B BIAYA PRODUKSI :
42000 MT X Rp 81.641 = Rp 3.428.920.000
E PEMBAGIAN PROFIT :
JUMLAH
NO URAIAN
( Rp. )
I BELANJA MODAL PERSIAPAN 868.750.000,00
Terbilang : Delapan Ratus Enam Puluh Delapan Juta Tujuh Ratus Lima Puluh Ribu Rupiah
RENCANA ANGGARAN BIAYA (COST PRODUKSI )
TARGET PRODUKSI 42.000 TON PER BULAN
2
SUB TOTAL Rp 765.000.000
KAPASITAS
Jumlah RATA-RATA PRODUKSI Jam
NO Jenis Equipment Type Equipment Hari Kerja PRODUKSI Ket.
Unit / JAM (TON) Kerja/Hari
BULANAN (TON)
2
TOTAL PRODUKSI 42000 TON
2
TOTAL LOADING 4800 RET
ANALISA PENGIRIMAN STONE BOLDER (DUMP TRUCK 6 RODA)
2
SUB TOTAL 42300
KONSUMSI
KONSUMSI BBM
Jumlah JAM KERJA BBM KONSUMSI BBM
NO Jenis Equipment Type Equipment KOEFISIEN BULANAN / UNIT
Unit HARIAN HARIAN/ BULANAN (2 UNIT)
(LITER)
UNIT (LITER)
Biaya Yang
Waktu Produksi Pemasukan Selisih
Dikeluarkan
OKTOBER Rp 2.604.170.000 Rp 140.000.000
Rp 12.108.880.000
1 1 1 1 4
2 MOBILISASI
0
1 1 1 3
6 PRA-PRODUKSI
0
PRODUKSI STONE 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 31
9
BOLDER 0
PENGANGKUTAN DAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 30
10
PENJUALAN 0