ProyekPembangunan Pabrik Spun Pile PT. Jaya Beton Indonesia Plant Sadang
R= 685 ton
Efisiensi ef = 0.8
Factor of Safety FS = 3
Rpakai = 182.667 ton
Factor of Safety FS = 3
Rpakai = 72.78 ton
III Metode WIKA
Efisiensi ef = 0.8
Factor of Safety FS = 3
Rpakai = 172.917 ton