ENERGY SOLUTION SJCS

PT KRAKATAU DAYA LISTRIK s K;-.


Jl, Amerika I Kawasan Industri Krakatau
PO BOX 156 Cilegon 42443 Indonesia
Phone:(0254) 372710 396502; Fax:(0254)396502

SURAT PENAWARAN HARGA


No. : 174/CSBU-KDL/MSA/SPH/0521
Lampiran :2Lembar

Kepada Yth,
Pimpinan
PT SAMATOR TAIYO
Di-
Cilegon.

Dengan hormat,
Menindakianjuti permohonan penawaran harga untuk pekerjaan "Maintenance Panel Electrical & Trafo", dengan ini kami sampaikan Surat
Penawaran Harga (SPH), dengan ketenluan sebagai berikut(Detail terlampir):

1.1.Harga penawaran Rp.46,939,000


empaf puluh enam juta sembilan ratus tiga puluh sembilan ribu rupiah

1.2. Lama pekerjaan -1 hari kalender pelaksanaan pekerjaan


-14 hari kalender Report Test

1.3. Proses pembayaran 100% setelah PO terbit

1.4. Masa beriaku penawaran 15 hari kalender

1.5. Kondisi Exclude PPN 10%

Demikian penawaran ini kami sampaikan, atas perhatian dan kerjasama yang baik kami ucapkan terimakasih.

Keterangan:

Cilegon, 28 Mei 2021


PT KRAKATAU DAYA LISTRIK
Commerce & Service Business Unit

Yona Sembada
SMP Superintendent

Cc Yth,
■ Arsip

F.UOJ.06.16.01 Revisi; 01 Tgl.Efektif: 22/03/10 Halaman 1 dari 1

<Ej(ecution J/ewness T,fficient (,'ratefuCIntegrity


RINCIAN HARGA PENAWARAN
KRAKATAU 5KSB «CB
Ciflhk ENERGY SOLUTION Lampiran SPH No : 174/CSBU-KDL7SMP/SPH/0521 s Kh
Jl. Amerika I Kawasan Industri Krakatau
PO BOX 156 Cilegon 42442 Indonesia MAINTENANCE PANEL ELECTRICAL & TRAFO
Phone:(0254)372710 396502; Fax:(0254) 396502 PT SAMATOR TAIYO

HARGA SATUAN JUMLAH


Jumlah
NO. URAIAN PEKERJAAN & MATERIAL VOL SAT Material Alat & Jasa Material Alat & Jasa KET
5Ei
MAINTENANCE PANEL ELECTRICAL & TRAFO

Mobdemob alat & personil 1.0 Is 17,425,890 17,425,890 17,425,890


Rapid test 12 orang personil 1.0 Is 3,552,000 3,552,000 3,552,000

1 Maintenance Panel Works

A Maintenance Panel
1 Panel UPSTREAM LVSWGR 6.0 Cubicle 185,578 1,113,469 1,113,469
2 Grounding Box(ETB) 1.0 unit 138,750 138,750 138,750

B Test Protection
1 Test ACB LS 3.0 unit 4,440,000 13,320,000 13,320,000
2 Test protection OCR/EFR, OVR/UVR 3.0 unit 1,261,937 3,785,810 3,785,810
3 Test Microfarad & Ampere capasitor bank 4.0 unit 832,500 3,330,000 3,330,000
4 Test grounding 1.0 unit 555,000 555,000 555,000

C Material support 1.0 lot 3,552,000 3,552,000 3,552,000


1 Cotton waste
2 Glove & masker
3 Sanpoli
4 Counpound
5 Cotton waste soap / chemical liquid
6 Contact cleaner
7 Grease electrical
8 Genset temporary for maintenance (by Samator)

D Documentation & report 1.0 lot 166,500 166,500 166,500

Scope of work
Tightening Bolt & nut
Dust vacum cleaner
Cleaning body and Cover panel
Check condition part electrical LBS, ACB, MCCB & Etc
Check metering
Check condition Metering
Chech insulation Resistance

Page 1 of 2
HAR6A SATUAN JUMLAH
NO. Jumlah
URAIAN PEKERJAAN & MATERiAL VOL SAT Material Alat & Jasa Material Alat & Jasa KET
Rp. Rp. Rp. Rp.
Greasing for mechanical contact
Greasing for electrical contact
Test record
Recommendation report

Material 3,552,000
Alat & Jasa 43,387,419
Total 46,939,419
Dibulatkan 46,939,000

Terbilang: Cilegon, 28 Mei 2021


empat puluh enam juta sembilan ratus tiga puluh sembilan ribu rupiah PT KRAKATAU DAYA LISTRIK
Commerce & Service Business Unit
Catatan:
- Exclude PPN 10%
- Lama pelaksanaan pekerjaan 1 hari kalender
- Report test 14 hari kalender Yona
SMP Superintendent

F,UOJ.06.16.02c RevisiiOl Tgl Efektif: 22/03/10


Execution Newness Efficient Reliable Grateful Integrity

Page 2 of 2