! SATUA HARGA
NO URAIAN PEKERJAAN TOTAL BIAYA-Rp
VOLUME N SATUAN
A PEKERJAAN PERSIAPAN
1 Pembebasan Tanah ! m2 442,010 520,00 229,845,200,000
| m2 0
2 Biaya Perijinan 442,010 71,135 31,442,250,000
3 Pengukuran & Gambar Conture ! m2 442,010 1,500 663,015,000
4 Pekerjaan Striping ! m2 442,010 3,750 1,657,537,500
5 Pekerjaan Cut & Fill ■ m2 442,010 22,500 9,945,225,000
6 Pembuatan Gudang/Barak Kerja ■ m2 700 2,000,000 1,400,000,000
1 sub total -A 274,953,227,500
■
Bangunan Mall ( 3 LT )
3 m2 ! 24,000 j 6,000,000 144,000,000,000
'
Bungunan Rumah Komersil - 800 Unit ! Type
4 70/135 m2 \ 56,000 ! 4,000,000 224,000,000,000
!
Bangunan Apartemen 4 Gedung Type ! 54 X
5 300 Unit (15 Lantai) m2 \ 81,000 Î 5,500,000 445,500,000,000
!
Bungunan Pusat Kuliner Type 100/180 ! -50
6 Unit m2 j 5,000 j 3,500,000 17,500,000,000
!
Bangunan Ruko 2 Lantai - 100 Unit \ Type ! 12,000 !
7 120/150 m2 L 3,500,000 42,000,000,000
'
j
」
İ sub total - C 1,120,800,000,000
D BIAYA MANAJEMEN \ \ \
1 Biaya Inventaris Kantor Ls ! 1 5,335,500,000 5,335,500,000
;
Biaya Over Head î! i
2 Ls 25,920,000,000 25,920,000,000
;Biaya Operasional Project 1 1
3 Ls ! 1 16,969,917,500 16,969,917,500
!Biaya Operasional Pemasaran !İ i
4 Ls 4,487,350,500 4,487,350,500
!
L
İ
JL ! sub total - D 52,712,768,000
R E K A PI T U L A S I
A PEKERJAAN PERSIAPAN 274,953,227,500
B PEKERJAAN FASILITAS UMUM DAN SOSIAL 96,988,550,000
C PEKERJAAN KONTRUKSI BANGUNAN 1,120,800,000,000
D BIAYA MANAJEMEN \ \ \ 52,712,768,000
: ! TOTAL BIAYA 1,545,454,545,500
! ! BIAYA PAJAK 10 % 154,545,454,550
| | GRAND TOTAL 1,700,000,000,050
; DIBULATKAN 1,700,000,000,000
TERBILANG : SATU TRILYUN TUJUH RATUS MILYAR RUPIAH
DOKUMEN PROYEK