaya Fuel =
12 hari = 43 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese=
438 Nm AT+WT+IT = 8 jam =
38 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2403 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa =
Pangkalan Susu = hari Tarif Labuh =
481 Biaya L =
42 Port Time POD 1 Tarif Tamb =
POD 1 = Tanjung Perak Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya =
Balikpapan Produktivi = 600 MT/jam Tarif Teta =
Pangkalan Susu Payload = 2403 ton Tarif Varia =
1454 Nm Effective T = 5 jam Asumsi Jum=
126 jam Port Time = 11 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Pangkalan Susu Port Time POD 2 Lama Penu =
- POL 2 = Balikpapan Biaya =
0 Nm AT+WT+IT = 5 jam Total Biay =
0 jam Produktivi = 600 MT/jam =
Payload = 2403 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
- Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
77 jam Port Time POD 3 Etmal =
POL 3 = Pangkalan Susu Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia =
14 hari Payload = 2403 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
25 shipment/th Port Time = 11 jam Tarif Teta =
60077 ton/th = hari Tarif Varia =
600770 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
60077 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2403 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
800,000 Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
48
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
2 jam
###
### /trip
### /tahun
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp -
1 jam
Rp -
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
TIDAK TERPILIH
Perhitungan Sewa
Margin Prof= 15% dari total PV
### /tahun
Time Charter Hire
Cicilan tah = ###
= ### /hari
= ### /bulan
Tarif TCH
= ### /tahun
= ### /masa kontrak
Unit Cost =
PTP - Tanjung Perak ###
PTP - Balikpapan ###
PTP - Lampung ###
PTP - Pangkalan Susu ###
Tunjangan
Jumlah Jabatan Gaji Pokok Sertifikat
Jabatan Berlayar Kesehatan
1 Master/Captain ### Rp 2,600,000 ### ### ###
1 Chief Engineer ### Rp 1,900,000 ### ### ###
1 Second Engineer ### Rp 1,900,000 ### ### ###
1 Chief Officer ### Rp 2,500,000 ### ### ###
1 Second Officer ### Rp 2,500,000 ### ### ###
1 Quarter Master ### Rp 1,000,000 ### ### ###
1 Electrician ### Rp 900,000 ### ### ###
1 Steward ### Rp 500,000 ### ###
1 Oiler ### Rp 1,000,000 ### ### ###
liter/HP.jam 1 Boys ### Rp 500,000 ### ### ###
liter/tahun 2 Cadet ### Rp 500,000 Rp - ### ###
1 Chief Cook ### Rp 500,000 ### ### ###
1 Assistant Cook ### Rp 500,000 ### ### ###
1 Boatswain ### Rp 500,000 ### ### ###
harga kapal 15 Total ### Rp 17,300,000 ### ### ###
Rute
POL
Tunjanga
Bonus POD 1
Voyage n Total Total Gaji
Seniority Jarak POL
### ### ### ### POD 2
### ### ### ### Jarak POD
### Rp - ### ### POD 3
### ### ### ### Jarak POD
### ### ### ### POD 4
### ### ### ### Jarak POD
### - ### ### TUKS
### - ### ### Jarak POD
### ### ### ###
### - ### ###
Rp - - ### ###
### ### ### ###
### ### ### ###
### ### ### ###
### ### ### ###
an Sewa Kapal
4 5 6 7 8 9 10
OWNER CHARTERER
BAREBOAT CHARTER
OWNER
OWNER CHARTERER
CHARTERER
TIME
TIME CHARTER
CHARTER
OWNER
OWNER CHARTERER
CHARTERER
VOYAGE
VOYAGE CHARTER
CHARTER OWNER
OWNER
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 121 Port Time =
Tanjung Perak Seatime Port Time =
438 Nm Jarak Total = 876 Nm Port Time =
- Seatime To = 36 jam Port Time =
0 Nm Seatime ro = 72 jam Port Time =
- = 3 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa =
438 Nm Jarak 1 = 438 Nm AT+WT+IT =
Seatime 1 = 36 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = - Port Time =
POD 2 = - =
Jarak 2 = 0
Seatime 2 = 0 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = - Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 438 Nm
Seatime 5 = 36 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 4 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 87.5 shipment/th Port Time =
Cargo Carr = 160006 ton/th =
= 1600064 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
2
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
3
RUTE
Perhitungan Frekuensi
Roundtrip = 2 hari
Commissio = 350 hari
Frekuensi = 175 shipment/th
Cargo Carr = 320013 ton/th
= 3200127 ton/kontrak
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
4
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 8
Commissio = 350
Frekuensi = 43.75
Cargo Carr = 80003
= 800032
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
151 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 10 jam Fuel Oil
Nm Port Time = 0 jam Harga IFO = ###
jam Port Time = 0 jam IFO = 1069.592
jam Port Time = 0 jam Biaya Fuel = ###
hari = 21 jam =
Total Port Time
= 1 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 107.0
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 1829 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Port Time = 11 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Produktivi = 650 MT/jam Tarif Teta = ###
Payload = 1829 ton Tarif Varia = Rp 22
Nm Effective T = 3 jam Asumsi Jum= 3
jam Port Time = 10 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = 0 Biaya = ###
Nm AT+WT+IT = 0 jam Total Biay = ###
jam Produktivi = 0 MT/jam = ###
Payload = 1829 ton
OD 4 - TUKS Effective T = 0 jam Port of Dis = Pangkalan Susu
Port Time = 0 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = 0 Biaya = ###
AT+WT+IT = 0 jam Tarif Teta = ###
an Frekuensi Produktivi = 0 MT/jam Tarif Varia = Rp 22
hari Payload = 1829 ton Asumsi Jum= 3
hari Effective T = 0 jam Biaya = ###
shipment/th Port Time = 0 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = 0 = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = 0
/tahun Payload = 1829 ton Tarif Labuh = Rp -
/tahun Effective T = 0 jam Biaya L = Rp -
/roundtrip Port Time = 0 jam Tarif Tamb = Rp -
/masa kontrak = hari Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = 0
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = 0
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
5
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
123451 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
3612 Nm Port Time = 9 jam Harga IFO =
223 jam Port Time = 10 jam IFO =
296 jam Port Time = 10 jam Biaya Fuel =
13 hari = 50 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese=
438 Nm AT+WT+IT = 8 jam =
36 jam Produktivi = 900 MT/jam Total Biay =
Payload = 1829 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa =
Lampung = hari Tarif Labuh =
481 Biaya L =
40 Port Time POD 1 Tarif Tamb =
POD 1 = Tanjung Perak Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya =
Balikpapan Produktivi = 600 MT/jam Tarif Teta =
Lampung Payload = 1829 ton Tarif Varia =
872 Nm Effective T = 4 jam Asumsi Jum=
71 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Lampung Port Time POD 2 Lama Penu =
Pangkalan Susu POL 2 = Balikpapan Biaya =
934 Nm AT+WT+IT = 5 jam Total Biay =
76 jam Produktivi = 600 MT/jam =
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
Pangkalan Susu Port Time = 9 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
73 jam Port Time POD 3 Etmal =
POL 3 = Lampung Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia =
16 hari Payload = 1829 ton Asumsi Jum=
350 hari Effective T = 3 jam Biaya =
21.875 shipment/th Port Time = 10 jam Tarif Teta =
40002 ton/th = hari Tarif Varia =
400016 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
40002 POD 4 = Pangkalan Susu =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis =
### /tahun Payload = 1829 ton Tarif Labuh =
### /tahun Effective T = 3 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
600,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
6
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
2 jam
###
### /trip
### /tahun
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp -
1 jam
Rp -
### /trip
### /tahun
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time
Rute = 123541 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 3438 Nm Port Time = 9 jam
Seatime To = 272 jam Port Time = 10 jam
Seatime ro = 282 jam Port Time = 10 jam
= 12 hari = 50 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 36 jam Produktivi = 900 MT/jam
Payload = 1829 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Balikpapan Port Time = 11 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 495
Seatime 2 = 41 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Balikpapan Produktivi = 600 MT/jam
POD 3 = Pangkalan Susu Payload = 1829 ton
Jarak 3 = 1454 Nm Effective T = 4 jam
Seatime 3 = 119 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = Lampung POL 2 = Balikpapan
Jarak 4 = 934 Nm AT+WT+IT = 5 jam
Seatime 4 = 76 jam Produktivi = 600 MT/jam
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = Lampung Port Time = 9 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 10 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 15 hari Payload = 1829 ton
Commissio = 350 hari Effective T = 3 jam
Frekuensi = 23.33333 shipment/th Port Time = 10 jam
Cargo Carr = 42668 ton/th = hari
= 426684 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 18 hari
Commissio = 350 hari
Frekuensi = 19.44444 shipment/th
Cargo Carr = 35557 ton/th
= 355570 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 42668 ton/th
= 426684 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip =
Commissio =
Frekuensi =
Cargo Carr =
=
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
Perhitungan waktu Port Time Voyage Cost
132451 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 9 jam Fuel Oil
3562 Nm Port Time = 10 jam Harga IFO =
220 jam Port Time = 10 jam IFO =
293 jam Port Time = 10 jam Biaya Fuel =
13 hari = 50 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
63 jam Produktivi = 900 MT/jam Total Biay =
Payload = 1829 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Tanjung Perak Port Time = 11 jam Port of Loa =
Lampung = hari Tarif Labuh =
481 Biaya L =
40 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
Tanjung Perak Produktivi = 600 MT/jam Tarif Teta =
Lampung Payload = 1829 ton Tarif Varia =
495 Nm Effective T = 4 jam Asumsi Jum=
41 jam Port Time = 9 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Lampung Port Time POD 2 Lama Penu =
Pangkalan Susu POL 2 = Tanjung Perak Biaya =
934 Nm AT+WT+IT = 6 jam Total Biay =
76 jam Produktivi = 600 MT/jam =
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
Pangkalan Susu Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
73 jam Port Time POD 3 Etmal =
POL 3 = Lampung Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia =
16 hari Payload = 1829 ton Asumsi Jum=
350 hari Effective T = 3 jam Biaya =
21.875 shipment/th Port Time = 10 jam Tarif Teta =
40002 ton/th = hari Tarif Varia =
400016 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
40002 POD 4 = Pangkalan Susu =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis =
### /tahun Payload = 1829 ton Tarif Labuh =
### /tahun Effective T = 3 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
600,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
13
RUTE
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 134521 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 9 jam Fuel Oil
= 4163 Nm Port Time = 10 jam Harga IFO
= 304 jam Port Time = 10 jam IFO
= 340 jam Port Time = 10 jam Biaya Fuel
= 15 hari = 50 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Balikpapan Port of Loa = Tanjung Priok Biaya Diese
= 765 Nm AT+WT+IT = 8 jam
= 63 jam Produktivi = 900 MT/jam Total Biay
Payload = 1829 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Lampung Port Time = 11 jam Port of Loa
= Pangkalan Susu = hari Tarif Labuh
= 872 Biaya L
= 71 Port Time POD 1 Tarif Tamb
POD 1 = Balikpapan Etmal
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya
= Lampung Produktivi = 600 MT/jam Tarif Teta
= Pangkalan Susu Payload = 1829 ton Tarif Varia
= 934 Nm Effective T = 4 jam Asumsi Jum
= 76 jam Port Time = 9 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Pangkalan Susu Port Time POD 2 Lama Penu
= Tanjung Perak POL 2 = Lampung Biaya
= 1154 Nm AT+WT+IT = 7 jam Total Biay
= 94 jam Produktivi = 700 MT/jam
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 3 jam Port of Dis
= Tanjung Perak Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 438 Nm Tarif Tamb
= 36 jam Port Time POD 3 Etmal
POL 3 = Pangkalan Susu Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia
= 18 hari Payload = 1829 ton Asumsi Jum
= 350 hari Effective T = 3 jam Biaya
= 19.44444 shipment/th Port Time = 10 jam Tarif Teta
= 35557 ton/th = hari Tarif Varia
= 355570 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 35557 POD 4 = Tanjung Perak
= ### AT+WT+IT = 6 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis
### /tahun Payload = 1829 ton Tarif Labuh
= ### /tahun Effective T = 4 jam Biaya L
### /roundtrip Port Time = 10 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 600,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
14
RUTE
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 134251 Port Time = 11 jam
Seatime Port Time = 9 jam
Jarak Total = 4173 Nm Port Time = 10 jam
Seatime To = 269 jam Port Time = 10 jam
Seatime ro = 342 jam Port Time = 10 jam
= 15 hari = 50 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 63 jam Produktivi = 900 MT/jam
Payload = 1829 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Lampung Port Time = 11 jam
POD 2 = Tanjung Perak = hari
Jarak 2 = 872
Seatime 2 = 71 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Lampung Produktivi = 600 MT/jam
POD 3 = Tanjung Perak Payload = 1829 ton
Jarak 3 = 495 Nm Effective T = 4 jam
Seatime 3 = 41 jam Port Time = 9 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = Pangkalan Susu POL 2 = Lampung
Jarak 4 = 1154 Nm AT+WT+IT = 7 jam
Seatime 4 = 94 jam Produktivi = 700 MT/jam
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 3 jam
POD 4 = Pangkalan Susu Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 73 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 18 hari Payload = 1829 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 19.44444 shipment/th Port Time = 10 jam
Cargo Carr = 35557 ton/th = hari
= 355570 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 42668 ton/th
= 426684 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 17
Commissio = 350
Frekuensi = 20.58824
Cargo Carr = 37649
= 376486
jam
/trip
/tahun
Pangkalan Susu
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Balikpapan
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
143251 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
3511 Nm Port Time = 9 jam Harga IFO =
215 jam Port Time = 10 jam IFO =
288 jam Port Time = 10 jam Biaya Fuel =
12 hari = 50 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Lampung Port of Loa = Tanjung Priok Biaya Diese=
117 Nm AT+WT+IT = 8 jam =
10 jam Produktivi = 900 MT/jam Total Biay =
Payload = 1829 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa =
Tanjung Perak = hari Tarif Labuh =
872 Biaya L =
71 Port Time POD 1 Tarif Tamb =
POD 1 = Lampung Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Balikpapan Produktivi = 700 MT/jam Tarif Teta =
Tanjung Perak Payload = 1829 ton Tarif Varia =
481 Nm Effective T = 3 jam Asumsi Jum=
40 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Tanjung Perak Port Time POD 2 Lama Penu =
Pangkalan Susu POL 2 = Balikpapan Biaya =
1154 Nm AT+WT+IT = 5 jam Total Biay =
94 jam Produktivi = 600 MT/jam =
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
Pangkalan Susu Port Time = 9 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
73 jam Port Time POD 3 Etmal =
POL 3 = Tanjung Perak Biaya =
AT+WT+IT = 6 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
15 hari Payload = 1829 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
23.33333 shipment/th Port Time = 10 jam Tarif Teta =
42668 ton/th = hari Tarif Varia =
426684 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
42668 POD 4 = Pangkalan Susu =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis =
### /tahun Payload = 1829 ton Tarif Labuh =
### /tahun Effective T = 3 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
800,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
20
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 143521 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 4035 Nm Port Time = 9 jam Harga IFO
= 294 jam Port Time = 10 jam IFO
= 330 jam Port Time = 10 jam Biaya Fuel
= 14 hari = 50 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Lampung Port of Loa = Tanjung Priok Biaya Diese
= 117 Nm AT+WT+IT = 8 jam
= 10 jam Produktivi = 900 MT/jam Total Biay
Payload = 1829 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Balikpapan Port Time = 11 jam Port of Loa
= Pangkalan Susu = hari Tarif Labuh
= 872 Biaya L
= 71 Port Time POD 1 Tarif Tamb
POD 1 = Lampung Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Balikpapan Produktivi = 700 MT/jam Tarif Teta
= Pangkalan Susu Payload = 1829 ton Tarif Varia
= 1454 Nm Effective T = 3 jam Asumsi Jum
= 119 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Pangkalan Susu Port Time POD 2 Lama Penu
= Tanjung Perak POL 2 = Balikpapan Biaya
= 1154 Nm AT+WT+IT = 5 jam Total Biay
= 94 jam Produktivi = 600 MT/jam
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= Tanjung Perak Port Time = 9 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 438 Nm Tarif Tamb
= 36 jam Port Time POD 3 Etmal
POL 3 = Pangkalan Susu Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia
= 17 hari Payload = 1829 ton Asumsi Jum
= 350 hari Effective T = 3 jam Biaya
= 20.58824 shipment/th Port Time = 10 jam Tarif Teta
= 37649 ton/th = hari Tarif Varia
= 376486 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 37649 POD 4 = Tanjung Perak
= ### AT+WT+IT = 6 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis
### /tahun Payload = 1829 ton Tarif Labuh
= ### /tahun Effective T = 4 jam Biaya L
### /roundtrip Port Time = 10 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
21
RUTE
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 145231 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 3451 Nm Port Time = 10 jam
Seatime To = 220 jam Port Time = 10 jam
Seatime ro = 283 jam Port Time = 9 jam
= 12 hari = 50 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 10 jam Produktivi = 900 MT/jam
Payload = 1829 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Pangkalan Susu Port Time = 11 jam
POD 2 = Tanjung Perak = hari
Jarak 2 = 934
Seatime 2 = 76 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Pangkalan Susu Produktivi = 700 MT/jam
POD 3 = Tanjung Perak Payload = 1829 ton
Jarak 3 = 1154 Nm Effective T = 3 jam
Seatime 3 = 94 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = Balikpapan POL 2 = Pangkalan Susu
Jarak 4 = 481 Nm AT+WT+IT = 7 jam
Seatime 4 = 40 jam Produktivi = 650 MT/jam
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 3 jam
POD 4 = Balikpapan Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 765 Nm
Seatime 5 = 63 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 15 hari Payload = 1829 ton
Commissio = 350 hari Effective T = 4 jam
Frekuensi = 23.33333 shipment/th Port Time = 10 jam
Cargo Carr = 42668 ton/th = hari
= 426684 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 42668 ton/th
= 426684 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 42668 ton/th
= 426684 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 16
Commissio = 350
Frekuensi = 21.875
Cargo Carr = 40002
= 400016
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
154321 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 10 jam Fuel Oil
Nm Port Time = 10 jam Harga IFO = ###
jam Port Time = 9 jam IFO = 2177.772
jam Port Time = 10 jam Biaya Fuel = ###
hari = 50 jam =
Total Port Time
= 3 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 217.8
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 1829 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Port Time = 11 jam Port of Loa = Tanjung Priok
Balikpapan = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Produktivi = 650 MT/jam Tarif Teta = ###
Balikpapan Payload = 1829 ton Tarif Varia = Rp 22
Nm Effective T = 3 jam Asumsi Jum= 3
jam Port Time = 10 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Balikpapan Port Time POD 2 Lama Penu = Rp 1
Tanjung Perak POL 2 = Lampung Biaya = ###
Nm AT+WT+IT = 7 jam Total Biay = ###
jam Produktivi = 700 MT/jam = ###
Payload = 1829 ton
OD 4 - TUKS Effective T = 3 jam Port of Dis = Pangkalan Susu
Tanjung Perak Port Time = 10 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Balikpapan Biaya = ###
AT+WT+IT = 5 jam Tarif Teta = ###
an Frekuensi Produktivi = 600 MT/jam Tarif Varia = Rp 22
hari Payload = 1829 ton Asumsi Jum= 3
hari Effective T = 4 jam Biaya = ###
shipment/th Port Time = 9 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = Tanjung Perak = ###
AT+WT+IT = 6 jam
/roundtrip Produktivi = 600 MT/jam Port of Dis = Lampung
/tahun Payload = 1829 ton Tarif Labuh = Rp 73
/tahun Effective T = 4 jam Biaya L = ###
/roundtrip Port Time = 10 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
jam
/trip
/tahun
Balikpapan
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Tanjung Perak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
154231 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
3562 Nm Port Time = 10 jam Harga IFO =
230 jam Port Time = 10 jam IFO =
293 jam Port Time = 9 jam Biaya Fuel =
13 hari = 50 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese=
887 Nm AT+WT+IT = 8 jam =
73 jam Produktivi = 900 MT/jam Total Biay =
Payload = 1829 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Lampung Port Time = 11 jam Port of Loa =
Tanjung Perak = hari Tarif Labuh =
934 Biaya L =
76 Port Time POD 1 Tarif Tamb =
POD 1 = Pangkalan Susu Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Lampung Produktivi = 650 MT/jam Tarif Teta =
Tanjung Perak Payload = 1829 ton Tarif Varia =
495 Nm Effective T = 3 jam Asumsi Jum=
41 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Tanjung Perak Port Time POD 2 Lama Penu =
Balikpapan POL 2 = Lampung Biaya =
481 Nm AT+WT+IT = 7 jam Total Biay =
40 jam Produktivi = 700 MT/jam =
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 3 jam Port of Dis =
Balikpapan Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
765 Nm Tarif Tamb =
63 jam Port Time POD 3 Etmal =
POL 3 = Tanjung Perak Biaya =
AT+WT+IT = 6 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
16 hari Payload = 1829 ton Asumsi Jum=
350 hari Effective T = 4 jam Biaya =
21.875 shipment/th Port Time = 10 jam Tarif Teta =
40002 ton/th = hari Tarif Varia =
400016 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
40002 POD 4 = Balikpapan =
### AT+WT+IT = 5 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis =
### /tahun Payload = 1829 ton Tarif Labuh =
### /tahun Effective T = 4 jam Biaya L =
### /roundtrip Port Time = 9 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
600,000 Tarif Teta =
800,000 Tarif Varia =
700,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
29
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 1231 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 1684 Nm Port Time = 9 jam Harga IFO
= 76 jam Port Time = 0 jam IFO
= 139 jam Port Time = 0 jam Biaya Fuel
= 6 hari = 30 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese
= 438 Nm AT+WT+IT = 8 jam
= 36 jam Produktivi = 900 MT/jam Total Biay
Payload = 1829 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Balikpapan Port Time = 11 jam Port of Loa
= - = hari Tarif Labuh
= 481 Biaya L
= 40 Port Time POD 1 Tarif Tamb
POD 1 = Tanjung Perak Etmal
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya
= Balikpapan Produktivi = 600 MT/jam Tarif Teta
= - Payload = 1829 ton Tarif Varia
= 0 Nm Effective T = 4 jam Asumsi Jum
= 0 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Balikpapan Biaya
= 0 Nm AT+WT+IT = 5 jam Total Biay
= 0 jam Produktivi = 600 MT/jam
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= - Port Time = 9 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 63 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 8 hari Payload = 1829 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 43.75 shipment/th Port Time = 0 jam Tarif Teta
= 80003 ton/th = hari Tarif Varia
= 800032 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 80003 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 1829 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
30
RUTE
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1321 Port Time = 11 jam
Seatime Port Time = 9 jam
Jarak Total = 1684 Nm Port Time = 10 jam
Seatime To = 103 jam Port Time = 0 jam
Seatime ro = 139 jam Port Time = 0 jam
= 6 hari = 30 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 63 jam Produktivi = 900 MT/jam
Payload = 1829 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Tanjung Perak Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 481
Seatime 2 = 40 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Tanjung Perak Produktivi = 600 MT/jam
POD 3 = - Payload = 1829 ton
Jarak 3 = 0 Nm Effective T = 4 jam
Seatime 3 = 0 jam Port Time = 9 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Tanjung Perak
Jarak 4 = 0 Nm AT+WT+IT = 6 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 4 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 36 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 8 hari Payload = 1829 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 43.75 shipment/th Port Time = 0 jam
Cargo Carr = 80003 ton/th = hari
= 800032 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1241 Port Time = 11
Tanjung Perak Seatime Port Time = 10
Nm Jarak Total = 1050 Nm Port Time = 10
Seatime To = 77 jam Port Time = 0
Nm Seatime ro = 87 jam Port Time = 0
= 4 hari = 31
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Nm Jarak 1 = 438 Nm AT+WT+IT = 8
Seatime 1 = 36 jam Produktivi = 900
Payload = 1829
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = Lampung Port Time = 11
POD 2 = - =
Jarak 2 = 495
Seatime 2 = 41 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6
POD 2 = Lampung Produktivi = 600
POD 3 = - Payload = 1829
Jarak 3 = 0 Nm Effective T = 4
Seatime 3 = 0 jam Port Time = 10
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7
Seatime 4 = 0 jam Produktivi = 700
Payload = 1829
Seatime POD 4 - TUKS Effective T = 3
POD 4 = - Port Time = 10
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 10 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0
Perhitungan Frekuensi Produktivi = 0
Roundtrip = 6 hari Payload = 1829
Commissio = 350 hari Effective T = 0
Frekuensi = 58.33333 shipment/th Port Time = 0
Cargo Carr = 106671 ton/th =
= 1066709 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1421 Port Time =
Lampung Seatime Port Time =
117 Nm Jarak Total = 1050 Nm Port Time =
Tanjung Perak Seatime To = 51 jam Port Time =
495 Nm Seatime ro = 87 jam Port Time =
- = 4 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Lampung Port of Loa =
438 Nm Jarak 1 = 117 Nm AT+WT+IT =
Seatime 1 = 10 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Tanjung Perak Port Time =
POD 2 = - =
Jarak 2 = 495
Seatime 2 = 41 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Tanjung Perak Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 438 Nm
Seatime 5 = 36 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 6 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 58.33333 shipment/th Port Time =
Cargo Carr = 106671 ton/th =
= 1066709 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
33
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
34
RUTE
Perhitungan Frekuensi
Roundtrip = 8 hari
Commissio = 350 hari
Frekuensi = 43.75 shipment/th
Cargo Carr = 80003 ton/th
= 800032 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
35
RUTE
Perhitungan Frekuensi
Roundtrip = 11 hari
Commissio = 350 hari
Frekuensi = 31.81818 shipment/th
Cargo Carr = 58184 ton/th
= 581841 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
36
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 11
Commissio = 350
Frekuensi = 31.81818
Cargo Carr = 58184
= 581841
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
1521 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 10 jam Fuel Oil
Nm Port Time = 10 jam Harga IFO = ###
jam Port Time = 0 jam IFO = 1494.656
jam Port Time = 0 jam Biaya Fuel = ###
hari = 31 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 149.5
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 1829 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Tanjung Perak Port Time = 11 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Tanjung Perak Produktivi = 650 MT/jam Tarif Teta = ###
Payload = 1829 ton Tarif Varia = Rp 22
Nm Effective T = 3 jam Asumsi Jum= 3
jam Port Time = 10 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = Tanjung Perak Biaya = ###
Nm AT+WT+IT = 6 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 1829 ton
OD 4 - TUKS Effective T = 4 jam Port of Dis = Pangkalan Susu
Port Time = 10 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = - Biaya = ###
AT+WT+IT = 0 jam Tarif Teta = ###
an Frekuensi Produktivi = 0 MT/jam Tarif Varia = Rp 22
hari Payload = 1829 ton Asumsi Jum= 3
hari Effective T = 0 jam Biaya = ###
shipment/th Port Time = 0 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Tanjung Perak
/tahun Payload = 1829 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
37
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
1351 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 9 jam Fuel Oil
3106 Nm Port Time = 10 jam Harga IFO =
182 jam Port Time = 0 jam IFO =
255 jam Port Time = 0 jam Biaya Fuel =
11 hari = 30 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
63 jam Produktivi = 900 MT/jam Total Biay =
Payload = 1829 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Pangkalan Susu Port Time = 11 jam Port of Loa =
- = hari Tarif Labuh =
1454 Biaya L =
119 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
Pangkalan Susu Produktivi = 600 MT/jam Tarif Teta =
- Payload = 1829 ton Tarif Varia =
0 Nm Effective T = 4 jam Asumsi Jum=
0 jam Port Time = 9 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
- Port Time POD 2 Lama Penu =
- POL 2 = Pangkalan Susu Biaya =
0 Nm AT+WT+IT = 7 jam Total Biay =
0 jam Produktivi = 650 MT/jam =
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 3 jam Port of Dis =
- Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
73 jam Port Time POD 3 Etmal =
POL 3 = - Biaya =
AT+WT+IT = 0 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia =
13 hari Payload = 1829 ton Asumsi Jum=
350 hari Effective T = 0 jam Biaya =
26.92308 shipment/th Port Time = 0 jam Tarif Teta =
49233 ton/th = hari Tarif Varia =
492327 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
49233 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 1829 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
- Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
38
RUTE
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 1531 Port Time = 11 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 3106 Nm Port Time = 9 jam Harga IFO
= 192 jam Port Time = 0 jam IFO
= 255 jam Port Time = 0 jam Biaya Fuel
= 11 hari = 30 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese
= 887 Nm AT+WT+IT = 8 jam
= 73 jam Produktivi = 900 MT/jam Total Biay
Payload = 1829 ton
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
= Balikpapan Port Time = 11 jam Port of Loa
= - = hari Tarif Labuh
= 1454 Biaya L
= 119 Port Time POD 1 Tarif Tamb
POD 1 = Pangkalan Susu Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Balikpapan Produktivi = 650 MT/jam Tarif Teta
= - Payload = 1829 ton Tarif Varia
= 0 Nm Effective T = 3 jam Asumsi Jum
= 0 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Balikpapan Biaya
= 0 Nm AT+WT+IT = 5 jam Total Biay
= 0 jam Produktivi = 600 MT/jam
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis
= - Port Time = 9 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 63 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 13 hari Payload = 1829 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 26.92308 shipment/th Port Time = 0 jam Tarif Teta
= 49233 ton/th = hari Tarif Varia
= 492327 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 49233 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 1829 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
39
RUTE
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1451 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 1938 Nm Port Time = 10 jam
Seatime To = 86 jam Port Time = 0 jam
Seatime ro = 159 jam Port Time = 0 jam
= 7 hari = 31 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 10 jam Produktivi = 900 MT/jam
Payload = 1829 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Pangkalan Susu Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 934
Seatime 2 = 76 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Pangkalan Susu Produktivi = 700 MT/jam
POD 3 = - Payload = 1829 ton
Jarak 3 = 0 Nm Effective T = 3 jam
Seatime 3 = 0 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Pangkalan Susu
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 650 MT/jam
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 3 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 73 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 9 hari Payload = 1829 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 38.88889 shipment/th Port Time = 0 jam
Cargo Carr = 71114 ton/th = hari
= 711139 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1541 Port Time = 11 jam
Seatime Port Time = 10 jam
Jarak Total = 1938 Nm Port Time = 10 jam
Seatime To = 149 jam Port Time = 0 jam
Seatime ro = 159 jam Port Time = 0 jam
= 7 hari = 31 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Pangkalan Susu Port of Loa = Tanjung Priok
Jarak 1 = 887 Nm AT+WT+IT = 8 jam
Seatime 1 = 73 jam Produktivi = 900 MT/jam
Payload = 1829 ton
Seatime POD 1 - POD 2 Effective T = 3 jam
POD 1 = Lampung Port Time = 11 jam
POD 2 = - = hari
Jarak 2 = 934
Seatime 2 = 76 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Lampung Produktivi = 650 MT/jam
POD 3 = - Payload = 1829 ton
Jarak 3 = 0 Nm Effective T = 3 jam
Seatime 3 = 0 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 700 MT/jam
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 3 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 10 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 9 hari Payload = 1829 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 38.88889 shipment/th Port Time = 0 jam
Cargo Carr = 71114 ton/th = hari
= 711139 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 12341 Port Time = 11
Tanjung Perak Seatime Port Time = 10
Nm Jarak Total = 1908 Nm Port Time = 9
Balikpapan Seatime To = 147 jam Port Time = 10
Nm Seatime ro = 157 jam Port Time = 0
= 7 hari = 40
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Nm Jarak 1 = 438 Nm AT+WT+IT = 8
Seatime 1 = 36 jam Produktivi = 900
Payload = 1829
Seatime POD 1 - POD 2 Effective T = 3
POD 1 = Balikpapan Port Time = 11
POD 2 = Lampung =
Jarak 2 = 481
Seatime 2 = 40 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6
POD 2 = Balikpapan Produktivi = 600
POD 3 = Lampung Payload = 1829
Jarak 3 = 872 Nm Effective T = 4
Seatime 3 = 71 jam Port Time = 10
=
Seatime POD 3 - POD 4
POD 3 = Lampung Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5
Seatime 4 = 0 jam Produktivi = 600
Payload = 1829
Seatime POD 4 - TUKS Effective T = 4
POD 4 = - Port Time = 9
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 10 jam Port Time POD 3
POL 3 = Lampung
AT+WT+IT = 7
Perhitungan Frekuensi Produktivi = 700
Roundtrip = 9 hari Payload = 1829
Commissio = 350 hari Effective T = 3
Frekuensi = 38.88889 shipment/th Port Time = 10
Cargo Carr = 71114 ton/th =
= 711139 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 12431 Port Time =
Tanjung Perak Seatime Port Time =
438 Nm Jarak Total = 2570 Nm Port Time =
Lampung Seatime To = 148 jam Port Time =
495 Nm Seatime ro = 211 jam Port Time =
Balikpapan = 9 hari =
Total Port Time
872 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa =
765 Nm Jarak 1 = 438 Nm AT+WT+IT =
Seatime 1 = 36 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Lampung Port Time =
POD 2 = Balikpapan =
Jarak 2 = 495
Seatime 2 = 41 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Lampung Produktivi =
POD 3 = Balikpapan Payload =
Jarak 3 = 872 Nm Effective T =
Seatime 3 = 71 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = Balikpapan Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 765 Nm
Seatime 5 = 63 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 11 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 31.81818 shipment/th Port Time =
Cargo Carr = 58184 ton/th =
= 581841 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
43
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
44
RUTE
Perhitungan Frekuensi
Roundtrip = 11 hari
Commissio = 350 hari
Frekuensi = 31.81818 shipment/th
Cargo Carr = 58184 ton/th
= 581841 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
45
RUTE
Perhitungan Frekuensi
Roundtrip = 9 hari
Commissio = 350 hari
Frekuensi = 38.88889 shipment/th
Cargo Carr = 71114 ton/th
= 711139 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
46
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 9
Commissio = 350
Frekuensi = 38.88889
Cargo Carr = 71114
= 711139
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
14321 Port Time = 11 jam Biaya Bahan Bakar
time Port Time = 10 jam Fuel Oil
Nm Port Time = 9 jam Harga IFO = ###
jam Port Time = 10 jam IFO = 1150.384
jam Port Time = 0 jam Biaya Fuel = ###
hari = 40 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 115.0
Lampung Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 1829 ton = ###
OD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa = Tanjung Priok
Tanjung Perak = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Lampung Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Balikpapan Produktivi = 700 MT/jam Tarif Teta = ###
Tanjung Perak Payload = 1829 ton Tarif Varia = Rp 22
Nm Effective T = 3 jam Asumsi Jum= 3
jam Port Time = 10 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Tanjung Perak Port Time POD 2 Lama Penu = Rp 1
POL 2 = Balikpapan Biaya = ###
Nm AT+WT+IT = 5 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 1829 ton
OD 4 - TUKS Effective T = 4 jam Port of Dis = Lampung
Port Time = 9 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Tanjung Perak Biaya = ###
AT+WT+IT = 6 jam Tarif Teta = ###
an Frekuensi Produktivi = 600 MT/jam Tarif Varia = Rp 22
hari Payload = 1829 ton Asumsi Jum= 3
hari Effective T = 4 jam Biaya = ###
shipment/th Port Time = 10 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Balikpapan
/tahun Payload = 1829 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
47
RUTE
jam
/trip
/tahun
Tanjung Perak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
12351 Port Time = 11 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
3260 Nm Port Time = 9 jam Harga IFO =
195 jam Port Time = 10 jam IFO =
268 jam Port Time = 0 jam Biaya Fuel =
12 hari = 40 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese=
438 Nm AT+WT+IT = 8 jam =
36 jam Produktivi = 900 MT/jam Total Biay =
Payload = 1829 ton =
Seatime POD 1 - POD 2 Effective T = 3 jam Biaya Pelabuhan
Balikpapan Port Time = 11 jam Port of Loa =
Pangkalan Susu = hari Tarif Labuh =
481 Biaya L =
40 Port Time POD 1 Tarif Tamb =
POD 1 = Tanjung Perak Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya =
Balikpapan Produktivi = 600 MT/jam Tarif Teta =
Pangkalan Susu Payload = 1829 ton Tarif Varia =
1454 Nm Effective T = 4 jam Asumsi Jum=
119 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Pangkalan Susu Port Time POD 2 Lama Penu =
- POL 2 = Balikpapan Biaya =
0 Nm AT+WT+IT = 5 jam Total Biay =
0 jam Produktivi = 600 MT/jam =
Payload = 1829 ton
Seatime POD 4 - TUKS Effective T = 4 jam Port of Dis =
- Port Time = 9 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
73 jam Port Time POD 3 Etmal =
POL 3 = Pangkalan Susu Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia =
14 hari Payload = 1829 ton Asumsi Jum=
350 hari Effective T = 3 jam Biaya =
25 shipment/th Port Time = 10 jam Tarif Teta =
45716 ton/th = hari Tarif Varia =
457161 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
45716 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 1829 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
800,000 Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
48
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
2 jam
###
### /trip
### /tahun
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp -
1 jam
Rp -
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
TIDAK TERPILIH
Perhitungan Sewa
Margin Prof= 15% dari total PV
Rp5,674,819,344 /tahun
Time Charter Hire
Cicilan tah = Rp61,231,461,844
= Rp174,947,034 /hari
= Rp5,102,621,820 /bulan
Tarif TCH
= Rp61,231,461,844 /tahun
= Rp612,314,618,437 /masa kontrak
Unit Cost =
PTP - Tanjung Perak Rp 30,616
PTP - Balikpapan Rp 87,474
PTP - Lampung Rp 102,052
PTP - Pangkalan Susu Rp 76,539
Operating Cost
Jumlah Jabatan Gaji Pokok Sertifikat
15 orang
13 kali 1 Master/Captain ### Rp 2,600,000
Rp 140,110,000 /bulan 1 Chief Engineer ### Rp 1,900,000
Rp 1,821,430,000 /tahun 1 Second Engineer ### Rp 1,900,000
Kebutuhan Perbekalan 1 Chief Officer ### Rp 2,500,000
15 orang 1 Second Officer ### Rp 2,500,000
Rp 50,000 /hari 1 Quarter Master ### Rp 1,000,000
Rp 262,500,000 /tahun 1 Electrician ### Rp 900,000
Kebutuhan Minyak Pelumas 1 Steward ### Rp 500,000
1 Oiler ### Rp 1,000,000
0.00015 liter/HP.jam 1 Boys ### Rp 500,000
180986 liter/tahun 2 Cadet ### Rp 500,000
Rp 35,000 /liter 1 Chief Cook ### Rp 500,000
Rp 6,334,524,000 /tahun 1 Assistant Cook ### Rp 500,000
Rp 6,334,524,000 /tahun 1 Boatswain ### Rp 500,000
Rp 6,334,524,000 harga kapal 15 Total ### Rp 17,300,000
Rp 6,334,524,000 /tahun
Rp 6,334,524,000 /masa sewa
Rp 6,334,524,000 harga kapal Umur 2010 0
Rp 6,334,524,000 /tahun Sisa 10 Kenaikan Biaya
Rp 6,334,524,000 /masa sewa masa sewa 10 Gaji Kru Rp1,821,430,000
Rp 6,334,524,000 harga kapal kenaikan 2% Perbekalan Rp262,500,000
Rp 6,334,524,000 /tahun 3% Minyak Pe Rp6,334,524,000
Rp 6,334,524,000 /masa sewa 5% Reparasi d Rp6,334,524,000
Rp 6,334,524,000 /tahun periode 2 Asuransi Rp6,334,524,000
Rp 6,334,524,000 /masa sewa 5 Biaya umu Rp6,334,524,000
rate 5% Total FV Rp27,422,026,000
NPV Rp292,129,671,619
Anuitas Op Rp37,832,128,958
Perhitungan Biaya
WACC Rp 136,863,995,322
CC Rp17,724,513,542.19
OC Rp37,832,128,958
Total Rp55,556,642,500 /tahun
Tunjangan Tunjanga
Bonus
Voyage n Total Total Gaji
Jabatan Berlayar Kesehatan Seniority
### ### Rp 1,500,000 ### ### ### ###
### ### Rp 1,500,000 ### ### ### ###
### ### Rp 1,500,000 ### Rp - ### ###
### ### Rp 1,500,000 ### ### ### ###
### ### Rp 1,500,000 ### ### ### ###
### ### Rp 500,000 ### ### ### ###
### ### Rp 400,000 ### - ### ###
### Rp 300,000 ### - ### ###
### ### Rp 500,000 ### ### ### ###
### ### Rp 400,000 ### - ### ###
Rp - ### Rp 400,000 Rp - - ### ###
### ### Rp 400,000 ### ### ### ###
### ### Rp 400,000 ### ### ### ###
### ### Rp 400,000 ### ### ### ###
### ### Rp 11,200,000 ### ### ### ###
OWNER
OWNER CHARTERER
CHARTERER
TIME
TIME CHARTER
CHARTER
OWNER
OWNER CHARTERER
CHARTERER
VOYAGE
VOYAGE CHARTER
CHARTER OWNER
OWNER
1
RUTE
Perhitungan Frekuensi
Roundtrip days =
Commission Days =
Frekuensi =
Cargo Carried =
=
Tarif VCH =
=
Demand POD 1
Demand POD 2
Demand POD 3
Demand POD 4
Total Demand
Unit Cost Skema VCH =
Perhitungan waktu Port Time
121 Port Time = 12 jam
Seatime Port Time = 11 jam
876 Nm Port Time = 0 jam
30 jam Port Time = 0 jam
60 jam Port Time = 0 jam
3 hari = 23 jam
Total Port Time
= 1 hari
Seatime POL - POD 1
Tanjung Priok Port Time POL
Tanjung Perak Port of Loa = Tanjung Priok
438 Nm AT+WT+IT = 8 jam
30 jam Produktivi = 900 MT/jam
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
- Port Time = 12 jam
- = hari
0
0 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
- Produktivi = 600 MT/jam
- Payload = 2914 ton
0 Nm Effective T = 5 jam
0 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
- Port Time POD 2
- POL 2 = -
0 Nm AT+WT+IT = 0 jam
0 jam Produktivi = 0 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 0 jam
- Port Time = 0 jam
Tanjung Priok = hari
438 Nm
30 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
4 hari Payload = 2914 ton
350 hari Effective T = 0 jam
87.5 shipment/th Port Time = 0 jam
254981 ton/th = hari
2549815 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = Rp 19,781,034 /roundtrip
= Rp 1,730,840,507 /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 131 Port Time =
Balikpapan Seatime Port Time =
Nm Jarak Total = 1530 Nm Port Time =
Seatime To = 51 jam Port Time =
Nm Seatime ro = 102 jam Port Time =
= 5 hari =
Total Port Time
Nm =
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Balikpapan Port of Loa =
Nm Jarak 1 = 765 Nm AT+WT+IT =
Seatime 1 = 51 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = 0 Port Time =
POD 2 = 0 =
Jarak 2 = 0
Seatime 2 = 0 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = 0 Produktivi =
POD 3 = 0 Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = 0 Port Time POD 2
POD 4 = 0 POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = 0 Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 765 Nm
Seatime 5 = 51 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 6 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 58.3333333333333 shipment/th Port Time =
Cargo Carr = 169988 ton/th =
= 1699877 ton/kontrak
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = Rp 20,339,034 /roundtrip
= Rp 1,186,443,671 /tahun
3
RUTE
Perhitungan Frekuensi
Roundtrip = 2 hari
Commissio = 350 hari
Frekuensi = 175 shipment/th
Cargo Carr = 509963 ton/th
= 5099630 ton/kontrak
Port of Dis = 0
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = 0
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = Rp 186,000
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = Rp 19,781,034
= Rp 3,461,681,013
4
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
151 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 12 jam Fuel Oil
1774 Nm Port Time = 0 jam Harga IFO =
60 jam Port Time = 0 jam IFO =
120 jam Port Time = 0 jam Biaya Fuel =
5 hari = 24 jam =
Total Port Time
= 1 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese=
887 Nm AT+WT+IT = 8 jam =
60 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2914 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
0 Port Time = 12 jam Port of Loa =
0 = hari Tarif Labuh =
0 Biaya L =
0 Port Time POD 1 Tarif Tamb =
POD 1 = Pangkalan Susu Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
0 Produktivi = 650 MT/jam Tarif Teta =
0 Payload = 2914 ton Tarif Varia =
0 Nm Effective T = 5 jam Asumsi Jum=
0 jam Port Time = 12 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
0 Port Time POD 2 Lama Penu =
0 POL 2 = 0 Biaya =
0 Nm AT+WT+IT = 0 jam Total Biay =
0 jam Produktivi = 0 MT/jam =
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 0 jam Port of Dis =
0 Port Time = 0 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
60 jam Port Time POD 3 Etmal =
POL 3 = 0 Biaya =
AT+WT+IT = 0 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia =
6 hari Payload = 2914 ton Asumsi Jum=
350 hari Effective T = 0 jam Biaya =
58.33333 shipment/th Port Time = 0 jam Tarif Teta =
169988 ton/th = hari Tarif Varia =
1699877 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
169988 POD 4 = 0 =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2914 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
- Tarif Teta =
- Tarif Varia =
- Asumsi Jum=
800,000 Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
5
RUTE
0
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
0
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 123451 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 11 jam Fuel Oil
= 3612 Nm Port Time = 10 jam Harga IFO
= 185 jam Port Time = 12 jam IFO
= 245 jam Port Time = 12 jam Biaya Fuel
= 11 hari = 57 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese
= 438 Nm AT+WT+IT = 8 jam
= 30 jam Produktivi = 900 MT/jam Total Biay
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Balikpapan Port Time = 12 jam Port of Loa
= Lampung = hari Tarif Labuh
= 481 Biaya L
= 33 Port Time POD 1 Tarif Tamb
POD 1 = Tanjung Perak Etmal
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya
= Balikpapan Produktivi = 600 MT/jam Tarif Teta
= Lampung Payload = 2914 ton Tarif Varia
= 872 Nm Effective T = 5 jam Asumsi Jum
= 59 jam Port Time = 11 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Lampung Port Time POD 2 Lama Penu
= Pangkalan Susu POL 2 = Balikpapan Biaya
= 934 Nm AT+WT+IT = 5 jam Total Biay
= 63 jam Produktivi = 600 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= Pangkalan Susu Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 887 Nm Tarif Tamb
= 60 jam Port Time POD 3 Etmal
POL 3 = Lampung Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia
= 14 hari Payload = 2914 ton Asumsi Jum
= 350 hari Effective T = 5 jam Biaya
= 25 shipment/th Port Time = 12 jam Tarif Teta
= 72852 ton/th = hari Tarif Varia
= 728519 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 72852 POD 4 = Pangkalan Susu
= ### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis
### /tahun Payload = 2914 ton Tarif Labuh
= ### /tahun Effective T = 5 jam Biaya L
### /roundtrip Port Time = 12 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 600,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
6
RUTE
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 123541 Port Time = 12 jam
Seatime Port Time = 11 jam
Jarak Total = 3438 Nm Port Time = 10 jam
Seatime To = 223 jam Port Time = 12 jam
Seatime ro = 231 jam Port Time = 12 jam
= 10 hari = 57 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 30 jam Produktivi = 900 MT/jam
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Balikpapan Port Time = 12 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 495
Seatime 2 = 33 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Balikpapan Produktivi = 600 MT/jam
POD 3 = Pangkalan Susu Payload = 2914 ton
Jarak 3 = 1454 Nm Effective T = 5 jam
Seatime 3 = 97 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = Lampung POL 2 = Balikpapan
Jarak 4 = 934 Nm AT+WT+IT = 5 jam
Seatime 4 = 63 jam Produktivi = 600 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = Lampung Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 8 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 13 hari Payload = 2914 ton
Commissio = 350 hari Effective T = 5 jam
Frekuensi = 26.92308 shipment/th Port Time = 12 jam
Cargo Carr = 78456 ton/th = hari
= 784558 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 67995 ton/th
= 679951 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 67995 ton/th
= 679951 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 13
Commissio = 350
Frekuensi = 26.92308
Cargo Carr = 78456
= 784558
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
132541 Port Time = 12 jam Biaya Bahan Bakar
time Port Time = 10 jam Fuel Oil
Nm Port Time = 11 jam Harga IFO = ###
jam Port Time = 12 jam IFO = ###
jam Port Time = 12 jam Biaya Fuel = ###
hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 6664.7
Balikpapan Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2914 ton = ###
OD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Tanjung Perak Port Time = 12 jam Port of Loa = Tanjung Priok
Pangkalan Susu = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Balikpapan Etmal = 1
O2 - POD 3 AT+WT+IT = 5 jam Biaya = ###
Tanjung Perak Produktivi = 600 MT/jam Tarif Teta = ###
Pangkalan Susu Payload = 2914 ton Tarif Varia = Rp 22
Nm Effective T = 5 jam Asumsi Jum= 3
jam Port Time = 10 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Pangkalan Susu Port Time POD 2 Lama Penu = Rp 1
POL 2 = Tanjung Perak Biaya = ###
Nm AT+WT+IT = 6 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2914 ton
OD 4 - TUKS Effective T = 5 jam Port of Dis = Balikpapan
Port Time = 11 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Pangkalan Susu Biaya = ###
AT+WT+IT = 7 jam Tarif Teta = ###
an Frekuensi Produktivi = 650 MT/jam Tarif Varia = Rp 22
hari Payload = 2914 ton Asumsi Jum= 3
hari Effective T = 5 jam Biaya = ###
shipment/th Port Time = 12 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = Lampung = ###
AT+WT+IT = 7 jam
/roundtrip Produktivi = 700 MT/jam Port of Dis = Tanjung Perak
/tahun Payload = 2914 ton Tarif Labuh = Rp 73
/tahun Effective T = 5 jam Biaya L = ###
/roundtrip Port Time = 12 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Seatime POD 3 - PO
jam POD 3
POD 4
/trip Jarak 4
/tahun Seatime 4
jam
/trip
/tahun
Pangkalan Susu
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
= 132451 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 3562 Nm Port Time = 11 jam Harga IFO
= 180 jam Port Time = 12 jam IFO
= 240 jam Port Time = 12 jam Biaya Fuel
= 10 hari = 57 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Balikpapan Port of Loa = Tanjung Priok Biaya Diese
= 765 Nm AT+WT+IT = 8 jam
= 51 jam Produktivi = 900 MT/jam Total Biay
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Tanjung Perak Port Time = 12 jam Port of Loa
= Lampung = hari Tarif Labuh
= 481 Biaya L
= 33 Port Time POD 1 Tarif Tamb
POD 1 = Balikpapan Etmal
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya
= Tanjung Perak Produktivi = 600 MT/jam Tarif Teta
= Lampung Payload = 2914 ton Tarif Varia
= 495 Nm Effective T = 5 jam Asumsi Jum
= 33 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Lampung Port Time POD 2 Lama Penu
= Pangkalan Susu POL 2 = Tanjung Perak Biaya
= 934 Nm AT+WT+IT = 6 jam Total Biay
= 63 jam Produktivi = 600 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= Pangkalan Susu Port Time = 11 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 887 Nm Tarif Tamb
= 60 jam Port Time POD 3 Etmal
POL 3 = Lampung Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia
= 13 hari Payload = 2914 ton Asumsi Jum
= 350 hari Effective T = 5 jam Biaya
= 26.92308 shipment/th Port Time = 12 jam Tarif Teta
= 78456 ton/th = hari Tarif Varia
= 784558 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 78456 POD 4 = Pangkalan Susu
= ### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis
### /tahun Payload = 2914 ton Tarif Labuh
= ### /tahun Effective T = 5 jam Biaya L
### /roundtrip Port Time = 12 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 800,000 Tarif Teta
Demand POD 3 600,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
13
RUTE
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 134521 Port Time = 12 jam
Seatime Port Time = 10 jam
Jarak Total = 4163 Nm Port Time = 12 jam
Seatime To = 250 jam Port Time = 12 jam
Seatime ro = 280 jam Port Time = 11 jam
= 12 hari = 57 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 51 jam Produktivi = 900 MT/jam
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Lampung Port Time = 12 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 872
Seatime 2 = 59 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Lampung Produktivi = 600 MT/jam
POD 3 = Pangkalan Susu Payload = 2914 ton
Jarak 3 = 934 Nm Effective T = 5 jam
Seatime 3 = 63 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = Tanjung Perak POL 2 = Lampung
Jarak 4 = 1154 Nm AT+WT+IT = 7 jam
Seatime 4 = 77 jam Produktivi = 700 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = Tanjung Perak Port Time = 12 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 30 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 15 hari Payload = 2914 ton
Commissio = 350 hari Effective T = 5 jam
Frekuensi = 23.33333 shipment/th Port Time = 12 jam
Cargo Carr = 67995 ton/th = hari
= 679951 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 67995 ton/th
= 679951 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 13 hari
Commissio = 350 hari
Frekuensi = 26.92308 shipment/th
Cargo Carr = 78456 ton/th
= 784558 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip =
Commissio =
Frekuensi =
Cargo Carr =
=
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
Perhitungan waktu Port Time Voyage Cost
142531 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 12 jam Fuel Oil
3985 Nm Port Time = 11 jam Harga IFO =
215 jam Port Time = 12 jam IFO =
266 jam Port Time = 10 jam Biaya Fuel =
12 hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Lampung Port of Loa = Tanjung Priok Biaya Diese=
117 Nm AT+WT+IT = 8 jam =
8 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2914 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Tanjung Perak Port Time = 12 jam Port of Loa =
Pangkalan Susu = hari Tarif Labuh =
495 Biaya L =
33 Port Time POD 1 Tarif Tamb =
POD 1 = Lampung Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Tanjung Perak Produktivi = 700 MT/jam Tarif Teta =
Pangkalan Susu Payload = 2914 ton Tarif Varia =
1154 Nm Effective T = 5 jam Asumsi Jum=
77 jam Port Time = 12 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Pangkalan Susu Port Time POD 2 Lama Penu =
Balikpapan POL 2 = Tanjung Perak Biaya =
1454 Nm AT+WT+IT = 6 jam Total Biay =
97 jam Produktivi = 600 MT/jam =
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Balikpapan Port Time = 11 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
765 Nm Tarif Tamb =
51 jam Port Time POD 3 Etmal =
POL 3 = Pangkalan Susu Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia =
15 hari Payload = 2914 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
23.33333 shipment/th Port Time = 12 jam Tarif Teta =
67995 ton/th = hari Tarif Varia =
679951 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
67995 POD 4 = Balikpapan =
### AT+WT+IT = 5 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis =
### /tahun Payload = 2914 ton Tarif Labuh =
### /tahun Effective T = 5 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
800,000 Tarif Varia =
700,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
19
RUTE
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 143251 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 12 jam Fuel Oil
= 3511 Nm Port Time = 10 jam Harga IFO
= 177 jam Port Time = 11 jam IFO
= 237 jam Port Time = 12 jam Biaya Fuel
= 10 hari = 57 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Lampung Port of Loa = Tanjung Priok Biaya Diese
= 117 Nm AT+WT+IT = 8 jam
= 8 jam Produktivi = 900 MT/jam Total Biay
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Balikpapan Port Time = 12 jam Port of Loa
= Tanjung Perak = hari Tarif Labuh
= 872 Biaya L
= 59 Port Time POD 1 Tarif Tamb
POD 1 = Lampung Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Balikpapan Produktivi = 700 MT/jam Tarif Teta
= Tanjung Perak Payload = 2914 ton Tarif Varia
= 481 Nm Effective T = 5 jam Asumsi Jum
= 33 jam Port Time = 12 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Tanjung Perak Port Time POD 2 Lama Penu
= Pangkalan Susu POL 2 = Balikpapan Biaya
= 1154 Nm AT+WT+IT = 5 jam Total Biay
= 77 jam Produktivi = 600 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= Pangkalan Susu Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 887 Nm Tarif Tamb
= 60 jam Port Time POD 3 Etmal
POL 3 = Tanjung Perak Biaya
AT+WT+IT = 6 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia
= 13 hari Payload = 2914 ton Asumsi Jum
= 350 hari Effective T = 5 jam Biaya
= 26.92308 shipment/th Port Time = 11 jam Tarif Teta
= 78456 ton/th = hari Tarif Varia
= 784558 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 78456 POD 4 = Pangkalan Susu
= ### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis
### /tahun Payload = 2914 ton Tarif Labuh
= ### /tahun Effective T = 5 jam Biaya L
### /roundtrip Port Time = 12 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
20
RUTE
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 143521 Port Time = 12 jam
Seatime Port Time = 12 jam
Jarak Total = 4035 Nm Port Time = 10 jam
Seatime To = 241 jam Port Time = 12 jam
Seatime ro = 271 jam Port Time = 11 jam
= 12 hari = 57 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 8 jam Produktivi = 900 MT/jam
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Balikpapan Port Time = 12 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 872
Seatime 2 = 59 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Balikpapan Produktivi = 700 MT/jam
POD 3 = Pangkalan Susu Payload = 2914 ton
Jarak 3 = 1454 Nm Effective T = 5 jam
Seatime 3 = 97 jam Port Time = 12 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = Tanjung Perak POL 2 = Balikpapan
Jarak 4 = 1154 Nm AT+WT+IT = 5 jam
Seatime 4 = 77 jam Produktivi = 600 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = Tanjung Perak Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 30 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 15 hari Payload = 2914 ton
Commissio = 350 hari Effective T = 5 jam
Frekuensi = 23.33333 shipment/th Port Time = 12 jam
Cargo Carr = 67995 ton/th = hari
= 679951 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 13 hari
Commissio = 350 hari
Frekuensi = 26.92308 shipment/th
Cargo Carr = 78456 ton/th
= 784558 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 13 hari
Commissio = 350 hari
Frekuensi = 26.92308 shipment/th
Cargo Carr = 78456 ton/th
= 784558 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 13
Commissio = 350
Frekuensi = 26.92308
Cargo Carr = 78456
= 784558
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
153241 Port Time = 12 jam Biaya Bahan Bakar
time Port Time = 12 jam Fuel Oil
Nm Port Time = 10 jam Harga IFO = ###
jam Port Time = 11 jam IFO = ###
jam Port Time = 12 jam Biaya Fuel = ###
hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 6631.9
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2914 ton = ###
OD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Balikpapan Port Time = 12 jam Port of Loa = Tanjung Priok
Tanjung Perak = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Balikpapan Produktivi = 650 MT/jam Tarif Teta = ###
Tanjung Perak Payload = 2914 ton Tarif Varia = Rp 22
Nm Effective T = 5 jam Asumsi Jum= 3
jam Port Time = 12 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Tanjung Perak Port Time POD 2 Lama Penu = Rp 1
POL 2 = Balikpapan Biaya = ###
Nm AT+WT+IT = 5 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2914 ton
OD 4 - TUKS Effective T = 5 jam Port of Dis = Pangkalan Susu
Port Time = 10 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Tanjung Perak Biaya = ###
AT+WT+IT = 6 jam Tarif Teta = ###
an Frekuensi Produktivi = 600 MT/jam Tarif Varia = Rp 22
hari Payload = 2914 ton Asumsi Jum= 3
hari Effective T = 5 jam Biaya = ###
shipment/th Port Time = 11 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = Lampung = ###
AT+WT+IT = 7 jam
/roundtrip Produktivi = 700 MT/jam Port of Dis = Balikpapan
/tahun Payload = 2914 ton Tarif Labuh = Rp 73
/tahun Effective T = 5 jam Biaya L = ###
/roundtrip Port Time = 12 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
jam
/trip
/tahun
Tanjung Perak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
154321 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 12 jam Fuel Oil
3612 Nm Port Time = 12 jam Harga IFO =
215 jam Port Time = 10 jam IFO =
245 jam Port Time = 11 jam Biaya Fuel =
11 hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese=
887 Nm AT+WT+IT = 8 jam =
60 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2914 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Lampung Port Time = 12 jam Port of Loa =
Balikpapan = hari Tarif Labuh =
934 Biaya L =
63 Port Time POD 1 Tarif Tamb =
POD 1 = Pangkalan Susu Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Lampung Produktivi = 650 MT/jam Tarif Teta =
Balikpapan Payload = 2914 ton Tarif Varia =
872 Nm Effective T = 5 jam Asumsi Jum=
59 jam Port Time = 12 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Balikpapan Port Time POD 2 Lama Penu =
Tanjung Perak POL 2 = Lampung Biaya =
481 Nm AT+WT+IT = 7 jam Total Biay =
33 jam Produktivi = 700 MT/jam =
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Tanjung Perak Port Time = 12 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
438 Nm Tarif Tamb =
30 jam Port Time POD 3 Etmal =
POL 3 = Balikpapan Biaya =
AT+WT+IT = 5 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
14 hari Payload = 2914 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
25 shipment/th Port Time = 10 jam Tarif Teta =
72852 ton/th = hari Tarif Varia =
728519 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
72852 POD 4 = Tanjung Perak =
### AT+WT+IT = 6 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis =
### /tahun Payload = 2914 ton Tarif Labuh =
### /tahun Effective T = 5 jam Biaya L =
### /roundtrip Port Time = 11 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
600,000 Tarif Teta =
700,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
28
RUTE
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 154231 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 12 jam Fuel Oil
= 3562 Nm Port Time = 12 jam Harga IFO
= 189 jam Port Time = 11 jam IFO
= 240 jam Port Time = 10 jam Biaya Fuel
= 10 hari = 57 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese
= 887 Nm AT+WT+IT = 8 jam
= 60 jam Produktivi = 900 MT/jam Total Biay
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Lampung Port Time = 12 jam Port of Loa
= Tanjung Perak = hari Tarif Labuh
= 934 Biaya L
= 63 Port Time POD 1 Tarif Tamb
POD 1 = Pangkalan Susu Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Lampung Produktivi = 650 MT/jam Tarif Teta
= Tanjung Perak Payload = 2914 ton Tarif Varia
= 495 Nm Effective T = 5 jam Asumsi Jum
= 33 jam Port Time = 12 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Tanjung Perak Port Time POD 2 Lama Penu
= Balikpapan POL 2 = Lampung Biaya
= 481 Nm AT+WT+IT = 7 jam Total Biay
= 33 jam Produktivi = 700 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= Balikpapan Port Time = 12 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 51 jam Port Time POD 3 Etmal
POL 3 = Tanjung Perak Biaya
AT+WT+IT = 6 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia
= 13 hari Payload = 2914 ton Asumsi Jum
= 350 hari Effective T = 5 jam Biaya
= 26.92308 shipment/th Port Time = 11 jam Tarif Teta
= 78456 ton/th = hari Tarif Varia
= 784558 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 78456 POD 4 = Balikpapan
= ### AT+WT+IT = 5 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis
### /tahun Payload = 2914 ton Tarif Labuh
= ### /tahun Effective T = 5 jam Biaya L
### /roundtrip Port Time = 10 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 600,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 700,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
29
RUTE
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1231 Port Time = 12 jam
Seatime Port Time = 11 jam
Jarak Total = 1684 Nm Port Time = 10 jam
Seatime To = 63 jam Port Time = 0 jam
Seatime ro = 114 jam Port Time = 0 jam
= 5 hari = 33 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 30 jam Produktivi = 900 MT/jam
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Balikpapan Port Time = 12 jam
POD 2 = - = hari
Jarak 2 = 481
Seatime 2 = 33 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Balikpapan Produktivi = 600 MT/jam
POD 3 = - Payload = 2914 ton
Jarak 3 = 0 Nm Effective T = 5 jam
Seatime 3 = 0 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 765 Nm
Seatime 5 = 51 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 7 hari Payload = 2914 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 50 shipment/th Port Time = 0 jam
Cargo Carr = 145704 ton/th = hari
= 1457037 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1321 Port Time = 12
Balikpapan Seatime Port Time = 10
Nm Jarak Total = 1684 Nm Port Time = 11
Tanjung Perak Seatime To = 84 jam Port Time = 0
Nm Seatime ro = 114 jam Port Time = 0
= 5 hari = 33
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Balikpapan Port of Loa = Tanjung Priok
Nm Jarak 1 = 765 Nm AT+WT+IT = 8
Seatime 1 = 51 jam Produktivi = 900
Payload = 2914
Seatime POD 1 - POD 2 Effective T = 4
POD 1 = Tanjung Perak Port Time = 12
POD 2 = - =
Jarak 2 = 481
Seatime 2 = 33 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5
POD 2 = Tanjung Perak Produktivi = 600
POD 3 = - Payload = 2914
Jarak 3 = 0 Nm Effective T = 5
Seatime 3 = 0 jam Port Time = 10
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Tanjung Perak
Jarak 4 = 0 Nm AT+WT+IT = 6
Seatime 4 = 0 jam Produktivi = 600
Payload = 2914
Seatime POD 4 - TUKS Effective T = 5
POD 4 = - Port Time = 11
TUKS = Tanjung Priok =
Jarak 5 = 438 Nm
Seatime 5 = 30 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0
Perhitungan Frekuensi Produktivi = 0
Roundtrip = 7 hari Payload = 2914
Commissio = 350 hari Effective T = 0
Frekuensi = 50 shipment/th Port Time = 0
Cargo Carr = 145704 ton/th =
= 1457037 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1241 Port Time =
Tanjung Perak Seatime Port Time =
438 Nm Jarak Total = 1050 Nm Port Time =
Lampung Seatime To = 63 jam Port Time =
495 Nm Seatime ro = 71 jam Port Time =
- = 3 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa =
117 Nm Jarak 1 = 438 Nm AT+WT+IT =
Seatime 1 = 30 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Lampung Port Time =
POD 2 = - =
Jarak 2 = 495
Seatime 2 = 33 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Lampung Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 8 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 5 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 70 shipment/th Port Time =
Cargo Carr = 203985 ton/th =
= 2039852 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
32
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
33
RUTE
Perhitungan Frekuensi
Roundtrip = 7 hari
Commissio = 350 hari
Frekuensi = 50 shipment/th
Cargo Carr = 145704 ton/th
= 1457037 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
34
RUTE
Perhitungan Frekuensi
Roundtrip = 7 hari
Commissio = 350 hari
Frekuensi = 50 shipment/th
Cargo Carr = 145704 ton/th
= 1457037 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
35
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 9
Commissio = 350
Frekuensi = 38.88889
Cargo Carr = 113325
= 1133251
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
1251 Port Time = 12 jam Biaya Bahan Bakar
time Port Time = 11 jam Fuel Oil
Nm Port Time = 12 jam Harga IFO = ###
jam Port Time = 0 jam IFO = ###
jam Port Time = 0 jam Biaya Fuel = ###
hari = 35 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 4787.6
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2914 ton = ###
OD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Pangkalan Susu Port Time = 12 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Tanjung Perak Etmal = 1
O2 - POD 3 AT+WT+IT = 6 jam Biaya = ###
Pangkalan Susu Produktivi = 600 MT/jam Tarif Teta = ###
Payload = 2914 ton Tarif Varia = Rp 22
Nm Effective T = 5 jam Asumsi Jum= 3
jam Port Time = 11 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = Pangkalan Susu Biaya = ###
Nm AT+WT+IT = 7 jam Total Biay = ###
jam Produktivi = 650 MT/jam = ###
Payload = 2914 ton
OD 4 - TUKS Effective T = 5 jam Port of Dis = Tanjung Perak
Port Time = 12 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = - Biaya = ###
AT+WT+IT = 0 jam Tarif Teta = ###
an Frekuensi Produktivi = 0 MT/jam Tarif Varia = Rp 22
hari Payload = 2914 ton Asumsi Jum= 3
hari Effective T = 0 jam Biaya = ###
shipment/th Port Time = 0 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Pangkalan Susu
/tahun Payload = 2914 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
36
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
1521 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 12 jam Fuel Oil
2479 Nm Port Time = 11 jam Harga IFO =
137 jam Port Time = 0 jam IFO =
167 jam Port Time = 0 jam Biaya Fuel =
7 hari = 35 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese=
887 Nm AT+WT+IT = 8 jam =
60 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2914 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Tanjung Perak Port Time = 12 jam Port of Loa =
- = hari Tarif Labuh =
1154 Biaya L =
77 Port Time POD 1 Tarif Tamb =
POD 1 = Pangkalan Susu Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Tanjung Perak Produktivi = 650 MT/jam Tarif Teta =
- Payload = 2914 ton Tarif Varia =
0 Nm Effective T = 5 jam Asumsi Jum=
0 jam Port Time = 12 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
- Port Time POD 2 Lama Penu =
- POL 2 = Tanjung Perak Biaya =
0 Nm AT+WT+IT = 6 jam Total Biay =
0 jam Produktivi = 600 MT/jam =
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
- Port Time = 11 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
438 Nm Tarif Tamb =
30 jam Port Time POD 3 Etmal =
POL 3 = - Biaya =
AT+WT+IT = 0 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia =
9 hari Payload = 2914 ton Asumsi Jum=
350 hari Effective T = 0 jam Biaya =
38.88889 shipment/th Port Time = 0 jam Tarif Teta =
113325 ton/th = hari Tarif Varia =
1133251 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
113325 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2914 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
- Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
37
RUTE
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 1351 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 3106 Nm Port Time = 12 jam Harga IFO
= 148 jam Port Time = 0 jam IFO
= 208 jam Port Time = 0 jam Biaya Fuel
= 9 hari = 34 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Balikpapan Port of Loa = Tanjung Priok Biaya Diese
= 765 Nm AT+WT+IT = 8 jam
= 51 jam Produktivi = 900 MT/jam Total Biay
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Pangkalan Susu Port Time = 12 jam Port of Loa
= - = hari Tarif Labuh
= 1454 Biaya L
= 97 Port Time POD 1 Tarif Tamb
POD 1 = Balikpapan Etmal
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya
= Pangkalan Susu Produktivi = 600 MT/jam Tarif Teta
= - Payload = 2914 ton Tarif Varia
= 0 Nm Effective T = 5 jam Asumsi Jum
= 0 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Pangkalan Susu Biaya
= 0 Nm AT+WT+IT = 7 jam Total Biay
= 0 jam Produktivi = 650 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= - Port Time = 12 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 887 Nm Tarif Tamb
= 60 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 11 hari Payload = 2914 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 31.81818 shipment/th Port Time = 0 jam Tarif Teta
= 92721 ton/th = hari Tarif Varia
= 927205 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 92721 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2914 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 800,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
38
RUTE
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1531 Port Time = 12 jam
Seatime Port Time = 12 jam
Jarak Total = 3106 Nm Port Time = 10 jam
Seatime To = 157 jam Port Time = 0 jam
Seatime ro = 208 jam Port Time = 0 jam
= 9 hari = 34 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Pangkalan Susu Port of Loa = Tanjung Priok
Jarak 1 = 887 Nm AT+WT+IT = 8 jam
Seatime 1 = 60 jam Produktivi = 900 MT/jam
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Balikpapan Port Time = 12 jam
POD 2 = - = hari
Jarak 2 = 1454
Seatime 2 = 97 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Balikpapan Produktivi = 650 MT/jam
POD 3 = - Payload = 2914 ton
Jarak 3 = 0 Nm Effective T = 5 jam
Seatime 3 = 0 jam Port Time = 12 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Balikpapan
Jarak 4 = 0 Nm AT+WT+IT = 5 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = - Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 765 Nm
Seatime 5 = 51 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 11 hari Payload = 2914 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 31.81818 shipment/th Port Time = 0 jam
Cargo Carr = 92721 ton/th = hari
= 927205 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1451 Port Time = 12 jam
Seatime Port Time = 12 jam
Jarak Total = 1938 Nm Port Time = 12 jam
Seatime To = 71 jam Port Time = 0 jam
Seatime ro = 131 jam Port Time = 0 jam
= 6 hari = 36 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 8 jam Produktivi = 900 MT/jam
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Pangkalan Susu Port Time = 12 jam
POD 2 = - = hari
Jarak 2 = 934
Seatime 2 = 63 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Pangkalan Susu Produktivi = 700 MT/jam
POD 3 = - Payload = 2914 ton
Jarak 3 = 0 Nm Effective T = 5 jam
Seatime 3 = 0 jam Port Time = 12 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Pangkalan Susu
Jarak 4 = 0 Nm AT+WT+IT = 7 jam
Seatime 4 = 0 jam Produktivi = 650 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = - Port Time = 12 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 60 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 8 hari Payload = 2914 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 43.75 shipment/th Port Time = 0 jam
Cargo Carr = 127491 ton/th = hari
= 1274907 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1541 Port Time = 12
Pangkalan Susu Seatime Port Time = 12
Nm Jarak Total = 1938 Nm Port Time = 12
Seatime To = 123 jam Port Time = 0
Nm Seatime ro = 131 jam Port Time = 0
= 6 hari = 36
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Pangkalan Susu Port of Loa = Tanjung Priok
Nm Jarak 1 = 887 Nm AT+WT+IT = 8
Seatime 1 = 60 jam Produktivi = 900
Payload = 2914
Seatime POD 1 - POD 2 Effective T = 4
POD 1 = Lampung Port Time = 12
POD 2 = - =
Jarak 2 = 934
Seatime 2 = 63 Port Time POD 1
POD 1 = Pangkalan Susu
Seatime PO2 - POD 3 AT+WT+IT = 7
POD 2 = Lampung Produktivi = 650
POD 3 = - Payload = 2914
Jarak 3 = 0 Nm Effective T = 5
Seatime 3 = 0 jam Port Time = 12
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7
Seatime 4 = 0 jam Produktivi = 700
Payload = 2914
Seatime POD 4 - TUKS Effective T = 5
POD 4 = - Port Time = 12
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 8 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0
Perhitungan Frekuensi Produktivi = 0
Roundtrip = 8 hari Payload = 2914
Commissio = 350 hari Effective T = 0
Frekuensi = 43.75 shipment/th Port Time = 0
Cargo Carr = 127491 ton/th =
= 1274907 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 12341 Port Time =
Tanjung Perak Seatime Port Time =
438 Nm Jarak Total = 1908 Nm Port Time =
Balikpapan Seatime To = 122 jam Port Time =
481 Nm Seatime ro = 130 jam Port Time =
Lampung = 6 hari =
Total Port Time
872 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa =
117 Nm Jarak 1 = 438 Nm AT+WT+IT =
Seatime 1 = 30 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Balikpapan Port Time =
POD 2 = Lampung =
Jarak 2 = 481
Seatime 2 = 33 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Balikpapan Produktivi =
POD 3 = Lampung Payload =
Jarak 3 = 872 Nm Effective T =
Seatime 3 = 59 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = Lampung Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 8 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 8 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 43.75 shipment/th Port Time =
Cargo Carr = 127491 ton/th =
= 1274907 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
42
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
43
RUTE
Perhitungan Frekuensi
Roundtrip = 8 hari
Commissio = 350 hari
Frekuensi = 43.75 shipment/th
Cargo Carr = 127491 ton/th
= 1274907 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
44
RUTE
Perhitungan Frekuensi
Roundtrip = 10 hari
Commissio = 350 hari
Frekuensi = 35 shipment/th
Cargo Carr = 101993 ton/th
= 1019926 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
45
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 8
Commissio = 350
Frekuensi = 43.75
Cargo Carr = 127491
= 1274907
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
14231 Port Time = 12 jam Biaya Bahan Bakar
time Port Time = 12 jam Fuel Oil
Nm Port Time = 11 jam Harga IFO = ###
jam Port Time = 10 jam IFO = ###
jam Port Time = 0 jam Biaya Fuel = ###
hari = 45 jam =
Total Port Time
= 2 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 3588.3
Lampung Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2914 ton = ###
OD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Tanjung Perak Port Time = 12 jam Port of Loa = Tanjung Priok
Balikpapan = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Lampung Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Tanjung Perak Produktivi = 700 MT/jam Tarif Teta = ###
Balikpapan Payload = 2914 ton Tarif Varia = Rp 22
Nm Effective T = 5 jam Asumsi Jum= 3
jam Port Time = 12 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Balikpapan Port Time POD 2 Lama Penu = Rp 1
POL 2 = Tanjung Perak Biaya = ###
Nm AT+WT+IT = 6 jam Total Biay = ###
jam Produktivi = 600 MT/jam = ###
Payload = 2914 ton
OD 4 - TUKS Effective T = 5 jam Port of Dis = Lampung
Port Time = 11 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Balikpapan Biaya = ###
AT+WT+IT = 5 jam Tarif Teta = ###
an Frekuensi Produktivi = 600 MT/jam Tarif Varia = Rp 22
hari Payload = 2914 ton Asumsi Jum= 3
hari Effective T = 5 jam Biaya = ###
shipment/th Port Time = 10 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = - = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = Tanjung Perak
/tahun Payload = 2914 ton Tarif Labuh = Rp 73
/tahun Effective T = 0 jam Biaya L = ###
/roundtrip Port Time = 0 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
Port of Dis = -
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
46
RUTE
jam
/trip
/tahun
Balikpapan
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
14321 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 12 jam Fuel Oil
1908 Nm Port Time = 10 jam Harga IFO =
100 jam Port Time = 11 jam IFO =
130 jam Port Time = 0 jam Biaya Fuel =
6 hari = 45 jam =
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Lampung Port of Loa = Tanjung Priok Biaya Diese=
117 Nm AT+WT+IT = 8 jam =
8 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2914 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Balikpapan Port Time = 12 jam Port of Loa =
Tanjung Perak = hari Tarif Labuh =
872 Biaya L =
59 Port Time POD 1 Tarif Tamb =
POD 1 = Lampung Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Balikpapan Produktivi = 700 MT/jam Tarif Teta =
Tanjung Perak Payload = 2914 ton Tarif Varia =
481 Nm Effective T = 5 jam Asumsi Jum=
33 jam Port Time = 12 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Tanjung Perak Port Time POD 2 Lama Penu =
- POL 2 = Balikpapan Biaya =
0 Nm AT+WT+IT = 5 jam Total Biay =
0 jam Produktivi = 600 MT/jam =
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
- Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
438 Nm Tarif Tamb =
30 jam Port Time POD 3 Etmal =
POL 3 = Tanjung Perak Biaya =
AT+WT+IT = 6 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
8 hari Payload = 2914 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
43.75 shipment/th Port Time = 11 jam Tarif Teta =
127491 ton/th = hari Tarif Varia =
1274907 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
127491 POD 4 = - =
### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis =
### /tahun Payload = 2914 ton Tarif Labuh =
### /tahun Effective T = 0 jam Biaya L =
### /roundtrip Port Time = 0 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
800,000 Tarif Varia =
- Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
47
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
-
Rp - GT/Kunjungan
Rp - /trip
Rp - /GT/etmal
1
Rp - /trip
Rp - /kapal/gerakan
Rp - /GT/Kapal/Gerakan
3 gerakan
Rp -
###
Rp -
1 jam
Rp -
Rp - /trip
Rp - /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 12351 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 11 jam Fuel Oil
= 3260 Nm Port Time = 10 jam Harga IFO
= 160 jam Port Time = 12 jam IFO
= 220 jam Port Time = 0 jam Biaya Fuel
= 10 hari = 45 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese
= 438 Nm AT+WT+IT = 8 jam
= 30 jam Produktivi = 900 MT/jam Total Biay
Payload = 2914 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Balikpapan Port Time = 12 jam Port of Loa
= Pangkalan Susu = hari Tarif Labuh
= 481 Biaya L
= 33 Port Time POD 1 Tarif Tamb
POD 1 = Tanjung Perak Etmal
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya
= Balikpapan Produktivi = 600 MT/jam Tarif Teta
= Pangkalan Susu Payload = 2914 ton Tarif Varia
= 1454 Nm Effective T = 5 jam Asumsi Jum
= 97 jam Port Time = 11 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Pangkalan Susu Port Time POD 2 Lama Penu
= - POL 2 = Balikpapan Biaya
= 0 Nm AT+WT+IT = 5 jam Total Biay
= 0 jam Produktivi = 600 MT/jam
Payload = 2914 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= - Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 887 Nm Tarif Tamb
= 60 jam Port Time POD 3 Etmal
POL 3 = Pangkalan Susu Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia
= 12 hari Payload = 2914 ton Asumsi Jum
= 350 hari Effective T = 5 jam Biaya
= 29.16667 shipment/th Port Time = 12 jam Tarif Teta
= 84994 ton/th = hari Tarif Varia
= 849938 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 84994 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2914 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
48
RUTE
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
TERPILIH
Perhitungan Sewa
Margin Prof= 15% dari total PV
### /tahun
Time Charter Hire
Cicilan tah = ###
= ### /hari
= ### /bulan
Tarif TCH
= ### /tahun
= ### /masa kontrak
Unit Cost =
PTP - Tanjung Perak ###
PTP - Balikpapan ###
PTP - Lampung ###
PTP - Pangkalan Susu ###
Tunjangan
Jumlah Jabatan Gaji Pokok Sertifikat
Jabatan Berlayar Kesehatan
1 Master/Captain ### Rp 2,600,000 ### ### ###
1 Chief Engineer ### Rp 1,900,000 ### ### ###
1 Second Engineer ### Rp 1,900,000 ### ### ###
1 Chief Officer ### Rp 2,500,000 ### ### ###
1 Second Officer ### Rp 2,500,000 ### ### ###
1 Quarter Master ### Rp 1,000,000 ### ### ###
1 Electrician ### Rp 900,000 ### ### ###
1 Steward ### Rp 500,000 ### ###
1 Oiler ### Rp 1,000,000 ### ### ###
liter/HP.jam 1 Boys ### Rp 500,000 ### ### ###
liter/tahun 2 Cadet ### Rp 500,000 Rp - ### ###
1 Chief Cook ### Rp 500,000 ### ### ###
1 Assistant Cook ### Rp 500,000 ### ### ###
1 Boatswain ### Rp 500,000 ### ### ###
harga kapal 15 Total ### Rp 17,300,000 ### ### ###
Rute
POL
Tunjanga
Bonus POD 1
Voyage n Total Total Gaji
Seniority Jarak POL
### ### ### ### POD 2
### ### ### ### Jarak POD
### Rp - ### ### POD 3
### ### ### ### Jarak POD
### ### ### ### POD 4
### ### ### ### Jarak POD
### - ### ### TUKS
### - ### ### Jarak POD
### ### ### ###
### - ### ###
Rp - - ### ###
### ### ### ###
### ### ### ###
### ### ### ###
### ### ### ###
Sewa Kapal
4 5 6 7 8 9 10
OWNER CHARTERER
BAREBOAT CHARTER
OWNER
OWNER CHARTERER
CHARTERER
TIME
TIME CHARTER
CHARTER
OWNER
OWNER CHARTERER
CHARTERER
VOYAGE
VOYAGE CHARTER
CHARTER OWNER
OWNER
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 121 Port Time =
Tanjung Perak Seatime Port Time =
438 Nm Jarak Total = 876 Nm Port Time =
- Seatime To = 34 jam Port Time =
0 Nm Seatime ro = 68 jam Port Time =
- = 3 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa =
438 Nm Jarak 1 = 438 Nm AT+WT+IT =
Seatime 1 = 34 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = - Port Time =
POD 2 = - =
Jarak 2 = 0
Seatime 2 = 0 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = - Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 438 Nm
Seatime 5 = 34 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 4 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 87.5 shipment/th Port Time =
Cargo Carr = 255287 ton/th =
= 2552870 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
2
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
3
RUTE
Perhitungan Frekuensi
Roundtrip = 2 hari
Commissio = 350 hari
Frekuensi = 175 shipment/th
Cargo Carr = 510574 ton/th
= 5105741 ton/kontrak
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = 0
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
4
RUTE
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 7
Commissio = 350
Frekuensi = 50
Cargo Carr = 145878
= 1458783
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
151 Port Time = 12 jam Biaya Bahan Bakar
time Port Time = 12 jam Fuel Oil
Nm Port Time = 0 jam Harga IFO = ###
jam Port Time = 0 jam IFO = 881.563
jam Port Time = 0 jam Biaya Fuel = ###
hari = 24 jam =
Total Port Time
= 1 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 88.2
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2918 ton = ###
OD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Port Time = 12 jam Port of Loa = Tanjung Priok
= hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Produktivi = 650 MT/jam Tarif Teta = ###
Payload = 2918 ton Tarif Varia = Rp 22
Nm Effective T = 5 jam Asumsi Jum= 3
jam Port Time = 12 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Port Time POD 2 Lama Penu = Rp 1
POL 2 = 0 Biaya = ###
Nm AT+WT+IT = 0 jam Total Biay = ###
jam Produktivi = 0 MT/jam = ###
Payload = 2918 ton
OD 4 - TUKS Effective T = 0 jam Port of Dis = Pangkalan Susu
Port Time = 0 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = 0 Biaya = ###
AT+WT+IT = 0 jam Tarif Teta = ###
an Frekuensi Produktivi = 0 MT/jam Tarif Varia = Rp 22
hari Payload = 2918 ton Asumsi Jum= 3
hari Effective T = 0 jam Biaya = ###
shipment/th Port Time = 0 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = 0 = ###
AT+WT+IT = 0 jam
/roundtrip Produktivi = 0 MT/jam Port of Dis = 0
/tahun Payload = 2918 ton Tarif Labuh = Rp -
/tahun Effective T = 0 jam Biaya L = Rp -
/roundtrip Port Time = 0 jam Tarif Tamb = Rp -
/masa kontrak = hari Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = 0
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Port of Dis = 0
Tarif Labuh = Rp -
Biaya L = Rp -
Tarif Tamb = Rp -
Etmal = 1
Biaya = Rp -
Tarif Teta = Rp -
Tarif Varia = Rp -
Asumsi Jum= 3
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = Rp -
= Rp -
Total Biay = ###
= ###
5
RUTE
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
123451 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 11 jam Fuel Oil
3612 Nm Port Time = 10 jam Harga IFO =
211 jam Port Time = 12 jam IFO =
280 jam Port Time = 12 jam Biaya Fuel =
12 hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese=
438 Nm AT+WT+IT = 8 jam =
34 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2918 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Balikpapan Port Time = 12 jam Port of Loa =
Lampung = hari Tarif Labuh =
481 Biaya L =
37 Port Time POD 1 Tarif Tamb =
POD 1 = Tanjung Perak Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya =
Balikpapan Produktivi = 600 MT/jam Tarif Teta =
Lampung Payload = 2918 ton Tarif Varia =
872 Nm Effective T = 5 jam Asumsi Jum=
68 jam Port Time = 11 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Lampung Port Time POD 2 Lama Penu =
Pangkalan Susu POL 2 = Balikpapan Biaya =
934 Nm AT+WT+IT = 5 jam Total Biay =
72 jam Produktivi = 600 MT/jam =
Payload = 2918 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Pangkalan Susu Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
69 jam Port Time POD 3 Etmal =
POL 3 = Lampung Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia =
15 hari Payload = 2918 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
23.33333 shipment/th Port Time = 12 jam Tarif Teta =
68077 ton/th = hari Tarif Varia =
680765 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
68077 POD 4 = Pangkalan Susu =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis =
### /tahun Payload = 2918 ton Tarif Labuh =
### /tahun Effective T = 5 jam Biaya L =
### /roundtrip Port Time = 12 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
600,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
6
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
2 jam
###
### /trip
### /tahun
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp -
1 jam
Rp -
### /trip
### /tahun
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time
Rute = 123541 Port Time = 12 jam
Seatime Port Time = 11 jam
Jarak Total = 3438 Nm Port Time = 10 jam
Seatime To = 257 jam Port Time = 12 jam
Seatime ro = 266 jam Port Time = 12 jam
= 12 hari = 57 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Jarak 1 = 438 Nm AT+WT+IT = 8 jam
Seatime 1 = 34 jam Produktivi = 900 MT/jam
Payload = 2918 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Balikpapan Port Time = 12 jam
POD 2 = Pangkalan Susu = hari
Jarak 2 = 495
Seatime 2 = 39 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6 jam
POD 2 = Balikpapan Produktivi = 600 MT/jam
POD 3 = Pangkalan Susu Payload = 2918 ton
Jarak 3 = 1454 Nm Effective T = 5 jam
Seatime 3 = 112 jam Port Time = 11 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Pangkalan Susu Port Time POD 2
POD 4 = Lampung POL 2 = Balikpapan
Jarak 4 = 934 Nm AT+WT+IT = 5 jam
Seatime 4 = 72 jam Produktivi = 600 MT/jam
Payload = 2918 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = Lampung Port Time = 10 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 117 Nm
Seatime 5 = 9 jam Port Time POD 3
POL 3 = Pangkalan Susu
AT+WT+IT = 7 jam
Perhitungan Frekuensi Produktivi = 650 MT/jam
Roundtrip = 15 hari Payload = 2918 ton
Commissio = 350 hari Effective T = 5 jam
Frekuensi = 23.33333 shipment/th Port Time = 12 jam
Cargo Carr = 68077 ton/th = hari
= 680765 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 17 hari
Commissio = 350 hari
Frekuensi = 20.58824 shipment/th
Cargo Carr = 60068 ton/th
= 600675 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 68077 ton/th
= 680765 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip =
Commissio =
Frekuensi =
Cargo Carr =
=
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
Perhitungan waktu Port Time Voyage Cost
132451 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 10 jam Fuel Oil
3562 Nm Port Time = 11 jam Harga IFO =
207 jam Port Time = 12 jam IFO =
276 jam Port Time = 12 jam Biaya Fuel =
12 hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Balikpapan Port of Loa = Tanjung Priok Biaya Diese=
765 Nm AT+WT+IT = 8 jam =
59 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2918 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Tanjung Perak Port Time = 12 jam Port of Loa =
Lampung = hari Tarif Labuh =
481 Biaya L =
37 Port Time POD 1 Tarif Tamb =
POD 1 = Balikpapan Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya =
Tanjung Perak Produktivi = 600 MT/jam Tarif Teta =
Lampung Payload = 2918 ton Tarif Varia =
495 Nm Effective T = 5 jam Asumsi Jum=
39 jam Port Time = 10 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Lampung Port Time POD 2 Lama Penu =
Pangkalan Susu POL 2 = Tanjung Perak Biaya =
934 Nm AT+WT+IT = 6 jam Total Biay =
72 jam Produktivi = 600 MT/jam =
Payload = 2918 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Pangkalan Susu Port Time = 11 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
69 jam Port Time POD 3 Etmal =
POL 3 = Lampung Biaya =
AT+WT+IT = 7 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 700 MT/jam Tarif Varia =
15 hari Payload = 2918 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
23.33333 shipment/th Port Time = 12 jam Tarif Teta =
68077 ton/th = hari Tarif Varia =
680765 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
68077 POD 4 = Pangkalan Susu =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis =
### /tahun Payload = 2918 ton Tarif Labuh =
### /tahun Effective T = 5 jam Biaya L =
### /roundtrip Port Time = 12 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
800,000 Tarif Teta =
600,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
13
RUTE
Lampung
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 134521 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 10 jam Fuel Oil
= 4163 Nm Port Time = 12 jam Harga IFO
= 288 jam Port Time = 12 jam IFO
= 322 jam Port Time = 11 jam Biaya Fuel
= 14 hari = 57 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Balikpapan Port of Loa = Tanjung Priok Biaya Diese
= 765 Nm AT+WT+IT = 8 jam
= 59 jam Produktivi = 900 MT/jam Total Biay
Payload = 2918 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Lampung Port Time = 12 jam Port of Loa
= Pangkalan Susu = hari Tarif Labuh
= 872 Biaya L
= 68 Port Time POD 1 Tarif Tamb
POD 1 = Balikpapan Etmal
Seatime PO2 - POD 3 AT+WT+IT = 5 jam Biaya
= Lampung Produktivi = 600 MT/jam Tarif Teta
= Pangkalan Susu Payload = 2918 ton Tarif Varia
= 934 Nm Effective T = 5 jam Asumsi Jum
= 72 jam Port Time = 10 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Pangkalan Susu Port Time POD 2 Lama Penu
= Tanjung Perak POL 2 = Lampung Biaya
= 1154 Nm AT+WT+IT = 7 jam Total Biay
= 89 jam Produktivi = 700 MT/jam
Payload = 2918 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= Tanjung Perak Port Time = 12 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 438 Nm Tarif Tamb
= 34 jam Port Time POD 3 Etmal
POL 3 = Pangkalan Susu Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia
= 17 hari Payload = 2918 ton Asumsi Jum
= 350 hari Effective T = 5 jam Biaya
= 20.58824 shipment/th Port Time = 12 jam Tarif Teta
= 60068 ton/th = hari Tarif Varia
= 600675 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 60068 POD 4 = Tanjung Perak
= ### AT+WT+IT = 6 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis
### /tahun Payload = 2918 ton Tarif Labuh
= ### /tahun Effective T = 5 jam Biaya L
### /roundtrip Port Time = 11 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 600,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
14
RUTE
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 134251 Port Time = 12 jam
Seatime Port Time = 10 jam
Jarak Total = 4173 Nm Port Time = 12 jam
Seatime To = 255 jam Port Time = 11 jam
Seatime ro = 324 jam Port Time = 12 jam
= 14 hari = 57 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 59 jam Produktivi = 900 MT/jam
Payload = 2918 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Lampung Port Time = 12 jam
POD 2 = Tanjung Perak = hari
Jarak 2 = 872
Seatime 2 = 68 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Lampung Produktivi = 600 MT/jam
POD 3 = Tanjung Perak Payload = 2918 ton
Jarak 3 = 495 Nm Effective T = 5 jam
Seatime 3 = 39 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = Pangkalan Susu POL 2 = Lampung
Jarak 4 = 1154 Nm AT+WT+IT = 7 jam
Seatime 4 = 89 jam Produktivi = 700 MT/jam
Payload = 2918 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = Pangkalan Susu Port Time = 12 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 887 Nm
Seatime 5 = 69 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 17 hari Payload = 2918 ton
Commissio = 350 hari Effective T = 5 jam
Frekuensi = 20.58824 shipment/th Port Time = 11 jam
Cargo Carr = 60068 ton/th = hari
= 600675 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 68077 ton/th
= 680765 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 16
Commissio = 350
Frekuensi = 21.875
Cargo Carr = 63822
= 638218
jam
/trip
/tahun
Pangkalan Susu
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Balikpapan
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
143251 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 12 jam Fuel Oil
3511 Nm Port Time = 10 jam Harga IFO =
203 jam Port Time = 11 jam IFO =
272 jam Port Time = 12 jam Biaya Fuel =
12 hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Lampung Port of Loa = Tanjung Priok Biaya Diese=
117 Nm AT+WT+IT = 8 jam =
9 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2918 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Balikpapan Port Time = 12 jam Port of Loa =
Tanjung Perak = hari Tarif Labuh =
872 Biaya L =
68 Port Time POD 1 Tarif Tamb =
POD 1 = Lampung Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Balikpapan Produktivi = 700 MT/jam Tarif Teta =
Tanjung Perak Payload = 2918 ton Tarif Varia =
481 Nm Effective T = 5 jam Asumsi Jum=
37 jam Port Time = 12 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Tanjung Perak Port Time POD 2 Lama Penu =
Pangkalan Susu POL 2 = Balikpapan Biaya =
1154 Nm AT+WT+IT = 5 jam Total Biay =
89 jam Produktivi = 600 MT/jam =
Payload = 2918 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Pangkalan Susu Port Time = 10 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
887 Nm Tarif Tamb =
69 jam Port Time POD 3 Etmal =
POL 3 = Tanjung Perak Biaya =
AT+WT+IT = 6 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
15 hari Payload = 2918 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
23.33333 shipment/th Port Time = 11 jam Tarif Teta =
68077 ton/th = hari Tarif Varia =
680765 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
68077 POD 4 = Pangkalan Susu =
### AT+WT+IT = 7 jam
### /roundtrip Produktivi = 650 MT/jam Port of Dis =
### /tahun Payload = 2918 ton Tarif Labuh =
### /tahun Effective T = 5 jam Biaya L =
### /roundtrip Port Time = 12 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
700,000 Tarif Teta =
800,000 Tarif Varia =
800,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
20
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Pangkalan Susu
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 143521 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 12 jam Fuel Oil
= 4035 Nm Port Time = 10 jam Harga IFO
= 278 jam Port Time = 12 jam IFO
= 312 jam Port Time = 11 jam Biaya Fuel
= 13 hari = 57 jam
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Lampung Port of Loa = Tanjung Priok Biaya Diese
= 117 Nm AT+WT+IT = 8 jam
= 9 jam Produktivi = 900 MT/jam Total Biay
Payload = 2918 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Balikpapan Port Time = 12 jam Port of Loa
= Pangkalan Susu = hari Tarif Labuh
= 872 Biaya L
= 68 Port Time POD 1 Tarif Tamb
POD 1 = Lampung Etmal
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya
= Balikpapan Produktivi = 700 MT/jam Tarif Teta
= Pangkalan Susu Payload = 2918 ton Tarif Varia
= 1454 Nm Effective T = 5 jam Asumsi Jum
= 112 jam Port Time = 12 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= Pangkalan Susu Port Time POD 2 Lama Penu
= Tanjung Perak POL 2 = Balikpapan Biaya
= 1154 Nm AT+WT+IT = 5 jam Total Biay
= 89 jam Produktivi = 600 MT/jam
Payload = 2918 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= Tanjung Perak Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 438 Nm Tarif Tamb
= 34 jam Port Time POD 3 Etmal
POL 3 = Pangkalan Susu Biaya
AT+WT+IT = 7 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 650 MT/jam Tarif Varia
= 16 hari Payload = 2918 ton Asumsi Jum
= 350 hari Effective T = 5 jam Biaya
= 21.875 shipment/th Port Time = 12 jam Tarif Teta
= 63822 ton/th = hari Tarif Varia
= 638218 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 63822 POD 4 = Tanjung Perak
= ### AT+WT+IT = 6 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis
### /tahun Payload = 2918 ton Tarif Labuh
= ### /tahun Effective T = 5 jam Biaya L
### /roundtrip Port Time = 11 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 800,000 Tarif Varia
Demand POD 4 800,000 Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
21
RUTE
= Lampung
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= Pangkalan Susu
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 1 jam
= ###
= ### /trip
= ### /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 145231 Port Time = 12 jam
Seatime Port Time = 12 jam
Jarak Total = 3451 Nm Port Time = 12 jam
Seatime To = 207 jam Port Time = 11 jam
Seatime ro = 266 jam Port Time = 10 jam
= 12 hari = 57 jam
Total Port Time
= 3 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Lampung Port of Loa = Tanjung Priok
Jarak 1 = 117 Nm AT+WT+IT = 8 jam
Seatime 1 = 9 jam Produktivi = 900 MT/jam
Payload = 2918 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Pangkalan Susu Port Time = 12 jam
POD 2 = Tanjung Perak = hari
Jarak 2 = 934
Seatime 2 = 72 Port Time POD 1
POD 1 = Lampung
Seatime PO2 - POD 3 AT+WT+IT = 7 jam
POD 2 = Pangkalan Susu Produktivi = 700 MT/jam
POD 3 = Tanjung Perak Payload = 2918 ton
Jarak 3 = 1154 Nm Effective T = 5 jam
Seatime 3 = 89 jam Port Time = 12 jam
= hari
Seatime POD 3 - POD 4
POD 3 = Tanjung Perak Port Time POD 2
POD 4 = Balikpapan POL 2 = Pangkalan Susu
Jarak 4 = 481 Nm AT+WT+IT = 7 jam
Seatime 4 = 37 jam Produktivi = 650 MT/jam
Payload = 2918 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = Balikpapan Port Time = 12 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 765 Nm
Seatime 5 = 59 jam Port Time POD 3
POL 3 = Tanjung Perak
AT+WT+IT = 6 jam
Perhitungan Frekuensi Produktivi = 600 MT/jam
Roundtrip = 15 hari Payload = 2918 ton
Commissio = 350 hari Effective T = 5 jam
Frekuensi = 23.33333 shipment/th Port Time = 11 jam
Cargo Carr = 68077 ton/th = hari
= 680765 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 68077 ton/th
= 680765 ton/kontrak
Perhitungan Frekuensi
Roundtrip = 15 hari
Commissio = 350 hari
Frekuensi = 23.33333 shipment/th
Cargo Carr = 68077 ton/th
= 680765 ton/kontrak
/kapal/gerakan
/GT/Kapal/Gerakan Perhitungan Frekuensi
Roundtrip = 15
Commissio = 350
Frekuensi = 23.33333
Cargo Carr = 68077
= 680765
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
GT/Kunjungan
/GT/etmal
/kapal/gerakan
/GT/Kapal/Gerakan
/roundtrip
gan waktu Port Time Voyage Cost
154321 Port Time = 12 jam Biaya Bahan Bakar
time Port Time = 12 jam Fuel Oil
Nm Port Time = 12 jam Harga IFO = ###
jam Port Time = 10 jam IFO = 1794.931
jam Port Time = 11 jam Biaya Fuel = ###
hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
POL - POD 1 Harga HSD = ###
Tanjung Priok Port Time POL WFO = 179.5
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese= ###
Nm AT+WT+IT = 8 jam =
jam Produktivi = 900 MT/jam Total Biay = ###
Payload = 2918 ton = ###
OD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Port Time = 12 jam Port of Loa = Tanjung Priok
Balikpapan = hari Tarif Labuh = Rp 73
Biaya L = ###
Port Time POD 1 Tarif Tamb = Rp 68
POD 1 = Pangkalan Susu Etmal = 1
O2 - POD 3 AT+WT+IT = 7 jam Biaya = ###
Produktivi = 650 MT/jam Tarif Teta = ###
Balikpapan Payload = 2918 ton Tarif Varia = Rp 22
Nm Effective T = 5 jam Asumsi Jum= 3
jam Port Time = 12 jam Biaya = ###
= hari Tarif Teta = ###
OD 3 - POD 4 Tarif Varia = Rp 3
Balikpapan Port Time POD 2 Lama Penu = Rp 1
Tanjung Perak POL 2 = Lampung Biaya = ###
Nm AT+WT+IT = 7 jam Total Biay = ###
jam Produktivi = 700 MT/jam = ###
Payload = 2918 ton
OD 4 - TUKS Effective T = 5 jam Port of Dis = Pangkalan Susu
Tanjung Perak Port Time = 12 jam Tarif Labuh = Rp 73
Tanjung Priok = hari Biaya L = ###
Nm Tarif Tamb = Rp 68
jam Port Time POD 3 Etmal = 1
POL 3 = Balikpapan Biaya = ###
AT+WT+IT = 5 jam Tarif Teta = ###
an Frekuensi Produktivi = 600 MT/jam Tarif Varia = Rp 22
hari Payload = 2918 ton Asumsi Jum= 3
hari Effective T = 5 jam Biaya = ###
shipment/th Port Time = 10 jam Tarif Teta = ###
ton/th = hari Tarif Varia = Rp 3
ton/kontrak Lama Penu = 2
Biaya = ###
harter Hire Port Time POD 4 Total Biay = ###
POD 4 = Tanjung Perak = ###
AT+WT+IT = 6 jam
/roundtrip Produktivi = 600 MT/jam Port of Dis = Lampung
/tahun Payload = 2918 ton Tarif Labuh = Rp 73
/tahun Effective T = 5 jam Biaya L = ###
/roundtrip Port Time = 11 jam Tarif Tamb = Rp 68
/masa kontrak = hari Etmal = 1
Biaya = ###
Tarif Teta = ###
Tarif Varia = Rp 22
Asumsi Jum= 3
Biaya = ###
/ton Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1
Biaya = Rp -
Total Biay = ###
= ###
jam
/trip
/tahun
Balikpapan
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
Tanjung Perak
GT/Kunjungan
/trip
/GT/etmal
/trip
/kapal/gerakan
/GT/Kapal/Gerakan
gerakan
jam
/trip
/tahun
/roundtrip
/tahun
Perhitungan waktu Port Time Voyage Cost
154231 Port Time = 12 jam Biaya Bahan Bakar
Seatime Port Time = 12 jam Fuel Oil
3562 Nm Port Time = 12 jam Harga IFO =
217 jam Port Time = 11 jam IFO =
276 jam Port Time = 10 jam Biaya Fuel =
12 hari = 57 jam =
Total Port Time
= 3 hari Diesel Oil
Seatime POL - POD 1 Harga HSD =
Tanjung Priok Port Time POL WFO =
Pangkalan Susu Port of Loa = Tanjung Priok Biaya Diese=
887 Nm AT+WT+IT = 8 jam =
69 jam Produktivi = 900 MT/jam Total Biay =
Payload = 2918 ton =
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
Lampung Port Time = 12 jam Port of Loa =
Tanjung Perak = hari Tarif Labuh =
934 Biaya L =
72 Port Time POD 1 Tarif Tamb =
POD 1 = Pangkalan Susu Etmal =
Seatime PO2 - POD 3 AT+WT+IT = 7 jam Biaya =
Lampung Produktivi = 650 MT/jam Tarif Teta =
Tanjung Perak Payload = 2918 ton Tarif Varia =
495 Nm Effective T = 5 jam Asumsi Jum=
39 jam Port Time = 12 jam Biaya =
= hari Tarif Teta =
Seatime POD 3 - POD 4 Tarif Varia =
Tanjung Perak Port Time POD 2 Lama Penu =
Balikpapan POL 2 = Lampung Biaya =
481 Nm AT+WT+IT = 7 jam Total Biay =
37 jam Produktivi = 700 MT/jam =
Payload = 2918 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis =
Balikpapan Port Time = 12 jam Tarif Labuh =
Tanjung Priok = hari Biaya L =
765 Nm Tarif Tamb =
59 jam Port Time POD 3 Etmal =
POL 3 = Tanjung Perak Biaya =
AT+WT+IT = 6 jam Tarif Teta =
Perhitungan Frekuensi Produktivi = 600 MT/jam Tarif Varia =
15 hari Payload = 2918 ton Asumsi Jum=
350 hari Effective T = 5 jam Biaya =
23.33333 shipment/th Port Time = 11 jam Tarif Teta =
68077 ton/th = hari Tarif Varia =
680765 ton/kontrak Lama Penu =
Biaya =
Voyage Charter Hire Port Time POD 4 Total Biay =
68077 POD 4 = Balikpapan =
### AT+WT+IT = 5 jam
### /roundtrip Produktivi = 600 MT/jam Port of Dis =
### /tahun Payload = 2918 ton Tarif Labuh =
### /tahun Effective T = 5 jam Biaya L =
### /roundtrip Port Time = 10 jam Tarif Tamb =
### /masa kontrak = hari Etmal =
- Biaya =
600,000 Tarif Teta =
800,000 Tarif Varia =
700,000 Asumsi Jum=
### Biaya =
### /ton Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Port of Dis =
Tarif Labuh =
Biaya L =
Tarif Tamb =
Etmal =
Biaya =
Tarif Teta =
Tarif Varia =
Asumsi Jum=
Biaya =
Tarif Teta =
Tarif Varia =
Lama Penu =
Biaya =
Total Biay =
=
Total Biay =
=
29
RUTE
Tanjung Perak
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
Balikpapan
Rp 73 GT/Kunjungan
### /trip
Rp 68 /GT/etmal
1
### /trip
### /kapal/gerakan
Rp 22 /GT/Kapal/Gerakan
3 gerakan
###
###
Rp 3
1 jam
###
### /trip
### /tahun
### /roundtrip
### /tahun
Perhitungan waktu Port Time Voyage Cost
= 1231 Port Time = 12 jam Biaya Bahan Bak
Seatime Port Time = 11 jam Fuel Oil
= 1684 Nm Port Time = 10 jam Harga IFO
= 71 jam Port Time = 0 jam IFO
= 130 jam Port Time = 0 jam Biaya Fuel
= 6 hari = 33 jam
Total Port Time
= 2 hari Diesel Oil
Seatime POL - POD 1 Harga HSD
= Tanjung Priok Port Time POL WFO
= Tanjung Perak Port of Loa = Tanjung Priok Biaya Diese
= 438 Nm AT+WT+IT = 8 jam
= 34 jam Produktivi = 900 MT/jam Total Biay
Payload = 2918 ton
Seatime POD 1 - POD 2 Effective T = 4 jam Biaya Pelabuhan
= Balikpapan Port Time = 12 jam Port of Loa
= - = hari Tarif Labuh
= 481 Biaya L
= 37 Port Time POD 1 Tarif Tamb
POD 1 = Tanjung Perak Etmal
Seatime PO2 - POD 3 AT+WT+IT = 6 jam Biaya
= Balikpapan Produktivi = 600 MT/jam Tarif Teta
= - Payload = 2918 ton Tarif Varia
= 0 Nm Effective T = 5 jam Asumsi Jum
= 0 jam Port Time = 11 jam Biaya
= hari Tarif Teta
Seatime POD 3 - POD 4 Tarif Varia
= - Port Time POD 2 Lama Penu
= - POL 2 = Balikpapan Biaya
= 0 Nm AT+WT+IT = 5 jam Total Biay
= 0 jam Produktivi = 600 MT/jam
Payload = 2918 ton
Seatime POD 4 - TUKS Effective T = 5 jam Port of Dis
= - Port Time = 10 jam Tarif Labuh
= Tanjung Priok = hari Biaya L
= 765 Nm Tarif Tamb
= 59 jam Port Time POD 3 Etmal
POL 3 = - Biaya
AT+WT+IT = 0 jam Tarif Teta
Perhitungan Frekuensi Produktivi = 0 MT/jam Tarif Varia
= 8 hari Payload = 2918 ton Asumsi Jum
= 350 hari Effective T = 0 jam Biaya
= 43.75 shipment/th Port Time = 0 jam Tarif Teta
= 127644 ton/th = hari Tarif Varia
= 1276435 ton/kontrak Lama Penu
Biaya
Voyage Charter Hire Port Time POD 4 Total Biay
= 127644 POD 4 = -
= ### AT+WT+IT = 0 jam
### /roundtrip Produktivi = 0 MT/jam Port of Dis
### /tahun Payload = 2918 ton Tarif Labuh
= ### /tahun Effective T = 0 jam Biaya L
### /roundtrip Port Time = 0 jam Tarif Tamb
= ### /masa kontrak = hari Etmal
Demand POD 1 - Biaya
Demand POD 2 700,000 Tarif Teta
Demand POD 3 - Tarif Varia
Demand POD 4 - Asumsi Jum
Total Demand ### Biaya
= ### /ton Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Port of Dis
Tarif Labuh
Biaya L
Tarif Tamb
Etmal
Biaya
Tarif Teta
Tarif Varia
Asumsi Jum
Biaya
Tarif Teta
Tarif Varia
Lama Penu
Biaya
Total Biay
Total Biay
30
RUTE
= Tanjung Perak
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp 3
= 2 jam
= ###
= ### /trip
= ### /tahun
= Balikpapan
= Rp 73 GT/Kunjungan
= ### /trip
= Rp 68 /GT/etmal
= 1
= ### /trip
= ### /kapal/gerakan
= Rp 22 /GT/Kapal/Gerakan
= 3 gerakan
= ###
= ###
= Rp -
= 1 jam
= Rp -
= ### /trip
= ### /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= -
= Rp - GT/Kunjungan
= Rp - /trip
= Rp - /GT/etmal
= 1
= Rp - /trip
= Rp - /kapal/gerakan
= Rp - /GT/Kapal/Gerakan
= 3 gerakan
= Rp -
= ###
= Rp -
= 1 jam
= Rp -
= Rp - /trip
= Rp - /tahun
= ### /roundtrip
= ### /tahun
Perhitungan waktu Port Time
Rute = 1321 Port Time = 12 jam
Seatime Port Time = 10 jam
Jarak Total = 1684 Nm Port Time = 11 jam
Seatime To = 96 jam Port Time = 0 jam
Seatime ro = 130 jam Port Time = 0 jam
= 6 hari = 33 jam
Total Port Time
= 2 hari
Seatime POL - POD 1
POL = Tanjung Priok Port Time POL
POD 1 = Balikpapan Port of Loa = Tanjung Priok
Jarak 1 = 765 Nm AT+WT+IT = 8 jam
Seatime 1 = 59 jam Produktivi = 900 MT/jam
Payload = 2918 ton
Seatime POD 1 - POD 2 Effective T = 4 jam
POD 1 = Tanjung Perak Port Time = 12 jam
POD 2 = - = hari
Jarak 2 = 481
Seatime 2 = 37 Port Time POD 1
POD 1 = Balikpapan
Seatime PO2 - POD 3 AT+WT+IT = 5 jam
POD 2 = Tanjung Perak Produktivi = 600 MT/jam
POD 3 = - Payload = 2918 ton
Jarak 3 = 0 Nm Effective T = 5 jam
Seatime 3 = 0 jam Port Time = 10 jam
= hari
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Tanjung Perak
Jarak 4 = 0 Nm AT+WT+IT = 6 jam
Seatime 4 = 0 jam Produktivi = 600 MT/jam
Payload = 2918 ton
Seatime POD 4 - TUKS Effective T = 5 jam
POD 4 = - Port Time = 11 jam
TUKS = Tanjung Priok = hari
Jarak 5 = 438 Nm
Seatime 5 = 34 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0 jam
Perhitungan Frekuensi Produktivi = 0 MT/jam
Roundtrip = 8 hari Payload = 2918 ton
Commissio = 350 hari Effective T = 0 jam
Frekuensi = 43.75 shipment/th Port Time = 0 jam
Cargo Carr = 127644 ton/th = hari
= 1276435 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1241 Port Time = 12
Tanjung Perak Seatime Port Time = 11
Nm Jarak Total = 1050 Nm Port Time = 12
Seatime To = 73 jam Port Time = 0
Nm Seatime ro = 82 jam Port Time = 0
= 4 hari = 35
Total Port Time
Nm = 2
Seatime POL - POD 1
Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Tanjung Perak Port of Loa = Tanjung Priok
Nm Jarak 1 = 438 Nm AT+WT+IT = 8
Seatime 1 = 34 jam Produktivi = 900
Payload = 2918
Seatime POD 1 - POD 2 Effective T = 4
POD 1 = Lampung Port Time = 12
POD 2 = - =
Jarak 2 = 495
Seatime 2 = 39 Port Time POD 1
POD 1 = Tanjung Perak
Seatime PO2 - POD 3 AT+WT+IT = 6
POD 2 = Lampung Produktivi = 600
POD 3 = - Payload = 2918
Jarak 3 = 0 Nm Effective T = 5
Seatime 3 = 0 jam Port Time = 11
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 = Lampung
Jarak 4 = 0 Nm AT+WT+IT = 7
Seatime 4 = 0 jam Produktivi = 700
Payload = 2918
Seatime POD 4 - TUKS Effective T = 5
POD 4 = - Port Time = 12
TUKS = Tanjung Priok =
Jarak 5 = 117 Nm
Seatime 5 = 9 jam Port Time POD 3
POL 3 = -
AT+WT+IT = 0
Perhitungan Frekuensi Produktivi = 0
Roundtrip = 6 hari Payload = 2918
Commissio = 350 hari Effective T = 0
Frekuensi = 58.33333 shipment/th Port Time = 0
Cargo Carr = 170191 ton/th =
= 1701914 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
Rute Perhitungan waktu Port Time
Tanjung Priok Rute = 1421 Port Time =
Lampung Seatime Port Time =
117 Nm Jarak Total = 1050 Nm Port Time =
Tanjung Perak Seatime To = 48 jam Port Time =
495 Nm Seatime ro = 82 jam Port Time =
- = 4 hari =
Total Port Time
0 Nm =
- Seatime POL - POD 1
0 Nm POL = Tanjung Priok Port Time POL
Tanjung Priok POD 1 = Lampung Port of Loa =
438 Nm Jarak 1 = 117 Nm AT+WT+IT =
Seatime 1 = 9 jam Produktivi =
Payload =
Seatime POD 1 - POD 2 Effective T =
POD 1 = Tanjung Perak Port Time =
POD 2 = - =
Jarak 2 = 495
Seatime 2 = 39 Port Time POD 1
POD 1 =
Seatime PO2 - POD 3 AT+WT+IT =
POD 2 = Tanjung Perak Produktivi =
POD 3 = - Payload =
Jarak 3 = 0 Nm Effective T =
Seatime 3 = 0 jam Port Time =
=
Seatime POD 3 - POD 4
POD 3 = - Port Time POD 2
POD 4 = - POL 2 =
Jarak 4 = 0 Nm AT+WT+IT =
Seatime 4 = 0 jam Produktivi =
Payload =
Seatime POD 4 - TUKS Effective T =
POD 4 = - Port Time =
TUKS = Tanjung Priok =
Jarak 5 = 438 Nm
Seatime 5 = 34 jam Port Time POD 3
POL 3 =
AT+WT+IT =
Perhitungan Frekuensi Produktivi =
Roundtrip = 6 hari Payload =
Commissio = 350 hari Effective T =
Frekuensi = 58.33333 shipment/th Port Time =
Cargo Carr = 170191 ton/th =
= 1701914 ton/kontrak
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Port of Dis = -
Tarif Labuh = Rp - GT/Kunjungan
Biaya L = Rp - /trip
Tarif Tamb = Rp - /GT/etmal
Etmal = 1
Biaya = Rp - /trip
Tarif Teta = Rp - /kapal/gerakan
Tarif Varia = Rp - /GT/Kapal/Gerakan
Asumsi Jum= 3 gerakan
Biaya = Rp -
Tarif Teta = ###
Tarif Varia = Rp -
Lama Penu = 1 jam
Biaya = Rp -
Total Biay = Rp - /trip
= Rp - /tahun
Total Biay = ### /roundtrip
= ### /tahun
33