LAPORAN Konsultan Minggu Ke 21
LAPORAN Konsultan Minggu Ke 21
- Urugan Kembali m3 19.36 0.01 19.36 - 19.36 0.011 - 0.011 100.000 - 100.000
6.4 PC-4 (3,7m x 3,7m x 0,3m)
- Beton K-250 m3 4.11 0.03 - - - - - - - - -
- Bekesting m2 4.44 0.00 3.33 - 3.33 0.003 - 0.003 75.000 - 75.000
- Pembesian BJTD-32 kg 405.29 0.05 405.29 - 405.29 0.048 - 0.048 100.000 - 100.000
- Lantai Kerja 10 cm m3 1.37 0.01 - - - - - - - - -
- Galian m3 25.21 0.01 25.21 - 25.21 0.014 - 0.014 100.000 - 100.000
- Urugan Kembali m3 8.40 0.00 - - - - - - - - -
7 Pek. Beton Bertulang Kolom Pedestal:
7.1 Kolom K1 (55 cm x 55 cm)
- Beton K-250 m3 29.19 0.24 26.54 2.65 29.19 0.216 0.022 0.238 90.933 9.067 100.000
- Bekesting m2 212.30 0.32 171.60 40.70 212.30 0.256 0.061 0.317 80.829 19.171 100.000
- Pembesian BJTD-32 kg 8,345.37 0.98 7,368.31 977.06 8,345.37 0.867 0.115 0.982 88.292 11.708 100.000
8 Pek. Beton Bertulang Kolom Pedestal:
8.1 Kolom K1 (50 cm x 20 cm)
- Beton K-250 m3 0.86 0.01 - - - - - - - - -
- Bekesting m2 9.60 0.01 - - - - - - - - -
- Pembesian BJTD-32 kg 240.21 0.03 180.16 - 180.16 0.021 - 0.021 75.000 - 75.000
C PEK. STRUKTUR LANTAI I -
1 Urugan tanah peninggian lantai m3 609.41 0.87 - - - - - - - - -
2 Pek. Urug pasir bawah lantai t. 10cm m3 152.35 0.29 - - - - - - - - -
3 Pek. Beton lantai t. 10 cm -
- Beton K-250 m3 163.16 1.33 - - - - - - - - -
- Pembesian Wiremesh M8 kg 8,892.10 1.02 - - - - - - - - -
4 Pembuatan Beton Bertulang Tie Beam/Sloof
4.1 Tie Beam/Sloof S1 (30cm x 60cm)
- Beton K-250 m3 90.97 0.74 - - - - - - - - -
- Bekesting m2 758.10 0.85 - - - - - - - - -
- Pembesian BJTD-32 kg 17,365.40 2.04 4,341.35 5,209.62 9,550.97 0.511 0.613 1.123 25.000 30.000 55.000
4.2 Tie Beam/Sloof S2 (30cm x 50cm) -
- Beton K-250 m3 7.91 0.06 - - - - - - - - -
- Bekesting m2 67.20 0.08 - - - - - - - - -
- Pembesian BJTD-32 kg 1,077.04 0.13 269.26 161.56 430.82 0.032 0.019 0.051 25.000 15.000 40.000
5 Kolom K1 (55 cm x 55 cm)
- Beton K-250 m3 78.05 0.64 - - - - - - - - -
- Bekesting m2 567.60 1.07 - - - - - - - - -
- Pembesian BJTD-32 kg 12,718.81 1.50 3,179.70 5,723.46 8,903.17 0.374 0.673 1.047 25.000 45.000 70.000
6 Kolom K1 (50 cm x 20 cm) -
- Beton K-250 m3 2.64 0.02 - - - - - - - - -
- Bekesting m2 26.40 0.05 - - - - - - - - -
- Pembesian BJTD-32 kg 525.66 0.06 - - - - - - - - -
7 Pembuatan Beton Bertulang Tangga
- Beton K-250 m3 16.31 0.13 - - - - - - - - -
- Bekesting m2 135.85 0.20 - - - - - - - - -
- Pembesian BJTD-40 kg 2,821.77 0.33 - - - - - - - - -
8 Kolom Kanopi (HB 200.200.8.12) -
- Base Plat t. 20 mm kg 153.69 0.04 - - - - - - - - -
- Baut M-20 bh 96.00 0.02 - - - - - - - - -
- H-Beam 200.200.8.12 kg 2,195.60 0.51 - - - - - - - - -
D PEK. STRUKTUR LANTAI II ( Elev. +5.50)
1 Balok B1 (35 cm x 65 cm)
- Beton K-250 m3 60.52 0.49 - - - - - - - - -
- Bekesting m2 375.06 0.72 - - - - - - - - -
- Pembesian BJTD-32 kg 13,679.00 1.61 - - - - - - - - -
2 Balok B2 (35 cm x 65 cm)
- Beton K-250 m3 54.46 0.44 - - - - - - - - -
- Bekesting m2 337.55 0.65 - - - - - - - - -
- Pembesian BJTD-32 kg 9,360.47 1.10 - - - - - - - - -
3 Balok B3 (25 cm x 50 cm) -
- Beton K-250 m3 56.51 0.46 - - - - - - - - -
- Bekesting m2 456.62 0.88 - - - - - - - - -
- Pembesian BJTD-32 kg 12,008.86 1.41 - - - - - - - - -
4 Balok B4 (25 cm x 50 cm)
- Beton K-250 m3 1.39 0.01 - - - - - - - - -
- Bekesting m2 11.21 0.02 - - - - - - - - -
- Pembesian BJTD-32 kg 233.11 0.03 - - - - - - - - -
5 Balok B5 (25 cm x 50 cm)
- Beton K-250 m3 0.61 0.00 - - - - - - - - -
- Bekesting m2 6.45 0.01 - - - - - - - - -
- Pembesian BJTD-32 kg 69.04 0.01 - - - - - - - - -
6 Balok BK1 (35 cm x 65 cm)
- Beton K-250 m3 19.82 0.16 - - - - - - - - -
- Bekesting m2 25.55 0.05 - - - - - - - - -
- Pembesian BJTD-32 kg 56.51 0.007 - - - - - - - - -
7 Balok BK2 (35 cm x 65 cm)
- Beton K-250 m3 5.14 0.04 - - - - - - - - -
- Bekesting m2 37.94 0.07 - - - - - - - - -
- Pembesian BJTD-32 kg 806.51 0.09 - - - - - - - - -
8 Balok BK3 (25 cm x 50 cm)
- Beton K-250 m3 0.72 0.006 - - - - - - - - -
- Bekesting m2 7.20 0.01 - - - - - - - - -
- Pembesian BJTD-32 kg 146.16 0.02 - - - - - - - - -
9 Pek. Beton bertulang lantai t. 12cm
- Beton K-250 m3 191.04 1.55 - - - - - - - - -
- Bondeks m2 1,592.01 4.02 - - - - - - - - -
- Pembesian Wiremesh M8 kg 17,352.86 2.00 - - - - - - - - -
10 Kolom K1 (55 cm x 55 cm)
- Beton K-250 m3 62.62 0.51 - - - - - - - - -
- Bekesting m2 455.40 0.86 - - - - - - - - -
- Pembesian BJTD-32 kg 9,276.06 1.09 - - - - - - - - -
11 Pembuatan Beton Bertulang Tangga
- Beton K-250 m3 10.87 0.09 - - - - - - - - -
- Bekesting m2 90.56 0.13 - - - - - - - - -
- Pembesian BJTD-40 kg 1,881.18 0.22 - - - - - - - - -
12 Balok Kanopi (IWF 350.175.7.11)
- IWF 350.175.7.11 kg 2,678.40 0.63 - - - - - - - - -
- Baut M-20 bh 144.00 0.02 - - - - - - - - -
- Joint Plat dan Plat Buhul kg 76.32 0.02 - - - - - - - - -
13 Balok Kanopi (IWF 300.150.6,5.9)
- IWF 250.125.6.9.12 kg 249.56 0.06 - - - - - - - - -
- Baut M-20 bh 24.00 0.004 - - - - - - - - -
- Joint Plat dan Plat Buhul kg 12.72 0.003 - - - - - - - - -
14 Balok Kanopi (IWF 200.100.5,5.8)
- IWF 250.125.6.9.12 kg 383.40 0.09 - - - - - - - - -
- Baut M-20 bh 1,056.00 0.18 - - - - - - - - -
- Joint Plat dan Plat Buhul kg 559.68 0.13 - - - - - - - - -
15 Balok Kanopi (IWF 250.125.6.9.12)
- IWF 250.125.6.9.12 kg 2,296.96 0.54 - - - - - - - - -
- Baut M-20 bh 480.00 0.08 - - - - - - - - -
- Joint Plat dan Plat Buhul kg 254.40 0.06 - - - - - - - - -
16 Gording Kanopi (HLW 100.50.3)
- HLW 100.50.3 kg 5,819.35 1.36 - - - - - - - - -
E PEK. STRUKTUR LANTAI III ( Elev. + 9.50)
1 Balok B1 (35 cm x 65 cm)
- Beton K-250 m3 60.52 0.49 - - - - - - - - -
- Bekesting m2 375.06 0.72 - - - - - - - - -
- Pembesian BJTD-32 kg 13,679.00 1.61 - - - - - - - - -
2 Balok B2 (35 cm x 65 cm)
- Beton K-250 m3 54.46 0.44 - - - - - - - - -
- Bekesting m2 337.55 0.65 - - - - - - - - -
- Pembesian BJTD-32 kg 9,360.47 1.10 - - - - - - - - -
3 Balok B3 (25 cm x 50 cm)
- Beton K-250 m3 53.94 0.44 - - - - - - - - -
- Bekesting m2 435.87 0.84 - - - - - - - - -
- Pembesian BJTD-32 kg 11,463.00 1.35 - - - - - - - - -
4 Balok B4 (25 cm x 50 cm)
- Beton K-250 m3 0.86 0.01 - - - - - - - - -
- Bekesting m2 6.92 0.01 - - - - - - - - -
- Pembesian BJTD-32 kg 146.20 0.02 - - - - - - - - -
5 Balok B5 (25 cm x 50 cm)
- Beton K-250 m3 0.61 0.005 - - - - - - - - -
- Bekesting m2 6.45 0.01 - - - - - - - - -
- Pembesian BJTD-32 kg 69.04 0.01 - - - - - - - - -
6 Balok BK1 (35 cm x 65 cm)
- Beton K-250 m3 1.81 0.01 - - - - - - - - -
- Bekesting m2 13.39 0.03 - - - - - - - - -
- Pembesian BJTD-32 kg 303.88 0.04 - - - - - - - - -
7 Balok BK2 (35 cm x 65 cm) -
- Beton K-250 m3 6.65 0.05 - - - - - - - - -
- Bekesting m2 49.10 0.09 - - - - - - - - -
- Pembesian BJTD-32 kg 1,043.72 0.12 - - - - - - - - -
8 Pek. Beton bertulang lantai t. 12cm
- Beton K-250 m3 193.62 1.58 - - - - - - - - -
- Bondeks m2 1,613.49 4.07 - - - - - - - - -
- Pembesian Wiremesh M8 kg 8,793.50 1.01 - - - - - - - - -
9 Kolom K1 (55 cm x 55 cm)
- Beton K-250 m3 81.67 0.66 - - - - - - - - -
- Bekesting m2 594.00 1.12 - - - - - - - - -
- Pembesian BJTD-32 kg 12,186.17 1.43 - - - - - - - - -
F PEK. STRUKTUR RINGBALK ( Elev. + 15.50)
1 Balok RB1 (35 cm x 65 cm) -
- Beton K-250 m3 61.65 0.50 - - - - - - - - -
- Bekesting m2 435.66 0.84 - - - - - - - - -
- Pembesian BJTD-32 kg 10,542.73 1.24 - - - - - - - - -
G PEKERJAAN KONSTRUKSI ATAP -
1 Kolom & Kuda-Kuda Atap Utama WF 250.125.6.9 kg 5,765.49 1.35 - - - - - - - - -
2 Pengaku (Stifiner) UNP 125.65.6.8 kg 10,059.65 2.36 - - - - - - - - -
3 Gording C Lips 100.50.20.3,2 kg 6,491.10 1.52 - - - - - - - - -
4 Base Plat t. 20 mm kg 847.80 0.19 - - - - - - - - -
5 Joint Plat dan Plat Buhul kg 1,459.12 0.33 - - - - - - - - -
6 Dudukan Gording L 75.75.7 kg 1,017.36 0.24 - - - - - - - - -
7 Baut M-20 bh 240.00 0.04 - - - - - - - - -
8 Cat Zincromate m2 1,582.50 0.18 - - - - - - - - -
9 Penutup atap ACP + Rangka Hollow Galvanis 40.40 m2 750.09 4.36 - - - - - - - - -
10 Penutup atap Spandek t. 0,35 mm m2 1,054.76 1.02 - - - - - - - - -
11 Listplank Panel ACP + Rangka Hollow Galvanis 40.40 m2 812.91 4.72 - - - - - - - - -
12 Tingkap Luar (Timpa Laja) - Panel ACP + Rangka Galv. 40.40 m2 526.29 3.06 - - - - - - - - -
H PEKERJAAN ARSITEKTUR
H.1 PEKERJAAN LANTAI 01
H.1.1 PEKERJAAN DINDING dan FASADE
1 Pek. Dinding Bata Adukan 1 : 4 m2 950.40 0.96 - - - - - - - - -
2 Pek. Plesteran 1 : 4 m2 1,900.80 0.90 - - - - - - - - -
3 Pek. Kolom dan Balok Praktis m3 14.89 0.83 - - - - - - - - -
H.1.2 PEKERJAAN KUSEN, PINTU, JENDELA ALUMINIUM
1 Pas. Pintu Jendela Type PJ1 - Kusen Aluminium (termasuk penggantung) unit 5.00 1.95 - - - - - - - - -
2 Pas. Pintu Jendela Type PJ2 - Kusen Aluminium (termasuk penggantung) unit 3.00 1.58 - - - - - - - - -
3 Pas. Pintu Jendela Type PJ3 - Kusen Aluminium (termasuk penggantung) unit 1.00 0.32 - - - - - - - - -
4 Pas. Pintu Jendela Type PJ4 - Kusen Aluminium (termasuk penggantung) unit 1.00 0.39 - - - - - - - - -
5 Pas. Pintu Jendela Type PJ5 - Kusen Aluminium (termasuk penggantung) unit 1.00 0.06 - - - - - - - - -
6 Pas. Pintu Jendela Type PJ6 - Kusen Aluminium (termasuk penggantung) unit 1.00 0.03 - - - - - - - - -
7 Pas. Pintu Jendela Type PJ7 - Kusen Aluminium (termasuk penggantung) unit 1.00 0.04 - - - - - - - - -
8 Pas. Pintu Type P1 - Kusen Aluminium, Daun Pintu Engineering (termasuk
-
penggantung) unit 5.00 0.13 - - - - - - - -
9 Pas. Pintu Type P2 - Kusen Aluminium, Daun Pintu Engineering (termasuk
-
penggantung) unit 4.00 0.10 - - - - - - - -
10 Pas. Pintu Type P3 - Kusen Aluminium, Daun Pintu Engineering (termasuk
-
penggantung) unit 2.00 0.03 - - - - - - - -
11 Pas. Pintu Type P4 - Kusen Aluminium, Daun Pintu Engineering (termasuk
-
penggantung) unit 8.00 0.10 - - - - - - - -
12 Pas. Jendela Type J1 - Kusen Aluminium (termasuk penggantung) unit 1.00 0.07 - - - - - - - - -
13 Pas. Jendela Type J2 - Kusen Aluminium (termasuk penggantung) unit 1.00 0.04 - - - - - - - - -
14 Pas. Jendela Type J3 - Kusen Aluminium (termasuk penggantung) unit 1.00 0.03 - - - - - - - - -
15 Pas. Jendela Type J4 - Kusen Aluminium (termasuk penggantung) unit 2.00 0.04 - - - - - - - - -
L PEKERJAAN LANTAI 02
L.1 PEKERJAAN DINDING
1 Pek. Dinding Bata Adukan 1 : 4 m2 875.52 0.88 - - - - - - - - -
2 Pek. Plesteran 1 : 4 m2 1,751.04 0.83 - - - - - - - - -
3 Pek. Kolom dan Balok Praktis m3 14.33 0.80 - - - - - - - - -
L.2 PEKERJAAN KUSEN, PINTU, JENDELA ALUMINIUM -
1 Pas. Pintu Jendela Type PJ8 - Kusen Aluminium (termasuk penggantung) unit 3.00 0.17 - - - - - - - - -
2 Pas. Pintu Jendela Type PJ9 - Kusen Aluminium (termasuk penggantung) unit 4.00 0.18 - - - - - - - - -
3 Pas. Pintu Type P1 - Kusen Aluminium, Daun Pintu Engineering (termasuk
-
penggantung) unit 3.00 0.08 - - - - - - - -
4 Pas. Pintu Type P1A - Kusen Aluminium, Daun Pintu Engineering (termasuk
-
penggantung) unit 2.00 0.05 - - - - - - - -
5 Pas. Pintu Type P2 - Kusen Aluminium, Daun Pintu Engineering (termasuk
-
penggantung) unit 2.00 0.05 - - - - - - - -
6 Pas. Pintu Type P3 - Kusen Aluminium, Daun Pintu Engineering (termasuk
-
penggantung) unit 1.00 0.02 - - - - - - - -
7 Pas. Pintu Type P4 - Kusen Aluminium, Daun Pintu Engineering (termasuk
-
penggantung) unit 4.00 0.05 - - - - - - - -
8 Pas. Pintu Type P5 - Kusen Aluminium, Daun Pintu Engineering (termasuk
-
penggantung) unit 4.00 0.10 - - - - - - - -
9 Pas. Jendela Type JB1 - Kusen Aluminium (termasuk penggantung) unit 18.00 3.45 - - - - - - - - -
10 Pas. Jendela Type JK1 - Kusen Aluminium (termasuk penggantung) unit 15.00 0.17 - - - - - - - - -
11 Pas. Jendela Type JK2 - Kusen Aluminium (termasuk penggantung) unit 4.00 0.05 - - - - - - - - -
M PEKERJAAN LANTAI 03
M.1 PEKERJAAN DINDING
1 Pek. Dinding Bata Adukan 1 : 4 m2 38.15 0.04 - - - - - - - - -
100 2.0 10.2 2.0 10.2