Anda di halaman 1dari 11

PROYEK PEMBANGUNAN RUMAH SUSUN PEKERJA INDUSTRI BATANG II No.

Dokumen
PERIODE : 21 DESEMBER 2021 S.D. 31 DESEMBER 2021 25.092.331.884,00 F.01a/W.10/P.02/PM/PRK
REKAP COST CONTROL UNIT
24.494.910.666,47

NO URAIAN BOBOT RAB RAP LABA / RUGI % Rencana Bulan Deviasi

EXCLUDE PPH (3%) & BUKP (3,5%)


1 RENCANA AWAL (BUKU BIRU) 100,00 88.381.300.188,18 83.072.234.365,13 5.309.065.823,05 6,01 - Sales :

2 RENCANA POSISI SAAT INI 100,00 88.381.300.188,18 87.783.878.970,65 597.421.217,53 0,68 - Laba :

3 REALISASI TAHUN LALU - Volume :

4 REALISASI TAHUN 2021 45,43 40.147.503.691,15 40.259.187.101,65 2.212.541.311,62 5,51

5 REALISASI SAAT INI 9,85 8.707.475.656 7.792.187.046,00 1.176.589.548,09 13,51 2.062.923.784,06


Periode Minggu Lalu
6 REALISASI BULAN INI 16,80 14.845.589.990 14.666.511.288,19 895.407.666,46 6,03 PeriodeBulan Iini
(7.247.026.731,00)
7 REALISASI S/D BULAN LALU 28,63 25.301.913.701 25.592.675.813,46 1.317.133.645,16 5,21 Periode Bulan Lalu 1.607.895.757,96
1740632207
8 REALISASI S/D SAAT INI 45,43 40.147.503.691 40.259.187.101,65 2.212.541.311,62 5,51 Periode Saat Ini 2.324.224.722,12

9 RENCANA SISA 54,57 48.233.796.497,03 47.524.691.869,00 (1.615.120.094,09) (3,35)

INCLUDE PPH (3%) & BUKP (3,5%)


1 RENCANA AWAL (BUKU BIRU) 100,00 88.381.300.188,18 88.817.018.877,36 (435.718.689,18) (0,49)

2 RENCANA POSISI SAAT INI 100,00 88.381.300.188,18 93.528.663.482,88 (5.147.363.294,70) (5,82)

3 REALISASI TAHUN LALU - - - - -

4 REALISASI TAHUN 2021 45,43 40.147.503.691,15 42.868.774.841,58 (397.046.428,31) (0,99)

5 REALISASI SAAT INI 9,85 8.707.475.656,03 8.358.172.963,64 610.603.630,45 7,01

6 REALISASI BULAN INI 16,80 14.845.589.990,49 15.631.474.637,57 (69.555.682,92) (0,47)

7 REALISASI S/D BULAN LALU 28,63 25.301.913.700,66 27.237.300.204,01 (327.490.745,39) (1,29)

8 REALISASI S/D SAAT INI 45,43 40.147.503.691,15 42.868.774.841,58 (397.046.428,31) (0,99)

9 RENCANA SISA 54,57 48.233.796.497,03 50.659.888.641,30 (4.750.316.866,39) (9,85)

- 4.711.644.605,52 (4.711.644.605,5) PERUBAHAN

45,43 11,48 aspk harga aspek pek +/_ aspek volume aspek lain2
PERUBAHAN AKIBAT : BIAYA UPAH 1.796.927,96 - (71.503.978,42) -
X = aspek harga satuan 4.063.042.104,06 (4.063.042.104,06) SUB KONTRAKTOR - - (1.018.395.316,62) -
Y = aspek peker tambah - - - BIAYA BAHAN 3.987.271.284,13 - 672.015.488,19 -
Z' = aspek over minder volume 648.602.501,46 (648.602.501,46) BIAYA ALAT 73.973.891,96 - 542.838.908,31 -
Z" = aspek lain2 ( rework ) 556.237.500,00 - - BIAYA UMUM dan KARYAWAN - - - -
PEMBEBANAN - - 523.647.400,00 -
- - 4.711.644.605,52 (4.711.644.605,52) 4.063.042.104,06 - 648.602.501,46 -

REKAP BIAYA 4.063.042.104,06 - 648.602.501,46 -


MINGGU INI JUMLAH JUMLAH RAP AWAL RAP JUMLAH RENCANA
NO DU MUTASI VIA. UNIT SAAT INI BULAN INI BUKU BIRU PADA POSISI S/D SAAT INI SISA
TUNAI NON TUNAI GUDANG SAAT INI

1 BIAYA UPAH 2.217.373.490,47 - - - 2.217.373.490,47 3.495.140.149,46 15.493.109.494,50 15.423.402.444,04 7.680.851.601,18 7.742.550.842,87

2 SUB KONTRAKTOR 619.500.000,00 - - - 619.500.000,00 619.500.000,00 30.958.930.633,93 29.940.535.317,32 1.977.307.548,88 27.963.227.768,44

3 BIAYA BAHAN 498.583.082,00 3.322.154.643,53 5.960.000,00 - 3.826.697.725,53 9.089.156.775,73 30.288.305.446,54 34.947.592.218,86 25.301.646.327,53 9.645.945.891,33

3 BIAYA ALAT 153.951.432,00 336.514.167,00 - - 490.465.599,00 669.994.726,00 2.678.144.763,16 3.294.957.563,43 2.327.959.725,07 966.997.838,36

4 BIAYA UMUM dan KARYAWAN 64.941.660,00 - - 573.208.571,00 638.150.231,00 792.719.637,00 3.653.744.027,00 3.653.744.027,00 2.447.774.499,00 1.205.969.528,00

5 PEMBEBANAN - - - - - - - 523.647.400,00 523.647.400,00 -

3.554.349.664,47 3.658.668.810,53 5.960.000,00 573.208.571,00 7.792.187.046,00 14.666.511.288,19 83.072.234.365,13 87.783.878.970,65 40.259.187.101,65 47.524.691.869,00
(4.768.021.847,89) - (0) - - - -
Disetujui / Diperiksa : Diperiksa : Jakarta, BIAYA/SALES BULAN INI RAP AWAL RAP PROYEKSI S/D SAAT INI RENCANA SISA
Mengetahui/MenyetujuiMengetahui/Menyetujui
: : Diperiksa : Dilaporkan : BIAYA UPAH 23,54% 17,53% 17,45% 19,13% 16,05%
SUB KONTRAKTOR 4,17% 35,03% 33,88% 4,93% 57,97%
BIAYA BAHAN 56,40% 34,27% 39,54% 57,23% 24,82%
BIAYA ALAT 4,51% 3,03% 3,73% 5,80% 2,00%
BIAYA UMUM dan KARYAWAN 5,34% 4,13% 4,13% 6,10% 2,50%
Ardian Rahmatullah Mahendra Prima P PEMBEBANAN 0,00% 0,00% 0,59% 1,30% 0,00%
Manager Teknik Cost Control Unit Ridy Chandra Andry Prasetyo A. Danang Wahyu Wahid Andang 93,97% 93,99% 99,32% 94,49% 103,35%
Koordinator PM PM SOE Cost Control Proyek
BERITA ACARA SISA BAHAN
NO: 010/BASB/APIK/RSBTG-II/XII/2021

Pada hari Jumat, tanggal Tiga Puluh Satu bulan Desember tahun Dua Ribu Dua Puluh satu telah
di adakan pemeriksaan dan perhitungan sisa bahan pada Proyek RUSUN BATANG II, seperti
terlampir berikut ini :

Sisa Bahan : Rp 1.499.891.880

Satu Milyar Empat Ratus Sembilan Puluh Sembilan Juta Delapan Ratus
Terbilang :
Sembilan Puluh Satu Ribu Delapan Ratus Delapan Puluh Rupiah

Demikian Berita Acara ini kami buat untuk dapat digunakan dengan sebagai mestinya.

Jakarta, 31 Desember 2021


Diperiksa oleh, Dibuat oleh,

A. Danang Maychris Erlino


SOE Logistik

Mengetahui/menyetujui,

Andri Prasetyo
Project Manager
REKAPITULASI PEMAKAIAN DAN SISA BAHAN
Proyek : RUSUN BATANG II
Periode : 20 Desember - 31 Desember 2021

Sisa Bahan Lalu Penerimaan Pengeluaran Sisa Bahan


NO NAMA BAHAN SAT HARSAT Minggu lalu Minggu ini S/d Minggu ini Minggu Lalu Minggu ini S/d minggu ini Volume Jumlah
Volume Jumlah
Volume Jumlah Volume Jumlah Volume Jumlah Volume Jumlah Volume Jumlah Volume Jumlah

STRUKTUR

1 Solar ltr Rp 8.800,00 - Rp - 25.000,00 Rp 220.000.000 Rp - 25.000,00 Rp 220.000.000 25.000,00 Rp 220.000.000 25.000,00 Rp 220.000.000 - Rp -
2 Solar ltr Rp 10.272,73 - Rp - 5.000,00 Rp 51.363.650 Rp - 5.000,00 Rp 51.363.650 5.000,00 Rp 51.363.650 5.000,00 Rp 51.363.650 - Rp -
3 Solar ltr Rp 10.181,82 3.500,00 Rp 35.636.370 5.000,00 Rp 50.909.100 10.000,00 Rp 101.818.200 15.000,00 Rp 152.727.300 1.500,00 Rp 15.272.730 10.500,00 Rp 106.909.110 12.000,00 Rp 122.181.840 3.000,00 Rp 30.545.460
4 Semen Gresik @40 kg/zak zak Rp 47.200,00 - Rp - 1.000,00 Rp 47.200.000 Rp - 1.000,00 Rp 47.200.000 1.000,00 Rp 47.200.000 Rp - 1.000,00 Rp 47.200.000 - Rp -
5 Semen Gresik @40 kg/zak zak Rp 49.200,00 200,00 Rp 9.840.000 200,00 Rp 9.840.000 Rp - 200,00 Rp 9.840.000 - Rp - 200,00 Rp 9.840.000 200,00 Rp 9.840.000 - Rp -
6 Besi Beton ulir 10 x 12m kg Rp 10.350,00 - Rp - 20.805,00 Rp 215.331.750 Rp - 20.805,00 Rp 215.331.750 20.805,00 Rp 215.331.750 Rp - 20.805,00 Rp 215.331.750 - Rp -
7 Besi Beton ulir 19 x 12m kg Rp 10.350,00 - Rp - 29.196,00 Rp 302.178.600 Rp - 29.196,00 Rp 302.178.600 29.196,00 Rp 302.178.600 Rp - 29.196,00 Rp 302.178.600 - Rp -
8 Besi ulir D 10mm x 12mm ex AS kg Rp 10.200,00 - Rp - 28.143,00 Rp 287.058.600 Rp - 28.143,00 Rp 287.058.600 28.143,00 Rp 287.058.600 Rp - 28.143,00 Rp 287.058.600 - Rp -
9 Besi ulir D 19mm x 12mm ex AS kg Rp 10.200,00 - Rp - 21.236,00 Rp 216.607.200 Rp - 21.236,00 Rp 216.607.200 21.236,00 Rp 216.607.200 Rp - 21.236,00 Rp 216.607.200 - Rp -
10 Besi polos D 10mm x 12mm ex AS kg Rp 10.200,00 849,96 Rp 8.669.633 1.740,00 Rp 17.748.000 Rp - 1.740,00 Rp 17.748.000 890,04 Rp 9.078.367 Rp - 890,04 Rp 9.078.367 849,96 Rp 8.669.633
11 Besi polos D 8mm x 12mm ex AS kg Rp 10.200,00 - Rp - 720,00 Rp 7.344.000 Rp - 720,00 Rp 7.344.000 720,00 Rp 7.344.000 Rp - 720,00 Rp 7.344.000 - Rp -
12 Besi ulir D 19mm x 12mm ex AS kg Rp 10.300,00 - Rp - 49.871,00 Rp 513.671.300 Rp - 49.871,00 Rp 513.671.300 49.871,00 Rp 513.671.300 Rp - 49.871,00 Rp 513.671.300 - Rp -
13 Besi Polos 8mm x 12mm ex MS kg Rp 11.150,00 - Rp - 720,48 Rp 8.033.352 Rp - 720,48 Rp 8.033.352 720,48 Rp 8.033.352 Rp - 720,48 Rp 8.033.352 - Rp -
14 Besi Polos 10mm x 12mm ex MS kg Rp 10.950,00 - Rp - 1.740,00 Rp 19.053.000 Rp - 1.740,00 Rp 19.053.000 1.740,00 Rp 19.053.000 Rp - 1.740,00 Rp 19.053.000 - Rp -
15 Besi ulir D 10mm x 12mm ex MS kg Rp 10.950,00 3.927,00 Rp 43.000.650 111.570,86 Rp 1.221.700.917 Rp - 111.570,86 Rp 1.221.700.917 107.643,86 Rp 1.178.700.267 3.927,00 Rp 43.000.650 111.570,86 Rp 1.221.700.917 - Rp -
16 Besi ulir D 16mm x 12mm ex MS kg Rp 10.950,00 10.390,53 Rp 113.776.304 151.089,92 Rp 1.654.434.624 Rp - 151.089,92 Rp 1.654.434.624 140.699,39 Rp 1.540.658.321 10.390,53 Rp 113.776.304 151.089,92 Rp 1.654.434.624 - Rp -
17 Besi ulir D 19mm x 12mm ex MS kg Rp 10.950,00 4.475,60 Rp 49.007.820 94.640,62 Rp 1.036.314.789 Rp - 94.640,62 Rp 1.036.314.789 90.165,02 Rp 987.306.969 Rp - 90.165,02 Rp 987.306.969 4.475,60 Rp 49.007.820
18 Besi ulir D 22mm x 12mm ex MS kg Rp 10.950,00 - Rp - 166.757,85 Rp 1.825.998.458 Rp - 166.757,85 Rp 1.825.998.458 166.757,85 Rp 1.825.998.458 Rp - 166.757,85 Rp 1.825.998.458 - Rp -
19 Besi ulir D 10mm x 12mm ex MS kg Rp 11.150,00 - Rp - 28.142,60 Rp 313.789.990 Rp - 28.142,60 Rp 313.789.990 28.142,60 Rp 313.789.990 Rp - 28.142,60 Rp 313.789.990 - Rp -
20 Besi ulir D 16mm x 12mm ex MS kg Rp 11.150,00 Rp - 23.859,36 Rp 266.031.864 Rp - 23.859,36 Rp 266.031.864 23.859,36 Rp 266.031.864 Rp - 23.859,36 Rp 266.031.864 Rp -
21 Besi ulir D 10mm x 12mm ex MS kg Rp 11.050,00 173,61 Rp 1.918.369 56.285,20 Rp 621.951.460 Rp - 56.285,20 Rp 621.951.460 56.111,59 Rp 620.033.091 Rp - 56.111,59 Rp 620.033.091 173,61 Rp 1.918.369
22 Besi ulir D 16mm x 12mm ex MS kg Rp 11.050,00 - Rp - 27.722,30 Rp 306.331.415 Rp - 27.722,30 Rp 306.331.415 27.722,30 Rp 306.331.415 Rp - 27.722,30 Rp 306.331.415 - Rp -
23 Besi ulir D 22mm x 12mm ex MS kg Rp 11.050,00 - Rp - 19.980,86 Rp 220.788.503 Rp - 19.980,86 Rp 220.788.503 19.980,86 Rp 220.788.503 Rp - 19.980,86 Rp 220.788.503 - Rp -
24 Besi ulir 16x12 mtr kg Rp 10.700,00 43.408,37 Rp 464.469.559 44.518,54 Rp 476.348.378 Rp - 44.518,54 Rp 476.348.378 1.110,17 Rp 11.878.819 5.498,40 Rp 58.832.880 6.608,57 Rp 70.711.699 37.909,97 Rp 405.636.679
25 Besi ulir 22x12 mtr kg Rp 10.700,00 - Rp - 27.178,27 Rp 290.807.510 Rp - 27.178,27 Rp 290.807.510 27.178,27 Rp 290.807.510 Rp - 27.178,27 Rp 290.807.510 - Rp -
26 Besi ulir D 22mm x 12mm ex MS kg Rp 10.800,00 16.110,00 Rp 173.988.000 20.016,67 Rp 216.180.036 Rp - 20.016,67 Rp 216.180.036 3.906,67 Rp 42.192.036 Rp - 3.906,67 Rp 42.192.036 16.110,00 Rp 173.988.000
27 Besi ulir D 10mm x 12mm ex MS kg Rp 10.800,00 32.207,40 Rp 347.839.920 32.207,40 Rp 347.839.920 Rp - 32.207,40 Rp 347.839.920 - Rp - 27.987,40 Rp 302.263.920 27.987,40 Rp 302.263.920 4.220,00 Rp 45.576.000
28 Besi ulir D 10mm x 12mm ex MS kg Rp 10.690,00 - 9.003,26 Rp 96.244.849 Rp - 9.003,26 Rp 96.244.849 9.003,26 Rp 96.244.849 Rp - 9.003,26 Rp 96.244.849 - Rp -
29 Besi Polos 8mm x 12mm ex MS kg Rp 11.090,00 3.000,00 Rp 33.270.000 5.341,98 Rp 59.242.558 Rp - 5.341,98 Rp 59.242.558 2.341,98 Rp 25.972.558 2.279,52 Rp 25.279.877 4.621,50 Rp 51.252.435 720,48 Rp 7.990.123
30 Besi ulir D 22mm x 12mm ex MS kg Rp 10.690,00 - Rp - 15.433,25 Rp 164.981.443 Rp - 15.433,25 Rp 164.981.443 15.433,25 Rp 164.981.443 Rp - 15.433,25 Rp 164.981.443 - Rp -
31 Besi ulir D 16mm x 12mm ex MS kg Rp 10.690,00 22.003,63 Rp 235.218.805 22.003,63 Rp 235.218.805 Rp - 22.003,63 Rp 235.218.805 - Rp - Rp - - Rp - 22.003,63 Rp 235.218.805
32 Wiremesh m8 SNI (61.79 kg/lbr) kg Rp 12.493,00 - Rp - 30.895,00 Rp 385.971.235 Rp - 30.895,00 Rp 385.971.235 30.895,00 Rp 385.971.235 Rp - 30.895,00 Rp 385.971.235 - Rp -
33 Wiremesh m8 SNI (61.79 kg/lbr) kg Rp 12.651,00 - Rp - 29.870,50 Rp 377.891.696 Rp - 29.870,50 Rp 377.891.696 29.870,50 Rp 377.891.696 Rp - 29.870,50 Rp 377.891.696 - Rp -
34 Wiremesh m8 B (54.31 kg/lbr) kg Rp 12.651,00 3.094,22 Rp 39.144.977 29.870,50 Rp 377.891.696 Rp - 29.870,50 Rp 377.891.696 26.776,28 Rp 338.746.718 Rp - 26.776,28 Rp 338.746.718 3.094,22 Rp 39.144.977
35 Wiremesh m8 C (50.05 kg/lbr) kg Rp 12.572,00 - Rp - 27.527,50 Rp 346.075.730 Rp - 27.527,50 Rp 346.075.730 27.527,50 Rp 346.075.730 Rp - 27.527,50 Rp 346.075.730 - Rp -
36 Wiremesh m8 C (50.05 kg/lbr) kg Rp 11.863,00 - Rp - 27.527,50 Rp 326.558.733 55.055,00 Rp 653.117.465 82.582,50 Rp 979.676.198 27.527,50 Rp 326.558.733 38.788,75 Rp 460.150.941 66.316,25 Rp 786.709.674 16.266,25 Rp 192.966.524
37 Beton Readymix k-350 Slump 16 ± 2 m3 Rp 804.545,45 - Rp - 498,50 Rp 401.065.907 Rp - 498,50 Rp 401.065.907 498,50 Rp 401.065.907 Rp - 498,50 Rp 401.065.907 - Rp -
38 Beton Readymix k-350 Slump 14 ± 2 m3 Rp 780.000,00 - Rp - 701,00 Rp 546.780.000 Rp - 701,00 Rp 546.780.000 701,00 Rp 546.780.000 Rp - 701,00 Rp 546.780.000 - Rp -
39 Beton Readymix k-350 Slump 14 ± 2 m3 Rp 790.909,09 - Rp - 592,00 Rp 468.218.181 Rp - 592,00 Rp 468.218.181 592,00 Rp 468.218.181 Rp - 592,00 Rp 468.218.181 - Rp -
40 Beton Readymix k-350 Slump 12 ± 2 m3 Rp 759.090,91 - Rp - 2.343,00 Rp 1.778.550.002 240,00 Rp 182.181.818 2.583,00 Rp 1.960.731.821 2.343,00 Rp 1.778.550.002 240,00 Rp 182.181.818 2.583,00 Rp 1.960.731.821 - Rp -
41 Beton Readymix k-250 Slump 12 ± 2 m3 Rp 736.363,64 - Rp - 167,00 Rp 122.972.728 Rp - 167,00 Rp 122.972.728 167,00 Rp 122.972.728 Rp - 167,00 Rp 122.972.728 - Rp -
42 Beton Readymix k-350 Slump 12 ± 2 m3 Rp 770.000,00 - Rp - 2.932,00 Rp 2.257.640.000 538,00 Rp 414.260.000 3.470,00 Rp 2.671.900.000 2.932,00 Rp 2.257.640.000 538,00 Rp 414.260.000 3.470,00 Rp 2.671.900.000 - Rp -
43 Beton Readymix k-250 Slump 12 ± 2 m3 Rp 745.000,00 - Rp - 75,00 Rp 55.875.000 Rp - 75,00 Rp 55.875.000 75,00 Rp 55.875.000 Rp - 75,00 Rp 55.875.000 - Rp -
44 Beton Readymix k-B0 Slump 12 ± 2 NFA m3 Rp 613.636,00 - Rp - 12,00 Rp 7.363.632 24,00 Rp 14.727.264 36,00 Rp 22.090.896 12,00 Rp 7.363.632 24,00 Rp 14.727.264 36,00 Rp 22.090.896 - Rp -
44 Beton Readymix k-B0 Slump 12 ± 2 NFA m3 Rp 620.000,00 - Rp - 6,00 Rp 3.720.000 6,00 Rp 3.720.000 6,00 Rp 3.720.000 6,00 Rp 3.720.000 - Rp -
45 Bata ringan 60x20x10 m3 Rp 600.000,00 - Rp - 110,88 Rp 66.528.000 Rp - 110,88 Rp 66.528.000 110,88 Rp 66.528.000 Rp - 110,88 Rp 66.528.000 - Rp -
46 Thin bed mortar @50 kg /zak zak Rp 65.000,00 - Rp - 280,00 Rp 18.200.000 Rp - 280,00 Rp 18.200.000 280,00 Rp 18.200.000 Rp - 280,00 Rp 18.200.000 - Rp -
47 Plester @50 kg /zak zak Rp 41.000,00 - Rp - 160,00 Rp 6.560.000 Rp - 160,00 Rp 6.560.000 160,00 Rp 6.560.000 Rp - 160,00 Rp 6.560.000 - Rp -
48 Acian @40 kg /zak zak Rp 57.500,00 - Rp - 50,00 Rp 2.875.000 Rp - 50,00 Rp 2.875.000 50,00 Rp 2.875.000 Rp - 50,00 Rp 2.875.000 - Rp -
49 Pasir Pasang m3 Rp 185.000,00 - Rp - 278,78 Rp 51.574.300 Rp - 278,78 Rp 51.574.300 278,78 Rp 51.574.300 Rp - 278,78 Rp 51.574.300 - Rp -
50 Split 1/2 m3 Rp 240.000,00 - Rp - 14,33 Rp 3.439.200 Rp - 14,33 Rp 3.439.200 14,33 Rp 3.439.200 Rp - 14,33 Rp 3.439.200 - Rp -
51 Batu Belah m3 Rp 185.000,00 - Rp - 22,54 Rp 4.169.900 57,42 Rp 10.622.700 79,96 Rp 14.792.600 22,54 Rp 4.169.900 49,92 Rp 9.235.200 72,46 Rp 13.405.100 7,50 Rp 1.387.500
52 Pasir urug m3 Rp 150.000,00 - Rp - 127,31 Rp 19.096.500 94,21 Rp 14.131.500 221,52 Rp 33.228.000 127,31 Rp 19.096.500 94,21 Rp 14.131.500 221,52 Rp 33.228.000 - Rp -
53 Sirtu ( non tunai ) m3 Rp 135.000,00 - Rp - 350,34 Rp 47.295.900 Rp - 350,34 Rp 47.295.900 350,34 Rp 47.295.900 Rp - 350,34 Rp 47.295.900 - Rp -
54 Sirtu ( Tunai ) m3 Rp 135.000,00 - Rp - 29,64 Rp 4.001.400 Rp - 29,64 Rp 4.001.400 29,64 Rp 4.001.400 Rp - 29,64 Rp 4.001.400 - Rp -
55 Kaso 5x7 btg Rp 33.000,00 - Rp - 550,00 Rp 18.150.000 Rp - 550,00 Rp 18.150.000 550,00 Rp 18.150.000 Rp - 550,00 Rp 18.150.000 - Rp -
56 Kaso 5x7 m3 Rp 2.150.000,00 - Rp - 15,00 Rp 32.250.000 2,00 Rp 4.300.000 17,00 Rp 36.550.000 15,00 Rp 32.250.000 2,00 Rp 4.300.000 17,00 Rp 36.550.000 - Rp -
57 Kawat bendrat @25 kg/roll roll Rp 580.000,00 - Rp - 210,00 Rp 121.800.000 Rp - 210,00 Rp 121.800.000 210,00 Rp 121.800.000 Rp - 210,00 Rp 121.800.000 - Rp -
58 Phenolic 12mm 1 muka lbr Rp 275.900,00 - Rp - 1.264,00 Rp 348.737.600 Rp - 1.264,00 Rp 348.737.600 1.264,00 Rp 348.737.600 Rp - 1.264,00 Rp 348.737.600 - Rp -
59 Phenolic 18mm 1 muka lbr Rp 356.400,00 75,00 Rp 26.730.000 423,00 Rp 150.757.200 Rp - 423,00 Rp 150.757.200 348,00 Rp 124.027.200 46,00 Rp 16.394.400 394,00 Rp 140.421.600 29,00 Rp 10.335.600
60 Bata ringan pilecap - 10x19x60 m3 Rp 350.000,00 - Rp - 302,40 Rp 105.840.000 Rp - 302,40 Rp 105.840.000 302,40 Rp 105.840.000 Rp - 302,40 Rp 105.840.000 - Rp -
61 Roster ( Tunai ) pcs Rp 15.000,00 - Rp - 575,00 Rp 8.625.000 Rp - 575,00 Rp 8.625.000 575,00 Rp 8.625.000 Rp - 575,00 Rp 8.625.000 - Rp -
62 Calbon pail Rp 800.000,00 - Rp - 10,00 Rp 8.000.000 Rp - 10,00 Rp 8.000.000 10,00 Rp 8.000.000 Rp - 10,00 Rp 8.000.000 - Rp -
63 Mould oil drum Rp 3.850.000,00 - Rp - 1,00 Rp 3.850.000 Rp - 1,00 Rp 3.850.000 1,00 Rp 3.850.000 Rp - 1,00 Rp 3.850.000 - Rp -
64 Makadam m3 Rp 200.000,00 - Rp - 36,60 Rp 7.320.000 Rp - 36,60 Rp 7.320.000 36,60 Rp 7.320.000 Rp - 36,60 Rp 7.320.000 - Rp -
65 Paku 5 dus Rp 550.000,00 6,00 Rp 3.300.000 18,00 Rp 9.900.000 Rp - 18,00 Rp 9.900.000 12,00 Rp 6.600.000 5,00 Rp 2.750.000 17,00 Rp 9.350.000 1,00 Rp 550.000
66 Paku 7 dus Rp 550.000,00 5,00 Rp 2.750.000 8,00 Rp 4.400.000 Rp - 8,00 Rp 4.400.000 3,00 Rp 1.650.000 4,00 Rp 2.200.000 7,00 Rp 3.850.000 1,00 Rp 550.000
67 Kawat ayam 1x1 roll Rp 195.000,00 16,00 Rp 3.120.000 20,00 Rp 3.900.000 Rp - 20,00 Rp 3.900.000 4,00 Rp 780.000 Rp - 4,00 Rp 780.000 16,00 Rp 3.120.000
68 Kawat las RB 26 kg Rp 33.000,00 - Rp - 50,00 Rp 1.650.000 Rp - 50,00 Rp 1.650.000 50,00 Rp 1.650.000 Rp - 50,00 Rp 1.650.000 - Rp -
69 Kawat bendrat @25 kg/roll roll Rp 540.000,00 5,00 Rp 2.700.000 110,00 Rp 59.400.000 60,00 Rp 32.400.000 170,00 Rp 91.800.000 105,00 Rp 56.700.000 27,00 Rp 14.580.000 132,00 Rp 71.280.000 38,00 Rp 20.520.000
70 Plastik Cor roll Rp 65.000,00 3,00 Rp 195.000 10,00 Rp 650.000 Rp - 10,00 Rp 650.000 7,00 Rp 455.000 3,00 Rp 195.000 10,00 Rp 650.000 - Rp -
71 Kawat Putih 16 roll Rp 1.175.000,00 0,50 Rp 587.500 1,00 Rp 1.175.000 Rp - 1,00 Rp 1.175.000 0,50 Rp 587.500 0,50 Rp 587.500 1,00 Rp 1.175.000 - Rp -

TOTAL STRUKTUR Rp 1.595.162.907 Rp 19.883.543.609 Rp 1.431.278.947 Rp 21.314.822.557 Rp 18.288.380.703 Rp 20.087.697.067 Rp 1.227.125.490


Sisa Bahan Lalu Penerimaan Pengeluaran Sisa Bahan
NO NAMA BAHAN SAT HARSAT Minggu lalu Minggu ini S/d Minggu ini Minggu Lalu Minggu ini S/d minggu ini Volume Jumlah
Volume Jumlah
Volume Jumlah Volume Jumlah Volume Jumlah Volume Jumlah Volume Jumlah Volume Jumlah

ARSITEKTUR

1 Kolom Praktis 60x60x 5/4 x 3 mtr btg Rp 27.500,00 - Rp - 860,00 Rp 23.650.000 2.000,00 Rp 55.000.000 2.860,00 Rp 78.650.000 860,00 Rp 23.650.000 1.300,00 Rp 35.750.000 2.160,00 Rp 59.400.000 700,00 Rp 19.250.000
2 Kolom Praktis 60x60x 6/4 x 3 mtr btg Rp 39.750,00 434,00 Rp 17.251.500 470,00 Rp 18.682.500 Rp - 470,00 Rp 18.682.500 36,00 Rp 1.431.000 434,00 Rp 17.251.500 470,00 Rp 18.682.500 - Rp -
3 Kolom Praktis 60x60x 6/4 x 3 mtr btg Rp 40.000,00 36,00 Rp 1.440.000 370,00 Rp 14.800.000 Rp - 370,00 Rp 14.800.000 334,00 Rp 13.360.000 Rp - 334,00 Rp 13.360.000 36,00 Rp 1.440.000
4 Pasir Pasang m3 Rp 185.000,00 24,00 Rp 4.440.000 116,68 Rp 21.585.800 147,17 Rp 27.226.450 263,85 Rp 48.812.250 92,68 Rp 17.145.800 160,74 Rp 29.736.900 253,42 Rp 46.882.700 10,43 Rp 1.929.550
5 Screening/split 0.5 m3 Rp 240.000,00 9,00 Rp 2.160.000 33,29 Rp 7.989.600 Rp - 33,29 Rp 7.989.600 24,29 Rp 5.829.600 9,00 Rp 2.160.000 33,29 Rp 7.989.600 - Rp -
6 Bata ringan 60x20x10 m3 Rp 600.000,00 24,74 Rp 14.844.000 454,08 Rp 272.448.000 533,76 Rp 320.256.000 987,84 Rp 592.704.000 429,34 Rp 257.604.000 457,58 Rp 274.548.000 886,92 Rp 532.152.000 100,92 Rp 60.552.000
7 Thin bed mortar @50 kg /zak zak Rp 65.000,00 1.220,00 Rp 79.300.000 1.480,00 Rp 96.200.000 40,00 Rp 2.600.000 1.520,00 Rp 98.800.000 260,00 Rp 16.900.000 1.210,00 Rp 78.650.000 1.470,00 Rp 95.550.000 50,00 Rp 3.250.000
8 Plesteran @50 kg /zak zak Rp 41.000,00 1.750,00 Rp 71.750.000 1.800,00 Rp 73.800.000 1.930,00 Rp 79.130.000 3.730,00 Rp 152.930.000 50,00 Rp 2.050.000 3.480,00 Rp 142.680.000 3.530,00 Rp 144.730.000 200,00 Rp 8.200.000
9 Acian @40 kg /zak zak Rp 57.500,00 1.350,00 Rp 77.625.000 1.350,00 Rp 77.625.000 1.000,00 Rp 57.500.000 1.000,00 Rp 57.500.000 350,00 Rp 20.125.000
10 Semen Gresik @40 kg/zak zak Rp 49.200,00 400,00 Rp 19.680.000 400,00 Rp 19.680.000 400,00 Rp 19.680.000 400,00 Rp 19.680.000 - Rp -
11 Semen Gresik @40 kg/zak zak Rp 51.700,00 400,00 Rp 20.680.000 400,00 Rp 20.680.000 400,00 Rp 20.680.000 400,00 Rp 20.680.000 - Rp -
12 Semen garuda @40 kg/zak zak Rp 51.700,00 200,00 Rp 10.340.000 200,00 Rp 10.340.000 200,00 Rp 10.340.000 200,00 Rp 10.340.000 - Rp -
13 HT 60x60 Crema Polished 1 dus = 1.44 m2 m2 Rp 86.000,00 1.837,44 Rp 158.019.840 1.837,44 Rp 158.019.840 Rp - - Rp - 1.837,44 Rp 158.019.840

TOTAL ARSITEKTUR Rp 191.185.500 Rp 529.155.900 Rp 770.557.290 Rp 1.299.713.190 Rp 337.970.400 Rp 688.976.400 Rp 1.026.946.800 Rp 272.766.390

TOTAL STRUKTUR DAN ARSITEKTUR Rp 1.786.348.407 Rp 20.412.699.509 Rp 2.201.836.237 Rp 22.614.535.747 Rp 18.626.351.103 Rp 688.976.400 Rp 21.114.643.867 Rp 1.499.891.880

Mengetahui Diperiksa Oleh Jakarta, 31 Desember 2021


* Sisa bahan periode sebelumnya = Rp 1.786.348.407 Dibuat oleh
* Penerimaan Periode saat ini = Rp 22.614.535.747
* Pengeluaran Periode saat ini = Rp 21.114.643.867
* Sisa bahan periode saat ini = Rp 1.499.891.880

Andri Prasetyo A. Danang Maychris Erlino


Kepala Proyek SOE Logistik Proyek