1 2 3
TOTAL 1,003,769,007.31
PPN 11% 110,414,590.80
TOTAL + PPN 11% 1,114,183,598.12
DIBULATKAN 1,114,100,000.00
Terbilang : Satu Milyar Seratus Empat Belas Juta Seratus Ribu Rupiah
### : #NAME?
### : #NAME?
### : #NAME?
### : #NAME?
### : #NAME?
### : #NAME?
### : #NAME?
### : #NAME?
1 2 3
P E K E R J A A N
7 Pasang Topi Beton Tiang 30/30/5 Ruang Lounge 1,800,000.00 0.18 0.18
E. PEKERJAAN LANTAI DAN DINDING
1 Urungan Tanah Ruang Lounge 1,808,500.00 0.18 0.18
2 Urungan Pasir Bawah Lantai Ruang Lounge 11,460,606.40 1.13 1.13
3 Urungan Pasir Bawah Lantai Toilet 393,067.20 0.04 0.04
4 Urungan Pasir Bawah Lantai Ruang Tunggu 2,990,393.60 0.30 0.30
5 Rabat Beton Bawah Lantai Toilet 1,849,399.63 0.18 0.18
6 Lantai Granite Ruang Lounge 60 x 60 Cm Polished Merk Ikad 67,584,239.66 6.67 3.34 3.34
7 Lantai Granite Ruang Tunggu 60 x 60 Cm Polished Merk Ikad 88,165,705.60 8.70
T E R I M A
1 Pasang Langit - langit Plafond PVC Bermotif + perangkat tambahan : 61,617,000.00 6.08 3.04 3.04
- Main Runner Hollow Meni 2/4
- Cross Runner Hollow Meni 2/4
- Suspension Rod/ Penggantung
2 Atap Spandek Kanopy + Rangka Hollow + Sling Baja + Accessories Terpasang 35,227,500.00 3.48 1.74 1.74
R E N C A N A
3 Atap Spandek Toilet + Rangka Baja Ringan + Accessories Terpasang 16,170,000.00 1.60 1.60
G. PEKERJAAN PINTU, JENDELA DAN VENTILASI
1 Pintu Type P1 16,800,000.00 1.66 1.66
Kosen Aluminium + Daun Pintu Kaca Rayband 8 mm + Accessories Lengkap Terpasang
2 Pintu Type P2 15,000,000.00 1.48 1.48
Kosen Aluminium + Daun Pintu Kaca Rayband 10 mm + Accessories Lengkap Terpasang
3 Pintu Type P3 10,800,000.00 1.07 1.07
Kosen Aluminium + Daun Pintu Kaca Rayband 8 mm + Accessories Lengkap Terpasang
4 Pintu Type P4 Sensor Otomatis 50,000,000.00 4.94 4.94 40%
Kosen Alumunium + Daun Pintu Kaca 12 mm + Accessories Lengkap Terpasang
5 Pintu Type P5 10,080,000.00 1.00 1.00
Kosen Aluminium + Daun Pintu Aluminium + Accessories Lengkap Terpasang
6 Pintu Type P6 4,500,000.00 0.44 0.44
Kosen Aluminium + Daun Pintu Kaca Bening 10 mm + Accessories Lengkap Terpasang
7 Pintu Jendela Type PJ 16,500,000.00 1.63 1.63
Kosen Aluminium + Daun Pintu Kaca Temperet 12 mm + Accessories Lengkap Terpasang
8 Jendela Type J1 21,000,000.00 2.07 2.07
Kosen Aluminium + Kaca Bening 8 mm + Accessories Lengkap Terpasang
9 Jendela Type J2 14,400,000.00 1.42 1.42
Kosen Aluminium + Kaca Bening 8 mm + Accessories Lengkap Terpasang
10 Jendela Type J3 25,200,000.00 2.49 2.49
Kosen Aluminium + Kaca Bening 8 mm dan 5 mm + Accessories Lengkap Terpasang
11 Jendela Type J4 11,400,000.00 1.13 1.13
Kosen Aluminium + Kaca Bening 8 mm dan 5 mm + Accessories Lengkap Terpasang
12 Jendela Type J5 2,250,000.00 0.22 0.22
Kosen Aluminium + Kaca Bening 8 mm dan 5 mm + Accessories Lengkap Terpasang 30%
TOTAL 10,660,000.00
ENGINEERING ESTIMATED
### : #NAME?
### : #NAME?
### : #NAME?
### : #NAME?
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)
### : #NAME?
### : #NAME?
### : #NAME?
### : #NAME?
1 2 3
### : ###
### : ###
### : ###
### : ###
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA HARGA SATUAN (Rp.)JUMLAH HARGA (Rp.)
### : #NAME?
### : #NAME?
### : #NAME?
### : #NAME?
KEGIATAN : #NAME?
PEKERJAAN : #NAME?
LOKASI : #NAME?
TAHUN : #NAME?
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)
A. 4.1.1.2 Membuat 1 m3 beton mutu f'c = 9.8 Mpa (K 125),slump (12 ± 2) cm, w/c = 0.78
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.65 88,000.00 145,200.00
Tukang batu L.02 OH 0.275 104,000.00 28,600.00
Kepala Tukang L.03 OH 0.028 138,000.00 3,864.00
Mandor L.04 OH 0.083 110,000.00 9,130.00
Jumlah Tenaga Kerja 186,794.00
B BAHAN
Semen Portland kg 276 1,540.00 425,040.00
Pasir Beton kg 828 113.93 94,332.86
Kerikil (Maks 30 mm) kg 1012 118.15 119,565.93
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan 660,438.78
C PERALATAN
A. 4.1.1.3 Membuat 1 m3 beton mutu f'c = 12.2 Mpa (K 150),slump (12 ± 2) cm, w/c = 0.72
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.65 88,000.00 145,200.00
Tukang batu L.02 OH 0.275 104,000.00 28,600.00
Kepala Tukang L.03 OH 0.028 138,000.00 3,864.00
Mandor L.04 OH 0.083 110,000.00 9,130.00
Jumlah Tenaga Kerja 186,794.00
B BAHAN
Semen Portland kg 299 1,540.00 460,460.00
Pasir Beton kg 799 113.93 91,028.93
Kerikil (Maks 30 mm) kg 1017 118.15 120,156.67
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan 693,145.60
C PERALATAN
A. 4.1.1.5 Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0.66
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.65 88,000.00 145,200.00
Tukang batu L.02 OH 0.275 104,000.00 28,600.00
Kepala Tukang L.03 OH 0.028 138,000.00 3,864.00
Mandor L.04 OH 0.083 110,000.00 9,130.00
Jumlah Tenaga Kerja 186,794.00
B BAHAN
Semen Portland kg 326 1,540.00 502,040.00
Pasir Beton kg 760 113.93 86,585.71
Kerikil (Maks 30 mm) kg 1029 118.15 121,574.44
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan 731,700.16
C PERALATAN
A. 4.1.1.6 Membuat 1 m3 beton mutu f'c = 16.9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0.61
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.65 88,000.00 145,200.00
Tukang batu L.02 OH 0.275 104,000.00 28,600.00
Kepala Tukang L.03 OH 0.028 138,000.00 3,864.00
Mandor L.04 OH 0.083 110,000.00 9,130.00
Jumlah Tenaga Kerja 186,794.00
B BAHAN
Semen Portland kg 352 1,540.00 542,080.00
Pasir Beton kg 731 113.93 83,281.79
Kerikil (Maks 30 mm) kg 1031 118.15 121,810.74
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan 768,672.53
C PERALATAN
A. 4.1.1.8 Membuat 1 m3 beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0.56
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.65 88,000.00 145,200.00
Tukang batu L.02 OH 0.275 104,000.00 28,600.00
Kepala Tukang L.03 OH 0.028 138,000.00 3,864.00
Mandor L.04 OH 0.083 110,000.00 9,130.00
Jumlah Tenaga Kerja 186,794.00
B BAHAN
Semen Portland kg 384 1,540.00 591,360.00
Pasir Beton kg 692 113.93 78,838.57
Batu Pecah 2-3 cm kg 1039 220.69 229,296.55
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan 920,995.12
C PERALATAN
A. 4.1.1.12 Membuat 1 m3 beton mutu f'c = 31.2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0.48
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 2.1 88,000.00 184,800.00
Tukang batu L.02 OH 0.35 104,000.00 36,400.00
Kepala Tukang L.03 OH 0.035 138,000.00 4,830.00
Mandor L.04 OH 0.105 110,000.00 11,550.00
Jumlah Tenaga Kerja 237,580.00
B BAHAN
Semen Portland kg 448 1,540.00 689,920.00
Pasir Beton kg 667 113.93 75,990.36
Batu Pecah 2-3 cm kg 1000 220.69 220,689.66
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan 1,008,100.01
C PERALATAN
A. 4.4.1.8 Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu campuran 1SP : 3PP
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.3 88,000.00 26,400.00
Tukang batu L.02 OH 0.1 104,000.00 10,400.00
Kepala Tukang L.03 OH 0.01 138,000.00 1,380.00
Mandor L.04 OH 0.015 110,000.00 1,650.00
Jumlah Tenaga Kerja 39,830.00
B BAHAN
Bata Merah bh 70 770.00 53,900.00
Semen Portland kg 14.37 1,540.00 22,129.80
Pasir Pasang m3 0.04 163,000.00 6,520.00
Jumlah Harga Bahan 82,549.80
C PERALATAN
A. 4.5.1.7 Pemasangan 1 m2 Langit-langit Gypsum Board ukuran (120 x 240) cm, tebal 9 mm
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1 88,000.00 8,800.00
Tukang Kayu L.02 OH 0.05 104,000.00 5,200.00
Kepala Tukang L.03 OH 0.005 138,000.00 690.00
Mandor L.04 OH 0.005 110,000.00 550.00
Jumlah Tenaga Kerja 15,240.00
B BAHAN
Gypsum Board 9 mm Lembar 0.464 54,302.00 25,196.13
Paku Skrup kg 0.11 23,500.00 2,585.00
Cotton Plaster bh 0.072 32,000.00 2,304.00
Compoun zak 0.0625 52,000.00 3,250.00
Jumlah Harga Bahan 33,335.13
C PERALATAN
A. 4.7.1.4 Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.07 88,000.00 6,160.00
Tukang Cat L.02 OH 0.009 104,000.00 936.00
Kepala Tukang L.03 OH 0.006 138,000.00 828.00
Mandor L.04 OH 0.003 110,000.00 330.00
Jumlah Tenaga Kerja 8,254.00
B BAHAN
Cat Menie kg 0.2 80,860.00 16,172.00
Plamur kg 0.15 16,536.00 2,480.40
Cat Dasar kg 0.17 37,320.00 6,344.40
Cat Penutup kg 0.26 106,500.00 27,690.00
Kuas Bh 0.01 15,000.00 150.00
Pengencer kg 0.03 37,320.00 1,119.60
Amplas Lbr 0.2 7,748.00 1,549.60
Jumlah Harga Bahan 55,506.00
C PERALATAN
A. 4.7.1.10 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.02 88,000.00 1,760.00
Tukang Cat L.02 OH 0.063 104,000.00 6,552.00
Kepala Tukang L.03 OH 0.0063 138,000.00 869.40
Mandor L.04 OH 0.003 110,000.00 330.00
Jumlah Tenaga Kerja 9,511.40
B BAHAN
Plamur kg 0.1 16,536.00 1,653.60
Cat Dasar kg 0.1 37,320.00 3,732.00
Cat Penutup kg 0.26 106,500.00 27,690.00
Jumlah Harga Bahan 33,075.60
C PERALATAN
A. 4.7.1.11 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.028 88,000.00 2,464.00
Tukang Cat L.02 OH 0.042 104,000.00 4,368.00
Kepala Tukang L.03 OH 0.0042 138,000.00 579.60
Mandor L.04 OH 0.003 110,000.00 330.00
Jumlah Tenaga Kerja 7,741.60
B BAHAN
Cat Dasar kg 0.12 37,320.00 4,478.40
Cat Penutup kg 0.18 106,500.00 19,170.00
Jumlah Harga Bahan 23,648.40
C PERALATAN
BandaPenandatangan
Pejabat Aceh, 10 Juni Kontrak
2022
Jenis Pekerjaan : Membuat Beton Mutu F'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, W/c = 0,87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1
Jenis Pekerjaan : Membuat Beton Mutu F'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, W/c = 0,78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2
Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5
Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6
Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7
Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Beton Mutu F'c = 26,4 Mpa (K 300), Slump (12 ± 2) cm, W/c = 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.8
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.10
Jenis Pekerjaan : Memasang Langit-Langit Tripleks Ukuran (120 x 240) cm, tebal 4 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5
Jenis Pekerjaan : Membuat dan Memasang Kusen pintu dan Kusen Jendela, Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1
Jenis Pekerjaan : Memasang Listplank Uk. 2.5 x 30 Cm Kayu Kelas I atau Klas II
Satuan / Unit : M'
Analisa : AHSP PU A.4.6.1.21
Jenis Pekerjaan : Pengecatan Bidang Kayu Baru (1 x plamir, 1 x cat dasar,2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4
Jenis Pekerjaan : Pengecatan Tembok Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10
Jenis Peker : Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafont
Satuan / Uni: M2
Analisa : AHSP PU A. 4.2.1.21
### : #NAME?
### : #NAME?
### : #NAME?
### : #NAME?
A. UPAH
1 Mandor Orang 96,000.00
2 Kepala Tukang Orang 104,000.00
3 Tukang Orang 96,000.00
4 Pekerja Orang 70,000.00
B. HARGA BAHAN
1 Air Liter 100.00
2 Batu Bata Buah 700.00
3 Batu Kali/Batu Belah (Sungai/Gunung) M³ 142,500.00
4 Batu Pecah 2 - 3 Cm M³ 373,722.00
5 Besi Beton Polos Kg 14,000.00
6 Besi Beton Ulir Kg 18,000.00
7 Besi Plat Strip Kg 16,000.00
8 Besi Baja IWF Kg 16,000.00
9 Besi Hollow 40.40.2 cm m' 12,500.00
10 Bubungan Seng Genteng M¹ 65,000.00
11 Bubungan Seng BJLS M¹ 35,000.00
12 Cat Dasar Kg 28,000.00
13 Cat Dasar Penutup Kg 32,000.00
14 Cat Kayu Mengkilat Setara Jotun Kg 82,500.00
15 Cat Menie Kg 65,000.00
16 Cat Tembok (WeatherShield) Setara Jotun Kg 90,000.00
17 Dempul Kayu Kg 28,000.00
18 Dolken Kayu ø 8 -10/400 cm Batang 28,000.00
19 Floor Drain Steinless Buah 45,000.00
20 Gypsum Board tebal 9 mm Lembar 105,000.00
21 Kaso- kaso ( 5 x 7 ) cm M³ 2,500,000.00
22 Kawat Beton Kg 18,700.00
23 Kayu Klas I ( Seumantok / Ulim / dll ) M³ 6,482,550.00
24 Kayu Klas II ( Kamper / Kruing / dll ) M³ 5,255,650.00
25 Kayu Klas III ( Borneo / dll ) M³ 4,554,850.00
26 Kayu Klas IV ( Sengon / dll ) M³ 3,817,000.00
27 Keramik Sisi Kulit Jeruk 20 X 20 Cm Bh 2,773.58
28 Keramik Uk. 20 X 25 Cm Bh 3,981.25
29 Keramik Uk. 40 X 40 Cm Bh 13,876.32
30 Keramik Uk. 60 X 60 Cm Bh 61,290.32
31 Keramik Uk. 30 x 30 cm Bh 5,160.07
32 Kertas Amplas Lembar 9,800.00
No. Nama Jenis Barang Satuan Harga
33 Kerikil M³ 114,730.00
34 Kerikil Kg 84.99
35 Kloset Duduk Keramik Buah 1,860,000.00
36 Kloset Jongkok Keramik Buah 394,500.00
37 Kran Air 3/4" Steinless Buah 65,000.00
38 Kuas Cat Buah 8,000.00
39 Lem Kayu Kg 15,000.00
40 List Gypsum M¹ 8,500.00
41 Minyak Cat Liter 9,185.00
42 Minyak Bekisting Liter 6,861.00
43 Multipleks 3 mm Lembar 73,500.00
44 Multipleks 4 mm Lembar 79,625.00
45 Multipleks 6 mm Lembar 104,125.00
46 Multipleks 9 mm Lembar 159,250.00
47 Paku Asbes Kg 18,900.00
48 Paku Beton 8 Inci Kotak 17,000.00
49 Paku Kait Buah 1,200.00
50 Paku Kayu Kg 15,400.00
51 Paku Triplek Kg 15,400.00
52 Paku Seng Kg 20,000.00
53 Paku Sumbat Buah 1,200.00
54 Paku Sekrup Kg 24,200.00
55 Pasir Batu ( Sirtu ) M³ 127,820.00
56 Pasir Beton / M³ 104,300.00
57 Pasir Beton Kg 74.50
58 Pasir Pasang M³ 117,900.00
59 Pasir Urug M³ 89,900.00
60 Plamur Tembok Kg 15,290.00
61 Plin Keramik Buah 1,400.00
62 Plywood tebal 9 mm Lembar 110,000.00
63 Profil Aluminium M 15,000.00
64 Penjaga jarak bekisting/ Spacer Bh 25,000.00
65 Residu Kg 6,500.00
66 Semen @ 40 Kg Zak 52,800.00
67 Semen @ 40 Kg Kg 1,320.00
68 Semen @ 50 Kg Zak 60,000.00
69 Semen Putih @ 50 Kg Zak 185,000.00
70 Semen Warna Kg 165,000.00
71 Seng Genteng tebal 0.3 mm Lbr 95,000.00
72 Tanah Timbun M³ 61,250.00
73 Titik Lampu + Instalasi Titik Err:509
74 Tripleks tebal 4 mm Lembar 87,000.00
DAFTAR ANALISA HARGA SATUAN
Pekerjaan ###
Lokasi ###
Prop / Kab ###
Tahun Anggaran ###
PEKERJAAN PERSIAPAN
RSNI.T-12-2002(B.8)
1m2 Membersihkan Lapangan dan Perataan
Upah : 0.100 OH Pekerja @ Rp. 70,000.00 Rp. 7,000.00
0.050 OH Mandor @ Rp. 96,000.00 Rp. 4,800.00
Jumlah Rp. 11,800.00
Dibulatkan Rp. 11,800.00
RSNI.T-12-2002(B.4)
1m1 Pengukuran dan Pemasangan Bouwplank
Upah : 0.100 OH Pekerja @ Rp. 70,000.00 Rp. 7,000.00
0.100 OH Tukang @ Rp. - Rp. 0.00
0.010 OH Kepala Tukang @ Rp. - Rp. 0.00
0.050 OH Mandor @ Rp. 96,000.00 Rp. 4,800.00
Bahan : 0.020 Kg Paku Kayu @ Rp. 15,400.00 Rp. 308.00
0.012 M3 Kayu Kelas III/Bekisting @ Rp. 4,554,850.00 Rp. 54,658.20
0.007 M3 Papan Kayu Kelas III @ Rp. 4,554,850.00 Rp. 31,883.95
Jumlah Upah + Bahan Rp. 98,650.15
Dibulatkan Rp. 98,650.00
PEKERJAAN TANAH
SNI.2835-2008-6.1
1m3 Galian tanah biasa sedalam 1 Meter
Upah : 0.750 OH Pekerja @ Rp. 70,000.00 Rp. 52,500.00
0.025 OH Mandor @ Rp. 96,000.00 Rp. 2,400.00
Jumlah Rp. 54,900.00
Dibulatkan Rp. 54,900.00
SNI.2835-2008-6.2
1m3 Galian tanah biasa sedalam 2 Meter
Upah : 0.900 OH Pekerja @ Rp. 70,000.00 Rp. 63,000.00
0.045 OH Mandor @ Rp. 96,000.00 Rp. 4,320.00
Jumlah Rp. 67,320.00
Dibulatkan Rp. 67,320.00
SNI.2835-2008-6.9
1m3 Urugan kembali Galian Tanah (1/3 Galian Tanah) Rp. 22,440.00
Upah : 0.250 OH Pekerja @ Rp. 70,000.00 Rp. 17,500.00
0.008 OH Mandor @ Rp. 96,000.00 Rp. 800.00
Jumlah Rp. 18,300.00
Dibulatkan Rp. 18,300.00
SNI.2835-2008-6.10
1 m3 Timbunan tanah
SNI.2835-2008-6.11
1 m3 Urugan pasir
Upah : 0.300 OH Pekerja @ Rp. 70,000.00 Rp. 21,000.00
0.010 OH Mandor @ Rp. 96,000.00 Rp. 960.00
Bahan : 1.200 M3 Pasir urug @ Rp. 89,900.00 Rp. 107,880.00
Jumlah Bahan Rp. 129,840.00
Dibulatkan Rp. 129,840.00
PEKERJAAN PONDASI
SNI.2835-2008-6.1
1m3 Pondasi batu belah, campuran 1 PC : 3 PP
Upah : 1.500 OH Pekerja @ Rp. 70,000.00 Rp. 105,000.00
0.600 OH Tukang @ Rp. - Rp. 0.00
0.060 OH Kepala tukang @ Rp. - Rp. 0.00
0.075 OH Mandor @ Rp. 96,000.00 Rp. 7,200.00
Bahan : 1.200 m3 Batu belah 15cm/20cm @ Rp. 142,500.000 Rp. 171,000.00
0.485 m3 Pasir pasang @ Rp. 117,900.000 Rp. 57,181.50
202.000 Kg Semen Portland @ Rp. 1,320.00 Rp. 266,640.00
Jumlah Upah + Bahan Rp. 607,021.50
Dibulatkan Rp. 607,022.00
SNI.2836-2008-6.9
1 m3 Pasangan batu Kosong (Aamstamping)
Upah : 0.780 Org Pekerja @ Rp. 70,000.00 Rp. 54,600.00
0.390 Org Tukang @ Rp. - Rp. 0.00
0.039 Org Kepala tukang @ Rp. - Rp. 0.00
0.039 Org Mandor @ Rp. 96,000.00 Rp. 3,744.00
Bahan : 1.200 m3 Batu gunung/kali @ Rp. 142,500.00 Rp. 171,000.00
0.432 m3 Pasir Urug @ Rp. 89,900.00 Rp. 38,836.80
Jumlah Upah + Bahan Rp. 268,180.80
Dibulatkan Rp. 268,181.00
PEKERJAAN BETON
SNI.7394-2008-6.4
1m3 Lantai Kerja Beton mutu ρc= 7.4 Mpa(K100),slump (3-6) cm, w/c =0,87
Upah : 1.650 OH Pekerja @ Rp. 70,000.00 Rp. 115,500.00
0.275 OH Tukang @ Rp. - Rp. 0.00
0.280 OH Kepala tukang @ Rp. - Rp. 0.00
0.830 OH Mandor @ Rp. 96,000.00 Rp. 79,680.00
Jumlah Rp. 195,180.00
SNI.7394-2008-6.22
1 m2 Cetakan Beton /Bekisting untuk Kolom
SNI.7394-2008-6.24
1 m2 Cetakan Beton /Bekisting untuk Lantai
SNI.7394-2008-6.26
1 m2 Cetakan Beton /Bekisting untuk Tangga
Upah : 0.660 OH Pekerja @ Rp. 70,000.00 Rp. 46,200.00
0.330 OH Tukang batu @ Rp. 0.00 Rp. 0.00
0.033 OH Kepala tukang @ Rp. 0.00 Rp. 0.00
0.033 OH Mandor @ Rp. 96,000.00 Rp. 3,168.00
Bahan : 0.030 m3 Kayu Kelas III @ Rp. 4,554,850.00 Rp. 136,645.50
0.400 Kg Paku 5 cm - 10 cm @ Rp. 15,400.00 Rp. 6,160.00
0.150 Ltr Minyak bekisting @ Rp. 6,861.00 Rp. 1,029.15
0.015 m3 Balok Kayu Kelas II @ Rp. 5,255,650.00 Rp. 78,834.75
0.350 Lbr Plywood Tebal 9 mm @ Rp. 110,000.00 Rp. 38,500.00
2.000 Btg Dolken Kayu ø 8 -10/400 cm @ Rp. 28,000.00 Rp. 56,000.00
Jumlah Upah + Bahan Rp. 366,537.40
untuk 2 x pakai (total harga x 1/2 Rp. 183,268.70
Dibulatkan Rp. 183,269.00
PEKERJAAN DINDING
SNI.6897-2008-6.7
1m2 Pasangan Dinding Batu bata teb. 1/2 bata, 1Pc : 2 PP.
SNI.2837-2008-6.4
1m2 Plesteran, 1Pc :4 PP tebal 13 mm
Upah : 0.200 OH Pekerja @ Rp. 70,000.00 Rp. 14,000.00
0.150 OH Tukang @ Rp. - Rp. 0.00
0.015 OH Kepala tukang @ Rp. - Rp. 0.00
0.010 OH Mandor @ Rp. 96,000.00 Rp. 960.00
Bahan : 0.024 m3 Pasir pasang @ Rp. 117,900.00 Rp. 2,829.60
6.240 kg Semen Portland @ Rp. 1,320.00 Rp. 8,236.80
Jumlah Upah + Bahan Rp. 26,026.40
Dibulatkan Rp. 26,026.00
SNI.2837-2008-6.27
1m2 Acian Semen Portland
Upah : 0.200 OH Pekerja @ Rp. 70,000.00 Rp. 14,000.00
0.100 OH Tukang @ Rp. - Rp. 0.00
0.010 OH Kepala tukang @ Rp. - Rp. 0.00
0.010 OH Mandor @ Rp. 96,000.00 Rp. 960.00
Bahan : 3.250 Kg Semen Portland @ Rp. 1,320.00 Rp. 4,290.00
Jumlah Upah + Bahan Rp. 19,250.00
Dibulatkan Rp. 19,250.00
PEKERJAAN LANTAI
SNI.7395-2008-6.13
Memasang 1 m2 Lantai Granite 60 x 60 cm
Upah : 0.700 OH Pekerja @ Rp. 70,000.00 Rp. 49,000.00
0.350 OH Tukang @ Rp. - Rp. 0.00
0.035 OH Kepala Tukang @ Rp. - Rp. 0.00
0.035 OH Mandor @ Rp. 96,000.00 Rp. 3,360.00
Jumlah Rp. 52,360.00
SNI.7395-2008-6.54 (a)
Memasang 1 m2 Dinding Keramik kmr. Mandi 20 x 25 cm
Upah : 0.900 OH Pekerja @ Rp. 70,000.00 Rp. 63,000.00
0.450 OH Tukang @ Rp. - Rp. 0.00
0.045 OH Kepala Tukang @ Rp. - Rp. 0.00
0.045 OH Mandor @ Rp. 96,000.00 Rp. 4,320.00
Jumlah Rp. 67,320.00
SNI.7395-2008-6.40
Memasang 1m' plin kramik 10 x 10
Upah : 0.090 OH Pekerja @ Rp. 70,000.00 Rp. 6,300.00
0.090 OH Tukang @ Rp. - Rp. 0.00
0.009 OH Kepala Tukang @ Rp. - Rp. 0.00
0.005 OH Mandor @ Rp. 96,000.00 Rp. 480.00
Jumlah Rp. 6,780.00
Bahan : 10.600 Bh Plin Keramik (10 x 10) @ Rp. 1,400.00 Rp. 14,840.00
0.003 M3 Pasir Pasang @ Rp. 117,900.00 Rp. 353.70
1.140 Kg Semen Portland @ Rp. 1,320.00 Rp. 1,504.80
0.050 Kg Semen Warna @ Rp. 165,000.00 Rp. 8,250.00
Jumlah Bahan Rp. 24,948.50
Jumlah Upah + Bahan Rp. 31,728.50
Dibulatkan Rp. 31,729.00
PEKERJAAN KAYU
SNI.3434-2008-6.1
Membuat Kusen pintu dan kusen jendela ,Kayu Klass I
7.000 OH Pekerja @ Rp. 70,000.00 Rp. 490,000.00
21.000 OH Tukang @ Rp. - Rp. 0.00
2.100 OH Kepala Tukang @ Rp. - Rp. 0.00
0.350 OH Mandor @ Rp. 96,000.00 Rp. 33,600.00
1.100 m3 Kayu Balok @ Rp. 6,482,550.00 Rp. 7,130,805.00
1.250 Kg Paku Kayu 10 Cm @ Rp. 15,400.00 Rp. 19,250.00
1.000 Kg Lem Kayu @ Rp. 15,000.00 Rp. 15,000.00
Jumlah Upah + Bahan Rp. 7,688,655.00
Dibulatkan Rp. 7,688,655.00
SNI.3434-2008-6.2
Membuat Kusen pintu dan kusen jendela ,Kayu Klass II dan Klass III
6.000 OH Pekerja @ Rp. 70,000.00 Rp. 420,000.00
18.000 OH Tukang @ Rp. - Rp. 0.00
1.800 OH Kepala Tukang @ Rp. - Rp. 0.00
0.300 OH Mandor @ Rp. 96,000.00 Rp. 28,800.00
1.200 m3 Kayu Balok @ Rp. 5,255,650.00 Rp. 6,306,780.00
1.250 Kg Paku Kayu 10 Cm @ Rp. 15,400.00 Rp. 19,250.00
1.000 Kg Lem Kayu @ Rp. 15,000.00 Rp. 15,000.00
Jumlah Upah + Bahan Rp. 6,789,830.00
Dibulatkan Rp. 6,789,830.00
SNI.3434-2008-6.5
Membuat Dan Memasang 1 m2 Daun Pintu Panel Klass I Atau Klass II
1.000 OH Pekerja @ Rp. 70,000.00 Rp. 70,000.00
3.000 OH Tukang Kayu @ Rp. - Rp. 0.00
0.300 OH Kepala Tukang @ Rp. - Rp. 0.00
0.050 OH Mandor @ Rp. 96,000.00 Rp. 4,800.00
1.200 m3 Papan Kayu @ Rp. 185,000.00 Rp. 222,000.00
1.000 Kg Lem Kayu @ Rp. 15,400.00 Rp. 15,400.00
Jumlah Upah + Bahan Rp. 312,200.00
Dibulatkan Rp. 312,200.00
SNI.3434-2008-6.13
1 m3 Pasang Konstruksi kuda-kuda Kayu
1.1000 m3 Kayu Klas I @ Rp. 6,482,550.00 Rp. 7,130,805.00
15.0000 kg Besi plat Strip @ Rp. 16,000.00 Rp. 240,000.00
0.200 OH Pekerja @ Rp. 70,000.00 Rp. 14,000.00
0.100 OH Tukang @ Rp. - Rp. -
0.010 OH Kepala Tukang @ Rp. - Rp. -
0.001 OH Mandor @ Rp. 96,000.00 Rp. 96.00
Jumlah Upah + Bahan Rp. 7,384,901.00
Dibulatkan Rp. 7,384,901.00
SNI.3434-2008-6.6
Membuat dan memasang 1 m2 Pintu dan Jendela Kaca, Kayu Klass I Atau II
0.800 OH Pekerja @ Rp. 70,000.00 Rp. 56,000.00
2.400 OH Tukang @ Rp. - Rp. 0.00
0.240 OH Kepala Tukang @ Rp. - Rp. 0.00
0.040 OH Mandor @ Rp. 96,000.00 Rp. 3,840.00
Jumlah Rp. 59,840.00
SNI.3434-2008-6.21
1 m1 Memasang Lisplank Uk. (3 x 30 ) cm , Kayu Klass I atau Klass II
SNI.3436-2008-6.33
1 m2 Memasang Atap Multiroof
0.120 OH Pekerja @ Rp. 70,000.00 Rp. 8,400.00
0.060 OH Tukang @ Rp. - Rp. 0.00
0.006 OH Kepala Tukang @ Rp. - Rp. 0.00
0.006 OH Mandor @ Rp. 96,000.00 Rp. 576.00
1.150 m2 Atap Seng Genteng @ Rp. 95,000.00 Rp. 109,250.00
0.200 Kg Paku Seng @ Rp. 20,000.00 Rp. 4,000.00
Jumlah Upah + Bahan Rp. 122,226.00
Dibulatkan Rp. 122,226.00
SNI.3436-2008-6.37
1 m' Memasang Rabung Atap Multiroof
0.200 OH Pekerja @ Rp. 70,000.00 Rp. 14,000.00
0.100 OH Tukang @ Rp. 0.00 Rp. 0.00
0.010 OH Kepala Tukang @ Rp. 0.00 Rp. 0.00
0.001 OH Mandor @ Rp. 96,000.00 Rp. 96.00
0.300 m Rabung Atap Multiroof @ Rp. 65,000.00 Rp. 19,500.00
0.216 Kg Paku Seng @ Rp. 20,000.00 Rp. 4,320.00
Jumlah Upah + Bahan Rp. 37,916.00
Dibulatkan Rp. 37,916.00
SNI.2839-2008-6.5
Memasang 1 m2 Langit-langit Tripleks tebal 4 mm
0.100 OH Pekerja @ Rp. 70,000.00 Rp. 7,000.00
0.100 OH Tukang @ Rp. - Rp. 0.00
0.010 OH Kepala Tukang @ Rp. - Rp. 0.00
0.075 OH Mandor @ Rp. 96,000.00 Rp. 7,200.00
Jumlah Rp. 14,200.00
RSNI. T-03-6.4.2008
1 Set Pekerjaan Pemasangan Kunci Pintu Tanam 2 slaag
0.0600 Oh Pekerja @ Rp. 70,000.00 Rp. 4,200.00
0.0150 Oh Tukang Kayu @ Rp. - Rp. -
0.1500 Oh Kepala Tukang @ Rp. - Rp. -
0.0007 Oh Mandor @ Rp. 96,000.00 Rp. 67.20
Jumlah Rp. 4,267.20
1.0000 Set Kunci Pintu Tanam 2 slaag Merk Benotti @ Rp. 185,000.00 Rp. 185,000.00
Jumlah Bahan Rp. 185,000.00
Jumlah Upah + Bahan Rp. 189,267.20
Dibulatkan Rp. 189,267.00
RSNI.T- 03-6.5.2008
1 Buah Pasang Kunci Tanam Biasa
RSNI.T-30.2000-C- 4
1 Pasang Engel Pintu
0.0150 Oh Pekerja @ Rp. 70,000.00 Rp. 1,050.00
0.1500 Oh Tukang Kayu @ Rp. 0.00 Rp. -
0.0150 Oh Kepala Tukang @ Rp. 0.00 Rp. -
0.0001 Oh Mandor @ Rp. 96,000.00 Rp. 9.60
Jumlah Rp. 1,059.60
1.0000 Psg Hak Angin Jendela & ventilasi @ Rp. 8,500.00 Rp. 8,500.00
Jumlah Bahan Rp. 8,500.00
Jumlah Upah + Bahan Rp. 23,950.00
Dibulatkan Rp. 23,950.00
RSNI. T-03-6.11.2002
1 Pasang Pegangan pintu/door holder
0.0500 Oh Pekerja @ Rp. 70,000.00 Rp. 3,500.00
0.5000 Oh Tukang Kayu @ Rp. 0.00 Rp. -
0.0500 Oh Kepala Tukang @ Rp. 0.00 Rp. -
0.0025 Oh Mandor @ Rp. 96,000.00 Rp. 240.00
Jumlah Rp. 3,740.00
PEKERJAAN SANITASI
RSNI.T-15-2-2002
Memasang Kloset Jongkok Setara KIA
PT. T-38-2008-C-B14
1 m2 Pengecatan Tembok Baru
1 2
PEKERJAAN BONGKARAN #NAME?
Depan Blk Panjang = 74.40 m'
Lebar = 0.65 m'
Tebal = 0.10 m'
Volume = Panjang x Lebar x Tebal
= 80.40 x 0.65 x 0.10
= 5.23 m3
#NAME?
Tiang Panjang = 0.25 m'
Lebar = 0.25 m'
Tinggi = 3.50 m'
Unit = 2.00 bh
Volume = Panjang x Lebar x Tinggi x Unit
= 0.25 x 0.25 x 3.50 x 2.00
= 0.44 m3
Lantai 2
r.genset Panjang = 5.20 m'
Tinggi = 3.30 m'
Volume = Panjang x Tinggi
= 5.20 x 3.30
= 17.16 m2
#NAME?
ruang lt 1 Luas = 240.53 m2
selasar dan teras Luas = 149.71 m2
ruang lt 2 Luas = 248.28 m2
selasar Luas = 132.71 m2
Volume = ruang lt 1 + selasar dan t+ ruang lt 2 + selasar
= 240.53 + 149.71 + 248.28 + 132.71
= 771.23 m2
#NAME?
Lantai 1 Luas = 63.08 m2
Lantai 2 Luas = 63.08 m2
Volume Total = Lantai 1 + Lantai 2
= 63.08 + 63.08
= 126.16 m2
PEKERJAAN PASANGAN DAN PLESTERAN Pas. Bata Tebal 1/2 Camp. 1 : 4 Ruang Lounge
bag.j2 Panjang = 2.50 m'
Lebar = 2.40 m'
Pengurangan Kusen = 0.00 m'
Unit = 1.00 bh
Volume = Panjang x Lebar - Pengurangan Kux Unit
= 2.50 x 2.40 - 0.00 x 1.00
= 6.00 m2
Plesteran Dinding 1 : 2
r.tunggu = 28.22 m2
r.lounge = 36.47 sisi
Sisi = 1.00 bh
Unit = 1.00 bh
Volume = 28.22 + 36.47 x 1.00 x 1.00
= 64.68 m2
Plesteran Dinding 1 : 4
Luas = 86.30 m2
Bidang = 2.00 sisi
Volume = 86.30 x 2.00
= 172.60 m2
Volume 10.95
#NAME?
#NAME?
Selasar Dalam
Luas Ruangan = 31.40 m2
Tinggi = 0.15 m'
Volume = 31.40 x 0.15
= 4.71 m3
Teras
Luas Ruangan = 0.00 m2
Tinggi = 0.30 m'
Volume = 0.00 x 0.30
= 0.00 m3
#NAME?
Luas Ruangan = 237.94 m2
Tinggi = 0.00 m'
Volume = 237.94 x 0.00
= 0.00 m3
#NAME?
Luas Ruangan = 310.40 m2
Tinggi = 0.00 m'
Volume = 310.40 x 0.00
= 0.00 m3
Toilet = 40.83 m2
Luas = 0.00 + 40.83
= 40.83 m2
#NAME?
#NAME?
Luas Bid. Pintu+Listp= 21.89 m2
Sisi = 2.00 bh
Volume = Luas Bid. Pintu+L x Sisi
= 21.89 x 2.00
= 43.78 m2
BACK UP DATA PEKERJAAN LANTAI. II
Pekerjaan : ###
Lokasi : ###
Prop / Kab / Kodya : ###
Tahun Anggaran : ###
1 2
#NAME?
#NAME? #NAME?
#NAME? Ruangan
Bag. Pintu Panjang = 9.20 m'
Tinggi = 2.50 m'
Pengurangan = 0.00 m2
Volume = 9.20 x 2.500 - -
= 23.00 m2
Bag.Ruang
Panjang = 10.00 m'
Tinggi = 3.40 m'
Pengurangan = 0.00 m2
Volume = 10.00 x 3.400 - -
= 34.00 m2
Plesteran Dinding 1 : 2
Luas = 6.00 m2
Bidang = 1.00 sisi
Volume = 6.00 x 1.000
= 6.00 m2
Plesteran Dinding 1 : 4
Luas = 57.00 m2
Bidang = 2.00 sisi
Volume = 57.00 x 2.000
= 114.00 m2
#NAME? #NAME?
Luas Ruangan = 183.56 m2
Pengurangan = 0.00 m2
Volume = 183.56 - -
= 183.56 m2
#NAME?
Luas Ruangan = 63.08 m2
Pengurangan = 0.00 m2
Volume = 63.08 - -
= 63.08 m2
#NAME?
Luas Ruangan = 1.80 m2
Pengurangan = 0.00 m2
Volume = Luas Ruangan - Pengurangan
= 1.80 - -
= 1.80 m2
#NAME? #NAME?
Plesteran 1 : 4 = 114.00 m2
Plesteran 1 : 2 = 6.00 m2
Volume = Plesteran 1 : 4 + Plesteran 1 : 2
= 114.00 + 6.000
= 120.00 m2
#NAME?
Kusen dan Pintu = 9.45 m2
Listplank = 39.82 m2
Volume = Kusen dan Pintu + Listplank
= 9.45 + 39.816
= 49.27 m2
Back Drop Dinding HPL Setara TACO + Rangka Blockboard Ruang Ketua
Luas Daag = 186.16 m2
Volume = Luas Daag
= 186.16 m2
PEKERJAAN PLAFOND Pasang Langit - langit Plafond PVC Bermotif + perangkat tambahan :
Luas Ruangan = 120.48 m2
Luas Toilet = 63.08 m2
Dibawah Kubah = 47.04 m2
Volume = 120.48 + 63.080 + 47.04
= 230.60 m2
PEKERJAAN LAIN - LAIN Pas. Dinding Aluminium Composite Panel + Rangka Terpasang (Setara MACO)
1 Panjang = 4.87 m'
Tinggi = 7.20 m'
Jumlah = 2.00 bh
Volume = Panjang x Tinggi sisi
= 4.87 x 7.200 x 2.00
= 70.13 m2
2 Panjang = 2.66 m'
Tinggi = 7.20 m'
Jumlah = 2.00 bh
Volume = Panjang x Tinggi sisi
= 2.66 x 7.200 x 2.00
= 38.30 m2
3 Panjang = 1.44 m'
Tinggi = 7.20 m'
Jumlah = 2.00 bh
Volume = Panjang x Tinggi sisi
= 1.44 x 7.200 x 2.00
= 20.74 m2
4 Panjang = 1.54 m'
Tinggi = 7.20 m'
Jumlah = 2.00 bh
Volume = Panjang x Tinggi sisi
= 1.54 x 7.200 x 2.00
= 22.18 m2
5 Panjang = 1.72 m'
Tinggi = 7.20 m'
Jumlah = 2.00 bh
Volume = Panjang x Tinggi sisi
= 1.72 x 7.200 x 2.00
= 24.77 m2
6 Panjang = 2.87 m'
Tinggi = 7.20 m'
Jumlah = 2.00 bh
Volume = Panjang x Tinggi sisi
= 2.87 x 7.200 x 2.00
= 41.33 m2
1 2
PEKERJAAN LANTAI ATAP
PEKERJAAN PASANGAN DAN PLESTERAN Pas. Bata Tebal 1/2 Camp. 1 : 4
Plesteran Dinding 1 : 4
Luas = 32.76 m2
Bidang = 1.00 sisi
Volume = 32.76 x 1.000
= 32.76 m2
Err:509
Luas Ruangan = Err:509 m2
Jumlah = Err:509 bh
Volume = Err:509 x Err:509
= Err:509 m2
PEKERJAAN PLAFOND Pasang Langit - langit Plafond PVC Bermotif + perangkat tambahan :
Luas Bidang = Err:509 m2
Void = 0.00 m2
Luas = Err:509 - -
= Err:509 m2
Err:509 Err:509
Panjang = Err:509 m'
Tinggi = Err:509 m' Unit
Luas = Err:509 x Err:509 X 0
= Err:509 m2
Jendela Type J2
Panjang = 0.62 m'
Tinggi = 2.00 m' Unit
Luas = 0.62 x 2.000 X 6
= 7.44 m2
###
###
###
###
Rp -
JADWAL PENGGUNAAN BAHAN
### #NAME?
### #NAME?
### #NAME?
### #NAME?
B PEKERJAAN TANAH
1 Galian Tanah Pondasi Tapak
2 Galian Tanah Pondasi Menerus
3 Urugan Tanah Kembali
4 Urugan Pasir Bawah Pondasi t= 10 cm
Jenis Bahan :
Pasir Urug
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
C PEKERJAAN PONDASI DAN BETON
1 Aanstamping pada Pondasi Tapak
Jenis Bahan :
Batu gunung/kali
Pasir Urug
2 Pasangan Batu Pondasi Menerus 1:2
Jenis Bahan :
Batu belah 15cm/20cm
Pasir pasang
Semen Portland
3 Lantai Kerja T = 5 Cm K-100
Jenis Bahan :
Kerikil beton
Pasir beton
Semen Portland
Air
5 Pondasi Tapak (80/80)
6 Sloof Beton Bertulang (25/40)
7 Sloof Beton Bertulang (20/30)
8 Balok Beton Bertulang (25/30)
12 Kolom (40 x 40)
13 Kolom Praktis (13/13)
16 Plat Lantai t=12 cm
Jenis Bahan :
Kerikil beton
Pasir beton
Semen Portland
Air
Besi betn
Kayu Kelas III
Paku 5 cm - 10 cm
Minyak bekisting
Balok Kayu Kelas II
Plywood tebal 9 mm
Dolken Kayu ø 8 -10/400 cm
F PEKERJAAN LANTAI
1 Timbunan Tanah bawah Lantai
Jenis Bahan :
Tanah timbun
2 Urugan Pasir Bawah Lantai
Jenis Bahan :
Pasir Urug
3 Beton Cor 1:3:5
Jenis Bahan :
Kerikil beton
Pasir beton
Semen Portland
Air
5 Lantai Keramik 40 x 40 Cm
6 Lantai Keramik 20 x 20 Cm KM/WC
7 Pasangan dinding keramik 20 x 25 cm
Jenis Bahan :
Keramik
Pasir pasang
Semen Portland
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
H PEKERJAAN PLAFOND
1 Rangka Plafond ( Furing )
2 Plafond Gypsum Board 8 mm
3 List Plafond
Jenis Bahan :
Gipsum Board
Furing
List Gipsum
I PEKERJAAN PENGECATAN
1 Cat Dinding Tembok
2 Cat Kusen, Pintu, dan Ventilasi
Jenis Bahan :
CatT embok
Cat Minyak
Minyak Cat
J PEKERJAAN ELEKTRIKAL
3 Instalasi titik lampu + Kabel NYA 2,5
4 Lampu Hemat Energi
6 Out Fitting Lamp ( Fitting + Lampu Hemat Energy 18 Watt )
7 Stop Kontak 3 Phase Lengkap Kelas 1
8 Stop Kontak 1 Phase Lengkap Kelas 1
9 Saklar Ganda Lengkap Kelas 1
K PEKERJAAN SANITASI
1 Memasang Floor Drain Stainless Kelas 1
2 Memasang Kloset Duduk Kelas 1
3 Memasang Kran Air Stainless Kelas 1
4 Memasang Wastafel + Assesoris Kelas 1
5 Cermin Wastafel (150x80 cm) + frame Alumunium
6 Memasang Pipa Air Bersih dan kotor + Aksesoris
Jenis Bahan :
Floor Drain
Kloset Duduk
Kran
Wastafel
Pipa
Seal Tape
Lem Pipa
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
PEMBANGUNAN MUSALLA
A PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus
2 Urugan Tanah Kembali
3 Urugan Pasir Bawah Pondasi t= 10 cm
Jenis Bahan :
pasir Urug
E PEKERJAAN LANTAI
1 Timbunan Tanah bawah Lantai
2 Urugan Pasir Bawah Lantai
Jenis Bahan :
Tanah Timbun
Pasir Urug
3 Beton Cor 1:3:5
Jenis Bahan :
Pasir Beton
Semen Portland
Kerikil beton
Air
4 Lantai Keramik 40 x 40 Cm
Jenis Bahan :
Keramik
Pasir Pasang
Semen Portland
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
F PEKERJAAN ATAP
1 Rangka kuda-kuda Metal Zincalume 0.75 mm
2 Atap Genteng metal 3mm
3 Rabung metal Zincalume 3mm
4 Listplank Kayu Kelas 1
Jenis Bahan :
Rangka Profil C Truss
Seng Metal
Rabung metal
Kayu Klas I
H PEKERJAAN PENGECATAN
1 Cat Dinding Tembok
Jenis Bahan :
Cat Tembok
I PEKERJAAN ELEKTRIKAL
3 Instalasi titik lampu + Kabel NYA 2,5
4 Lampu Hemat Energi
6 Out Fitting Lamp ( Fitting + Lampu Hemat Energy 18 Watt )
7 Stop Kontak 3 Phase Lengkap Kelas 1
8 Stop Kontak 1 Phase Lengkap Kelas 1
9 Saklar Ganda Lengkap Kelas 1
J PEKERJAAN LAIN-LAIN
1 Pembongkaran Beton
2 Perbaiki Instalasi Air
Jenis Bahan :
Pipa
Seal Tape
Lem Pipa
3 Perbaiki Plafond Bocor
###
###
###
###
JADWAL PENGGUNAAN PERALATAN
### #NAME?
### #NAME?
### #NAME?
### #NAME?
F PEKERJAAN LANTAI
1 Timbunan Tanah bawah Lantai
Jenis Alat :
Alat Pertukangan
2 Urugan Pasir Bawah Lantai
Jenis Alat :
Alat Pertukangan
3 Beton Cor 1:3:5
Jenis Alat :
Molen
Kereta Sorong
5 Lantai Keramik 40 x 40 Cm
6 Lantai Keramik 20 x 20 Cm KM/WC
7 Pasangan dinding keramik 20 x 25 cm
Jenis Alat :
Water Pass
Alat Pertukangan
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
H PEKERJAAN PLAFOND
1 Rangka Plafond ( Furing )
2 Plafond Gypsum Board 8 mm
3 List Plafond
Jenis Alat :
Bor Listrik
Alat Pertukangan
Water Pass
I PEKERJAAN PENGECATAN
1 Cat Dinding Tembok
2 Cat Kusen, Pintu, dan Ventilasi
Jenis Alat :
Kuas/Roll
J PEKERJAAN ELEKTRIKAL
3 Instalasi titik lampu + Kabel NYA 2,5
4 Lampu Hemat Energi
6 Out Fitting Lamp ( Fitting + Lampu Hemat Energy 18 Watt )
7 Stop Kontak 3 Phase Lengkap Kelas 1
8 Stop Kontak 1 Phase Lengkap Kelas 1
9 Saklar Ganda Lengkap Kelas 1
Jenis Alat :
Alat Tool Listrik
Alat Pertukangan
K PEKERJAAN SANITASI
1 Memasang Floor Drain Stainless Kelas 1
2 Memasang Kloset Duduk Kelas 1
3 Memasang Kran Air Stainless Kelas 1
4 Memasang Wastafel + Assesoris Kelas 1
5 Cermin Wastafel (150x80 cm) + frame Alumunium
6 Memasang Pipa Air Bersih dan kotor + Aksesoris
Jenis Alat :
Alat Pertukangan
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
PEMBANGUNAN MUSALLA
A PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus
2 Urugan Tanah Kembali
3 Urugan Pasir Bawah Pondasi t= 10 cm
Jenis Alat :
Kereta Sorong
Cangkul
Sekop
E PEKERJAAN LANTAI
1 Timbunan Tanah bawah Lantai
2 Urugan Pasir Bawah Lantai
Jenis Alat :
Kereta Sorong
Alat Pertukangan
3 Beton Cor 1:3:5
Jenis Alat :
Kereta Sorong
Alat Pertukangan
4 Lantai Keramik 40 x 40 Cm
Jenis Alat :
WaterPass
Alat Pertukangan
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
F PEKERJAAN ATAP
1 Rangka kuda-kuda Metal Zincalume 0.75 mm
2 Atap Genteng metal 3mm
3 Rabung metal Zincalume 3mm
4 Listplank Kayu Kelas 1
Jenis Alat :
Bor Listrik
Alat Pertukangan
H PEKERJAAN PENGECATAN
1 Cat Dinding Tembok
Jenis Alat :
Kuas/Roll
I PEKERJAAN ELEKTRIKAL
3 Instalasi titik lampu + Kabel NYA 2,5
4 Lampu Hemat Energi
6 Out Fitting Lamp ( Fitting + Lampu Hemat Energy 18 Watt )
7 Stop Kontak 3 Phase Lengkap Kelas 1
8 Stop Kontak 1 Phase Lengkap Kelas 1
9 Saklar Ganda Lengkap Kelas 1
Jenis Alat :
Alat Tool Listrik
Alat Pertukangan
J PEKERJAAN LAIN-LAIN
1 Pembongkaran Beton
2 Perbaiki Instalasi Air
3 Perbaiki Plafond Bocor
Jenis Alat :
Mobil Pick Up
Alat Pertukangan
Kereta Sorong
###
###
###
###
JADWAL PERSONIL INTI
### #NAME?
### #NAME?
### #NAME?
### #NAME?
#NAME?
#NAME?
#NAME?
-
MURTUAL CHANGE ORDER ( MC - 0 )
II. PEKERJAAN RUANG LOUNGE DAN RUANG TUNGGU
B. PEKERJAAN GALIAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Tapak
URAIAN PERHITUNGAN
KETERANGAN Panjang Lebar Tinggi Volume Volume Jumlah
No Jumlah
Penguran Bersih Volume Satuan
(meter) (meter) (meter) gan ( M3 ) Pias
1 Lounge
Tapak 0.80 0.80 0.80 0.51 10.00 5.12 M3
Rolaag 22.50 0.50 0.45 5.06 1.00 5.06 M3
2 Selasar
Tapak 0.80 0.80 0.80 0.51 4.00 2.05 M3
Rolaag 16.25 0.50 0.45 3.66 1.00 3.66 M3
Batu Gunung 15.00 0.80 0.90 10.80 1.00 10.80 M3
VOLUME 15.89 M3
MURTUAL CHANGE ORDER ( MC - 0 )
II. PEKERJAAN RUANG LOUNGE DAN RUANG TUNGGU
B. PEKERJAAN GALIAN TANAH DAN PONDASI
4 Urungan Kembali Bekas Galian
URAIAN PERHITUNGAN
KETERANGAN Panjang Lebar Tinggi Volume Pembagi Jumlah
No
Pias Bersih Satuan
(meter) (meter) (meter) ( M3 ) (1/3) Volume
1 Lounge
Tapak 0.80 0.80 0.80 10.00 5.12 0.33 1.71 M3
Rolaag 22.50 0.50 0.45 5.06 0.33 1.69 M3
2 Selasar
Tapak 0.80 0.80 0.80 0.51 0.33 0.17 M3
Rolaag 16.25 0.50 0.45 3.66 0.33 1.22 M3
Batu Gunung 15.00 0.80 0.90 10.80 0.33 3.60 M3
VOLUME 8.38 M3
1 Lounge
VOLUME 19.50 -
VOLUME 39.00 M3
MURTUAL CHANGE ORDER ( MC - 0 )
II. PEKERJAAN RUANG LOUNGE DAN RUANG TUNGGU
C. PEKERJAAN BETON BERTULANG
1 Kolom Pedestal 25/25
BESI UTAMA
BESI BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL. Satuan
KETERANGAN
(Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
Besi Memanjang ( D ) 10.00 0.62 0.95 4.00 3.80 6.00 22.800 14.136 KG
JUMLAH : 14.136 KG
BESI BEGEL
BESI BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL. Satuan
KETERANGAN
(Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
sengkang ( Ø ) 6.00 0.22 0.90 5.00 4.50 6.00 27.000 5.940 KG
JUMLAH : 5.940 KG
BEKISTING
JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG TINGGI SISI
(M2) (UNIT) (M2)
Bekisting SISI LUAR 0.25 0.45 2.00 0.23 6.00 1.350 1.350 M2
Bekisting SISI LUAR 0.25 0.45 2.00 0.23 6.00 1.350 1.350 M2
JUMLAH : 2.700 M2
BETON K -250
JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI PHI
(M2) (UNIT) (M3) BETON
BETON - K175 0.25 0.25 0.45 0.03 6.00 0.169 0.169 M3
JUMLAH : 0.169 M3
PEMBONGKARAN DAN PENYIRAMAN
JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI PHI
(M2) (UNIT) (M3) BETON
PEMBONGKARAN DAN PENYIRAMAN 0.25 0.25 0.45 0.03 6.00 0.169 0.169 M3
JUMLAH : 0.169 M3
JUMLAH : 91.760 0
bekisting
JUMLAH Pengeurangan BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (M2) (UNIT) (M2)
BEKISTING 1.60 2.20 1.00 3.52 0 1.00 3.520 3.520 M2
JUMLAH : 3.520 M2
-
Pengeurangan JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI
(M2) (M2) (UNIT) (M3) BETON
BETON - K175 1.60 2.20 0.10 0.35 1.00 0.352 0.352 M3
JUMLAH : 0.352 M3
PEMBONGKARAN DAN PENYIRAMAN
Pengeurangan JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI
(M2) (M2) (UNIT) (M3) BETON
PEMBONGKARAN DAN PENYIRAMAN 1.60 2.20 0.10 0.35 1.00 0.352 0.352 M3
JUMLAH : 0.352 M3
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : - Tahun Anggaran :0
No. Kontrak : - Nilai Kontrak : -
Tanggal : 0 Masa Pelaksanaan :0
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : - Tahun Anggaran :0
No. Kontrak : - Nilai Kontrak : -
Tanggal : 0 Masa Pelaksanaan :0
JUMLAH : 4.050 M3
PEMBONGKARAN DAN PENYIRAMAN
Satuan
JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI PHI
(M2) (UNIT) (M3) BETON
PEMBONGKARAN DAN PENYIRAMAN 22.50 0.30 0.60 4.05 1.00 4.050 4.050 M3
pertemuan kolom 30x40 0.50 0.40 0.60 0.12 - - - M3
pertemuan kolom 30x30 - 0.30 - - - - - M3
JUMLAH : 4.050 M3
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : - Tahun Anggaran :0
No. Kontrak : - Nilai Kontrak : -
Tanggal : 0 Masa Pelaksanaan :0
JUMLAH : 4.725 M3
PEMBONGKARAN DAN PENYIRAMAN
JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI PHI
(M2) (UNIT) (M3) BETON
PEMBONGKARAN DAN PENYIRAMAN 37.80 0.25 0.50 4.73 1.00 4.725 4.725 M3
pertemuan kolom 30x40 0.50 0.40 0.50 0.10 - - - M3
pertemuan kolom 30x30 - 0.30 - - - - - M3
JUMLAH : 4.725 M3
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : - Tahun Anggaran :0
No. Kontrak : - Nilai Kontrak : -
Tanggal : 0 Masa Pelaksanaan :0
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : PENAMBAHAN RUANG PUSKESMAS CUBO ( DAK FISIK ) Tahun Anggaran : 2021
No. Kontrak : 206 / SP - DAK / Dinkes - KB/ PJ/VII / 2021 Nilai Kontrak : 4.949.849.424.00;-
Tanggal : 19 Juli 2021 Masa Pelaksanaan : 160 Hari Kalender
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : PENAMBAHAN RUANG PUSKESMAS CUBO ( DAK FISIK ) Tahun Anggaran : 2021
No. Kontrak : 206 / SP - DAK / Dinkes - KB/ PJ/VII / 2021 Nilai Kontrak : 4.949.849.424.00;-
Tanggal : 19 Juli 2021 Masa Pelaksanaan : 160 Hari Kalender
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : PENAMBAHAN RUANG PUSKESMAS CUBO ( DAK FISIK ) Tahun Anggaran : 2021
No. Kontrak : 206 / SP - DAK / Dinkes - KB/ PJ/VII / 2021 Nilai Kontrak : 4.949.849.424.00;-
Tanggal : 19 Juli 2021 Masa Pelaksanaan : 160 Hari Kalender
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : PENAMBAHAN RUANG PUSKESMAS CUBO ( DAK FISIK ) Tahun Anggaran : 2021
No. Kontrak : 206 / SP - DAK / Dinkes - KB/ PJ/VII / 2021 Nilai Kontrak : 4.949.849.424.00;-
Tanggal : 19 Juli 2021 Masa Pelaksanaan : 160 Hari Kalender
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : PENAMBAHAN RUANG PUSKESMAS CUBO ( DAK FISIK ) Tahun Anggaran : 2021
No. Kontrak : 206 / SP - DAK / Dinkes - KB/ PJ/VII / 2021 Nilai Kontrak : 4.949.849.424.00;-
Tanggal : 19 Juli 2021 Masa Pelaksanaan : 160 Hari Kalender
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : PENAMBAHAN RUANG PUSKESMAS CUBO ( DAK FISIK ) Tahun Anggaran : 2021
No. Kontrak : 206 / SP - DAK / Dinkes - KB/ PJ/VII / 2021 Nilai Kontrak : 4.949.849.424.00;-
Tanggal : 19 Juli 2021 Masa Pelaksanaan : 160 Hari Kalender
JUMLAH : 141.466 KG
BESI POLOS
BESI BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL. Satuan
KETERANGAN
(Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
sengkang Memanjang( Ø ) 8.00 0.39 0.68 218.00 148.24 1.00 148.240 57.814 KG
JUMLAH : 57.814 KG
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG TINGGI SISI
(M2) (UNIT) (M2)
Bekisting Memanjang sisi dalam 21.17 0.44 1.00 9.31 1.00 9.315 9.315 M2
JUMLAH : 9.315 M2
- Beton Cor
JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI PHI
(M2) (UNIT) (M3) BETON
- Beton Cor 21.17 0.18 0.13 0.50 1.00 0.495 0.495 M3
JUMLAH : 0.495 M3
PEMBONGKARAN DAN PENYIRAMAN
JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI PHI
(M2) (UNIT) (M3) BETON
PEMBONGKARAN DAN PENYIRAMAN 21.17 0.18 0.13 0.50 1.00 0.495 0.495 M3
- - - - - - - - M3
JUMLAH : 0.495 M3
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : PENAMBAHAN RUANG PUSKESMAS CUBO ( DAK FISIK ) Tahun Anggaran : 2021
No. Kontrak : 206 / SP - DAK / Dinkes - KB/ PJ/VII / 2021 Nilai Kontrak : 4.949.849.424.00;-
Tanggal : 19 Juli 2021 Masa Pelaksanaan : 160 Hari Kalender
JUMLAH : 251.680 KG
BESI POLOS
BESI BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL. Satuan
KETERANGAN
(Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg
sengkang Memanjang( Ø ) 8.00 0.39 0.86 154.00 132.44 1.00 132.440 51.652 KG
JUMLAH : 51.652 KG
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG TINGGI SISI
(M2) (UNIT) (M2)
Bekisting Sisi Luar 19.10 0.80 1.00 15.28 1.00 15.280 15.280 M2
Bekisting Sisi Dalam 3.80 0.70 1.00 2.66 1.00 2.660 2.660 M2
bekisting sambungan kolom 30 x 30 2.80 0.35 1.00 0.98 0.072 1.00 0.980 0.908 M2
JUMLAH : 18.848 M2
- Beton Cor
JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI PHI
(M2) (UNIT) (M3) BETON
- Beton Cor 19.10 0.18 0.25 0.86 1.00 0.860 0.860 M3
0.30 0.30 0.25 0.02 4.00 0.090 0.090 M4
JUMLAH : 0.950 M3
PEMBONGKARAN DAN PENYIRAMAN
JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI PHI
(M2) (UNIT) (M3) BETON
PEMBONGKARAN DAN PENYIRAMAN 19.10 0.18 0.25 0.86 1.00 0.860 0.860 M3
- 0.30 0.30 0.25 0.02 4.00 0.090 0.090 M3
JUMLAH : 0.950 M3
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : PENAMBAHAN RUANG PUSKESMAS CUBO ( DAK FISIK ) Tahun Anggaran : 2021
No. Kontrak : 206 / SP - DAK / Dinkes - KB/ PJ/VII / 2021 Nilai Kontrak : 4.949.849.424.00;-
Tanggal : 19 Juli 2021 Masa Pelaksanaan : 160 Hari Kalender
JUMLAH : 25.914 M3
PEMBONGKARAN DAN PENYIRAMAN
Pengeurangan JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI
(M2) (M2) (UNIT) (M3) BETON
TERAS BELAKANG 4.05 2.40 0.12 1.17 1.00 1.166 1.166 M3
GEDUNG UTAMA 19.25 11.25 0.12 1.24 25.99 1.00 25.988 24.748 M3
JUMLAH : 25.914 M3
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : PENAMBAHAN RUANG PUSKESMAS CUBO ( DAK FISIK ) Tahun Anggaran : 2021
No. Kontrak : 206 / SP - DAK / Dinkes - KB/ PJ/VII / 2021 Nilai Kontrak : 4.949.849.424.00;-
Tanggal : 19 Juli 2021 Masa Pelaksanaan : 160 Hari Kalender
Besi Melintang ( Ø ) 10.00 0.62 0.78 38.00 29.64 1.00 29.640 18.377 KG
Besi memanjang ( Ø ) 10.00 0.62 4.30 4.00 17.20 1.00 17.200 10.664 KG
JUMLAH : 189.001 KG
bekisting
JUMLAH Pengeurangan BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (M2) (UNIT) (M2)
BEKISTING 0.33 3.85 1.00 1.27 0.032 3.00 3.780 3.780 M2
0.33 3.80 1.00 1.25 0.032 2.00 2.508 2.476 M2
1.30 3.80 1.00 4.94 0.032 1.00 4.940 4.908 M2
JUMLAH : 11.164 M2
- Beton Cor
Pengeurangan JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI
(M2) (M2) (UNIT) (M3) BETON
TERAS DEPAN 4.20 2.18 0.10 0.92 1.00 0.916 0.916 M3
GEDUNG UTAMA 3.85 0.68 0.10 0.26 2.00 0.524 0.524 M4
GEDUNG UTAMA 4.20 0.68 0.10 0.29 2.00 0.571 0.571 M4
JUMLAH : 2.010 M3
PEMBONGKARAN DAN PENYIRAMAN
Pengeurangan JUMLAH BIAS VOLUME VOL. Satuan
KETERANGAN PANJANG LEBAR TINGGI
(M2) (M2) (UNIT) (M3) BETON
TERAS DEPAN 4.20 2.18 0.10 0.92 1.00 0.916 0.916 M3
GEDUNG UTAMA 3.85 0.68 0.10 0.26 2.00 0.524 0.524 M4
GEDUNG UTAMA 4.20 0.68 0.10 0.29 2.00 0.571 0.571 M4
JUMLAH : 2.010 M3
KONTRAKTOR PELAKSANA
PEMERINTAH KABUPATEN PIDIE JAYA
PT. FATA PERDANA MANDIRI
DINAS KESEHATAN DAN KELUARGA BERENCANA KONSULTAN PENGAWAS
Jln. Iskandar Muda Simpang 4 Meuruedu Kec. Meurah Dua Kode Pos 24186 Telp 0653 - 51244, Email : dinkes _ pijay@yahoo.com CV. ALPINE CONSULTAN
BACK UP DATA
Nama Paket : PENAMBAHAN RUANG PUSKESMAS CUBO ( DAK FISIK ) Tahun Anggaran : 2021
No. Kontrak : 206 / SP - DAK / Dinkes - KB/ PJ/VII / 2021 Nilai Kontrak : 4.949.849.424.00;-
Tanggal : 19 Juli 2021 Masa Pelaksanaan : 160 Hari Kalender