Anda di halaman 1dari 8

BOP

TARIP DISTRIBUSI BOP BERSAMA ===> DISTRIBUSIKAN KE DEPARTEMEN PRODUKSI DAN DE


TARIP ALOKASI BOP BERSAMA ===> DI DEPARTEMEN JASA==> DIALOKASIKAN KE DEPT J
ALOKASI --> ALOKASI LANGSUNG==> BOP DARI DEPT JASA
ALOKASI BERTAHAP ==> BOP DEPT JASA AKAN
ALOKASI KONTINYU ==> BOP DEPT JASA DIALO
TARIP PEMBEBANAN BOP AKAN DIBEBANKAN DARI DEPT PRODUKSI KE PRODUK

TARIP JUMLAH ANGGARAN / DASAR PEMBEBANAN


DASAR PEMBEBANAN: UNIT YG DIPRODUKSI

KONSEP KAPASITAS 1. KAPASITAS TEORITIS


2. KAPASITAS PRAKTIS
3. KAPASITAS NORMAL
4. KAPASITAS SESUNGGUHNYA

DEPRESIASI BANGUNAN 10,000,000 LUAS LANTAI YNG DIGUNAKAN


DEPT PRODUKSI 1 200 2,000,000
DEPT PRODUKSI 2 350 3,500,000
DEPT JASA A 100 1,000,000
DEPT JASA B 75 750,000
ADMINISTRASI 150 1,500,000
PEMASARAN 125 1,250,000
1,000
BOP LANGSUNG
DEPT PRODUKSI 1 10,000,000
DEPT PRODUKSI 2 7,500,000
DEPT JASA A (LISTRIK) 4,000,000
DEPT JASA B (BENGKEL) 4,500,000

PRODUKSI 1 PRODUKSI 2
DEPT JASA A (LISTRIK) KWH 400 250
DEPT JASA B (BENGKEL)JKL 375 275

ALOKASI LANGSUNG DEPT JASA A ALOKASI


PRODUKSI 1 400 0.62 3,076,923.08
PRODUKSI 2 250 0.38 1,923,076.92
650

ALOKASI LASNGSUNG DEPT JASA B (BENGKEL) 5,250,000.00


PRODUKSI 1 375 0.58 3,028,846.15
PRODUKSI 2 275 0.42 2,221,153.85
650

METODE ALOKASI BERTAHAP: JASA A BARU JASA B


JASA A AKAN DIALOKASIKAN KE : BOP DARI JASA A
PRODUKSI 1 400 0.40 2,000,000.00
PRODUKSI 2 250 0.25 1,250,000.00
JASA B 350 0.35 1,750,000.00
1,000

JASA B AKAN DIALOKASIKAN KE :


PRODUKSI 1 375 0.58 4,038,461.54
PRODUKSI 2 275 0.42 2,961,538.46
650

BOP DI DEPT PRODUKSI DENGAN METODE BERTAHAP DARI JASA A DULU BARU JASA B:
BOP l + DIST JASA A
PRODUKSI 1 12,000,000.00 2,000,000.00
PRODUKSI 2 11,000,000.00 1,250,000.00

ALOKASI BERTAHAP DARI JASA B BARU KE JASA A


ALOKASI JASA B: 5,250,000.00
PRODUKSI 1 375 0.38 1,968,750.00
PRODUKSI 2 275 0.28 1,443,750.00
JASA A 350 0.35 1,837,500.00
1,000

ALOKASI JASA A: 6,837,500.00


PRODUKSI 1 400 0.62 4,207,692.31
PRODUKSI 2 250 0.38 2,629,807.69
650

BOP YANG ADA DI DEPT: BOP L+DISTR JASA B


PRODUKSI 1 12,000,000.00 1,968,750.00
PRODUKSI 2 11,000,000.00 1,443,750.00
KAN KE DEPARTEMEN PRODUKSI DAN DEPARTEMEN JASA
MEN JASA==> DIALOKASIKAN KE DEPT JASA LAINNYA DAN DEPT PRODUKSI
SI LANGSUNG==> BOP DARI DEPT JASA DIALOKASIKAN KE DEPT PRODUKSI
SI BERTAHAP ==> BOP DEPT JASA AKAN DIALOKASIKAN KE DEPT JASA BERIKUTNYA DAN DEPT PRODUKSI
SI KONTINYU ==> BOP DEPT JASA DIALOKASIKAN KE DEPT JASA (SALING MEMBERI DAN MENERIMA) DAN
EPT PRODUKSI KE PRODUK

MBEBANAN
DIPRODUKSI
JUMLAH JKL
JUMLAH JAM MESIN, PEMAKAIAN BAHAN BAKU , DLL

ANTAI YNG DIGUNAKAN

BOP TDK LANGSUNG JUMLAH BOP ALOKASI DARI JASA A


2,000,000 12,000,000 3,076,923
3,500,000 11,000,000 1,923,077
1,000,000 5,000,000 HARUS DIALOKASIKAN KE DEPT PRODUKSI
750,000 5,250,000

JASA A (LISTRIK) JASA B (BENGKEL)


50 350
350 100
ARI JASA A

DITAMBAHKAN KE BOP YG ADA DI DEPT JASA B


7,000,000.00 YG AKAN DIALOKASIKAN KEMUDIAN KE DEPT PRODUKSI 1 DAN 2

ARI JASA A DULU BARU JASA B:


JASA B TOTALNYA
4,038,461.54 18,038,461.54
2,961,538.46 15,211,538.46

5,000,000.00 6,837,500.00 (DIALOKASIKAN KE PRODUKSI 1 DAN 2)

JASA A TOTAL BOP


4,207,692.31 18,176,442.31
2,629,807.69 15,073,557.69
BERIKUTNYA DAN DEPT PRODUKSI
G MEMBERI DAN MENERIMA) DAN DEPT PRODUKSI

DEPRESIASI HRS DIDISTRIBUSIKAN:

ALOKASI DARO JASA B JUMLAH BOP DGN METODE LANGSUNG


3,028,846 18,105,769
2,221,154 15,144,231
ASIKAN KE DEPT PRODUKSI
IAN KE DEPT PRODUKSI 1 DAN 2

N KE PRODUKSI 1 DAN 2)

Anda mungkin juga menyukai