Pekerjaan
Lokasi
T.A.
NO
URAIAN PEKERJAAN
VOLUME
SATUAN
HARGA SATUAN
JLH HARGA
1.
2.
3.
4.
Pembersihan Awal
Pengukuran dan Pemasangan Bouwplank
Papan Proyek
Pembuatan Direksi Keet/Gudang
225.00
50,00
1.00
18.00
m2
m'
LS
m2
Rp
Rp
Rp
Rp
17,870.00 Rp
4,020,750.00
69,511.58 Rp
1,000,000.00 Rp
3,475,579.00
1,000,000.00
500,000.00 Rp
9,000,000.00
,Rp
17,496,329.00
B. PEKERJAAN TANAH
1.
2.
3.
4.
5.84
0.56
1.46
7.50
m3
m3
m3
m3
Rp
Rp
Rp
Rp
48,126.80 Rp
281,060.51
886,647.00 Rp
25,795.11 Rp
496,522.32
886,647.00 Rp
6,649,852.50
Rp
7,465,096.19
4,955,727.74 Rp
2,019,115.77 Rp
5,138,098.52
2,019,115.77 Rp
10,600,357.79
8,060,539.36 iRp
24,181,618.09
37,660.86
C. PEKERJAAN BETON
1.
2.
3.
4.
5.
6.
7.
Pondasi Telapak 60 X 60
1.04
Lantai Kerja 5 cm
0.40
Rabat Beton 7 cm
5.25
Sloof 20X30
3.00
Kolom 20 X 20
0.96
3.00
3.90
m3
m3
m3
m3
m3
m3
m3
Rp
Rp
Rp
Rp
Rp
Rp
Rp
807,646.31
Rp
10,542,012.99
9,139,367.11 Rp
18,704,962.70 Rp
27,418,101.34
Rp
151,637,189.59
186,538.26 Rp
73,612.77 Rp
5,372,302.00
10,981,263.53
72,949,354.55
28.80
28.80
71.40
m2
m2
m2
Rp
Rp
Rp
2,120,047.64
73,612.77 Rp
5,255,951.44
Rp
12,748,301.08
345,708.21 Rp
31,125.00 Rp
15,556,869.28
Rp
16,490,619.28
55,978.80 Rp
78,801.00 Rp
10,076,184.00
99,801.00 Rp
637,281.20 Rp
199,602.00
9,559,217.99
Rp
19,913,804.99
4,653,626.00 Rp
4,653,626.00 Rp
1,005,183.22
86,143.07 Rp
69,484.77Rp
3,282,050.97
E. PEKERJAAN LANTAI
1. Lantai Keramik 40 X 40
2. Lantai Semen
45.00
30.00
m2
m2
Rp
Rp
933,750.00
F. PEKERJAAN LISTRIK
1.
2.
3.
4.
Instalasi Listrik
Saklar Ganda
1.00
2.00
G. PEKERJAAN ATAP
1. Rangka Kuda-kuda Kayu Klas I
2.
3.
4.
5.
6.
180.00
15.00
0.22
0.45
38.10
30.00
Baut 0 12
36.00
Angkur 0 12
24.00
m'
bh
bh
m'
m3
m3
m2
m'
bh
bh
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
16,500.00Rp
78,801.00
2,094,131.70
2,084,543.10
594,000.00
16,500.00 Rp
396,000.00
Rp
9,455,908.98
30,463.49 Rp
58,603.26 Rp
3,052,441.30
H. PEKERJAAN PENGECATAN
100.20
12.96
m2
m2
Rp
Rp
759,498.18
Rp
3,811,939.48