A PEKERJAAN PONDASI
1 Pas.Bouwplank T.1,00M/m' 56.22 m' 10,000 562,222
2 Galian Tanah Pondasi
pondasi Telapak 4.42 m3 35,000 154,560
Pondasi Batu Kali 4.60 m3 35,000 161,000
3 Bor Strous diameter 30 cm 46.00 m' 25,000 1,150,000
4 Cor beton strouss diameter 300cm - -
Beton 2.44 m3 850,000 2,071,811
Pembesian besi DEFORM 13 239.63 kg 9,500 2,276,519
besi 8 63.53 kg 9,500 603,569
5 Plat setempat PONDASI TELAPAK - -
Plat setempat 80 x80 - -
Beton 2.29 m3 850,000 1,946,311
Pembesian besi DEFORM 13 123.94 kg 9,500 1,177,466
besi DEFORM 13 123.94 kg 9,500 1,177,466
Plat setempat 50 x 50 - -
Beton 0.26 m3 850,000 217,222
Pembesian besi DEFORM 10 10.24 kg 9,500 97,287
besi DEFORM 10 10.24 kg 9,500 97,287
6 Pasangan Batu Kali 1:6 Pondasi Rumah 12.27 m3 650,000 7,973,333
7 Pasangan Batu Kali 1:6 Pondasi pagar Halaman 2.20 m3 650,000 1,428,556
8 Pasangan Batu Kali 1/2 camp. 1:6 4.91 m3 650,000 3,189,333
9 Tanah Urug.----diperhitungkan di fasum -
-
SUB TOTAL BIAYA PEKERJAAN PONDASI - 24,283,943
-
B PEKERJAAN STRUKTUR - `
LANTAI 1 -
1 Beton sloff 15/30 - -
Beton 2.42 m3 750,000 1,811,250
Pembesian besi DEFORM 13 223.66 kg 8,500 1,901,093
besi DEFORM 12 95.29 kg 8,500 809,933
besi 6 62.73 kg 8,500 533,206
begesting 32.20 m2 25,000 805,000
2 Beton sloff 15/20 - -
Beton 0.33 m3 750,000 247,250
Pembesian besi DEFORM 12 39.02 kg 8,500 331,687
besi 6 9.59 kg 8,500 81,540
begesting 4.40 m2 25,000 109,889
3 kolom 15/30.30 - -
Beton 1.21 m3 750,000 905,625
Pembesian besi DEFORM 12 127.05 kg 8,500 1,079,911
besi 6 28.85 kg 8,500 245,230
begesting 21.47 m2 50,000 1,073,333
4 kolom 15/30 - -
Beton 2.01 m3 750,000 1,509,375
Pembesian besi DEFORM 12 238.22 kg 8,500 2,024,833
besi 6 52.28 kg 8,500 444,338
begesting 20.13 m2 50,000 1,006,250
5 kolom 15/15 - -
Beton 0.40 m3 750,000 301,875
Pembesian besi 10 44.11 kg 8,500 374,969
besi 6 12.97 kg 8,500 110,241
begesting 3.07 m2 50,000 153,333
6 BALOK 15 /50 - -
Beton 4.60 m3 750,000 3,450,000
Pembesian besi 13 255.61 kg 8,500 2,172,678
besi 10 75.62 kg 8,500 642,804
besi 6 107.99 kg 8,500 917,924
begesting 52.13 m2 100,000 5,213,333
7 BALOK anak 15/25 - -
Beton 0.29 m3 750,000 215,625
Pembesian besi 10 18.91 kg 8,500 160,701
besi 6 7.83 kg 8,500 66,530
begesting 2.99 m2 100,000 299,000
8 Plat Lisplang - -
Beton 0.54 m3 750,000 402,500
Pembesian besi 8 14.12 kg 8,500 119,990
besi 8 20.17 kg 8,500 171,414
begesting 7.67 m2 100,000 766,667
9 Plat tangga - -
Beton 1.15 m3 750,000 862,500
Pembesian besi 10 31.51 kg 8,500 267,835
besi 10 31.51 kg 8,500 267,835
begesting 7.67 m2 100,000 766,667
LANTAI 2 - -
1 Plat Lantai - -
Beton 4.75 m3 850,000 4,033,817
Pembesian besi 8 250.06 kg 8,500 2,125,539
besi 8 250.06 kg 8,500 2,125,539
begesting 46.00 m2 150,000 6,900,000
2 kolom 15/30.30 - -
Beton 1.38 m3 850,000 1,173,000
Pembesian besi DEFORM 12 145.20 kg 8,500 1,234,184
besi 6 32.97 kg 8,500 280,263
begesting 24.53 m2 50,000 1,226,667
3 kolom 15/15 - -
Beton 1.61 m3 850,000 1,368,500
Pembesian besi 10 176.46 kg 8,500 1,499,876
NO PEKERJAAN VOL SAT Harga Satuan JUMLAH