Date OB (BCM) COAL (MT) FUEL (liter)
OB (BCM) MDT COAL (MT) MTD FUEL (liter) MTD
1-Dec-18 3,444 3,444 7,840 7,840 4,324 4,324
2-Dec-18 4,830 8,274 7,840 8,400 12,724
3-Dec-18 4,536 12,810 7,840 5,249 17,973
4-Dec-18 7,812 20,622 7,840 3,800 21,773
5-Dec-18 9,198 29,820 9,880 17,720 9,576 31,349
6-Dec-18 9,408 39,228 10,280 28,000 8,554 39,903
7-Dec-18 39,228 28,000 39,903
8-Dec-18 39,228 28,000 39,903
Chart Title
9-Dec-18 39,228 28,000 39,903
10-Dec-18 39,228 28,000 45000 39,903
11-Dec-18 39,228 28,000 40000 39,903
12-Dec-18 39,228 28,000 35000 39,903
13-Dec-18 39,228 28,000 30000 39,903
14-Dec-18 39,228 28,000 25000 39,903
15-Dec-18 39,228 28,000 20000 39,903
16-Dec-18 39,228 28,000 15000 39,903
17-Dec-18 39,228 28,000 10000 39,903
18-Dec-18 39,228 28,000 5000 39,903
19-Dec-18 39,228 28,000 0 39,903
1 2 3 4 5 6 7 8 9 10111213141516171819202122232425
20-Dec-18 39,228 28,000 39,903
21-Dec-18 39,228 28,000 39,903Date 4,830 COAL (MT) FUEL (liter)
22-Dec-18 39,228 28,000 39,903
23-Dec-18 39,228 28,000 39,903
24-Dec-18 39,228 28,000 39,903
25-Dec-18 39,228 28,000 39,903
26-Dec-18 39,228 28,000 39,903
27-Dec-18 39,228 28,000 39,903
28-Dec-18 39,228 28,000 39,903
29-Dec-18 39,228 28,000 39,903
30-Dec-18 39,228 28,000 39,903
31-Dec-18 39,228 28,000 39,903
TOTAL 39,228 39,228 28,000.0 28,000 39,903
SUM 39,228 28,000.0 39,903
Catatan ;
1. kegiatan hauling (subcont) tgl 2-4 distop sementara karena ketersediaan tongkang dan vesel di pelabu
Chart Title
120,000

100,000

80,000

60,000
102,540.0
92,001.0
40,000

20,000 39,903.0

-
OB COAL FUEL

Chart Title
APE
160,000
260,000
355,000
470,000
390,000
280,000
450,000
310,000
360,000
31415161718192021222324252627282930313233
290,000
0 COAL (MT) FUEL (liter) 210,000
39,909
ngkang dan vesel di pelabuhan belum tersedia
OB COAL FUEL
39,228 28,000.0 39,903

5999
PROGRESS EFFESIENSI
MINING PLAN
Working Shedule
PROGRESS EFFESIENSI DAN PRODUKTIVITAS
HAULING DONI MOTOR
Progress PO
UKTIVITAS
PAL.5 HRD
Support reapair maintenance Kedisiplinan dan Kebijakan
RR TEKNIK
PT. BARA JASA MULIA
SARONGGA MINE PROJECT
MINE ENGINEERING DEPT

PERIODE : 1 - 20 DESEMBER 2018

LAPORAN MINGGUAN PRODUKSI DAN PENGGUNAAN SOLAR


SUNGAI DUA MINING - HAULING
Date OB (BCM) COAL (MT) FUEL (liter)
Daily MDT Daily MTD Daily MTD
1-Dec-18 3,444 3,444 7,840 7,840 4,324 4,324
2-Dec-18 4,830 8,274 7,840 8,400 12,724
3-Dec-18 4,536 12,810 7,840 5,249 17,973
4-Dec-18 7,812 20,622 7,840 3,800 21,773
5-Dec-18 9,198 29,820 9,880 17,720 9,576 31,349
6-Dec-18 9,429 39,249 10,280 28,000 8,554 39,903
7-Dec-18 3,213 42,462 28,000 39,903
8-Dec-18 2,331 44,793 28,000 39,903
9-Dec-18 4,200 48,993 10,840 38,840 39,903
10-Dec-18 7,623 56,616 12,040 50,880 39,903
11-Dec-18 3,717 60,333 50,880 39,903
12-Dec-18 5,208 65,541 50,880 39,903
13-Dec-18 6,384 71,925 50,880 39,903
14-Dec-18 2,625 74,550 50,880 39,903
15-Dec-18 4,914 79,464 50,880 39,903
16-Dec-18 3,255 82,719 10,880 61,760 39,903
17-Dec-18 1,449 84,168 7,580 69,340 39,903
18-Dec-18 1,344 85,512 10,840 80,180 39,903
19-Dec-18 1,617 87,129 10,480 90,660 39,903
20-Dec-18 4,872 92,001 11,880 102,540 39,903
21-Dec-18 92,001 102,540 39,903
TOTAL 92,001 92,001 102,540.0 102,540 39,903
SUM 92,001 102,540.0 39,903

Catatan ;
1. kegiatan hauling (subcont) tgl 2-4 distop sementara karena ketersediaan tongkang dan vesel di pelabu
GRAFIK PRODUCTI
120,000

100,000

80,000

60,000
102,540.0
92,001.0
40,000

20,000

-
OB COAL

ngkang dan vesel di pelabuhan belum tersedia


OB COAL FUEL
92,001 102,540.0 39,903

GRAFIK PRODUCTION

102,540.0
001.0

39,903.0

OB COAL FUEL
PERIODE : 31 DESEMBER 2018
REVIEW PRODUCTION MINING SEI-2 FUEL CONSUMPTION
OB Removing Coal Getting Fuel Total
Priode
BCM Fuel MT Fuel Liter
Januari 168,081 286,225 189,620 109,023 395,248
Februari 252,154 401,687 242,400 130,920 532,607
Maret 249,382 386,569 213,580 112,612 499,181
April 338,835 417,700 236,400 110,053 527,753
Mei 234,983 356,361 243,100 119,378 475,739
Juni 119,728 245,141 172,640 91,650 336,791
Juli 271,854 455,750 323,960 145,752 601,502
Agustus 291,653 330,017 157,920 68,530 398,547
September 244,739 337,560 255,700 116,610 454,170
Oktober 152,684 242,910 202,780 91,312 334,222
November 94,038 214,133 166,420 78,120 292,253
Desember 141,309 156,059 164,380 82,513 238,572
TOTAL 2,559,439 3,830,112 2,568,900 1,256,473 5,086,585
JANUARI
400,000
OB 168,081
Jan-18 COAL 189,620 350,000

FUEL 395,248 300,000

250,000
395,248
200,000
OB 91,266
Jan-19 COAL 159,356 150,000
189,620 20
FUEL 205,742 100,000 168,081 159,356
91,266
50,000

-
OB COAL FUEL OB COAL FU

OB 252,154 FEBRUARI
Feb-18 COAL 242,400
600,000
FUEL 532,607
500,000

OB 101,136 400,000
Feb-19 COAL 170,640
300,000
FUEL 216,240
200,000

100,000

-
OB COAL FUEL OB COAL FU

OB 249,382
Mar-18 COAL 213,580 Chart Title
FUEL 499,181
500,000
450,000
400,000
OB 162,816
350,000
Mar-19 COAL 290,018
300,000
FUEL 334,199
250,000
200,000
150,000
100,000
50,000
-
OB COAL FUEL OB COAL FUEL
100,000
50,000
-
OB COAL FUEL OB COAL FUEL
OB 338,835
Apr-18 COAL 236,400
600,000
FUEL 527,753 500,000
400,000
300,000
200,000
OB 129,085
100,000
Apr-19 COAL 290,816 -
OB COAL FUEL OB COAL FUEL
FUEL 295,413

Mei
500,000
450,000
OB 234,983 400,000
350,000
May-18 COAL 243,100 300,000
475,739 250,000
FUEL 200,000
150,000
100,000
50,000
OB 107,468 -
OB COAL FUEL OB COAL FUEL
May-19 COAL 227,456
FUEL 249,751

JUNI
350,000
300,000
OB 119,728
250,000
Jun-18 COAL 172,640
336,791 200,000
FUEL
150,000
100,000

OB 90,215 50,000
Jun-19 COAL 193,860 -
OB COAL FUEL OB COAL FUEL
FUEL 217,119 Jun-18 Jun-19
JULI
700,000
OB 271,854 600,000
Jul-18 COAL 323,960
500,000
FUEL 601,502
400,000
300,000
200,000
OB 133,144
100,000
Jul-19 COAL 266,110
-
FUEL 296,852 OB COAL FUEL OB COAL F
Jul-18 Jul-19
UARI

248

205,742
159,356
91,266

OB COAL FUEL

RUARI

L OB COAL FUEL

Title

OB COAL FUEL
OB COAL FUEL

COAL FUEL

B COAL FUEL

JUNI

FUEL OB COAL FUEL


Jun-19
JULI

L FUEL OB COAL FUEL


8 Jul-19
PT BARA JASA MULIA
SARONGGA MINE PROJECT
MINE ENGINEERING DEPT

PERIODE : 30 SEPTEMBER 2019


REVIEW PRODUCTION MINING SEI-2 FUEL CONSUMPTION

OB Removing Coal Getting Fuel Total


Priode
BCM Fuel MT MT (JB) MT (BJM) Fuel Liter Fuel Getting Grafik Produksi & Consumption Fuel 2019
Januari 91,266 125,390 159,356 - 159,356 80,352 205,742 19 400,000
Februari 101,136 126,734 170,640 - 170,640 89,506 216,240 23 350,000
Maret 162,816 199,623 290,018 46,950 243,068 134,576 334,199 33 300,000
April 129,085 153,359 290,816 92,160 198,656 142,054 295,413 29 250,000
Mei 107,468 131,608 227,456 56,070 171,386 118,143 249,751 25 200,000
Juni 90,215 113,510 193,860 72,680 121,180 103,609 217,119 22 150,000
Juli 133,144 160,275 266,110 68,820 197,290 136,577 296,852 29 100,000
Agustus 146,131 133,813 52,200 25,770 26,430 27,701 161,514 16 50,000
September 89,818 79,632 127,190 63,630 63,560 63,452 143,084 14 -
ar
i ri et ril ei ni li s r r r r
Oktober 88,045 115,216 2,100 113,116 - 12 ua ar Ap M Ju Ju tu be be be be
nu br M us m to m m
Ja Fe Ag pte Ok ve se
November 136,607 208,080 33,690 174,390 - 23 Se N o De
Desember 110,336 139,240 139,240 - 18
TOTAL 1,386,065 1,223,944 2,240,182 461,870 1,778,312 895,970 2,119,914 263 Over Burden Coal Fuel
PT BARA JASA MULIA
SUNGAI DUA MINE PROJECT
MINE ENGINEERING DEPT

PERIODE : DESEMBER 2020


REVIEW PRODUCTION MINING SEI-2 FUEL CONSUMPTION

OB By Survey Coal Getting & Coal Hauling Fuel Total RATIO


Priode
BCM Fuel MT MT (BCMP) MT (ASTRI) MT (BJM) Fuel Liter SR Fuel Getting Grafik Produksi & Consumption Fuel 2020
Januari 72,526.32 122,574 164,560 - - 164,560 70,229 192,803 0.44 19 300,000.00
Februari 130,245.62 133,070 143,720 - - 143,720 70,096 203,166 0.91 20 250,000.00
Maret 105,124.32 113,501 122,670 - - 122,670 64,837 178,338 0.86 19
200,000.00
April 140,465.25 151,332 120,016 37,860 - 82,156 67,511 218,843 1.71 21
Mei 117,203.97 138,273 146,576 22,856 12,720 111,000 102,168 240,441 1.06 24 150,000.00
Juni 121,024.47 117,153 148,185 42,345 22,200 83,640 92,722 209,875 1.45 19 100,000.00
Juli 55,125.32 73,065 76,000 3,570 30,850 41,580 50,727 123,792 1.33 13
50,000.00
Agustus 61,180.74 41,923 75,720 15,690 47,670 12,360 61,226 103,149 4.95 9
September 3,524.62 16,633 83,380 11,310 12,730 59,340 43,223 59,856 0.06 7 -
i ri et ri l ei ni li s r r r r
Oktober 40,210.68 54,411 126,230 30,060 8,300 87,870 61,786 116,197 0.46 11 ar ua ar Ju Ju tu be be be be
nu br M Ap M us m to m m
November 65,123.50 81,684 102,790 2,640 5,920 94,230 50,933 132,617 0.69 13
Ja Fe Ag pte Ok ove ese
Se N D
Desember 123,670.00 101,670 - 1.22 15
TOTAL 1,035,424.81 1,043,619 1,309,847 166,331 1,104,796 735,458 1,779,077 0.94 190 Over Burden Coal Fuel
PT BARA JASA MULIA
SUNGAI DUA MINE PROJECT
MINE ENGINEERING DEPT

PERIODE : FEBLUARY 2021


REVIEW PRODUCTION MINING SEI-2 FUEL CONSUMPTION

OB By Survey Coal Getting & Coal Hauling Fuel Total RATIO


Priode Grafik Produksi & Consumption Fuel 2020
BCM Fuel MT MT (JB) MT (BJM) Fuel Liter SR Fuel Getting
Januari 106,874.50 107,944 117,780 8,880 108,900 68,134 176,078 0.98 17 200,000.00
180,000.00
Februari 65,198.00 81,220 117,690 990 116,700 61,291 142,511 0.56 13
160,000.00
Maret 46,607.00 97,951 96,810 20,040 76,770 55,625 153,576 0.61 15 140,000.00
April - - - 120,000.00
Mei - - - 100,000.00
80,000.00
Juni - - -
60,000.00
Juli - - - 40,000.00
Agustus - - - 20,000.00
September - - - -
ar
i ri et ril ei ni li us r r r r
Oktober - - ua ar Ap Ju Ju t be be be be
- nu br M
M us m to m m
Ja Fe Ag pt
e Ok ove e se
November - - - Se N D
Desember - -
TOTAL 218,679.50 287,115 332,280 29,910 302,370 185,050 472,165 0.72 45 Over Burden Coal Fuel
PT. BARA JASA MULIA
SARONGGA MINE PROJECT
MINE ENGINEERING DEPT

PERIODE : 25 Desember 2019


UPDATE UNIT MINING SEI 2 PRIODE Februari 2019
NO UNIT MODEL KATEGORI MERK HM
EXC-23 320D Hydraulic Excavator - Small Class CATERPILLAR 8409
EXC-25 390D Hydraulic Excavator - Big Class CATERPILLAR 15,850.70
EXC-27 349D Hydraulic Excavator - Medium Class CATERPILLAR 12,284.00
EXC-30 329D Hydraulic Excavator - Small Class CATERPILLAR 10,408.00
EXD-17 S500LC Hydraulic Excavator - Medium Class DOOSAN 13,820.80
EXD-20 S500LC Hydraulic Excavator - Medium Class DOOSAN 12,955.30
EXD-32 S500LC Hydraulic Excavator - Medium Class DOOSAN 10,773.10
EXD-33 DX700LC Hydraulic Excavator - Medium Class DOOSAN 10,177.00
ARC-03 740B Articulated Dump Truck - Big Class CATERPILLAR 18,293.00
HDK-01 HD465-7 Rigid Dump Truck - Big Class KOMATSU 14,795.50
HDK-02 HD465-7 Rigid Dump Truck - Big Class KOMATSU 13,458.80
HDC-01 773E Rigid Dump Truck - Big Class CATERPILLAR 20,219.80
HDC-02 773E Rigid Dump Truck - Big Class CATERPILLAR 17,733.70
HDC-03 773E Rigid Dump Truck - Big Class CATERPILLAR 17,959.50
HDC-04 773E Rigid Dump Truck - Big Class CATERPILLAR 7,378.50
HDC-05 775E Rigid Dump Truck - Big Class CATERPILLAR 8,458.00
DTOB-01 ZS700 Dump Truck - 6x4 Damper Vessel HINO 2,828.00
DTOB-03 ZS700 Dump Truck - 6x4 Damper Vessel HINO 3,978.00
DTOB-04 ZS700 Dump Truck - 6x4 Damper Vessel HINO 2,818.00
DTOB-06 ZS700 Dump Truck - 6x4 Damper Vessel HINO 2,886.70
DZK-08 D85ESS-2 Buldozer - Small Class KOMATSU 7,806.60
DZK-09 D85ESS-2 Buldozer - Small Class KOMATSU 7,186.60
MGK-04 GD705A-4 Motor Grader - Big Class KOMATSU 11,193.30
WPC-04 HH220i Support - Water Pump SYKES 13,557.00
WPV-01 DnD200 Support - Water Pump KSB 4,103.00
WT-01 FM 260 Support - Water Truck HINO 11,623.00
PT. BARA JASA MULIA
SARONGGA MINE PROJECT
MINE ENGINEERING DEPT

PERIODE : 07 FEBRUARI 2019


UPDATE MINGGUAN UNIT MINING SEI 2
NO UNIT MODEL KATEGORI MERK SLOC PLANT FUEL SN TAHUN PRODUKSI

EXK-03 PC200-7 Hydraulic Excavator - Small Class KOMATSU KM 5 HEAD OFFIC 400 J31933
EXK-21 PC300SE-8 Hydraulic Excavator - Small Class KOMATSU KM 5 HEAD OFFIC 605 63043 2012
EXK-22 PC300SE-8 Hydraulic Excavator - Small Class KOMATSU KM 5 HEAD OFFIC 605 63025 2012
EXK-24 PC300SE-8 Hydraulic Excavator - Small Class KOMATSU KM 5 HEAD OFFIC 605 J30883 2012
EXC-23 320D Hydraulic Excavator - Small Class CATERPILLAR KNTP - MINING KINTAP 410 TBZP03261 2012
EXC-27 349D Hydraulic Excavator - Medium Class CATERPILLAR SEI2 - MINING SEI DUA 705 LNNF00409 2012
EXC-29 329D Hydraulic Excavator - Small Class CATERPILLAR SEI2 - MINING SEI DUA 520
EXD-15 S500LC Hydraulic Excavator - Medium Class DOOSAN SEI2 - MINING SEI DUA 620
EXD-19 S500LC Hydraulic Excavator - Medium Class DOOSAN SEI2 - MINING SEI DUA 620 DWGHELY0JB1011 2013
HDT-01 TR50 Rigid Dump Truck - Big Class NHL TEREX SEI2 - MINING SEI DUA 470 2016
HDT-02 TR50 Rigid Dump Truck - Big Class NHL TEREX SEI2 - MINING SEI DUA 470 2016
HDT-03 TR50 Rigid Dump Truck - Big Class NHL TEREX SEI2 - MINING SEI DUA 470 T1030-1712 2017
HDT-04 TR50 Rigid Dump Truck - Big Class NHL TEREX SEI2 - MINING SEI DUA 470 T1030-1722 2017
ARC-01 740B Articulated Dump Truck - Big Class CATERPILLAR SEI2 - MINING SEI DUA 560 HL4E00416 2011
ARC-03 740B Articulated Dump Truck - Big Class CATERPILLAR KM 5 HEAD OFFIC 560 HL4E00457 2011
ARC-04 740B Articulated Dump Truck - Big Class CATERPILLAR SEI2 - MINING SEI DUA 560 HL4E00989 2012
ARC-05 740B Articulated Dump Truck - Big Class CATERPILLAR SEI2 - MINING SEI DUA 560 HL4E00990 2012
ARC-06 740B Articulated Dump Truck - Big Class CATERPILLAR KNTP - MINING KINTAP 560 HL4E00991 2012
ARC-07 740B Articulated Dump Truck - Big Class CATERPILLAR KNTP - MINING KINTAP 560 HL4E02164 2013
ARC-08 740B Articulated Dump Truck - Big Class CATERPILLAR KNTP - MINING KINTAP 560 HL4E002159 2013
ARC-09 740B Articulated Dump Truck - Big Class CATERPILLAR SEI2 - MINING SEI DUA 560 HL4E002157 2013
DTOB-01 ZS700 Dump Truck - 6x4 Damper Vessel HINO SEI2 - MINING SEI DUA 330 JHDZ51EPPHXX102 2017
DTOB-02 ZS700 Dump Truck - 6x4 Damper Vessel HINO SEI2 - MINING SEI DUA 330 JHDZ51EPPHXX102 2017
DTOB-03 ZS700 Dump Truck - 6x4 Damper Vessel HINO SEI2 - MINING SEI DUA 330 JHDZ51EPPHXX102 2017
DTOB-04 ZS700 Dump Truck - 6x4 Damper Vessel HINO SEI2 - MINING SEI DUA 330 JHDZ51EPPHXX102 2017
DTOB-05 ZS700 Dump Truck - 6x4 Damper Vessel HINO SEI2 - MINING SEI DUA 330 JHDZ51EPPHXX102 2017
DTOB-06 ZS700 Dump Truck - 6x4 Damper Vessel HINO SEI2 - MINING SEI DUA 330 JHDZ51EPPHXX102 2017
DZK-09 D85ESS-2 Buldozer - Small Class KOMATSU SEI2 - MINING SEI DUA 407 J17000
MGK-04 GD705A-4 Motor Grader - Big Class KOMATSU SEI2 - MINING SEI DUA 400 26063 2016
MGC-02 120K Motor Grader - Small Class CATERPILLAR KNTP - MINING KINTAP 340 0SZN00861 2013
DZC-04 D6R Buldozer - Small Class CATERPILLAR SEI2 - MINING SEI DUA 383 THX37250
DZC-05 D3K Buldozer - Small Class CATERPILLAR BAR BAR 0
DZC-06 D3K Buldozer - Small Class CATERPILLAR BAR BAR 0
DZC-10 D6R Buldozer - Small Class CATERPILLAR SEI2 - MINING SEI DUA 383
DZC-11 D6R Buldozer - Small Class CATERPILLAR SEI2 - MINING SEI DUA 383 TXD04300
WPC-03 HH150ISS Support - Water Pump SYKES KM 5 KM 5 0 09ZR01661. INV.S 2012
VRC-01 CS533 Vibratory Roller - Small Class CATERPILLAR KM 5 HEAD OFFIC 180
VRB-02 BW211D-40 Vibratory Roller - Small Class BOMAG KM 5 HEAD OFFIC 250
HM STATUS UNIT REMARK

- Aktif Ready for use / Stand By


- Non Aktif Ready for use / Stand By
- Aktif Breakdown (diatas 1 minggu )
- Non Aktif Ready for use / Stand By
- Aktif Ready for use / Stand By
- Aktif Ready for use / Stand By
- Aktif Ready for use / Stand By
- Non Aktif Ready for use / Stand By
84,778.50 Ready Radio
6,371.00 Ready HM Error
7,611.80 Breakdown leaking Radiator, (waiting Parts, Progress tim Kobex)
7,067.20 Breakdown Diverensial
8,808.70 Breakdown Chamber belakang (L-R)
Aktif Breakdown (diatas 1 minggu )
Aktif Breakdown (diatas 1 minggu )
Aktif Ready for use / Stand By
Aktif Waiting Part (maks 1 minggu)
Aktif Ready for use / Stand By
Aktif Ready for use / Stand By
Aktif Ready for use / Stand By
Aktif Ready for use / Stand By
1,402.70 Aktif Ready for use / Stand By
no hm Aktif no hm
1,340.30 Aktif Ready for use / Stand By
1,151.00 Aktif Ready for use / Stand By
989.90 Aktif Ready for use / Stand By
886.70 Aktif Ready for use / Stand By
7,186.60 Break Down
11,193.30 Break Down
Aktif Ready for use / Stand By
8,864.40 Break Down Over head, Remove KM.5
Aktif Ready for use / Stand By
Aktif Ready for use / Stand By
Aktif Ready for use / Stand By
Aktif Ready for use / Stand By
Aktif Ready for use / Stand By
Aktif Ready for use / Stand By
Aktif Ready for use / Stand By

Anda mungkin juga menyukai