Anda di halaman 1dari 4

Nama Boy Fernandes RSP Simanullang

NIM 41119110060
Fakultas /Program Studi Teknik / Teknik Sipil
Mata Kuliah Struktur Beton 2
Dosen Zainal Abidin Shahab, Ir. MT

Data – data Perencanaan kolom :


Pu = 100 + 0 = 100 ton
Mu = 10 + 0 = 10 ton meter
Ey = 2000000 kg/cm2
Fc' = 250 kg/cm2 , β = 0.85
Fy = 2400 kg/cm2

Coba dimensi kolom 20 x 30 cm2


b = 20 + 0 = 20
h = 30 + 0 = 30

30

20
Luas tulangan ( As ) = 2% Luas Beton ( Ac )
= 0.02 x ( 28 x 38 )
= 21.28 cm2
Pakai tulangan ϕ = 16 , A = 2.01 cm2
Jumlah tulangan (n) = 21.28 / 2.01 = 10.60
Dipasang tulangan = 6 ϕ 16
salah!! yg terpasang, hrs lebih besar dari n
As total = 12.06 cm2
As max = 36.00 cm2
As min = 3.48 cm2 As max < As total < As
min
0.5 As = 6.03 cm2
Jarak antar tulangan = 2.6 cm , (oke)

Cek, dimensi & tulangan :


1. Keadaan Normal
Pn0 = ( Ac x 0.85Fc' ) + ( As x Fy )
= ( 20x30 ) x 0.85 x 250 + ( 12.06 x 2400 )
= 156444.00 kg = 156.44 ton
Pu0 = 0.65 x Pn0
= 101.69 ton
2. Keadaan Balance

Persamaan Deformasi/Kompatibilitas :

ec' = 0.003 Sc
es'
Cub Cc
38 33 Pnb
Mnb
5 St
es = e y
28

Persamaan statika :

(1). Ʃ H = 0

Sc + Cc - St - Pnb = 0

Pnb = 14472 + 64519.25 - 14472

Pnb = 64519.25 kg

Pub = 0.65 x 119205.28 = 41937.5125 kg

Pub = 41.94 ton < Pu = 100 ton Not oke

(2). Ʃ M = 0

Sc(d - d') +Cc (d-0.5au) - Pnb (0.5h-d') - Mnb = 0


Mnb = ( 14472 x 28) + (64519.25 x 17.4095) - (64519.25 x 14)
= 767495.38 kgcm

Mub = 0.65x767495.38 = 498872.00 kg

Mub = 4.99 tm < Mu = 10 tm Not oke, dimensi harus diperbesar


3. Keadaan Decompresi

ec' = 0.003
es' Sc
-
Cu = d = 33 au Cc Pnd
Mnd

es = 0 St 0
dia e

au = 0.85 x Cu = 0.85 x 33 = 21.25 cm


Sc = 0.5As.Fy = 6.03 x 2400 = 14472.00 kg
Cc = b x au x 0.85Fc = 20 x 21.25 x 0.85 x 250 = 90312.50 kg
St = 0 (Decompresi)

Persamaan statika :
(1). Ʃ H = 0
Sc + Cc - St - Pnd = 0
14472 + 166897.5 - 0 = Pnd
Pnd = 10478.5 kg
Pud = 0.65 x Pnd = 68109.93 kg
= 68.110 ton
(2). Ʃ M = 0
Sc(d - d') + Cc (d-0.5au) - Pnd (0.5h-d') - = 0
= ( 14472 x 28) + (93012.5 x 22.5) - (104784.5 x 10)
= 53987.19 kgcm
= 5.938 tm
Mud = 0.65 x Mnd = 0.65 x 5.398
= 3.509 tm

Ringkasan M & P dalam 3 kondisi

No. Kondisi M P
( Tm ) (T)
1. Normal 0.0 101.7
2. Decompresi 3.5 68.1
3. Balance 5.0 41.9
Hasil grafik interaksi :
Kolom berdimensi 20cm x 30cm dengan tulangan 6 dia16 dibebani dengan gaya luar :

Pu = 100 ton
Mu = 10 ton meter
Tidak mampu menahan gaya luar tsb, karena berada diluar grafik Interaksi.

120 Diagram Interaksi


100
80
60
Pu

40
20
0
0 2 4 6 8 10 12
Mu

kekuatan batas gaya luar

Dari perhitungan di dapat kesimpulan :

1. Kolom berdimensi 20cm x 30cm dengan tulangan 6 dia16 dibebani dengan gaya luar :
Pu = 100 ton dan Mu = 10 ton meter, tidak mampu menahan gaya luar tsb, karena berada
diluar grafik Interaksi.
2. Jumlah tulangan 6 D 16 tidak memenuhi jika di pasang pada kolom 20cm x 30cm
3. Nilai Pub = 41.94 ton < Pu = 100 ton
4. Nilai Mub = 10.00 tm < Mu = 10 tm