Anda di halaman 1dari 9

SPESIFIKASI TEKNIS

BELANJA JASA KEGIATAN EXPO BUTON TENGAH


TAHUN ANGGARAN 2022

PEMERINTAH/INSTANSI : KABUPATEN BUTON TENGAH

UNIT ORGANISASI : DINAS PENANAMAN MODAL DAN


PELAYANAN TERPADU SATU PINTU
KABUPATEN BUTON TENGAH

PROGRAM : PROGRAM PROMOSI PENANAMAN


MODAL

KEGIATAN : PENYELENGGARAAN PROMOSI


PENANAMAN MODAL YANG MENJADI
KEWENANGAN DAERAH
KABUPATEN/KOTA

SUB KEGIATAN : PELAKSANAAN KEGIATAN PROMOSI


PENANAMAN MODAL DAERAH
KABUPATEN/KOTA

NAMA PEKERJAAN : BELANJA JASA KEGIATAN EXPO


BUTON TENGAH

PEMERINTAH/INSTANSI : KABUPATEN BUTON TENGAH


SPESIFIKASI TEKNIS

A. Ruang Lingkup Kegiatan


Adapun ruang lingkup kegiatan Buteng Expo memiliki kegiatan berupa :
1. Pameran hasil dan capaian pembangunan
2. Pameran hasil kerja UMKM se-Buton Tengah
3. Penampilan Kesenian dan Budaya Daerah
4. Festival Ramadhan :
 Kuliner & jajanan ramadhan
 Pentas seni & musik religi
 Lomba adzan
 Lomba tahfidz alqur'an
 Lomba mewarnai

Pekerjaan dibagi dalam 2 (dua) kegiatan mini expo yang dilaksanakan di 6 (enam)
kecamatan antara lain: Kecamatan dan event puncak yang berada di salah satu lokasi
kecamatan.

B. Waktu Pelaksanaan
Kegiatan Buteng Expo direncanakan akan dilaksanakan pada bulan April 2022
sampai dengan Mei 2022, yang pelaksanaannya dilakukan sebanyak 30 (tiga
puluh) hari kalender yang dilaksanakan secara bergilir pada 7 kecamatan yang ada
di Kabupaten Buton Tengah.

C. Lokasi Pekerjaan

Lokasi pekerjaan sebagai berikut:


1. Kecamatan Gu
2. Kecamatan Lakudo
3. Kecamatan Sangiawambulu
4. Kecamatan Mawasangka
5. Kecamatan Mawasangka Timur
6. Kecamatan Mawasangkat Tengah
7. Kecamatan Talaga Raya
D. Persyaratan Teknis
I. Expo & Safari Ramadhan 6 (enam) Kecamatan

1) Persyaratan Peralatan dan Bahan


Expo & Safari Ramadhan 6 (Enam) Kecamatan antara lain: Kecamatan Talaga,
Mawasangka Tengah, Mawasangka Timur, Sangiawambulu, GU, dan Lakudo
Adapun persyaratan peralatan dan bahan sebagai berikut:

a. Panggung Utama (Riging)


 Bahan dari besi holo
 Ukuran Panjang = 8 m, Lebar = 4 m, Tinggi= 0,75 m
 Riging Screen Ukuran
 Riging Sound System/ Gerbang Sound System
 Terpal dan Atap Riging

b. Tenda VIP
 Tenda Kerucut Sarnavil Ukur 5x5 M sebanyak 5 (lima) unit

c. Tenda Expo UMKM


 Tenda Sarnavil Ukuran 5 x 5 M = 4 (empat) unit

d. Gate
 Ukuran 4 x 3 M sebanyak 1 unit
 Design motif religius
e. Foto Booth
 Ukuran 3 x 2,4 M

f. Umbul-umbul
 Ukuran 270 x 40 sebanyak 20 Unit (6 Kecamatan/ Expo Mini)
 Design Umbul-umbul bercorak merah dan hitam

g. Promosi
 Memasukkan dalam media cetak dan sosial media
 Design Twibbon
 Backdrop Stand Expo (Ukuran 5 x 2,5 cm)
h. Sound System

 Speaker Passive Array =(10.000) Watt


 Speaker Passive Subwoofer = ( 5000 ) Watt
 Power Amplifier Sound System (12.000) Watt
 keyboard
 mic wireless = 2 pair
 Electrical Generator set= 12 KVA
i. Lighting

 Moving Beam 220 Watt = 2 Unit


 Parled 30 Watt = 6 Unit
 Mixer Ligthing =1 Unit
 Lampu Tarikan = 50M
 Electrical Generator set = 8 KVA

j. Multimedia

 Kamera Video FULLHD =1 UNIT


 Projector 3500 Lumens = 1 UNIT
 Mixer Video FULLHD = 1 UNIT
 Recorder Video FULLHD
 Wireless System

PANGGUNG UTAMA

STAND UMKM
STAND UMKM

V I P

STAND UMKM STAND UMKM

GATE

2) Rencana Denah Acara Expo 6 (Enam) Kecamatan


3) Rencana Round Down Kegiatan
RENCANA RUN DOWN KEGIATAN
KECAMATAN
WAKTU KEGIATAN
15. 00 BU PA TI/ TA M U VIP TIBA DI LOK A S I
15. 00- 15. 15 PEN A M PILA N LOC A L TA LLEN T
15. 15- 15. 20 PEM BU K AA N OLEH M C
15. 20- 15. 30 PEM BA C AA N A YA T-A YA T SU C I A LQU R 'A N
PEM BA C AA N DOA
15. 30- 15. 40 S AM BU TA N : CA MA T
15. 40- 15. 55 S AM BU TA N : BUP AT I BU TON TEN GA H/ YAN G
M EWA K ILI
15. 55- 16. 00 PER ES M IA N PEM BU KA A N EX PO OLEH BU PA TI
16. 00- 16. 15 K ON FER EN S I PERS
BUPATI BUTON TENGAH
SEKRETARIAT DAERAH KABUPATEN BUTON TENGAH
16. 15- 16. 45 VIS IT STA N D PA M ER AN & UM KM
16. 45- 17. 50 TA US IA H RA M A DHA N & DOA M EN UN GGU W AK TU
18. 05 BER BU KA
21. 25 BU K A PU AS A BER SA M A & S HOLA T BER J A MA A
21. 30- 22. 00 IST IRAH AT
22. 00 MC OPENING
HIBU R A N M US IK RELIGI
C LOS IN G

H ARI K E 2
15. 00
15. 00- 15. 15 PEM BU K AA N
15. 30 LOM BA TA HFIDZ A LQU R 'A N
17. 50 DOA M EN UN GGU W AK TU BER BU KA
21. 25 PEM BA GIA N TA K J IL & BU K A PU AS A BER S AM A
IS TIR A HA T
21. 30- 22. 00 M C OPEN IN G
22. 00 HIBU R A N M US IK RELIGI
C LOS S IN G

H ARI K E 3
15. 00 PEN A M PILA N LOK A L TA LLEN T
15. 00- 15. 15 PEM BU K AA N OLEH M C
15. 30 LOM BA A DZ A N & M EW A RN A I
17. 50 DOA M EN UN GGU W AK TU BER BU KA
21. 25 PEM BA GIA N TA K J IL & BU K A PU AS A BER S AM A
IS TIR A HA T
21. 30- 22. 00 M C OPEN IN G
22. 00 HIBU R A N M US IK RELIGI
C LOS S IN G

II. Expo Puncak


1) Persyaratan Peralatan dan Bahan
Expo Puncak Kabupaten Buton Tengah Tahun 2022 Kecamatan antara lain:
Kecamatan Mawasangka
Adapun persyaratan peralatan dan bahan sebagai berikut:
a. Panggung Utama (Riging)
 Bahan dari besi holo
 Ukuran Panjang = 10 m, Lebar = 8 m, Tinggi= 1 m
 Riging Screen
 Barikade sepanjang kurang lebih 200 M
 Riging Sound System/ Gerbang Sound System
 Terpal dan Atap Riging
 Floor Bridge = 30 M

b. Tenda VIP
 Tenda Kerucut Sarnavil Ukur 12x12 M sebanyak 1 (satu) unit

c. Tenda Expo UMKM


 Tenda Sarnavil Ukuran 5 x 5 M = 40 (empat puluh) unit

d. Gate
 Ukuran 4 x 3 M sebanyak 2 unit
 Design motif religius
e. Foto Booth
 Ukuran 3 x 2,4 M

f. Umbul-umbul
 Ukuran 270 x 40 sebanyak 100 Unit
 Design Umbul-umbul bercorak merah dan hitam

g. Promosi
 Memasukkan dalam media cetak dan sosial media
 Design Twibbon
 Backdrop Stand Expo (Ukuran 5 x 2,5 cm)
h. Sound System

 Speaker Passive Array = (20.000) Watt


 Speaker Passive Subwoofer = (10000 ) Watt
 Power Amplifier Sound System (30.000) Watt
 keyboard
 mic wireless = 2 pair
 Electrical Generator set= 80 KVA

i. Lighting
 Moving Beam 220 Watt = 8 Unit
 Parled 30 Watt 12 Unit
 Mixer Ligthing =1 Unit
 Lampu Tarikan = 100 M
 Electrical Generator set = 30 KVA

j. Multimedia

 Kamera Video FULLHD = 3 UNIT


 Projector 3500 Lumens = 2 UNIT
 Mixer Video FULLHD = 1 UNIT
 Recorder Video FULLHD
 Wireless System
2). Rencana Denah Acara Expo Puncak

PANGGUNG
UTAMA

VIP

AREA AREA
EXPO EXPO

GATE GATE
3). Rencana Round Down Kegiatan

RUN DOWN KEGIATAN


PUNCAK
H AR I K E 1
WAKTU KEGIATAN
09 .0 0 - SE LE SAI VAKSI N OPE N G ATE
14 .5 5 - 1 5 .0 0 OPE NING OLE H MC
15 .0 0 - 1 7 .2 0 LOM BA SE NAM KRE ASI
1 7 .2 0 ISTIR AH AT
19 .1 5 - 1 9 3 0 PE NAM PILAN LOCAL TALLE N T
19 .3 0 - 1 9 .4 0 PEM BUKAA N OLE H MC
19 .4 0 - 2 2 .3 0 LOM BA KAROKE ANTAR KE CAM ATAN
CLOSSI NG

H AR I K E 2
09 .0 0 - SE LE SAI VAKSI N OPE N G ATE
14 .5 5 - 1 5 .0 0 OPE NING OLE H MC
15 .0 0 - 1 7 .2 0 LOM BA SE NAM KRE ASI
1 7 .2 0 ISTIR AH AT
19 .1 5 - 1 9 3 0 PE NAM PILAN LOCAL TALLE N T
19 .3 0 - 1 9 .4 0 PEM BUKAA N OLE H MC
19 .4 0 - 2 2 .3 0 LOM BA KAROKE ANTAR KE CAM ATAN
CLOSSI NG

H AR I K E 3
15 .0 0 - 1 5 .3 0 OPE NING OLE H MC
15 .3 0 - 1 5 .4 5 PEM BACAA N AYAT- AYA T SUCI ALQ UR'AN
15 .4 5 - SE LE SAI TAUSI AH OLE H "USTAD KOND A NG "
1 9 .1 5 ISTIR AH AT
19 .3 0 - 1 9 .4 0 PEM BUKAA N OLE H MC
19 .4 0 - 2 0 .0 0 PEM BACAA N D OA
20 .0 0 - 2 0 .1 5 PEM UTARA N VIDE O PEM BANG UNA N BU TON
20 .1 5 - 2 0 .4 5 TE NG AH
20 .4 5 - 2 1 .0 0 LAPOR AN KE TUA PANITI A
21 .0 0 - 2 3 .0 0 PE NG UM UM AN JUARA & PE NYE RAH A N
2 3 .0 0 H AD IAH JUARA LOM BA OLE H BUPATI
SAM BUTA N : BUPATI BUTON TE NG AH
SE KALIG US M E NUTUP EVE NT E XPO
H IBURAN
CLOSI NG

Anda mungkin juga menyukai