HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp)
I Pekerjaan Persiapan
Bongkar Rumah Lama 170.00 ls
VI Upah Kerja
- Tukang 1,360 Oh 120,000
- Pembantu Tukang 1,360 Oh 100,000
Disahkan oleh,
Koordinator Fasilitator
RUDI HARTONO
RAN BIAYA (RAB) RUTILAHU
RAT TAHUN ANGGARAN 2018
6x6
SUMBER DANA/BAHAN
TOTAL HARGA SWADAYA
(Rp) RUTILAHU MEMAKAI BAHAN
DANA TUNAI
BANGUNAN LAMA
Gotong Royong
KPB
25,480,000 25,480,000
51,000,000 51,000,000
84,760,000 84,760,000
119,000,000 119,000,000
175,590,000 175,590,000
- -
- -
- -
- -
- -
- -
- -
- -
- -
36,465,000 36,465,000
17,297,500 17,297,500 16.5
8,005,878 8,005,878
6,539,832 6,539,832
10,382,580 10,382,580
53,040,000 53,040,000
23,587,500 23,587,500
10,674,504 10,674,504
8,719,776 8,719,776
13,843,440 13,843,440
(6,266,520) (6,266,520)
(7,067,174) (7,067,174)
208,000,000 208,000,000
76,500,000 76,500,000
76,500,000 76,500,000
102,000,000 102,000,000 0.6
81,000,000 81,000,000
29,626,920 29,626,920
27,200,000 27,200,000
40,800,000 40,800,000
10,370,000 10,370,000
10,710,000 10,710,000
13,600,000 13,600,000
17,340,000 17,340,000
5,270,000 5,270,000
6,076,000 6,076,000
3,038,000 3,038,000
2,635,000 2,635,000
12,920,000 12,920,000
17,000,000 17,000,000
3,400,000 3,400,000
18,700,000 18,700,000
8,160,000 8,160,000
40,800,000 40,800,000
2,415,204,486 2,210,000,000 204,000,000 1,204,486 210,292,647
2,415,204,000 2,210,000,000 204,000,000 1,204,000
Diketahui Oleh,
Tim Teknis Kabupaten Indramayu 2,210,000,000.00
46290000
48707353
2 3.2
2 1.2
1,274,000,000.00
Keterangan
Kuda - Kuda hanya 1 Kalo Tambah tinggal Kali 2 terahirnya
ANALISA EFEKTIF
Sudut Kemiringan 1,15
Panjang Lebar Kuda-Kuda Jml Kaso/Usuk 5/10
Analisa Kayu 6/12 Analisa
1 2 3 4 5
3 3 2.0 2.9 btg 2.5
4 4 2.0 2.9 btg 2.5
5 5 2.0 2.9 btg 3.0
6 6 2.5 4.0 btg 3.0
7 7 2.5 4.2 btg 4.0
11.52
36,000.00
Genteng Bumbung Bata
Dinding
(((Panjang + 1) x (Lebar +1)) x 1,15) x 35 (Panjang + 1) x 5
Gunungan dan KM
9 = ((1 +1) x (2+1) x 1,15)) x 35 10 11
5 20 Err:508
6 25 Err:508
8 30 Err:508
9 35 Err:508
10 40 Err:508
Bata Hitungan Bata
Dinding Bata
Gunungan dan KM + Spit Tenk Yang Ada
11 12
bh 630 bh
bh 840 bh
bh 1,050 bh
bh 1,260 bh
bh 1,470 bh
FORMULIR
RENCANA ANGGARAN BIAYA (RAB) RUTILAHU
TAHUN ANGGARAN 2018
Nomor BNBA : ###
Nama LPM : LPM DESA TEMIYANG
Alamat : BLOK RANCAWAS RT. 008 RW. 003
Desa : TEMIYANG
Kecamatan : KROYA
Kabupaten : INDRAMAYU
2,210,000,000 259,708,000
HARGA TOTAL HARGA (Rp)
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN
(Rp) RUTILAHU SWADAYA
I Pekerjaan Persiapan
Bongkar Rumah Lama ls
II Pekerjaan Atap
1 Kuda-kuda dan Rangka Atap
- Kayu rangka kuda-kuda Dolken ɸ 10 Panjang 4 1092 Btg 65,000 70,980,000 1,300,000
- Kayu (6cm x 12cm x 4 m) Meranti 564 Btg 150,000
- Kayu Dolken ɸ 8 cm panjang 4 1630 Btg 52,000 84,760,000
- Kayu Gapit (5cm x 10cm x 4 m) Meranti 62 Btg 100,000 6,200,000
- Dolken Usuk ɸ 5 cm panjang 4 m jarak 0,4 m 11706 Btg 15,000 175,590,000 4,920,000
- Kayu (5cm x 7cm x 4 m) Meranti 90 Btg 70,000 6,300,000
2 Penutup Atap 65 M2 -
- Genteng plentong kecil Jatiwangi 140471 Bh 1,900 266,894,900 190,000