Anda di halaman 1dari 44

Oktober 2019

Daftar Isi
• Plan Profile Overpass
• Flowchart prosedur lifting
• Pemadatan area kerja
• Peralatan yang digunakan
• Aksesoris peralatan yang digunakan
• Job Safety Analysis
• Metode Pekerjaan
• Dokumentasi
Plan Profil
FLOWCHART PROSEDUR LIFTING

START

Identifikasi Peralatan OK
Check Point Operasional
Pengangkatan 3 Pengangkatan

NOT-OK

NOT-OK
Review Lifting
Kondisi SAFE
Plan
PRE LIFTING
STOP
NOT-OK OK

Check Point - Instalasi Lifting Penempatan


COMPLETED JOB
1 Material/ Positioning
GEAR

OK OK
NOT OK
Check Point Check Point OK Release Sling
2 4 Gear
PERSIAPAN

NOT-OK
GENERAL DIMENSION
LOAD CHART CRANE
AKSESORIES / KELENGKAPAN ERECTION

LIFTING GEAR

SHACKLE

WELDING

TRAFO LAS KEDOK LAS


SARUNG TANGAN
LAS
AKSESORIES / KELENGKAPAN ERECTION

PERALATAN SAFETY

HELM SAFETY BODY HARNESS SEPATU SAFETY VEST SAFETY SARUNG TANGAN

ALAT KOMUNIKASI

HANDY TALKY
9
JOB SAFETY ANALYSIS
JOB SAFETY ANALYSIS
JOB SAFETY ANALYSIS
JOB SAFETY ANALYSIS
SURAT IZIN LAYAK OPERASI (SILO)
SURAT IZIN OPERATOR (SIO)
SERTIFIKAT KOMPETENSI PERSONIL
PROSES ERECTION A1-P1 & P2-A2 (BENTANG 16.6m)
LIFTING PLAN ERECTION PC-I GIRDER BENTANG 16,60m

Caps : 150 Ton


Panjang boom : 33 M

Berat Total Girder 16.78 ton


PC-I Girder Bentang 16.6 m
Hook Crane
Girder : 16,78 Ton
W ire Sling 2" x 10 meter = 32 Ton (2Pcs) : 0,5 Ton
W ire Sling 1" x 8 meter = 8 Ton (2Pcs) 0,1 Ton
Hook Block : 2,2 Ton
Sling Ø 1.5"
Spreader beam : 1,4 Ton
Shackle
Spreader Total : 20,98 Ton

Sling 1” Sling
Webbing Max Radius : 16 M
Caps Loadchart : 36,5 Ton
Caps Caps Usage : 100%
PC-I Girder 16,60 m
350 Berat 10,8 Ton Konv ersi pengunaan alat % x36,5 Ton : 36,5
Safety Factor : 1,74

Wire Sling Ø1,5 "

1250
Berat 1/2 Girder : 8,39 Ton
Tinggi Girder : 1,25 M
Lebar Girder : 0,65 M
Goni Kain Kapasitas Sling :
650 18 Ton
Safety Factor : 2,15
Metode kerja
Metode kerja
Metode kerja
Metode kerja
Metode kerja
Metode kerja
Metode kerja
Metode kerja
Metode kerja
Metode kerja
Metode kerja
Metode kerja
PROSES BRACING GIRDER
PEMASANGAN BRACING

1. Girder pertama yang sudah di letakan


diatas bearing pad, di bracing dengan
besi dia. 32 ke angkur jembatan sebagai
penahan. Pengikatan besi dengan di las.
2. Pengikatan girder selanjutnya dilakukan
dengan cara yang sama ditambah
dengan bracing tengah antara girder
sejumlah 4 batang. Pengikatan ke besi
stek girder dengan di las.
PROSES ERECTION P1-P2 (BENTANG 40 m)
LIFTING PLAN ERECTION PC-I GIRDER BENTANG 40.8 m

45800
40000
3000 3000

Caps : 150 Ton Caps : 150 Ton


CRANE CONFIGURATION 2
PanjangSumitomo
boom LS 248-5 RH : 33 M PanjangCRANE
boomCONFIGURATION 2
Sumitomo SC 1500
: 33 M
Sumitomo LS 248-5 RH
Sumitomo LS 248-5 RH
KAPASITAS
Berat total girder bentang 45,8 m CAPS
Berat total girder bentang 45,8 m: : 150.00
150 Ton
TON
PANJANG BOOM
PANJANG BOOM :: 27.43
27.43 M
M
PCI Girder 46,5 PCI Girder 46,5
BERAT TOTAL GIRDER BENTANG 40.8 M BERAT TOTALGIRDER
BERAT TOTAL GIRDERBENTANG
BENTANG 40.8
45.8 MM
PCI Girder = 93 ton/2 = 46.5 ton PCI PCI Girder
PC-IGIRDER
GIRDER = 80
== 106,66
93 ton/2
Ton/2==40
Ton/2 : tonTon
53.33 46.50 Ton
Girder : 46,5 Ton Girder : 46,5 Ton
40 Ton
Wire Sling 2" x 10 (32 Ton) 1 Pcs : 0,5 Ton Berat
Wire Sling 2"Total
GIRDER x 10 (32 Ton) 1 Pcs : 53.33 : 0,5 Ton
0.35TONTon
Hook Block : 2,2 Ton Hook BlockGIRDER
PCI
WIRE SLING 2" x 15 (2pc) :: 46.50 Ton
2.2:TON
0.35 Ton 2,2 Ton
WIRE
HOOKSLING
BLOCK2" x 15 (2pc) :: 0.35
2.2 Ton
TON
42.55 Ton
HOOK
TOTAL BLOCK :: 2.20
55.88 TonTON
Total : 49,2 Ton Total Total : :9 mtr
49.05 Ton 49,2 Ton
MAX RADIUS : 9 MTon
82.1
Maximal Radius
CAPS LOADCHART :: 9.00 80M
82.2 TON
Max Radius : 8M Max Radius
KAPASITASLoad
Kapasitas CRANE SESUAI
Chart ::
:% %
67.98 Ton
82.10
8M
Caps Loadchart : 83,8 Ton Caps Loadchart
RADIUS ANGKAT
Kapasitas Kcrane&sesuai
BOOM 1.54: 83,8 Ton
: 80.00 %
Caps Caps Usage : 100% Caps Caps Usage
Safety
Radius Factor
Angakt Dan Boom : 1.47 : 100%
Konversi Pengunaan alat % x 83,8 Ton : 83,8 KonversiSafety
Pengunaan
Factor alat % x 83,8
: Ton 1.34 : 83,8
Safety Factor : 1,70 Safety Factor : 1,70
PENGGUNAAN SAFETY LOCK / JAWARA PADA SAAT PENGANGKATAN GIRDER

Sling Angkat

Jawara/Safety lock

PC-I Girder

Gambar : Pemasangan Sling ke Jawara / Safety Lock


Metode kerja
Metode kerja
Metode kerja
Metode kerja
Metode kerja
PEMASANGAN BRACING

1. Girder pertama yang sudah di letakan


diatas bearing pad, di bracing dengan
besi dia. 32 ke angkur jembatan sebagai
penahan. Pengikatan besi dengan di las.
2. Pengikatan girder selanjutnya dilakukan
dengan cara yang sama ditambah
dengan bracing tengah antara girder
sejumlah 4 batang. Pengikatan ke besi
stek girder dengan di las.
3. Di setiap ujung atara girder di pasang
balok kayu 5/7 agar tidak terjadi
pergeseran.
METHODE PELAKSANAAN
METHODE PELAKSANAAN
TERIMA KASIH