REKAPITULASI PROGRES PADAT KARYA

BPJN KALSEL TA. 2021

RENCANA REALISASI PROGRES RENCANA REALISASI PROGRES KET.


NO. PENANGANAN
(Rp Ribu) (Rp Ribu) KEUANGAN (%) HOK HOK HOK (%)
1 REVITALISASI DRAINASE 32,833,722 32,739,234 99.71 118,387 121,511 102.64
SKPD KALSEL 1,499,799 1,499,799 100.00 8,394 8,421 100.32 SELESAI
PJN I KALSEL 18,042,888 18,014,030 99.84 50,535 53,656 106.18 SELESAI
PJN II KALSEL 13,291,035 13,225,405 99.51 59,458 59,434 99.96 SELESAI

2 PADAT KARYA RUTIN JALAN 13,924,436 5,359,051 38.49 22,518 8,478 37.65

SKPD KALSEL 126,342 94,149 74.52 1,350 820 60.74


PJN I KALSEL 11,298,311 4,417,834 39.10 16,123 4,793 29.73
PJN II KALSEL 2,499,783 847,068 33.89 5,045 2,865 56.79

3 PADAT KARYA RUTIN JEMBATAN 7,667,719 2,154,605 28.10 23,992 8,455 35.24

SKPD KALSEL 1,315,200 240,300 18.27 5,880 995 16.92


PJN I KALSEL 4,732,399 1,635,655 34.56 13,383 6,054 45.24
PJN II KALSEL 1,620,120 278,650 17.20 4,729 1,406 29.73

4 TAMBAHAN PADAT KARYA 49,108,839 18,547,917 37.77 42,737 6,649 15.56

SKPD KALSEL 3,915,848 2,624,837 67.03 664 480 72.29


PJN I KALSEL 28,102,256 14,116,955 50.23 14,222 4,706 33.09
PJN II KALSEL 17,090,735 1,806,125 10.57 27,851 1,463 5.25

5 PADAT KARYA BUN 4,000,000 2,373,336 59.33 13,107 10,886 83.05

SKPD KALSEL - - - - - -
PJN I KALSEL 2,250,000 1,272,031 56.53 7,877 5,814 73.81
PJN II KALSEL 1,750,000 1,101,305 62.93 5,230 5,072 96.98
TOTAL Rp 107,534,716 Rp 61,174,143 56.89% 220,741 155,979 70.66%

Status Tanggal 28/10/2021


Sumber emon pu.go.id
PADAT KARYA RUTIN JALAN

Padat Karya

Target Realisasi
Permasalahan dan Tindak
No PPK Satker/Paket
Lanjut
Tenaga Hari Orang Tenaga Hari Orang Tanggal
Non Upah Upah Non Upah Upah
Total (Rp Ribu) Kerja Kerja Total (Rp Ribu) % Keuangan Kerja Kerja % Fisik Update

(Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Orang) (Hari)
BPJN KALIMANTAN SELATAN - 3,742,655 13,924,436 181 22,518 4,293,589 1,065,462 5,359,051 38.49% 165 8,478 37.65%
DINAS PEKERJAAN UMUM PROV. KALSEL - 126,342 126,342 9 1,350 - 94,149 94,149 74.52% 15 820 60.74%
1  PPK 0.1 PRESERVASI JALAN SUTOYO S - PELABUHAN TRISAKTI - LIANG ANGGANG - 126,342 126,342 9 1350 - 94,149 94,149 74.52% 15 820 60.74% 29-09-2021
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL 9,417,316 1,880,996 11,298,311 119 16,123 3,847,333 570,501 4,417,834 39.10% 69 4,793 29.73%

Paket MYC SBSN baru


terkontrak 25 Juni 2021,
1 PPK 1.2 PRESERVASI JALAN KP. ASAM ASAM - KINTAB - SEBAMBAN - PAGATAN - BATULICIN 937,800 293,973 1,231,773 19 2510 - - - 0.00% 0 0 0.00% 24-09-2021 tagging emon dilakukan
24 September 2021,
namun belum ada
pekerjaan padat karya
di lapangan

2 PPK 1.2 PRESERVASI JALAN KP. ASAM ASAM - KINTAB - SEBAMBAN - PAGATAN - BATULICIN 1,519,511 358,063 1,877,574 20 3064 - - - 0.00% 0 0 0.00% 24-09-2021
3 PPK 1.3 PRESERVASI JALAN KANDANGAN - LUMPANGI - BTS. KAB. TANAH BUMBU 187,420 58,250 245,670 5 500 107,047 35,882 142,929 58.18% 5 308 61.60% 14-09-2021
4 PPK 1.3 PRESERVASI JALAN BTS. KAB. TANAH BUMBU - MENTEWE - BATULICIN 318,269 154,596 472,864 8 1327 227,741 113,588 341,329 72.18% 8 871 65.64% 14-09-2021
5 PPK 1.3 PRESERVASI JALAN KOTABARU - TANJUNG SERDANG 19,184 1,398 20,582 4 12 19,184 1,398 20,582 100.00% 4 12 100.00% 14-04-2021
6 PPK 1.3 PRESERVASI JALAN BTS. KAB. TANAH BUMBU - MENTEWE - BATULICIN 1,698,422 94,831 1,793,253 13 814 1,273,817 74,327 1,348,144 75.18% 13 638 78.38% 13-08-2021
7 PPK 1.3 PRESERVASI JALAN KOTABARU - TANJUNG SERDANG 1,357,611 50,095 1,407,706 11 430 852,453 31,455 883,908 62.79% 11 270 62.79% 13-08-2021
Terdapat progress di
lapangan belum
8 PPK 1.4 PRESERVASI JALAN BATULICIN - SERONGGA - SEI KUPANG - MANGGALAU - KERANG 838,809 246,281 1,085,090 8 2114 21,913 64,308 86,221 7.95% 6 552 26.11% 9/9/2021 terlapor di emon
Terdapat progress di
lapangan belum
9 PPK 1.4 PRESERVASI JALAN BATULICIN - SERONGGA - SEI KUPANG - MANGGALAU - KERANG 814,230 391,674 1,205,904 13 3362 188,901 90,870 279,771 23.20% 4 780 23.20% 9/9/2021 terlapor di emon
10 PPK 1.4 PRESERVASI JALAN KANDANGAN - LUMPANGI - BTS. KAB. TANAH BUMBU 625,071 82,016 707,087 8 704 468,803 67,104 535,907 75.79% 8 576 81.82% 14-09-2021
11 PPK 1.4 PRESERVASI JALAN BATULICIN - SERONGGA - SEI KUPANG - MANGGALAU - KERANG 1,091,444 137,004 1,228,448 8 1176 683,135 85,744 768,879 62.59% 8 736 62.59% 9/9/2021
12 PPK 1.5 PRESERVASI JALAN DALAM KOTA BANJARMASIN 9,545 12,815 22,360 2 110 4,339 5,825 10,164 45.46% 2 50 45.45% 25-05-2021
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL 764,465 1,735,317 2,499,783 53 5,045 446,256 400,812 847,068 33.89% 81 2,865 56.79%
1 PPK 2.1 Preservasi Jalan Liang Anggang - Martapura - Bts. Kota Rantau - 266,115 266,115 15 700 - 51,000 51,000 19.16% 15 408 58.29% 29-09-2021
2 PPK 2.3 Preservasi Jalan Pantai Hambawang - Bts. Kota Amuntai - Pasar Panas - Kelua - Tanjung 314,084 1,293,326 1,607,410 18 2,700 446,256 180,960 627,216 39.02% 32 1508 55.85% 9/15/2021
3 PPK 2.1 Preservasi Jalan Liang Anggang - Martapura - Bts. Kota Rantau 340,680 143,956 484,637 15 1,380 - 168,750 168,750 34.82% 33 948 68.70% 9/15/2021
Terdapat progress di
lapangan belum
4 PPK 2.2 Preservasi Jalan Rantau - Kandangan - Ds. Bagambir - Pantai Hambawang - Mantimin - Paringin 109,701 31,920 141,621 5 265 - 102 102 0.07% 1 1 0.38% 29-09-2021 terlapor di emon
PADAT KARYA RUTIN JALAN

Padat Karya ASET YANG TERBENTUK

JENIS AKUN Target Realisasi


PENJELASAN Belanja Pemeliharaan Jalan Permasalahan dan Tindak
No PPK Satker/Paket JALAN, IRIGASI, JARINGAN
PAKET/KEGIATAN PERALATAN & MESIN (5321) GEDUNG & BANGUNAN (5331) dan Jembatan Lanjut
Tenaga Hari Orang Tenaga Hari Orang Tanggal (5341)
KODE MAK/AKUN VOLUME SATUAN Non Upah Upah Non Upah Upah (523131)
AKUN REGULER AKUN KHUSUS Total (Rp Ribu) Kerja Kerja Total (Rp Ribu) % Keuangan Kerja Kerja % Fisik Update

(Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp.) (Rp.) (Rp.) (Rp.)
BPJN KALIMANTAN SELATAN - 3,742,655 13,924,436 181 22,518 4,293,589 1,065,462 5,359,051 38.49% 165 8,478 37.65%
DINAS PEKERJAAN UMUM PROV. KALSEL - 126,342 126,342 9 1,350 - 94,149 94,149 74.52% 15 820 60.74%
2409.CDC.001.319.B
1  PPK 0.1 PRESERVASI JALAN SUTOYO S - PELABUHAN TRISAKTI - LIANG ANGGANG 2.1 Kilometer - 126,342 126,342 9 1350 - 94,149 94,149 74.52% 15 820 60.74% 29-09-2021 126,342
523131
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL 9,417,316 1,880,996 11,298,311 119 16,123 3,847,333 570,501 4,417,834 39.10% 69 4,793 29.73%

1 PPK 1.2 PRESERVASI JALAN KP. ASAM ASAM - KINTAB - SEBAMBAN - PAGATAN - BATULICIN 937,800 293,973 1,231,773 19 2510 - - - 0.00% 0 0 0.00% 24-09-2021 Paket MYC SBSN baru
terkontrak 25 Juni 2021,
tagging emon dilakukan
24 September 2021,
namun belum ada
pekerjaan padat karya
2 PPK 1.2 PRESERVASI JALAN KP. ASAM ASAM - KINTAB - SEBAMBAN - PAGATAN - BATULICIN 1,519,511 358,063 1,877,574 20 3064 - - - 0.00% 0 0 0.00% 24-09-2021 di lapangan

2409.CDC.001.319.J
3 PPK 1.3 PRESERVASI JALAN KANDANGAN - LUMPANGI - BTS. KAB. TANAH BUMBU 19.7 Kilometer 187,420 58,250 245,670 5 500 107,047 35,882 142,929 58.18% 5 308 61.60% 14-09-2021 245,670
523131
2409.CDC.001.319.K
4 PPK 1.3 PRESERVASI JALAN BTS. KAB. TANAH BUMBU - MENTEWE - BATULICIN 18.3 Kilometer 318,269 154,596 472,864 8 1327 227,741 113,588 341,329 72.18% 8 871 65.64% 14-09-2021 472,864
523131
2409.CDC.001.319.M
5 PPK 1.3 PRESERVASI JALAN KOTABARU - TANJUNG SERDANG 0.8 Kilometer 19,184 1,398 20,582 4 12 19,184 1,398 20,582 100.00% 4 12 100.00% 14-04-2021 20,582
523131
6 PPK 1.3 PRESERVASI JALAN BTS. KAB. TANAH BUMBU - MENTEWE - BATULICIN 1,698,422 94,831 1,793,253 13 814 1,273,817 74,327 1,348,144 75.18% 13 638 78.38% 13-08-2021
2409.CDC.001.319.M
7 PPK 1.3 PRESERVASI JALAN KOTABARU - TANJUNG SERDANG 29.7 Kilometer 1,357,611 50,095 1,407,706 11 430 852,453 31,455 883,908 62.79% 11 270 62.79% 13-08-2021
523131
Terdapat progress di
8 PPK 1.4 PRESERVASI JALAN BATULICIN - SERONGGA - SEI KUPANG - MANGGALAU - KERANG 838,809 246,281 1,085,090 8 2114 21,913 64,308 86,221 7.95% 6 552 26.11% 9/9/2021 lapangan belum
terlapor di emon
Terdapat progress di
2409.CDC.001.319.L
9 PPK 1.4 PRESERVASI JALAN BATULICIN - SERONGGA - SEI KUPANG - MANGGALAU - KERANG 73.9 Kilometer 814,230 391,674 1,205,904 13 3362 188,901 90,870 279,771 23.20% 4 780 23.20% 9/9/2021 1,205,904 lapangan belum
523131 terlapor di emon
10 PPK 1.4 PRESERVASI JALAN KANDANGAN - LUMPANGI - BTS. KAB. TANAH BUMBU 625,071 82,016 707,087 8 704 468,803 67,104 535,907 75.79% 8 576 81.82% 14-09-2021
11 PPK 1.4 PRESERVASI JALAN BATULICIN - SERONGGA - SEI KUPANG - MANGGALAU - KERANG 1,091,444 137,004 1,228,448 8 1176 683,135 85,744 768,879 62.59% 8 736 62.59% 9/9/2021
2409.CDC.001.319.H
12 PPK 1.5 PRESERVASI JALAN DALAM KOTA BANJARMASIN 0.39 Kilometer 9,545 12,815 22,360 2 110 4,339 5,825 10,164 45.46% 2 50 45.45% 25-05-2021 22,360
523131
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL 764,465 1,735,317 2,499,783 53 5,045 446,256 400,812 847,068 33.89% 81 2,865 56.79%
2409.CDC.016.319.E
1 PPK 2.1 Preservasi Jalan Liang Anggang - Martapura - Bts. Kota Rantau 8.7 Kilometer - 266,115 266,115 15 700 - 51,000 51,000 19.16% 15 408 58.29% 29-09-2021 266,115
523131
2409.CDC.016.320.Q
2 PPK 2.3 Preservasi Jalan Pantai Hambawang - Bts. Kota Amuntai - Pasar Panas - Kelua - Tanjung 42.53 Kilometer 314,084 1,293,326 1,607,410 18 2,700 446,256 180,960 627,216 39.02% 32 1508 55.85% 9/15/2021 1,607,410
523131
2409.CDC.016.319.E
3 PPK 2.1 Preservasi Jalan Liang Anggang - Martapura - Bts. Kota Rantau 22.4 Kilometer 340,680 143,956 484,637 15 1,380 - 168,750 168,750 34.82% 33 948 68.70% 9/15/2021 484,637
523131
Terdapat progress di
2409.CDC.016.329.K
4 PPK 2.2 Preservasi Jalan Rantau - Kandangan - Ds. Bagambir - Pantai Hambawang - Mantimin - Paringin 523131 22.1 Kilometer 109,701 31,920 141,621 5 265 - 102 102 0.07% 1 1 0.38% 29-09-2021 141,621 lapangan belum
terlapor di emon
PADAT KARYA RUTIN JEMBATAN

Padat Karya
Target Realisasi
No PPK Satker/Paket Tenaga Hari Orang Tenaga Hari Orang Tanggal Permasalahan dan Tindak Lanjut
Non Upah Upah Non Upah Upah
Total (Rp Ribu) Kerja Kerja Total (Rp Ribu) % Keuangan Kerja Kerja % Fisik Update
(Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Orang) (Hari)
BPJN KALIMANTAN SELATAN 4,163,961.00 3,503,760.00 7,667,719.00 196.00 23,992.00 1,029,864.00 1,124,741.00 2,154,605.00 28.10% 135.00 8,455.00 35.24%
DINAS PEKERJAAN UMUM PROV. KALSEL 596,520.00 718,680.00 1,315,200.00 49.00 5,880.00 - 240,300.00 240,300.00 18.27% 20.00 995.00 16.92%
1  PPK 0.1 PRESERVASI JALAN SUTOYO S - PELABUHAN TRISAKTI - LIANG ANGGANG 596,520.00 718,680.00 1,315,200.00 49.00 5,880.00 - 240,300.00 240,300.00 18.27% 20.00 995.00 16.92% 7/5/2021
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL 3,167,375.00 1,565,025.00 4,732,399.00 71.00 13,383.00 930,364.00 705,291.00 1,635,655.00 34.56% 50.00 6,054.00 45.24%

Paket MYC SBSN baru


terkontrak 25 Juni 2021,
tagging emon dilakukan 24
September 2021, namun
belum ada pekerjaan padat
1 PPK 1.2 PRESERVASI JALAN KP. ASAM ASAM - KINTAB - SEBAMBAN - PAGATAN - BATULICIN 923,247.00 424,372.00 1,347,619.00 24.00 3,592.00 - - - 0.00% - - 0.00% 24-09-2021 karya di lapangan
2 PPK 1.3 PRESERVASI JALAN KOTABARU - TANJUNG SERDANG 262,449.00 69,900.00 332,349.00 6.00 600.00 139,342.00 41,940.00 181,282.00 54.55% 6.00 360.00 60.00% 14-09-2021
3 PPK 1.3 PRESERVASI JALAN KANDANGAN - LUMPANGI - BTS. KAB. TANAH BUMBU 205,106.00 486,038.00 691,144.00 14.00 4,172.00 143,574.00 311,521.00 455,095.00 65.85% 14.00 2,674.00 64.09% 14-09-2021
4 PPK 1.3 PRESERVASI JALAN BTS. KAB. TANAH BUMBU - MENTEWE - BATULICIN 106,540.00 212,496.00 319,036.00 12.00 1,824.00 71,027.00 142,596.00 213,623.00 66.96% 12.00 1,224.00 67.11% 14-09-2021
5 PPK 1.4 PRESERVASI JALAN BATULICIN - SERONGGA - SEI KUPANG - MANGGALAU - KERANG 976,466.00 314,551.00 1,291,017.00 12.00 2,700.00 530,183.00 170,789.00 700,972.00 54.30% 8.00 1,466.00 54.30% 11/10/2021
6 PPK 1.5 PRESERVASI JALAN DALAM KOTA BANJARMASIN 693,567.00 57,668.00 751,234.00 3.00 495.00 46,238.00 38,445.00 84,683.00 11.27% 10.00 330.00 66.67% 25-05-2021
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL 400,066.00 1,220,055.00 1,620,120.00 76.00 4,729.00 99,500.00 179,150.00 278,650.00 17.20% 65.00 1,406.00 29.73%
1  PPK 2.1 Preservasi Jalan Liang Anggang - Martapura - Bts. Kota Rantau - 719,920.00 719,920.00 20.00 440.00 - 44,750.00 44,750.00 6.22% 9.00 286.00 65.00% 15-09-2021

Terdapat progress di lapangan


2  PPK 2.2 Preservasi Jalan Paringin - Tanjung - Mabuun - Sp. Empat Haruai - Batubabi 400,066.00 500,135.00 900,200.00 56.00 4,289.00 99,500.00 134,400.00 233,900.00 25.98% 56.00 1,120.00 26.11% 29-09-2021 belum terlapor di emon
PADAT KARYA RUTIN JEMBATAN

Padat Karya ASET YANG TERBENTUK


JENIS AKUN Target Realisasi Belanja Pemeliharaan Jalan
PENJELASAN JALAN, IRIGASI, JARINGAN
No PPK Satker/Paket Tenaga Hari Orang Tenaga Hari Orang Tanggal PERALATAN & MESIN (5321) GEDUNG & BANGUNAN (5331) dan Jembatan Permasalahan dan Tindak Lanjut
KODE MAK/AKUN VOLUME SATUAN Non Upah Upah Non Upah Upah PAKET/KEGIATAN (5341)
AKUN REGULER AKUN KHUSUS Total (Rp Ribu) Kerja Kerja Total (Rp Ribu) % Keuangan Kerja Kerja % Fisik Update (523131)
(Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Rp Ribu) (Rp Ribu)
BPJN KALIMANTAN SELATAN 4,163,961.00 3,503,760.00 7,667,719.00 196.00 23,992.00 1,029,864.00 1,124,741.00 2,154,605.00 28.10% 135.00 8,455.00 35.24%
DINAS PEKERJAAN UMUM PROV. KALSEL 596,520.00 718,680.00 1,315,200.00 49.00 5,880.00 - 240,300.00 240,300.00 18.27% 20.00 995.00 16.92%
2409.CDF.001.325.B
1  PPK 0.1 PRESERVASI JALAN SUTOYO S - PELABUHAN TRISAKTI - LIANG ANGGANG 1315.2 Meter 596,520.00 718,680.00 1,315,200.00 49.00 5,880.00 - 240,300.00 240,300.00 18.27% 20.00 995.00 16.92% 7/5/2021 1,315,200
523131
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL 3,167,375.00 1,565,025.00 4,732,399.00 71.00 13,383.00 930,364.00 705,291.00 1,635,655.00 34.56% 50.00 6,054.00 45.24%

Paket MYC SBSN baru


terkontrak 25 Juni 2021,
tagging emon dilakukan 24
1 PPK 1.2 PRESERVASI JALAN KP. ASAM ASAM - KINTAB - SEBAMBAN - PAGATAN - BATULICIN 923,247.00 424,372.00 1,347,619.00 24.00 3,592.00 - - - 0.00% - - 0.00% 24-09-2021 September 2021, namun
belum ada pekerjaan padat
karya di lapangan

2409.CDF.001.325.M
2 PPK 1.3 PRESERVASI JALAN KOTABARU - TANJUNG SERDANG 385.3 Meter 262,449.00 69,900.00 332,349.00 6.00 600.00 139,342.00 41,940.00 181,282.00 54.55% 6.00 360.00 60.00% 14-09-2021 332,349
523131
2409.CDF.001.325.J
3 PPK 1.3 PRESERVASI JALAN KANDANGAN - LUMPANGI - BTS. KAB. TANAH BUMBU 716.1 Meter 205,106.00 486,038.00 691,144.00 14.00 4,172.00 143,574.00 311,521.00 455,095.00 65.85% 14.00 2,674.00 64.09% 14-09-2021 691,144
523131
2409.CDF.001.325.K
4 PPK 1.3 PRESERVASI JALAN BTS. KAB. TANAH BUMBU - MENTEWE - BATULICIN 441.8 Meter 106,540.00 212,496.00 319,036.00 12.00 1,824.00 71,027.00 142,596.00 213,623.00 66.96% 12.00 1,224.00 67.11% 14-09-2021 319,036
523131
2409.CDF.001.325.L
5 PPK 1.4 PRESERVASI JALAN BATULICIN - SERONGGA - SEI KUPANG - MANGGALAU - KERANG 1561.4 Meter 976,466.00 314,551.00 1,291,017.00 12.00 2,700.00 530,183.00 170,789.00 700,972.00 54.30% 8.00 1,466.00 54.30% 11/10/2021 1,291,017
523131
2409.CDF.001.325.H
6 PPK 1.5 PRESERVASI JALAN DALAM KOTA BANJARMASIN 928.5 Meter 693,567.00 57,668.00 751,234.00 3.00 495.00 46,238.00 38,445.00 84,683.00 11.27% 10.00 330.00 66.67% 25-05-2021 751,234
523131
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL 400,066.00 1,220,055.00 1,620,120.00 76.00 4,729.00 99,500.00 179,150.00 278,650.00 17.20% 65.00 1,406.00 29.73%
2409.CDF.014.325.E
1  PPK 2.1 Preservasi Jalan Liang Anggang - Martapura - Bts. Kota Rantau 899.9 Meter - 719,920.00 719,920.00 20.00 440.00 - 44,750.00 44,750.00 6.22% 9.00 286.00 65.00% 15-09-2021 719,920
523131

2409.CDF.014.325.R Terdapat progress di lapangan


2  PPK 2.2 Preservasi Jalan Paringin - Tanjung - Mabuun - Sp. Empat Haruai - Batubabi 900.2 Meter 400,066.00 500,135.00 900,200.00 56.00 4,289.00 99,500.00 134,400.00 233,900.00 25.98% 56.00 1,120.00 26.11% 29-09-2021 900,200 belum
523131 terlapor di emon
PADAT KARYA REVITALISASI DRAINASE

Padat Karya
Target Realisasi
Permasalahan dan
No PPK Satker/Paket Tenaga Tenaga Hari Orang Selisih Tanggal
Non Upah Upah Hari Orang Kerja Non Upah Upah % Fisik Tindak Lanjut
Kerja % Kerja Kerja Update
Total (Rp Ribu) Total (Rp Ribu)
Keuangan
(Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu)
BPJN KALIMANTAN SELATAN 18,371,871 14,461,851 32,833,722 1494 118,387.00 18,043,798 14,695,436 32,739,234 99.71% 1584 121,511.00 102.64%
DINAS PEKERJAAN UMUM PROV. KALSEL 508,346 991,453 1,499,799 69 8,394.00 508,346 991,453 1,499,799 100.00% 117 8,421.00 100.32%
1  PPK 0.1 REVITALISASI DRAINASE PPK.01 (2.00 KM) - 288,794 288,794 29 3,534.00 - 288,794 288,794 100.00% 47 2,760.00 78.10% - 9/27/2021
508,346 702,659 1,211,005 40 4,860.00 508,346 702,659 1,211,005 100.00% 70 5,661.00 116.48% - 9/27/2021
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL 11,917,535 6,125,353 18,042,888 634 50,535.00 11,643,695 6,370,335 18,014,030 99.84% 804 53,656.00 106.18%
Selisih biaya nego
1  PPK 1.1 REVITALISASI DRAINASE PPK 1.1 PROVINSI KALIMANTAN SELATAN (5.652 KM) 2,598,743 1,603,749 4,202,492 303 12,973 2,601,841 1,600,620 4,202,461 100.00% 252 12,976.00 100.02% - 31 29-06-2021 bahan
2  PPK 1.2 REVITALISASI DRAINASE PPK 1.2 PROVINSI KALIMANTAN SELATAN (7.01 KM) 2,609,517 1,339,241 3,948,758 113 10,792 2,602,064 1,339,174 3,941,238 99.81% 145 10,795.00 100.03% - 7,520 15-10-2021

20,182 19-07-2021 Biaya


narasumber
3  PPK 1.3 REVITALISASI DRAINASE PPK 1.3 PROVINSI KALIMANTAN SELATAN (6.5 KM) 3,826,387 1,637,840 5,464,227 84 13,540 3,454,937 1,989,108 5,444,045 99.63% 217 16,288.00 120.30% - belum terserap

Selisih biaya nego


4  PPK 1.4 REVITALISASI DRAINASE PPK 1.4 PROVINSI KALIMANTAN SELATAN (7.610 KM) 2,882,888 1,544,523 4,427,411 134 13,230 2,984,853 1,441,433 4,426,286 99.97% 190 13,597.00 102.77% - 1,125 28-06-2021 bahan

PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL 5,945,990 7,345,045 13,291,035 791 59,458.00 5,891,757 7,333,648 13,225,405 99.51% 663 59,434.00 99.96%

-Pasangan batu
harganya kurang dari
HPS (Rp -11.000.000)
-Selisih biaya kepala
1  PPK 2.1 REVITALISASI DRAINASE PPK 2.1 (34.56 KM) 1,737,989 1,348,978 3,086,967 100 10,897 1,710,116 1,337,581 3,047,697 98.73% 107 10,865.00 99.71% - 39,270 1/16/1900 pekerja menjadi
pekerja Rp
11.000.000
-Honor narasumber
Rp 9.000.000 belum
ditarik

Selisih biaya nego


2  PPK 2.2 REVITALISASI DRAINASE PPK 2.2 (6.00 KM) 1,200,266 4,139,627 5,339,893 377 33,320 1,189,050 4,139,627 5,328,677 99.79% 367 33,303.00 99.95% - 11,216 7/29/1900
bahan

Honor dan SPPD


3  PPK 2.3 REVITALISASI DRAINASE PPK 2.3 (9.479 KM) 3,007,735 1,856,440 4,864,175 314 15,241 2,992,591 1,856,440 4,849,031 99.69% 189 15266 100.16% - 15,144 1/29/1900 narasumber belum
terserap
PADAT KARYA REVITALISASI DRAINASE

Padat Karya ASET YANG TERBENTUK


JENIS AKUN Target Realisasi Belanja Penambahan Nilai Belanja Perjalanan Dinas Belanja Honor Output Belanja Pemeliharaan Jalan
PENJELASAN GEDUNG & BANGUNAN JALAN, IRIGASI, JARINGAN Permasalahan dan
No PPK Satker/Paket Tenaga Tenaga Hari Orang Selisih Tanggal PERALATAN & MESIN (5321) Jalan dan Jembatan Biasa Kegiatan dan Jembatan
KODE MAK/AKUN VOLUME SATUAN Non Upah Upah Hari Orang Kerja Non Upah Upah % Fisik PAKET/KEGIATAN (5331) (5341) Tindak Lanjut
Kerja % Kerja Kerja Update (534141) (524111) (521213 (534141)
AKUN REGULER AKUN KHUSUS Total (Rp Ribu) Total (Rp Ribu)
Keuangan
(Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Rp Ribu) (Rp Ribu) (Rp Ribu) (Rp Ribu) (Rp Ribu) (Rp Ribu)
BPJN KALIMANTAN SELATAN 18,371,871 14,461,851 32,833,722 1494 118,387.00 18,043,798 14,695,436 32,739,234 99.71% 1584 121,511.00 102.64%
DINAS PEKERJAAN UMUM PROV. KALSEL 508,346 991,453 1,499,799 69 8,394.00 508,346 991,453 1,499,799 100.00% 117 8,421.00 100.32%
2409.CDC.004.403.C (Galian tanah dan
1,500,000
1  PPK 0.1 REVITALISASI DRAINASE PPK.01 (2.00 KM) 534141 1 Km - 288,794 288,794 29 3,534.00 - 288,794 288,794 100.00% 47 2,760.00 78.10% - 9/27/2021 Pasangan Batu)
508,346 702,659 1,211,005 40 4,860.00 508,346 702,659 1,211,005 100.00% 70 5,661.00 116.48% - 9/27/2021
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL 11,917,535 6,125,353 18,042,888 634 50,535.00 11,643,695 6,370,335 18,014,030 99.84% 804 53,656.00 106.18%
2409.CDC.004.403.YA Selisih biaya nego
524111 1 Lumsum 4,153,092 49,400 49,400 bahan (Pasangan
1  PPK 1.1 REVITALISASI DRAINASE PPK 1.1 PROVINSI KALIMANTAN SELATAN (5.652 KM) 534141 2,598,743 1,603,749 4,202,492 303 12,973 2,601,841 1,600,620 4,202,461 100.00% 252 12,976.00 100.02% - 31 29-06-2021 Batu)
2409.CDC.004.403.YB
1 Lumsum 3,948,758
2  PPK 1.2 REVITALISASI DRAINASE PPK 1.2 PROVINSI KALIMANTAN SELATAN (7.01 KM) 534141 2,609,517 1,339,241 3,948,758 113 10,792 2,602,064 1,339,174 3,941,238 99.81% 145 10,795.00 100.03% - 7,520 15-10-2021 (Pasangan Batu)
2409.CDC.004.403.YC
521213 Biaya narasumber
3  PPK 1.3 REVITALISASI DRAINASE PPK 1.3 PROVINSI KALIMANTAN SELATAN (6.5 KM) 1 Lumsum 3,826,387 1,637,840 5,464,227 84 13,540 3,454,937 1,989,108 5,444,045 99.63% 217 16,288.00 120.30% - 20,182 19-07-2021 5,355,307 88,920 20,000 belum terserap
524111
534141 (Pasangan Batu)

Selisih biaya nego


2409.CDC.004.403.YD
4  PPK 1.4 REVITALISASI DRAINASE PPK 1.4 PROVINSI KALIMANTAN SELATAN (7.610 KM) 1 Lumsum 2,882,888 1,544,523 4,427,411 134 13,230 2,984,853 1,441,433 4,426,286 99.97% 190 13,597.00 102.77% - 1,125 28-06-2021 4,427,411 bahan(Pasangan
534141 Batu)
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL 5,945,990 7,345,045 13,291,035 791 59,458.00 5,891,757 7,333,648 13,225,405 99.51% 663 59,434.00 99.96%

-Pasangan batu
harganya kurang dari
HPS (Rp -11.000.000)
-Selisih biaya kepala
2409.CDC.020.403.BA
521213 pekerja menjadi
pekerja Rp
1  PPK 2.1 REVITALISASI DRAINASE PPK 2.1 (34.56 KM) 523131 1 Lumsum 1,737,989 1,348,978 3,086,967 100 10,897 1,710,116 1,337,581 3,047,697 98.73% 107 10,865.00 99.71% - 39,270 1/16/1900 2,978,150 9,424 6,800 92,593
524111 11.000.000
-Honor narasumber
534141
Rp 9.000.000 belum
ditarik
(Pembersihan dan
Pasangan Batu)

2409.CDC.020.403.BB Selisih biaya nego


2  PPK 2.2 REVITALISASI DRAINASE PPK 2.2 (6.00 KM) 521213 1 Lumsum 1,200,266 4,139,627 5,339,893 377 33,320 1,189,050 4,139,627 5,328,677 99.79% 367 33,303.00 99.95% - 11,216 7/29/1900 5,323,669 9,424 6,800 bahan
524111 (Galian tanah dan
534141 Pasangan Batu)

Honor dan SPPD


2409.CDC.020.403.BC
narasumber belum
3  521213 terserap
PPK 2.3 REVITALISASI DRAINASE PPK 2.3 (9.479 KM) 524111 1 Lumsum 3,007,735 1,856,440 4,864,175 314 15,241 2,992,591 1,856,440 4,849,031 99.69% 189 15266 100.16% - 15,144 1/29/1900 4,847,951 9,424 6,800
(Galian tanah dan
534141
Pasangan Batu)
PADAT KARYA TAMBAHAN

Target Realisasi
Permasalahan dan
No PPK Satker/Paket Tenaga Hari Orang % Tenaga Hari Orang
Non Upah Upah Total (Rp Ribu) Non Upah Upah Total (Rp Ribu) % Fisik Tanggal Update Tindak Lanjut
Kerja Kerja Keuangan Kerja Kerja

(Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Orang) (Hari)
BPJN KALIMANTAN SELATAN 41,232,916.00 7,875,924.00 49,108,839.00 503.00 42,737.00 17,021,507.00 1,526,412.00 18,547,917.00 37.77% 171.00 6,649.00 15.56%
DINAS PEKERJAAN UMUM PROV. KALSEL 2,936,000.00 979,848.00 3,915,848.00 7.00 664.00 1,837,386.00 787,451.00 2,624,837.00 67.03% 5.00 480.00 72.29%
1 PPK 0.1 PRESERVASI JALAN SUTOYO S - PELABUHAN TRISAKTI - LIANG ANGGANG 2,936,000.00 979,848.00 3,915,848.00 7.00 664.00 1,837,386.00 787,451.00 2,624,837.00 67.03% 5.00 480.00 72.29% 9/29/2021
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL 26,401,536.00 1,700,721.00 28,102,256.00 187.00 14,222.00 13,544,531.00 572,426.00 14,116,955.00 50.23% 85.00 4,706.00 33.09%

1 PPK 1.2 PRESERVASI JALAN KP. ASAM ASAM - KINTAB - SEBAMBAN - PAGATAN - BATULICIN 1,078,681.00 106,472.00 1,185,153.00 12.00 874.00 - - - 0.00% - - 0.00% 24-09-2021
Paket MYC SBSN baru
terkontrak 25 Juni
2021, tagging emon
2 PPK 1.2 PRESERVASI JALAN KP. ASAM ASAM - KINTAB - SEBAMBAN - PAGATAN - BATULICIN 3,645,390.00 194,434.00 3,839,824.00 20.00 1,594.00 - - - 0.00% - - 0.00% 24-09-2021 dilakukan 24
September 2021,
namun belum ada
3 PPK 1.2 PRESERVASI JALAN KP. ASAM ASAM - KINTAB - SEBAMBAN - PAGATAN - BATULICIN 61,667.00 15,210.00 76,877.00 10.00 120.00 - - - 0.00% - - 0.00% 24-09-2021 pekerjaan padat karya
di lapangan
4 PPK 1.2 PENGGANTIAN JEMBATAN S. KINTAP KECIL I CS 1,756,985.00 302,217.00 2,059,202.00 21.00 2,436.00 - - - 0.00% - - 0.00% 19-04-2021
5 PPK 1.3 PRESERVASI JALAN KANDANGAN - LUMPANGI - BTS. KAB. TANAH BUMBU 219,941.00 115,918.00 335,859.00 8.00 995.00 176,404.00 107,530.00 283,933.00 84.54% 8.00 923.00 92.76% 14-09-2021
6 PPK 1.3 PRESERVASI JALAN BTS. KAB. TANAH BUMBU - MENTEWE - BATULICIN 303,227.00 8,388.00 311,615.00 8.00 72.00 303,227.00 8,388.00 311,615.00 100.00% 8.00 72.00 100.00% 25-06-2021
7 PPK 1.3 PRESERVASI JALAN KANDANGAN - LUMPANGI - BTS. KAB. TANAH BUMBU 390,885.00 51,260.00 442,145.00 8.00 440.00 312,708.00 41,008.00 353,716.00 80.00% 8.00 352.00 80.00% 22-10-2021
8 PPK 1.3 PRESERVASI JALAN BTS. KAB. TANAH BUMBU - MENTEWE - BATULICIN 1,882,297.00 206,904.00 2,089,201.00 13.00 1,776.00 1,156,828.00 139,800.00 1,296,628.00 62.06% 13.00 1,018.00 57.32% 14-09-2021
9 PPK 1.3 PRESERVASI JALAN KOTABARU - TANJUNG SERDANG 189,514.00 21,320.00 210,833.00 8.00 183.00 189,514.00 21,320.00 210,833.00 100.00% 8.00 183.00 100.00% 13-08-2021
10 PPK 1.3 PRESERVASI JALAN BTS. KAB. TANAH BUMBU - MENTEWE - BATULICIN 9,984,237.00 72,696.00 10,056,933.00 13.00 624.00 9,984,237.00 72,696.00 10,056,933.00 100.00% 13.00 624.00 100.00% 14-09-2021
11 PPK 1.4 PRESERVASI JALAN BATULICIN - SERONGGA - SEI KUPANG - MANGGALAU - KERANG 391,677.00 58,483.00 450,160.00 4.00 502.00 193,488.00 28,892.00 222,380.00 49.40% 4.00 248.00 49.40% 9/9/2021
12 PPK 1.4 PRESERVASI JALAN BATULICIN - SERONGGA - SEI KUPANG - MANGGALAU - KERANG 1,740,850.00 181,740.00 1,922,590.00 10.00 1,560.00 821,333.00 85,744.00 907,077.00 47.18% 8.00 736.00 47.18% 9/9/2021
Pekerjaan pasangan
batu sudah selesai
13 PPK 1.4 PENGGANTIAN JEMBATAN S. BAKAU X CS 202,002.00 45,236.00 247,238.00 25.00 460.00 164,141.00 36,758.00 200,899.00 81.26% 10.00 290.00 63.04% 11/10/2021 tetapi belum terlapor
di emon
14 PPK 1.4 PEMBANGUNAN JEMBATAN GANTUNG DS. BATUAH 3,762,827.00 229,573.00 3,992,400.00 21.00 1,806.00 - - - 0.00% - - 0.00% 25-05-2021
15 PPK 1.5 PRESERVASI JALAN DALAM KOTA BANJARMASIN 175,395.00 13,980.00 189,375.00 2.00 120.00 - - - 0.00% - - 0.00% 25-05-2021
16 PPK 1.5 PRESERVASI JALAN DALAM KOTA BANJARMASIN 615,961.00 76,890.00 692,851.00 4.00 660.00 242,651.00 30,290.00 272,941.00 39.39% 5.00 260.00 39.39% 25-05-2021
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL 11,895,380.00 5,195,355.00 17,090,735.00 309.00 27,851.00 1,639,590.00 166,535.00 1,806,125.00 10.57% 81.00 1,463.00 5.25%
1 PPK 2.1 Preservasi Jalan Liang Anggang - Martapura - Bts. Kota Rantau 670,611.00 143,956.00 814,567.00 15.00 1,380.00 - 74,375.00 74,375.00 9.13% 35.00 595.00 43.12% 9/8/2021
2 PPK 2.1 Preservasi Jalan Liang Anggang - Martapura - Bts. Kota Rantau 734,400.00 345,600.00 1,080,000.00 12.00 552.00 - 34,560.00 34,560.00 3.20% 26.00 388.00 70.29% 9/8/2021
3 PPK 2.2 Preservasi Jalan Rantau - Kandangan - Ds. Bagambir - Pantai Hambawang - Mantimin - Paringin 996,408.00 3,592.00 1,000,000.00 12.00 24.00 - - - 0.00% - - 0.00% 4/1/2021
4 PPK 2.2 Preservasi Jalan Sp. Handil Bakti - Marabahan - Kandangan 749,500.00 1,250,500.00 2,000,000.00 110.00 10,400.00 - - - 0.00% - - 0.00% 4/5/2021
5 PPK 2.2 Preservasi Jalan Sp. Handil Bakti - Marabahan - Kandangan 2,099,798.00 3,320,994.00 5,420,792.00 150.00 15,300.00 - - - 0.00% - - 0.00% 4/5/2021
6 PPK 2.3 PENGGANTIAN JEMBATAN S. DAHAI I CS 3,946,177.00 53,823.00 4,000,000.00 - - - - - 0.00% - - #DIV/0! 3/23/2021
7 PPK 2.3 Preservasi Jalan Pantai Hambawang - Bts. Kota Amuntai - Pasar Panas - Kelua - Tanjung 1,368,203.00 11,184.00 1,379,387.00 5.00 95.00 1,077,658.00 30,000.00 1,107,658.00 80.30% 10.00 250.00 263.16% 6/25/2021
8 PPK 2.3 Preservasi Jalan Paringin - Tanjung - Mabuun - Sp. Empat Haruai - Batubabi 873,229.00 11,883.00 885,112.00 5.00 100.00 561,932.00 27,600.00 589,532.00 66.61% 10.00 230.00 230.00% 6/24/2021
9 PPK 2.3 PENGGANTIAN JEMBATAN S. DAHAI I CS 457,054.00 53,823.00 510,877.00 - - - - - 0.00% - - #DIV/0! 3/23/2021
PADAT KARYA TAMBAHAN

ASET YANG TERBENTUK


JENIS AKUN Target Realisasi
PENJELASAN GEDUNG & BANGUNAN JALAN, IRIGASI, JARINGAN Permasalahan dan
No PPK Satker/Paket Tenaga Hari Orang % Tenaga Hari Orang PERALATAN & MESIN (5321)
KODE MAK/AKUN VOLUME SATUAN Non Upah Upah Total (Rp Ribu) Non Upah Upah Total (Rp Ribu) % Fisik Tanggal Update PAKET/KEGIATAN (5331) (5341) Tindak Lanjut
AKUN REGULER AKUN KHUSUS Kerja Kerja Keuangan Kerja Kerja

(Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp.) (Rp.) (Rp.)
BPJN KALIMANTAN SELATAN 41,232,916.00 7,875,924.00 49,108,839.00 503.00 42,737.00 17,021,507.00 1,526,412.00 18,547,917.00 37.77% 171.00 6,649.00 15.56%
DINAS PEKERJAAN UMUM PROV. KALSEL 2,936,000.00 979,848.00 3,915,848.00 7.00 664.00 1,837,386.00 787,451.00 2,624,837.00 67.03% 5.00 480.00 72.29%
1 PPK 0.1 PRESERVASI JALAN SUTOYO S - PELABUHAN TRISAKTI - LIANG ANGGANG 2,936,000.00 979,848.00 3,915,848.00 7.00 664.00 1,837,386.00 787,451.00 2,624,837.00 67.03% 5.00 480.00 72.29% 9/29/2021
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL 26,401,536.00 1,700,721.00 28,102,256.00 187.00 14,222.00 13,544,531.00 572,426.00 14,116,955.00 50.23% 85.00 4,706.00 33.09%

1 PPK 1.2 PRESERVASI JALAN KP. ASAM ASAM - KINTAB - SEBAMBAN - PAGATAN - BATULICIN 1,078,681.00 106,472.00 1,185,153.00 12.00 874.00 - - - 0.00% - - 0.00% 24-09-2021
Paket MYC SBSN baru
terkontrak 25 Juni
2021, tagging emon
2 PPK 1.2 PRESERVASI JALAN KP. ASAM ASAM - KINTAB - SEBAMBAN - PAGATAN - BATULICIN 3,645,390.00 194,434.00 3,839,824.00 20.00 1,594.00 - - - 0.00% - - 0.00% 24-09-2021 dilakukan 24
September 2021,
namun belum ada
3 PPK 1.2 PRESERVASI JALAN KP. ASAM ASAM - KINTAB - SEBAMBAN - PAGATAN - BATULICIN 61,667.00 15,210.00 76,877.00 10.00 120.00 - - - 0.00% - - 0.00% 24-09-2021 pekerjaan padat karya
di lapangan
4 PPK 1.2 PENGGANTIAN JEMBATAN S. KINTAP KECIL I CS 1,756,985.00 302,217.00 2,059,202.00 21.00 2,436.00 - - - 0.00% - - 0.00% 19-04-2021
5 PPK 1.3 PRESERVASI JALAN KANDANGAN - LUMPANGI - BTS. KAB. TANAH BUMBU 219,941.00 115,918.00 335,859.00 8.00 995.00 176,404.00 107,530.00 283,933.00 84.54% 8.00 923.00 92.76% 14-09-2021
6 PPK 1.3 PRESERVASI JALAN BTS. KAB. TANAH BUMBU - MENTEWE - BATULICIN 303,227.00 8,388.00 311,615.00 8.00 72.00 303,227.00 8,388.00 311,615.00 100.00% 8.00 72.00 100.00% 25-06-2021
7 PPK 1.3 PRESERVASI JALAN KANDANGAN - LUMPANGI - BTS. KAB. TANAH BUMBU 390,885.00 51,260.00 442,145.00 8.00 440.00 312,708.00 41,008.00 353,716.00 80.00% 8.00 352.00 80.00% 22-10-2021
8 PPK 1.3 PRESERVASI JALAN BTS. KAB. TANAH BUMBU - MENTEWE - BATULICIN 1,882,297.00 206,904.00 2,089,201.00 13.00 1,776.00 1,156,828.00 139,800.00 1,296,628.00 62.06% 13.00 1,018.00 57.32% 14-09-2021
9 PPK 1.3 PRESERVASI JALAN KOTABARU - TANJUNG SERDANG 189,514.00 21,320.00 210,833.00 8.00 183.00 189,514.00 21,320.00 210,833.00 100.00% 8.00 183.00 100.00% 13-08-2021
10 PPK 1.3 PRESERVASI JALAN BTS. KAB. TANAH BUMBU - MENTEWE - BATULICIN 9,984,237.00 72,696.00 10,056,933.00 13.00 624.00 9,984,237.00 72,696.00 10,056,933.00 100.00% 13.00 624.00 100.00% 14-09-2021
11 PPK 1.4 PRESERVASI JALAN BATULICIN - SERONGGA - SEI KUPANG - MANGGALAU - KERANG 391,677.00 58,483.00 450,160.00 4.00 502.00 193,488.00 28,892.00 222,380.00 49.40% 4.00 248.00 49.40% 9/9/2021
12 PPK 1.4 PRESERVASI JALAN BATULICIN - SERONGGA - SEI KUPANG - MANGGALAU - KERANG 1,740,850.00 181,740.00 1,922,590.00 10.00 1,560.00 821,333.00 85,744.00 907,077.00 47.18% 8.00 736.00 47.18% 9/9/2021
Pekerjaan pasangan
13 PPK 1.4 PENGGANTIAN JEMBATAN S. BAKAU X CS 202,002.00 45,236.00 247,238.00 25.00 460.00 164,141.00 36,758.00 200,899.00 81.26% 10.00 290.00 63.04% 11/10/2021 batu sudah selesai
tetapi belum terlapor
di emon
14 PPK 1.4 PEMBANGUNAN JEMBATAN GANTUNG DS. BATUAH 3,762,827.00 229,573.00 3,992,400.00 21.00 1,806.00 - - - 0.00% - - 0.00% 25-05-2021
15 PPK 1.5 PRESERVASI JALAN DALAM KOTA BANJARMASIN 175,395.00 13,980.00 189,375.00 2.00 120.00 - - - 0.00% - - 0.00% 25-05-2021
16 PPK 1.5 PRESERVASI JALAN DALAM KOTA BANJARMASIN 615,961.00 76,890.00 692,851.00 4.00 660.00 242,651.00 30,290.00 272,941.00 39.39% 5.00 260.00 39.39% 25-05-2021
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL 11,895,380.00 5,195,355.00 17,090,735.00 309.00 27,851.00 1,639,590.00 166,535.00 1,806,125.00 10.57% 81.00 1,463.00 5.25%
1 PPK 2.1 Preservasi Jalan Liang Anggang - Martapura - Bts. Kota Rantau 670,611.00 143,956.00 814,567.00 15.00 1,380.00 - 74,375.00 74,375.00 9.13% 35.00 595.00 43.12% 9/8/2021
2 PPK 2.1 Preservasi Jalan Liang Anggang - Martapura - Bts. Kota Rantau 734,400.00 345,600.00 1,080,000.00 12.00 552.00 - 34,560.00 34,560.00 3.20% 26.00 388.00 70.29% 9/8/2021
3 PPK 2.2 Preservasi Jalan Rantau - Kandangan - Ds. Bagambir - Pantai Hambawang - Mantimin - Paringin 996,408.00 3,592.00 1,000,000.00 12.00 24.00 - - - 0.00% - - 0.00% 4/1/2021
4 PPK 2.2 Preservasi Jalan Sp. Handil Bakti - Marabahan - Kandangan 749,500.00 1,250,500.00 2,000,000.00 110.00 10,400.00 - - - 0.00% - - 0.00% 4/5/2021
5 PPK 2.2 Preservasi Jalan Sp. Handil Bakti - Marabahan - Kandangan 2,099,798.00 3,320,994.00 5,420,792.00 150.00 15,300.00 - - - 0.00% - - 0.00% 4/5/2021
6 PPK 2.3 PENGGANTIAN JEMBATAN S. DAHAI I CS 3,946,177.00 53,823.00 4,000,000.00 - - - - - 0.00% - - #DIV/0! 3/23/2021
7 PPK 2.3 Preservasi Jalan Pantai Hambawang - Bts. Kota Amuntai - Pasar Panas - Kelua - Tanjung 1,368,203.00 11,184.00 1,379,387.00 5.00 95.00 1,077,658.00 30,000.00 1,107,658.00 80.30% 10.00 250.00 263.16% 6/25/2021
8 PPK 2.3 Preservasi Jalan Paringin - Tanjung - Mabuun - Sp. Empat Haruai - Batubabi 873,229.00 11,883.00 885,112.00 5.00 100.00 561,932.00 27,600.00 589,532.00 66.61% 10.00 230.00 230.00% 6/24/2021
9 PPK 2.3 PENGGANTIAN JEMBATAN S. DAHAI I CS 457,054.00 53,823.00 510,877.00 - - - - - 0.00% - - #DIV/0! 3/23/2021
PADAT KARYA BUN

Padat Karya
Target Realisasi Permasala
han dan
No PPK Satker/Paket Tenaga Hari Orang Tenaga Hari Orang Tanggal
Non Upah Upah Non Upah Upah Tindak
Total (Rp Kerja Kerja Total (Rp % Kerja Kerja Update
% Fisik Lanjut
Ribu) Ribu) Keuangan
(Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Orang) (Hari)
BPJN KALIMANTAN SELATAN 2,427,736 1,572,264 4,000,000 303 13107 1,187,205 1,186,131 2,373,336 59.33% 405 10886 83.05%
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL 1,327,310 922,690 2,250,000 185 7877 710,777 561,254 1,272,031 56.53% 191 5814 73.81%
1  PPK 1.1 REVITALISASI PEN PRESERVASI JEMBATAN PPK 1.1 PROV KALSEL 447,960 352,040 800,000 89 2873 218,396 226,940 445,336 55.67% 60 2265 78.84% 22-10-2021
2  PPK 1.2 REVITALISASI PEN PRESERVASI JEMBATAN PPK 1.2 PROV KALSEL 404,568 245,432 650,000 38 2376 386,183 245,308 631,491 97.15% 29 1931 81.27% 22-10-2021
3  PPK 1.3 REVITALISASI PEN PRESERVASI JEMBATAN PPK 1.3 PROV KALSEL 250,427 149,573 400,000 20 1200 - 34,898 34,898 8.72% 26 326 27.17% 22-10-2021
4  PPK 1.4 REVITALISASI PEN PRESERVASI JEMBATAN PPK 1.4 PROV KALSEL 224,355 175,645 400,000 38 1428 106,198 54,108 160,306 40.08% 76 1292 90.48% 22-10-2021
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL 1,100,426 649,574 1,750,000 118 5230 476,428 624,877 1,101,305 62.93% 214 5072 96.98%
1   PPK 2.1 REVITALISASI PEN PRESERVASI JEMBATAN PPK 2.1 PROV. KALSEL 300,324 249,676 550,000 40 2000 295,687 251,958 547,645 99.57% 73 2044 102.20% 19-10-2021
2   PPK 2.2 REVITALISASI PEN PRESERVASI JEMBATAN PPK 2.2 PROV. KALSEL 374,261 225,739 600,000 31 1820 180,741 225,739 406,480 67.75% 61 1828 100.44% 9/10/2021
3   PPK 2.3 REVITALISASI PEN PRESERVASI JEMBATAN PPK 2.3 PROV. KALSEL 425,841 174,159 600,000 47 1410 - 147,180 147,180 24.53% 80 1200 85.11% 22-10-2021
PADAT KARYA BUN

Padat Karya ASET YANG TERBENTUK


JENIS AKUN Target Realisasi Belanja Modal Gedung dan
PENJELASAN GEDUNG & BANGUNAN JALAN, IRIGASI, JARINGAN Bangunan - Penanganan Pandemi Permasalahan dan
No PPK Satker/Paket Tenaga Hari Orang Tenaga Hari Orang Tanggal PERALATAN & MESIN (5321)
KODE MAK/AKUN VOLUME SATUAN Non Upah Upah Non Upah Upah PAKET/KEGIATAN (5331) (5341) Covid-19 Tindak Lanjut
Total (Rp Kerja Kerja Total (Rp % Kerja Kerja Update
AKUN REGULER AKUN KHUSUS % Fisik (533119)
Ribu) Ribu) Keuangan
(Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Orang) (Hari) (Rp Ribu) (Rp Ribu) (Rp Ribu) (Rp Ribu)
BPJN KALIMANTAN SELATAN 2,427,736 1,572,264 4,000,000 303 13107 1,187,205 1,186,131 2,373,336 59.33% 405 10886 83.05%
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL 1,327,310 922,690 2,250,000 185 7877 710,777 561,254 1,272,031 56.53% 191 5814 73.81%
2409.CDC.020.403.VB
1   PPK 1.1 REVITALISASI PEN PRESERVASI JEMBATAN PPK 1.1 PROV KALSEL 533119 1000 Meter 447,960 352,040 800,000 89 2873 218,396 226,940 445,336 55.67% 60 2265 78.84% 22-10-2021 800,000
2409.CDC.020.403.VC
2   PPK 1.2 REVITALISASI PEN PRESERVASI JEMBATAN PPK 1.2 PROV KALSEL 884.14 Meter 404,568 245,432 650,000 38 2376 386,183 245,308 631,491 97.15% 29 1931 81.27% 22-10-2021 650,000
533119
2409.CDC.020.403.VD
3   PPK 1.3 REVITALISASI PEN PRESERVASI JEMBATAN PPK 1.3 PROV KALSEL 533119 290 Meter 250,427 149,573 400,000 20 1200 - 34,898 34,898 8.72% 26 326 27.17% 22-10-2021 400,000

2409.CDC.020.403.VE
4   PPK 1.4 REVITALISASI PEN PRESERVASI JEMBATAN PPK 1.4 PROV KALSEL 533119 400 Meter 224,355 175,645 400,000 38 1428 106,198 54,108 160,306 40.08% 76 1292 90.48% 22-10-2021 400,000
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL 1,100,426 649,574 1,750,000 118 5230 476,428 624,877 1,101,305 62.93% 214 5072 96.98%
2409.CDC.020.403.CA
1   PPK 2.1 REVITALISASI PEN PRESERVASI JEMBATAN PPK 2.1 PROV. KALSEL 1 Lumsum 300,324 249,676 550,000 40 2000 295,687 251,958 547,645 99.57% 73 2044 102.20% 19-10-2021 550,000
533119
2409.CDC.020.403.CB
2   PPK 2.2 REVITALISASI PEN PRESERVASI JEMBATAN PPK 2.2 PROV. KALSEL 1 Lumsum 374,261 225,739 600,000 31 1820 180,741 225,739 406,480 67.75% 61 1828 100.44% 9/10/2021 600,000
533119
2409.CDC.020.403.CC
3   PPK 2.3 REVITALISASI PEN PRESERVASI JEMBATAN PPK 2.3 PROV. KALSEL 1 Lumsum 425,841 174,159 600,000 47 1410 - 147,180 147,180 24.53% 80 1200 85.11% 22-10-2021 600,000
533119