I UMUM - - - - - - - -
II DRAINASE - - - - - - - -
IV PEKERJAAN PREVENTIF - - - - - - - -
VI PERKERASAN ASPAL - - - - - - - -
VII STRUKTUR - - - - - - - -
X.1 PEKERJAAN PEMELIHARAAN KINERJA 3,987,204,500.00 100.00 3,987,204,500.00 100.000 3,987,204,500.00 100.000 1,993,602,250.00 50.014
A JUMLAH HARGA PEKERJAAN 3,987,204,500.00 100.00 3,987,204,500.00 100.000 3,987,204,500.00 100.000 1,993,602,250.00 50.014
Terbilang : Lima Puluh Satu Juta Tiga Ratus Lima Puluh Satu Ribu Dua Ratus Tiga Puluh Dua Rupiah
KONTRAK AWAL ADDENDUM NO. 2 ADDENDUM NO. 3 ADDENDUM NO. 3 SAMPAI BULAN LALU BULAN INI SAMPAI BULAN INI
HARGA SATUAN
DIV URAIAN SATUAN
(Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOL (%) VOL (%) VOL (%) VOL (%) VOL (%) VOL (%) VOL (%)
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
DIV. I UMUM
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Bh 291,000.00 - - - - - - - - -
Sub Total - - - - - - - - - - - - - -
KONTRAK AWAL SAMPAI BULAN LALU BULAN INI SAMPAI BULAN INI
HARGA
DIV. URAIAN SATUAN
SATUAN (Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOL (%) VOL (%) VOL (%) VOL (%)
(Rp) (Rp) (Rp) (Rp)
DIV. II DRAINASE
Sub Total - - - - - - - -
KONTRAK AWAL SAMPAI BULAN LALU BULAN INI SAMPAI BULAN INI
HARGA
DIV. URAIAN SATUAN
SATUAN (Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOL (%) VOL (%) VOL (%) VOL (%)
(Rp) (Rp) (Rp) (Rp)
Sub Total - - - - - - - -
KONTRAK AWAL SAMPAI BULAN LALU BULAN INI SAMPAI BULAN INI
HARGA SATUAN
DIV. URAIAN SATUAN
(Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOL (%) VOL (%) VOL (%) VOL (%)
(Rp) (Rp) (Rp) (Rp)
4.7.(2) Lapis Tipis Beton Aspal - B Halus (LTBA-B Halus) Ton 1,164,200.00 - - - - - -
Sub Total - - - - - - - -
KONTRAK AWAL SAMPAI BULAN LALU BULAN INI SAMPAI BULAN INI
HARGA
DIV. URAIAN SATUAN
SATUAN (Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOL (%) VOL (%) VOL (%) VOL (%)
(Rp) (Rp) (Rp) (Rp)
Sub Total - - - - - - - -
KONTRAK AWAL SAMPAI BULAN LALU BULAN INI SAMPAI BULAN INI
HARGA
DIV. URAIAN SATUAN
SATUAN (Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOL (%) VOL (%) VOL (%) VOL (%)
(Rp) (Rp) (Rp) (Rp)
Sub Total - - - - - - - -
KONTRAK AWAL SAMPAI BULAN LALU BULAN INI SAMPAI BULAN INI
HARGA
DIV. URAIAN SATUAN
SATUAN (Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOL (%) VOL (%) VOL (%) VOL (%)
(Rp) (Rp) (Rp) (Rp)
Sub Total - - - - - - - -
KONTRAK AWAL ADDENDUM NO. 2 ADDENDUM NO. 3 ADDENDUM NO. 3 SAMPAI BULAN LALU BULAN INI SAMPAI BULAN INI
HARGA
DIV. URAIAN SATUAN
SATUAN (Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOL JUMLAH HARGA (Rp) (%) VOL (%) VOL (%) VOL (%) VOL (%) VOL (%) VOL (%)
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
8.3.(2a) Pengecetan dekoratif pada elemen struktur beton, tebal : 100 μm M2 98,400.00 - - - - - - - - -
8.7.(1b) Pengecatan struktur baja pada daerah kering tebal 240 mikron M2 108,700.00 - - - - - - - - -
Sub Total - - - - - - - - - - - - - -
KONTRAK AWAL SAMPAI BULAN LALU BULAN INI SAMPAI BULAN INI
HARGA
DIV. URAIAN SATUAN
SATUAN (Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOL (%) VOL (%) VOL (%) VOL (%)
(Rp) (Rp) (Rp) (Rp)
Sub Total - - - - - - - -
KONTRAK AWAL ADDENDUM NO. 2 ADDENDUM NO. 3 SAMPAI BULAN LALU BULAN INI SAMPAI BULAN INI
DIV. URAIAN SAT HARGA SATUAN (Rp)
JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOL (%) VOL (%) VOL (%) VOL (%) VOL (%) VOL (%)
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
10.2.(2) Pemeliharaan Rutin Jembatan S. RAY 2 Ls 39,895,300.00 1.00 39,895,300.00 1.001 1.00 39,895,300.00 1.001 1.00 39,895,300.00 1.001 0.500 19,947,650.00 0.501 - - - 0.500 19,947,650.00 0.501
10.2.(3) Pemeliharaan Rutin Jembatan HANDIL PANDAN Ls 21,284,400.00 1.00 21,284,400.00 0.534 1.00 21,284,400.00 0.534 1.00 21,284,400.00 0.534 0.500 10,642,200.00 0.267 - - - 0.500 10,642,200.00 0.267
10.2.(4) Pemeliharaan Rutin Jembatan HANDIL PARE Ls 22,297,900.00 1.00 22,297,900.00 0.559 1.00 22,297,900.00 0.559 1.00 22,297,900.00 0.559 0.500 11,148,950.00 0.280 - - - 0.500 11,148,950.00 0.280
10.2.(5) Pemeliharaan Rutin Jembatan HANDIL LAMPIHONG Ls 41,334,900.00 1.00 41,334,900.00 1.037 1.00 41,334,900.00 1.037 1.00 41,334,900.00 1.037 0.500 20,667,450.00 0.519 - - - 0.500 20,667,450.00 0.519
10.2.(6) Pemeliharaan Rutin Jembatan S. ANTASAN RAYA Ls 20,270,700.00 1.00 20,270,700.00 0.508 1.00 20,270,700.00 0.508 1.00 20,270,700.00 0.508 0.500 10,135,350.00 0.254 - - - 0.500 10,135,350.00 0.254
10.2.(7) Pemeliharaan Rutin Jembatan S. TATAH GURU Ls 20,270,700.00 1.00 20,270,700.00 0.508 1.00 20,270,700.00 0.508 1.00 20,270,700.00 0.508 0.500 10,135,350.00 0.254 - - - 0.500 10,135,350.00 0.254
10.2.(8) Pemeliharaan Rutin Jembatan S. RAY 17 Ls 51,617,100.00 1.00 51,617,100.00 1.295 1.00 51,617,100.00 1.295 1.00 51,617,100.00 1.295 0.500 25,808,550.00 0.648 - - - 0.500 25,808,550.00 0.648
10.2.(9) Pemeliharaan Rutin Jembatan S. BARITO Ls 2,220,974,100.00 1.00 2,220,974,100.00 55.699 1.00 2,220,974,100.00 55.699 1.00 2,220,974,100.00 55.699 0.333 740,324,700.00 18.566 0.167 370,162,350.00 9.284 0.500 1,110,487,050.00 27.850
10.2.(10) Pemeliharaan Rutin Jembatan BC.BARITO IV Ls 20,667,500.00 1.00 20,667,500.00 0.518 1.00 20,667,500.00 0.518 1.00 20,667,500.00 0.518 0.500 10,333,750.00 0.259 - - - 0.500 10,333,750.00 0.259
10.2.(11) Pemeliharaan Rutin Jembatan BC.BARITO V Ls 21,592,800.00 1.00 21,592,800.00 0.542 1.00 21,592,800.00 0.542 1.00 21,592,800.00 0.542 0.500 10,796,400.00 0.271 - - - 0.500 10,796,400.00 0.271
10.2.(12) Pemeliharaan Rutin Jembatan HANDIL DARHAM Ls 43,817,300.00 1.00 43,817,300.00 1.099 1.00 43,817,300.00 1.099 1.00 43,817,300.00 1.099 0.500 21,908,650.00 0.550 - - - 0.500 21,908,650.00 0.550
10.2.(13) Pemeliharaan Rutin Jembatan HANDIL DAHLAN Ls 21,387,200.00 1.00 21,387,200.00 0.536 1.00 21,387,200.00 0.536 1.00 21,387,200.00 0.536 0.500 10,693,600.00 0.268 - - - 0.500 10,693,600.00 0.268
10.2.(14) Pemeliharaan Rutin Jembatan HANDIL ULIS Ls 16,730,700.00 1.00 16,730,700.00 0.420 1.00 16,730,700.00 0.420 1.00 16,730,700.00 0.420 0.333 5,571,323.10 0.140 0.167 2,794,026.90 0.070 0.500 8,365,350.00 0.210
10.2.(15) Pemeliharaan Rutin Jembatan HANDIL BARUNAI Ls 16,804,200.00 1.00 16,804,200.00 0.421 1.00 16,804,200.00 0.421 1.00 16,804,200.00 0.421 0.333 5,595,798.60 0.140 0.167 2,806,301.40 0.071 0.500 8,402,100.00 0.211
10.2.(16) Pemeliharaan Rutin Jembatan HANDIL TURA Ls 25,911,400.00 1.00 25,911,400.00 0.650 1.00 25,911,400.00 0.650 1.00 25,911,400.00 0.650 0.333 8,628,496.20 0.216 0.167 4,327,203.80 0.109 0.500 12,955,700.00 0.325
10.2.(17) Pemeliharaan Rutin Jembatan HANDIL AIRMAS Ls 18,243,800.00 1.00 18,243,800.00 0.458 1.00 18,243,800.00 0.458 1.00 18,243,800.00 0.458 0.333 6,075,185.40 0.153 0.167 3,046,714.60 0.076 0.500 9,121,900.00 0.229
10.2.(18) Pemeliharaan Rutin Jembatan HANDIL SELUANG I Ls 18,243,800.00 1.00 18,243,800.00 0.458 1.00 18,243,800.00 0.458 1.00 18,243,800.00 0.458 0.333 6,075,185.40 0.153 0.167 3,046,714.60 0.076 0.500 9,121,900.00 0.229
10.2.(19) Pemeliharaan Rutin Jembatan HANDIL MESJID PAL Ls 18,243,800.00 1.00 18,243,800.00 0.458 1.00 18,243,800.00 0.458 1.00 18,243,800.00 0.458 0.333 6,075,185.40 0.153 0.167 3,046,714.60 0.076 0.500 9,121,900.00 0.229
10.2.(20) Pemeliharaan Rutin Jembatan HANDIL PENGHULU Ls 18,243,800.00 1.00 18,243,800.00 0.458 1.00 18,243,800.00 0.458 1.00 18,243,800.00 0.458 0.333 6,075,185.40 0.153 0.167 3,046,714.60 0.076 0.500 9,121,900.00 0.229
10.2.(21) Pemeliharaan Rutin Jembatan HANDIL UBAK Ls 18,243,800.00 1.00 18,243,800.00 0.458 1.00 18,243,800.00 0.458 1.00 18,243,800.00 0.458 0.333 6,075,185.40 0.153 0.167 3,046,714.60 0.076 0.500 9,121,900.00 0.229
10.2.(22) Pemeliharaan Rutin Jembatan S. LIANG ANGGANG I Ls 26,440,100.00 1.00 26,440,100.00 0.663 1.00 26,440,100.00 0.663 1.00 26,440,100.00 0.663 0.500 13,220,050.00 0.332 - - - 0.500 13,220,050.00 0.332
10.2.(23) Pemeliharaan Rutin Jembatan S. LIANG ANGGANG II Ls 15,687,900.00 1.00 15,687,900.00 0.393 1.00 15,687,900.00 0.393 1.00 15,687,900.00 0.393 0.500 7,843,950.00 0.197 - - - 0.500 7,843,950.00 0.197
10.2.(24) Pemeliharaan Rutin Jembatan S. LIANG ANGGANG III Ls 24,207,500.00 1.00 24,207,500.00 0.607 1.00 24,207,500.00 0.607 1.00 24,207,500.00 0.607 0.500 12,103,750.00 0.304 - - - 0.500 12,103,750.00 0.304
10.2.(25) Pemeliharaan Rutin Jembatan S. BATI BATI Ls 52,395,700.00 1.00 52,395,700.00 1.314 1.00 52,395,700.00 1.314 1.00 52,395,700.00 1.314 0.500 26,197,850.00 0.657 - - - 0.500 26,197,850.00 0.657
10.2.(26) Pemeliharaan Rutin Jembatan S. UJUNG GALAM Ls 52,395,700.00 1.00 52,395,700.00 1.314 1.00 52,395,700.00 1.314 1.00 52,395,700.00 1.314 0.500 26,197,850.00 0.657 - - - 0.500 26,197,850.00 0.657
10.2.(27) Pemeliharaan Rutin Jembatan S. SAMPA IRENG Ls 52,395,700.00 1.00 52,395,700.00 1.314 1.00 52,395,700.00 1.314 1.00 52,395,700.00 1.314 0.500 26,197,850.00 0.657 - - - 0.500 26,197,850.00 0.657
10.2.(28) Pemeliharaan Rutin Jembatan S. BATANG BANYU II Ls 23,972,400.00 1.00 23,972,400.00 0.601 1.00 23,972,400.00 0.601 1.00 23,972,400.00 0.601 0.500 11,986,200.00 0.301 - - - 0.500 11,986,200.00 0.301
10.2.(29) Pemeliharaan Rutin Jembatan S. BATANG BANYU III Ls 24,330,800.00 1.00 24,330,800.00 0.610 1.00 24,330,800.00 0.610 1.00 24,330,800.00 0.610 0.500 12,165,400.00 0.305 - - - 0.500 12,165,400.00 0.305
10.2.(30) Pemeliharaan Rutin Jembatan S. BATANG BANYU V Ls 16,863,000.00 1.00 16,863,000.00 0.423 1.00 16,863,000.00 0.423 1.00 16,863,000.00 0.423 0.500 8,431,500.00 0.212 - - - 0.500 8,431,500.00 0.212
10.2.(31) Pemeliharaan Rutin Jembatan S. PULAU SARI Ls 21,963,000.00 1.00 21,963,000.00 0.551 1.00 21,963,000.00 0.551 1.00 21,963,000.00 0.551 0.500 10,981,500.00 0.276 - - - 0.500 10,981,500.00 0.276
10.2.(32) Pemeliharaan Rutin Jembatan S. DANDANG I Ls 20,118,100.00 1.00 20,118,100.00 0.505 1.00 20,118,100.00 0.505 1.00 20,118,100.00 0.505 0.500 10,059,050.00 0.253 - - - 0.500 10,059,050.00 0.253
10.2.(33) Pemeliharaan Rutin Jembatan S. DANDANG II Ls 19,803,700.00 1.00 19,803,700.00 0.497 1.00 19,803,700.00 0.497 1.00 19,803,700.00 0.497 0.500 9,901,850.00 0.249 - - - 0.500 9,901,850.00 0.249
10.2.(34) Pemeliharaan Rutin Jembatan S. TAMBANGULANG Ls 26,410,800.00 1.00 26,410,800.00 0.662 1.00 26,410,800.00 0.662 1.00 26,410,800.00 0.662 0.500 13,205,400.00 0.331 - - - 0.500 13,205,400.00 0.331
10.2.(35) Pemeliharaan Rutin Jembatan S. BARU Ls 27,021,900.00 1.00 27,021,900.00 0.678 1.00 27,021,900.00 0.678 1.00 27,021,900.00 0.678 0.500 13,510,950.00 0.339 - - - 0.500 13,510,950.00 0.339
10.2.(37) Pemeliharaan Rutin Jembatan S. BAMBAN I Ls 22,209,700.00 1.00 22,209,700.00 0.557 1.00 22,209,700.00 0.557 1.00 22,209,700.00 0.557 0.500 11,104,850.00 0.279 - - - 0.500 11,104,850.00 0.279
10.2.(39) Pemeliharaan Rutin Jembatan S. ANGSAU Ls 20,306,000.00 1.00 20,306,000.00 0.509 1.00 20,306,000.00 0.509 1.00 20,306,000.00 0.509 0.500 10,153,000.00 0.255 - - - 0.500 10,153,000.00 0.255
10.2.(40) Pemeliharaan Rutin Jembatan S. PARING Ls 22,209,700.00 1.00 22,209,700.00 0.557 1.00 22,209,700.00 0.557 1.00 22,209,700.00 0.557 0.500 11,104,850.00 0.279 - - - 0.500 11,104,850.00 0.279
10.2.(41) Pemeliharaan Rutin Jembatan S. GUNTUNG MANGGARUNG Ls 16,216,600.00 1.00 16,216,600.00 0.407 1.00 16,216,600.00 0.407 1.00 16,216,600.00 0.407 0.500 8,108,300.00 0.204 - - - 0.500 8,108,300.00 0.204
10.2.(42) Pemeliharaan Rutin Jembatan S. TAJAU PECAH Ls 55,371,700.00 1.00 55,371,700.00 1.389 1.00 55,371,700.00 1.389 1.00 55,371,700.00 1.389 0.500 27,685,850.00 0.695 - - - 0.500 27,685,850.00 0.695
10.2.(43) Pemeliharaan Rutin Jembatan S. KARANG PUTIH Ls 31,728,200.00 1.00 31,728,200.00 0.796 1.00 31,728,200.00 0.796 1.00 31,728,200.00 0.796 0.500 15,864,100.00 0.398 - - - 0.500 15,864,100.00 0.398
10.2.(44) Pemeliharaan Rutin Jembatan S. BUNUT Ls 78,897,400.00 1.00 78,897,400.00 1.979 1.00 78,897,400.00 1.979 1.00 78,897,400.00 1.979 0.500 39,448,700.00 0.990 - - - 0.500 39,448,700.00 0.990
10.2.(45) Pemeliharaan Rutin Jembatan S. BAULIN Ls 91,377,200.00 1.00 91,377,200.00 2.292 1.00 91,377,200.00 2.292 1.00 91,377,200.00 2.292 0.500 45,688,600.00 1.146 - - - 0.500 45,688,600.00 1.146
10.2.(46) Pemeliharaan Rutin Jembatan BC JORONG I Ls 22,491,700.00 1.00 22,491,700.00 0.564 1.00 22,491,700.00 0.564 1.00 22,491,700.00 0.564 0.500 11,245,850.00 0.282 - - - 0.500 11,245,850.00 0.282
10.2.(47) Pemeliharaan Rutin Jembatan S. SAWARANGAN Ls 87,146,800.00 1.00 87,146,800.00 2.186 1.00 87,146,800.00 2.186 1.00 87,146,800.00 2.186 0.500 43,573,400.00 1.093 - - - 0.500 43,573,400.00 1.093
10.2.(48) Pemeliharaan Rutin Jembatan S. PARING JORONG Ls 27,909,000.00 1.00 27,909,000.00 0.700 1.00 27,909,000.00 0.700 1.00 27,909,000.00 0.700 0.500 13,954,500.00 0.350 - - - 0.500 13,954,500.00 0.350
10.2.(49) Pemeliharaan Rutin Jembatan BC. JORONG III Ls 22,374,200.00 1.00 22,374,200.00 0.561 1.00 22,374,200.00 0.561 1.00 22,374,200.00 0.561 0.500 11,187,100.00 0.281 - - - 0.500 11,187,100.00 0.281
10.2.(50) Pemeliharaan Rutin Jembatan BC. JORONG IV Ls 21,651,600.00 1.00 21,651,600.00 0.543 1.00 21,651,600.00 0.543 1.00 21,651,600.00 0.543 0.500 10,825,800.00 0.272 - - - 0.500 10,825,800.00 0.272
10.2.(51) Pemeliharaan Rutin Jembatan S. PULANTAN Ls 26,822,000.00 1.00 26,822,000.00 0.673 1.00 26,822,000.00 0.673 1.00 26,822,000.00 0.673 0.500 13,411,000.00 0.337 - - - 0.500 13,411,000.00 0.337
10.2.(52) Pemeliharaan Rutin Jembatan UND. BARUTAMA Ls 91,659,200.00 1.00 91,659,200.00 2.299 1.00 91,659,200.00 2.299 1.00 91,659,200.00 2.299 0.500 45,829,600.00 1.150 - - - 0.500 45,829,600.00 1.150
10.2.(53) Pemeliharaan Rutin Jembatan S. PONDOK BIAWAK Ls 32,433,300.00 1.00 32,433,300.00 0.813 1.00 32,433,300.00 0.813 1.00 32,433,300.00 0.813 0.500 16,216,650.00 0.407 - - - 0.500 16,216,650.00 0.407
10.2.(54) Pemeliharaan Rutin Jembatan S. LUKBUAYA Ls 31,581,300.00 1.00 31,581,300.00 0.792 1.00 31,581,300.00 0.792 1.00 31,581,300.00 0.792 0.500 15,790,650.00 0.396 - - - 0.500 15,790,650.00 0.396
10.2.(55) Pemeliharaan Rutin Jembatan S. LALANG II Ls 18,943,000.00 1.00 18,943,000.00 0.475 1.00 18,943,000.00 0.475 1.00 18,943,000.00 0.475 0.500 9,471,500.00 0.238 - - - 0.500 9,471,500.00 0.238
10.2.(56) Pemeliharaan Rutin Jembatan S. SOGUR Ls 51,102,900.00 1.00 51,102,900.00 1.282 1.00 51,102,900.00 1.282 1.00 51,102,900.00 1.282 0.500 25,551,450.00 0.641 - - - 0.500 25,551,450.00 0.641
10.2.(57) Pemeliharaan Rutin Jembatan S. PARIT A Ls 34,242,900.00 1.00 34,242,900.00 0.859 1.00 34,242,900.00 0.859 1.00 34,242,900.00 0.859 0.500 17,121,450.00 0.430 - - - 0.500 17,121,450.00 0.430
10.2.(58) Pemeliharaan Rutin Jembatan S. PARIT B Ls 49,354,900.00 1.00 49,354,900.00 1.238 1.00 49,354,900.00 1.238 1.00 49,354,900.00 1.238 0.500 24,677,450.00 0.619 - - - 0.500 24,677,450.00 0.619
10.2.(59) Pemeliharaan Rutin Jembatan S. BERANGAS Ls 31,093,700.00 - - - 1.00 31,093,700.00 0.780 1.00 31,093,700.00 0.780 0.333 10,354,202.10 0.260 0.167 5,192,647.90 0.130 0.500 15,546,850.00 0.390
Sub Total 3,987,204,500.00 100.00 3,987,204,500.00 100.00 3,987,204,500.00 100.00 1,593,086,147.00 39.970 400,516,103.00 10.044 1,993,602,250.00 50.014
2 Rp 6,835,245.82
3 Rp 6,835,245.82
4 Rp 6,835,245.82
5 Rp 6,835,245.82
6 Rp 6,835,245.82
7 Rp 6,835,245.82
8 Rp 6,835,245.82
9 Rp 6,835,245.82
10 Rp 6,835,245.82
11 Rp 6,835,245.82
12 Rp 6,835,245.82
TOTAL Rp 6,835,245.82