Asumsi :
a. Hasil pasir 40 ton/jan
40 ton x 10 x 25 hari 10 000 ton / bln : 1,8 = 5.555 m3
Harga jual pasir @ Rp.125.000/m3 x 5.555 = Rp. 694.375.000 /bln
b. Hasil split 15 ton/jam
15 ton x 10 x 25 hari 3 750 ton / bln : 1,8 = 2.083 m3
Harga jual split @ Rp.125.000/m3 x 2.083 = Rp 260.375.000/ bln
-----------------------------------------------------------------------------
Total pendapatan = Rp. 954.750.000/ bln
Jumlah Rp 850.000/hari