Swing
Digging Swing Isi Dumping Cycle Time
Kosong
8 4 5 3 20 (detik)
*Produktivitas PC 200
*Produktivitas PC300
(ton/bucket)
ton/bucket
*Produktivitas Dump Truck Hino (OB)
Jarak haul 10 km
Jarak antar DT 625.00 m
DT / PC300 20
DT / PC200 11
Match Factor 0.80 PC lebih banyak menunggu
Max produksi ore 4954 ton
Efektivitas
Working hours Total Biaya Sewa/hari
(%)
75 7.50 10,590,000
75 7.50 30,375,000
75 7.50 10,125,000
75 7.50 10,125,000
75 7.50 101,520,000
75 7.50 28,552,568
75 7.50 10,125,000
75 7.50 3,375,000
75 7.50 3,375,000
75 7.50 6,750,000
RP 214,912,568
$ 15,350.90
$/ton 3.10
4.31
Total Ore tons 440000
Total OB tons 880000
Area Ha 10
Land Clearing rate hour/Ha 4.5
Drainage and dyke m 500.00
Drainage and dyke construction rate m/hour 5.00
1. Land Clearing
Bulldozer D85/D65 45 1
PC 200 45 2
1B. Hauling OB
PC 200 847.46 3.00
Bulldozer 847.46 1.00
Dumptruck 847.46 9.00
2. Ore getting
PC 200 888.15 9.00
6. TransShipment
Pc.300 (loading) 888.15 2.00
Pc.200 (Loading barges) 888.15 4.00
Pc.200 (unloading barges) 888.15 4.00
Dump Truck 888.15 6.00
Operational Cost
Total Rp 26,557,816,601
Production 440,000
Rp/Ton 60,359
$/Ton 4.31
4.31
OB Sidecast
(50%)
PC200
440,000
18
176.77
2489.05
3.00
10.00
82.97
7.00
11.85
Equipment Requirement
Pc.200 16
Pc.300 5
Bulldozer 2
Grader 1
Vibro 1
Dump Truck 50
Water Truck 2
Rp/Ton $/Ton
Rp 934 $ 0.07
428,027
Rp 6,131.26 $ 0.44
552,500
Rp 24,167.76 $ 1.73 440,000
Rp3,913 $ 0.28
Rp1,363 $ 0.10
11,905.24 $ 0.85