DAFTAR

HARGA DASAR SATUAN UPAH


HARGA
No. URAIAN SATUAN SATUAN KETERANGAN
( Rp.) ( hari )

1. Pekerja Jam 10,783.00

2. Tukang Jam 13,375.00

3. Mandor Jam 15,533.00

4. Operator Jam 15,967.00

5. Pembantu Operator Jam 14,667.00

6. Sopir / Driver Jam 14,667.00

7. Pembantu Sopir / Driver Jam 12,508.00

8. Mekanik Jam 15,967.00

9. Pembantu Mekanik Jam 12,508.00

12.

File : 527059994.xls
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. URAIAN SATUAN SATUAN KETERANGAN
( Rp.)

1. Tanah urugan Biasa M3 29,600.00

2. Tanah urugan pilihan M3 29,600.00

3. Pasir Beton M3 130,300.00

4. Pasir urug M3 130,300.00

5. Sirtu M3 0.00

6. Batu pecah ukuran 10,0 - 15,0 cm M3 147,600.00

7. Batu pecah ukuran 5,0 - 7,0 cm M3 175,000.00

8. Batu pecah ukuran 4,0 - 6,0 cm M3 185,000.00

9. Batu pecah ukuran 3,0 - 5,0 cm M3 200,000.00

10. Batu pecah ukuran 2,0 - 3,0 cm M3 250,000.00

11. Batu pecah ukuran 1,0 - 2,0 cm M3 275,000.00

12. Batu pecah ukuran 0,50 - 1,0 cm M3 300,000.00

13. Debu batu M3 350,000.00

Berlanjut ke halaman berikut

File : 527059994.xls
DAFTAR
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
No. URAIAN SATUAN SATUAN KETERANGAN
( Rp.)

14 Agregat untuk Pondasi Klas A :


- Agregat Kasar M3 541,660.00
- Agregat Halus M3 372,428.00

15 Agregat untuk Pondasi Klas B :


- Agregat Kasar M3 519,713.00
- Agregat Halus M3 114,177.00

16 Agregat untuk Pondasi Klas S :


- Agregat Kasar M3 558,229.00
- Agregat Halus M3 114,651.00

17 Agregat untuk Pondasi Klas C (Pengkkrikilan) :


- Agregat Kasar M3 72,457.00
- Agregat Halus M3 107,188.00

18 Agregat untuk Pondasi Agregat semen :


- Agregat Kasar M3 520,727.00
- Agregat Halus M3 119,825.00

19 Agregat untuk HRSS Klas B :


- Agregat ukuran 0,50 - 2,00 Mm M3 440,010.00
- Agregat ukuran 0,00 - 0,50 Mm M3 470,000.00
- Pasir halus M3 119,825.00
- Filler M3 1,012.00

20 Agregat untuk Lapen Permukaan :


- Agregat Pokok M3 511,100.00
- Agregat Pengunci M3 555,025.00
- Agregat Penutup M3 588,850.00

21 Agregat Lapen Pondasi :


- Agregat Kasar M3 472,625.00
- Agregat Halus M3 555,025.00

22 Agregat untuk HRS-Wearing Course :


- Agregat ukuran 0,50 - 2,00 Mm M3 429,000.00
- Agregat ukuran 0,00 - 0,50 Mm M3 470,000.00
- Pasir halus M3 119,825.00
- Filler M3 1,012.00

23 Agregat untuk HRS-Base Course :


- Agregat ukuran 0,50 - 2,00 Mm M3 429,000.00
- Agregat ukuran 0,00 - 0,50 Mm M3 470,000.00
- Pasir halus M3 119,825.00
- Filler M3 1,012.00

24 Agregat untuk Beton (uk. Max. 3,50 cm)


- Agregat Kasar M3 516,109.00
- Agregat Halus M3 119,825.00

25 Agregat untuk Beton (uk. Max. 2,50 cm)


- Agregat Kasar M3 566,425.00
- Agregat Halus M3 119,825.00

26 Agregat untuk Beton (uk. Max. 19,00 cm)


- Agregat Kasar M3 566,425.00
- Agregat Halus M3 119,825.00

Berlanjut ke halaman berikut

File : 527059994.xls
DAFTAR
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
No. URAIAN SATUAN SATUAN KETERANGAN
( Rp.)

27 Beton K-400 M3 1,826,355.20 Lokasi Pekerjaan


Beton K-350 M3 1,773,609.20 -sda'-
Beton K-300 M3 -sda'-
Beton K-250 M3 1,670,217.20 -sda'-
Beton K-225 M3 -sda'-
Beton K-175 M3 -sda'-
Beton Siklop K-175 M3 -sda'-
Beton K-150 M3 -sda'-
Beton K-125 M3 -sda'-
Beton B0 M3 1,400,013.00 -sda'-

28 Baja Tulangan u-22 Kg 14,500.00 Lokasi Pekerjaan


Baja Tulangan u-24 Kg 21,500.00 Lokasi Pekerjaan
Baja Tulangan u-32
Baja Tulangan u-39
Baja Tulangan u-48

29 Kawat beton (Bindrat) Kg 15,000.00 Lokasi Pekerjaan


Strand Kg 45,000.00 Lokasi Pekerjaan
30 Kawat Beronjong Kg 40,000.00 Lokasi Pekerjaan

31 Rambu Lalu-lintas (termasuk tiang) Bh Base Camp

32 Pipa galvanis dia. 1.0" M' 25,000.00 Base Camp


Pipa galvanis dia. 2.0" M' 45,000.00 -sda'-
Pipa galvanis dia. 4.0" M' 80,000.00 -sda'-

33 Road Paint/Serbuk Thermoplastic Kg 75,000.00 Base Camp


Tinner Road Paint 25,000.00 -sda'-
Glass Bit 45,000.00 -sda'-

34 Guard Rall (rel Pengaman) M' Base Camp

35 Aspal Panas I (aspal drum) Drum 1,402,149.75 Base Camp


Kg 9,347.67

36 Aspal Panas II (aspal curah) Kg 12,395.00 Lokasi Pencampuran Aspal

37 Solar Ltr 8,000.00 Base Camp

38 Bensin Ltr 8,500.00 Base Camp

39 Minyak Tanah Ltr 12,033.00 Base Camp

40 Minyak Pelumas Ltr 31,333.00 Base Camp

41 Semen Zak 103,658 Base Camp


Kg 2,073.16

42 Kayu Bekisting Dos 75,000.00 Lokasi Pekerjaan

43 Kayu Klas II : - Balok M3 2,950,000.00 Pelabuhan terdekat


Kayu Klas II : - Papan M3 1,867,000.00

44 Kayu Belian : - Balok M3 6,200,000.00 Base Camp


Kayu Klas II : - Papan M3 6,200,000.00

Berlanjut ke halaman berikut

File : 527059994.xls
DAFTAR
HARGA DASAR SATUAN BAHAN
Lanjutan
HARGA
No. URAIAN SATUAN SATUAN KETERANGAN
( Rp.)

45 Cerucuk dia. 10-12 cm panj. 400 Cm Btg 17,400.00 Lokasi Pekerjaan


Cerucuk dia. 15-20 cm panj. 400 Cm Btg Lokasi Pekerjaan

46 Kayu Bakar M3 91,500.00 Base Camp

47 Geotextile M3 Base Camp

48 Pipa porous untuk sub drain M' Lokasi Pekerjaan

49 Pipa Baja dia. 100 cm M' 22,750,000 Lokasi Pekerjaan


Pipa Baja dia. 80 cm M' 26,000,000 Lokasi Pekerjaan
Pipa Baja dia. 60 cm M' 33,750,000 Lokasi Pekerjaan
Pipa Baja dia. 40 cm M' 54,350,000 Lokasi Pekerjaan
Baja Profil M' 140,000.000 Lokasi Pekerjaan

50 Baja dgn tegangan leleh 100 Kg/cm2 Kg

51 Bout Btg 4,000 Base Camp

52 Beugel Btg 27,500 Base Camp

53 Paku biasa Kg 15,000.00 Base Camp

54 Paku belian Kg Base Camp

55 Cat kilat Kg 40,000.00 Base Camp

56 Tinner Ltr 17,500.00 -sda'-

57 Cat dinding Kg 25,000.00 -sda'-

58 Air Ltr 50.00 Lokasi Pekerjaan

59 Bahan tambahan (addetive) beton Ltr 25,000.00 Lokasi Pekerjaan

60 Baja tegangan leleh 3200 Kg/Cm2 Kg

61 Bahan2 untuk perkerasan beton :


a. Sealer Kg Lokasi pekerjaan
b. Curring compound Kg Lokasi pekerjaan
c. Crack inducer (kayu klas II 3x6x380 cm) Kg Lokasi pekerjaan
d. Kap tie-bar/dowel (Pipa PVC panj. 50 cm) Btg Lokasi pekerjaan
e. Plastik penyekat M2 Lokasi pekerjaan
f. Cat Anti Karat Kg Lokasi pekerjaan

62 Bahan Cat : *) Kilat Kg Base Camp


Bahan Cat : *) Dinding Kg 65,000.00 -sda'-
Bahan Cat : *) Weathernound emultion Kg -sda'-
Bahan Cat : *) Tinner Ltr -sda'-
Bahan Cat : *) Anti Karat (aluminium epxy mast Kg -sda'-

File : 527059994.xls
Formulir Penentuan Harga Bahan
Bahan : Semen

No Uraian Kegiatan Biaya Jumlah Kombinasi


Rp/satuan Jumlah (Rp) (Rp)

1 Harga di Pontianak Rp/ton ### 1,140,000.00

2 Handling - - -

3 Transport ke proyek Rp/ton 300,000.00 300,000.00

4 Pembongkaran, gudang Rp/ton 1,250.00 1,250.00

5 Waste 5% Rp/ton 57,000.00 57,000.00

subtotal Rp/ton 1,498,250.00

6 Keuntungan & Overhead Rp/ton 74,912.50


5 % (hanya utk pekerjaan
harian)

total jumlah Rp/ton 1,573,162.50


Rp/zak 78,658.13

7 Harga Netto Rp/zak 25,000.00


8 Harga setelah ditambah Rp/zak 103,658.13

Bahan : Aspal

No Uraian Kegiatan Biaya Jumlah Kombinasi


Rp/satuan Jumlah (Rp) (Rp)

1 Harga di pelabuhan Rp/ton ### 6,666,666.67


dari Jakarta

2 Handling Rp/ton 1,500.00 1,500.00

3 Transport ke proyek Rp/ton 466,666.67 466,666.67

4 Pembongkaran, gudang Rp/ton 1,500.00 1,500.00

5 Waste 2% Rp/ton 4,300.00 4,300.00

subtotal Rp/ton 7,140,633.33

6 Keuntungan & Overhead Rp/ton 357,031.67


5 % (hanya utk pekerjaan
harian)

total jumlah Rp/ton 7,497,665.00


Rp/kg 7,497.67

7 Harga Netto Rp/kg 1,850.00


8 Harga setelah ditambah Rp/kg 9,347.67