SUMMARY QUANTITY

10.1.(9) PERBAIKAN CAMPURAN ASPAL PANAS (CAP)


MC - 08 / BULAN JULI 2021
Lingkup : REHABILITASI MAYOR

KUANTITAS (KUBIK)
No. URAIAN NO. RUAS S.D BULAN KETERANGAN
LALU
BULAN INI S.D BULAN INI

1 Perbaikan Campuran Aspal Panas (CAP) RUAS 04 23.25 - 23.25


RUAS 05 14.26 7.31 21.57
RUAS 06 11.63 - 11.63

TOTAL 49.14 7.31 56.45

A VOLUME KONTRAK AWAL 232.53


B VOLUME KONTRAK ADD.03 82.50

C VOLUME SAMPAI DENGAN BULAN LALU 49.14

D VOLUME BULAN INI 7.31

E VOLUME SAMPAI DENGAN BULAN INI 56.45

PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA

TAUFAN RIFANI, ST SAMSUDDIN, ST BAGUS MAHENDRA DEWATA, ST


NIP. 19720305 200701 1 005 Inspection Engineer Chief Engineer
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKRORAT JENDERAL BINA MARGA
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALIMANTAN SELATAN
PPK 1.1 PROVINSI KALIMANTAN SELATAN
Preservasi Jalan Anjir Pasar (Bts. Prov. Kalteng)- Bati Bati - Bts. Kota Pelaihari - Kp. Asam Asam

PERHITUNGAN VOLUME
MC : 08
Divisi : 10
No Item : 10.1.(9)
Pekerjaan : Perbaikan Campuran Aspal Panas
Periode : 26 Juni -25 Juli 2021

WASCO BAWAN, KSO PT. ADIYA WIDYAJASA (JO) PT WAHANA MITRA


AMERTA PT ANUGRAH KRIDAPRADANA

TEBAL
LOKASI PANJANG LEBAR LUAS VOLUME
No LAPANGAN DESIGN DITAGIHKAN KETERANGAN
STATIONING POSISI (M) (M) (M2) (M) (M) (M) (M3)
1 2 3 4 5 6 7 8 9 10 = 6 x 9 11

1 R 2.25 2.40 5.40 0.030 0.060 0.030 0.16 P14A

2 08+475 - 08+483 L 7.90 1.60 12.64 0.063 0.060 0.063 0.80 P10

3 09+233 - 09+261 L 27.55 3.00 82.65 0.068 0.060 0.068 5.60 P20

4 00+015 - 00+024 R 9.25 1.35 12.49 0.061 0.060 0.061 0.76 P21C

JUMLAH 7.31
JUMLAH S/D HALAMAN INI 7.31

Disetujui Oleh: Diperiksa Oleh : Dibuat Oleh :


KEMENTERIAN PU KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA

__________________ __________________
Pengawas Lapangan Quantity Quantity Engineer
SUMMARY QUANTITY
10.1.(4) PERBAIKAN LAPIS PONDASI AGREGAT KELAS A
MC - 08 / BULAN JULI 2021
Lingkup : REHABILITASI MAYOR

KUANTITAS (KUBIK)
No. URAIAN NO. RUAS S.D BULAN KETERANGAN
LALU
BULAN INI S.D BULAN INI

1 Perbaikan Lapis Pondasi Agregat Kelas A RUAS 04 10.89 - 10.89


RUAS 05 2.97 15.26 18.23
RUAS 06 5.59 - 5.59

TOTAL 19.45 15.26 34.71

A VOLUME KONTRAK AWAL 247.50


B VOLUME KONTRAK ADD.03 247.50

C VOLUME SAMPAI DENGAN BULAN LALU 19.45

D VOLUME BULAN INI 15.26

E VOLUME SAMPAI DENGAN BULAN INI 34.71

PENGGUNA JASA KONSULTAN SUPERVISI PENYEDIA JASA

TAUFAN RIFANI, ST SAMSUDDIN, ST BAGUS MAHENDRA DEWATA, ST


NIP. 19720305 200701 1 005 Inspection Engineer Chief Engineer
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKRORAT JENDERAL BINA MARGA
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALIMANTAN SELATAN
PPK 1.1 PROVINSI KALIMANTAN SELATAN
Preservasi Jalan Anjir Pasar (Bts. Prov. Kalteng)- Bati Bati - Bts. Kota Pelaihari - Kp. Asam Asam

PERHITUNGAN VOLUME
MC : 08
Divisi : 10
No Item : 10.1.(4)
Pekerjaan : Perbaikan Lapis Pondasi Agregat Kelas A
Periode : 26 Juni -25 Juli 2021

WASCO BAWAN, KSO PT. ADIYA WIDYAJASA (JO) PT WAHANA MITRA


AMERTA PT ANUGRAH KRIDAPRADANA

TEBAL
LOKASI PANJANG LEBAR LUAS VOLUME
No LAPANGAN DESIGN DITAGIHKAN KETERANGAN
STATIONING POSISI (M) (M) (M2) (M) (M) (M) (M3)
1 2 3 4 5 6 7 8 9 10 = 6 x 9 11

1 08+475 - 08+483 L 7.90 1.60 12.64 0.148 0.300 0.148 1.86 P10

2 08+518 - 08+521 L 2.95 1.10 3.25 0.094 0.300 0.094 0.31 P13 A

3 08+600 - 08+612 L 11.70 1.35 15.80 0.073 0.300 0.073 1.16 P13B

4 08+722 - 08+734 L 11.90 1.44 17.14 0.068 0.300 0.068 1.17 P13F

5 08+833 - 08+835 L 2.25 1.55 3.49 0.093 0.300 0.093 0.32 P18

6 09+290 - 09+319 L 29.20 1.47 42.92 0.077 0.300 0.077 3.28 P21

7 09+324 - 09+330 L 6.10 1.50 9.15 0.090 0.300 0.090 0.82 P21A

8 09+724 - 09+735 L 11.30 1.25 14.13 0.075 0.300 0.075 1.06 P22

9 09+741 - 09+747 L 6.40 1.30 8.32 0.076 0.300 0.076 0.63 P23

10 09+808 - 09+821 L 12.90 1.40 18.06 0.065 0.300 0.065 1.18 P24

11 09+827 - 09+840 L 13.05 1.68 21.92 0.101 0.300 0.101 2.21 P25

12 09+841 - 09+851 L 9.55 1.75 16.71 0.075 0.300 0.075 1.25 P25A

JUMLAH 15.26
JUMLAH S/D HALAMAN INI 15.26

Disetujui Oleh: Diperiksa Oleh : Dibuat Oleh :


KEMENTERIAN PU KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA

__________________ __________________
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKRORAT JENDERAL BINA MARGA
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALIMANTAN SELATAN
PPK 1.1 PROVINSI KALIMANTAN SELATAN
Preservasi Jalan Anjir Pasar (Bts. Prov. Kalteng)- Bati Bati - Bts. Kota Pelaihari - Kp. Asam Asam

PERHITUNGAN VOLUME
MC : 08
Divisi : 10
No Item : 10.1.(4)
Pekerjaan : Perbaikan Lapis Pondasi Agregat Kelas A
Periode : 26 Juni -25 Juli 2021

WASCO BAWAN, KSO PT. ADIYA WIDYAJASA (JO) PT WAHANA MITRA


AMERTA PT ANUGRAH KRIDAPRADANA

TEBAL
LOKASI PANJANG LEBAR LUAS VOLUME
No LAPANGAN DESIGN DITAGIHKAN KETERANGAN
STATIONING POSISI (M) (M) (M2) (M) (M) (M) (M3)
1 2 3 4 5 6 7 8 9 10 = 6 x 9 11
Pengawas Lapangan Quantity Quantity Engineer

Anda mungkin juga menyukai