KONSOLIDASI
MENGGUNAKAN VERTICAL DRAIN &
VACUUM SYSTEM
POKOK BAHASAN
03 VACUUM SYSTEM
04 STUDI KASUS
05 METODE PELAKSANAAN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
01
LATAR BELAKANG
PERCEPATAN
KONSOLIDASI
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
KARAKTERISTIK :
02 PRINSIP DASAR
VERTICAL DRAIN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
Long Short
drainage drainage
paths paths
MATERIAL GEOSINTETIK
VERTIKAL
DRAIN
LAPISAN
TANAH LUNAK
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
03 VACUUM SYSTEM
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
TEKANAN 1 ATM
VACUUM
PRESSURE
- 60 / 70 kPa
VACUUM PRELOADING
W. KJELLMAN, SWEDIA, 1949
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
VACUUM GAUGE
SETTLEMENT
PLATE MESIN VAKUM
PIEZO METER
HORIZONTAL DRAIN
PIPA PERFORASI
VERTIKAL DRAIN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
TANAH TIMBUNAN
Memerlukan area yang lebih besar Memerlukan area yang lebih kecil
TANAH TIMBUNAN
KAKI KAKI
TIMBUNAN AREA PERBAIKAN TIMBUNAN 1-2 M AREA PERBAIKAN 1-2 M
Adanya pemindahan tanah preload Tidak ada pekerjaan pemindahan tanah preload
TANAH DIPOTONG
Tekanan air pori meningkat tajam, Tekanan air pori menurun, menghindari resiko
menimbulkan resiko kelongsoran. kelongsoran.
SOFT SOIL
HARD SOIL
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
EFEK
PENURUNAN
PENURUNAN EFEK
PENURUNAN
TANAH
URUGAN TIMBUNAN
TANAH
ARAH GAYA
ARAH GAYA
Lebih lama untuk mencapai beban Lebih cepat untuk mencapai beban rencana
rencana
URUGAN TANAH KONSTRUKSI
VAKUM
KONSOLIDASI
REMOVAL
KONSTRUKSI PVD
SURCHARGE
• TANAH DASAR
60.00
• Sondir 13.45
Var 16.55
33.10
CL 16.55
13.45
Var
• Borlog
• Uji lab (Index properties dan PLATFORM PASIR (0.50)
• PROPERTI TIMBUNAN
MUKA AIR
BANJIR
+ 2,700
• Tinggi rencana
• Beban rencana
VERTIKAL DRAIN (H= -9 DARI TOP PASIR)
R = 0,565 . S R = 0,525 . S
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
PLATFORM PASIR
TANAH TIMBUNAN
50.00 M
25.00 M 25.00 M
GEOMEMBRAN
PVD
A
KEDALAMAN PVD
CROSS SECTION
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
15.00 M
50.00 M
50.00 M
76.00 M
76.00 M
LAYOUT PVD
LAYOUT PHD
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
SETTLEMENT PLATE
METODE ASAOKA
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
SAND CLEAN
BENTONITE
GROUTING
CABLE VW
PIEZOMETER
20 cm BENTONITE
TABLET/CHIPS
100 cm (ELV,18) SENSOR VW
PIEZOMETER
SAND CLEAN
BENTONITE
GROUTING
PIEZO METER
20 cm
(ELV,18)
100 cm SENSOR VW
PIEZOMETER
10 cm
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
VACUUM GAUGE
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
INCLINOMETER
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
04 STUDI KASUS
PVD VACUUM SYSTEM
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
STUDI KASUS 1
JALAN TOL KAYU AGUNG – PALEMBANG
- BETUNG SEKSI 2
PROJECT OVERVIEW
Lokasi : Sumatera Selatan
Pekerjaan : EPC
Metode : Vacuum System
Volume : 2,671,875 m’ - PVD
140,625 m2 - Vacuum System
Aplikasi : Jalan Tol
Pelaksanaan : 2017 – 2018
Segmen : STA 44+090 – 46+670 & STA 51+367 – 52+200
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
STUDI KASUS 1
JALAN TOL KAYU AGUNG – PALEMBANG
- BETUNG SEKSI 2
DATA-DATA PERENCANAAN
• Berat Jenis Tanah Timbunan 15,5 kN/m3
• Beban kendaraan diasumsikan 20 kPa
• Beban perkerasan jalan 0,85 x 19 = 16,15 kPa
• Tekanan Vakum 80 kPa
• Jarak pemancangan PVD 1,0 m pola segiempat
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
DESAIN PERANCANGAN
Kedalaman PVD dari platform pasir adalah 11,5 m. Prediksi penurunannya adalah 50 cm. Waktu yang
dibutuhkan untuk tercapainya 90% derajat konsolidasi adalah 2 bulan sejak start pompa vakum.
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
DATA MONITORING
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
STUDI KASUS 2
JALAN TOL TERBANGGI BESAR –
KAYU AGUNG
PROJECT OVERVIEW
Lokasi : Lampung
Pekerjaan : EPC
Material : Sistem Vakum
Volume : 165,190 m’ - PVD
17,449 m2 - Vacuum System
Aplikasi : Jalan Tol
Pelaksanaan : 2018
Segmen : STA 108+000 – 108+600
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
STUDI KASUS 2
JALAN TOL TERBANGGI BESAR –
KAYU AGUNG
Panjang Ketinggian
Cell STA Penanganan Timbunan
(m) Rencana (m)
1 108+000 - 108+065 65 6,859
2 108+065 - 108+130 65 8,021
3 108+350 - 108+422 72 7,755
4 108+422 - 108+505 83 6,474
5 108+505 - 108+600 95 5,036
SOFT SOIL
HARD SOIL
SOFT SOIL
HARD SOIL
Grafik penurunan
sempat stabil karena
penurunan hampir
selesai akibat beban
vakum. Namun
penurunan kembali
terjadi saat timbunan
preload mulai
dikerjakan
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
METODE
05 PELAKSANAAN
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE
Verticality Pressure
Sensor Sensor
PERCEPATAN PRINSIP DASAR
KONSOLIDASI VERTICAL DRAIN VACUUM SYSTEM STUDI KASUS METODE