No Deskripsi Pekerjaan Volume Total Estimasi Volume Unit Harga Satuan Harga Total % Referensi
Sanitair Pekerjaan
24 SAFETY PROTECTOR
* Seragam/Uniform 4 M/Set 276D/150 set 550000 2,200,000
* Safety Shoes 4 M/Set 276D/300 set 350000 1,400,000
* Safety Helmet 4 M/Set 276D/450 set 50000 200,000
Analisa Engineer
* Safety Googles 4 M/Set 276D/150 set 35000 140,000
* Cotton Gloves 4 M/Set 276D/14 set 20000 80,000
* Dusk Masker 4 M/Set 276D/150 set 20000 80,000
25 PERALATAN
* Peralatan Tukang 1 1 Lot 3,500,000 3,500,000
Subtotal 699,440,500
TOTAL IDR
Overhead IDR
Jumlah Sebelum Pajak (Barang Import) IDR
Jamsostek IDR
Jumlah Setelah Pajak (Barang Import) IDR
Pajak Pertambahan Nilai (PPN 10%) IDR
TOTAL (inci. PPN, Rounded) IDR
bak cuci piring yang 1 lobang atau dua ?
681,840,500
10,000,000
4,100,000
3,500,000
699,440,500
731,020,500
591,241,000
108,199,500
31,580,000 5,912,410
2318
59124100
532,116,900