Anda di halaman 1dari 20

SUMMARY TEST

Matrial : Agregat S
Proyek : Probolinggo - Paiton - Situbondo
Hasil Test
No Uraian Satuan Spec
Mix Design Trial
1 Proctor Gr/cc 1.99 1.983 -
2 CBR test % 59.5 61.00 Min 50
3 Atterberg limit LL % 0.00 25.3 0-35
PL % 0.00 20.1 -
PI % 0.00 5.2 4-15
4 Kadar air optimum % 10.52 10.49 -
5 Abrasi % 33.77 - 0-40
6 Analisa saringan 2" → % 100.00 100.00 100
11/2" % 100.00 100.00 100
1" % 87.01 86.56 77-89
3
/8" % 62.08 46.39 41-66
#4 % 43.63 35.87 26-54
#10 % 29.18 26.70 15-42
#40 % 16.54 11.76 7-26
#200 % 4.61 5.28 4-16

GRADASI AGREGAT S
100
90
80
70
60
50
40
30
20
10
0

Bina Marga Konsultan Kontraktor

( ………………………….) (………………………….) ( ………………………….)


NIP. 19681201200812 1 001 Quality Engineer Quality Control
PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO
Pekerjaan : Preservasi Jalan Kontraktor : CV.Mitra Utama
Probolinggo - Paiton - Situbondo Konsultan : PT.Krida Pratama Adhicipta.Kso
Konstruksi : Agregat S Tanggal : 14 April 2020
PERCOBAAN PEMADATAN DAN CBR
Berat tanah basah Gr
Kadar air awal %
Kadar air akhir Gr
Penambahan air ml

BERAT ISI
Berat cetakan 5645 5645 5645 5645 5645
Berat tanah+cetakan 9922 10195 10319 10315 10125
Berat tanah 4277 4550 4674 4670 4480
Isi cetakan 2132.8 2132.8 2132.8 2132.8 2132.8
Berat isi basah 2.005 2.133 2.191 2.190 2.101
Berat isi kering 1.869 1.955 1.983 1.953 1.839
KADAR AIR
Berat tin box 100.5 100.5 100.5 100.5 100.5
Berat tanahbasah+tin box 999.6 929.1 1090.2 1127.4 975.0
Berat tanah kering+tin box 938.6 860.0 996.2 1016.4 866.0
Berat air 61.0 69.1 94.0 111.0 109.0
Berat tanah kering 838.1 759.5 895.7 915.9 765.5
Kadar air 7.3 9.1 10.5 12.1 14.2
BERAT ISI KERING
BERAT ISI KERING

2.400
2.400
2.300 ZAV
L 2.300
2.200
Ȣd Max Gr/cc 2.200
65 Blow
2.100
2.100 35 Blow
2.000
11.983 2.000
1.900
10 Blow
1.900
1.800 OMC = gr/cc 1.800
1.700 1.700

1.600 1.600

1.500 1.500

1.400 1.400
6 7 8 9 10 11 12 13 14 15 40 45 50 55 60 65 70 75 80
KADAR AIR ( % ) CBR ( % )

SPGR (G) = 2.732 gr/cc CARA PEMADATAN Modified/D


ZAVL = G x ȢW BERAT JENIS 2.732 gr/cc
1+(G x W) KADAR AIR OPTIMUM 10.49 %
W 11% Ȣd = 2.146 gr/cc YD MAKSIMUM 1.983 gr/cc
W 12% Ȣd = 2.101 gr/cc 95% YD MAKSIMUM 1.884 gr/cc
W 13% Ȣd = 2.057 gr/cc NILAI CBR 95% 55.00 %
NILAI CBR 100% 61.00 %

Bina Marga Konsultan Kontraktor


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO

Jenis Campuran : Agregat S Kontraktor : CV.Mitra Utama


Tanggal : 14 April 2020 Konsultan : PT.Krida Pratama Adhicipta.Kso

PEMERIKSAAN CBR LABORATORIUM

JUMLAH PUKULAN : 10 x
NO. KADAR AIR BERAT ISI KERING
A Berat Wadah 100.5 Berat Ring 7655
B Berat Wadah + Tanah basah 944.0 Volume Ring 2148.6
C Berat Wadah + Tanah kering 868.4 Berat Ring+T.basah 11846
D Berat Tanah kering 767.9 Berat tanah basah 4191
E Berat Air 75.6 Berat isi basah 1.951
F Kadar Air 9.8 Berat isi kering 1.776

Kalbrasi = 26.128 lbs


5000
No. Waktu Penurunan
Pembacaan Dial Beban ( Lbs )
(menit) ( Inch ) 4500

1 0.25 0.0125 15 391.9


4000
2 0.5 0.0250 24 627.1
Beban Lbs

3 1 0.0500 33 862.2 3500

4 1.5 0.0750 45 1175.8 3000


5 2 0.1000 56 1463.2
2500
6 3 0.1500 75 1959.6
2221
7 4 0.2000 85 2220.9 2000

8 6 0.3000 99 2586.7
1500 1463
9 8 0.4000 108 2821.8
10 10 0.5000 115 3004.7 1000

500
0.1 " 48.77 %
C.B.R 0
0.2 " 49.35 % 0 1 2 3 4 5 6
Penurunan (Inch )
Rata - rata 49.06 %

Bina Marga Konsultan Kontraktor

( ………………………….) ( ………………………….) ( ………………………….)


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO

Jenis Campuran : Agregat S Kontraktor : CV.Mitra Utama


Tanggal : 14 April 2020 Konsultan : PT.Krida Pratama Adhicipta.Kso

PEMERIKSAAN CBR LABORATORIUM

JUMLAH PUKULAN : 35 x
NO. KADAR AIR BERAT ISI KERING
A Berat Wadah 100.50 Berat Ring 7585
B Berat Wadah + Tanah basah 902.40 Volume Ring 2148.6
C Berat Wadah + Tanah kering 812.00 Berat Ring+T.basah 12256
D Berat Tanah kering 711.5 Berat tanah basah 4671
E Berat Air 90.4 Berat isi basah 2.174
F Kadar Air 12.71 Berat isi kering 1.929

Kalbrasi = 26.128 lbs


5000
No. Waktu Penurunan
Pembacaan Dial Beban ( Lbs )
(menit) ( Inch ) 4500

1 0.25 0.0125 15 391.9


4000
2 0.5 0.0250 29 757.7
Beban Lbs

3 1 0.0500 42 1097.4 3500

4 1.5 0.0750 56 1463.2 3000


5 2 0.1000 67 1750.6
2500
6 3 0.1500 86 2247.0
7 4 0.2000 98 2560.5 2000

8 6 0.3000 116 3030.8


1500
9 8 0.4000 126 3292.1
10 10 0.5000 129 3370.5 1000

500
0.1 " 58.35 %
C.B.R 0
0.2 " 56.90 % 0 1 2 3 4 5 6
Penurunan (Inch )
Rata - rata 57.63 %

Bina Marga Konsultan Kontraktor

(………………………….) (………………………….) (………………………….)


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO

Jenis Campuran : Agregat S Kontraktor : CV.Mitra Utama


Tanggal : 14 April 2020 Konsultan : PT.Krida Pratama Adhicipta.Kso

PEMERIKSAAN CBR LABORATORIUM

JUMLAH PUKULAN : 65 x
NO. KADAR AIR BERAT ISI KERING
A Berat Wadah 101.10 Berat Ring 7926
B Berat Wadah + Tanah basah 1122.20 Volume Ring 2148.6
C Berat Wadah + Tanah kering 1012.80 Berat Ring+T.basah 12869
D Berat Tanah kering 911.7 Berat tanah basah 4943
E Berat Air 109.4 Berat isi basah 2.301
F Kadar Air 12.00 Berat isi kering 2.054

Kalbrasi = 26.128 lbs


5000
No. Waktu Penurunan
Pembacaan Dial Beban ( Lbs )
(menit) ( Inch ) 4500

1 0.25 0.0125 11 287.4


4000
2 0.5 0.0250 34 888.4
Beban Lbs

3 1 0.0500 51 1332.5 3500

4 1.5 0.0750 64 1672.2 3000 2952


5 2 0.1000 75 1959.6
2500
6 3 0.1500 100 2612.8
7 4 0.2000 113 2952.5 2000 1960
8 6 0.3000 136 3553.4
1500
9 8 0.4000 146 3814.7
10 10 0.5000 152 3971.5 1000

500
0.1 " 65.32 %
C.B.R 0
0.2 " 65.61 % 0 1 2 3 4 5 6
Penurunan (Inch )
Rata - rata 65.47 %

Bina Marga Konsultan Kontraktor

(………………………….) (………………………….) (………………………….)


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO

PEMERIKSAAN BERAT JENIS DAN PENYERAPAN AIR


AASHTO T.85 8 84

Proyek : Preservasi Jalan Tanggal : 11 April 2020


Probolinggo - Paiton - Situbondo Dikerjakan : CV.Mitra Utama
Matrial : Agregat S Diperiksa : PT.Krida Pratama Adhicipta.Kso

AGGREGAT KASAR :

NO. CONTOH I II

BERAT CONTOH KERING OVEN A 5570 5345


BERAT CONTOH KERING PERMUKAAN B 5712 5481
BERAT CONTOH DALAM AIR C 3537 3413
A 2.561 2.585
BERAT JENIS BULK (ATAS DASAR KERING OVEN)
Rata - rata 2.573
B-C
B 2.626 2.650
BERAT JENIS BULK (ATAS DASAR KERING PERMUKAAN)
Rata - rata 2.638
B-C
A 2.740 2.767
BERAT JENIS SEMU
Rata - rata 2.753
A-C
B-A 2.549 2.544
PENYERAPAN AIR x 100 %
Rata - rata 2.547
A

100
Keterangan : SPGR Rata-rata = 2.732 % ( G )
56.22 43.78
+
2.753 2.705

RET # no. 4 = 56.22 %


Pass # no 4 = 43.78 %

AGGREGAT HALUS :
NO. CONTOH I II

BERAT CONTOH KERING OVEN A 487.1 486.6


BERAT BOTOL + AIR SAMPAI BATAS KALIBRASI B 641.1 641.1
BERAT CONTOH + BOTOL + AIR SAMPAI BATAS KALIBRASI C 947.4 948.5
A 2.515 2.526
BERAT JENIS BULK (ATAS DASAR KERING OVEN)
Rata - rata 2.521
B + 500 - C
500 2.581 2.596
BERAT JENIS BULK (ATAS DASAR KERING PERMUKAAN JENUH)
Rata - rata 2.589
B + 500 - C
A 2.694 2.715
BERAT JENIS SEMU
Rata - rata 2.705
B + A - C
500 - A 2.648 2.754
PENYERAPAN AIR x 100 %
Rata - rata 2.701
A

Bina Marga Konsultan Kontraktor

( ……………..………… ) ( ……………..………… ) ( ……………..………… )


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO

PEMERIKSAAN BATAS - BATAS ATTERBERG

Tanggal : 11 April 2020 Kontraktor : CV.Mitra Utama


Jenis Campuran : Agregat S Konsultan : PT.Krida Pratama Adhicipta.Kso

PUKULAN KADAR AIR Liquid Limit LL (%) 25.3


37 23.41 Plastic Limit PL (%) 20.1
28 24.63 Plastic Index PI (%) 5.2
21 25.97
14 27.42

28.0
KADAR AIR (%)

27.0

26.0

25.0

24.0

23.0

22.0

21.0
10 15 20 25 30 35 40
BANYAKNYA PUKULAN

Liquid limit Plastic limit


A Banyaknya ketukan 37 28 21 14
B Berat wadah + tanah basah 41.2 43.4 42.3 41.5 30.2 30.8
C Berat wadah + tanah kering 35.3 36.8 35.6 34.7 26.7 27.5
D Berat wadah 10.1 10.0 9.8 9.9 10.1 10.2
E Berat Air 5.9 6.6 6.7 6.8 3.5 3.3
F Berat tanah kering 25.2 26.8 25.8 24.8 16.6 17.3
E
G Kadar air = x 100%
F 23.4 24.6 26.0 27.4 21.1 19.1

Bina Marga Konsultan Kontraktor

( …………………… ) ( …………………… ) ( …………………… )


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO

ANALISA PEMBAGIAN BUTIRAN


SK. SNI. M - 08 - 1989 - F
Pekerjaan : Preservasi Jalan
Probolinggo - Paiton - Situbondo Tanggal : 10 April 2020
Sumber Material : Pasuruan Dan Mojokerto dikerjakan : CV.Mitra Utama
Konstruksi : Agregat S diperiksa : PT.Krida Pratama Adhicipta.Kso
Ukuran Berat Komulatif
Saringan Tertahan
masing² Berat % % Spesifikasi
ASTM mm saringan Tetahan Tertahan Lolos
( gram ) ( gram )
2'' 50.8 - - -
1½'' 38.1 0 0 100 100
1'' 25.4 801 14.6 85.4 77-89
3/4'' 19.0 - - -
1/2'' 12.7 - - -
3/8'' 9.5 2,464 44.9 55.1 41-66
#4 4.76 3,044 55.5 44.5 26-54
#8 2.38 - - -
#10 2.00 3,952 72.0 28.0 15-42
# 16 1.19 - - -
# 40 0.42 4,666 85.1 14.9 7-26
# 50 0.279 - - -
# 100 0.149 - - -
# 200 0.074 5,074 92.5 7.5 4-16
pan
Berat seluruh contoh 5,486 Gram

100

90

80

70
Test Agregat S

60

50

40 Limit Spek
Agregat S
30

20

10

0 #200 #40 #10 #4 3/8" 1" 1,5"

Bina Marga Konsultan Kontraktor


`

( …………………………. ) ( …………………………. ) ( …………………………. )


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO
GRADASI GABUNGAN CAMPURAN

Pekerjaan : Preservasi Jalan Tanggal : 10 April 2020


Probolinggo - Paiton - Situbondo
Sumber Material : Pasuruan Dan Mojokerto dikerjakan : CV.Mitra Utama
Konstruksi : Agregat S diperiksa : PT.Krida Pratama Adhicipta.Kso
Ukuran Gradasi Asli Gradasi
Saringan a b c d Gabungan Spesifikasi
( ASTM )
1½'' 100.0 100.0 100.0 100.00 100
1'' 68.6 100.0 98.2 86.56 77-89
3/8'' 0.4 39.8 84.5 46.39 41-66
#4 0.3 2.3 71.1 35.87 26-54
#10 - 1.9 53.0 26.70 15-42
# 40 - 1.6 23.2 11.76 7-26
# 200 - 1.4 10.3 5.28 4-16

a. CA 1 1/2" (15-38 mm) 40%


Proporsi b. CA 3/4 (10-15 mm) 10%
Total Agregat c. Sirtu Ayak 50%
d. -

GRAFIK GRADASI GABUNGAN

100

90

80

70

60

50

40

30

20

10

0 #200 #40 #10 #4 3/8" 1" 1,5"


Keterangan :
= Test Agregat S
= Limit speck Agregat S
Bina Marga Konsultan Kontraktor

( …………………………. ) ( …………………………. ) ( …………………………. )


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO

ANALISA PEMBAGIAN BUTIRAN


SK. SNI. M - 08 - 1989 - F
Pekerjaan : Preservasi Jalan
Probolinggo - Paiton - Situbondo Tanggal : 10 April 2020
Sumber Material : Pasrepan dikerjakan : CV.Mitra Utama
Konstruksi : CA (15-35mm) diperiksa : PT.Krida Pratama Adhicipta.Kso
Ukuran Berat Komulatif
Saringan Tertahan
masing² Berat % % Keterangan
ASTM mm saringan Tetahan Tertahan Lolos
( gram ) ( gram )
2'' 50.8 - - -
1½'' 38.1 0 0 100
1'' 25.4 880 31.4 68.6
3/4'' 19.0 - - -
1/2'' 12.7 - - -
3/8'' 9.5 2,795 99.6 0.4
#4 4.76 2,798 99.7 0.3
#8 2.38 - - -
#10 2.00 2,806 100.0 0.0
# 16 1.19 - - -
# 40 0.42 2,806 100.0 0.0
# 50 0.279 - - -
# 100 0.149 - - -
# 200 0.074 2,806 100.0 0.0
pan
Berat seluruh contoh 2,806 Gram

100

90

80

70

60

50

40

30

20

10

0
#200 #40 #10 #4 3/8" 1" 1,5"

Bina Marga Konsultan Kontraktor


`

( …………………………. ) ( …………………………. ) ( …………………………. )


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO
ANALISA PEMBAGIAN BUTIRAN
SK. SNI. M - 08 - 1989 - F
Pekerjaan : Preservasi Jalan
Probolinggo - Paiton - Situbondo Tanggal : 10 April 2020
Sumber Material : Pasrepan dikerjakan : CV.Mitra Utama
Konstruksi : CA (10-15mm) diperiksa : PT.Krida Pratama Adhicipta.Kso
Ukuran Berat Komulatif
Saringan Tertahan
masing² Berat % % Keterangan
ASTM mm saringan Tetahan Tertahan Lolos
( gram ) ( gram )
2'' 50.8 - - -
1½'' 38.1 0 0 100
1'' 25.4 0 0.0 100.0
3/4'' 19.0 - - -
1/2'' 12.7 - - -
3/8'' 9.5 683 60.2 39.8
#4 4.76 1,109 97.7 2.3
#8 2.38 - - -
#10 2.00 1,113 98.1 1.9
# 16 1.19 - - -
# 40 0.42 1,117 98.4 1.6
# 50 0.279 - - -
# 100 0.149 - - -
# 200 0.074 1,119 98.6 1.4
pan
Berat seluruh contoh 1,135 Gram

100

90

80

70

60

50

40

30

20

10

0
#200 #40 #10 #4 3/8" 1" 1,5"

Bina Marga Konsultan Kontraktor


`

( …………………………. ) ( …………………………. ) ( …………………………. )


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO
ANALISA PEMBAGIAN BUTIRAN
SK. SNI. M - 08 - 1989 - F
Pekerjaan : Preservasi Jalan
Probolinggo - Paiton - Situbondo Tanggal : 10 April 2020
Sumber Material : Pasrepan dikerjakan : CV.Mitra Utama
Konstruksi : Sirtu Ayak diperiksa : PT.Krida Pratama Adhicipta.Kso
Ukuran Berat Komulatif
Saringan Tertahan
masing² Berat % % Keterangan
ASTM mm saringan Tetahan Tertahan Lolos
( gram ) ( gram )
2'' 50.8 - - -
1½'' 38.1 0 0 100
1'' 25.4 50 1.8 98.2
3/4'' 19.0 - - -
1/2'' 12.7 - - -
3/8'' 9.5 435 15.5 84.5
#4 4.76 812 28.9 71.1
#8 2.38 - - -
#10 2.00 1,258 47.0 53.0
# 16 1.19 - - -
# 40 0.42 2,056 76.8 23.2
# 50 0.279 - - -
# 100 0.149 - - -
# 200 0.074 2,402 89.7 10.3
pan
Berat seluruh contoh 2,677 Gram

100

90

80

70

60

50

40

30

20

10

0
#200 #40 #10 #4 3/8" 1" 1,5"

Bina Marga Konsultan Kontraktor


`

( …………………………. ) ( …………………………. ) ( …………………………. )


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO

PEMERIKSAAN BATAS - BATAS ATTERBERG

Tanggal : 11 April 2020 Kontraktor : CV.Mitra Utama


Jenis Campuran : Agregat S Konsultan : PT.Krida Pratama Adhicipta.Kso

PUKULAN KADAR AIR Liquid Limit LL (%) 25.6


37 24.05 Plastic Limit PL (%) 20.2
29 24.81 Plastic Index PI (%) 5.4
21 26.23
13 27.38

28.0
KADAR AIR (%)

27.0

26.0

25.0

24.0

23.0

22.0
10 15 20 25 30 35 40
BANYAKNYA PUKULAN

Liquid limit Plastic limit


A Banyaknya ketukan 37 29 21 13
B Berat wadah + tanah basah 42.3 42.1 40.9 43.5 29.1 29.9
C Berat wadah + tanah kering 36.0 35.7 34.5 36.3 25.9 26.6
D Berat wadah 9.8 9.9 10.1 10.0 10.2 10.1
E Berat Air 6.3 6.4 6.4 7.2 3.2 3.3
F Berat tanah kering 26.2 25.8 24.4 26.3 15.7 16.5
E
G Kadar air = x 100%
F 24.0 24.8 26.2 27.4 20.4 20.0

Kontraktor Konsultan Bina Marga

( ……………………… ) ( ……………………… ) ( ……………………… )


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
WARU – SIDOARJO – KRIAN

PEMERIKSAAN BATAS - BATAS ATTERBERG

Tanggal : 11 April 2020 Kontraktor : CV.Mitra Utama


Jenis Campuran : Agregat S Konsultan : PT.Krida Pratama Adhicipta.Kso

PUKULAN KADAR AIR Liquid Limit LL (%) 25.3


34 24.03 Plastic Limit PL (%) 19.4
26 25.00 Plastic Index PI (%) 5.9
20 25.86
14 27.13

28.0
KADAR AIR (%)

27.0

26.0

25.0

24.0

23.0

22.0
10 15 20 25 30 35 40
BANYAKNYA PUKULAN

Liquid limit Plastic limit


A Banyaknya ketukan 34 26 20 14
B Berat wadah + tanah basah 42.1 43.5 42.9 42.7 29.9 29.3
C Berat wadah + tanah kering 35.9 36.8 36.1 35.7 26.7 26.2
D Berat wadah 10.1 10.0 9.8 9.9 10.1 10.3
E Berat Air 6.2 6.7 6.8 7.0 3.2 3.1
F Berat tanah kering 25.8 26.8 26.3 25.8 16.6 15.9
E
G Kadar air = x 100%
F 24.0 25.0 25.9 27.1 19.3 19.5

Kontraktor Konsultan Bina Marga

( ……………………… ) (………………………….) (………………………….)


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
WARU – SIDOARJO – KRIAN

PEMERIKSAAN BATAS - BATAS ATTERBERG

Tanggal : 11 April 2020 Kontraktor : CV.Mitra Utama


Jenis Campuran : Agregat S Konsultan : PT.Krida Pratama Adhicipta.Kso

PUKULAN KADAR AIR Liquid Limit LL (%) 25.4


37 23.64 Plastic Limit PL (%) 19.2
29 24.62 Plastic Index PI (%) 6.2
22 25.76
15 27.24

28.0
KADAR AIR (%)

27.0

26.0

25.0

24.0

23.0

22.0
10 15 20 25 30 35 40
BANYAKNYA PUKULAN

Liquid limit Plastic limit


A Banyaknya ketukan 37 29 22 15
B Berat wadah + tanah basah 42.1 43.0 43.1 42.5 29.7 29.5
C Berat wadah + tanah kering 36.0 36.5 36.3 35.5 26.4 26.5
D Berat wadah 10.2 10.1 9.9 9.8 9.9 10.2
E Berat Air 6.1 6.5 6.8 7.0 3.3 3.0
F Berat tanah kering 25.8 26.4 26.4 25.7 16.5 16.3
E
G Kadar air = x 100%
F 23.6 24.6 25.8 27.2 20.0 18.4

Kontraktor Konsultan Bina Marga

(………………………….) (………………………….) (………………………….)


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
WARU – SIDOARJO – KRIAN

PEMERIKSAAN BATAS - BATAS ATTERBERG

Tanggal : 11 April 2020 Kontraktor : CV.Mitra Utama


Jenis Campuran : Agregat S Konsultan : PT.Krida Pratama Adhicipta.Kso

PUKULAN KADAR AIR Liquid Limit LL (%) 25.3


37 23.40 Plastic Limit PL (%) 19.0
30 24.42 Plastic Index PI (%) 6.3
22 25.76
14 27.24

28.0
KADAR AIR (%)

27.0

26.0

25.0

24.0

23.0

22.0
10 15 20 25 30 35 40
BANYAKNYA PUKULAN

Liquid limit Plastic limit


A Banyaknya ketukan 37 30 22 14
B Berat wadah + tanah basah 42.9 42.2 43.3 41.3 30.7 28.5
C Berat wadah + tanah kering 36.7 35.9 36.5 34.6 27.4 25.6
D Berat wadah 10.2 10.1 10.1 10.0 10.1 10.3
E Berat Air 6.2 6.3 6.8 6.7 3.3 2.9
F Berat tanah kering 26.5 25.8 26.4 24.6 17.3 15.3
E
G Kadar air = x 100%
F 23.4 24.4 25.8 27.2 19.1 19.0

Kontraktor Konsultan Bina Marga

(………………………….) (………………………….) (………………………….)


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO

ANALISA PEMBAGIAN BUTIRAN


SK. SNI. M - 08 - 1989 - F
Pekerjaan : Preservasi Jalan
Probolinggo - Paiton - Situbondo Tanggal : 10 April 2020
Sumber Material : Pasuruan Dan Mojokerto dikerjakan : CV.Mitra Utama
Konstruksi : Agregat S diperiksa : PT.Krida Pratama Adhicipta.Kso
Ukuran Berat Komulatif
Saringan Tertahan
masing² Berat % % Spesifikasi
ASTM mm saringan Tetahan Tertahan Lolos
( gram ) ( gram )
2'' 50.8 - - -
1½'' 38.1 0 0 100 100
1'' 25.4 740 14.9 85.1 77-89
3/4'' 19.0 - - -
1/2'' 12.7 - - -
3/8'' 9.5 2,166 43.6 56.4 41-66
#4 4.76 2,802 56.4 43.6 26-54
#8 2.38 - - -
#10 2.00 3,618 72.8 27.2 15-42
# 16 1.19 - - -
# 40 0.42 4,241 85.4 14.6 7-26
# 50 0.279 - - -
# 100 0.149 - - -
# 200 0.074 4,565 91.9 8.1 4-16
pan
Berat seluruh contoh 4,968 Gram

100

90

80

70
Test Agregat S

60

50

40 Limit Spek
Agregat S
30

20

10

0 #200 #40 #10 #4 3/8" 1" 1,5"

Kontraktor Konsultan Bina marga


`

( …………………………. ) ( …………………………. ) ( …………………………. )


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO

ANALISA PEMBAGIAN BUTIRAN


SK. SNI. M - 08 - 1989 - F
Pekerjaan : Preservasi Jalan
Probolinggo - Paiton - Situbondo Tanggal : 10 April 2020
Sumber Material : Pasuruan Dan Mojokerto dikerjakan : CV.Mitra Utama
Konstruksi : Agregat S diperiksa : PT.Krida Pratama Adhicipta.Kso
Ukuran Berat Komulatif
Saringan Tertahan
masing² Berat % % Spesifikasi
ASTM mm saringan Tetahan Tertahan Lolos
( gram ) ( gram )
2'' 50.8 - - -
1½'' 38.1 0 0 100 100
1'' 25.4 802 15.2 84.8 77-89
3/4'' 19.0 - - -
1/2'' 12.7 - - -
3/8'' 9.5 2,315 43.9 56.1 41-66
#4 4.76 3,006 57.0 43.0 26-54
#8 2.38 - - -
#10 2.00 3,799 72.0 28.0 15-42
# 16 1.19 - - -
# 40 0.42 4,482 85.0 15.0 7-26
# 50 0.279 - - -
# 100 0.149 - - -
# 200 0.074 4,866 92.3 7.7 4-16
pan
Berat seluruh contoh 5,274 Gram

100

90

80

70
Test Agregat S

60

50

40 Limit Spek
Agregat S
30

20

10

0 #200 #40 #10 #4 3/8" 1" 1,5"

Kontraktor Konsultan Bina marga


`

( …………………………. ) ( …………………………. ) ( …………………………. )


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO

ANALISA PEMBAGIAN BUTIRAN


SK. SNI. M - 08 - 1989 - F
Pekerjaan : Preservasi Jalan
Probolinggo - Paiton - Situbondo Tanggal : 10 April 2020
Sumber Material : Pasuruan Dan Mojokerto dikerjakan : CV.Mitra Utama
Konstruksi : Agregat S diperiksa : PT.Krida Pratama Adhicipta.Kso
Ukuran Berat Komulatif
Saringan Tertahan
masing² Berat % % Spesifikasi
ASTM mm saringan Tetahan Tertahan Lolos
( gram ) ( gram )
2'' 50.8 - - -
1½'' 38.1 0 0 100 100
1'' 25.4 935 15.4 84.6 77-89
3/4'' 19.0 - - -
1/2'' 12.7 - - -
3/8'' 9.5 2,648 43.6 56.4 41-66
#4 4.76 3,415 56.2 43.8 26-54
#8 2.38 - - -
#10 2.00 4,314 71.0 29.0 15-42
# 16 1.19 - - -
# 40 0.42 5,111 84.1 15.9 7-26
# 50 0.279 - - -
# 100 0.149 - - -
# 200 0.074 5,555 91.4 8.6 4-16
pan
Berat seluruh contoh 6,075 Gram

100

90

80

70
Test Agregat S

60

50

40 Limit Spek
Agregat S
30

20

10

0 #200 #40 #10 #4 3/8" 1" 1,5"

Kontraktor Konsultan Bina marga


`

( …………………………. ) ( …………………………. ) ( …………………………. )


PELAKSANAAN JALAN NASIONAL
PPK 1.1 PROVINSI JAWA TIMUR
PRESERVASI JALAN
PROBOLINGG0 - PAITON - SITUBONDO

ANALISA PEMBAGIAN BUTIRAN


SK. SNI. M - 08 - 1989 - F
Pekerjaan : Preservasi Jalan
Probolinggo - Paiton - Situbondo Tanggal : 10 April 2020
Sumber Material : Pasuruan Dan Mojokerto dikerjakan : CV.Mitra Utama
Konstruksi : Agregat S diperiksa : PT.Krida Pratama Adhicipta.Kso
Ukuran Berat Komulatif
Saringan Tertahan
masing² Berat % % Spesifikasi
ASTM mm saringan Tetahan Tertahan Lolos
( gram ) ( gram )
2'' 50.8 - - -
1½'' 38.1 0 0 100 100
1'' 25.4 788 14.6 85.4 77-89
3/4'' 19.0 - - -
1/2'' 12.7 - - -
3/8'' 9.5 2,455 45.5 54.5 41-66
#4 4.76 3,024 56.0 44.0 26-54
#8 2.38 - - -
#10 2.00 3,825 70.9 29.1 15-42
# 16 1.19 - - -
# 40 0.42 4,577 84.8 15.2 7-26
# 50 0.279 - - -
# 100 0.149 - - -
# 200 0.074 4,965 92.0 8.0 4-16
pan
Berat seluruh contoh 5,398 Gram

100

90

80

70
Test Agregat S

60

50

40 Limit Spek
Agregat S
30

20

10

0 #200 #40 #10 #4 3/8" 1" 1,5"

Kontraktor Konsultan Bina marga


`

( …………………………. ) ( …………………………. ) ( …………………………. )

Anda mungkin juga menyukai