PROJECT :

UPGRADING JALAN HAULING SEGMEN 1,2,3 & JEMBATAN


10 TAHUN 2022

PT. MULTI TAMBANGJAYA UTAMA

MOISTURE CONTENT
SNI 03-1971-2011
Kontraktor : PT. WIDYA SAPTA CONTRACTOR
Konsultan : PT. ARKONIN ENGINEERING MP
Proyek/Pekerjaan : UPGRADING JALAN HAULING SEGMEN 1,2,3 & JEMBATAN 10 TAHUN 2022
Sumber Material : PELABUHAN PT.MUTU Dikerjakan : NANDA Tanggal : 22/10/2022
Deskripsi : LPB (PATCHING KM 36+900) Diperiksa : RAMDAN Tanggal : 22/10/2022

Test Test Test Test Test


NO. SAMPLE NO. Unit REMARKS
1 2 3 4 5

1 Weight of Wet Sample + Container gram 498,0 423,0 298,7 298,7 298,7

2 Weight of Dry Sample + Container gram 455 387 289,8 289,8 289,8

3 Weight of Container gram 0 0 111,3 111,3 111,3

4 Weight of Water 1-2 gram 43,0 36,0 8,9 8,9 8,9

5 Weight of Dry Sample 2-3 gram 455 387 178,5 178,5 178,5

6 Moisture Content (4 / 5) x 100% % 9,45 9,30 4,99 4,99 4,99

AVERAGE % 9,38

Remarks:

Diajukan Oleh Diperiksa Oleh Disetujui Oleh


PT. WIDYA SAPTA CONTRACTOR PT. ARKONIN ENGINEERING MP PT. MULTI TAMBANGJAYA UTAMA