Anda di halaman 1dari 5

KELOMPOK 4/D

NAMA : YULIANA PUTRI ANANDA SARI (192040)

NADILA RAHAYU (192050)

M. ALI MURTADHO (192053)

RAYHAN THORIQ HILMYANSYAH (192037)

JOFAN ADITHAMA (192046)

NABILA SAHASNA (192049)

JAWAB:

1. TOTAL DISPLACEMENT PHASE 1-4


2. WAKTU TOTAL KONSOLIDASI PHASE PRELOADING 1-4
 PHASE 1 (7 HARI)
 PHASE 2 (47 HARI)
 PHASE 3 (51 HARI)
 PHASE 4 (57,78 HARI)
3. SAFETY ANALYSIS

4. WAKTU KONSOLIDASI VERTIKAL DRAIN UPDATE DAN NO UPDATE

5. TOTAL DISPLACEMENT VS WAKTU WATER PREASURE

Anda mungkin juga menyukai