Bulan 1 2 3 4 5
Sasaran Produksi 7,500 8,625 9,750 11,212.50 12,894
Pendapatan
Produk Harga Ton Bulan ke Bulan Ke Bulan Ke Bulan Ke Bulan Ke
mm (Rp) 1 2 3 4 5
Sub Total
BIAYA PENGURUSAN PERIJINAN & EKSPLORASI
Total 10,500,000,000
Biaya Perijinan
Biaya Iuran
- Iuran Tetap -
- Iuran Pembangunan Daerah -
- PBB -
Sub Total -
Biaya Konstruksi dan Rekayasa
Total 160,000,000
CASH FLOW
Month
URAIAN 0 1 2 3 4
PENDAPATAN
Hasil Pendapatan 14,625,000,000 16,818,750,000 19,012,500,000 21,864,375,000
Royalti (5%) 731,250,000 840,937,500 950,625,000 1,093,218,750
Pendapatan setelah royalti 13,893,750,000 15,977,812,500 18,061,875,000 20,771,156,250
BIAYA OPERASIONAL
Biaya Variable
- Biaya Perawatan
Biaya Tetap
- Biaya Penyusutan - - - -
- Amortisasi
- Bunga Pinjaman
25,144,031,250
1,257,201,563
23,886,829,688
23,886,829,688
1,940,000
200,000
350,000
2,490,000
122,700,000
2,454,000
628,600,781
9,500,000
251,440,313
1,014,695,094
1,017,185,094
22,869,644,594
2,973,053,797
2,973,053,797
19,896,590,797
585,603,000
-
19,520,100,000
20,105,703,000
(209,112,203)
971,940,208
BIAYA INVENTARIS
Keterangan Jumlah Harga Satuan/ Harga Umur Tahun Ke Tahun Ke Tahun Ke Tahun Ke Tahun Ke
Unit Unit (Rp) Total Alat 1 2 3 4 5
- Meja
- Kursi
- Meja Kursi Rapat
- Lemari Arsip
- Komputer
- Printer
- Faximile
- Telephone
- Mesin Foto Copy
- Dispenser
- White Board
- Genset
- Proyektor
- CCTV
- Tempat sampah
- AC
- Kulkas
- TV
- Tempat Tidur + Kasur
- Kipas Angin
- Peralatan Masak (set)
- Peralatan Makan (set)
Total - - - - - - -
Biaya Listrik, Telephon
Keterangan Jumlah Jumlah
Perbulan Pertahun
Air
Keterangan Jumlah Jumlah
Perbulan Pertahun
- Kantor 150,000 1,800,000
- Mess 200,000 2,400,000
- Kantin - -
- Mushola - -
- Stock Yard - -
- Pos Keamanan - -
Sub Total 350,000 4,200,000
Tahun 1 2 3 4 5
Total Ekskalasi 5% 32,000,000 33,600,000 35,280,000 37,044,000 38,896,200
BBM / Harga BBM Hari/ Jumlah Kebutuhan/ Hari/ Biaya / Tahun
JENIS ALAT Liter Liter (Rp) Liter Unit Liter 1 2 3 4
- Excavator PC 200
- Excavator PC 300
- Excavator PC 400
- Dozer
- Tronton
- Track loader, motor grader & back hoe
- Dump truck
- Mobil
- Motor
TOTAL - - - -
5
-
Biaya Pembelian Alat Operasi (Investasi Peralatan Tahunan)
Jenis Jumlah Harga Satuan/ Nilai Sisa Umur Tahun Ke Tahun Ke Tahun Ke Tahun Ke Tahun Ke
Alat Unit Unit (Rp) Total Alat 1 2 3 4 5
Pembelian Peralatan Operasi
I. Peralatan Tambang
a. Alat Gali dan Muat (Excavator)
- Komatsu PC 200
- Komatsu PC 300
- Komatsu PC 400
- Komatsu PC 750
- Daewoo Dossan 500
- Caterpilar 320
- Caterpilar 330
- Caterpilar 345
- Caterpilar 385
- Caterpilar 320
Sub Total - - - - - - -
b. Alat Garuk Dorong (Dozer)
- Komatsu D85E
- Komatsu D375
- Caterpilar D8 R
- Caterpilar D7 G
- Caterpilar D9 R
- Caterpilar D10 T
Sub Total - - - - - - -
c. Alat Perata Jalan (Grader) -
- Caterpilar 120 H/G - 5 - - - - -
- Caterpilar 14 H - 5 - - - - -
Sub Total
d. Alat Pemadat Tanah
- Compactor SD 1000 5 - - - - -
- Compactor CD 33D 5 - - - - -
Sub Total
e. Alat Angkut Batu Bara & Alat Angkut OB (Dump Truck)
- Trusck PS
- DT Tronton Hino
- Caterpilar 773 D
- Caterpilar AT 740
- Kerak 350
- Volvo FM 12
- Komatsu HM 400
- Nissan CWB 520
Sub Total - - - - - - -
f. Alat Penyiram Jalan (Water Truck)
- Isuzu
- Renault Kerak 350
- WT Hino
Sub Total
g. Pompa Air Tambang
- MF 380
- MF 290
- Sykes HH-150
- Torishima
Sub Total
II. Peralatan Pendukung Operasional
- Genset
- Mobil Operasional
- Camp
- Sepeda Motor
- Bola Lampu Ruangan
- HT
- Lain-lain
Sub Total
III. Peralatan K3
- Helm Pengaman
- Sepatu Pengaman
- Kaca Mata Pelindung
- Ear Protector
- Masker Debu
- Ambulans
- Perlengkapan P3K
- Lain-lain
Sub Total
1 INVESTASI AWAL
Biaya Persiapan 10,500,000,000
Biaya Kontruksi dan Rekayasa 160,000,000
Investasi Alat -
Sub Total 10,660,000,000
T O T A L 10,975,000,000
BIAYA OPERASIONAL
Biaya Variable
- Biaya Pemakaian Listrik 23,280,000 23,280,000 23,280,000 23,280,000 23,280,000
- Biaya Pemakaian Telepon 2,400,000 2,400,000 2,400,000 2,400,000 2,400,000
- Biaya Pemakaian Air 4,200,000 4,200,000 4,200,000 4,200,000 4,200,000
- Biaya Perawatan 32,000,000 32,000,000 32,000,000 32,000,000 32,000,000
Total Biaya Variable 61,880,000 61,880,000 61,880,000 61,880,000 61,880,000
Biaya Tetap
- Biaya Penyusutan - - - - -
- Amortisasi 32,000,000 32,000,000 35,280,000 37,044,000 38,896,200
- Bunga Pinjaman dan Pengembalian Pinjaman 11,677,400,000 13,429,010,000 15,443,361,500 17,759,865,725 20,423,845,583.75
- Gaji Pegawai 122,700,000 122,700,000 122,700,000 122,700,000 122,700,000
- Jamsostek 2,454,000 2,454,000 2,454,000 2,454,000 2,454,000
- Biaya fee marketing 365,625,000 420,468,750 475,312,500 546,609,375 628,600,781
- Tunjangan Jabatan 9,500,000 9,500,000 9,500,000 9,500,000 9,500,000
- Biaya Lain-lain 146,250,000 146,250,000 190,125,000 218,643,750 251,440,313
Total Biaya Tetap 12,355,929,000 14,162,382,750 16,278,733,000 18,696,816,850 21,477,436,878
No Kegiatan
1 Biaya Langsung
a.
-
-
-
-
-
-
b.
-
-
-
-
-
c.
-
-
-
-
-
-
-
-
d.
e.
f
g.
Kegiatan
Biaya Langsung
Tapak Bekas Tambang
Pembongkaran Fasilitas Tambang
Reklamasi lahan bekas fasilitas tambang
Pembongkaran dan reklamasi Jalan Tambang
Reklamasi Tambang Permukaan (pit, waste dump)
Reklamasi lahan bekas kolam pengendap
Pengamanan semua bukaan tambang yang berpotensi bahaya terhadap manusia (shaft, raise, stope, edit, decline, tunnel, d
Fasilitas Pengolahan atau Pemulihan
Pembongkaran fasilitas pengolahan dan pemurnian
Reklamasi lahan bekas fasilitas pengolahan dan pemurnian
Reklamasi lahan bekas kolam tailing dan upaya stabilisasinya
Reklamasi lahan bekas timbunan konsentrat
Pemulihan (remediasi) tanah yang terkontaminasi bahan kimiaminyak dan Bahan Berbahaya dan Beracun (B3) serta Limbah
Fasilitas Penunjang
Reklamasi lahan bekas landfill
Pembongkaran sisa bangunan, transmisi Iistrik, pipa, pelabuhan (udara dan air), dan fasilitas lainnya
Reklamasi lahan bekas bangunan, transmisi listrik, pipa pelabuhan (udara dan air), dan fasilitas lainnya
Pembongkaran peralatan, mesin, tangki SBM dan pelumas
Penanganan sisa BBM, pelumas, serta bahan kimia
Reklamasi lahan bekas sarana transportasi
Reklamasi lahan bekas bangunan dan pondasi beton
Pemulihan (remediasi) tanah yang terkontaminasi bahan kimia minyak dan B3d
Sosial dan Ekonomi
Pemeliharaan dan Perawatan
Pemantauan Lain-Lain
Lain-lain
Sub Total
Biaya Tidak Langsung
Biaya mobilisasi dan demobilisasi alat
Biaya perencanaan dan Kegiatan
Biaya perencanaan dan Kegiatan
Biaya administrasi dan keuntungan kontraktor
Sub Total
Total
Biaya