Anda di halaman 1dari 50

NO URAIAN PEKERJAAN

(1) (2)

A PEKERJAAN PERSIAPAN
1 Mobilisasi Alat, Material & Tenaga Kerja
2 Papan Nama Pekerjaan
3 Dokumentasi dan Pelaporan

B PENGADAAN DERMAGA
1 Floating Dock
2 Connecting Pins
3 Sliding Nut
4 Lug Connectors
5 Nut For Lug Connectors
6 Spacer
7 Tool For Connecting Pin
8 Tool For Lug Connector

C PEKERJAAN DERMAGA
1 Pemasangan Dermaga Apung
2 Alat Bantu

TOTAL A + B + C
PAJAK PERTAMBAHAN NILAI (PPN) 10%
GRAND TOTAL
DIBULATKAN
Terbilang : Satu Milyar Sembilan Ratus Tiga Puluh Delapan Juta Sembilan Ratus Dua Puluh Lima Ribu Rupiah

NO. URAIAN

A. DAFTAR TENAGA KERJA


1 Pekerja
2 Tukang
3 Kepala Tukang
4 Mandor
5 Supir

B. DAFTAR BAHAN / MATERIAL


1 Floating Dock
2 Connecting Pins
3 Sliding Nut
4 Lug Connectors
5 Nut For Lug Connectors
6 Spacer
7 Tool For Connecting Pin
8 Tool For Lug Connector

C. DAFTAR PERALATAN
1 Flat Bed Truck 3-4 M3
2 Pick Up
3 Ponton
4 Tug Boat
5 Alat Bantu

A. URAIAN PERALATAN

1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harg
B. BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B
2 Faktor Angsuran Modal =

3 Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

Biaya Pasti per Jam =

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms

2 Pelumas = (2.5%-3%) x Pw x Mp

Biaya bengkel (6.25% dan 8.75%) x B W

3 Perawatan dan (12,5 % - 17,5 %) x B


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1

5 Pembantu Operat = ( 1 Orang / Jam ) x U2


Biaya Operasi per Jam
D. TOTAL BIAYA SEWA ALAT / JAM
E. LAIN - LAIN
1 Tingkat Suku Bunga
2 Upah Operator / Sopir
3 Upah Pembantu Operator / Pmb.Sopir
4 Bahan Bakar Bensin
5 Bahan Bakar Solar
6 Minyak Pelumas
7 PPN diperhitungkan pada lembar Rekapitula
Biaya Pekerjaan

No. ELEMEN BIAYA


1. Biaya CIF di Pelabu
2. Penanganan / Pera

3. Angkutan ke Lapan

4. Bongkar Muatan, P

T0TAL (Rp.)

No. ELEMEN BIAYA

1. Biaya CIF di Pelabu


2. Penanganan / Pera

3. Angkutan ke Lapan
4. Bongkar Muatan, P

No. ELEMEN BIAYA

1. Biaya CIF di Pelabu

2. Penanganan / Pera
3. Angkutan ke Lapan

4. Bongkar Muatan, P

No. ELEMEN BIAYA


1. Biaya CIF di Pelabu
2. Penanganan / Pera

3. Angkutan ke Lapan

4. Bongkar Muatan, P

No. ELEMEN BIAYA

1. Biaya CIF di Pelabu


2. Penanganan / Pera

3. Angkutan ke Lapan

4. Bongkar Muatan, P

No. ELEMEN BIAYA

1. Biaya CIF di Pelabu

2. Penanganan / Pera
3. Angkutan ke Lapan

4. Bongkar Muatan, P

No. ELEMEN BIAYA


1. Biaya CIF di Pelabu
2. Penanganan / Pera

3. Angkutan ke Lapan

4. Bongkar Muatan, P

No. ELEMEN BIAYA

1. Biaya CIF di Pelabu


2. Penanganan / Pera

3. Angkutan ke Lapan

4. Bongkar Muatan, P

NO URAIAN JENIS PEKER

B PENGADAAN DERMA
1 Floating Dock
2 Connecting Pins
3 Sliding Nut
4 Lug Connectors
5 Nut For Lug Connect
6 Spacer
7 Tool For Connecting
8 Tool For Lug Connec

C PEKERJAAN DERMA
1 Pemasangan Dermag
2 Alat Bantu

TOTAL

A PEKERJAAN PERSIAP

1 Mobilisasi Alat, Mate


2 Papan Nama Pekerja

3 Dokumentasi dan Pe
B PENGADAAN DERMA

1 Floating Dock
2 Connecting Pins

3 Sliding Nut
4 Lug Connectors

5 Nut For Lug Connecto

6 Spacer
7 Tool For Connecting

8 Tool For Lug Connect

C PEKERJAAN DERMAG

1 Pemasangan Dermag

2 Alat Bantu
JUMLAH HARGA (Rp)

JUMLAH BOBOT PEKERJAAN

RENCANA KEMAJUAN PEKERJAAN MINGGUAN (%)

RENCANA KEMAJUAN PEKERJAAN KUMULATIF (%)

NO. Jenis Peralatan

1 Flat Bed Truck 3-4 M3

2 Pick Up

3 Ponton

4 Tug Boat

5 Alat Bantu

NO. NAMA BAHAN/MATERIAL

1 Floating Dock
2 Connecting Pins

3 Sliding Nut

4 Lug Connectors

5 Nut For Lug Connectors

6 Spacer

7 Tool For Connecting Pin

8 Tool For Lug Connector

NO. Nama Personil/Tenaga Kerja

1 SITE MANAGER

2 TENAGA AHLI K3 KONTRUKSI

3 JURU GAMBAR

4 SURVEYOR

5 ADMINISTRASI / KEUANGAN

6 Pekerja

7 Tukang

8 Kepala Tukang

9 Mandor

10 Supir

No.Mata
Pembayaran
TOTAL ( % )

NO

A PEKERJAAN PERSIAPAN
1 Mobilisasi Alat, Material & Tenaga Kerja
2 Papan Nama Pekerjaan
3 Dokumentasi dan Pelaporan

TOTAL DAFTAR 1
( Pindahkan nilai total ke Daftar Rekapitulas

NO

B PENGADAAN DERMAGA
1 Floating Dock
2 Connecting Pins
3 Sliding Nut
4 Lug Connectors
5 Nut For Lug Connectors
6 Spacer
7 Tool For Connecting Pin
8 Tool For Lug Connector

C PEKERJAAN DERMAGA
1 Pemasangan Dermaga Apung
2 Alat Bantu

TOTAL DAFTAR 2
( Pindahkan nilai total ke Daftar Rekapitulas

NO

TOTAL DAFTA 3
( Pindahkan nilai total ke Daftar Rekapitulas

DAFTAR 1 : Mata Pembayaran Umum

DAFTAR 2 : Mata Pembayaran Utama

DAFTAR 3 : Mata Pembayaran

JUMLAH ( DAFTAR 1 + 2 + 3 )
PPN 10%
TOTAL NILAI
DIBULATKAN
URAIAN PEKERJAAN
URAIAN PEKERJAAN

x
I. BARANG
1). Material Langsung (bahan baku)
2). Peralatan Barang Jadi

II. JASA
3). Menejemen proyek dan perekayasaan
4). Alat kerja/ Fasilitas kerja
5). Konstruksi dan fabrikasi
6). Jasa umum

TOTAL BIAYA ( I + II )

NO NAMA

Nama
Jabatan
Alamat
NO. JENIS/TYPE PEKERJAAN

1 2
I PEKERJAAN PERSIAPAN

Mobilisasi Alat, Material & Tenaga Kerja

Papan Nama Pekerjaan

Dokumentasi dan Pelaporan

II PENGADAAN DERMAGA

3
II

1
Floating Dock
a) Kecelakaan Lalulintas -- Luka berat/ ringan/ kematian b. Tertimpa material saat bongkar muat -- Luka berat/ringan

Connecting Pins
a) Kecelakaan Lalulintas -- Luka berat/ ringan/ kematian ---- Utamakan keselamatan
3 b. Tertimpa material saat bongkar muat -- Luka berat/ringan ---- Mematuhi rambu lalulintas
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm

4
Sliding Nut
a) Kecelakaan Lalulintas -- Luka berat/ ringan/ kematian ---- Utamakan keselamatan
b. Tertimpa material saat bongkar muat -- Luka berat/ringan ---- Mematuhi rambu lalulintas
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm

Lug Connectors
a) Kecelakaan Lalulintas -- Luka berat/ ringan/ kematian b. Tertimpa material saat bongkar muat -- Luka berat/ringan

5 Nut For Lug Connectors

Spacer

8
Tool For Connecting Pin

Tool For Lug Connector

C PEKERJAAN DERMAGA

Pemasangan Dermaga Apung

Alat Bantu
SATUAN KUANTITAS UNIT PRICE

(2) (3) (4) (5)

Ls 1 86,300,000.00
Ls 1 500,000.00
Ls 1 4,500,000.00
A. TOTAL PERSIAPAN PEKERJAAN

Unit 952 1,100,000.00


Unit 654 244,000.00
Unit 654 125,000.00
Unit 584 215,000.00
Unit 584 101,000.00
Unit 198 65,100.00
Unit 1 1,850,000.00
Unit 1 1,550,000.00
B. TOTAL PENGADAAN DERMAGA

Ls 1 118,000,000.00
Ls 1 64,000,000.00
C. TOTAL PEKERJAAN DERMAGA

SAT. HARGA SATUAN (Rp.)

OH
OH
OH 110,000.00
OH 100,000.00
Jam 100,000.00

Unit 1,100,000.00
Unit 244,000.00
Unit 125,000.00
Unit 215,000.00
Unit 101,000.00
Unit
Unit 1,850,000.00
Unit 1,550,000.00

Jam 521,672.00
Hari 1,000,000.00
Jam 500,000.00
Jam 500,000.00
Ls 64,000,000.00

FLAT BED TRUCK 3-4 M3

Pw 190
Cp
konomis A
W 2,000.00
c. Harga Alat B 398,100,000.00

C 39,810,000.00
i x (1 + i)^A D 0.30541
(1 + i)^A - 1

(B-C)xD E 54,712.56
W
0.002 x B F 398.1
W
(E+F) G

RJA

w x Ms H

x Mp I

n 8.75%) x B W J

7,5 %) x B K

g / Jam ) x U1 L

g / Jam ) x U2 M
= (H+I+K+L+M) P 466,560.98
= (G+P) S
N
ku Bunga i
rator / Sopir U1
bantu Operator / Pmb.Sopir U2
ar Bensin Mb
ar Solar Ms
lumas Mp
hitungkan pada lembar Rekapitulasi
erjaan

ELEMEN BIAYA HARGA SATUAN (Rp)


Biaya CIF di Pelabuhan / Penambangan 1,028,500.00 / Kg
Penanganan / Perawatan 1,500.00 / Kg

Angkutan ke Lapangan 50,000.00 / Kg

Bongkar Muatan, Penyimpanan, dll. 20,000.00 / Kg

T0TAL (Rp.)

ELEMEN BIAYA Rp. / SATUAN

Biaya CIF di Pelabuhan / Penambangan 206,000.00 / M3


Penanganan / Perawatan 1,000.00 / M3

Angkutan ke Lapangan 35,000.00 / M3


Bongkar Muatan, Penyimpanan, dll. 2,000.00 / M3

T0TAL (Rp.)

ELEMEN BIAYA Rp. / SATUAN

Biaya CIF di Pelabuhan / Penambangan 87,000.00 / M3

Penanganan / Perawatan 1,000.00 / M3


Angkutan ke Lapangan 35,000.00 / M3

Bongkar Muatan, Penyimpanan, dll. 2,000.00 / M3

T0TAL (Rp.)

ELEMEN BIAYA Rp. / SATUAN


Biaya CIF di Pelabuhan / Penambangan 177,000.00 / Kg
Penanganan / Perawatan 1,000.00 / Kg

Angkutan ke Lapangan 35,000.00 / Kg

Bongkar Muatan, Penyimpanan, dll. 2,000.00 / Kg

T0TAL (Rp.)
ELEMEN BIAYA Rp. / SATUAN

Biaya CIF di Pelabuhan / Penambangan 63,000.00 / Kg


Penanganan / Perawatan 1,000.00 / Kg

Angkutan ke Lapangan 35,000.00 / Kg

Bongkar Muatan, Penyimpanan, dll. 2,000.00 / Kg

T0TAL (Rp.)
ELEMEN BIAYA Rp. / SATUAN

Biaya CIF di Pelabuhan / Penambangan 37,100.00 / Kg

Penanganan / Perawatan 1,000.00 / Kg


Angkutan ke Lapangan 25,000.00 / Kg

Bongkar Muatan, Penyimpanan, dll. 2,000.00 / Kg

T0TAL (Rp.)
ELEMEN BIAYA Rp. / SATUAN
Biaya CIF di Pelabuhan / Penambangan 1,679,000.00 / Kg
Penanganan / Perawatan 1,000.00 / Kg

Angkutan ke Lapangan 150,000.00 / Kg

Bongkar Muatan, Penyimpanan, dll. 20,000.00 / Kg

T0TAL (Rp.)
ELEMEN BIAYA Rp. / SATUAN

Biaya CIF di Pelabuhan / Penambangan 1,379,000.00 / Kg


Penanganan / Perawatan 1,000.00 / Kg

Angkutan ke Lapangan 150,000.00 / Kg

Bongkar Muatan, Penyimpanan, dll. 20,000.00 / Kg

T0TAL (Rp.)
URAIAN JENIS PEKERJAAN SATUAN KUANTITAS
UKURAN

PENGADAAN DERMAGA
Floating Dock Unit 952
Connecting Pins Unit 654
Sliding Nut Unit 654
Lug Connectors Unit 584
Nut For Lug Connectors Unit 584
Spacer Unit 198
Tool For Connecting Pin Unit 1
Tool For Lug Connector Unit 1

PEKERJAAN DERMAGA
Pemasangan Dermaga Apung Ls 1
Alat Bantu Ls 1

TOTAL

PEKERJAAN PERSIAPAN

Mobilisasi Alat, Material & Tenaga Kerja 1.00

Papan Nama Pekerjaan

Dokumentasi dan Pelaporan


PENGADAAN DERMAGA

Floating Dock 952

Connecting Pins 654.00

Sliding Nut 654

Lug Connectors 584.00

Nut For Lug Connectors 584.00

Spacer 198

Tool For Connecting Pin 1.00

Tool For Lug Connector 1.00

PEKERJAAN DERMAGA

Pemasangan Dermaga Apung

Alat Bantu

latan JUMLAH SAT JADWAL PENGGUNAAN PERALATAN

BULAN - I

1 2 3

d Truck 3-4 M3 1 Unit

1 Unit

1 Unit

at 1 Unit

ntu 1 Ls

N/MATERIAL JUMLAH SAT JADWAL PENGGUNAAN BAHAN/MATERIAL

1 2

ck 952 Unit
Pins 654 Unit

654 Unit

tors 584 Unit

Connectors 584 Unit

198 Unit

nnecting Pin 1 Unit

g Connector 1 Unit

sonil/Tenaga Kerja JUMLAH SAT JADWAL PENGGUNAAN PERSONIL INTI DAN TENAGA KERJA

BU

1 2 3

ANAGER 1 Org

A AHLI K3 KONTRUKSI 1 Org

AMBAR 1 Org

YOR 1 Org

ISTRASI / KEUANGAN 1 Org

15 Org

4 Org

Tukang 1 Org

r 1 Org

2 Org

Jenis Pekerjaan
URAIAN PEKERJAAN SATUAN UKURAN

AN PERSIAPAN
i Alat, Material & Tenaga Kerja Ls
ma Pekerjaan Ls
ntasi dan Pelaporan Ls

AFTAR 1
an nilai total ke Daftar Rekapitulasi )

URAIAN PEKERJAAN SATUAN UKURAN

AAN DERMAGA
Dock Unit
ng Pins Unit
ut Unit
ectors Unit
ug Connectors Unit
Unit
Connecting Pin Unit
Lug Connector Unit

AN DERMAGA
gan Dermaga Apung Ls
u Ls

AFTAR 2
an nilai total ke Daftar Rekapitulasi )

URAIAN PEKERJAAN SATUAN UKURAN

AFTA 3
an nilai total ke Daftar Rekapitulasi )

MATA PEMBAYARAN

NILAI GABUNGAN BARANG/JASA


1,346,495,821.22
-

Sub Total I 1,346,495,821.22


-
202,705,877.00
121,094,728.26
92,363,373.52

Sub Total II 416,163,978.78


1,762,659,800.00

NAMA SPESIFIKASI

: USMAN BAKRI
: Direktur / CV. BANGUN KARYA BEUTARI

IDENTIFIKASI JENIS BAHAYA & RISIKO K3

a) Kecelakaan Lalulintas -- Luka berat/ ringan/ kematian

a) Terkena Peralatan Kerja -- Luka berat/ringan

a) Terkena Peralatan Kerja -- Luka berat/ringan


Luka berat/ringan

Luka berat/ringan

a) Kecelakaan Lalulintas -- Luka berat/ ringan/ kematian b. Tertimpa material saat bongkar muat -- Luka berat/ringan

a) Kecelakaan Lalulintas -- Luka berat/ ringan/ kematian b. Tertimpa material saat bongkar muat -- Luka berat/ringan

a) Kecelakaan Lalulintas -- Luka berat/ ringan/ kematian b. Tertimpa material saat bongkar muat -- Luka berat/ringan

a) Kecelakaan Lalulintas -- Luka berat/ ringan/ kematian b. Tertimpa material saat bongkar muat -- Luka berat/ringan

a) Terkena Peralatan Kerja -- Luka berat/ringan


b) Terseret arus saat pemasangan -- Luka berat/ ringan/ kematian

a) Terkena Peralatan Kerja -- Luka berat/ringan


AMOUNT

(5) (7) = (4) X (5)

0 86,300,000.00
500,000.00
4,500,000.00
91,300,000.00

1,047,200,000.00
159,576,000.00
81,750,000.00
125,560,000.00
58,984,000.00
12,889,800.00
1,850,000.00
1,550,000.00
1,489,359,800.00

00 118,000,000.00
0 64,000,000.00
182,000,000.00

1,762,659,800.00
176,265,980.00
1,938,925,780.00
1,938,925,000.00

HARGA SATUAN (Rp.)

110,000.00
100,000.00
100,000.00

1,100,000.00
244,000.00
125,000.00
215,000.00
101,000.00

1,850,000.00
1,550,000.00

521,672.00
1,000,000.00
500,000.00
500,000.00
64,000,000.00

190

2,000.00
398,100,000.00

39,810,000.00
0.30541 -

54,712.56 Rupiah

Rupiah

55,110.66

237,120.00

152,000.00

17,416.88

24,881.25

22,857.14

12,285.71
Rupiah
521,672.00

22,857.14
12,285.71
11,000.00
11,000.00
35,000.00

HARGA SATUAN (Rp)


1,028,500.00 / Kg
1,500.00 / Kg

50,000.00 / Kg

20,000.00 / Kg

Rp. / SATUAN

206,000.00 / M3
1,000.00 / M3

35,000.00 / M3
2,000.00 / M3

Rp. / SATUAN

87,000.00 / M3

1,000.00 / M3
35,000.00 / M3

2,000.00 / M3

Rp. / SATUAN
177,000.00 / Kg
1,000.00 / Kg

35,000.00 / Kg

2,000.00 / Kg

Rp. / SATUAN

63,000.00 / Kg
1,000.00 / Kg

35,000.00 / Kg

2,000.00 / Kg

Rp. / SATUAN

37,100.00 / Kg

1,000.00 / Kg
25,000.00 / Kg

2,000.00 / Kg

Rp. / SATUAN
1,679,000.00 / Kg
1,000.00 / Kg

150,000.00 / Kg

20,000.00 / Kg

Rp. / SATUAN

1,379,000.00 / Kg
1,000.00 / Kg

150,000.00 / Kg

20,000.00 / Kg

HARGA
SATUAN

1,100,000.00
244,000.00
125,000.00
215,000.00
101,000.00
65,100.00
1 1,850,000.00
1 1,550,000.00

1 118,000,000.00
1 64,000,000.00

1.00 Ls

1 Ls

1 Ls
952 Unit

654.00 Unit

654 Unit

584.00 Unit

584.00 Unit

198 Unit

1.00 Unit

1.00 Unit

1 Ls

1 Ls

N-I BULAN - II

3 4 5

AAN BAHAN/MATERIAL

BULAN - I

2 3 4
INTI DAN TENAGA KERJA

BULAN - I BULAN - II

3 4 5
RAN KUANTITAS

Ls 1
Ls 1
Ls 1

RAN KUANTITAS

952
654
654
584
584
198
1
1

Ls 1
Ls 1

RAN KUANTITAS

A PEMBAYARAN

UNGAN BARANG/JASA
Dalam
Negeri
(Rp.) [ DN ]
a
821.22

821.22

7.00
8.26
.52

8.78
800.00

SI

PENGENDALIAN RISIKO K3

---- Utamakan keselamatan


---- Mematuhi rambu lalulintas
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm

---- Utamakan keselamatan


---- Hati-hati dalam berkerja
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm

---- Utamakan keselamatan


---- Hati-hati dalam berkerja
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm
---- Utamakan keselamatan
---- Mematuhi rambu lalulintas
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm

---- Utamakan keselamatan


---- Mematuhi rambu lalulintas
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm

---- Utamakan keselamatan


---- Mematuhi rambu lalulintas
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm

---- Utamakan keselamatan


---- Mematuhi rambu lalulintas
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm

---- Utamakan keselamatan


---- Mematuhi rambu lalulintas
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm

---- Utamakan keselamatan


---- Mematuhi rambu lalulintas
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm

---- Utamakan keselamatan


---- Hati-hati dalam berkerja
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm

---- Utamakan keselamatan


---- Hati-hati dalam berkerja
---- Memakai Pelindung Badan dan menggunakan
Sepatu Boat dan Helm
KETERANGAN

86,000.00
95,000.00

65,100.00
HP
10 M3
5 Tahun
Jam
Rupiah

Rupiah
-

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

16 % / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

JUMLAH HARGA (Rp)


1,028,500.00
1,500.00

50,000.00

20,000.00

1,100,000.00

JUMLAH HARGA (Rp)

206,000.00
1,000.00

35,000.00
2,000.00

244,000.00

JUMLAH HARGA (Rp)

87,000.00

1,000.00
35,000.00

2,000.00

125,000.00

JUMLAH HARGA (Rp)


177,000.00
1,000.00

35,000.00

2,000.00

215,000.00
JUMLAH HARGA (Rp)

63,000.00
1,000.00

35,000.00

2,000.00

101,000.00
JUMLAH HARGA (Rp)

37,100.00

1,000.00
25,000.00

2,000.00

65,100.00
JUMLAH HARGA (Rp)
1,679,000.00
1,000.00

150,000.00

20,000.00

1,850,000.00
JUMLAH HARGA (Rp)

1,379,000.00
1,000.00

150,000.00

20,000.00

1,550,000.00
TOTAL
HARGA

1,047,200,000.00
159,576,000.00
81,750,000.00
125,560,000.00
58,984,000.00
12,889,800.00
1,850,000.00
1,550,000.00

118,000,000.00
64,000,000.00

1,671,359,800.00

86,300,000.00 86,300,000.00

Ls 500,000.00 500,000.00

Ls 4,500,000.00 4,500,000.00
1,100,000.00 1,047,200,000.00

244,000.00 159,576,000.00

125,000.00 81,750,000.00

215,000.00 125,560,000.00

101,000.00 58,984,000.00

65,100.00 12,889,800.00

1,850,000.00 1,850,000.00

1,550,000.00 1,550,000.00

Ls 118,000,000.00 118,000,000.00

Ls 64,000,000.00 64,000,000.00
1,762,659,800.00

BULAN - II BULAN - III

6 7 8 9 10

BULAN - II BULA

5 6 7 8 9 10
BULAN - III

5 6 7 8 9 10

Persentase dari harga Total Mata Pembayaran


-

HARGA SATUAN TOTAL HARGA - HARGA

86,300,000.00 86,300,000.00
500,000.00 500,000.00
4,500,000.00 4,500,000.00

91,300,000.00

HARGA SATUAN TOTAL HARGA - HARGA

1,100,000.00 1,047,200,000.00
244,000.00 159,576,000.00
125,000.00 81,750,000.00
215,000.00 125,560,000.00
101,000.00 58,984,000.00
65,100.00 12,889,800.00
1,850,000.00 1,850,000.00
1,550,000.00 1,550,000.00

118,000,000.00 118,000,000.00
64,000,000.00 64,000,000.00

1,671,359,800.00

HARGA SATUAN TOTAL HARGA - HARGA

HARGA

91,300,000.00

1,671,359,800.00

1,762,659,800.00
176,265,980.00
1,938,925,780.00
1,938,925,000.00

Luar Total
Negeri
(Rp.) [ LN ]
Luar
Negeri (Rp.)
(Rp.) [ LN ] (Rp.)

b c
- 1,346,495,821.22
- -

- 1,346,495,821.22
- -
- 202,705,877.00
- 121,094,728.26
- 92,363,373.52

- 416,163,978.78
- 1,762,659,800.00

SATUAN JUMLAH

TOTA

N RISIKO K3

amatan
bu lalulintas
dung Badan dan menggunakan
lm

amatan
berkerja
dung Badan dan menggunakan
lm

amatan
berkerja
dung Badan dan menggunakan
lm
amatan
bu lalulintas
dung Badan dan menggunakan
lm

amatan
bu lalulintas
dung Badan dan menggunakan
lm
OTAL
ARGA

00.00
00
00
00
00
00
0
0

00
00

0.00

86,300,000.00 4.90 1.71 1.71

500,000.00 0.03 0.03

4,500,000.00 0.26 0.02 0.02 0.02 0.02 0.02 0.02


1,047,200,000.00 59.41 4.75 6.54 7.13 7.72

159,576,000.00 9.05 0.91 1.00 1.09 1.18

81,750,000.00 4.64 0.46 0.51 0.56 0.6

125,560,000.00 7.12 0.71 0.78 0.85 0.93

58,984,000.00 3.35 0.33 0.37 0.40 0.44

12,889,800.00 0.73 0.07 0.08 0.09 0.1

1,850,000.00 0.10 0.01 0.01 01 0.01

1,550,000.00 0.09 0.01 0.01 0.01 0.01

118,000,000.00 6.69

64,000,000.00 3.63
9,800.00

100.00

KETERANGAN (%)

BULAN - III BULAN - IV

11 12 13 14 15 16

KETERANGAN (%)

BULAN - III BULAN - IV

10 11 12 13 14 15 16
KETERANGAN (%)

BULAN - III BULAN - IV

10 11 12 13 14 15 16

arga Total Mata Pembayaran


Persentase
( %dari
) harga Penawaran ( % ) Nama Subkontraktor
( Jika diperlukan )
-

TOTAL HARGA - HARGA

86,300,000.00
500,000.00
4,500,000.00

91,300,000.00

TOTAL HARGA - HARGA

1,047,200,000.00
159,576,000.00
81,750,000.00
125,560,000.00
58,984,000.00
12,889,800.00
1,850,000.00
1,550,000.00

118,000,000.00
64,000,000.00

1,671,359,800.00

TOTAL HARGA - HARGA

HARGA

91,300,000.00

1,671,359,800.00

1,762,659,800.00
176,265,980.00
1,938,925,780.00
1,938,925,000.00
TKDN
Total Barang/Jasa Gabungan
(%) (%)
Barang/Jasa Gabungan
(Rp.) %TKDN (%) (%)
(Rp.)

c d e f
495,821.22 100.00% 100.00% 76.39%
0.00% 0.00% 0.00%

495,821.22 100.00% 100.00% 76.39%


0.00% 0.00% 0.00%
05,877.00 100.00% 48.71% 11.50%
4,728.26 100.00% 29.10% 6.87%
3,373.52 100.00% 22.19% 5.24%

3,978.78 100.00% 100.00% 23.61%


659,800.00 100.00% 100.00% 100.00%

AH HARGA

TOTAL HARGA
1.47 10
90
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

80
7.13 7.72 7.13 6.54 4.75

1.18 1.00 0.81 0.72


60
0.6 0.6 0.51 0.42 0.37

0.93 0.93 0.78 0.64 0.57


50
0.44 0.44 0.37 0.30 0.27

40
0.1 0.1 0.08 0.07 0.06
30
0.01 0.01 0.01 0.01 0.01

0.01 0.01 0.01 0.01 0.01


20

10
2.34 1.67 1.47 1.2

1.27 0.91 0.73 0.73


0

Anda mungkin juga menyukai