Anda di halaman 1dari 7

RAB PENAMBANGAN NICKEL

PT. MULTI DINAR KARYA


KEC : AMPANA KOTA, KAB : TOJO UNA UNA, PROV : SULAWESI TENGAH

Volume Harga Harga


No Deskripsi QTY
/ Unit Satuan Total
1 Persiapan Legalitas Kontraktor Penambangan Lump Sump
2 Persiapan Penambangan
a Container Office 3 Ukuran 40 ft
b Container Toilet 2 Ukuran 20 ft
c Container Camp / Mess 4 Ukuran 40 ft
3 Instalasi Listrik
a Genset 100KVA 5 Unit
b Peralatan Instalasi Lump Sump
4 Peralatan Kantor
a AC Split
b Exhaust Fan
c Telepon PABX
d Laptop
e Printer
f Kursi Kerja
g Meja Kerja
5 Instalasi Air & BBM
a Tangki Air Tawar 50000 L
b Water Pump
C Tangki Solar 50000 L
6 Biaya Pembelian Alat Berat
a EXCAVATOR PC300SE-8M0 15
b DOZER D85E-SS-2 5
c WHEEL LOADER WA380-6z 5
7 Biaya Pembelian Kendaraan
a HINO FM JD260 (6X4) Roda 10 17
b HINO FG 235 (4X2) Roda 6 16
c Mitsubishi Pajero 2
d Toyota Fortuner 2
e Mitsubishi Triton Strada Double Cabin 4
f Kawasaki KLX 150 10
8 Biaya Ongkos Kirim Alat Berat Lokasi
a Container Box
b HINO FM JD260 (6X4) Roda 10
c HINO FG 235 (4X2) Roda 6
d EXCAVATOR PC300SE-8M0
e DOZER D85E-SS-2
f WHEEL LOADER WA380-6z
g Tangki Air Tawar 50000 L
h Water Pump
i Tangki Solar 50000 L
j Genset 100KVA
9 Biaya Pelindung Diri
a Safety Shoes
b Safety Helmet
c Masker Debu
d Rompi Safety
e Jas Hujan
f Pakaian Kerja (Wear Pack)
g Kaca Mata
10 Perlengkapan ATK Lump Sump
11 Sarana Pendukung
a
b
c
12 Biaya BBM Kendaraan & Alat Berat
a HINO FM JD260 (6X4) Roda 10
b HINO FG 235 (4X2) Roda 6
c Mitsubishi Pajero
d Toyota Fortuner
e Mitsubishi Triton Strada Double Cabin
f Kawasaki KLX 150
g EXCAVATOR PC300SE-8M0
h DOZER D85E-SS-2
i WHEEL LOADER WA380-6z
j Genset 100 KVA
13 Biaya P3K & Keselamatan Kerja
RAB BIAYA TENAGA KERJA PENAMBANGAN NICKEL
PT. MULTI DINAR KARYA
KEC : AMPANA KOTA, KAB : TOJO UNA UNA, PROV : SULAWESI TENGAH

GAJI Tunjangan Tunjangan


No Deskripsi QTY
POKOK Jabatan Komunikasi
1 Dewan Direksi
a Direktur Utama
Direktur Operasional
Direktur Keuangan
2 Manager
a Admin
3 Penambangan
a Kepala Tehnik Tambang
b KKJ
c Safety Officer
d Supervisor
e Juru Ukur
f Ass. Pengukuran
g Pengawas Persiapan Tambang
h Pencatat Retasi
i Tenaga Sortir
j Operator Buldozer
k Operator Excavator
l Driver Dumptruck
m Helper Dumptruck
4 Stock Pile
a Pengawas Stock Pile
b Tenaga Pendataan Stock Pile
c Pengawas Pengambilan Sample
d Tenaga Pengambilan Sample
e Driver Angkutan Sample
5 Bagian Umum & Kesehatan
a Paramedis
b Security
c Chef
d Cook Helper
e Operator Genset
f Office Boy
g Engineering
h Operator BBM
ANGAN NICKEL
A
ROV : SULAWESI TENGAH

Uang Uang BPJS Gaji


Makan Transport FULL Total

Anda mungkin juga menyukai