MINGGU KE 1 (SATU) MINGGU KE : 2 (DUA) MINGGU KE : 3 (TIGA) MINGGU KE : 4 (EMPAT) MINGGU KE : 5 (LIMA) MINGGU KE : 9 (SEMBILAN) MINGGU KE : 8 (DELAPAN) MINGGU KE : 7 (TUJUH) MINGGU KE : 6 (ENAM)
PERIODE : 27 DESEMBER S.D 2 JANUARI 2022 PERIODE : 3 JANUARY S.D 9 JANUARI 2022 PERIODE : 10 JANUARY S.D 16 JANUARI 2022 PERIODE : 17 JANUARY S.D 23 JANUARI 2022 PERIODE : 24 JANUARY S.D 30 JANUARI 2022 PERIODE : 21 FEBRUARI S.D 27 FEBRUARI 2022 PERIODE : 14 FEBRUARI S.D 20 FEBRUARI 2022 PERIODE : 30 JANUARI S.D 04 FEBRUARI 2022 PERIODE : 06 FEBRUARI S.D 13 FEBRUARI 2022
BOBOT MINGGU INI : % BOBOT MINGGU INI : 0.00 % BOBOT MINGGU INI : 0.00 % BOBOT MINGGU INI : 0.00 % BOBOT MINGGU INI : 0.00 % BOBOT MINGGU INI : 0.00 % BOBOT MINGGU INI : 0.00 % BOBOT MINGGU INI : 0.00 % BOBOT MINGGU INI : 9.99 %
PROGRES RENCANA : % PROGRES RENCANA : 10.38 % PROGRES RENCANA : 25.70 % PROGRES RENCANA : 44.69 % PROGRES RENCANA : 71.91 % PROGRES RENCANA : 100.00 % PROGRES RENCANA : 98.39 % PROGRES RENCANA : 98.39 % PROGRES RENCANA : 98.39 %
DEVIASI : 0.00 % DEVIASI : + 0.00 % DEVIASI : + -25.70 % DEVIASI : + -44.69 % DEVIASI : -71.91 % DEVIASI : -100.00 % DEVIASI : + -98.39 % DEVIASI : -98.39 % DEVIASI : -23.18 %
PEKERJAAN NEW ACCESS ROAD (SALURAN U-DITCH)
TOTAL PROGRESS SAMPAI MINGGU INI 0.00 TOTAL PROGRESS SAMPAI MINGGU INI 0.00 TOTAL PROGRESS SAMPAI MINGGU INI 0.00 TOTAL PROGRESS S/D MINGGU INI 0.00 TOTAL PROGRESS S/D MINGGU INI 0.00 TOTAL PROGRESS S/D MINGGU INI 0.00 TOTAL PROGRESS S/D MINGGU INI 0.00 TOTAL PROGRESS S/D MINGGU INI 0.00 TOTAL PROGRESS S/D MINGGU INI 75.21
PRESTASI PEKERJAAN PRESTASI PEKERJAAN PRESTASI PEKERJAAN PRESTASI PEKERJAAN PRESTASI PEKERJAAN PRESTASI PEKERJAAN PRESTASI PEKERJAAN PRESTASI PEKERJAAN PRESTASI PEKERJAAN
NO KETERANGAN OUANTITY UNIT BOBOT S/D MINGGU LALU MINGGU INI S/D MINGGU INI S/D MINGGU LALU MINGGU INI S/D MINGGU INI S/D MINGGU LALU MINGGU INI S/D MINGGU INI S/D MINGGU LALU MINGGU INI S/D MINGGU INI S/D MINGGU LALU MINGGU INI S/D MINGGU INI S/D MINGGU LALU MINGGU INI S/D MINGGU INI S/D MINGGU LALU MINGGU INI S/D MINGGU INI S/D MINGGU LALU MINGGU INI S/D MINGGU INI S/D MINGGU LALU MINGGU INI S/D MINGGU INI
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
I. PEKERJAAN PERSIAPAN
1 Pengukuran 1.00 ls 1.37 0% 0% 7.84 1.19 9.03
2 Pembersihan Lahan dan Perataan (dikupas 15cm dan dipadatkan hingga CBR 5%) 183.00 m2 0.96 0% 0% 5.96 0.90 6.86
3 Mob & Demobilisasi 1.00 ls 2.53 0% 0% 1.10 0.17 1.27
4 Safety 1.00 ls 1.58 0% 0% 4.33 4.33
II. PEKERJAAN PERKERASAN BADAN JALAN
1 Pekerjaan Lapisan Plastik Cor (LDPE) 183.00 m2 0.29 0% 0% 1.39 1.39
2 Pekerjaan Lean Mix Concrete (K-B0 / Tebal 10cm) 18.30 m3 4.34
3 Bekisting (Tebal 9mm) 14.77 m2 0.86
4 Wiremesh (M10-150) 1,563.11 Kg 6.92
5 Dowel (D32) 147.72 Kg 0.65
- Tulangan Utama (D13) 146.70 Kg 0.65
- Sengkang (D13) 88.22 Kg 0.39
6 Tiebar (Dibungkus pipa dan di cat anti lengket) 34.25 Kg 0.15
- Tulangan Utama (D13) 190.87 Kg 0.84
- Sengkang (D13) 47.26 Kg 0.21
7 Decking (D13) 45.84 Kg 0.20
8 Pekerjaan Pengecoran (K-300 / tebal 25cm) 36.51 m3 14.23 0% 0% 0.16 0.16
9 Joint Sealant (Expanseal) 54.50 m' 0.52 0% 0% 0.37 0.37
III. SALURAN BETON
1 Galian Tanah 158.80 Lot 3.68 0% 0% 3.50 3.50
2 Pembuangan Tanah 158.80 Lot 2.18 0% 0% 0.07 0.07
Saluran Keliling (30x50) #DIV/0! #DIV/0! 0.19 0.19
3
- U-Ditch (Penambahan dinding beton) 229.20 m1 31.40 0% 0% 0.05 0.05
Saluran Crossing (30x40) #DIV/0! #DIV/0! 0.27 0.27
4
- U-Ditch (Penambahan dinding beton) 18.00 m1 2.47 0% 0% 1.57 1.57
Saluran Sisi Pagar (30x50)
5
- U-Ditch (Penambahan dinding beton) 87.00 m1 11.92
Kansteen
6 - Keliling (28x15x40 / K-300) 229.20 m1 8.45
- Sisi Pagar (28x15x40 / K-300) 87.00 m1 3.21
TOTAL 100.00
TOTAL 65.22 9.99 75.21