Contoh Rab Masjid
Contoh Rab Masjid
A. AGRE
AGREGA
GAT
T KAS
KASAR
AR,B
,BAH
AHAN
AN PERE
PEREKA
KAT
T & BAHA
BAHAN
N JJAD
ADIN
INYA
YA
B LABU
LABURA
RAN,
N,PE
PENG
NGIS
ISII DAN
DAN ALAT
ALATNY
NYA
A
1 Pl
P lamir Tembok kg 18,000.00
2 Cat Tembok ICI Eksterior ( Beton ) lt 90,000.00
3 Cat Tembok ICI Interior ( Plafon Dan Dinding ) lt 75,000.00
4 Cat Tembok Vinilex kg 18,000.00
5 Cat Dasar kg 25,000.00
6 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) kg 90,000.00
7 Water Profing Emulsion ml 70,000.00
8 Water Profing Membrance bh 62,500.00
9 Rool Cat Tembok bh 25,000.00
10 Kape Tembok bh 8,500.00
11 Kwas 3" bh 8,000.00
12 Me
Meni Kayu / Besi kg 30,400.00
13 Sincromat kg 40,900.00
14 Cat Kayu Sieve lt 41,700.00
C BAHA
BAHAN
N KAY
KAYU
U BERI
BERIKU
KUT
T BAH
BAHAN
AN JADI
JADINY
NYA
A
1 Ba
Bambu 5 s.d 7 bt 10,000.00
2 Kayu Balok Albasia m3 1,650,000.00
3 Kayu Papan Albasia m3 1,750,000.00
4 Do
Dolken 5 s/d 7 bt 14,000.00
5 Do
D olken 7 s/d 10 bt 17,000.00
6 Kayu Kaso 4/6 m3 1,872,000.00
7 Kayu Kaso 5/7 m3 1,890,000.00
8 Kayu Papan Terentang m3 2,000,000.00
9 Kayu Balok Terentang m3 1,900,000.00
DAFTAR HARGA SATUAN BAHAN BANGUNAN
F BAHA
BAHAN
N LAN
LANTA
TAII DAN
DAN PELA
PELAPI
PIS
S DIND
DINDIN
ING
G
1 Keramik 20 x 20 (KM) KW I DN Corak/Warna /Anti Slip Mulia m2 48,000.00
2 Keramik 20 x 20 (KM) KW I DN Putih Polos Mulia m2 42,000.00
3 Keramik 20 x 25 Dinding KM KW I DN Corak Mulia m2 48,000.00
4 Keramik 30 x 30 KWI DN Putih Polos Mulia m2 40,000.00
5 Keramik 30 x 30 KWI DN Warna/Corak (ANTI SLIP) Mulia m2 48,000.00
6 Keramik 40 x 40 KWI DN Putih Polos Mulia m2 52,000.00
7 Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia m2 58,000.00
8 Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip Roman m2 75,200.00
9 Keramik 20 x 20 (KM) KW I DN Putih Polos Roman m2 72,900.00
10 Keramik 20 x 25 Dinding KM KW I DN Corak Roman m2 75,200.00
11 Keramik 20 x 25 KW I DN Putih Polos Roman m2 72,900.00
12 Keramik 30 x 30 KW I DN Polos Roman m2 68,900.00
13 Keramik 30 x 30 KW I DN Warna/Corak (ANTI SLIP) Roman m2 76,600.00
Keramik 40 x 40 KW I DN Polos setara MULIA m2 58,000.00
Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) setara MULIA m2 65,000.00
14 Keramik 40 x 40 KW I DN Polos Roman m2 72,500.00
15 Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) Roman m2 77,000.00
16 Granit Alam LN Ukuran Besar m2 1,848,400.00
17 Granit Alam LN Ukuran Kecil m2 1,612,900.00
18 Granit Alam DN Ukuran Besar m2 1,331,100.00
19 Granit Alam DN Ukuran Kecil m2 1,299,400.00
20 Granito Tile Essenza Ukuran 40 x 40 Polis m2 345,000.00
21 Granito Tile Essenza Ukuran 30 x 30 m2 322,800.00
22 Granito Tile Essenza Ukuran 40 x 40 UnPolis m2 204,900.00
23 Granito Tile Essenza 60 x 60 Polis m2 358,100.00
24 Granito Tile Essenza 60 x 60 UnPolis m2 231,800.00
25 Batu Tempel Hitam m2 96,500.00
G BAHA
BAHAN
N SAL
SALUR
URAN
AN AIR
AIR KOT
KOTOR
OR / BER
BERSI
SIH
H
1 Grafel U 20 cm' m1 44,300.00
2 Grafel U 30 cm' m1 56,400.00
3 Grafel U 40 cm' m1 74,200.00
4 Buis Beton 20 cm ( 1 M' ) m1 49,200.00
5 Buis Beton 30 cm ( 1 M' ) m1 61,700.00
6 Buis Beton 40 cm ( 1 M' ) m1 80,900.00
7 Buis Beton 50 cm ( 1 M' ) stk 94,300.00
8 Buis Beton 60 cm ( 1 M' ) stk 130,900.00
9 Buis Beton 100 cm ( 0.50 M' ) stk 299,800.00
10 Buis Beton 80 cm ( 0.50 M' ) stk 298,500.00
DAFTAR HARGA SATUAN BAHAN BANGUNAN
K BAHAN PERPIPAAN
a. b. c.
A. PEKERJAAN LANTAI DASAR (lantai 1)
JUMLAH Rp 189,048,626.96
DIBULATKAN Rp 189,000,000.00
Ter i ang :
RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PEMBANGUNAN MESJID YAYASAN FATHAN MUBIINA
LOKASI : CIAWI - BOGOR
TAHUN : 2012
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
( Rp ) ( Rp )
a. b. c. d. e. f.
A. PEKERJAAN LANTAI DASAR (lantai 1)
I. PEKERJAAN PERSIAPAN
1 Pek. Papan bouwplank 12.00 m¹ 44,425.00 533,100.00
Sub Total 1 Rp 533,100.00
II PEKERJAAN GALIAN DAN URUGAN
1 Pek. galian tanah untuk pondasi 13.82 m³ 30,200.00 417,484.80
2 Pek. galian tanah untuk tie-beam 8.16 m³ 23,000.00 187,680.00
3 Pek urugan tanah kembali bekas galian 4.15 m³ 11,025.00 45,722.88
4 Pek. urugan tanah peninggian lantai bangunan 100.80 m³ 83,804.00 8,447,443.20
5 Pek. urugan pasir bawah pondasi dan lantai 7.78 m³ 147,750.00 1,148,904.00
6 Pek. Lantai Kerja Pondasi dan Lantai 7.78 m³ 679,360.00 5,282,703.36
Sub Total 2 Rp 15,529,938.24
III PEKERJAAN BETON STRUKTUR
1 Pek. pondasi plat beton bertulang (150kg besi + bekisting ) 2.88 m³ 3,290,065.00 9,475,387.20
2 Pek. beton tie-beam 20/40 (240kg besi + bekisting ) 2.56 m³ 4,636,740.00 11,870,054.40
3 Pek. kolom beton struktur 30/30 (175 kg besi + bekisting ) 3.89 m³ 4,742,990.00 18,440,745.12
4 Pek. kolom praktis 12/12 ( 175kg besi + bekisting ) 0.20 m³ 4,742,990.00 967,569.96
5 Pek. balok induk 25/60 ( 230kg besi + bekisting ) 8.10 m³ 4,541,970.00 36,789,957.00
6 Pek. balok anak 20/40 + Lispank 10/70 ( 200kg besi + bekisting ) 3.87 m³ 5,238,690.00 20,263,252.92
7 Pek. Plat lantai tb=12cm + Lisplang (Bondek + Wire Mesh ) 10.73 m³ 2,703,631.00 29,004,553.37
Sub Total 3 32.23 Rp 126,811,519.97
IV PEKERJAAN PASANGAN
1 Pas. bata merah ad 1 : 5 77.53 m² 95,115.00 7,373,790.38
2 Plesteran + acian ad 1 : 5 155.05 m² 31,170.00 4,832,908.50
3 Plesteran + acian Finishing Beton ad 1 : 3 139.84 m² 41,045.00 5,739,732.80
4 Plesteran Rellif Lisplank beton 48.00 m² 41,045.00 1,970,160.00
a. b. c.
A. PEKERJAAN LANTAI DASAR / BAWAH
Jumlah Rp 197,714,590.16
Jumlah Rp 194,452,118.84
JUMLAH Rp 392,166,709.00
DIBULATKAN Rp 392,000,000.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
( Rp ) ( Rp )
a. b. c. d. e. f.
A. PEKERJAAN LANTAI DASAR / BAWAH
I. PEKERJAAN PERSIAPAN
1 Pek. Papan bouwplank 12.00 m¹ 44,425.00 533,100.00
Sub Total 1 Rp 533,100.00
II PEKERJAAN GALIAN DAN URUGAN
1 Pek. galian tanah untuk pondasi 13.82 m³ 30,200.00 417,484.80
2 Pek. galian tanah untuk tie-beam 8.16 m³ 23,000.00 187,680.00
3 Pek urugan tanah kembali bekas galian 4.15 m³ 11,025.00 45,722.88
4 Pek. urugan tanah peninggian lantai bangunan 100.80 m³ 83,804.00 8,447,443.20
5 Pek. urugan pasir bawah pondasi dan lantai 7.78 m³ 147,750.00 1,148,904.00
6 Pek. Lantai Kerja Pondasi dan Lantai 7.78 m³ 679,360.00 5,282,703.36
a. b.
A. PEKERJAAN LANTAI DASAR (lantai 1)
I. PEKERJAAN PERSIAPAN
IV PEKERJAAN PASANGAN
V PEKERJAAN PENGECATAN
JUMLAH
DIBULATKAN
Terbilang :
a. b. c.
A. PEKERJAAN LANTAI DASAR (lantai 1)
I. PEKERJAAN PERSIAPAN
1 Pek. Papan bouwplank 12.00
Sub Total 1
II PEKERJAAN GALIAN DAN URUGAN
1 Pek. galian tanah untuk pondasi 13.82
2 Pek. galian tanah untuk tie-beam 8.16
3 Pek urugan tanah kembali bekas galian 4.15
4 Pek. urugan tanah peninggian lantai bangunan 86.40
5 Pek. urugan pasir bawah pondasi dan lantai 7.78
6 Pek. Lantai Kerja Pondasi dan Lantai 7.78
Sub Total 2
III PEKERJAAN BETON STRUKTUR
1 Pek. pondasi plat beton bertulang (150kg besi + bekisting ) 2.88
2 Pek. beton tie-beam 20/40 (240kg besi + bekisting ) 2.56
3 Pek. kolom beton struktur 30/30 (175 kg besi + bekisting ) 3.89
4 Pek. kolom praktis 12/12 ( 175kg besi + bekisting ) 0.20
5 Pek. balok induk 25/55 ( 230kg besi + bekisting ) 8.10
6 Pek. balok anak 20/40 ( 200kg besi + bekisting ) 3.87
7 Pek. Pasangan Bondek 144.00
8 Pek. Pembesian Wire Mesh 144.00
9 Beton Plat Dak 9.72
Sub Total 3
IV PEKERJAAN PASANGAN
1 Pas. bata merah ad 1 : 5 77.53
2 Plesteran + acian ad 1 : 5 155.05
3 Plesteran + acian Finishing Beton ad 1 : 3 139.84
4 Plesteran Rellif Lisplank beton 48.00
5 Pas. keramik lantai 40/40 158.40
6 Pas. keramik lantai 30/30 15.08
7 Pas. keramik ornamen dinding 40/40 5.22
Sub Total 4
V PEKERJAAN PENGECATAN
1 Pengecatan Dinding 294.89
2 Pengecatan Plafon beton 144.00
3 Pengecatan Lispank Beton 48.00
Sub Total 5
JUMLAH HARGA
c.
Rp 533,100.00
Rp 15,529,938.24
Rp 126,811,519.97
Rp 36,708,927.15
Rp 9,465,141.60
Rp 189,048,626.96
Rp 189,000,000.00
HARGA JUMLAH
SATUAN SATUAN HARGA
( Rp ) ( Rp )
d. e. f.
m¹ 44,425.00 533,100.00
Rp 533,100.00
m³ 30,200.00 417,484.80
m³ 23,000.00 187,680.00
m³ 11,025.00 45,722.88
m³ 83,804.00 7,240,665.60
m³ 147,750.00 1,148,904.00
m³ 679,360.00 5,282,703.36
Rp 14,323,160.64
m³ 3,290,065.00 9,475,387.20
m³ 4,636,740.00 11,870,054.40
m³ 4,742,990.00 18,440,745.12
m³ 4,742,990.00 967,569.96
m³ 4,541,970.00 36,789,957.00
m³ 5,238,690.00 20,263,252.92
m2 125,000.00 18,000,000.00
m2 57,454.55 8,273,454.55
m³ 742,240.00 7,214,572.80
Rp 131,294,993.95 Rp 145,618,154.59
m² 95,115.00 7,373,790.38
m² 31,170.00 4,832,908.50
m² 41,045.00 5,739,732.80
m² 41,045.00 1,970,160.00
m² 94,610.00 14,986,224.00
m² 84,610.00 1,275,707.28
m² 101,610.00 530,404.20
Rp 36,708,927.15
m² 19,440.00 5,732,661.60
m² 19,440.00 2,799,360.00
m² 19,440.00 933,120.00
Rp 9,465,141.60
144.00
1,300,000.00
0.17
17.06 9.24 7.20
33.00
26.42
6.70
15.85
10.40
6.40
23.86
1.35
203,220.00
M' P BUAH UNIT UNIT
2 KOLOM 30 X 30
TUL. UTAMA 5.60 0.50 8 4 8
3 SLOOF 20 X 40
TUL. UTAMA 36.00 4
4 Balok Utama
5 Balok Anak
28.00
32.00
28.80
12.52
6.00
24.00
23.48
9.39
49.09
9.40
4.70
17.19 -