Anda di halaman 1dari 57

PROGRAM :

KEGIATAN :
ABUPATEN :
PROPINSI :
LOKASI :
SUMBER DANA :
TAHUN ANGGARAN :

NO URAIAN PEKERJAAN

I DIVISI 1 - UMUM
II DIVISI 2 - DRAINASE
III DIVISI 3 - PEKERJAAN TANAH & GEOSINTETIK
IV DIVISI 4 - PEKERJAAN PREVENTIF
V DIVISI 5 - PERKERASAN BERBUTIR
VI DIVISI 6 - PERKERASAN ASPAL
VII DIVISI 7 - STRUKTUR
VIII DIVISI 8 - REHAB JEMBATAN
IX DIVISI 9 - PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
X DIVISI 10 - PEKERJAAN PEMELIHARAAN KINERJA

A. JUMLAH HARGA PEKERJAAN ( termasuk Biaya Umum dan Keuntungan )


B. PAJAK PERTAMBAHAN NILAI (PPN) 11 % = 11% X (A)
C. TOTAL BIAYA PEKERJAAN KONTRUKSI = (A) + (B)
D. DIBULATKAN

Terbilang
PENYELENGGARAAN JALAN
PENANGANAN LONG SEGMENT (PEMELIHARAAN RUTIN, PEMELIHARAAN BERKALA, PENINGKATAN/REKONSTRUKSI) RUAS JAL
KARANGANYAR
JAWA TENGAH
KECAMATAN JUMANTONO
DAK 2024
2024

URAIAN PEKERJAAN

AAN TANAH & GEOSINTETIK


AAN PREVENTIF
ASAN BERBUTIR
ASAN ASPAL

AAN HARIAN & PEKERJAAN LAIN-LAIN


JAAN PEMELIHARAAN KINERJA

PEKERJAAN ( termasuk Biaya Umum dan Keuntungan )


AHAN NILAI (PPN) 11 % = 11% X (A)
KERJAAN KONTRUKSI = (A) + (B)
UKSI) RUAS JALAN JUMANTONO - MATESIH, KEC. JUMANTONO

JUMLAH HARGA (Rp) TKDN JUMLAH BIAYA TKDN

-
-
-

-
-
-
PROGRAM : PENYELENGGARAAN JALAN
KEGIATAN : PENANGANAN LONG SEGMENT (PEMELIHARAAN RUTIN, PEMELIHARAAN BE
ABUPATEN : KARANGANYAR
PROPINSI : JAWA TENGAH
LOKASI : KECAMATAN JUMANTONO
SUMBER DANA : DAK 2024
TAHUN ANGGARAN : 2024

No. Mata
NO URAIAN PEKERJAAN
Pembayaran

I DIVISI 1 - UMUM
1.2 Mobilisasi
1 1.2 Mobilisasi

SKh-1.1.22 Sistem Manajemen Keselamatan Konstruksi


1 Penyiapan dokumen penerapan SMKK
SKh-1.1.22.(1a) Pembuatan dokumen RKK, RMPK, RKPPL, dan RMLLP
SKh-1.1.22.(1b) Pembuatan Prosedur dan Instruksi Kerja

2 Sosialisasi dan Promosi Dan Pelatihan:


SKh-1.1.22.(2g) Spanduk (Banner)
SKh-1.1.22.(2h) Poster / Leaflet
SKh-1.1.22.(2i) Papan Informasi Keselamatan Konstruksi

3 Alat Pelindung Kerja dan Alat Pelindung Diri


3a APK
SKh-1.1.22.(3a5) Pembatas area (Restricted Area)
3b
APD
SKh-1.1.22.(3b1) Topi pelindung (Safety Helmet)
SKh-1.1.22.(3b6) Pelindung pernafasan dan mulut (masker, masker respirator)
SKh-1.1.22.(3b7) Sarung tangan (Safety Gloves)
SKh-1.1.22.(3b8) Sepatu keselamatan (Safety Shoes, rubber safety shoes and toe cap)
SKh-1.1.22.(3b11) Rompi keselamatan (Safety Vest)

4 Asuransi dan Perizinan terkait Keselamatan Konstruksi


SKh-1.1.22.(4a) Asuransi ( Contruksion All Risk/ CAR )
5 Personel Keselamatan Konstruksi
SKh-1.1.22.(5c) Petugas Keselamatan Konstruksi, Petugas K3 Konstruksi

6 Fasilitas sarana, prasarana, dan alat kesehatan


SKh-1.1.22.(6a) Peralatan P3K

7 Rambu dan Perlengkapan lalu lintas yang diperlukan atau manajemen lalu lintas
SKh-1.1.22.(7a) Rambu petunjuk
SKh-1.1.22.(7b) Rambu larangan
SKh-1.1.22.(7c) Rambu peringatan
SKh-1.1.22.(7e) Rambu informasi
SKh-1.1.22.(7i) Tongkat pengatur lalu lintas (Warning Lights Stick)
SKh-1.1.22.(7m) Lampu/alat penerangan sementara

8 Konsultasi dengan Ahli terkait Keselamatan Konstruksi

9 Kegiatan dan peralatan terkait Pengendalian Risiko Keselamatan Konstruksi


SKh-1.1.22.(9a4) Bendera K3
SKh-1.1.22.(9c) Pengujian Baku Mutu Udara Ambien Lengkap
SKh-1.1.22.(9d2) Pengujian tingkat getaran kendaraan bermotor

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa

II DIVISI 2 - DRAINASE

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa

III DIVISI 3 - PEKERJAAN TANAH & GEOSINTETIK


1 3.1.(1) Galian Biasa
2 3.1.(8) Galian Perkerasan Beraspal Tanpa Cold Milling Machine
3 3.2.(1a) Timbunan Biasa dari sumber galian

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa

IV DIVISI 4 - PEKERJAAN PREVENTIF

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa

V DIVISI 5 - PERKERASAN BERBUTIR


1 5.1.(1) Lapis Pondasi Agregat Kelas A
2 5.3.(2.a) Perkerasan Beton Semen dengan Tulangan Wiremesh M.8
3 5.3.(3) Lapis Pondasi bawah Beton Kurus

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa
VI DIVISI 6 - PERKERASAN ASPAL
1 6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi
2 6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi
3 6.3(5a) Laston Lapis Aus (AC-WC)
4 6.3(6a) Laston Lapis Antara (AC-BC)

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa

VII DIVISI 7 - STRUKTUR UTAMA


1 7.1 (8) Beton , fc’15 Mpa
2 7.9.(1) Pasangan Batu

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa

VIII DIVISI 8 - REHAB JEMBATAN

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa

IX DIVISI 9 - PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


1 9.2.(1) Marka Jalan Termoplastik
2 9.2.(5) Patok Pengarah

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa

X DIVISI 10 - PEKERJAAN PEMELIHARAAN KINERJA


MENT (PEMELIHARAAN RUTIN, PEMELIHARAAN BERKALA, PENINGKATAN/REKONSTRUKSI) RUAS JALAN JUMANTONO - MATESIH, KEC. JUM

URAIAN PEKERJAAN

, RKPPL, dan RMLLP

(masker, masker respirator)

es, rubber safety shoes and toe cap)

selamatan Konstruksi
Petugas K3 Konstruksi

lat kesehatan

tas yang diperlukan atau manajemen lalu lintas

rning Lights Stick)

selamatan Konstruksi

engendalian Risiko Keselamatan Konstruksi

bien Lengkap
aan bermotor

(masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

(masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

GEOSINTETIK

a Cold Milling Machine

(masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

(masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Tulangan Wiremesh M.8

(masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)


(masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

(masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

(masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

PEKERJAAN LAIN-LAIN

(masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

ARAAN KINERJA
NSTRUKSI) RUAS JALAN JUMANTONO - MATESIH, KEC. JUMANTONO

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) TKDN (%)

-
-

-
-
-

-
-
-
-
-

-
-

-
-
-
-
-
-

-
-
-

- -
- -
- -

- -
- -
- -

-
- -
- -
- -
- -

- -
- -

- -
- -

-
JUMLAH KDN (Rp)
3.1.(1) 1 m3 Galian Tanah Biasa

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Mandor L.04

B. BAHAN

C. PERLATAN
1 Excavator E.10
2 Dump Truck E.09

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

3.1.(8) 1 m3 Galian Perkerasan Beraspal tanpa Cold Milling Machine

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Mandor L.04

B. BAHAN

C. PERLATAN
1 Concrete Cutter E.76
2 Jack Hammer E.26
3 Compresor E.05
4 Dump Truck E.09
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

3.2.(1a) 1 m3 Timbunan Biasa Dari Sumber Galian

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Mandor L.04

B. BAHAN
1 Bahan Timbunan M.08

C. PERLATAN
1 Excavator E.10
2 Dump Truck E.09
3 Motor Grader E.13
4 Sheepfoot Roller
5 Tandem Roller E.17
6 Water Tank Truck E.23
Alat Bantu

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

5.1.(1) 1 m3 Lapis Fondasi Agregat Kelas A

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Mandor L.04

B. BAHAN
1 Agregat A M.26

C. PERLATAN
1 Wheel Loader E.15
2 Dump Truck E.09
3 Motor Grader E.13
4 Vibratory Roller E.19

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

5.3.(2a) 1 m3 Perkerasan Beton Semen dengan Tulangan Wiremesh M.8

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Mandor L.04

B. BAHAN
1 Semen M.12
2 Pasir M.01a
3 Agregat Kasar M.03
4 Air M.170
5 Plasticizer M.171
6 Baja Tulangan Polos M.13
7 Wiremesh M.8 M.258
8 Joint Sealent M.94
9 Cat Anti Karat M.95
10 Pipa PVC Dia 1 1/5 "
11 Polytene 125 mikron M.97
12 Curing Compound M.98
13 Formwork Plate M.195

C. PERLATAN
1 Wheel Loader E.15
2 Concrete Mixing Plant E.43
3 Truck Mixer Agitator E.49
4 Concrete Vibrator (for manual) E.20
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

5.3.(3) 1 m3 Lapis Pondasi Bawah Beton Kurus

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Mandor L.04

B. BAHAN
1 Semen M.12
2 Pasir M.01a
3 Agregat Kasar M.03
4 Air M.170
5 Plasticizer M.171

C. PERLATAN
1 Wheel Loader E.15
2 Dump Truck E.09
3 Motor Grader E.13
4 Vibratory Roller E.19

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

6.1.(1) 1 Liter Lapis Resap Perekat - Aspal Cair/Emulsi

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Mandor L.04

B. BAHAN
1 Aspal Emulasi CSS-1 atau SS-1 M.31a

C. PERLATAN
1 Asp. Distributor E.41
2 Compressor E.05

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

6.1.(2a) 1 Liter Lapis Resap Pengikat - Aspal Cair/Emulsi

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Mandor L.04

B. BAHAN
1 Aspal Emulasi CSS-1 atau SS-1 M.31a

C. PERLATAN
1 Asp. Distributor E.41
2 Compressor E.05

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

6.3.(5a) 1 Ton Laston Lapis Aus (AC-WC)

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Mandor L.04
B. BAHAN
1 Agr Pch Mesin 5-10 & 10-15 M.92
2 Agr Pch Mesin 0 - 5 M.91
3 Semen M.12
4 Aspal M.10

C. PERLATAN
1 Wheel Loader E.41
2 AMP E.01
3 Genset E.12
4 Dump Truck E.09
5 Asp. Finisher E.02
6 Tandem Roller E.17a
7 P. Tyre Roller E.18

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

6.3.(6a) 1 Ton Laston Lapis Antara (AC-WC)

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Mandor L.04

B. BAHAN
1 Agr Pch Mesin 5-10 & 10-15 M.92
2 Agr Pch Mesin 0 - 5 M.91
3 Semen M.12
4 Aspal M.10

C. PERLATAN
1 Wheel Loader E.41
2 AMP E.01
3 Genset E.12
4 Dump Truck E.09
5 Asp. Finisher E.02
6 Tandem Roller E.17a
7 P. Tyre Roller E.18
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

7.1.(8) 1 m3 Beton struktur fc’ 15 Mpa

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Tukang L.02
3 Mandor L.04

B. BAHAN
1 Semen M.12
2 Pasir Beton M.01a
3 Agregat Kasar M.03
4 Air M.170
5 Sewa Acuan Beton
6 Plastik Alas Beton

C. PERLATAN
1 Concrete Mixer E.06
2 Concrete Vibrator E.20
3 Water Tank Truck E.23
4 Alat Bantu

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

7.9.(1) 1 m3 Pasangan Batu

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Tukang L.02
3 Mandor L.04

B. BAHAN
1 Batu Kali M.02
2 Semen ( PC ) M.12
3 Pasir M.01b

C. PERLATAN
1 Concrete Mixer E.06
2 Water Tank Truck E.23

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

9.2.(1) 1 m2 Marka Jalan Termoplastik

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Tukang L.02
3 Mandor L.04

B. BAHAN
1 Cat Marka Thermoplastic M.17b
2 Glass Bead M.34

C. PERLATAN
1 Dump Truck E.08
2 Thermoplastic Road Marking Machine E.85

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

9.2.(5) 1 Buah Patok Pengarah

NO KOMPONEN KODE
NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Tukang L.02
3 Mandor L.04

B. BAHAN
1 Beton fc 20 Mpa M.186
2 Baja Tulangan M.57a

C. PERLATAN
1 Dump Truck E.08

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

7.1.(7a) 1 m3 Beton Struktur f'c 20 Mpa

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Tukang L.02
3 Mandor L.04

B. BAHAN
1 Semen M.12
2 Pasir Beton M.01a
3 Agregat Kasar M.03
4 Air M.170

C. PERLATAN
1 Concrete Mixing Plant E.43
2 Truck Mixer E.49
3 Concrete Vibrator E.20
4 Water Tank Truck E.23
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

2.3.(36) 1 m' Pemasangan Box Culvert 800 x 800 x 1200

NO KOMPONEN KODE

A. Tenaga
1 Pekerja L.01
2 Tukang L.02
3 Mandor L.04

B. BAHAN
1 Box Culvert LD 800 x 800 x 1200

C. PERLATAN
1 Exsavator
2 Truck Mixer

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 0.044 - -
OH 0.0294 - -
JUMLAH -

JUMLAH

Jam 0.0147 - -
Jam 0.0671 - -
JUMLAH -

ERALATAN -
11% x D -
-

Milling Machine

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 3.984 - -
OH 1.992 - -
JUMLAH -

JUMLAH

Jam 0.1785 -
Jam 0.5020 - -
Jam 0.5020 - -
Jam 0.2567 - -
JUMLAH -

ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 0.0489 - -
OH 0.0122 - -
JUMLAH -

m3 1.200 - -
JUMLAH -

Jam 0.0000 -
Jam 0.0000 -
Jam 0.0000 -
0.0024 -
Jam 0.0004 - -
Jam 0.007 - -
Ls 1.0000 -
JUMLAH -

ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 0.0974 - -
OH 0.0097 - -
JUMLAH -
m3 1.195 - -
JUMLAH -

Jam 0.0081 - -
Jam 0.2704 - -
Jam 0.0009 - -
Jam 0.0097 - -
JUMLAH -

ERALATAN -
11% x D -
-

gan Wiremesh M.8

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 0.0974 - -
OH 0.0097 - -
JUMLAH -

Kg 458.350 - -
m3 0.4736 - -
m3 0.654 - -
Ltr 166.860 - -
m3 1.375 - -
Kg 10.864 - -
Kg 25.900 - -
Kg 0.990 - -
Kg 0.020 - -
m 1.080 -
Kg 0.328 - -
Ltr 0.653 - -
m2 0.400 - -
JUMLAH -

Jam 0.0081 - -
Jam 0.2704 - -
Jam 0.0009 - -
Jam 0.0097 - -
JUMLAH -
ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 0.0803 - -
OH 0.0321 - -
JUMLAH -

Kg 233.810 - -
m3 0.600 - -
m3 0.925 - -
Ltr 163.770 - -
Kg 0.000 - -
JUMLAH -

Jam 0.0071 - -
Jam 0.0161 - -
Jam 0.1580 - -
Jam 0.0964 - -
JUMLAH -

ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 0.0016 - -
OH 0.0008 - -
JUMLAH -
Ltr 1.214 - -
JUMLAH -

Jam 0.0002 - -
Jam 0.0010 - -
JUMLAH -

ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 0.0029 - -
OH 0.0015 - -
JUMLAH -

Ltr 1.200 - -
JUMLAH -

Jam 0.0002 - -
Jam 0.0015 - -
JUMLAH -

ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 0.2008 - -
OH 0.0201 - -
JUMLAH -
m3 0.319 - -
m3 0.415 - -
Kg 9.270 - -
Kg 70.040 - -
JUMLAH -

Jam 0.0564 - -
Jam 0.0201 - -
Jam 0.0201 - -
Jam 0.1667 - -
Jam 0.0126 - -
Jam 0.0128 - -
Jam 0.0084 - -
JUMLAH -

ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 0.2008 - -
OH 0.0201 - -
JUMLAH -

m3 0.369 - -
m3 0.370 - -
Kg 9.682 - -
Kg 60.564 - -
JUMLAH -

Jam 0.0638 - -
Jam 0.0201 - -
Jam 0.0201 - -
Jam 0.3658 - -
Jam 0.0084 - -
Jam 0.0085 - -
Jam 0.0056 - -
JUMLAH -

ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 1.7671 - -
OH 1.1044 - -
OH 0.2209 - -
JUMLAH -

Kg 263.680 - -
m3 0.649 - -
m3 0.778 - -
Ltr 190.550 - -
m 2.376 - -
m2 10.692 - -
JUMLAH -

Jam 0.2209 - -
Jam 0.2209 - -
Jam 0.0382 - -
Ls 1.0000 -
JUMLAH -

ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 9.5855 - -
OH 4.4025 - -
OH 0.4403 - -
JUMLAH -

m3 1.073 - -
Kg 104.000 - -
m3 0.499 - -
JUMLAH -

Jam 0.4403 - -
Jam 0.0100 - -
JUMLAH -

ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 0.1428 - -
OH 0.0178 - -
OH 0.0178 - -
JUMLAH -

m3 2.132 - -
Kg 0.464 - -
JUMLAH -

Jam 0.0178 - -
Jam 0.0178 -
JUMLAH -

ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN
SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 1.000 - -
OH 0.1333 - -
OH 0.0667 - -
JUMLAH -

m3 0.035 - -
Kg 1.825 - -
JUMLAH -

Jam 0.0667 - -
JUMLAH -

ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 0.386 - -
OH 0.241 - -
OH 0.0482 - -
JUMLAH -

Kg 275.010 - -
m3 0.634 - -
m3 0.792 - -
Ltr 190.550 - -
JUMLAH -

Jam 0.0482 - -
Jam 0.1986 - -
Jam 0.2892 - -
Jam 0.0318 - -
JUMLAH -
ERALATAN -
11% x D -
-

SAT KOEF HARGA SATUAN (Rp) JUMLAH HARGA (Rp) NILAI TKDN

OH 2.008 - -
OH 0.4016 -
OH 0.2008 -
JUMLAH -

m 0.833 -
JUMLAH -

Jam 0.2008 -
Ls 1.0000 -
JUMLAH -

ERALATAN -
11% x D -
-
JUMLAH BIAYA
KETERANGAN
KDN

JUMLAH BIAYA
KETERANGAN
KDN
JUMLAH BIAYA
KETERANGAN
KDN

JUMLAH BIAYA
KETERANGAN
KDN
JUMLAH BIAYA
KETERANGAN
KDN
JUMLAH BIAYA
KETERANGAN
KDN

JUMLAH BIAYA
KETERANGAN
KDN
JUMLAH BIAYA
KETERANGAN
KDN

JUMLAH BIAYA
KETERANGAN
KDN
JUMLAH BIAYA
KETERANGAN
KDN
JUMLAH BIAYA
KETERANGAN
KDN

JUMLAH BIAYA
KETERANGAN
KDN
JUMLAH BIAYA
KETERANGAN
KDN

JUMLAH BIAYA
KETERANGAN
KDN
JUMLAH BIAYA
KETERANGAN
KDN

JUMLAH BIAYA
KETERANGAN
KDN
JUMLAH BIAYA
KETERANGAN
KDN
NO URAIAN

1 2
1 Pasir Pasang (Sedang)
2 Pasir Beton (Kasar)
3 Batu Kali
4 Agregat Pecah Kasar
5 Bahan Tanah Timbunan
6 Aspal
7 Semen / PC (kg)
8 Semen / PC (curah)
9 Besi Beton
10 Cat Marka (Thermoplastic)
11 Agr. Kelas A (analisis)
12 Glass Bead
13 Baja Tulangan
14 Agregat Pecah Mesin 0-5 mm
15 Agregat Pecah Mesin 5-10 & 10-20 mm
16 Joint Sealent
17 Cat Anti Karat
18 Polytene 125 mikron
19 Curing Compound
20 Aspal Emulsi CSS-1 atau SS-1
21 Air
22 Super plastiziser, maks 0,3 % Sm
23 Beton Struktur fc' 20 MPa
24 Perancah/ formwoks
25 Anyaman Kawat Baja Dilas
26 Sewa acuan beton untuk perkerasan jalan
27 Plastik alas beton
TKDN
HARGA SATUAN
KODE SATUAN KETERANGAN
(Rp) NILAI
3 4 5 6 7
M01b m3 Base Camp
M01a m3 Base Camp
M02 m3 Lokasi Pekerjaan
M03 m3 Base Camp
M08 m3 Lokasi Pekerjaan
M10 Kg Base Camp
M12 Kg
M12 Kg
M13 Kg Lokasi Pekerjaan
M17b Kg Lokasi Pekerjaan
M26 m3 Base Camp
M34 Kg Lokasi Pekerjaan
M57a Kg Lokasi Pekerjaan
M91 m3
M92 m3
M94 Kg
M95 Kg
M97 Kg
M98 Ltr
M31a Liter Base Camp
M170 Liter
M171 Kg
M186 m3
M195 m2
M258 Kg
m
m2
TKDN

KETERANGAN
8
NO JENIS ALAT KODE SATUAN

B. PERALATAN

1 ASPHALT MIXING PLANT E01 Unit


2 ASPHALT FINISHER E02 Unit
3 POWER BROOM E03 Unit
4 BULLDOZER 100-150 HP E04 Unit
5 COMPRESSOR 4000-6500 L\M E05 Unit
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit
7 CRANE 10-15 TON E07 Unit
8 DUMP TRUCK 3 - 4 M3 E08 Unit
9 DUMP TRUCK 6-8 M3 E09 Unit
10 EXCAVATOR 80-140 HP E10 Unit
11 FLAT BED TRUCK 3-4 TON E11 Unit
12 GENERATOR SET E12 Unit
13 MOTOR GRADER >100 HP E13 Unit
14 TRACK LOADER 75-100 HP E14 Unit
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit
16 THREE WHEEL ROLLER 6-8 T E16 Unit
17 TANDEM ROLLER 6-8 T. E17 Unit
18 TIRE ROLLER 8-10 T. E18 Unit
19 VIBRATORY ROLLER 5-8 T. E19 Unit
20 CONCRETE VIBRATOR E20 Unit
21 STONE CRUSHER E21 Unit
22 WATER PUMP 70-100 mm E22 Unit
23 WATER TANKER 3000-4500 L. E23 Unit
24 PEDESTRIAN ROLLER E24 Unit
25 TAMPER E25 Unit
26 JACK HAMMER E26 Unit
27 FULVI MIXER E27 Unit
28 CONCRETE PUMP E28 Unit
29 TRAILER 20 TON E29 Unit
30 PILE DRIVER + HAMMER E30 Unit
31 CRANE ON TRACK 35 TON E31 Unit
32 WELDING SET E32 Unit
33 BORE PILE MACHINE E33 Unit
34 ASPHALT LIQUID MIXER E34 Unit
35 TRONTON 15 TON E35 Unit
36 COLD MILLING MACHINE E36 Unit
37 ROCK DRILL BREAKER E37 Unit
38 COLD RECYCLER E38 Unit
39 HOT RECYCLER E39 Unit
40 AGGREGAT (CHIP) SPREADER E40 Unit
41 ASPHALT DISTRIBUTOR E41 Unit
42 SLIP FORM PAVER E42 Unit
43 CONCRETE PAN MIXER E43 Unit
44 CONCRETE BREAKER E44 Unit
45 ASPAHLT TANKER E45 Unit
46 CEMENT TANKER E46 Unit
47 CONCRETE MIXER (350) E47 Unit
48 VIBRATING RAMMER E48 Unit
49 TRUK MIXER (AGITATOR) E49 Unit
50 BORE PILE MACHINE E50 Unit
51 CRANE ON TRACK 75-100 TON E51 Unit
VOL HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1
1

1
1

1
1

1
HARGA SATUAN
NO URAIAN KODE SATUAN
(Rp)

1. Pekerja L.01 OH
2. Tukang L.02 OH
3. Mandor L.03 OH
4. Operator L.04 OH
5. Pembantu Operator L.05 OH
6. Sopir / Driver L.06 OH
7. Pembantu Sopir / Driver L.07 OH
8. Mekanik L.08 OH
9. Pembantu Mekanik L.09 OH
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK

NO URAIAN

A. Sewa Tanah

B. PERALATAN
Periksa lembar 1.2-2

C. Kantor Lapangan dan Fasilitas


1 Sewa Base Camp dan Kantor
2 Sewa Kantor
3 Sewa Barak
4 Sewa Bengkel dan Gudang
5 Sewa Gudang, dan lain-lain
6 Sewa Kendaraan Operasional

D. MOBILISASI FASILITAS LABORATORIUM


1 Ruang Laboratorium (sesuai Gambar)

2 Soil & Aggregate Testing


Compaction Test
CBR Test
Specific Gravity
Atterberg Limits
Grain Size Analysis
Field Density Test by Sand Cone Methode
Moisture Content
Abrasion of Aggregate by Los Angeles Machine

3 Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor

4 Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine

5 Pendukung (Periksa Fasilitas Laboratorium)


6 Operasional (Periksa Fasilitas Laboratorium)

E. MOBILISASI PERSONIL
E.I. Personil Sesuai Struktur Organisasi
E.II. Personi Lainnya

F. Manajemen dan Keselamatan lalu lintas

G. DEMOBILISASI

Total Biaya Mobilisasi


=

HARGA SATUAN JUMLAH HARGA


SATUAN VOLUME
(Rp) (Rp)

M2

Ls 1.00

....

set 1.00

eles Machine
sive Strength

ilitas Laboratorium)
ilitas Laboratorium)

LS

LS

LS 1.00

Total Biaya Mobilisasi