PERCEPATAN

KONSOLIDASI
MENGGUNAKAN VERTICAL DRAIN &
VACUUM SYSTEM
POKOK BAHASAN

01 LATAR BELAKANG PERCEPATAN KONSOLIDASI

02 PRINSIP DASAR VERTICAL DRAIN

03 VACUUM SYSTEM

04 STUDI KASUS

05 METODE PELAKSANAAN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

01
LATAR BELAKANG
PERCEPATAN
KONSOLIDASI
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

Sumber : Badan Geologi - Kementerian ESDM, 2019


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> LATAR BELAKANG

KARAKTERISTIK :

1. Kuat Geser Rendah


• N-SPT < 10
• qc < 20 kg/cm2
• CBR < 3%
2. Kompresibilitas Tinggi
• Deformasi besar
• Penurunan konsolidasi
besar
TANAH LUNAK
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> LATAR BELAKANG

ILUSTRASI LAPISAN TANAH LUNAK


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> LATAR BELAKANG

Sumber : Manual desain perkerasan jalan - PUPR, 2017


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PEMECAHAN MASALAH

STRUKTUR POLA Pondasi :


a. Gedung Bertingkat
PEMBEBANAN Tiang Pancang
TERPUSAT b. Tower Tiang Bor

a. Embankment jalan & rel K.A.


b. Landas pacu pesawat terbang
c. Lahan penumpukan kontainer Soil Improvement :
STRUKTUR
BENTANGAN LUAS d. Kawasan industri & perumahan Vertical Drain
e. Kawasan umum ( stadion, dll )
f. Lahan tangki,
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

02 PRINSIP DASAR
VERTICAL DRAIN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PRINSIP DASAR


VERTICAL DRAIN DAN MENAMBAHKAN
PRELOAD

Soil improvement dengan menggunakan Vertical Drain


memiliki prinsip dasar yaitu mempercepat penurunan
konsolidasi agar terjadi di awal dengan menambahkan
timbunan preload pengganti beban rencana.
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PRINSIP DASAR

Long Short
drainage drainage
paths paths

ILUSTRASI FOTO MIKROSKOPIS TANPA VERTIKAL DRAIN DENGAN VERTIKAL DRAIN


TANAH LEMPUNG

CARA KERJA KONSOLIDASI DENGAN VERTIKAL DRAIN :


• Memperpendek jarak tempuh air pori.
• Memanfaatkan permeabilitas tanah yang umumnya lebih baik pada arah horizontal.
• Menambahkan preload pengganti beban rencana.
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

MATERIAL GEOSINTETIK

PREFABRICATED VERTICAL DRAIN

Material PVD memiliki struktur kombinasi antara bahan inti


(core) polypropylene yang didesain khusus untuk mempunyai
kapasitas pengaliran yang tinggi dan dibungkus dengan
selubung filter terbuat dari geotextile non woven polyester.
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> METODE PELAKSANAAN PVD


METODE TIMBUNAN KONVENSIONAL
PRELOADING
MATERIAL

LAPISAN TANAH PASIR

VERTIKAL
DRAIN

LAPISAN
TANAH LUNAK
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

03 VACUUM SYSTEM
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> METODE VACUUM PRELOADING

TEKANAN 1 ATM

VACUUM
PRESSURE
- 60 / 70 kPa

VACUUM PRELOADING
W. KJELLMAN, SWEDIA, 1949
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> METODE VACUUM SYSTEM


GENERATOR

VACUUM GAUGE

SETTLEMENT
PLATE MESIN VAKUM

PIEZO METER

TANGKI PEMISAH UTAMA

HORIZONTAL DRAIN

PIPA PERFORASI

VERTIKAL DRAIN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PERBEDAAN METODE TIMBUNAN KONVENSIONAL DAN VACUUM

METODE TIMBUNAN KONVENSIONAL METODE VAKUM

Perlu timbunan sebagai preloading Tidak memerlukan timbunan sebagai preloading


jika beban rencana ≤80 kPa

TANAH TIMBUNAN

SOFT SOIL SOFT SOIL

HARD SOIL HARD SOIL


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PERBEDAAN METODE TIMBUNAN KONVENSIONAL DAN VACUUM

METODE TIMBUNAN KONVENSIONAL METODE VAKUM

Memerlukan area yang lebih besar Memerlukan area yang lebih kecil

TANAH TIMBUNAN

SOFT SOIL SOFT SOIL

HARD SOIL HARD SOIL

KAKI KAKI
TIMBUNAN AREA PERBAIKAN TIMBUNAN 1-2 M AREA PERBAIKAN 1-2 M

LAHAN YANG DIPERLUKAN LAHAN YANG DIPERLUKAN


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PERBEDAAN METODE TIMBUNAN KONVENSIONAL DAN VACUUM

METODE TIMBUNAN KONVENSIONAL METODE VAKUM

Adanya pemindahan tanah preload Tidak ada pekerjaan pemindahan tanah preload

TANAH DIPOTONG

TANAH TIMBUNAN TANAH TIMBUNAN TAMBAHAN

SOFT SOIL SOFT SOIL

HARD SOIL HARD SOIL


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PERBEDAAN METODE TIMBUNAN KONVENSIONAL DAN VACUUM

METODE TIMBUNAN KONVENSIONAL METODE VAKUM

Tekanan air pori meningkat tajam, Tekanan air pori menurun, menghindari resiko
menimbulkan resiko kelongsoran. kelongsoran.

TANAH TIMBUNAN TAMBAHAN

SOFT SOIL

HARD SOIL
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PERBEDAAN METODE TIMBUNAN KONVENSIONAL DAN VACUUM

METODE TIMBUNAN KONVENSIONAL METODE VAKUM

Efek penurunan menyebar Efek penurunan setempat

TANAH TIMBUNAN TANAH TIMBUNAN TAMBAHAN

SOFT SOIL SOFT SOIL

HARD SOIL HARD SOIL


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PERBEDAAN METODE TIMBUNAN KONVENSIONAL DAN VACUUM

METODE TIMBUNAN KONVENSIONAL METODE VAKUM

Efek penurunan menyebabkan kenaikan Efek penurunan bisa menyebabkan keretakan di


tanah di tepi timbunan tepi timbunan.

EFEK
PENURUNAN
PENURUNAN EFEK
PENURUNAN
TANAH
URUGAN TIMBUNAN
TANAH

ARAH GAYA
ARAH GAYA

HARD SOIL HARD SOIL


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PERBEDAAN METODE TIMBUNAN KONVENSIONAL DAN VACUUM

METODE TIMBUNAN KONVENSIONAL METODE VAKUM

Lebih lama untuk mencapai beban Lebih cepat untuk mencapai beban rencana
rencana
URUGAN TANAH KONSTRUKSI
VAKUM
KONSOLIDASI
REMOVAL
KONSTRUKSI PVD
SURCHARGE

HARD SOIL HARD SOIL


NEED STRESS PARTH
SETTLEMENT
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> DATA PERANCANGAN

• TANAH DASAR
60.00

• Sondir 13.45
Var 16.55
33.10
CL 16.55
13.45
Var

• Borlog
• Uji lab (Index properties dan PLATFORM PASIR (0.50)

Konsolidasi) JALAN KERJA


+ 2.917 2%
+1.00
2%
ELEVASI. TOP PASIR
+ 4.260
TANAH TIMBUNAN
2% 2%
JALAN KERJA
+ 2.917

• PROPERTI TIMBUNAN
MUKA AIR
BANJIR
+ 2,700

• DESAIN RENCANA EXISTING

• Tinggi rencana
• Beban rencana
VERTIKAL DRAIN (H= -9 DARI TOP PASIR)

• Waktu pelaksanaan rencana


• Gambar rencana
(Cross dan Layout)
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> ANALISIS PERANCANGAN


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> ANALISIS PERANCANGAN

R = 0,565 . S R = 0,525 . S
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> HASIL PERANCANGAN

PLATFORM PASIR
TANAH TIMBUNAN

50.00 M

25.00 M 25.00 M
GEOMEMBRAN

PVD

A
KEDALAMAN PVD

CROSS SECTION
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> HASIL PERANCANGAN

SYMBOL MEANING Unit


15.00 M
SEPARATE TANK 7
ST ST ST MT
MAIN TANK 1
VACUUM
GAUGE VACUUM GAUGE 3

50.00 M 20.00 M PIEZO METER 1


PIEZO
METER SETTLEMENT PLATE 3
ST ST ST ST

15.00 M

8.00 M 20.00 M 20.00 M 20.00 M 8.00 M


76.00 M

LAYOUT VACUUM SYSTEM


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> HASIL PERANCANGAN

50.00 M
50.00 M

76.00 M

76.00 M
LAYOUT PVD
LAYOUT PHD
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> MONITORING PELAKSANAAN

SETTLEMENT PLATE

METODE ASAOKA
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> MONITORING PELAKSANAAN


QUICK RELEASE COUPLING(QRC)
BORE HOLE (3”)
EXISTING LEVEL
0.00 M

SAND CLEAN

BENTONITE
GROUTING
CABLE VW
PIEZOMETER
20 cm BENTONITE
TABLET/CHIPS
100 cm (ELV,18) SENSOR VW
PIEZOMETER
SAND CLEAN

BENTONITE
GROUTING

PIEZO METER
20 cm

(ELV,18)
100 cm SENSOR VW
PIEZOMETER
10 cm
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> MONITORING PELAKSANAAN

VACUUM GAUGE
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> MONITORING PELAKSANAAN

INCLINOMETER
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

04 STUDI KASUS
PVD VACUUM SYSTEM
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

STUDI KASUS 1
JALAN TOL KAYU AGUNG – PALEMBANG
- BETUNG SEKSI 2

PROJECT OVERVIEW
Lokasi : Sumatera Selatan
Pekerjaan : EPC
Metode : Vacuum System
Volume : 2,671,875 m’ - PVD
140,625 m2 - Vacuum System
Aplikasi : Jalan Tol
Pelaksanaan : 2017 – 2018
Segmen : STA 44+090 – 46+670 & STA 51+367 – 52+200
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

STUDI KASUS 1
JALAN TOL KAYU AGUNG – PALEMBANG
- BETUNG SEKSI 2

DATA-DATA PERENCANAAN
• Berat Jenis Tanah Timbunan 15,5 kN/m3
• Beban kendaraan diasumsikan 20 kPa
• Beban perkerasan jalan 0,85 x 19 = 16,15 kPa
• Tekanan Vakum 80 kPa
• Jarak pemancangan PVD 1,0 m pola segiempat
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

DESAIN PERANCANGAN
Kedalaman PVD dari platform pasir adalah 11,5 m. Prediksi penurunannya adalah 50 cm. Waktu yang
dibutuhkan untuk tercapainya 90% derajat konsolidasi adalah 2 bulan sejak start pompa vakum.
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

DATA MONITORING
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

HASIL UJI PLATE LOAD TEST

HASIL UJI SONDIR ULANG


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

STUDI KASUS 2
JALAN TOL TERBANGGI BESAR –
KAYU AGUNG

PROJECT OVERVIEW
Lokasi : Lampung
Pekerjaan : EPC
Material : Sistem Vakum
Volume : 165,190 m’ - PVD
17,449 m2 - Vacuum System
Aplikasi : Jalan Tol
Pelaksanaan : 2018
Segmen : STA 108+000 – 108+600
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

STUDI KASUS 2
JALAN TOL TERBANGGI BESAR –
KAYU AGUNG
Panjang Ketinggian
Cell STA Penanganan Timbunan
(m) Rencana (m)
1 108+000 - 108+065 65 6,859
2 108+065 - 108+130 65 8,021
3 108+350 - 108+422 72 7,755
4 108+422 - 108+505 83 6,474
5 108+505 - 108+600 95 5,036

Jika menggunakan metode preload konvensional, tinggi


timbunan yang diperlukan maksimum mencapai 13 m.
Sedangkan dengan menggunakan kombinasi vakum
dan preload, timbunan preload yang perlu
ditambahkan adalah 9 m.
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

SKEMA KOMBINASI VACUUM SYSTEM +


PRELOADING TIMBUNAN TANAH
BEBAN VAKUM 80 kPa

SOFT SOIL

HARD SOIL

PERCEPATAN KONSOLIDASI DENGAN METODE VAKUM

TIMBUNAN PRELOAD H-(80/gtimbunan)

SOFT SOIL

HARD SOIL

PERCEPATAN KONSOLIDASI DENGAN KOMBINASI METODE VAKUM DAN PRELOAD


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

DATA MONITORING PIEZOMETER

Grafik pore pressure


pada saat proses
Vacuum System
berjalan semakin
menurun, namun pore
water pressure
kembali naik saat
timbunan preload
mulai dikerjakan.
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

DATA MONITORING SETTLEMENT PLATE

Grafik penurunan
sempat stabil karena
penurunan hampir
selesai akibat beban
vakum. Namun
penurunan kembali
terjadi saat timbunan
preload mulai
dikerjakan
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

METODE
05 PELAKSANAAN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


PERSIAPAN LAHAN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


PENYELIDIKAN TANAH
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


PENGGELARAN PASIR
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


SKEMA ALAT PANCANG VERTIKAL DRAIN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> SETTING ALAT


PEMASANGAN RIG PADA BASE MACHINE
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> SETTING ALAT


PEMASANGAN RIG PADA BASE MACHINE
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> MARKING TITIK PANCANG


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> MARKING TITIK PANCANG


POLA PEMASANGAN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> KALIBRASI RIG 8 9 10


7 11
6
5
4
3
1m 2
2m 1
3m
0
4m
5m
6m
7m
8m
9m
10 m
11 m
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PEMANCANGAN PVD


RECORDER DATA LOGER
Specification of Recorder

Computer Onboard Head Unit

Mandrel Sensor Drain Sensor

Verticality Pressure
Sensor Sensor
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PEMANCANGAN PVD


RECORDER DATA LOGER
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> PEMANCANGAN PVD


PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


PEMASANGAN PHD
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


PEMASANGAN PIPA PERFORATED
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


PEMASANGAN PIEZOMETER
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


PEMASANGAN PIPA SISTEM VAKUM
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


PEMASANGAN SEPARATE TANK DAN MAIN TANK
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


PENGGELARAN GEOTEKSTIL NON WOVEN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


PENGGELARAN GEOMEMBRAN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


PENGGALIAN ANGKUR
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


SETTING POMPA, GENSET DAN PANEL
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


START VAKUM
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


MONITORING SETTLEMENT PLATE
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


MONITORING PIEZO METER
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


MONITORING VACUUM GAUGE
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE

> TAHAPAN PELAKSANAAN


TIMBUNAN PRELOAD
TERIMA KASIH