PETA LOKASI
DATA PROYEK
IMB : 503.4/0105/1220/KPPT/2011
TAWARAN KERJASAMA
NO OF YTD TOTAL
NO NAME OF HOTEL ROOM YTD OCC YTD ROOM REV YTD FB REV REVENUE
Trans Luxury
1 Hotel 280 54,70% 82.938.753.000 60.492.635.000 143.431.388.000
Sheraton
3 Bandung 156 56,00% 41.451.800.000 19.896.864.000 61.348.664.000