Perhitungan
B1 = B2 = 10.17 m
B3 = 1m
Be1 = 10.17 -0.42 H1
Be2 = 10.17 -0.04 H1
Be3 = 10.17 -0.04 H1
Bs = 0.8 m
Be = 31.31 -0.5 H1
= 32.71
1.3 Tinggi Muka Air Banjir di Atas Mercu Bendung
Data
Q = 70.64 m³/dtk (Qsp 30%) = 70.64
r = 0.5 H1
H1/r = 2
Dari grafik didapatkan Co = 1.33 p/H1 ≥ 1,5 dan r = 0.5 H
Percepatan gravitasi = 9.8
Perhitungan
70.64 = 347.3325
H1 = 2.8 m coba-coba
Be = 32.71 m
Rumus Chezy
Perhitungan h
h A P R V Q
c
(m) (m²) (m) (m) (m/dtk) (m³/dtk)
2 16 8.472136 1.888544 41.59674 1.807685 28.92297
2.4 12.48 9.366563 1.332399 37.83442 1.381034 17.2353
2.25 11.53125 9.031153 1.27683 37.37965 1.335678 15.40204
2.47 12.93045 9.523088 1.3578 38.03643 1.401579 18.12305
D2 = 3.702367
L/D2 = 2.25
L = 8.330327 m
Panjang kolam olakan
D2 = 3.702367
L/D2 = 3.8
L = 14.069 m